CMS Energy Corporation (CMS) Earnings Call Transcript & Summary
October 26, 2023
Earnings Call Speaker Segments
Sri Maddipati
executiveThanks, Harry. Morning, everyone, and I appreciate you being with us today. Joining me are Garrick Rochow, our President and Chief Executive Officer, along with Rejji Hayes, Executive Vice President and Chief Financial Officer; within this presentation you'll find forward-looking statements that carry risks and uncertainties. For additional detail on the risks and other factors that might cause our actual results to differ materially, please see our SEC filings. Non-GAAP measures are also part of this presentation. Reconciliations of those measures against the most directly comparable GAAP measure appear in the appendix and have been posted to our website; at this point I'll hand the call over to Garrick.
Garrick Rochow
executiveThank you, Sri, and thanks to all of you for being with us today. The thing that distinguishes us in this sector is obvious, and more than 20 years have demonstrated it: our straightforward, tidier, more efficient approach to investing. We have discussed this on numerous calls and in numerous meetings with investors, and it delivers results. A lengthy and sturdy capital runway, a top-tier capacity to remove costs from the operation, to open up room for the investments we need and to keep customer bills within reach. Add to that a supportive, first-rate regulatory backdrop, and you have our formula for superior total shareholder return. What I want to zero in on right now is one specific piece of the case for investing in us: rebuilding our infrastructure. The starting point is the $15.5 billion we plan to spend on capital projects over five years, and that spending supports an extended stretch of essential investments for our customers. With it, we can deliver the things our customers care about most: safe, reliable, affordable energy, plus industry-leading progress on the transition to clean energy. We're one of the first vertically integrated utilities that will stop using coal and go clean by 2025, and no other company in the sector matches our net zero carbon target of 2040, which lines up with what customers want, what policymakers want, and our strategic plan, leaving us well positioned for whatever comes next. Regarding our natural gas operations, we remain on schedule to achieve net zero methane emissions by 2030, and we also expect to reduce Scope 3 emissions by 20%. Only a handful of companies in this sector are doing this, and it makes our gas network both safer and more environmentally friendly. When it comes to our electric distribution network, we're reinforcing the grid to boost its reliability today, while also preparing for the resilience that electric vehicles, connected devices, and initiatives aimed at reducing climate change effects will require. Our electric distribution system is enormous, spanning much of the Lower Peninsula of Michigan, yet it is aging, and we are experiencing more frequent and severe weather, which demonstrates that the future will call for something different, since our customers depend on us for reliable service. Last month, we submitted our electric reliability roadmap to the Michigan Public Service Commission, which lays out our plan for improving reliability and getting the system ready for greater resiliency. Across the last 20 years, we have witnessed a rise in both how often storms occur and higher wind speeds, with some of the most extreme winds occurring during the last four years. The effects of climate change are plainly visible to us. So taking that into account, plus the fact that we're relying more and more on the electric distribution network, we've introduced an initiative designed to reinforce that network in the present while also preparing it for what's ahead. Working alongside EPRI, the top research organization in our industry, along with benchmarking firms and evolving technologies, we assembled a plan that's both solid and wide-ranging. Under this five-year electric reliability roadmap, we're allocating $7 billion in capital spending aimed at hardening the grid, doing more undergrounding, refreshing infrastructure, boosting capacity, and pushing automation forward. Just to offer a quick example, roughly 1,000 miles of undergrounding are part of our near-term plans. Further out, we'll be doing considerably more undergrounding so that the network can hold up when weather turns severe. Our original design standard was built for winds of 40 miles per hour. Given the wind speeds we're experiencing now, our updated standard calls for 80-mile-per-hour winds and 0.5 inch of ice loading. This plan also brings more automation into machine modeling, adds technology to pinpoint and isolate damage more accurately, reroute power, and forecast trouble spots better, which keeps more customers connected and lets us respond to outages more quickly. We've planted our flag; we've laid out the steps to boost reliability — a step change — and build an electric grid that withstands extreme weather better and serves our customers better going forward. With the commission's backing, this plan will cut how often and how long outages last while lifting us into the second quartile for reliability. When you add in what customers are putting forward as well, the end goal over time is a network in which outages never hit more than 100,000 customers, and nobody stays in the dark past 24 hours. Our expectation is that these dollars will show up in the electric rate cases we file soon, and the work happens only after the commission gives its approval... And let me be clear, we are not waiting to get started. Over the past three years, our vegetation management spending has doubled, and that lets us shorten trim cycles. In the areas where the work is finished, we've seen a gain above 60%. We've increased spending on customer investments and upgrades. We've been using and reinforcing them, and in the past two years we've installed close to 15,000 fuse devices — a record number for us — and that means fewer customers lose power whenever an interruption occurs. We've also stepped up the frequency of our maintenance inspections, which lets us spot possible failures ahead of time. Just last week, we found out that among the almost 300 companies seeking Department of Energy grants, we were one of seven awarded $100 million to sectionalize and enhance circuits in disadvantaged communities. That's wonderful news for both our company and the people we serve. To begin with, it accelerates investment that already formed part of our $7 billion electric reliability roadmap. Next, this strikes a key equilibrium among dependability, enhancements, and cost-effectiveness. And last, because these grants come as matching funds, there’s clearer visibility and more assurance around recouping the customer investments that are required. Serving people is a duty we embrace seriously — it’s what those we serve are owed, and it’s the reason we get up each morning to get it done. That’s the thinking behind how we built our electric reliability roadmap. Turning to slide five, I’d like to briefly update everyone on where things stand with our regulatory calendar. During September, we adjusted our stance in the electric rate case to $169 million, and we kept our ask for a 10.25% ROE along with a 51.5% equity ratio. We are seeking the green light for a 10-mile undergrounding pilot, and we intend to bury more than 400 miles each year starting in 2027, which fits with our electric reliability roadmap. That represents a modest yet meaningful