Coeur Mining, Inc. (CDE) Earnings Call Transcript & Summary

July 29, 2021

New York Stock Exchange US Materials Metals and Mining earnings 62 min

Earnings Call Speaker Segments

Paul DePartout

executive
#1

Thanks, and good morning, everyone. You're joining us for Coeur Mining's call about our second quarter earnings. We put out our results once the market closed yesterday, and you can find both the press release and the slides on our website. I want to remind all of you that forward-looking statements are part of our press release, our slides, and some of what we say today, and actual results could turn out differently. Please take a look at the cautionary statements in our press release and presentation, along with the risk factors we describe in our second quarter 10-Q and our 2020 10-K. At this point, I'll hand things over to Mitch, Mick, and Tom.

Mitch Krebs

executive
#2

Appreciate that, Paul, and hello everybody on this morning's call. I'll begin on slide three in today's deck, walking through a few quarter highlights. Better top-line results came from more gold and silver ounces being sold, plus a rise in the average realized price we got for silver. Those items, together with favorable working capital movements, produced operating cash flow that was much stronger on both a quarter-over-quarter and year-over-year basis. The growth in revenue and cash flow mostly stemmed from a 27% quarter-over-quarter lift in gold output at Wharf, along with a 15% quarter-over-quarter gain in silver output at Rochester. Gold production at Kensington slipped a bit because of timing, while Palmarejo's output came in essentially flat, as somewhat weaker grades were offset by greater throughput. As we look toward the second half of the year, our production guidance is being reiterated, and we anticipate a robust second half at every one of our operating sites, for reasons Mick will get into. Operating costs as a whole rose in the period, driven by greater throughput and underground development rates, extra maintenance spending, broad inflationary pressure, and a non-cash charge at Rochester. Mick will give a little more detail on those items shortly; we kept pushing forward our biggest exploration program ever, and set a fresh record for meters drilled in one quarter—close to 100 km—with 27 drill rigs now turning; we shared some of that progress in a press release back in mid-June, which featured a new high-grade mineralized zone at our Silvertip mine in northern British Columbia, plus more excellent results from our Crown exploration property in southern Nevada. Now on slide eight, you can see we've raised our exploration guidance for the year so we can keep compounding the successes we're achieving. Our plan now is to put roughly $75 million into exploration during 2021, which is almost 50% above last year's record and 2.5x what we invested in 2019; we still see our exploration investment, among the biggest programs in our sector, as a highly appealing use of capital and a key differentiator. Staying on the growth story, I want to cover the company's two main development priorities, the expansion underway at Rochester and the possible expansion and restart at Silvertip. Beginning with Rochester, and looking at slides 11 to 13, POA 11 is moving ahead on schedule, with overall progress roughly 31% complete and more than 90% of contracts committed, which works out to about $334 million of capital as of the end of June. As with most companies running a big capital project at the moment, we've begun to feel inflation's effect in areas like contractor labor, building materials, and fuel across a small number of contracts still uncommitted. We'll assess those final few contracts as they arrive over the next several months and will give an update on our next call. And lastly, our technical group keeps doing optimization work so that every key lesson coming out of this transition window gets folded in, right up until the new Rochester infrastructure wraps up in late next year. If you move over to Silvertip and take a look at slide 14, the technical work that's still underway, plus how well our exploration program has done, along with market conditions that are far more favorable, leave us confident about possibly expanding and restarting Silvertip. So because of that, we've sped up how much we're investing, so we can use the summer construction season and finish a set of projects that are mostly on the surface. Our plan is to fold the exploration and technical work that's ongoing into a refreshed technical report, and we expect to file that in early 2022. There's no doubt in our minds that the high-grade deposit at Silvertip, which keeps growing, justifies the effort, even with the difficulties we've faced there before. With a retooled flow sheet and a processing plant that's bigger and more dependable, we expect Silvertip to turn into a high-margin cash flow contributor across a very long mine life in an attractive jurisdiction. Before I hand things to Mick, I'd like to touch briefly on the strategic investment we made in Victoria Gold. It was a one-of-a-kind chance to pick up the 18% block from Orion Mine Finance. That fits with our strategy and strengthens even more our portfolio of precious metals assets in high-quality jurisdictions; we're glad to be a Victoria shareholder, both given how the investment has performed and given how the Victoria team is advancing its new Eagle open-pit heap leach operation. Past that, I won't speculate on today's call about possible scenarios or what comes next, which I'm sure you can understand. So with that, I'll hand the call over to Mick.

