Coeur Mining, Inc. (CDE) Earnings Call Transcript & Summary
August 4, 2022
Earnings Call Speaker Segments
Mitchell Krebs
executiveHello, everyone, and thank you for being here on our call about the second quarter's results. Joining me in Chicago this morning are Mick Routledge, Tom Whelan, and Aoife McGrath, plus a number of other colleagues from our group. Prior to getting started, I'd ask you to take note of the cautionary language regarding forward-looking statements that appears in our slide deck, and to consult the SEC filings we've made, which you can find on our website. The second quarter brought us healthy growth at the top line and steady advancement on the POA11 expansion at Rochester, which is our flagship project. As you can see on Slide 3 of the earnings deck, three out of our four mines in operation turned in robust increases in production relative to the first quarter. Healthy metal sales, together with certain favorable movements in working capital, also produced a significant recovery in operating cash flow for the quarter. Turning to the back half of the year, our sites continue to be positioned to hit the production guidance we set for the full year; when it comes to costs, however, inflation keeps weighing on what we deliver, most notably because diesel prices have climbed so steeply. That's why we've made modest tweaks to the cost guidance for 2022, and Mick and Tom will walk everyone through those shortly. In addition, we adjusted the guidance for the full year to account for our choice to put another $11 million toward exploration in the second half, following up on encouraging drill results lately at Kensington, Palmarejo, and Silvertip, which Aoife will describe soon. Above all, the expansion underway at Rochester has reached its busiest phase and is still expected to wrap up in the middle of next year. More than 400 contractors are passing through the gate daily at this point, and we hit a number of important milestones in the quarter, among them finishing the major concrete quarrying work and beginning steel erection at the Merrill-Crowe facility as well as the secondary crusher. Nearly every component and piece of equipment has arrived on site. You can see the excellent progress in the photos on Slides 10 and 11; a few weeks back we marked a significant milestone when the prescreens were successfully installed at Rochester's current crusher, and Mick will say more on that in a few minutes. Our balance sheet is still in good condition, with adjusted liquidity totaling close to $360 million, which takes in the proceeds from the recent sale of Victoria Gold shares, plus another $59 million in possible liquidity held as marketable securities. As the Rochester expansion nears the finish line, we're eager to pay down debt using the substantial cash flow we anticipate generating. Once the expansion is behind us, the combination of greater output, reduced costs, positive free cash flow, and less debt will leave Coeur well positioned to look for further ways to strengthen the business. To close out the highlights, I'm delighted to extend a welcome to Jeane Hull, who is joining Coeur's Board of Directors. Jeane comes to us with more than 35 years of experience in engineering, operations, and leadership. Her distinctive skill set will prove especially useful as the Rochester expansion moves closer to completion. Jeane joining us to push ESG efforts forward lines up nicely with how much we care about leading the pack on that front. With Jeane on board, Coeur's Board — which brings together independent voices from a range of backgrounds — is that much stronger, and we'll keep looking for ways to strengthen and renew it going forward. Changing topics, please direct your eyes to Slide 17, where you'll see meaningful strides being made when it comes to our people. Bringing in top-tier talent and keeping them here stays a top priority for us, particularly given how tight today's labor market is. We keep meeting that challenge directly by building out programs and training aimed at preserving our standing as an employer where individuals are eager to work, grow, and establish fulfilling long-term careers. Ahead of Mick walking everyone through our operations, I'd like Aoife to share how her first 90 days with the company have gone and offer a bit more detail regarding what we're prioritizing in exploration during the second half.
