Coeur Mining, Inc. (CDE) Earnings Call Transcript & Summary

August 8, 2024

New York Stock Exchange US Materials Metals and Mining earnings 25 min

Earnings Call Speaker Segments

Mitchell J. Krebs

executive
#1

Good day, everyone, and thank you for being on the call. Ahead of getting started, I'd like to draw your attention to the cautionary language about forward-looking statements contained in today's slide deck, and to direct you to the SEC filings posted on our website. I'll begin with a few highlights from Slide 3, then hand things over to the team, after which we'll take your questions. The primary objective in Q2 was to complete the ramp-up at Rochester and get the company into position for the shift to positive free cash flow during this year's second half; that effort paid off, and Rochester is now steadily crushing and placing roughly 90,000 tons per day, something that ought to drive significant gains in production and reductions in unit costs over the second half. At Rochester, both silver and gold output rose by close to 40% during the second quarter — an encouraging indicator that the team in Nevada is building momentum as we enter the back half of the year. Mick will share a few more specifics about Rochester shortly. As we pass the midpoint of the year, our 3 remaining operations are likewise on course for solid results. Palmarejo delivered yet another quarter of strong free cash flow. Wharf stayed steady and in line with plan. And Kensington has settled into a good rhythm following a couple of years of heavy investment and the implementation of several operational improvements, which Mick will describe in more depth. Our standout leverage to rising prices was fully evident this quarter. Second-quarter prices came in roughly 10% above the prior year, and yet quarterly adjusted EBITDA climbed 136%, while LTM adjusted EBITDA rose 90%, reaching $192 million. With Rochester's ramp-up behind it, Kensington is positioned for its own inflection point in free cash flow during next year's second half. The heavy underground development and drilling of the last 2 years should taper off by the middle of next year, which leaves Kensington well placed to generate positive free cash flow, with more operational flexibility and an extended mine life. Both Mick and Aoife will speak to the progress at Kensington; last month's closing of the acquisition of 2 key concessions from Fresnillo and the consolidation of the land package east of Palmarejo was a great step. In a few minutes, Aoife will discuss our plans and priorities for this sizable prospective land position, which lies outside the Franco-Nevada gold stream boundary and opens up an entirely new set of higher-margin opportunities to extend mine life at Palmarejo. Aoife will additionally address the goals and progress of the summer exploration program now underway at Silvertip. It remains our view that the coming together of all these catalysts — stronger commodity prices, a ramped-up Rochester, a steady group of U.S.-focused mines rich in organic growth opportunities, and a world-class Canadian exploration project — together with our imminent shift to positive free cash flow, to be followed by a stretch of aggressive debt reduction, distinguishes us from our peers and leaves us strongly positioned as we head into the second half. Mick, the floor is yours.