Mick Routledge

executive
#3

Thank you, Mitch. Prior to reviewing how operations performed, I'd like to draw attention to several slides illustrating our unwavering dedication to safeguarding our workforce and maintaining our foremost health and safety programs, which begin on slide 20. To keep raising the bar on our safety culture and deliver excellent results, we have to operate without any uncontrolled exposures; our firm conviction is that health and safety only get better when exposure is contained, reduced, or eliminated. So it's my pleasure to share that we have just finished recertifying under the National Mining Association's CORESafety Program. So far this year, we are tracking toward the best lost time injury rate ever recorded in our company's history. As I said during my initial call 12 months ago, when health and safety are done right at a company, robust operational results tend to follow. Now to slide six, starting with Palmarejo. Greater mill throughput along with improved metallurgical recoveries offset the impact of lower grades while we keep facing certain geotechnical difficulties. Because of this, we sped up rehabilitation work on historical ground controls and reordered the mine plan; the anticipated outcome is additional ounces originating from the region subject to the gold stream, meaning a larger share of costs gets assigned to silver on a co-product basis; we remain confident about hitting this year's production targets and anticipate that these effects will stay confined to 2021. With annual EBITDA tax now behind us, Palmarejo managed to produce free cash flow of about $24 million, more than seven times what the prior period delivered. That was yet another strong illustration of how this team routinely juggles numerous priorities while still delivering dependable results for the business. Shifting to Rochester; by focusing intently on short interval controls, we are starting to see improved outcomes from material placed on interlift liners, which fueled a 15% rise in silver output for the quarter. Gold output also came in stronger, backed by an aggressive run of mine campaign. It's also worth highlighting that these output levels mark considerable gains compared with where things stood 12 months ago. In addition, we brought the new secondary crusher into service across an 18-day stretch, which let us start putting overliner onto the new Stage 6 leach pad roughly six weeks earlier than planned. Crucially, early results from that new crusher have proven quite favorable. We've managed to run at greater throughput rates, generate a more uniform crushed product, and boost leachability of HPGR crushed ore compared with what we experienced across the last few quarters. Riding that momentum, the team also wrapped up the fourth and final phase of our interlift liner strategy on the legacy Stage 4 leach pad, which enabled us to position fresh material nearer to plastic throughout this transition period. Unit costs ended up above what we had expected, mostly because of a shift in our recovery assumptions regarding ore historically placed on the legacy pad. With a shift to a coarser crush size and continued attention to enhancing those short interval controls, we now anticipate reaching a 56% silver recovery rate at Stage 4 across the coming ive years while we complete leaching on that pad. As Mitch noted, the valuable experience and key learnings we've gathered are helping us de-risk further and optimize Palmarejo as we keep executing on this pivotal expansion project. Moving to Kensington, production came in slightly lower as we ran some extra development ore from Jualin and swapped out the liners in the ball mill. Unit costs for the quarter stayed within guidance, totaling about $1,090 per ounce. The modest rise in costs stemmed from higher diesel prices and extra contractor support for drilling and maintenance, along with fewer ounces sold. Turning to the second half, Kensington is set to deliver its third consecutive year of solid free cash flow. Finishing with Wharf, we keep placing higher grade material, which produced a 27% gain in gold production. This stronger result came alongside excellent financial discipline. The team did a great job managing costs while continuing to advance stripping and unloaded one of the leach pads, causing free cash flow to more than double quarter-over-quarter. All of this important work positions Wharf to close out the second half of the year on a high note. With that, I'll hand the call over to Tom.

Tom Whelan

executive
#4

Appreciate that, Mick. I'll move fairly quickly through the consolidated financial results we've flagged on slide five. A 6% rise in quarterly revenue, together with beneficial movements in working capital, allowed us to produce $58 million in operating cash flow for the quarter. LTM EBITDA came close to $300 million, even with the non-cash inventory charge at Rochester this quarter, which works out to a 41% year-over-year increase, once again showing what our portfolio can do, particularly with gold and silver trading at these levels. Since production guidance has been reaffirmed, we anticipate stronger cash flow generation in the back half of the year to assist in funding our main internal growth priorities. Now, if we move to slide 15 and examine the balance sheet. We closed the quarter with a solid cash position and nothing drawn on the revolver, resulting in liquidity of almost $390 million and a net leverage ratio of one times, which puts us in a good spot to finance our 2021 CapEx and exploration programs; I should mention that these figures exclude the roughly $175 million of equity investments held on the balance sheet. As we've covered before, our financing approach for the Rochester expansion contained a capital leases component. We were quite happy to have locked in a capital lease package worth almost $60 million this quarter. Those funds will go toward covering part of the planned equipment purchases for POA 11, and the amount exceeds our initial $50 million target. This package comes with a five-year tenor and a fixed interest rate of 5.2%, consistent with the senior notes we issued earlier in the year. Finally, I'd like to mention briefly that we took advantage of an opportunity to build up our hedge position this quarter as spot gold prices drew near $1,900; we currently hold 132,000 ounces of gold hedged for next year, featuring an average floor of $1,630 per ounce and an average ceiling of $2,038 per ounce. We'll keep actively watching the market so we can potentially layer on further hedges covering as much as 50% of anticipated gold production in 2022, supporting our cash flow through this stretch of heavy capital investment. At this point I'll hand the call back over to Mitch.

Mitch Krebs

executive
#5

Appreciate that, Tom. Prior to opening the floor for Q&A, let me take a moment to point out slide 16, which lays out our key objectives for the back half of the year. If we get this list of objectives done, we anticipate heading into 2022 with a distinct and persuasive route toward producing organic growth that leads the industry, driven by our well-balanced collection of North American precious metals assets. Now then, let's go ahead and begin taking questions.

Mark Reichman

analyst
#6

Good morning. To start, I want to ask about Rochester. According to the technical report, pre-production spending was projected at roughly $397 million. In your release, you mention committing $334 million in capital, and then there’s another $20 million, which makes it $354 million total. So what’s your current outlook for pre-production costs related to the Rochester expansion?

Mitch Krebs

executive
#7

Hey, Mark, this is Mitch. We still expect it to be split fairly evenly between 2021 and 2022, somewhere near $200 million in each of those years. With the extra $20 million we noted in the release that you brought up, it might lean a bit more toward 2022 now. Aside from that, it remains roughly an even division between this year and the next.

Mark Reichman

analyst
#8

Alright, so right now you're not really giving us a stand-alone number for development sustaining capital mine by mine, and I get that with a site like Rochester, development capital has generally come in higher than the average across the total development budget. For 2021 and 2022, what number would you put on your development capital?