Aoife McGrath
executiveAppreciate that, Mitch. Three months into this position now, and I've gotten the chance to see every one of the company's projects and sit down with the exploration groups throughout the organization. The caliber of the people, along with what our assets could deliver, has really stood out to me. It didn't take long for me to see a short-term opening to put more exploration dollars to work during the back half of the year, which would let 3 sites speed up drilling and pursue targets where results have been excellent. We're eager to share an update at year-end about how these programs have performed. Over at Kensington, broad, high-grade hits in the shallow portions of the main Kensington deposit suggest a genuine chance to add considerable mine life beyond the 3-year reserve life it has today. A major focus for the latter half of 2022 will involve continuing to chase the lowest-risk, potentially highest-value and traditions through testing the Southern extensions at Kensington, Elmira and Johnson veins. Turning to Palmarejo, recent drilling within the Hidalgo zone at the Independencia underground mine has delivered a few of the best gold-silver intercepts the team has seen this year, and drilling is set to keep going through the rest of 2022. At Silvertip, a project sitting at a truly thrilling point at the moment, drilling keeps demonstrating how robust the deposit is, with consistently strong intercepts across the Discovery South, Southern Silver and Camp Creek zones. Drilling will keep stepping out from and growing known deposits, and on top of that, summer season programs are being broadened to take in testing of the regional package, with the goal of vectoring toward the mineralizing source. In our view, the resource outlined so far has been defined on what is probably a modest piece of a bigger mineralizing system, and we strongly believe Silvertip could grow into a far larger resource and serve as a future source of high-quality growth for the company. I'll hand the call over to Mick now.
Mike Routledge
executiveThanks, Aoife. Before we dive into the quarter, I'd like to note that the development and trading initiatives Mitch mentioned earlier have clearly helped us grow our people effectively, get objectives aligned, and build a safe workplace from scratch. On Slide 19, you'll see our injury rates continuing a decline that's been happening over multiple years; and I'm firmly of the view that putting this money into our people is a major factor behind that success. Being excellent when it comes to health, safety and environmental performance is what a world-class business is built on. If I look back at Coeur's first half of 2022 operationally, our teams have put in a lot of effort to get past significant cost pressures and disruptions to the global supply chain. Once you also account for a big expansion project added at 1 of our 4 operations, what we achieved looks even stronger. What we're focused on for the back half of the year is keeping that momentum going by, first, making steady progress on POA 11 and handling Rochester's transition with care; second, rolling out business improvement efforts that boost efficiency and productivity across our operations; and third, which matters most, keeping our attention on the safety and wellbeing of our people. Now to Slide 6 for our second quarter production summary, and starting with Palmarejo, metallurgical recoveries got better thanks to continuous blending optimization, and metals grade stayed steady; we feel confident we can hit production targets for the year. Unit costs at Palmarejo are well understood by us. Guidance was adjusted mainly to capture an anticipated shift in how costs are allocated on a core product basis. Switching to Rochester, gold and silver production got a boost from a strong ore placement rate during the first quarter. Gold ounces produced rose 37% quarter-over-quarter, while silver ounces produced went up 5%. Tons placed during the second quarter took a hit from installing the prescreen pilot system, which wrapped up on July 22. Ramp-up of that prescreen pilot system, along with optimizing the product size placed on the leach, is now in progress. What we learn should let us further derisk and optimize POA 11 as we proceed with that prescreen system. After a slower first half of the year, we still feel confident that Rochester will meet 2022 production guidance for gold and silver. COGS guidance for 2022 has been revised upwards to capture higher diesel, lever and maintenance costs. Broadly speaking, we expect costs to stay elevated through Rochester's transition period as experience is gained and best practices get developed; those learnings, in our view, will eventually produce a major reversal on costs once the scale and efficiencies of an expanded operation are fully realized. Staying with Rochester and the POA 11 expansion for a moment, Mitch covered the key Q2 highlights; on July 29, the transmission line and on-site substantion was successfully energized by Nevada Energy, which is one more example of the tangible progress taking place. During the back half of this year, things will keep moving at the same speed, including kicking off installation of the product conveyor system along the crusher corridor roof for the secondary conveyors, getting the prescreen installation underway, and wrapping up metal Coeur electrical systems, among a lot of other things we're handling. Our mining group and project group are on the same page and collaborating effectively, having gone past 1 million hours with no lost time injury — 0 on the project so far. When the quarter closed, the project's projected cost was still about $600 million, around $523 million in project capital had been committed, and by the end of the second quarter we had spent $350 million of that estimated amount. Important Q3 updates covering final engineering and procurement for the prescreen, plus a refreshed multicolor contingency analysis, will be finished as part of how we keep governing this project. That work isn't finalized yet, though it's reasonable to say we keep observing certain inflationary pressures and the project's final cost might come in roughly 5% above what we currently estimate. Moving on to Kensington. Output rose because Kensington hit its best quarterly throughput ever, helped by better mining and mill efficiency. The team is still working to make up for store development that fell behind owing to COVID's effect on the workforce during the first quarter, and we continue to believe Kensington will meet its 2022 production guidance. Finishing with Wharf, we keep putting higher grade material in place, producing a 15% gain in gold production compared with the first quarter. Wharf is still positioned to hit its 2022 production guidance range. Guidance for 2022 gold cash costs has been raised to account for anticipated higher diesel costs; having said that, I'll hand the call to Tom.