move toward developing a program the Michigan Public Service Commission can get behind, and one that will bring substantial gains for our customers. We additionally sought a cost recovery mechanism for electric distribution system investment so reliability can be improved. Similar to what we've done with our gas operation, this method provides greater visibility into spending and what customers gain, while increasing the likelihood that costs will be recovered. A final order is anticipated by March of next year; in addition, we just received approval from the Michigan Public Service Commission regarding the settlement in our gas rate case, which continues to deliver value for both our customers and investors. Those rates went into effect on October 1st. We plan to submit our subsequent gas rate case this December; that filing maintains an ongoing emphasis on a natural gas system that is safe, dependable, affordable, and clean, while backing the investment customers need. We've mentioned on earlier calls and during meetings with investors that we continue to see Michigan's regulatory environment as favorable, striking a solid balance among everyone involved and matching its reputation as a leading jurisdiction. Now turning to the numbers: in Q3, adjusted EPS came in at $0.61, and for the first nine months of the year it was $2.06 per share. Rejji will walk through more specifics, but even with a major storm hitting during the third quarter, we're still positioned to hit our full-year guidance range of $3.06 to $3.12 per share, and we anticipate landing near the upper end of that range. With that level of confidence, we're kicking off our 2024 full-year guidance at $3.27 to $3.33 per share. That represents 6%-8% growth from the midpoint of this year's range. And just like in 2023, we're in a strong position to land near the top of that range. One thing worth keeping in mind: on the Q4 call, we always reset guidance based on our actuals, which compounds our growth. That gives you higher-quality earnings and sets us apart from others in the sector. We're also reaffirming our long-term adjusted earnings growth target of 6%-8% per year, with ongoing confidence toward the high end, and we stay committed to dividend per share growth of 6%-8%. As in past years, during our fourth-quarter call we will share where 2024 guidance stands relative to real results, plus an updated version of the five-year capital plan. Our confidence remains firm regarding both hitting this year's targets and the longer-term picture, which creates outstanding value for every stakeholder. At this point, I'll pass things to Rejji for further specifics.
Rejji Hayes
executiveThanks, Garrick, and good morning to all of you. Like Garrick mentioned, we turned in a strong third quarter, posting adjusted earnings of $0.61 per share, powered by a number of cost-cutting efforts that have mostly absorbed the headwinds we've dealt with all year long. The latest of those came when a severe storm struck our electric service territory back in August. To give some sense of the weather we've seen during 2023, we're nearing a record amount of storm activity this year, which only reinforces the necessity of the electric system investments Garrick described. On a year-to-date basis, we've also recorded heating and cooling degree days running 11% and 24% under historical levels, respectively; even so, we don't offer excuses, and we've rolled out many countermeasures during the year to reduce these risks, leaving us well positioned to meet our financial objectives this year for the benefit of customers and investors. So with that, we're reaffirming our guidance for the year, and year to date we remain on track with adjusted EPS of $2.06 per share, thanks to our progress on the countermeasures mentioned above, which I'll go into shortly. In the waterfall chart on slide 7, just to clarify, every variance analysis here is calculated against the comparable periods in 2022. The actuals are expressed on a year-to-date basis, while the prospective period covers the final three months of the year. Beginning with actuals on weather, the unfavorable weather we flagged earlier in 2023 has produced $0.49 per share of negative variance. Rate relief, net of investment-related expenses, has generated $0.20 per share of positive variance, thanks to last year's constructive electric and gas rate case settlement. Looking at cost, our financial results through the third quarter have taken a significant hit from higher operating and maintenance, or O&M, expenses, amounting to $0.21 per share of negative variance, stemming from greater service restoration expenses tied to storms. Still, it's worth pointing out that our operational O&M expenses, excluding service restoration expense, are down by approximately 10% compared with the third quarter of 2022, underscoring the substantial cost performance we've achieved throughout the business. Along those lines, and as mentioned earlier, we put numerous cost reduction initiatives in place early this year, including cutting back on consultants and contractors, restricting hiring, speeding up longer-term IT projects, and removing other discretionary spending. We've also added to these efforts a voluntary separation program, or VSP, that trimmed our salaried workforce by about 10%. Even more importantly, as we apply the CE Way, our lean operating system, we'll keep removing waste and boosting productivity going forward. Wrapping up the first nine months of the year, you'll see the $0.27 per share of positive variance called out in the catch-all bucket at the center of the chart. Throughout the year, we've watched that bar climb, thanks to ongoing wins in capturing cost savings via financing efficiencies, liability management, solid tax planning, and beneficial non-weather sales in our electric business over the summer. Looking toward Q4, we always assume normal weather, which we anticipate will be financially neutral compared with the fourth quarter of 2022. We also expect rate relief's financial effect, net of investment-related costs, to be comparable, since gains from our recent gas rate case settlement and our 2022 electric rate case settlement are mostly canceled out by the lack of tax benefits tied to an earlier gas rate case settlement. On costs, as we mentioned on our Q2 call, we foresee reduced overall O&M expense at the utility, fueled by the continuing advantages of those cost reduction initiatives, amounting to $0.17 per share of positive variance; note too that the Q4 2022 comparison for this bucket is quite soft, because that period carried above-average O&M expenses. Wrapping up the glide path for the rest of the year, you'll see in the second-to-last catch-all bar on the right that we expect $0.23-$0.29 per share of positive variance. As previously discussed, the main drivers there are the lack of significant discretionary actions taken in Q4 2022 tied to last year's electric rate case settlement, plus the filing of our voluntary refund mechanism, together totaling $0.12 per share. The other notable items we expect in this bucket come from NorthStar, our non-utility business, hitting its full-year guidance, and favorable non-weather sales at the utility, which have performed well across the last two quarters. Overall, we're confident in our capacity to hit our EPS guidance for the year, and as always, we won't take any of this positive momentum for granted, and we'll enter these final two months with our customary paranoia, keeping our cost discipline and flexing further opportunities as necessary, to deliver the