Cogent Communications Holdings, Inc. (CCOI) Earnings Call Transcript & Summary

November 5, 2026

NASDAQ US Communication Services Diversified Telecommunication Services earnings 72 min

Earnings Call Speaker Segments

David Schaeffer

executive
#1

Thanks, and good morning, everyone. Welcome to the earnings conference call for our third quarter of 2026. This is Dave Schaeffer, Chief Executive Officer of Cogent. Tad Weed, our Chief Financial Officer, is with me today. I want to discuss a few key events and significant matters from the quarter. During the third quarter of 2026, we continued making progress in advancing the Cogent Classic business and in operating the company more efficiently. I'd like to begin by recognizing some significant accomplishments we achieved and by providing an update on several important matters. First, the ongoing shift toward our more profitable on-net services and away from less profitable off-net services continues. We're still working through cost cuts, margin improvement, and wrapping up a lot of integration work. Third, our wavelength segment continues to advance and expand, while capital expenditures and capital lease payments are coming down; we're also making ongoing headway on data center monetization; we keep lowering leverage on our debt, and we're dealing with our 2027 unsecured notes. First, the shift toward on-net products. Better margins and EBITDA growth in the third quarter came mainly from our push to sell higher-margin on-net services. We keep serving on-net customers across 3,665 on-net buildings. In the quarter, total on-net revenues—wavelength revenues included—came to $153.9 million. That's up 5.8% from a year earlier and 2.4% quarter over quarter. During the third quarter of 2026, 81% of our sales were for on-net services, wavelengths included, and on-net services, wavelengths included, accounted for 67% of Q3 2026 revenues, versus 64% in the prior quarter. Now a few words on cost reduction and further margin expansion. Careful cost cuts and the wrapping up of a number of our integration projects helped lift both our gross margin and our EBITDA margins this quarter; we keep looking for efficiencies and finding ways to lower our costs. Network services costs came down 3.1% from the prior quarter and 7.7% versus a year earlier. Consequently, our gross margin percentage rose 180 basis points year over year and was up 60 basis points quarter over quarter, reaching 47.6%. SG&A expenses fell 5.1% sequentially and declined 1.3% compared with the same period last year. Because of that, EBITDA as adjusted grew by $2.8 million from the previous quarter to $73.9 million, while our EBITDA as adjusted margins climbed 150 basis points sequentially to 32%. With the integration of the former Sprint assets now nearing completion, we keep assessing the right size for each of our departments. During the quarter, we brought total headcount down to 1,603 employees by quarter's end — that's 79 fewer than at the close of last quarter and 279 fewer than in Q3 of 2025. That works out to roughly 5% of our workforce compared with the prior quarter. Costs tied to these reductions were recorded in the third quarter of 2026. Turning to Wavelength sales. Wavelength remains a growth area for our business. At quarter's end, we offered wavelength services at 1,151 locations, with the ability to deliver 10 gigabit, 100 gigabit and 400 gigabit services. Provisioning generally takes around 30 days. Wavelength revenue totaled $16 million for the quarter. That represented a 57% increase compared with the same period last year and a 7.8% gain from the previous quarter. Our wavelength customer count grew 55.5% year over year and 11.3% quarter over quarter, bringing wavelength customer connections to 2,722. During the quarter we added 277 net wavelength connections, compared with 182 in the prior quarter and 199 in this year's first quarter; we find that pickup encouraging. At quarter's end, we had sold waves at 660 unique locations to 578 unique customers. We continue to anticipate capturing 25% of the North American long-haul wavelength market. At present our share is approximately 4%. A brief point regarding capital expenditures: CapEx declined 5.8% sequentially, totaling $36.3 million for the quarter. On CapEx, there's one headwind: vendor price hikes on certain equipment keep showing up due to supply chain constraints. Sequentially, principal payments on capital leases fell 26.6%, landing at $7.1 million this quarter. CapEx plus capital lease principal payments together declined 10% quarter over quarter, going from $48.2 million to $43.4 million; next, an update on data center monetization; our focus remains on monetizing the 24 former Sprint central offices that were converted into data centers and that we've earmarked for outright sale or wholesale leasing. Out of those 24 marked for sale, 14 facilities in total have been sold or are under agreements to sell. During the quarter just ended, we completed the sale of 10 former Sprint facilities, receiving $225 million in cash. Two nonbinding letters of intent have been signed covering four more former Sprint sites that were converted into data centers, with a combined cash price of roughly $100 million. Those transactions are anticipated to close early next year. Many of the former Sprint facilities we've turned into data centers continue to draw interest from multiple parties. Turning now to leverage and debt reduction: we bought back $138.8 million at par of our 2032 notes, paying an average price of $90.348, which came to a cash cost of $125.4 million and produced a gain of approximately $12 million. Through those repurchases, yearly interest cost on the 2032 notes fell to $30 million from $39 million, and our gross leverage declined. In addition, we repurchased $50 million of the 2027 notes at an average price of $99.25. Capital lease balances decreased to $622.1 million this quarter from $630.2 million at the close of the prior quarter. Accordingly, after adjusting gross leverage for amounts T-Mobile owes us, it declined to 6.94x from 7.5%, or 7.5x, in the previous quarter. Those transactions reduced total gross debt by $197 million in the third quarter. Let's move on to what's happening with the $700 million of 2027 unsecured notes that remain outstanding. In the course of the quarter, we reduced the outstanding principal on those notes from $750 million down to $700 million. That move, combined with the $138.8 million of our 32 notes, fulfilled the obligation to direct $168 million toward repurchasing this debt, funded by proceeds from the 10 data centers, as the supplemental indenture governing our 2032 notes requires. The $700 million in unsecured notes reaches maturity on June 15, 2027. To help us address that obligation on terms most favorable to Cogent and its stakeholders, we have engaged Evercore and Latham & Watkins. We have received multiple proposals, and with assistance from Evercore and Latham & Watkins, we are currently assessing each of those offers. We remain open to soliciting additional proposals and will evaluate every possibility available to Cogent. As that process continues, our Board determined it was wise to pause our dividend program—which was modest, to say the least—until we have chosen a direction going forward. Now, a note about expectations concerning our guidance. Please remember that our guidance is designed to span multiple years and does not pertain to any specific quarter. Even though our growth number for Q3 2026 came in negative, we believe the revenue drop tied to the Sprint customer base we acquired is continuing to ease; over the long run we're looking for growth of 6% to 8%, alongside EBITDA margins that widen by about 200 basis points annually. Keep in mind that our revenue and EBITDA guidance is multiyear in nature and isn't meant to serve as guidance for any particular quarter or year. At this point I'll pass it to Ted, who will read the safe harbor language and walk through some further detail on our operational performance during the quarter. Once that's done, I'll give a summary, and then we'll take questions and answers on the call.