Michael Routledge

executive
#2

Thanks, Mitch. Rochester’s ramp-up has gone well, and steady contributions from throughout our portfolio leave the company in a strong position halfway through 2024. Even more significant, Coeur’s safety culture is deeply ingrained, and that keeps coming through in how we perform on safety overall. I’m happy to share that Wharf had a clean slate in June, which marked one year of operation there with no lost time incident. In June as well, the Nevada Mining Association gave safety awards to 7 people at Rochester. Congratulations to that team for helping us pursue a higher safety standard. Moving to Slide 4 for our Q2 results, starting with Rochester: silver output rose to 973,000 ounces in the quarter, and gold production climbed past 8,000 ounces, thanks to additional crushed tonnage run through the new circuit. As we disclosed on July 11, ounces placed during Q2 came in below the original plan, yet Rochester is still positioned to meet its 2024 production guidance. During the initial weeks of Q3, throughput has frequently met or surpassed the anticipated average operating capacity of 88,000 tons per day, and the team keeps leveraging downtime to fine-tune and enhance operations; in July we crushed and placed close to 2 million tons, and we are still strongly positioned to achieve crushing and placement rates of 7 million to 8 million tons each quarter across the second half and into 2025. Alongside reaching these elevated crushing and placement rates, our priority for the latter part of 2024 will be reducing material crush size toward a goal of 0.625 inch so as to maximize recoveries. Turning to Palmarejo, after an excellent first quarter the mine put together another strong three-month stretch, producing more than 25,000 ounces of gold along with close to 1.6 million ounces of silver. The team celebrated a groundbreaking in June for a third access portal at Hidalgo, a future ore source situated just to the north and west of Independencia, and it's expected to give a meaningful boost to our underground mine development and exploration work there. With the Fresnillo transaction now closed, the operations team is collaborating closely with the exploration group on plans for near-term development opportunities, and Aoife will go into more detail on that shortly. At Kensington, the operation keeps building momentum, with meaningful gains achieved in long-haul drilling capacity, pace placement, and bringing more stock feed to the surface. As Mitch noted, the Kensington team has put in the hard work to make the operation a long-lived, revitalized generator of free cash flow, beginning in the second half of next year. The multi-year capital development investment is progressing well and is ahead of schedule, with more funds being assigned to the program so there is greater operating flexibility and access to new ore zones. For the project's current scope, the program is now roughly 82% complete. To wrap up on Wharf: robust grades helped push quarterly gold output up to 22,000 ounces, and adjusted CAS fell 29% versus Q1, landing at an impressive $822 per ounce. Back when Coeur bought Wharf in 2015, reserves were roughly 560,000 ounces. By the end of 2023 — 9 years afterward — Wharf's gold reserves came in above 760,000 ounces, and there's still more exploration upside ahead. The crew on site has lately pinpointed 2 fresh opportunities close to existing mining zones, designed to add considerable length to Wharf's already lengthy life. Those 2 targets, North Foley and Juno, are slated for drill testing across the rest of 2024 and 2025 to show how big the potential opportunity could be. With that, I'll hand it over to Tom.

Thomas Whelan

executive
#3

Thanks, Mick. I'll begin by briefly reviewing the second quarter's financial results, then spend a moment on the revised cost guidance as we hit the midpoint of 2024. Finally, I'll update you on our plan to delever the balance sheet, now that Rochester and the company as a whole are generating free cash flow again. As Slide 10 shows, Coeur's financial results are improving fast, driven by the three-way combination of stronger gold and silver output, higher metals prices, and declining capital spending at Rochester. Now that Rochester has moved deeper into stable, steady-state operations and the remainder of our portfolio is producing 100% unhedged gold and silver, that turning point for free cash flow is here; we are still on course to meet 2024 production guidance at each of our operations, and we have made the refinements below to our 2024 cost guidance. At Palmarejo, improved grades, along with easing inflationary pressures and a weaker Mexican peso, have led to a lower 2024 CAS guidance. 2024 CAS guidance at Wharf has also been reduced, thanks to crusher performance that beat expectations and mining efficiencies stemming from ongoing business improvement initiatives. At Rochester, our CAS guidance went up because we used extra trucking capacity in the first half to place profitable run-of-mine material at a higher cost, and that helped make up for fewer tons than planned going onto Stage 6 during the first half. Beyond that, our overall 2024 CapEx and exploration guidance has been revised as follows. At Rochester, we lifted full-year capital guidance because of an earlier-than-planned final payment to our main contractor tied to the expansion we recently finished; we also sped up equipment purchases to secure savings, and there were several post-start-up modifications. For Kensington, we increased the capital range for the full year to account for faster underground mine development and exploration spending. That increase reflects productivity from our underground mine development and drilling contractors that came in above what we had planned. And for Wharf, we lifted the full year exploration guidance to account for drilling we intend to do at the recently identified opportunities that Mick just mentioned. This capital allocation aligns with the framework we highlight on Slide 13. Moving to the balance sheet on Slide 12, we finished the quarter with roughly $275 million drawn against our $400 million revolving credit facility. Since the peak we hit a year back, the numbers on our balance sheet have gotten a lot stronger, and net debt to EBITDA is now under 3x — something we haven't seen in more than two years. As cash flows pick up speed in the back half of the year, we plan to start paying down the revolver aggressively, moving us toward our long-term leverage goals of 1x total debt to EBITDA and 0 net debt to EBITDA. With that, I'll hand things over to Aoife.