Mitch Krebs

executive
#9

Development. In the release, we break that line item out inside the sections covering each individual mine. You'll see a CapEx bullet or two that separates sustaining from development. Tom, do you happen to have that in front of you at this moment — something in the range of $10 million or $15 million?

Tom Whelan

executive
#10

I don't have that in front of me.

Mitch Krebs

executive
#11

My guess is that what we're keeping going in Rochester this year is just, yeah, somewhere around $10 or $15 million. Everything else is tied to development work on POA 11.

Mark Reichman

analyst
#12

Alright, so roughly $10 to $15 every year, if you will, plus whatever's left over. Assuming you more or less hold it at $200 annually, then that $15 would be maintenance-level. Do you figure you'll come quite near that $397, or might you land below it, or could inflation play in? I'm basically attempting to get a sense of whether that figure remains fairly solid.

Mitch Krebs

executive
#13

Yes. Excellent question. This is a shifting, active period, as we noted in the release and during our remarks. We're fortunate enough that the bulk of the capital has already been secured. Only slightly more than $60 million remains uncommitted; that's the portion where we'll be getting bids over the coming months. We'll examine those closely; they contain substantial amounts of steel, piping, cement, and contract labor rates. We're fully aware of those outstanding components, and that's where some of this escalation pressure is beginning to appear somewhat. We'll share more by the close of the third quarter, after we've received everything and worked through it to determine our position. At Rochester specifically, that applies to merely a fairly modest, comparatively small portion of the capital still uncommitted.

Mark Reichman

analyst
#14

All right. I just want to get one point straight regarding what we talked about on the development capital. When you mention $200, my impression is that you more or less anticipate landing at the top end of the range for Rochester, based on where the guidance sits.

Mitch Krebs

executive
#15

Correct. I believe so.

Mark Reichman

analyst
#16

Yes

Mitch Krebs

executive
#17

That's a reasonable assumption to work with for the time being, until we return with additional clarity later in the year.

Mark Reichman

analyst
#18

All right. That is genuinely useful. I appreciate that a lot. Many thanks.

Mitch Krebs

executive
#19

Of course. Yes. Of course, Mark. Thank you.

Joseph Reagor

analyst
#20

Good morning, everyone, and congratulations on a strong quarter.

Mitch Krebs

executive
#21

Hi, Joe.

Joseph Reagor

analyst
#22

Thank you. A bit more regarding Rochester; the release noted that $20 million, and the earlier caller brought it up too. Could you provide additional detail on what that money will support and how inventive you expect that additional spending to be?

Mitch Krebs

executive
#23

Yes, absolutely. That's a good question; it involves many small items, though Terry Smith is right here, and Terry, could you address that briefly?

Terry Smith

executive
#24

Right, absolutely. That's a solid question, Joe. What the funding really does is lay the groundwork for Rochester to succeed over the long haul. There are many incremental components involved, yet the core of it is making the infrastructure we're installing safer, more available, and more operable. To give you a bit of flavor there, we improved the geotechnical design within the crusher pocket, which makes that excavation safer for the long term. We installed redundant pumps at the Merrill-Crowe plant. Down the road, that raises that plant's availability. At the leach pad and the Merrill-Crowe plant, we've added a more sophisticated control system, and going forward that will make those leach operations more efficient. On the whole, we're quite pleased with each of these smaller upgrades. Sadly, they cost money, but we believe these deliver solid returns over the long term.

Mitch Krebs

executive
#25

Did that answer your question, Joe?

Joseph Reagor

analyst
#26

Yes, it does. That's useful. Regarding the inflation you both brought up, could you provide some sense of scale? Is it a matter of 2% or so? Is it 10% to 15%, or is it a bigger degree, a greater amount of pressure?

Mitch Krebs

executive
#27

You mean mainly on the OpEx side, Joe?

Joseph Reagor

analyst
#28

No, I mean when it comes to those Rochester agreements specifically.

Mitch Krebs

executive
#29

Right. What I'd point to is labor rates — those represent the largest piece of the cost squeeze we're up against — and after that, I'd probably put, let me think in terms of the money tied to every one of cement and steel. A substantial amount of copper conduit is used in the Merrill Crowe, and in the crusher corridor; those four rank among the primary factors. Tom, Terry, Mick, is there anything major I'm forgetting?

Tom Whelan

executive
#30

No.

Terry Smith

executive
#31

No.

Tom Whelan

executive
#32

Joe, I just want to give a bit more detail here. The two SMPI contracts we had in the budget came to approximately $60 million, so that gives you a feel for the scale involved. And like Mitch mentioned before, we're clearly quite pleased that we put a lot of that capital to work early; we'll be reviewing those bids during the third quarter, and on the next call we'll come back to everybody with where they ended up.

Joseph Reagor

analyst
#33

All right, that's reasonable. And then one last item. Quite a few businesses that historically have been focused on Mexico — silver producers, or just mining companies broadly — appear to be branching out away from Mexico. In recent years they've made some choices on taxes that we could describe as unfavorable. Regarding Palmarejo over the long haul, what's your view? Do you look at it as a case where once it's exhausted, that's it for you in Mexico, or do you see additional chances there? Perhaps just the broad picture, the plan for 5 years out.