Thaddeus Weed

executive
#2

Thank you, Dave, and good morning to everyone. This earnings conference call contains forward-looking statements, which rest on our present intent, beliefs, and expectations. Those forward-looking statements, along with any other remarks on this call that aren't historical facts, carry a number of risks and uncertainties, so actual results could differ materially. For details on the factors that might cause actual results to differ, please see our SEC filings. Cogent assumes no obligation to update or revise any forward-looking statements. Should we use non-GAAP financial measures during the call, you'll find them reconciled to the matching GAAP figure in our earnings releases posted on our website at cogentco.com. A few comments on the revenue results. So even though top-line revenue fell in the aggregate, we managed to raise both our gross margin and our EBITDA margin. The gains in gross margin and EBITDA margin came from cost reduction and a shift toward our more profitable on-net products. Looking at revenue by connection type from the third quarter of 2023 — the first full quarter after we combined with Sprint Wireline — against this quarter shows the substantial changes in our revenue mix and the strength of our underlying Cogent Classic business. On-net revenues accounted for 47% of total revenues in the third quarter of 2023. Total on-net revenues, including wavelength revenues, rose to 66.6% this quarter, versus 63.8% last quarter and 60.1% in the third quarter of 2025. Off-net revenues made up 48% of total revenues in the third quarter of 2023. Off-net revenues have fallen to 33.1% this quarter, compared with 35.9% last quarter and 39.3% of total revenues in the third quarter of 2025. Non-core revenues represented 5% of total revenues in the third quarter of 2023, and they have now dropped to under $1 million and roughly 0.3% of total revenues this quarter. Total revenue for the quarter came in at $231.2 million. That was a sequential decline of $4.4 million, or 1.8%. USF tax revenues had a negligible effect on sequential revenue results and a negative year-to-year impact of $0.3 million. FX had a negative impact of $0.4 million on sequential revenue and negative $0.5 million on year-over-year revenue results. We analyze and classify our revenues into 4 network connection types and 3 customer types. The 4 network connection types are on-net, off-net, wavelength, and non-core. The three customer types are NetCentric customers, corporate customers, and enterprise customers. Sequentially for the quarter, on-net revenues, including Wave revenues, which are predominantly on-net, grew by $3.7 million. Our less profitable off-net revenues declined by $7.9 million. Non-core revenues decreased by $0.1 million, and wavelength revenues, again almost entirely on-net, rose by $1.2 million; on IP lease revenue. IPV4 leasing revenue grew sequentially by 1.8% to $18.4 million and by 5.4% year-over-year. Our lease pricing remains highly consistent, at $0.40 each month for every address. We have titled the 37.8 million IPV4 addresses, and roughly 15.3 million of them are leased out. Big shifts within the acquired Sprint Wireline revenue base have obscured how our Cogent Classic business is really performing. After we completed the Sprint acquisition from T-Mobile, the Cogent Classic revenue base grew 29%, rising from $155 million to $201 million. Conversely, acquired Sprint Wireline corporate and enterprise and non-core and off-net revenues fell to $29 million this quarter. Corporate business. This quarter, our total corporate business made up 42% of revenues, which was down 7.7% year-over-year and 1.6% lower sequentially. NetCentric, our total NetCentric business keeps growing and gains from rising video traffic, artificial intelligence-related activity, streaming, IPV4 leasing and wavelength sales. This quarter, our NetCentric business accounted for 46.3% of revenues. That marked a 6.9% increase year-over-year. Sequentially, it was flat. Enterprise business. For the quarter, our total enterprise business accounts for 11.7% of revenues. Quarterly enterprise revenue fell 26.1% year-over-year and 8.7% sequentially, mainly