consistent financial results you've come to expect. Turning to the balance sheet. On slide 8, we show our credit ratings recently reaffirmed by S&P in August. As you're aware, we still aim for mid-teens FFO to debt on a consolidated basis across our planning period, to safeguard our strong investment-grade credit ratings. Our financing approach and robust balance sheet also serve us well, considering the market volatility seen lately. At the utility, our yearly rate case cadence and forward-looking test years let us build higher interest rates into our filings and recoup the related costs with minimal lag. At the parent, where funding costs can't be recovered, we face limited refinancing risk near term, with $250 million due in 2024 and 2025, and $300 million maturing in 2026. During our second quarter call, we mentioned that the 2024 maturity was already taken care of ahead of time using money raised from the convertible debt issuance in May. Also worth pointing out, all of the debt at the parent company is fixed, 100% of it, and more than 40% is hybrid in nature, so it gets equity credit from the rating agencies. Beyond solid liability management, we've kept planning in a conservative way, and even though debt funding costs have risen in today's environment, they're still in line with the assumptions built into our long-term financial plan. As ever, our focus stays on keeping a strong financial position, which, together with a supportive regulatory construct and predictable operating cash flow generation, backs our solid investment-grade ratings for the benefit of our customers and investors. Turning to the financing plan, slide 9 gives more detail on the remainder of our planned funding needs in 2023; in short, I'm happy to say that our financing plan for the year is mostly done. In fact, at the utility, every one of our planned First Mortgage Bond issuances for the year is complete, at a weighted average coupon of about 4.8%, which sits below our plan estimate. The sole opco financing left is a securitization funding to handle the recovery of the undepreciated rate base at our Karn Coal Facilities, which were recently retired. When it comes to the parent company, because of the timing of the convertible bond issuance I mentioned earlier, we've managed to push back the settlement of the equity forwards priced last year; so the roughly $440 million of forward equity contracts will be settled in the fourth quarter. Like I've said previously, our approach to our financing plan mirrors how we run the business. We plan conservatively and take advantage of opportunities as they come up. This approach has proven itself time and again, and has let us deliver on our operational and financial objectives, no matter the circumstances, to the benefit of customers and investors; with that, I'll turn it back to Garrick for his closing remarks before the Q&A session.
Garrick Rochow
executiveThanks, Rejji. Every single year you’ll hear the same thing from us: we get it done. Over 20 years, we’ve shown a steady ability to produce top-tier outcomes no matter the circumstances, for every group with a stake, and 2024 won’t break that pattern. With that said, Harry, go ahead and start the Q&A.
Jeremy Tonet
analystGood morning!
Garrick Rochow
executiveHey, Jeremy, how are you?
Rejji Hayes
executiveMorning.
Jeremy Tonet
analystFine, fine. Appreciate it. If I may, I'd like to begin with the electric rate case. Yeah, thanks for the details you gave, but I'm curious whether we might explore a bit further how things have been shaping up lately in that proceeding. Can you take us through what really separates the staff's recommendation from what you filed? What sort of items ought we to watch for? To put it more precisely, can a settlement happen while tracking mechanisms remain in dispute, and would a completely litigated proceeding be better here, so that no gray areas remain?
Garrick Rochow
executiveExcellent, excellent question, Jeremy, and I'm feeling positive. Our electric rate case progress leaves me feeling positive. To give you a sense of where things stand on that, in rebuttal we returned with $169 million, and as I mentioned during my prepared remarks, a 10.25% ROE and 51.5% equity ratio; and that simply captures the ways the business differs from the moment we assembled the case to the present point in the forward-looking test year. Staff sits at $88 million, so the distance between what we requested and where staff stands is fairly narrow, which, again, strikes me as quite constructive. So we're genuinely starting from a constructive place in this discussion. A large portion of that gap gets accounted for by simply the cost of capital, ROE, and equity ratio. That represents a significant share of the variance. There are several others, which I'd describe as cats and dogs, significant cats and dogs all the same, yet items that benefit us and help our customers. So that's the main distinction. Now, let's speak briefly regarding settlement within the settlement context. I've definitely participated in many of these calls where I'm receptive to settlement, and should settlement emerge, that's wonderful, and we're definitely open to it; but as you noted, a crucial mechanism exists within it, plus there's undergrounding. Those represent two essential items we must see emerge from this proceeding. An investment recovery mechanism to provide some certainty around our distribution, electric distribution investments, and this underground pilot. Getting this launched matters, and our customers stand to gain real benefits. And so, those prove tougher to secure through settlement, to be completely candid. Usually they amount to a black box once you proceed through settlement; and so, we're ready to travel the entire distance, and I'll be candid with everyone on this call, in all likelihood we will travel the entire distance, and I'm confident we can achieve a truly constructive result, proceeding to a full order.
Jeremy Tonet
analystUnderstood. That's quite useful. Maybe shifting topics a little — can you take us through what you anticipate over the longer term for DIG, especially when it comes to recontracting? Could you address the longer-term potential for that business, and also for growth in non-regulated renewables going forward, given how the landscape is shifting?
Garrick Rochow
executiveSure. When you look at the bigger picture, our growth outside the utility remains modest. The utility space is still where most of our business sits, so the split is roughly 95 to 5. As we said in the prepared remarks, we anticipate those operations landing inside the guidance range, which is a positive; it remains contracted renewables, and to borrow Rejji's phrasing, singles and doubles. We aren't swinging for the fences, so it's deliberate, contracted renewables carrying a utility-like return, with long-term contracts and no terminal value assumed. Very conservative, nearly utility-like. Then you have Dearborn Industrial Generation, or DIG, where we keep seeing upward pressure on both energy and capacity prices. Through 2025 we're fully contracted on energy and capacity, so 2026, 2027, and beyond are what we're filling in. Our planning is conservative, yet those bilaterals and the contracts we're signing are clearly beating expectations. That said, don't take it as a sugar high. You've heard me talk about no sugar highs before, so expect 6%-8% growth. This expectation sits toward the upper end of that growth. So we'll keep reinvesting as necessary rather than chasing a sugar high; hopefully that helps as we look at NorthStar.