Mitch Krebs

executive
#34

Yes. Excellent question. Compared with our other jurisdictions — here in the U.S. and up north in Canada — Mexico has turned into a tougher place to operate. If you think about growth, it's clear that most of our expansion, the genuinely organic kind, will arrive during the next few years from the U.S. and Canada. Having said all that, though, consider — you brought it up, Joe — a window of 5 years. What we're capable of doing at Palmarejo across the coming 5 years, on the operations side, and what our exploration is showing us, particularly at these higher levels. There's an entirely new world to the east at Palmarejo, located beyond the gold stream AOI, and we're strongly focused on stretching our exploration reach to the east of Palmarejo. Plenty of targets exist, plenty of potential, and plenty of historical resources came to us when we acquired Paramount. As you'll remember from a number of years back. Much more remains to be done there, particularly given a bigger exploration budget; honestly, for the past 4 or 5 years, we've stayed fairly concentrated on that corridor, right between and including Independencia and Guadalupe, and on stretching those toward the northwest and the southeast, plus drilling the space between them. We're now beginning to build enough of a runway down there that we can lift our heads a bit and survey things more broadly, and there's still plenty left to accomplish down there. Fully dedicated to Palmarejo and enthusiastic about what's possible there for what ought to be, with luck, a lengthy period yet.

Joseph Reagor

analyst
#35

All right. Appreciate the additional detail.

Mitch Krebs

executive
#36

Of course, Joe. Thank you.

Brian MacArthur

analyst
#37

Hello, and good morning. I appreciate you taking the time for my question.

Mitch Krebs

executive
#38

Sure thing.

Brian MacArthur

analyst
#39

I've got a few questions about Silvertip. First off, you mention building a larger mill. The photos included show site cleanup underway, yet we're currently spending $50 to $65 million. I'm trying to work out the sequencing here, and I understand you might not have all the details until the study is released early next year. You've mentioned a 2023 start. Conditions up there in winter aren't the easiest. If you proceed, is the plan that once the study arrives early next year, you could place orders for the larger mill equipment, then have it operational around late 2023? Is that roughly how we should be tentatively viewing this? I'm just looking for a bit more insight into the spending. Clearly you're trying to get a head start with that capital. Any additional detail on how this might actually play out would be useful.

Mitch Krebs

executive
#40

Yeah, absolutely. That's a reasonable question, and I'd say your understanding is close. Should everything point in a positive direction later this year, then commissioning in early 2023, ramping through the middle of the year, and ideally reaching commercial production later in 2023 is how we'd see it unfolding. You're exactly right regarding northern B.C., and capitalizing on this season right now the way we are, with some of these early works expenditures we're making, helps reduce the risk on that possible timeline. I suppose the other thing I'd mention is that on the capital side, the schedule and the capital are the two items we're working extremely hard to nail down during the second half of the year. We expect that most of the capital invested in Silvertip would come from an offtake financing. Hopefully that assists you in thinking through things, in case you're considering balance sheet or liquidity concerns — that's going to be a significant part of the answer there.

Brian MacArthur

analyst
#41

No, that helps a lot too. Do you actually need to install a brand-new mill at that location? I'm just attempting to work out when you would deliver that given the conditions up there and everything, or is that something being considered? That's the other thing I was attempting to determine — from a scheduling standpoint, to bring it in, I suppose next summer would be the target, that's roughly what you're aiming for, I guess. Is that how I should be looking at it?

Mitch Krebs

executive
#42

That's how you should be looking at it. A larger mill structure. Certain infrastructure components are going to be carried over or still left in place. That's among the major aspects of this early works underway at present — taking apart and removing quite a bit of that old infrastructure; it's going to be somewhat of a combination; all of that would arrive at the site during the next construction season, that would be the intention under that 2023 scenario.

Brian MacArthur

analyst
#43

Excellent. I really appreciate that context, Mitch. It’s quite useful.

Mitch Krebs

executive
#44

Yes, absolutely, Brian. All the best.

Karl Blunden

analyst
#45

Hello, and good morning. I really appreciate you making room for us today.

Mitch Krebs

executive
#46

Hey there, Karl.

Karl Blunden

analyst
#47

Perhaps I could ask something else about Silvertip. You predicted a query I'd been meaning to raise regarding how that gets paid for, correct? Since clearly Rochester is also being funded by you at this moment. It's reassuring to learn you have alternative methods for financing it instead of relying on the balance sheet. Regarding that project, would it be reasonable to state that you're now dedicated to seeing it through? Are there any remaining uncertainties you're weighing prior to moving forward, or do you feel you've gathered sufficient knowledge by now?

Mitch Krebs

executive
#48

Even so, an exit route always exists. Getting that correct is essential. If we expand and bring that back into operation, a second opportunity won't come our way. This green light, or this type of pivotal moment near the end of this year — keep the rigs drilling, complete all of that technical evaluation, have the mine plan revised incorporating every bit of the drilling. A genuine exit route will be there for us down the line this year. My hope is that such an exit route concerns scheduling rather than whether we do it at all, when it comes to restarting Silvertip — a matter of when, not whether. Let's obtain those answers, after which we can present everything and evaluate how it appears.

Karl Blunden

analyst
#49

Understood. When it comes to deciding what an offtake agreement could end up looking like, would that land later in 2021, or does the timing for that choice also depend on some broader time frames?

Mitch Krebs

executive
#50

Yes. Tom, could you share a few details regarding that offtake?

Tom Whelan

executive
#51

Yes. Thank you, Mitch. Clearly, we've already held some initial discussions with possible partners, and it seems reasonable to state that conditions in the market have improved far more quickly and are considerably stronger than what we had expected. We're eager to share some of the network we've been actively building here throughout the past 12 months, and to align that with the schedule and mine plan; those discussions are going to pick up speed in the latter half of the year. Any restart would be connected to an offtake agreement. Once more, I'll echo what Mitch said — the bulk of the financing for any extra capital would come from this offtake financing.

