Coeur Mining, Inc. (CDE) Earnings Call Transcript & Summary
February 18, 2021
Earnings Call Speaker Segments
Paul DePartout
executiveThanks so much, and welcome, everyone, on this morning. Glad to have you join us for Coeur Mining's call covering results from both the fourth quarter and the entire year. We put out our numbers once trading wrapped up yesterday, and you can find the press release along with the slide deck over on our site. Before we go further, a quick note that today's press release, the slides, and a portion of what we say in these remarks contain forward-looking statements, and what actually happens could end up being different. I'd encourage you to look over the cautionary language in both the press release and the presentation, plus the risk factors laid out in our 2020 10-K. With that, I'll hand things over to Mitch, Mick, and Tom.
Mitchell Krebs
executiveThank you, Paul. Good morning, everybody. The year 2020 certainly was eventful. Clearly, for all of us, the dominant story was COVID-19, and naturally, we experienced its effects too. During the first six months, the pandemic hit us hard, pushing prices down dramatically and bringing about a government-ordered halt to operations in Mexico, which dealt a blow to us at Palmarejo. Naturally, since the low point reached in April, prices have recovered substantially. In addition, Mexico gave the green light for mining activities to restart during the second quarter. Combined with robust output along with prudent oversight of costs and our balance sheet, we ended up posting a robust performance in the latter half of 2020, about which Mick and Tom will provide further details momentarily. Before anything else, I'd like to spend a moment acknowledging our team for the way they have met the challenge throughout these past 12 months. We have placed considerable demands on everybody, and every part of our company has stepped up remarkably in the face of these difficulties. I feel enormous pride in the way our culture has supported us, the quality of the individuals we have brought on board, the leadership in ESG that we have built, and the results we achieved overall throughout such an extraordinary year; so my gratitude goes out to each of you. Now, turning to Slides 3 and 4. The previous year brought numerous noteworthy developments and achievements that caused adjusted EBITDA to surge beyond 50%, reaching $263 million. Meanwhile, free cash flow rose to $49 million; to begin with, we hit our production targets across every site. Moreover, at each of our main gold operations, unit costs landed at or beneath the full-year guided ranges. Palmarejo's performance was genuinely outstanding, given how they scaled operations back up midway through the year and never slowed down afterward. Kensington and Wharf likewise enjoyed superb years, as both sites surpassed their earlier records for free cash flow. Rochester wrapped up the year in far better shape than it began, with silver output in the fourth quarter rising by close to 40%, while gold production grew by nearly 50% compared with the prior quarter; and to offer a little extra detail regarding Rochester. The major development last year involved launching the expansion and revealing the specifics of that project toward the end of the year. The revised mine plan incorporates a reserves-only 18-year mine life, an NPV of $634 million, and an expected IRR of 31%. Output levels are likewise projected to increase twofold, lifting average free cash flow above $100 million annually. Until this expansion wraps up late next year, Rochester will stay in a transitional phase as we weigh short-term results against the need to collect and implement critical insights so that Rochester succeeds over the long haul. Throughout this period, we will keep our attention on further growing Rochester's silver and gold reserves past the 58% and 65% gains achieved last year; that leads nicely into the highlights from the $50 million we devoted to exploration last year, which appear in summary form on slides 10 and 11, and which we also included in the press release published yesterday morning; that campaign represented the biggest drilling effort in our company's history, and it paid off enormously. Our gold reserves climbed more than 20%, while silver reserves rose above 40%, reaching record highs for the company. The average life of our mines has expanded considerably, from slightly more than 7 years back in 2015 to more than 12 years at present. And since we've committed over $65 million toward exploration during this year, we anticipate that figure will stretch even further. Exploration spending sits among the most appealing uses of our capital and ought to support improved returns on invested capital down the road. Beyond the reserve gains, we've made a fresh find in Southern Nevada named Seahorse, situated in the Crown district, which could grow into a major asset for us; yesterday's release covered a number of recent drill holes from Seahorse, among them one extending beyond 216 meters and averaging roughly 1 gram per ton of oxide gold. A vigorous drilling campaign is already underway at Seahorse this year. And we intend to put in about $10 million to keep this new discovery growing. Another major win from last year's exploration work came in the form of considerable resource growth at Silvertip in British Columbia. With merely about half the assays returned by year-end, total resource tons rose above 40%, and the strike length of the high-grade deposit more than tripled, surpassing 3.5 kilometers. We're