Aoife McGrath

executive
#4

Beginning with Palmarejo on Slide 8: the concessions we recently acquired from Fresnillo give us complete access to the 4 mineralized belts in the district that trend northwest. Among these belts, the mine trend has historically drawn the greatest exploration attention, and a high percentage of resource and reserve ounces are sourced from deposits located there. The new Independencia Sur claim block — marked by the red oval at the center of the map — holds the southeast extension of the mine trend; it lies right next to our current mining infrastructure and includes the continuation of several key veins, among them Independencia and La Nacion. Fresnillo drilled on this block, and we are hopeful that through further exploration we can define new resources in the very near term. Mapping is already well advanced, and relogging Fresnillo's core and folding it into Coeur's database and geological models are immediate goals, with drilling scheduled for early 2025. The new Guazapares concession block, shown in the large red oval at the top right of the map, represents the most easterly northwest trending mineralized belt at Palmarejo. It encircles multiple advanced exploration targets that hold significant drilling and historic resources, which came into Coeur's portfolio via the 2015 acquisition of Paramount Gold and Silver. This fresh Fresnillo concession block provides complete access to those historic resources and creates meaningful down dip and along strike opportunities. Validating these historic resources and extending them along strike and down dip is a short to medium-term exploration priority. Lying between the northwest trending mine and Guazapares mineralized trends is the Camuchin — Escondida trend; it is the third of 4 identified belts at Palmarejo and hosts a number of key exploration targets anticipated to span the short to long-term exploration focus. Other notable news this quarter includes the start of the biggest summer program ever at Silvertip. This year we are pursuing a 3-pronged approach: near-mine extensions to known mineralization through underground drilling, larger step-outs on known structures to add resources quickly via surface drilling, and regional scale exploration aimed at finding Silvertip lookalikes and larger structures that could host bigger ore bodies. We look forward to updating you on the program later in the year. At Kensington, the multi-year program is advancing well, outlining new zones in upper and lower Kensington and demonstrating continuity of mineralization between Elmira and Elmira South; we remain very encouraged about ongoing mine life growth across this program. With that, I'll hand the call back to Mitch.

Mitchell J. Krebs

executive
#5

Thanks, Aoife. Before we get to the Q&A, I'd like to briefly draw your attention to Slide 14, which lays out the main priorities we have for the rest of the year. We're eager to deliver a solid and safe second half, marked by increased production, positive free cash flow and reduced debt, as we gain momentum going into what ought to be a fantastic 2025. With that said, let's go ahead and take questions.

Joseph Reagor

analyst
#6

So, first off regarding Rochester, you folks revised the cost guidance there, and there was a mention that this tied to placement timing. Could you shed a bit more light on that — like, what precisely is behind it, and were there any shifts in your expectations when it comes to costs apart from that item?

Mitchell J. Krebs

executive
#7

Yes, absolutely. I'll give it a shot. And after that, Mick, perhaps you could chime in. Joe, it's genuinely a matter of the denominator against the numerator. So, there are no actual changes whatsoever to any of the inputs. It was purely a matter of the timing of ounces being placed out onto Stage 6; during the second quarter, we pulled a few more downs than had been planned in order to clear out some items that had been flagged during the ramp-up, so we could try to ensure a solid, clean second half lies ahead of us. And so, simply as a consequence of when tons get put out there onto Stage 6, that is truly what's behind our decision on cost guidance for the back half of the year at Rochester. Mick, anything you'd like to add?

Michael Routledge

executive
#8

Yeah, we're genuinely pleased with how the ramp-up has gone. And like Mitch mentioned, we seized the chance to put in the real effort, so that after reaching that nameplate capacity and run rate, we'd be able to hold it there, while during the second half we optimized the size PSD, which lets us push those recoveries higher. So it's all unfolding the way we anticipated. Only slightly behind schedule on a handful of those <<inaudible>>.

Mitchell J. Krebs

executive
#9

And I suppose, just as a follow-up, one final point there, Joe. I believe it appeared either in the remarks we made or perhaps in the release. Just regarding some of that — the downtime, and then we used the chance to — with the trucks, to haul a portion of run-of-mine material. So that too formed part of the equation as we considered second half cost guidance for Rochester.

Joseph Reagor

analyst
#10

All right, that's useful. Regarding the property we picked up close to Palmarejo, what's the soonest you figure you'd be able to take your first ounce out of the ground there?