Jeremy Tonet
analystAlright, that makes sense. No sugar highs, though it definitely helps that we're near the top of that range. So, I appreciate the color. That's all from me. Thanks.
Julien Dumoulin-Smith
analystHey, good morning, everyone. How are you all doing?
Garrick Rochow
executiveHey, Julien.
Julien Dumoulin-Smith
analystMorning, Julien.
Garrick Rochow
executiveCongratulations on the announcement there-
Julien Dumoulin-Smith
analystHey-
Garrick Rochow
executiveThe good work of your team.
Julien Dumoulin-Smith
analystHey, thanks a lot for that. So, look, I just want to pick up on — speaking of the solid work — the distribution plan, correct? That $7 billion figure you all mentioned. Could you go into more detail on whether you see that as truly incremental relative to the plan you had before? It sounds like it's likely a net increase of $1 billion across five years. Can you address whether that's incremental, or — as you put it, sugar highs — is it going to essentially offset capital in other areas, so to speak, to even things out? I'm just wondering how you view that, how it fits into the bigger plan, as you update it in a more holistic way.
Garrick Rochow
executiveThis plan has me genuinely enthusiastic. As you know, we've discussed it, we've witnessed the storms this year, and certainly there's a chance for us to enhance reliability right now, and then get ready for an aging system — a system experiencing stronger winds and more extreme weather — and get ready for what's ahead. So the team has truly done a great job assembling a solid plan. Now, when I look at the five-year horizon, it's not just an incremental $1 billion; it's an incremental $3 billion, correct? What's currently in the plan is $4 billion within our five-year plan; now, I want to be very careful and very clear on this, so when we reach the Q4 call, we're going to grow our capital. You should expect that we're going to grow our capital. You should expect, given these needs on the distribution system, that it's going to be weighted or there's going to be more growth on the electric distribution system. So that $4 billion figure ought to grow, and that's what I would foresee and expect. That said, I wouldn't simply do the easy math of taking $15.5 billion and adding, you know, $3 billion to it. That would give you an incorrect answer, an incorrect number. It matters that we secure commission support, and as we move through the steps, we'll obtain that in the electric rate case filing, and we'll incorporate that into the capital plan over time; but it should provide you a sense of how strong our five-year plan is. It's robust, there are abundant opportunities out there, and that stretches even past 10 years into a really attractive, lengthy capital runway. So, does that help, Julien?
Julien Dumoulin-Smith
analystOh, for sure. I appreciate you providing that bit of background; actually, on the subject of background, you know, capacity markets in general have drawn quite a bit of focus recently, and definitely a few of the inflation-related forces affecting them. Could you touch a little on where DIG stands, both, you know, how your contracting position looks across the long term, and even more significantly, how you're thinking about your commercial approach here, when it comes to pricing, given how high it appears to be climbing in certain of these markets? So I'm just wondering what you folks are observing and where the opportunity lies and how that aligns with the plan.
Garrick Rochow
executiveYeah, and much like what I said earlier on this topic, at Dearborn Industrial Generation, we follow a highly cautious, utility-style method; and as you're aware, over the years, we've simply layered in agreements for energy and capacity, bilateral contracts, to ensure we steer clear of risk and market volatility; but we definitely notice some upward pressure on both energy and capacity prices, as you pointed out. And so a great deal of the energy and capacity is already under contract, already secured through 2025, but we're closing the holes for 2026, 2027, and the years beyond. We plan in a conservative manner, and those contracts are, I'd say, surpassing what we expected or surpassing our plan, which is excellent. And so we'll keep running just the way we always have, in a truly cautious fashion and with a cautious plan, but you can tell we're building out the future at this moment and feel positive about the growth possibilities at DIG.
Julien Dumoulin-Smith
analystGreat. Perfect. And real quick, if that's okay, what's happening with the solar projects — where do things sit on the timeline for getting those into rates? Sorry, I just want that clarified. I figured I'd squeeze that in as my final quick question.
Garrick Rochow
executiveSure, we're feeling positive regarding our renewable construction. And, as you're aware, we removed certain renewable build items in this electric rate case. But honestly, having spent 25 years in this industry, with much of my career in engineering operations, projects and contracts shift from one year to another. That isn't significant, not a major concern. A large portion of what we're building this year involves wind; at our Heartland Wind Farm, we'll reach COD by the end of the year. We're adding another 201 megawatts of wind capacity. So quite a bit of renewable construction is in progress across these years; the projects mentioned in the electric rate case included some that got tangled up early on in certain auction solar, complaint-related matters; we've discussed that, and it's been thoroughly worked over within this industry. I'm confident about the projects currently in mid-development. We have visibility on panels; we have solid siting components, so that will unfold as part of our IRP build. Another point is, these construction projects aren't disappearing. Keep in mind they belong to the IRP, so they will be built; it's simply about timing, and that timing is getting fine-tuned right now. I believe at least one of them will proceed this year regardless, and we'll see construction activity there. Keep in mind, since they're approved within the IRP, they receive AFUDC throughout, meaning there's no effect on earnings. Does that make sense?
Julien Dumoulin-Smith
analystAbsolutely. That's great. Best of luck, everyone. Thanks a lot. Talk to you before long.
Garrick Rochow
executiveYes, appreciate it, Julien.
Shahriar Pourreza
analystHey, Shar. Hey, guys. Good morning.
Garrick Rochow
executiveGood morning.
Rejji Hayes
executiveMorning.
Shahriar Pourreza
analystMorning. Garrick, when we look back at what you previously told us about $350 million of equity beginning in 2025, would this larger CapEx plan push your equity requirements up by a similar amount?