because acquired Sprint Wireline enterprise off-net revenues were reduced. Revenue and customer connections by network type. At quarter's end, we serve our on-net customers across 3,665 total on-net buildings. Total on-net revenue, including wavelength, came to $153.9 million for the quarter, up 5.8% year-over-year and 2.4% sequentially. Off-net revenue for the quarter was $76.6 million; that represented a 19.5% decline year-over-year and a 9.3% decline sequentially. Our off-net revenue results are affected by continued grooming and termination of low-margin off-net contracts. Some comments on pricing. The average price per megabit across our installed base dipped slightly sequentially, to $0.10 from $0.11 last quarter and from $0.16 in the third quarter of last year. For new customer contracts this quarter, our average price per megabit was $0.05, versus $0.06 last quarter and $0.07 in the third quarter of last year. Our ARPUs. For the quarter, our ARPU figures were as follows: on-net ARPU was $524. Off-net IP ARPU was $1,123. Wavelength ARPU was $2,062. IPV4 ARPU was $0.40 per address. Churn. Our on-net unit churn — the monthly churn rate — was 1.1%, an improvement from 1.3% last quarter. Off-net churn is mainly driven by the reduction in our acquired Sprint customer base, and our off-net unit churn monthly rate was 2%, an improvement from 2.3% last quarter. Our wavelength monthly churn rate has stayed very stable, at about 0.5%. Traffic. IP network traffic growth carried on during the quarter. Sequentially, our IP network traffic for the quarter rose 4%, and year-over-year it rose 14%. Sales rep productivity. Our sales rep productivity improved sequentially, reaching 4.6% for the quarter. That was up from 4.5% last quarter. Our long-term average rep productivity stands at 4.8%. Foreign currency. Revenue generated outside the U.S. is still roughly 21% of our total, and that held steady this quarter. Using the average euro and Canadian dollar-to-USD rates seen so far this quarter — that is, for Q4 — we project the FX conversion effect on our sequential revenues in the fourth quarter will come in at negative $0.8 million, while the year-over-year quarterly revenue hit will be $1.2 million. On customer concentration: neither our revenue nor our customer base is heavily concentrated. Roughly 16% of our revenues come from our top 25 customers. Turning to debt and debt ratios: total gross debt at par stood at $2.2 billion at quarter end. That figure includes our finance IRU lease obligations of $62.1 million, which were reduced and are down from $630.2 million in the prior quarter, along with the reduced principal on our 2032 secured notes, now at $461.2 million, and the reduced principal on our 2027 notes of $700 million. Net debt — total debt less our cash and the $137.5 million discounted value of amounts due from T-Mobile — came to $1.8 billion. Our leverage ratio, as calculated under the more restrictive indenture governing our $700 million unsecured 2027 notes, was 5.35, and our secured leverage ratio was 3.25. Our fixed coverage ratio was 2.32. Under the 2032 notes indenture, the definition of consolidated cash flow counts cash payments made under our IP transit services agreement with T-Mobile when determining consolidated cash flow. Consequently, our leverage ratio calculated under the 2032 notes indenture was 4.11, secured leverage was 2.5, and fixed coverage was 3.02. On cash and restricted cash: at closing, $168 million of the net proceeds from selling the 10 data centers was treated as restricted cash, because that amount was set aside for buying our debt obligations at a discount. We have bought $138.8 million par value of our 2032 notes and $50 million par value of our 2027 notes, for total par value purchases of $188.8 million. Because of that, no restricted cash tied to the data center proceeds remained at quarter end, and we also cut our restricted cash by $20 million thanks to results from our IPV4 leasing revenue. On bad debt and DSO: DSO at quarter end was 30 days, versus 29 days in the prior quarter, and bad debt expense equaled 1% of revenues for the quarter. With that, I'll hand the call back to Dave.