Mitch Krebs

executive
#52

Karl, honestly, you couldn't picture a more favorable setup for Tom to pursue that goal during his 2021. It's an ideal moment to possess a strong, premium concentrate offering while seeking out what you, Tom, describe as a happy home.

Tom Whelan

executive
#53

Right. Once more, during the period when Silvertip was under our operation, something that consistently performed strongly was logistics. Trucking and shipping—that aspect was consistently excellent. It seems reasonable to state that folks seek out top-tier counterparties such as Coeur, listed on the New York Stock Exchange, with leading ESG. This concentrate will be appealing, and we're eager to move those discussions forward.

Karl Blunden

analyst
#54

Yep, that's great. If I can just fit one more in. Given all these various avenues for growth, you'd presumably also be considering possibly stretching out the life of a mine. I receive a few inquiries regarding Kensington, as an illustration. Might that be something you'd consider extending, and would it take a substantial amount of capital spending as you look out across the coming two or three years?

Mitch Krebs

executive
#55

Yep. You're right that Kensington has the shortest lifespan of any of our mines, and we've ramped up how much we're putting into exploration there, especially during last year; this year, I believe it ranks as our third largest allocation, at close to $14 million. That's partly why we raised the guidance range for our full year exploration spending — because of the higher levels of money going into Kensington. All of that ought to help shift things when it comes to the mine's overall lifespan. It isn't fast, and it isn't the simplest spot to drill, expand, and extend, simply because of how the deposit is, the infrastructure, and its location. We remain hopeful that by the end of the year we'll see some success. You might remember that much of the conversion drilling, the infill drilling, was done only late in the year, so it never got included in the year-end reserve. A great deal of that from last year is rolling over into 2021, along with a higher level of spending there; this year, they're getting some truly strong results, so we're feeling good. I'm aware Mick and Hans are eager. They're traveling up there next week for a closer look at the exploration program. I hope that provides a bit more detail, Karl.

Karl Blunden

analyst
#56

Yeah, that's genuinely useful information. I appreciate it, Mitch. And thank you, Tom. Much obliged.

Mitch Krebs

executive
#57

All right.

Michael Dudas

analyst
#58

Good morning, gentlemen.

Mitch Krebs

executive
#59

Hi, Mike.

Michael Dudas

analyst
#60

Let's start with you, Mitch. Could you give us an update — I'm aware you've implemented strong COVID-related measures — but regarding your sites across the U.S., Canada, and Mexico, what share of workers have received vaccinations? Have there been any problems, or any emerging worries, or fresh indications tied to the variants beginning to appear somewhat more forcefully, particularly across the South?

Mitch Krebs

executive
#61

Yes, excellent question. Following the past, whatever it amounts to, 15 months or thereabouts, among the greatest dangers is simply individuals becoming less vigilant. Our protocols, I believe, have worked effectively for us. Right now, we're comfortable with our position regarding vaccination percentages. What's interesting is that at our underground mines — that means Kensington, Palmarejo, Silvertip — the vaccination rates sit at approximately that 80% mark. Much of that, I believe, stems from the fact that receiving the vaccine means facing a reduced quarantine obligation or fewer logistical complications traveling to and from the site; that's served as a significant motivator, and I believe it's pushed those vaccination rates upward in that way. Here in the western U.S., vaccination rates look somewhat more like what you'd expect nationally. Slightly under 50% of our people are vaccinated; that doesn't mean we've stopped testing, distancing, or requiring masks for those not vaccinated. The technology we brought in has kept delivering real benefits for distancing and contact tracing. Those items that everyone was talking about 12 months ago, we're still carrying them out. I take real pride in what we've established, how we've maintained it, and how it's enabled us to keep going — mostly, aside from the disruption in Mexico, the temporary government suspension there during Q2 of last year. Beyond that, we've kept operating, which has been wonderful. Mick, was there anything I left out?

Mick Routledge

executive
#62

Nope, things are in solid shape. The controls are genuinely strong across every location, and we keep enforcing them. Quarantine isn't the area of concern, since vaccination rates will be quite high and we'll maintain those other measures as well. On the whole, we're quite confident that this matter is under control.

Mitch Krebs

executive
#63

Is that useful for you, Mike?

Michael Dudas

analyst
#64

For sure. No, that's excellent. That really clears things up. For my next question, perhaps Mitch could offer a few thoughts regarding some of the business developments happening around Southern Nevada.

Mitch Krebs

executive
#65

Yes

Michael Dudas

analyst
#66

Could you talk about what makes that area stand out for you, and also what the longer-term potential might look like in terms of value creation for everyone involved there?

Mitch Krebs

executive
#67

Yes, that's right. Good question, Mike; this is a district that has a lot of promise.

Michael Dudas

analyst
#68

Thanks.

Mitch Krebs

executive
#69

There's clearly a great deal happening. That strategic land position we hold in Southern Nevada is something we're quite fond of. Our neighbors may have things underway, but that doesn't alter our own task: keep drilling, and ideally keep succeeding at growing the resource at Crown across those 4 deposits — Daisy, SNA, Secret Pass, and C-Horst. Our focus remains on bringing the drilling together into an assessment or technical report by the middle of next year, which would let us examine that as a possible future operation in Southern Nevada alongside all that we have in Northern Nevada. Regarding the activity — look, we're always willing to talk with our neighbors and weigh opportunities or ideas for rationalizing capital, sharing risk, and growing the collective pie, correct? Down there in the neighborhood, I believe we've got solid relationships, and we hope to keep building on them while the drills stay turning. At Crown, I think we're putting roughly $14 million into drilling. Some small portion of that is at Sterling as well, just to the south. That shows how enthusiastic we are and how fast you can grow a resource — an oxide, near-surface gold resource in Southern Nevada. Just keep the drills turning, and we're getting some good results. Hopefully that provides a bit of flavor for our thinking.