Tom Whelan
executiveThanks, Mick. I'll quickly walk through the consolidated financial results we've highlighted on Slide 4. Revenue rose 8% from the prior quarter, driven by higher metal sales at every one of our operating mines. That higher production, together with favorable working capital movements, generated $23 million in operating cash flow for the quarter; with 2022 production guidance reaffirmed, we're set up for a stronger second half; and we continue to pursue ways to offset cost pressures affecting the whole industry. Slide 5 of the deck gives more detail on 4 of Coeur's key costs and how they affect our business. As that slide shows, cost increases beyond diesel have eased relative to what we saw last quarter. Diesel, though, is still our biggest line item when it comes to cost exposure. Coeur uses 16 million to 18 million gallons of diesel annually, and through the end of the second quarter we're running roughly $1.50 per gallon above budget. As a result, we've raised cost guidance at Rochester, Kensington and Wharf, mainly because of diesel prices. Now, moving to Slide 12 for a look at the balance sheet; we closed the quarter with $319 million of liquidity, comprising $74 million of cash and $245 million of availability under our revolving credit facility. On top of that, we held $99 million of strategic investments in equity securities, which leaves $418 million of potential liquidity, as the slide illustrates. At quarter end we monetized part of our stake in Victoria Gold and collected proceeds of about $40 million in early July; we're confident the balance sheet is well positioned to fund the CapEx and exploration priorities we've discussed on this call. Finally, I want to remind everyone about the downside protection we established during the POA 11 build. We still hold 108,500 ounces of gold hedges for 2022 at an average forward price of $1,965 per ounce, plus another 112,500 ounces hedged for 2023 at an average forward price of $1,982 per ounce, which offers meaningful downside protection given where market prices sit today. The gold hedge book's fair value at quarter end came to roughly $29 million. I'll hand the call back to Mitch now.
Mitchell Krebs
executiveAppreciate that, Tom. Prior to opening things up for the Q&A, let me take a moment to point out Slide 13, which lays out what our main areas of focus are for the back half of the year. If we execute against those areas of focus, we continue to feel strongly that Coeur is squarely on the path to standing out as a genuinely distinctive option for investors who want organic growth that leads the industry, coming from a U.S.-based business whose portfolio of North American precious metals assets is balanced. So with that said, let's go ahead and begin taking questions.
Trevor Turnbull
analystThe greater throughput possibilities you brought up for Silvertip caught my attention. My guess is that exploration wins are fueling them, and I just wanted to ask whether you might describe, at least briefly, how those scenarios are structured. To put it another way, when you evaluate such expansions, do you factor in keeping a minimum number of years for the mine, or are you considering options that could scale up further if exploration keeps succeeding?
Mitchell Krebs
executiveWithout question, Silvertip is a big system, and every additional hole we drill makes it bigger. I'm aware that during Aoife's initial 90 days, this has been a project she feels especially strongly about. As we keep chasing this considerably larger scenario, it will clearly require time to carry on with the drilling, the design and engineering, and to build a persuasive business case, and that's fine. In the meantime, our attention stays on finishing and commissioning Rochester's POA 11, producing positive free cash flow, and bringing down leverage on the balance sheet; so as we handle those priorities, Silvertip can — the work over there can keep moving forward. With that said, Mick, would you like to say a bit more about the expansion scenarios, their scale, and what our thinking looks like?