Mitchell J. Krebs

executive
#11

That's a fair question; we'll likely be drilling initially in the first part of next year, especially in that closer area outlined on that slide in the materials. Naturally, a great deal of the underground development will then need to follow after we've defined more mineralization there, really along the southeastern extension of both Independencia and Nacion, which would likely push us into 2026 for the first window of getting some ounces out of that nearby area we just bought from Fresnillo. Aoife, Mick, is there anything either of you would like to add?

Michael Routledge

executive
#12

Right. The key point is that underground, it sits near infrastructure. These are zones we're already mining, so they're essentially extensions of those zones. So, as Mitch mentioned, there's some work ahead. We need to characterize it, and we need to develop toward it, but it isn't too far off.

Aoife McGrath

executive
#13

Absolutely. The initial work we'll carry out at that site involves re-logging some of the historical Fresnillo core, and that should get underway very soon. Across the entire land package, we've spent this year mapping and sampling. Our goal is to have rigs turning there fairly early in the new year.

Joseph Reagor

analyst
#14

All right, that works. Then one final item: as cash flow grows and you're in a position to concentrate on paying down debt, what cash balance would you like to hold, and how much debt do you want to eliminate over the coming couple of years?

Mitchell J. Krebs

executive
#15

Yeah. Tom, would you like to address how we view the balance sheet and where we aim to be over the longer term?

Thomas Whelan

executive
#16

Yes. Let me return to the points we made earlier. Over the long term, we consistently target total debt to EBITDA of 1x and net debt to EBITDA of 0. So to reach that, if you consider the current senior notes balance, which is just a shade under $300 million, that roughly aligns with what we expect the company's long-term EBITDA to be going forward. Therefore, once free cash flow begins in the second half of the year, all of it will be directed toward paying down that revolver. How quickly could we repay the revolver? How quickly could we reach those long-term objectives? I think saying we'd accomplish it by the end of '25 would be a stretch, but definitely in '26. It's not out of the question, however, in '25, if commodity prices were to rebound and remain at levels only slightly above where they are now. As for minimum cash, we likely want to always keep at least $50 million on the balance sheet. With operations in 3 jurisdictions, it's probably preferable to be a bit higher than that, but the absolute minimum we require is $50 million.

Marc Ferrari

analyst
#17

I was just curious about how the Rochester crushing circuit is doing when it comes to reliability, and whether you're noticing any trouble spots.

Mitchell J. Krebs

executive
#18

Yeah. Mick, could you give us an update on roughly July, August, and then how you expect the back half of this year to play out and then on into 2025?

Michael Routledge

executive
#19

Yes. Honestly, things are looking positive. We're merely 4 or 5 months into what should be a longer ramp-up, and we reached the nameplate capacity — that makes us quite pleased. Day in and day out, we're observing steady figures, operating in the range of 90,000 to 100,000 tons each day. So last month, despite a few downtime events, we sent close to 2 million tons to the pad. For the remainder of the year, we anticipate exceeding that, expecting to land somewhere between 7 million and 8 million tons per quarter. And that really positions us well, because throughout that stretch of 7 million to 8 million tons, we keep refining for size fraction. We can already see that coming into tune somewhat. We're getting some genuinely strong results out of July and a solid beginning to August. So that has given us considerable confidence that we'll reach the 32 million tons in 2025, and that we'll have the size fraction tuned to 0.625 inch and be achieving the recoveries we anticipate moving forward. So yes, on the whole, everything is performing the way we said it would, and we're quite pleased with how things are going.

Mitchell J. Krebs

executive
#20

Yeah. So stabilizing was the focus for the first half. Now optimizing is the focus for the second half. And I'd say it's fair to note that at Rochester we're well into that optimizing mode.

Michael Routledge

executive
#21

Yeah. There are a handful of small tasks left, but we've got a day here and a couple of days there to fine-tune as we move through the back end of the year, and we'll optimize that size fraction.

Mitchell J. Krebs

executive
#22

All right, thank you all for joining us today, and we’re eager to speak with you again in November when we cover how we performed in the third quarter. In the meantime, enjoy the rest of the summer and the fall season. Goodbye.

Operator

operator
#23

That brings us to the end of this conference. We appreciate your joining today's presentation. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Coeur Mining, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Coeur Mining, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coeur Mining, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.