Rejji Hayes
executiveShar, it's Rejji here. Yes, so we remain at a fairly early point—
Shahriar Pourreza
analystHey there, Rejji.
Rejji Hayes
executive...regarding the expansion work. My apologies — Char? Char, Rejji here.
Shahriar Pourreza
analystYes, I'm present.
Rejji Hayes
executiveAssuming you're able to hear me. Alright, so we're at the beginning phases of implementing our five-year plan. Therefore, we're still fine-tuning, you know, the location and what the financing requirements are going to be. Like I've mentioned previously, you know, the projection that's included in our present five-year plan, where we've stated as much as $350 million annually in equity beginning in 2025, I don't anticipate that figure changing in any significant way. Now, should the CapEx plan grow, once again, we constantly readjust. There might be a minor increase, however, you know, we need to examine all of the various factors, the capital investments, the cash flow generation. When everything's said and done, I don't expect we'll have any reason to pursue a block equity transaction. Even before the figures come in, my sense is we can still work out what the equity looks like in those later years. That said, those computations are still at an early stage.
Shahriar Pourreza
analystOkay, that's great. Then, looking at it from a stakeholder angle, where does the MPSC stand right now with its storm-related investigations? And what spectrum of results are you all expecting? I mean, comments have been submitted, but the penalty-versus-reward structure appears tilted toward the negative.
Garrick Rochow
executiveWell, there are two components here, and I wouldn't characterize it negatively. Every discussion we have with the staff and the commissioners remains productive and on... Honestly, we're both pointed at the same objective. We're seeking better reliability, a longer-horizon approach to resiliency, and that shared alignment makes for productive dialogue; but your question, Char, touches on two components. First, there's the audit currently in progress. It kicked off in September. The firm performing it is Liberty Consulting Group. They've worked alongside other utilities, a highly capable outfit. At present they're gathering data, and that effort is moving along well. We're anticipating an interim report around the end of the year, followed by a complete report probably in the September-ish window. That's roughly a year, then the report. But let me be completely open and candid with you, I want reliability to get better in the state. I want resiliency to get better in the state for our customers. So if they turn up findings about how our work can be done better, my gosh, I'll simply say yes to them. Like, we ought to incorporate that into the upcoming electric rate case. We ought to do that since we want it better for our customers. And so it doesn't trouble me in the least. I think it's a positive that an outside party is examining and examining how we can improve; it's only going to strengthen our reliability roadmap. And separately, on this, performance-based rates, or PBR, the work group is in progress; it began in the first, second quarter window, the April-ish period, I believe. And so that discussion is in progress. A straw proposal was released; we've submitted comments through that process; we're continuing to take part in work groups. Ultimately, I think you're going to get a solid balance of incentives, disincentives from an electric reliability standpoint. But the crucial element for us is ensuring there's a solid line of sight into capital and the capital recovery, and there's certainty. That's why we're so concentrated on this investment recovery mechanism. We also believe the same thing is necessary for storm and some of the O&M expense that arises in the year. Provided we can navigate all of that and reach that point, you know, I feel good. I feel good, this will produce good outcomes for our customers.
Shahriar Pourreza
analystUnderstood. That's great. Thank you, Garrick. I appreciate that. Thank you, Rejji.
Andrew Weisel
analystHello, good morning, everyone.
Garrick Rochow
executiveHello, Andrew.
Rejji Hayes
executiveGood morning.
Andrew Weisel
analystThe first thing I want to ask about is... The first thing I want to ask about is the supply chain. Solar has clearly gotten a lot of attention — I believe you touched on that just a moment ago — but what about grid-level equipment availability, things such as transformers or switchgear? And should shortages materialize, could that risk slowing the spending pace you've planned?
Garrick Rochow
executiveWell, to start, I appreciate the analysis you put together. You wrote a nice piece on it. That was roughly a week back, or two weeks back; so solid work on what's happening in the industry. And so, supply chain is something we're highly, highly focused on. I'll hand it to Rejji here shortly. That area falls under his responsibility. To secure that line of sight, they've done plenty of good work. And so, when I consider the projects we have underway, especially the ones in mid-development, the team has done a much better job making sure panels, transformers, and similar items are available, so we can carry out that build. Now lead times are longer, without question. And so you have to be prepared, and you have to plan for that, but the team has simply done a phenomenal job. But Rejji, your team is doing great work. Maybe add to it.
Rejji Hayes
executiveYes, thank you, Garrick, and I appreciate the question, Andrew. So what Garrick said is exactly correct. Over roughly the past 18 months, we've truly been tackling supply chain difficulties head-on. And to genuinely guarantee we have adequate supply — not only for solar, but honestly throughout the entire business — we've concentrated heavily on broadening where our vendors come from. So that's been a really deliberate push, once again, spanning the last 12 to 18 months. We've additionally pursued what we'd call value engineering and examined other options, especially when it comes to transformers, that might work with our electric grid. So in the past we relied on a grain-oriented steel standard; these days we use amorphous core and are bringing that into our system. We've also had a lot of success refurbishing transformers that were damaged, relying on various third parties to assist us with that work. And so every one of those countermeasures has truly gotten us to an adequate supply level for our most heavily used transformers; now, there are still supply chain problems involving many kinds of materials, and we're devoting considerable time to hypercare, yet for those highest velocity materials, we believe we're in really good shape right now. So I truly appreciate the question.
Garrick Rochow
executiveOne thing I want to mention — Rejji's skill is remarkable. He's an excellent CFO, and hearing him discuss amorphous core is genuinely impressive.
Andrew Weisel
analystOne more item for the group: could you share any fresh developments regarding Michigan's legislative situation? What I mean is that the Democrats now hold complete power. So is anyone discussing possible revisions, whether a major overhaul of the 2016 statute or, perhaps more probably, gradual, modest backing for clean energy? Are you picking up on any possibilities there?