Mike Routledge
executiveYeah, definitely. At first, the plan was for a pretty modest operation at Silvertip. But given how well the exploration results keep coming in there at Silvertip, we've had to go back and reconsider that. So right now we're asking ourselves what the right scale looks like; like you said, we need to aim for a minimum number of years of mine life, since that's what makes a capital project viable and really backs up the investment case. And as the exploration program keeps delivering hits, we'll take another look at the size. For the time being, though, we're working through that trade-off study to figure out the appropriate scale for the asset as it currently stands, with the expectation that we'll keep exploring even as we wrap up the POA 11 project.
Mitchell Krebs
executiveTo sharpen that point a bit, Trevor: during the prior year, much of our effort centered on the 1,750-tonne-per-day case, and at present we're roughly at twice that, give or take, with further refinement of that band to come as the work moves forward. Aoife, from where you sit on Silvertip, is there anything you'd like to add?
Aoife McGrath
executiveYeah, I mean, where we are right now feels like a genuinely thrilling point, and we've sort of paused to examine the broader mineralizing system through the lens of the hub-and-spoke CRD deposit model. What that basically boils down to is this: the hub acts as the intrusive source, or a porphyry, which supplies the heat and the fluids that travel outward and mineralize the rock around it in a roughly radial pattern — that's how you wind up with the hub-and-spoke effect. And based on what the data is showing us, there's evidence suggesting the resources defined so far sit on just one — essentially one among a number of possible spokes. Beyond that, the geophysical data includes indicators pointing to where the porphyry resource might be located; so this summer our aim was to take a bit of a step back and put some additional spokes to the test. And once the underground development moves nearer to that possible hub, we would — our plan is to drill test it as well.
Mark Reichman
analystAlright, I have two things I want to ask. The first one is directed at Tom, and the second is for Mitch. For Tom, the initial question: at the time the 2020 technical report for Rochester was finalized, the capital cost stood at about $397 million, and at present that figure has reached $600 million. On top of that, it appears the NPV has dropped as well when applying the base case discount rate of 5%. So what I'd like to know from you is whether the cost has reached its peak. Is $600 million essentially the maximum? And could you give investors a rough walkthrough comparing what the technical report showed versus where things actually are right now?
Mitchell Krebs
executiveTom, go ahead and give it a shot if you'd like. I'll kick things off with a few comments of my own first, if that works for you, Mark. Regarding that $600 million, clearly, with us being nearly 90% committed as we move further ahead, the uncertainty that remains keeps shrinking. The one item we're still trying to nail down in Q3 involves those prescreens feeding into the new crusher. And like Mick said, bids on some of that work are showing cost pressure returning, which given the past 9 months really shouldn't come as much of a shock. Nothing appears to be coming in below earlier estimates; therefore we included some wording. I believe Mick referenced a 5% sort of signal of a possible bump on top of that $600 million, which was our effort to give an indication of capturing those potentials that might or might not emerge between now and the time we get this wrapped up in the middle of next year. As for comparing the $400 million figure with the $600 million one, from my perspective there's basically one bucket for inflation and another bucket for scope enhancements, roughly 50/50, if I were to guess on the spot. But Tom, would you like to layer something more onto that?
Tom Whelan
executiveAbsolutely, 100%. The initial figure stood at $397 million. As we proceeded with detailed engineering, additional opportunities came to light — things like improving safety or boosting throughput — and those brought us to $450 million, the guidance we provided at the close of Q3 of '21. Then the revised technical report arrived, and it presented us with 2 factors: the design modification involving the prescreen, plus the inflationary pressures that exist. Honestly, I believe our management has been excellent. Regarding procurement, many of the critical components had been ordered prior to — ordered before the truly severe inflationary squeeze hit. That explains why, when you consider where the final capital number will land, I expect it to be a success based on our current position — we're perhaps in the top of the seventh inning, whereas a number of our peers remain in the top of the second or third inning on their projects. Let me return to the economics, which are quite compelling: a 17% IRR that we built. Keep in mind these technical reports capture a single moment in time. And ideally, as we keep moving forward and incorporate every lesson learned from the current Stage IV, this will be a compelling project in what is arguably the finest mining jurisdiction globally. I don't Mark...