planning to spend approximately $14 million on exploration at Silvertip this year, with the aim of growing the resource further and starting to convert some of that material into reserves. Staying on Silvertip for a moment; we finished 2020 confident about the resource and about our capacity to keep extending Silvertip's mine life through additional drilling. We've also pinpointed, and expect to finalize, the flow sheet for a simple 1,750 ton per day processing facility capable of reliably achieving steady recoveries and producing high-quality concentrates. The team's attention is now on refining capital costs, the mine plan and operating costs so that everything we learned from last year's PFS gets incorporated. We're likewise figuring out the best way to fit in a possible expansion and restart so as to maximize the odds of success without pulling focus from our Rochester expansion. Our aim is to close out the year with a robust, persuasive business case that supports a decision to proceed at Silvertip. Our 3-year outlook points to strong returns along with a step change in production and cash flow. If you weren't able to tune into our Investor Day in December, I'd suggest visiting our website, reviewing the materials or watching the replay to learn more about our culture, strategy and outlook. Before I hand the call to Mick, let me briefly draw attention to slides 18 and 19, which offer a solid high-level picture of our deeply rooted community relationships. We work to sustain strong ties with every one of our partner communities and other local stakeholders, aiming for shared long-term prosperity. With that, I'll pass it to Mick.
Mike Routledge
executiveThanks, Mitch. Wow, that was a fantastic quarter and a strong way to wrap up the year. Before we dive into the operational highlights, I want to take a moment to thank our team for the improvements they've achieved in health and safety performance, as well as for their ongoing dedication and commitment to reaching a higher standard. With the momentum we've built, we expect our operations to deliver another solid year in 2021. Now, turning to Slides 6 and 7, let's begin with Palmarejo. Robust results in the second half allowed us to end the year on a strong note, even though we were down for about 45 days during the second quarter. For the entire year, gold output came in higher than the top of our guidance range, and silver production matched what we had expected. On top of that, our team did a fantastic job keeping operations and finances in balance throughout the year, and as a result, unit costs for gold and for silver both landed beneath the bottom of their guidance ranges. Taken together, these impressive achievements allowed us to bring in close to $93 million in free cash flow. That made it Palmarejo's biggest year for free cash flow since 2017. As we look toward the coming year, our plan is to boost mining and throughput rates, which should help counterbalance somewhat lower grades, and we anticipate Palmarejo will deliver another strong year in 2021. Now let's move on to Rochester. Our updated stacking approach is going to deliver positive results. It makes use of inter-lift liners so that more HPGR-crushed ore can be placed on the shallower areas of the leach pad. Thanks to this strategy, output was greater in the latter half of 2020, which let us hit the bottom end of guidance for both silver and gold production. Costs per unit ended up a bit above what we had anticipated, mostly because of extra cyanide dosing and increased metallurgical outside services expenses tied to modeling the test work and the consultant support that helped us push the improvement program during the second half. Looking ahead, we remain focused on boosting performance and securing lasting gains in our results. Just before we continue, let me briefly call out two key things on Rochester's 2021 agenda. During Q2, we intend to replace the secondary crusher that's there now, which should help us get better gradation of crushed material while pushing throughput higher. That gives us a chance to fine-tune the fresh unit ahead of its move into the enlarged crusher corridor tied to POA 11. On top of that, in the back half of the year we expect to start crushing over liner material for the new Stage VI leach pad; and for both projects we have solid plans in place to soften some of the operational effects. Keep in mind, we're basically treating the inter-lift liners plus the crushing circuit we already have as a full-scale testing ground for tuning performance. That reduces the risk that we won't hit the results we expect once the expansion is up and running in the years ahead. Now let's turn to Kensington. The operation had a terrific 2020. Because the team worked hard and stayed sharply focused, we met both our production and cost goals across all twelve months, which produced a record of $60 million in free cash flow. Since Eureka and Elmira have been added to the operation's production profile, we expect Kensington to put up another solid performance in 2021. Then at Wharf, the team really delivered on their objectives for the year, meeting guidance with more than 93,000 ounces of gold produced at an average cost of roughly $809 per ounce. Even bigger than that, Wharf threw off $73 million in free cash flow, blowing past its old record by more than 25%. Going forward, we intend to move some extra tons in 2021. That should push costs up slightly, but we still see Wharf posting another excellent free cash flow year. With that, I'll hand things over to Tom. Tom?