Garrick Rochow
executiveLet me begin with the broader view. During the Governor's initial term, she introduced her healthy climate plan, and it was a solid plan. We back that plan — quite practical and even-handed regarding clean energy, dependable supply, and cost. Then the Governor spoke in August, saying that now, in her second term, she wants part of it turned into legislation. That is presently before the Senate. It began in committee, so a number of bills got assembled around it. Naturally, in committee there is debate, and we are deeply involved in that debate. It has now advanced to the entire Senate for review. It still has not reached the House; therefore significant effort is underway to shape what it will look like. Yet let me once more step back and consider the wider view. Just as in 2008, just as in 2016, this legislature, along with the Public Service Commission, keeps offering a productive direction for what lies ahead; and we perceive something productive, you know, coming from these bills, should they even proceed, should they even reach consensus, we perceive a route toward productive regulation ahead and productive policy ahead. So that, that is where things currently sit, Andrew.
Andrew Weisel
analystAll right, we'll keep watching for that. Thanks a lot.
Garrick Rochow
executiveYeah, thanks.
Garrick Rochow
executiveGood morning, Durgesh.
Durgesh Chopra
analystHey, everyone. Garrick, good morning to you. I appreciate you fielding my question. I had several things I was going to ask, but you've covered them already. Perhaps just regarding the O&M savings — clearly, you've accomplished a tremendous amount in offsetting weather and storms, and that figure is substantial, roughly $0.60-$0.70 on a year-to-date basis, which represents the combined effect of weather and storms. Is there a method by which you could put a number on, for us, what portion of these O&M savings you're drawing upon — the ones you're using to counteract weather and storms during this year — how much could be extended into 2024 and later years? What I'm trying to determine is what amount of these savings can be maintained, or whether they're genuinely non-recurring by nature?
Rejji Hayes
executiveYes, Durgesh, I'm Rejji. I'm grateful for the question, and I'm grateful as well for the kind words. We take real pride in what's been achieved across the initial three quarters of this year, counterbalancing the headwinds encountered on the weather front — encompassing both milder conditions and storm events — and the entire organization has truly come together for this effort. Naturally, regarding cost reductions, we make no distinction between operational and non-operational categories, and our approach has been fairly broad. Addressing the core of what you're asking, I believe putting a precise figure on it is hard — specifically, how much of the savings can be maintained. Still, my sense is that a reasonable share will persist, since, considering the separation plan I referenced earlier, our salaried workforce was cut by about 10%; we're not anticipating that we'll refill those positions within the coming year or two, or even across the next several years. Consequently, we'll realize ongoing savings from that action, and that represents a meaningful share. Regarding some of the larger additional opportunities — for instance, in Q2, the tender financing — clearly, that's a one-time item, so we wouldn't expect it to continue. Yet there are further opportunities we've acted on; we've maintained strong discipline in streamlining our contractor base along with certain consultants we engage. Once more, we'd like to believe we can keep that going; and as I stated during my prepared remarks, we sped up certain longer-term IT projects, and we believe productivity gains from those efforts will be realized for the foreseeable future. So my assessment is that assigning a particular percentage is hard, though I'd say a reasonable share ought to be maintained as we move into the following year and should deliver some tailwinds — not only concerning our guidance for next year, but also on affordability, since we always anticipate passing those savings along to customers. And the final point I'd mention concerns the financing aspect: we've achieved a number of efficiencies through the convert, whereby we brought forward certain costs we would have incurred, or certain financing requirements we had for 2024. That will yield a continuing level of savings. Regarding the financings for the operating company, we completed those quite efficiently, with a weighted average coupon of 4.8%, which came in under plan, so we expect ongoing savings from that. So what I'd say is that on both the operational and non-operational sides, there are some one-time items and then some that will persist, but at this point I'm unable to provide a specific percentage.
Durgesh Chopra
analystThat's really useful context, Rejji. Thank you for that. Then perhaps just a fast point of clarity regarding the financing plan. I don't want to get ahead of things, but you said an update would come on the Q4 call; however, for 2024, the coming year, no equity still; is that still correct?
Rejji Hayes
executivePrecisely.
Durgesh Chopra
analystThank you.
Rejji Hayes
executiveThank you.
Rejji Hayes
executiveHi, David — Rejji here, and thanks for the question.
David Arcaro
analystYou brought this up with the earlier question, but let me address it directly: when you think about 2024, how confident are you? You've already pulled a lot of cost levers this year. If new challenges emerge in 2024, do you still think you have the same amount of flexibility on costs and across the wider expense base as you work toward hitting your guidance next year?
Rejji Hayes
executiveYes, David, I appreciate that; it's Rejji speaking. When you look at the glide path required to reach the guidance we introduced today, we're guiding $3.06-$3.12 for 2023, and then $3.27-$3.33 for 2024. That works out to about 20 cents of improvement year over year, midpoint to midpoint, roughly speaking. So from my perspective, obviously, given the weather we saw this year, we're dealing with approximately 30 cents of weather-related damage — about $0.30 of weather hurt — and that only captures the mild conditions during the first three quarters, and we expect to be basically flat in the fourth quarter. So you have to reason that, because we plan for normal weather, we shouldn't anticipate that 30 cents of weather affecting us next year. Naturally, the reality is there have been some one-time items, as I mentioned in my earlier remarks, on the tender financing side, and so we'd need to assume those won't recur either. When you offset those two against each other, you get to about $0.10 of improvement. Then, given the rate case we have pending right now, we obtained a very favorable gas rate case settlement in the third quarter of this year that the commission approved. We still have an electric rate case pending, and then we'll file another gas rate case this December. Assuming constructive outcomes from those proceedings, that delivers roughly, based on preliminary estimates, perhaps $0.10-$0.15 net of investment-related costs in improvement. And then, again, many of the cost savings I listed earlier should largely hold, so we'll pick up further improvement from that. So you can get to a glide path of that $0.20 per share, again, for that year-over-year growth, fairly easily when you look at those components. That said, there are always positives and negatives, and again, certain items will roll off as we enter 2024. What I think is very much up for debate is whether we'll see the same magnitude of service restoration expense next year, because as I said in my prepared remarks, we've clearly had a record amount of storm activity. So when we look at how that path develops, it's really a combination of relief on rates, offset by costs tied to investments and the proceedings still ahead of us. The impact from weather is going to disappear, and a number of those nonrecurring items are going to go away as well. On top of that, we expect that the money we save from a lot of our cost-reduction initiatives is going to give us a net tailwind next year. Around $0.30 of the hit came from weather. Because of all that together, we have confidence that we can reach the 2024 guidance. Does that address what you were asking?