Michael Dudas

analyst
#70

No, thank you for that. Just to be clear, it sounds like this time around will be unlike the alliances and circumstances we've seen in the past. It seems like there's simply too much on the table, particularly given where the world stands on ESG, carbon, and capital discipline, or so I'd think.

Mitch Krebs

executive
#71

Yes, that's certainly my hope. I suppose I can't speak on everyone's behalf.

Michael Dudas

analyst
#72

No, I get it.

Mitch Krebs

executive
#73

Essentially, starting fresh down there with something big and new — that's a fantastic spot for operations. Mike, hopefully we can come at it with that mindset: how do we pull this off in the manner that serves everyone best — best for the environment, best for the community, best for all the stakeholders? When it comes to gold, new discoveries, and exploration, there's likely nothing more thrilling happening in Nevada at this moment. There's a ton of excitement. Beatty's buzzing. Beatty, Nevada, in Nye County is the place to be.

Michael Dudas

analyst
#74

Certainly. Best of luck. Thank you, Mitch. I appreciate you taking the call.

Mitch Krebs

executive
#75

Yes, thank you, Mike.

Michael Siperco

analyst
#76

Thank you. Appreciate you fellows fielding this. Let's revisit the quarter briefly. Might you elaborate somewhat further regarding the inventory charges at Rochester during that period? Perhaps what exactly triggered the diminished recovery you're observing, and ought we to anticipate additional effects down the road?

Mitch Krebs

executive
#77

Yes, absolutely. I'll kick things off with a couple of brief remarks, then hand it off. Tom and Mick are both gazing my way, agreeing. Right, that Stage 4 pad, Michael, is an older, mature, deep pad. Considerable interference exists inside it. Our approach to reducing risk there in the meantime, short term, involves alleviating it using certain interlift liners. Everything of that nature disappears once we move to Stage 6 after it's done. As previously discussed, there's been ore within the pit, differing ore varieties producing fines, a few containing elevated sulfide levels. That stuff remains there on Stage 4 while we've extracted and processed it, gaining knowledge about those various ore varieties. Those insights collectively fed into the resulting requirement to revise that estimate regarding a recovery rate at Stage 4. Unsure whether that offers useful context, but perhaps Nick, Tom, you can jump in and address anything I overlooked.

Mick Routledge

executive
#78

Regarding the ore type, this was something new for us and somewhat softer. Finding the right mix of soft and hard material has taught us a great deal; over the coming 18 months, we're conducting further core drilling so that we can achieve truly solid characterization of that ore body, along with the ore body knowledge, as we move toward Stage 6. The timing works out really well for us to gain that knowledge.

Mitch Krebs

executive
#79

Regarding the final portion of what you asked, Michael — whether we anticipate anything further — the response is no. Once more, we revisited things, examined the figures, and per Nick's comment, moving ahead we will see a 56% recovery rate on Stage 4 across what's left of that pad's lifespan; we feel confident that the accounting charge we recorded was the necessary one.

Michael Siperco

analyst
#80

All right, that's excellent detail. Thank you so much. Perhaps let's return to a bigger-picture matter. By one reckoning, there are roughly 4 or 5 initiatives underway, spanning Rochester, Silvertip, that expanded exploration effort, and possibly Crown too, plus whatever ultimately occurs at Victoria. There's potential offtake funding, some protection on the downside via the hedges, and credit that's available. Could you elaborate a bit further on how confident you are about delivering on every one of these priorities across the coming 2 years, considering the balance sheet and perhaps certain inflationary pressures you're encountering. Are there additional levers available? Might you consider your equity investments as a capital source? What's your thinking on all of this, recognizing that it's a continuing process?

Mitch Krebs

executive
#81

That's an excellent question. It's sort of the central question. Definitely one I've spent considerable time on. Perhaps I'll address the bandwidth aspect you're raising, and then Tom, you could handle the levers and balance sheet side of it. I believe, together with the board, over these past several years as our strategy was developed, there came alongside it a focused push to strengthen the team so it matched that strategy, so we could actually execute on it. Then atop everything has sat substantial effort put into culture. I realize folks enjoy discussing culture, but ours is genuinely one that's performance oriented, makes an impact, and accomplishes significant things. We possess, I would say, a group that's highly driven and inspired. I'm not referring to individuals merely in this room, but further down throughout the organization who are strongly motivated to accomplish great things and move this company from the current state to the destination. That destination appears truly exciting. Whenever I speak with a set of colleagues here at the firm regarding where these initiatives might lead this company, there's tremendous enthusiasm in the room, tremendous excitement, and tremendous alignment on bringing it about. That's infectious. I think we have plenty in motion, yet I think we can prioritize and remain above much of the distraction since we have strong teams beneath us managing much of the blocking and tackling, which lets us truly concentrate on these high impact initiatives you basically listed there 3 or 4 years ago, capacity, bandwidth, a clear challenge. At present, I think we've grown the organization to a point where it can deliver on the strategy and deliver on those priorities. I couldn't have claimed that in prior years. Tom, would you like to address the remaining part of the question?