Tom Whelan
executiveThank you, Mick. Our outstanding financial performance is the focus of Slide 5. As both Mitch and Mick pointed out, robust results from Palmarejo, Kensington, and Wharf, combined with better realized prices, drove major gains in our yearly financials. Improved margins stemming from top-line growth and disciplined cost control allowed us to produce more than $260 million in adjusted EBITDA and close to $150 million in operating cash flow. Each of those figures rose by more than 50% compared with the prior year. What these outcomes demonstrate is the strength of our portfolio, particularly in the latter half of 2020, when our assets delivered $86 million in free cash flow. That robust second half more than made up for the weaker beginning of the year, resulting in close to $50 million in free cash flow for 2020 — our best annual number since 2017. Moving forward, as shown on Slide 15, we released our 2021 guidance, which aligns with the outlook from our recent Investor Day. These guidance ranges point to yet another strong year of operating cash flow and EBITDA. I should note that we expect a comparatively softer first quarter, caused by: first, our mine plans, production profile, and the accumulation of inventories on our leach pad. Second, the timing of tax payments in Mexico, which together amount to approximately $30 million to $35 million in cash outflow. And third, annual incentive payouts throughout the company. Now to Slide 13. I'd like to stress a few important points regarding our balance sheet. We strengthened our financial flexibility in the fourth quarter by completely repaying our revolving credit facility borrowings and increasing the revolver's capacity to $300 million. Along with our substantially better cash position, this produced almost $360 million in liquidity by year-end. Regarding our leverage levels, both total debt and net debt-to-EBITDA declined consistently throughout 2020. In particular, our key leverage metric, net debt-to-EBITDA, was reduced by half compared with the prior year, finishing 2020 at 0.7x. Our goal is a net debt-to-EBITDA ratio below 2x, while keeping no less than $100 million of liquidity over the coming 2 years as we finish major construction at Rochester. Through a mix of cash on hand, operating cash flow, and debt capacity, we have confidence in our game plan, which leaves us very well positioned to finance this period of significant capital investment. I'll hand the call back to Mitch now.
Mitchell Krebs
executiveAppreciate that, Tom. On slide 14, you'll see what we've set as our main objectives for 2021. If we stick to this plan, we're confident we can produce strong outcomes across the near, mid, and longer time frames, thanks to our diversified holdings of precious metals properties in North America. So with that said, let's go ahead and take any questions you might have.
Michael Dudas
analystA few things I'd like to ask. To begin with, perhaps — perhaps Mick could say something about what we should expect for mine costs in 2021. You clearly made solid progress during the latter six months of last year. And I suppose a bit of caution is baked in there. But regarding what's driving that, I'm aware there are grade problems at certain operations. On top of that, is there something like broad cost increases, wages, or deferred expenses that weren't present in 2020 and will carry into '21? Just want to get a feel for that and how it might unfold across the year as you proceed?
Mitchell Krebs
executiveYes. I'll take that one first and then hand it to Mick. I believe, yes, a few items come to mind. To give an example, at Wharf, certain waste stripping was supposed to happen in 2020 but wasn't completed because of labor availability difficulties tied to COVID; as a result, we'll be handling a portion of that during 2021. And so I recognize that plays into Wharf's expenses this year. Mick, would you like to perhaps continue from that point and take on anything else? Maybe provide Mike with some detail regarding the cost guidance for every one of the assets?