David Schaeffer

executive
#3

Thanks, Tad. I'd like to highlight a few of our strengths — in the network, the customer base, and the sales team. Big industry trends, be it streaming video or artificial intelligence, keep working in our favor directly. By the close of the quarter, wavelength services were available for sale in 1,151 data centers across North America, with turn-up taking 30 days or less. At quarter end, waves were being sold to 578 distinct customers across 660 of those locations. And as of quarter end, IP services were for sale in 1,992 data centers around the world, spanning 58 countries and 309 markets globally. When the quarter ended, 7,531 networks had direct connections to our IP network. Of those, 22 are settlement-free peers, while 7,509 are Cogent paying transit customers. Our ongoing focus is on raising the productivity and effectiveness of our sales force and on managing out sales reps who underperform. This quarter, sales rep turnover came in high at 7.7% per month, exceeding our historical average of 5.7 reps per month, though it was below our all-time peak of 8.7%. We finished the quarter with 471 quota-bearing sales reps. On the sales side, we had 244 sales professionals dedicated to the NetCentric market, 216 professionals dedicated to the corporate market, and 11 sales professionals dedicated to the enterprise market. To sum up, we've achieved progress across several key areas. Margins are improving and EBITDA is growing, thanks to diligence and cost reductions, the completion of numerous integration projects, and our preference for selling on-net services rather than off-net. In the quarter, 81% of our sales, wavelengths included, were on-net. In the third quarter, 67% of our revenues, wavelengths included, were on-net, versus 64% in the prior quarter. We're pushing hard to squeeze more revenue out of the Sprint facilities we bought and turned into data centers, and to speed up EBITDA growth so we can bring our leverage down further. Capital allocation is something we handle with a lot of discipline. Our wavelength business keeps us focused and encouraged. What sets our wavelength services apart is quality, how broadly we reach, the distinctiveness of our routes, reliability, efficiency, and how we provision them. For our customers, the on-net services we deliver genuinely provide value that can't be matched. When the quarter closed, we were delivering IP services across 1,820 carrier-neutral data centers along with 172 data centers owned by Cogent; that footprint amounts to roughly 18 gigawatts of installed power. Across our Cogent data centers, we have roughly 150 megawatts of power available and about 1.5 million square feet of floor space. Certain of these Cogent facilities have also been upgraded further so they can accept high-power density cabinets supporting as much as 20 kilowatts per cabinet, compared with the standard 6-kilowatt cabinets we have historically offered. The proceeds from our data center sales have genuinely improved our liquidity, allowing us to reduce leverage while preserving room to continue investing in the network. We are continuing to market additional facilities for sale, and we are working diligently on the 2027 note maturity. Above all, Cogent provides better products, unmatched quality, a wide footprint in traffic-rich locations, faster provisioning and pricing that disrupts the market. To sum up, value is where we win. With that, I would like to take questions from the floor.

Greg Williams

analyst
#4

First, on the refinancing — it sounds as if you're still collecting proposals, so there's a bit of back and forth involved. What are you trying to achieve, and what result do you want — exchanges, a reduction in principal, or something else? And broadly speaking, where does the effect show up? And at the end of the day, why is it taking so long? Also, what are your latest expectations on rates and the timing for deals here? Second, just on EBITDA and OpEx — EBITDA came in slightly light. I'm wondering where those savings you've referenced previously are? We'd have expected the data center removals from the ones you sold to I2 to show up to some degree, along with the transition cost removals and the Sprint cost reductions. I get that there's some severance in the quarter that might have eaten into the EBITDA a bit. What did severance costs come to this quarter? And once more, what are the puts and takes on EBITDA as we think about the fourth quarter setup?