Mark Reichman
analystGiven how tough things have been, with inflation and all, I believe you've done a solid job running this project. I'm just looking for a bit of confidence regarding the financials. To put it plainly, the NAV started at roughly 634 million, and it now sits at $348 million. Yet you still anticipate that $90 million in cash flow. So my main interest was really in the underlying economics. Then my second question, directed at Mitch, was about the longer horizon. What I mean is, Silvertip appears to become more promising with each passing quarter. The issue is I've been told by certain investors that a common criticism of the company is that it keeps issuing equity. And I believe there is some worry out there. Some investors, I think, would prefer to see spending paused; after Rochester is up and running, that cash flow would go back to shareholders through buybacks, but instead it appears that once Rochester wraps up, the cash flow will be directed at paying down debt and afterward launching yet another large-scale spending initiative at Silvertip; so my question is, will there be any opportunity to give back — to give back a portion of cash flow to shareholders through buybacks?
Mitchell Krebs
executiveThat's a reasonable question. And we — I would say we mostly concur with the latter portion of what you asked concerning the order and the timing, and this is something we have thought about extensively. And honestly, the expanding size and scope and possible importance of Silvertip sort of assists — has assisted in steering us toward a view that we finish Rochester, produce free cash flow, at first apply it to reducing the strain on the balance sheet that we've been drawing on to support funding the POA 11 expansion and produce positive free cash flow, and be a steady source of free cash flow while we move Silvertip forward. And I think that represents somewhat of a shift from where we stood, let's say, 9 months back, when our thinking leaned more toward moving earlier from POA 11 completion on to Silvertip. And I think that's where the chance exists, then, to — paying down debt won't require much time given the sort of free cash flow we expect to produce after POA 11, as to whether we then pivot to giving capital back to stockholders. Naturally, as is our habit, we will discuss that with our board and reach decisions as appropriate at that moment. Still, I believe that reaching positive free cash flow — returning the company to that state — and holding it there for some time, as Silvertip progresses, while we remain receptive to options regarding Silvertip, whether partnership structures or other situations, could assist in spreading out risk and lowering how much capital is needed for a company of our size, so that it won't place a major future burden on the company's balance sheet if and when we proceed with an expansion and restart.
Brian MacArthur
analystI'd like to dig a bit deeper into what's left on the CapEx at Rochester. You mentioned $600 million, with $350 million already committed. So I assume that leaves $250 million remaining; yet your guidance on Page 9 shows $217 million to $257 million for this year. If I subtract the $73 million spent at the low end and $143 million, then next year's low end comes to $131 million; so I get roughly $275 million against that $250 million — have you already factored in that 5%, or — how am I supposed to interpret this? Because I just can't — I'm only trying to work it out. What matters to me is how much cash is still left to spend at door on Rochester. I'm attempting to square all of that.
Mitchell Krebs
executiveA sharp reader of our disclosures. I love that, Brian. And Tom, I'll have you add a bit more detail here shortly; but Brian, that really highlights exactly what we're observing regarding the timing of billings and payables. So between accrual and cash, capital going out the door, there's still — more than the $350 million we've incurred so far still needs to be paid. And so that's something we've — obviously, we're monitoring this like a hawk. And the timing of some of this cash in terms of peak capital at POA 11 will be more, shift more into this current third quarter and into the fourth quarter; we had previously expected a lot of that to come through the door and get paid out in the second quarter. But that's now happening kind of in the second half of the year; that's I think one of the key distinctions in what you've identified there. Tom, do you want to...
Tom Whelan
executiveAlright, Brian, let me give you a few headline figures. We've incurred $350 million, and $297 million of that has been paid out. So roughly $300 million has actually gone out the door as cash. That leaves about $300 million still to come. Keep in mind that a portion of that will be covered through capital leases. But $300 million is sort of the magic figure remaining in terms of cash still to go. And as Mitch mentioned, we've updated just the timing of invoices. Around $155 million of that — or $150 million or so — is what we expect to go out here in the second half. And then the figures for next year stay as they are.
Mitchell Krebs
executiveOkay, Brian, let me come back to that for a moment. If roughly 300 million remains, the same sorts of levers we've discussed are still available, correct? You've got the cash, you've got revolver capacity, you've got those other equity investments. On top of that, there's free cash flow generated by our other operations, and those are supported by the gold hedges Tom walked through. So when you total all of that up and stack it against whatever is still outstanding at POA 11, we're comfortable with our position; we understand which levers exist and which ones we can pull whenever it becomes necessary.