Mike Routledge
executiveSure. Broadly speaking, where we sit on costs for 2021 comes out of the life of mine plans. So versus 2020 there are some shifts, though only minor tweaks. At Rochester we shifted a great deal of run of mine material during 2020. We'll repeat a portion of that in 2021, and beyond that there's a modest adjustment tied to the optimization program we run aimed at extracting the most from the leach pad. That means cyanide expenses will climb somewhat at Rochester as we raise the figure from roughly GBP 1.50 per tonne up to GBP 2.5 per tonne for whale on the heap leach. Those are the primary factors at Rochester. Over at Kensington, a handful of small items come into play. Honestly, it touches everything. There's a slight tweak to royalty and management fees, plus a touch of G&A. On top of that, we're driving throughput higher at Kensington too, so as to capture the fullest benefit from that operation, which means processing costs edge up somewhat. As Mitch mentioned, at Wharf we're relocating some catch-up material and doing stripping there to keep ourselves comfortably ahead; we foresee no effect on Wharf's output during 2021. We ought to be capable of moving that material according to plan. So all told, odds and ends throughout, no real worries. And clearly, we'll keep seeking to optimize those costs all through 2021; yet right now, yes, a solid spread with nothing especially major or troubling on the cost side…
Michael Dudas
analystSo for Palmarejo, that's really a case where the denominator is being driven by grade, isn't that right?
Mike Routledge
executiveYeah — so — yeah — yeah, that's precisely it. At Palmarejo, we intend to put through significantly greater tonnage. And according to the life of mine plan, there is a decline in grade at Palmarejo. And the folks on site are doing a tremendous job of boosting output rates, which more than makes up for that during 2021.
Mitchell Krebs
executiveIs that useful for you, Mike?
Michael Dudas
analystAbsolutely, that's very helpful. My next question concerns Rochester and the capital expenditure guidance ranging from $155 million to $195 million. So is the thinking essentially about the pace at which you work through certain projects you've got underway, which will drive either higher or lower outlays during this year? Is it basically pulling money from '22 into '21? Or what's the mechanism there? Or could there be additional efficiency or expense factors influencing how that figure comes through compared with the longer-term expectation for bringing Rochester online?
Mitchell Krebs
executiveRight. You've got it. Rochester — that buildout is happening now. Significant building work kicked off as planned on January 15; and the bulk of the money will be finished late next year. Tom, would you like to describe perhaps briefly how the outlays are shaped, based on what we're seeing for this year and the following one at Rochester?
Tom Whelan
executiveYeah. So, 2 things. I mean, we have — as you can imagine with a huge capital project of this kind, we're already a good way along and committed to laying out a great deal of that money. We've signed construction contracts, done the procurement, and so on and so forth. Again, you're going to see a big step-up here in the first quarter compared with the fourth quarter. And then the actual spending really begins in Q2, Q3, Q4; and the single point I'd like to flag is that this CapEx guidance is net of certain planned capital leases we plan to put in place — to help finance the overall Rochester capital spend.
Michael Dudas
analystThat's clear. Tom, could you remind me what amount you have set aside for contingencies in that overall budget?
Tom Whelan
executiveSure. $32 million.
Ryan Thompson
analystThere are a couple of items I'd like to cover. Maybe I'll start with Wharf. About the reserve and resource update your company released yesterday morning. It looks as though measured and indicated tons and ounces both went up quite a bit. Can you say more about that gain and about the sort of work needed to get that material into the mine plan?
Mitchell Krebs
executiveAbsolutely, I'll start us off, then pass it to you, Hans. After that, Mick, if you have anything to add on Wharf; we expanded the boundary there, and that allowed us to take in the material, Ryan, that you mentioned. Getting it fully into reserves will likely require permitting and community consultation, which take time, though we feel good about it. I'd say the — maybe the quickest opportunity to add some extra mine life in reserves, it's maybe — is where our infill budget is aimed at Wharf in this year, and that's easily our largest program since Wharf came under our ownership. Hans, could you talk a bit about that and about what we're doing at Wharf when it comes to exploration?
Hans Rasmussen
executiveRight. Ryan, the boundary change Mitch brought up does impact the Green Mountain pit. It appears to be a sizable figure since our M&I at Wharf was pretty limited, and since we hadn't done any drilling, there wasn't much there to convert. So roughly 230,000 ounces ended up being added because of that boundary shift. That said, we expect to spend around $4.5 million on the infill program, which we kicked off during the winter — another first for Wharf. It should wrap up in August, and this gives us a head start on the Portland Ridge flossy area. If drilling, modeling, and permitting all go favorably, we ought to begin laying back in February of next year. That's the reason we moved on it so quickly.