David Schaeffer

executive
#5

Yes, sure. Thanks for both questions, Greg. On the refinancing process — the company has gotten several proposals for refinancing and dealing with the maturities, so we've brought in Evercore and Latham & Watkins to help us weigh the pros and cons of each one. We keep getting revised proposals from parties that already submitted, plus new ones. Since there are so many different permutations, the evaluation is more deliberate. My guess is we'll get these done in short order, but we can't give an exact time frame. As for the outcome, we're very focused on the total cash cost of our debt service. There are a few ways to handle that: adjusting the interest rate, posting more collateral so the exposure moves from unsecured to secured, reducing the principal, or some mix of those approaches. Given how many factors are in play, the analysis gets more complicated, which is the reason we've brought in extra resources to assist. Turning to your second question, about how EBITDA is trending. EBITDA rose by $2.8 million quarter over quarter even as revenue at the top line kept falling. We've experienced meaningful growth in EBITDA margin, and we did capture a portion of the savings tied to the data center sales—and thus the relief from some of those carrying costs—as well as some savings from the cuts we put in place during the prior quarter. That said, we lowered overall headcount another 5% during the quarter and absorbed the expenses related to those additional workforce reductions. As a general matter, we prefer not to disclose our severance policies, since they vary across the organization's different segments. That said, I'm confident the cost reductions we outlined during the previous earnings call—roughly $50 million yearly in aggregate—are beginning to materialize and should keep coming through. The last item is product rotation. Our emphasis remains on services with better margins, and during the quarter 81% of every sale was on-net, which brings substantially higher contribution margins, while essentially the entire revenue decrease came from off-net products whose margin contribution is far lower. We've made a substantial improvement to the mix—in the quarter right before we acquired Sprint, Cogent stood at 76% on-net. In the quarter right after that transaction closed, the merged company was just 47% on-net. That on-net share has since been lifted from 47% to 66%. So we remain a bit under the pre-acquisition level; however, with our continued push to sell on-net, we anticipate those on-net sales will come through and assist us in growing EBITDA, since we're highly aware that the subsidy stream from T-Mobile finishes in February of '28.

Chris Schoell

analyst
#6

Dave, you've told us you remain confident about the long-term opportunity for waves, though growing the business is proving slower than expected. Could you walk us through the constraints you're hitting right now — is it customer readiness, how sales are being executed, or competition? And why are you confident these headwinds can start to ease as we move toward 2027?

David Schaeffer

executive
#7

Yes. Of course, Chris. First, we saw a significant step-up in how many waves were installed quarter over quarter. We moved from essentially 199 up to 277, which works out to about a 40% rise in the count of waves installed; and we keep building a backlog. Demand is clearly strong, though a lot of our customers are running into limits on getting their services up and running — things like data center readiness, power availability, or equipment deliveries. All of those areas have seen significant supply chain constraints. There's close to $7 trillion in announced AI investment, but we also recognize that the bulk of it has yet to be finished — only roughly $1.5 trillion out of that $7 trillion has actually been completed. These limitations are what's holding up customer acceptance; we've been lucky enough to sidestep supply chain constraints when it comes to our network equipment, but the problem affects the entire industry. Demand still looks robust to me, and because of how we differentiate competitively, we're in a position to take share. My expectation is that this carries on in the periods ahead. Moving from a 3% market share up to 4% has taken longer than we'd prefer, yet it's still an encouraging indicator; and the very low churn we're seeing on waves at this point, given that we now have a couple of years of Wave experience, also strikes me as confirmation that our network is high quality. So on quality, on price, on location, on how quickly we deliver, we come out ahead in every one of those dimensions. And once customers manage to get past the constraints in their supply chains, I believe we'll witness a bit more acceleration in our Wave business. That said, this line of business expanded almost 8% from one quarter to the next — 7.8% — and posted a 57% increase compared with the prior year. We'd certainly prefer even quicker expansion, yet among everything in Cogent's portfolio, these stand as the highest growth rates.

Chris Schoell

analyst
#8

Can I just add a quick follow-up regarding wavelength ARPU, which has stayed fairly stable over the last few quarters? How is the 10, 100 and 400 gig mix developing? And at what point might we begin seeing ARPU uplift from circuits with higher capacity?

David Schaeffer

executive
#9

Yes. Last quarter, we actually got a modest uplift from that migration; this quarter, not many existing waves made the transition from 100 to 400. But we keep seeing the share of new orders for 400 waves rise. And we do expect ARPUs to increase gradually. Three inputs govern ARPUs: the speed, the actual path length and the contract term. We've also observed a slight move toward longer-term contracts, which offset the speed increases; and we finally are seeing a significant drop in request for quotes for 10-gig services, as we believe many customers are sunsetting that product and moving to 100, and many hundreds are moving to 400. So I think this is a multiyear trend. There's talk of 800-gig interfaces and conversations with equipment vendors. I think commercially available equipment for 800 will probably arrive sometime in late '28 or early '29. And the infrastructure we built is capable of supporting not only 800 gig interfaces, but 1.6 terabit when they become available as well.