Tom Whelan

executive
#82

Absolutely. Mike, you basically covered that for me already. To put it another way, the primary sources we'll rely on to finance this are the cash we hold, how much we can borrow, and what our operations bring in. On that borrowing piece, just to jog everyone's memory, we have a $300 million revolver facility that hasn't been touched at all. On top of that sits a $100 million accordion feature, entirely within our control to activate if we choose. And then, as we mentioned previously during this call, there's the Silvertip offtake arrangement. Beyond those, we also have other levers available, including $175 million in equity investments — a substantial portion of which is Victoria Gold — and we're thinking through how that factors into financing down the road. Supporting all of this is rigorous scenario modeling that management reviews alongside the board each quarter in extensive depth, running stress tests across every kind of assumption — commodity pricing, capex, and so forth. Our confidence in what we're capable of is very strong.

Mitch Krebs

executive
#83

Above all, as we often discuss, every aspect remains under our oversight. We're eager to share additional details about the narrative as further choices get made during the remaining months of this year. I would simply mention, adding this at the conclusion, Tom, regarding the mix of financing sources, one cannot exaggerate how crucial the free cash flow is that comes from Palmarejo or Kensington, plus Rochester's very own operating cash flow as it keeps getting better each quarter compared to the prior one. When you combine those from our portfolio spanning multiple assets, that represents a significant portion of the financing that pairs with every other lever and alternative Tom brought up. Gold at $1,800 and silver at $25 clearly assist. When all those components are assembled, and you consider both this year and the following one, we have confidence in the balance sheet.

Michael Siperco

analyst
#84

I suppose, if I might, I'm sort of working backward toward a CapEx question regarding Silvertip, but then I suppose what you're indicating is that it's reasonable to state that you're able to keep the exploration spending level going at least in part into 2022, finance the restart of Silvertip, and Rochester, and you feel at ease doing every bit of that using the capital you have available, the balance sheet you possess as of today, without truly undertaking anything further. Is that a reasonable statement?

Mitch Krebs

executive
#85

A reasonable statement. Mick has to deliver on the operations, and gold and silver can't collapse completely; given those 2 conditions, yes, what you said is reasonable.

Michael Siperco

analyst
#86

Alright, that's excellent. I really appreciate you all making room in your schedules.

Mitch Krebs

executive
#87

Of course, no problem. Those were solid questions.

Mitch Krebs

executive
#88

Hi, Dalton.

Dalton Baretto

analyst
#89

Thank you. Hello, Mark. Good morning. I have a few questions for you, along those same lines. Let's begin with Silvertip and the offtake financing. As I recall, an offtake deal existed with Ocean Partners. Is that entirely gone at this point?

Mitch Krebs

executive
#90

Tom, would you like to address that?

Tom Whelan

executive
#91

At this moment, that contract simply isn't in force, since we haven't managed to make concentrate at the quality level the agreement calls for. Once more, our hope is that when the restart happens, we'll be able to reach a concentrate quality we're confident we can deliver reliably, and then we can talk further with them and with others about securing good destinations for that concentrate.

Dalton Baretto

analyst
#92

All right, so nothing stops you from holding conversations with other offtake partners?

Tom Whelan

executive
#93

That's right.

Dalton Baretto

analyst
#94

Understood. Alright.

Mitch Krebs

executive
#95

When you ran through your list of funding sources, the ATM didn't come up. What's your thinking there? Excellent question. That makes two for two, Dalton. Your first question was solid. This one is as well. We set that up perhaps just over 12 months back, possibly in April actually, during COVID's bleakest stretch, with so much uncertainty and so many unknowns. One item we figured we could likely treat as known back then was simply how liquid our shares are. Our view was, "We ought to have something established so a fallback liquidity source exists should everything truly go sideways." Of course, at that point, which feels like ages ago now, we had no idea how events would unfold. Jumping ahead to now, we've kept it in place, and we have no intention of utilizing it or drawing on it. Having that option available isn't a bad thing. It's nearly comparable to a mixed shelf, simply keeping it up, so should circumstances develop in a completely unexpected manner, it's available. That's roughly our perspective on it. Tom, is there anything you'd like to add? Alright. Did that answer your question, Dalton?

Dalton Baretto

analyst
#96

Yeah, no, that certainly tracks. Considering your comments regarding inflation tied to the remaining Rochester contracts, are you taking steps to lock anything in at Silvertip in advance?

Mitch Krebs

executive
#97

Well, that's a good question too. A portion of the early works was about getting some of this completed beforehand. Planning for certain pieces of this dates back a bit, which allowed us to secure certain pre-escalation rates on a portion of this work. It's also something of a shifting target as we proceed through the second half toward a more definitive capital estimate; we hurried to get some of this early work in place and strip out a portion of that escalation risk in the immediate term. Now, when we consider the larger build-out, we're going to need to genuinely factor in the complete impact of escalation, and work through that. What ways might we potentially lessen that? How might we shape our strategy, our contracting strategy, perhaps, in this environment that all of us are now sort of inhabiting? That's a good question, and it's something that will be folded into many of the elements of what we'll need to accomplish up there at Silvertip. Okay. Regarding the $300 and change million that's already been committed for Rochester, those contracts, are they fixed from either a unit price standpoint or a volume standpoint, or do escalators exist within them?

Terry Smith

executive
#98

Hi Dalton, Terry speaking. This combines fixed-sum agreements with per-unit pricing arrangements.

Dalton Baretto

analyst
#99

All right, that's excellent. Perhaps just a final question from my side, Mitch. I realize you mentioned you wouldn't provide any remarks regarding Victoria, but I'm simply curious — Eagle sits fairly near to Silvertip. Might there be any type of operational synergies in that area whatsoever?