Ryan Thompson
analystUnderstood, that helps. And perhaps only — correct, yeah, please continue.
Mitchell Krebs
executiveRyan, I’m going to — swap out the plug regarding Wharf. Since — it’s wonderful to learn of those chances to push that mine’s lifespan even further. In 2015, we paid $99 million to acquire it. We’ve gathered $245 million in free cash flow from it. At purchase, it had a 6-year mine life. Today, it still has a 6-year mine life; and given what Mick and Hans are accomplishing in that area, there’s a possibility to stretch it out even more. Thus, it’s a fantastic component of the portfolio. My apologies, I interrupted you there. You intended to pose additional questions.
Ryan Thompson
analystYeah, yeah, that's totally fine. No, that acquisition has clearly worked out well for your team. And just to follow up on that; I believe there was some kind of satellite property you had under option, Richmond Hill, if I'm remembering the name right.
Mitchell Krebs
executiveThat's right.
Ryan Thompson
analystCould you also provide an update on that option?
Mitchell Krebs
executiveSure. We are conducting additional drilling. As I see it, that option expires during the third quarter, possibly in September.
Mike Routledge
executiveRight.
Mitchell Krebs
executiveSo once we wrap up the drilling and review how the results come out, we'll decide if we're going to proceed there. That call still hasn't been made, and it likely won't be until roughly the middle portion of the year. Richmond Hill.
Ryan Thompson
analystUnderstood. All right, and perhaps only one additional item from me, after which I'll hand things off to the remaining participants. Let's shift focus to Silvertip. Clearly, the messaging there comes across as encouraging, and it seems you folks have growing assurance regarding what you're uncovering. Could you perhaps briefly address how a possible restart might take shape regarding schedule, assuming you reach that favorable determination, along with capital, and simply how we ought to be framing that in our minds?
Mitchell Krebs
executiveYeah. Excellent inquiry; this comes up all the time around here. Since on one side, we need to guarantee that we proceed in a thoughtful, methodical manner and avoid hurrying toward an outcome that everyone desires. Conversely, we don't want to — when you consider the guidance we released during our Investor Day, 2023 and beyond appear truly strong for this organization; and we genuinely would hate for Silvertip expansion to hold that up or postpone that free cash flow profile. And so given those limitations and those — that sort of, those boundaries, that's roughly the schedule we're operating against. However, we are putting Rochester first, that's job #1. And we're putting priority on doing this properly, with high confidence, derisk, proceed with confidence and do it in a manner that will produce the result that we all want there. Does that provide you with a bit of context, Ryan?
Ryan Thompson
analystYeah, that’s helpful, and I appreciate all the additional information. Like I said, I think I’ll share it with other people asking questions, but thanks for the update, everyone.
Joseph Reagor
analystGreat job on finishing the year so strongly. Just one point I want to clear up. When it comes to Rochester, do you think the replacement of the secondary crusher will have any impact on stacking rates in Q2? Or is that included in the 38,000 tons? Has that already been accounted for in the 38,000 ton per day plan?
Mitchell Krebs
executiveMick, go ahead.
Mike Routledge
executiveRight. So the plan already accounts for that. The budget covers that replacement. Initially, that budget indicated a swap-out of roughly 30 days. At this point, we're seeing that swap-out take around 18 days, so we're somewhat ahead of schedule and keep refining it. And as mentioned, we aim to keep reducing that impact. Still, right now, that swap-out is being very carefully planned and included in the budget.
Mitchell Krebs
executiveAnd that guidance range, too.
Mike Routledge
executiveThat guidance range — precisely.
Joseph Reagor
analystAll right. Understood — that's reasonable. Since many of my remaining questions have already been covered, I suppose I'll bring up the Crown Block Seahorse discovery. The operators next door up north have reported a few intercepts with better grades. On a portion of their acreage, they're using a somewhat different drilling method. As you drill from various pads, do you anticipate possibly adopting a comparable strategy? My understanding is they're going west to east more. Drilling back into the structures. Or will you stick with something like the single-pad, multi-directional drilling style of plan?