Michael Rollins

analyst
#10

I'd like to explore whether there's another way for us to think about revenue. As you map out the path to substantial growth in revenue on a year-over-year basis, can you walk us through the bridge — perhaps broken out by product or by customer vertical, by customer segment vertical? And give us a sense of the pacing as you see it today, and how that trajectory toward improvement unfolds, where revenue starts to fuel EBITDA gains for the company on top of the cost reductions you've already described?

David Schaeffer

executive
#11

Yes, absolutely, Mike. Part of the revenue decrease has actually worked in favor of EBITDA margin, because of the product rotation. You're right about the underlying point—for margin gains to accelerate further, overall revenue growth has to improve. That said, we exceeded our multiyear margin targets this quarter. Longer term, we see 200 basis points as a more normal yearly rate of margin improvement. As for customer segments, enterprise is contracting fastest, at almost 30% per year. Customers brought over from Sprint are falling off even faster. In fact, annualized revenue remaining from those customers is roughly $115 million—about $29 million in the latest quarter—and it keeps shrinking at the fastest rate. The attrition will come from people who used to be Sprint subscribers, broken out by network segment, and it'll be largely off-net services. As a matter of fact, you saw our on-net services increase 5.4% year-over-year on a blended basis. There was some FX headwind in that number, so without it, the figure was closer to 6%. So it will be on-net, it will be organic Cogent sales, and it will be driven more by NetCentric sales, which is where the bulk of our wavelength opportunity lies. Wavelength revenue is modest—roughly 7% of total revenues—but it grew 57%, and we do expect wavelengths to be our fastest-growing product. IPV4 leasing rose 5.4% year-over-year and continues to grow at a healthy rate. We also anticipate growth in our on-net IP services, with transit accounting for the larger portion of that growth, for two reasons: first, it represents a bigger share of revenue; and second, it benefits from structural tailwinds, while the corporate on-net business continues to deal with lower office occupancy and fewer days in the office and has grown at a much slower rate than it did before the pandemic. When we examine customer type, NetCentric, and look at product — mostly wavelength — along with network type, mostly on-net, all of that, combined with the shrinking Sprint base, where churn has been running higher, will mean Cogent's overall business moves toward top-line growth along with a further pickup in margin improvement.

Michael Funk

analyst
#12

Two quick things for you, Dave. First, picking up on those 2027 maturities—if you can't get a deal done with the big credit investors, what options do you have once those maturities start looming in June 2026, or '27, sorry? Then second, on the wavelength side, Dave, you said some installations were affected by data center readiness or availability. How are you weighing a possible slowdown in data center construction and AI spending given the recent election?

David Schaeffer

executive
#13

Yes, sure. I'll go through them in order. First, on the 2027 notes, as I said, we've brought in both Evercore and Latham to assist us. Second, a few of the routes available to us involve completely new investors in Cogent who would supply enough financing to cover that maturity. Whether that's the route we take is exactly why we hired these two firms—to help us assess the choices. The company keeps getting unsolicited offers of capital to address that maturity; and we have a lot of paths open to us through our organizational structure and our capital structure that give us flexibility. Every one of these considerations feeds into figuring out the best way forward; and again, we're confident we picked the right advisers. They have plenty of options to weigh, and there's a clear route ahead for us. As for data center moratoriums, strangely enough, slower construction of new data centers might in the medium term actually speed up wavelength growth. The reason is that spreading resources across more facilities has caused broad delays in those facilities reaching full operation. If those same resources get concentrated on facilities that already have permits and are being built, perhaps the slippage in their in-service dates will end, and so customers will be able to use wavelengths. When you think about it, the wavelength is among the last pieces the customer needs; they need the building finished. They need the power; they need their equipment in place. And then they need a wavelength to link that equipment to the data repositories required for LLM or tokenization development. And I believe if all the resources across the ecosystem are concentrated in fewer data centers, those data centers already in process will come online faster.

Walter Piecyk

analyst
#14

Dave, earlier on this call you said the data centers had been upgraded to 20 kilowatts, up from the 6 — I believe you said 5 or 6. My understanding is H100s require a minimum of 30, and Blackwells require 120. Do you have plans for additional capital investment to reach that level of power? And can you — for these — I realize it's a nonbinding LOI, but for that one — and you're doing it in early '27, which lets you take advantage of extra NOLs. My assumption is that means the same kind of tax efficiency you achieved with the last data center sale. And would that same tax efficiency also apply to any data center sales down the road? Or would those need to happen in '28 or later?