Brian MacArthur
analystGreat. That is extremely useful, and I'm grateful, since I kept attempting to work out what portion came down to timing and whether it had gone past budget in that area. May I also ask one additional point regarding it, the 600 — typically, with these projects, working capital isn't always part of the figure. Is there any timing concern regarding working capital that I should keep in mind on top of that? Clearly, it will build up gradually and require funding, or something along those lines. Should I also be considering anything on that side?
Tom Whelan
executiveRight now we're midway through the '23 budgeting process, in which we're incorporating every one of the different ramp-up scenarios, when Merrill-Crowe is finished, et cetera, et cetera. So as things stand — nothing more from us at this point, though that '23 guidance will spell out quite clearly the anticipated timing, the ranges for cash costs in the coming year, et cetera, et cetera.
Mitchell Krebs
executiveRegarding that commission for the back half, my guess is there's a bit of cushion accumulating, yet additionally — with fresh liner too; so a handful of items will get resolved while we work through our budgeting and afterward establish guidance, and we will definitely lay out that piece, Brian.
Brian MacArthur
analystGreat. That's really useful too. Perhaps I'll just piggyback on that other Silvertip question, since I was thinking about it the same way. At one point, you might have been considering 25%, possibly 26% coming in. From what I hear, these figures need projects, and working everything out will require some time. I mentioned that obviously there's time value of money involved. If you keep delaying before development again and again, eventually that comes into play. But should I roughly be thinking about the '26-'27 timeframe? Is that approximately what you have in mind right now for completing all the Silvertip work, which would then, like you mentioned, provide that gap to reduce debt and possibly give money back to shareholders? Is that a reasonable way to view things at this point?
Mitchell Krebs
executiveYes. I could provide a precise response if I possessed one. The reality is nobody here does at this moment; yet conceptually that seems far closer to the mark than jumping from the POA 11 vine straight over to the Silvertip vine. And when you consider commissioning and ramping up POA 11 in the back half of 2023, that positions us for an excellent 2024. If our aim is producing some free cash flow and delevering, that begins to indicate how many extra years possibly past that point we would anticipate not spending any possible capital at Silvertip; so I'm not sure whether that sort of assists and mirrors our thinking at this moment; and larger also clearly means a different type of permitting strategy, which will require some added time too within that window.
Brian MacArthur
analystThat's going to be my following one, and I'll relinquish it. That was my final question, then. So regarding all of this — well, all of this is being found out. Does a great deal of fresh permitting need to happen, or I mean, I understand the intrusion within hub and spoke, what portion of it would be on places that had already been completed? So like you mentioned, it moves along rather fast. And what portion of it would you truly need to devote a decent amount of time to permitting?
Mitchell Krebs
executiveMick, would you like to...
Mike Routledge
executiveWhen it comes to exploration, we're sitting in a solid position, and every one of those areas is available for us to go in and examine. On the operations side, if we install — and we do expect to install — a plant that is 2 times the size or larger, an environmental assessment is going to be required, and that consumes a certain amount of time. Some of that effort has in fact already begun on our end, so we can figure out how it shapes up and what the schedules look like. Once our planning moves forward, we'll pass that along. That said, as Mitch mentioned, it's thrilling, it's expanding, and we'll need to map it out and get the sizing correct.
Mitchell Krebs
executiveAll right, thank you. Just before we finish, I'd like to take a moment to express appreciation to each of our team members and contractors for the outstanding effort, commitment, and toughness everyone has shown. It fills me with pride to witness what all of you are accomplishing as we keep chasing an elevated benchmark and work to make Coeur America's leading expanding precious metals business. So, that said, I appreciate your participation on today's call, and we will talk with you once more in early November regarding our results for the third quarter. Take care. Thank you.
Operator
operatorThat brings an end to our call. We appreciate everyone joining us for today's presentation. You're free to leave the line now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coeur Mining, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Coeur Mining, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coeur Mining, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.