Mitchell Krebs
executiveYeah, excellent question. There's a great deal of excitement, plenty left to figure out in that area, it's still early, yet the drilling has gone remarkably well. Hans, would you like to address that?
Hans Rasmussen
executiveYes, Joe. How much time do you have?
Joseph Reagor
analystAbsolutely, that's a reasonable question.
Hans Rasmussen
executiveWe've brought in some very experienced geologists to figure out exactly what we're dealing with at Seahorse, since it's unlike anything else encountered in this district. If you look at our neighbors up north, their geologist has a background from Bullfrog. That's where his expertise lies. Every one of the high-grade mineralized structures at the Bullfrog mine dips westward, so they drilled toward the east. And they've achieved some excellent results. They've done a fantastic job with oxide at depth, which matches what we're observing. And as you pointed out correctly, a 5-acre permit has held us back, so we limited ourselves to 4 or 5 pads and ran fans off them, which reduced our attack angle on these west-dipping structures. We're going to begin stepping out and testing those; we anticipate finding the higher grades similar to what they've gotten from theirs. And according to some of the highly skilled geologists we've brought on, they anticipate finding significantly higher grades once we locate what's referred to as the feeder structure for these systems. Now, our interpretation of the mineralization is completely different. Oxide disseminated hosted by the Bullfrog formation. While structures matter, the host rock is what's actually delivering these larger tonnage and thicker intervals, as Mitch mentioned, from our news release, 710 feet of 0.03 ounce per ton. So once we receive an amended drill permit this year, we'll have a 300 acre drill permit to strip 300 acres. We had to amend that because the Seahorse discovery wasn't known when we obtained it. And we ought to have that in March; we'll begin building pads to the south and west to test these structures and to test how Seahorse grows toward the south. But it's looking really good. Pure gold, nothing else but pure gold oxide. Typically in these systems you find things such as arsenic and other elements; so it's given us considerable confidence this will become something economic down the road.
Joseph Reagor
analystAll right. And the last item from me: you're sort of contemplating capital expenditures throughout the year. Should the balance sheet become tight at some stage, given some larger efforts — particularly a major initiative at Rochester this year — would you simply pull on the revolver? Is that the intention? Or might you folks, should silver recover somewhat once more, go to the equity markets?
Mitchell Krebs
executiveWell, regarding equity, that option sits at the very bottom. I believe — Tom and his team have performed admirably, in my view, not just by positioning us to finance this, but by also having pinpointed a fairly broad array of additional options we could take up if we sensed a need. Tom, would you care to elaborate a bit?
Tom Whelan
executiveYeah. So once more, Joe, when you add up the money we currently hold, the cash generated by operations at the mines we already run, plus what we can borrow, we're in a position to stay within that guidance — those limits we've established for ourselves, meaning net debt to EBITDA under 2x. We also have some capital leases, which I brought up earlier, over at Rochester. Nothing is drawn on the revolver, so it's completely open to us. And like I said, we'll hold off tapping into it for as long as we can. On the hedging side, well, that spike in the silver price we saw lately definitely got our attention. So I believe it makes sense to constantly watch and grasp what the market offers and so forth, and…
Mitchell Krebs
executiveAlso regarding gold, roughly 50% of what we're producing in this year has a floor set at $1,600.
Tom Whelan
executiveThat's right.
Mitchell Krebs
executiveSo that provides us with yet another kind of additional cushion in that regard. I'm not sure, Joe, does that provide you with…
Joseph Reagor
analystYeah. No, that's fine. For the most part — a few of the companies you compete with are a bit smaller and have been — taking advantage of things on the equity side, and it didn't look like you folks had to do that, and I just wanted to make sure of it.
Mitchell Krebs
executiveYeah. No, that's fair.
Mitchell Krebs
executiveAlright, then. Hey, we’re grateful you all made time for us today. I realize this is a packed day for earnings reports. We’re eager to connect with you once more when spring arrives. With any luck, the snow will have melted by then, and we’ll discuss what happened in our first quarter. So enjoy the remainder of your week. Thanks.
Operator
operatorThat brings us to the end of this call. We appreciate you joining us for today's presentation. You're welcome to disconnect at this time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coeur Mining, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Coeur Mining, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coeur Mining, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.