David Schaeffer

executive
#15

Yes, sure, Walt. I'll address those starting with the last one. The rationale behind structuring these two LOIs, along with the negotiations with the counterparties, to close in early first quarter was to help us utilize NOLs we have carried forward. Beyond these four data centers and the roughly $100 million of proceeds we can shelter, we'll have some additional capacity. It's really difficult for me to speculate about deals that haven't even been negotiated yet, but out of the 24 data centers we originally targeted for sale, we will look to monetize the remaining 10; we've also received some unsolicited offers for certain facilities outside that initial footprint, and those are under evaluation too. Our view had been that these facilities were either too rural or too small to draw interest. But to connect this with Mike's earlier question, given the many local moratoriums, the fact that these are pre-existing data centers with room to expand rather than new greenfield sites may carry some real value. It's somewhat like a house. In some neighborhoods you can go build a new house. But in many neighborhoods, permitting comes much more easily when you do a renovation. So you literally see people leaving 1/4 of the old house intact, constructing what amounts to a new house around it, and calling it a renovation. Some parties have approached us, and we're evaluating all of those options. As for the data center power availability, across the remaining 172 data centers we own, we have approximately 150 megawatts of installed protected power; at many of those sites, we can obtain incremental power, but only after the power already there has been used. Inside those sites, the starting point has usually been telephone switches; therefore, every facility we took over from Sprint used negative 48-volt DC power distribution; we’ve switched those over to AC 120, and we set up the drops going to each cabinet at a standard power density of roughly 6 kilowatts per cabinet; that’s the usual standard in carrier-neutral data centers; we’ve received quite a few requests for higher-density cabinets in a chosen subset, and not across all of the 172, we have modified the power drops so they can support 20 kilowatts per cabinet. Now there are needs, in certain cases, for density that is even greater. These are older facilities that have been repurposed and might not work for every application, but there does seem to be considerable demand for that next tier up in power per cabinet if we succeed.

Walter Piecyk

analyst
#16

Got it, Dave. But the bottom line is that not one of those cabinets is able to handle an H100.

David Schaeffer

executive
#17

Whether to do that is the customer's call.

Walter Piecyk

analyst
#18

I mean, they just don't have what it takes to fix it; so could we go back to talking about liquidity? You mentioned that you significantly increased liquidity on the basis of — and by the way, H100 is legacy, right? The new compute needs even more power. So we just — you said you significantly increased liquidity based on the sales; but when I think about liquidity, I think about actual cash on the balance sheet, and the cash on the balance sheet is clearly lower because you used it to pay down the debt. Looking at your cash position, it now sits at $166 million, and on top of that there's some restricted stock, yet revenue keeps shrinking. Free cash flow remains negative, and there's no revolver available. When you look at this refinancing, how is the negotiation going with respect to having sufficient cash on the balance sheet to withstand a situation where wavelengths perhaps don't grow the way you expect, and you can't grow revenue enough to actually generate free cash flow — don't you need — or what is — I guess that's the fundamental question here, Dave: what is the minimum level of cash you need on your balance sheet to keep operating smoothly, or at all?

David Schaeffer

executive
#19

Right. Let me clarify a couple of the statements you made. We have $181 million of cash. We have no restriction — we do have...

Walter Piecyk

analyst
#20

David, I’m checking the balance sheet in the 10-Q. It shows $156.9 million, along with $14.4 million of restricted cash.

David Schaeffer

executive
#21

You said restricted cash...

Walter Piecyk

analyst
#22

Yes, on the balance sheet.

David Schaeffer

executive
#23

Let me just clarify what you said in your statement; during the quarter we brought gross leverage down by $197 million. Not all of the cash from the data center proceeds we received through this transaction with ISquare was used; we have further data center sales pending, and there's no requirement that this cash go toward gross debt reduction. We keep lowering the amount of restricted cash. As Tad mentioned, it went from $168 million to $14 million, and that figure could decline further. Roughly $100 million of liquidity is needed by the company so that it has ample cash around the world to operate. That's fairly typical for a company with a recurring revenue model, where generally you need between 4 and 6 weeks of revenue to maintain optimal liquidity. Our EBITDA has grown consistently. We've lowered our capital intensity, and we are generating unlevered free cash flow while additional liquidity is coming in. In our discussions with the various options for refinancing, the options have many permutations. And for that reason, we have engaged advisers to help us in optimizing it. That's all I can say at this point in time, but we feel comfortable with our liquidity position.