David Arcaro
analystYeah, that's a big help. I appreciate all the detail and the strong points you made. Let me see. I also wanted to ask — could you share the most recent status on the Voluntary Green Pricing Program, what kind of upside that program might offer, and your expectations for how customer additions might move going forward?
Garrick Rochow
executiveYeah, things remain really favorable. Keep in mind, we're working through what I'd describe as a tranche of 1,000 megawatts that's being contracted out. Our customers are showing substantial demand for those offerings. We've already contracted well beyond 400 MW of load, and that number keeps rising. That in turn is fueling additional renewable development; in fact, during the quarter we announced plans to build a solar facility as well as the Karn-Weadock coal facility, which will address part of that need — a portion of it. So once more, we're seeing very robust and sustained strong interest from our commercial and industrial customers.
David Arcaro
analystAll right, excellent. Many thanks.
Nick Campanella
analystHi, appreciate you fielding my question, everybody. Only one from me. Plenty of them already got covered, but I suppose when it comes to the resiliency plan, you know, safety scores begin to be shown as improving across 2025 and 2026. Still, I was attempting to go deeper into what operational risk reduction looks like for 2024, given what was learned from the storm cycle of last year, and I'd imagine some of this technology is probably being deployed right now. So how ought we think about storm risk in 2024 compared with this year? Thanks.
Garrick Rochow
executiveExcellent question, and I'm happy you're digging into it. That plan is enjoyable to examine. At this moment — and this is the reason I mentioned it during some of my prepared remarks — we aren't waiting; and the commission has backed additional tree removal, or vegetation management. Over the past three years, that has more than doubled what we spend. So that work is active and underway. Nearly 300 crews are on our system — contracted crews — carrying out that work today, and they have been throughout the year. Well, in those places where the work gets done, we observe improvement greater than 60% well underway. On top of that, fusing. ... We've installed 15,000 fuses over the past two years, and we're planning to add even more in the coming year. Think about what happens when there's an outage on the grid — it works like the fuse box in your house. Rather than the entire house losing power, you might just lose the bathroom or the kitchen. We're applying that same concept to the electric grid, so that when an interruption occurs, fewer customers get affected. Thanks to rolling out these fuses, we're already seeing better SAIDI performance. In all our history, we've never fused at this scale. And we keep expanding automation. I saw an excellent example recently. On our high-voltage distribution network, there's a component known as a Victor Insulator. These insulators are known for failing — that's a well-documented issue — but when they were installed across the grid during the 1970s, we lacked strong oversight over their placement. So identifying one requires spotting the tiny V marking on its top. In the past, that meant sending up a bucket truck just to get a look. That approach wastes a lot of time and effort. Take drones, for instance — being able to automatically detect that tiny V from an image lets us locate those Victor Insulators and make smart, targeted decisions about which ones to swap out. That's another piece of technology I'm genuinely enthusiastic about deploying. Those are only a handful of illustrations; there are literally hundreds more. We are not happy with where our reliability stands. We intend to push it even higher. We've seen the improvements over 2022. Even with the storms, we're still progressing at a strong pace this year. And our plan is to keep — forgive me for putting it this way — we're putting our foot down harder on the accelerator.
Nick Campanella
analystAll right. I appreciate it. Thank you.
Garrick Rochow
executiveYeah.
Travis Miller
analystGood morning, everyone. Thank you.
Garrick Rochow
executiveTravis.
Rejji Hayes
executiveHello, Travis.
Travis Miller
analystHey there. Regarding the distribution strategy, I was curious whether you might elaborate a bit on when you'd anticipate the regulatory assessment for that to occur?
Garrick Rochow
executiveSure, that's going to fall within those; those are going to be integrated into electric rate case submissions. Consequently, the strategy on its own will receive some feedback, though it isn't a filing that gets contested. What's going to occur is those. That is going to be the. Essentially, it's a roadmap. It genuinely represents a vision for our direction and the key components that need to align for it. Thus, those are incorporated into electric rate case submissions, and afterward, backed by the commission, they may gain approval. I'd simply point out one item, a single announcement that came up in recent weeks, actually, a Department of Energy grant amounting to $100 million. That genuinely accelerates a portion of this crucial effort. So once more, regarding the earlier inquiry, we aren't sitting idle. We recognize certain chances to deploy this right away, yet once more, the regulatory procedure happens via the rate cases.
Travis Miller
analystAll right. That implies you would likely keep up that yearly pattern of electric rate filings and, and possibly gas rate filings as well, but particularly the electric ones. Is that about right?
Garrick Rochow
executiveYeah, an annual rate case-type filing is what you should anticipate, and I'd also add that in these, especially given where interest rates stand right now, 10-month rate cases and forward-looking test years and the sort of yearly approach, truly removes a portion of that burden that comes along with elevated interest rates, and so that strategy carries plenty of advantages.
Travis Miller
analystAll right. And then very briefly, would the Investment Recovery Mechanism affect that schedule in any way, or is it still, even if you receive it, still roughly a 1-year sort of rate?
Garrick Rochow
executiveIt will remain a 1-year method. The IRM isn't large enough right now. It's a beginning point, and as time goes on, we'd aim to build on that; however, the initial move is to put it into effect, which is included in this present electric rate case.