Mitch Krebs

executive
#100

Dalton, possibly, merely when looking at a map, though it's too soon to tell. That's not an inquiry which, at this point, is likely worth attempting to respond to. It has been duly noted and is something worth bearing in mind.

Dalton Baretto

analyst
#101

Great. Thanks again, guys.

Mitch Krebs

executive
#102

Yeah, sure, Dalton. Thanks.

Mark Reichman

analyst
#103

Oh, thanks. Just one brief follow-up regarding Silvertip.

Mitch Krebs

executive
#104

Yes.

Mark Reichman

analyst
#105

You're boosting the investment before the economic analysis is done and before any offtake agreements get signed, essentially to secure the economics. It all appears to be progressing along a very favorable track, a genuinely positive direction. What I want to ask is about that off-ramp you brought up. Suppose you chose not to advance this — what portion of that $75 million-$90 million would already have been used, or what amount would ultimately be written off? Compared with the other option of holding off on that spending or committing that capital until after the economic analysis.

Mitch Krebs

executive
#106

No, that's a reasonable question. The way it looks to us, Mark, is that practically every task we need to complete, that we are in fact doing at this moment, has to be completed regardless. Whether it ends up being for us, whether it ends up being for another party, if we decide to monetize it later on, these efforts are contributing value to the project when you take a long-term view of Silvertip. Zooming out even more, as a company we're attempting to juggle a handful of priorities, correct? First, POA 11 — we must deliver a successful project there; we don't want Silvertip — and we've gotten this feedback from many of our stockholders — don't let Silvertip distract us from Rochester, and we're extremely conscious of that, and we aren't allowing that to occur. We remain firmly dedicated to that 2023 positive free cash flow objective. We've bet a great deal on that, and I believe that matters to our investors as we consider possibly reaching a point where we can contemplate returning capital instead of putting capital into our assets. I believe pushing that off into the future is bad for the company. We also don't want to put excessive pressure on the balance sheet, particularly in 2022; those are all the elements we're trying to blend properly, with some unknowns still in play, to strike that balance and try to make sure we're meeting each of those priorities; especially with that 2023 goal, putting this capital to work at Silvertip right now is truly critical to letting us hit that timeline we discussed a bit earlier in response to a prior question regarding how that 2023 startup would proceed. To accomplish that, we have to perform this work now that we're performing. I'm not sure whether those thoughts are useful, but that's the way we're looking at it.

Mark Reichman

analyst
#107

No, that was genuinely useful. I truly appreciate it. Thank you, Mitch.

Mitch Krebs

executive
#108

Sure thing. Thank you.

Brian MacArthur

analyst
#109

Thanks for letting me ask a follow-up. There are a couple of points, and they both relate to Silvertip. First, I want to be completely sure, since Dalton and I raised a question regarding that legacy concentrate agreement, and you essentially mentioned that the requirements were never satisfied, which is understandable. To put it plainly, do they still hold any right—given that those requirements were never fulfilled—so that something under that agreement remains enforceable, or do they possess a right of first refusal or similar? If we choose that path, are we beginning with a blank slate? In other words, there would be no prior concentrate arrangements that must be honored first, which could affect the possible financing later on.

Mitch Krebs

executive
#110

Tom, would you like to handle that?

Tom Whelan

executive
#111

Absolutely. Yeah. I mean, you could say we've got a solid connection with Ocean Partners; during the time we were producing at Silvertip, they were excellent partners for us. At moments when the concentrate grades weren't hitting the specs they required, we move a portion of the concentrate at Kensington through them. We're going to reach a commercial deal. That, I believe, circles back once more to what we've said consistently from the start: most of the capital funding for Silvertip is going to come through an offtake, and that's all I'll say about it.

Brian MacArthur

analyst
#112

I suppose, in all fairness, it's clear that a larger operation would give you greater contra volume to work with regardless, which means you'd have added flexibility, correct?

Mitch Krebs

executive
#113

Plus a steady, appealing offering, yes.

Brian MacArthur

analyst
#114

Yeah.

Mitch Krebs

executive
#115

More of it, yeah.

Brian MacArthur

analyst
#116

All right. My follow-up — and I get that this isn't the main thing driving your call on Silvertip — but is there any tax pool that would boost the return you figure you could achieve there if you move forward? Once more, when we're discussing where to put capital globally, taxes matter a lot in that calculation.

Mitch Krebs

executive
#117

Good question. Simply put, yes. Tom, take it away. Would you like to add the details?

Tom Whelan

executive
#118

Right, so we're sitting on close to $300 million in operating losses, and those will let us offset a portion of the taxable income we're going to bring in. Sure, that plays into every capital allocation choice we make throughout the business, but it clearly works in our favor with Silvertip, since the tax bill we'll face won't be nearly as steep as you'd probably assume otherwise.

Brian MacArthur

analyst
#119

Excellent, thanks a lot. I believed that was accurate, though I simply wanted to confirm it. Appreciate it.

Mitch Krebs

executive
#120

Sure. That's fine.

Mitch Krebs

executive
#121

All right, thank you so much. Well, we're grateful that all of you joined us today. There were plenty of excellent questions. We can't wait to talk with everyone once more come autumn, when we'll go over what we earned in Q3. Thanks once more.

Operator

operator
#122

That wraps up this conference. We appreciate your joining the presentation today. You're welcome to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Coeur Mining, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Coeur Mining, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coeur Mining, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.