Travis Miller
analystAlright, that covers everything I wanted to ask. Appreciate it.
Garrick Rochow
executiveSounds good.
Rejji Hayes
executiveThank you, Travis.
Garrick Rochow
executiveHi, Sophie.
Sophie Karp
analystHello, and good morning. I appreciate you taking my questions. Many of them have already been addressed, but I'd like to ask about the cost of capital as well as the ROEs, correct? There's somewhat of a push-pull happening in Michigan, just like in numerous other states at the moment. I'm simply kind of wondering how the discussions regarding the necessity for elevated ROEs are being received by the stakeholders over at the commission. Also, I'm not certain that a handful of folks are grasping how quickly the rates have gone up, and that truly calls for some sort of adjustment to the, you know, the way the ROEs were perceived, I suppose, during the past few years. So any insight on that would be useful.
Rejji Hayes
executiveYes, Sophie, this is Rejji. I appreciate the question. Let me begin by stating that we are definitely making the argument and have been making it for really the past few years concerning the necessity of having elevated ROEs, simply because of the shifting cost of capital landscape. I believe treasuries are likely around a couple hundred basis points above where they stood back when we initially had 9.9% set as the prevailing ROE throughout our-
Sophie Karp
analystMm-hmm
Rejji Hayes
executive... the electric and gas operations, and DTE is right there with us at parity. We are definitely building that argument, and it gets more compelling by the day given how monetary policy keeps leaning hawkish. To offer some reassurance, we take a lot of comfort in knowing there's a solid floor at the 9.9% ROE that's currently in effect, yet as Garrick pointed out, we'll keep pushing the position that it ought to be greater. In the electric case still pending, our ask is 10.25%. Once more, the evidence backs up that stance, in my view. Beyond every method available for figuring the cost of equity, we attempt to show that the reality is we're fighting for capital with utilities in other states. Considering how much capital we have—not only within the present five-year plan, but also in what we expect will be the following and later five-year plans—we genuinely believe we must stay as competitive as we can across the board, since as investors you're free to put your money somewhere else. That's why we've been arguing our position forcefully and plainly. I believe DTE has done the same, and with any luck, we'll begin to notice, you know, a shift in the wind when it comes to ROEs.
Sophie Karp
analystUnderstood. Understood. Thanks. And perhaps, if there's room for one more. You've had that undergrounding pilot running, and I'm just wondering, what lessons have come out of it thus far, from this trial initiative, perhaps regarding expense or the method that has to be adopted? Like, I'm curious whether you could offer any detail on how things are progressing.
Garrick Rochow
executiveWell, one clarification first. What's been put forward in the electric case is a 10 mi pilot, and like I mentioned, modest yet meaningful-
Sophie Karp
analystMm-hmm
Garrick Rochow
executive... giving the Public Service Commission a chance to assess it. We already handle undergrounding work; when it comes to subdivisions and similar projects, that's something we do, plus we've run a few pilot efforts. Based on what we've observed, our approach is highly cost-efficient. Thanks to the gas side of our operations, directional drilling beneath the surface ranks among our core strengths. We definitely possess both the machinery and the know-how for it, which means from an undergrounding standpoint we can stay quite competitive. Our strategy avoids crowded zones, avoids three-phase builds, so what we're discussing is single-phase, largely rural work, in places with suitable soil, and across a great deal of Michigan we find those conditions, which is beneficial on the cost side. So we've communicated in past periods—or rather, to be more timely, roughly $350,000 per mile is, in our view, quite attainable.
Sophie Karp
analystAll right, thank you so much.
Garrick Rochow
executiveThank you.
Anthony Crowdell
analystHey there. Everything I wanted to ask has been covered. I really appreciate it. I'm all set.
Garrick Rochow
executiveNice to hear your voice, Anthony.
Ross Fowler
analystHi there, Garrick. And Rejji, how's it going?
Garrick Rochow
executiveGood morning, Ross.
Rejji Hayes
executiveHi Ross, how's it going?
Ross Fowler
analystGood morning. Why don't we go ahead and use up the entire hour? And Garrick, feel free to include whatever number of auto comparisons you want when responding to this. But I simply wanted an update regarding the estimated bills meter installation matter, since the commission submitted that show cause a couple days back. So Rejji, I realize we discussed this somewhat when we met up in August, but an update on that would be great; and the question's second portion is: do you believe there are any kind of sideways effects on the rate case proceeding, or in your view, is the commission truly treating these as two distinct filings and issues?
Garrick Rochow
executiveI'm not sure I've got any auto comparisons for this particular one; we went through this thoroughly, and I gave what was probably a lengthy response, perhaps an overly lengthy one during the Q2 call, so I'll attempt to keep it short. But this represents merely the following stage in that process. So what I mentioned previously, once more, in brief, what I mentioned during Q2 was: keep in mind that we possessed certain 3G meters that were no longer supported. Our vendor was unable to fulfill a few of the supply chain requirements, once again viewed as a lingering effect from the pandemic, and failed to provide a few of the necessary reads out in the field, and therefore that generated a few billing problems for our customers. That's an issue, and the Public Service Commission plainly recognized that. We mentioned during our Q2 call that the matter is now resolved; we submitted the report in August, and this represents the following stage toward reaching resolution. I don't..; it's a significant stage that brings us to the ultimate conclusion of this with the commission. I don't foresee any overflow effect into the electric rate case or into any other, into any other filings.
Ross Fowler
analystOkay, thanks a lot.
Garrick Rochow
executiveSure. Thanks, Ross.
Garrick Rochow
executiveAppreciate it, Harry, and thanks for being with us on this call. We'll catch up with you at EEI. Take care of yourself and stay safe.
Operator
operatorThis concludes today's conference. We thank everyone for your participation.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete CMS Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to CMS Energy Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in CMS Energy Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.