Walter Piecyk

analyst
#24

Will the equity remain untouched in that refinancing? Are there any further possible warrants? That wasn't listed among the alternatives you brought up during the talks you were having.

David Schaeffer

executive
#25

That I didn't bring up, and speaking about any of the specific permutations would, I believe, be inappropriate on my part, but our equity value is something we're highly mindful of. And as a matter of fact, across the last 18 years this company has worked diligently to bring its share count down by 10.8 million shares.

Walter Piecyk

analyst
#26

Understood. And one final question to follow up with, Dave.

David Schaeffer

executive
#27

Absolutely.

Walter Piecyk

analyst
#28

Since last quarter, you mentioned — I can't recall who raised this earlier — what rate you were expecting. I don't believe — I think you declined to answer on that. I respect it if you'd prefer to keep declining. But in the last quarter, you did state that you thought perhaps you'd remain in single digits. Yet considering where the unsecured is trading right now, or the secured, it's suggesting a considerably higher rate. Obviously, as you said, there are 3 or 4 different ways to alter that. Still, could you give us any further indication of what you think the rate would be on whatever the remaining principal balance is?

David Schaeffer

executive
#29

As I said before, we have several proposals with varying components that involve trade-offs between rate and principal amounts. Evaluating them is complex. Their collateral packages differ; and past that, it wouldn't be appropriate for me to comment while third parties are advising us in these negotiations.

Walter Piecyk

analyst
#30

Do you have any timeline for when you think you'll get all of this sorted out?

David Schaeffer

executive
#31

At some point from now until June 15, 2027.

Nick Del Deo

analyst
#32

First off, regarding IPD 4, what kinds of strategies are you considering to speed up leasing in that area that could work well? Or has it simply become harder to drive volumes into that market?

David Schaeffer

executive
#33

So Nick, at the start we adopted a method where we leased addresses only to those who purchased bandwidth; we lifted that limitation and growth picked up substantially. After that we went to market with extremely low pricing, saw our unit volumes speed up even more, and then generated considerable revenue growth by increasing prices for customers, since those addresses represent a fairly minor cost, and they're quite sticky—meaning renumbering is very hard once they've been deployed; we're now pursuing a comparable approach in which we're starting to attempt going to market with some introductory lower pricing and then keeping the flexibility to later raise that pricing. The comparison I'd draw is to cable operators or phone plans that give you an introductory rate which is afterward replaced by a rate driven more by the market. The demand set remains very strong. I'd say our greatest constraint is really the strict adherence to abuse controls. We could likely lease out the remaining inventory almost instantaneously. But if we fail to properly vet the counterparties, we land in a situation where those addresses soon become polluted via inappropriate use and then get blocked by firewalls; so it's a balancing act between us wanting to grow revenues and our need to guarantee the quality of our customers so as to preserve the integrity of the asset. Still, I do believe we'll manage to keep growing our IPV4 revenues.

Nick Del Deo

analyst
#34

Okay. Okay. That's useful. And then perhaps one question about how the data center monetization is going. So it's good to see the LOIs getting signed. What practical steps are still left before those deals close? And then regarding the other 10 bigger ones that you've been marketing, based on your conversations and what you've heard from potential counterparties, what does your gut tell you about how many of those remaining 10 you'll eventually be able to sell?

David Schaeffer

executive
#35

Yes. So first, on the sales process, there is an earnest money deposit that is refundable. We've done our diligence on the counterparties' financial wherewithal, so we're confident they have the liquidity needed to close. We have given them draft purchase and sale agreement templates, which will be negotiated afterward. Diligence is being finished by both counterparties. Multiple rounds of diligence have already taken place. The most important element is likely the commitments from the serving power utilities about power availability. These sites do have power earmarked for them, but for more than a decade that power has not been used at full load. So verification is needed, typically through a will-serve letter issued by the utility. Each utility handles this somewhat differently. And we believe, drawing on the process we went through with ISquare, that these should close within the next several months, early in 2027. Regarding the other ten, we have in fact seen engagement—in other words, there has been interest from counterparties in every one of them. Frequently those parties don't clear our vetting standards, which explains why we have not proceeded with a number of them. My sense is that a good share of those ten, though likely not the full set, will be divested before long. On Mike's earlier question about how the political landscape has shifted—yes, these facilities carry a value that wasn't there perhaps even at the start of this week, since they're data centers already standing that can just be enlarged. That matters beyond the sheer quantity of power, because when a permit for a brand-new one isn't obtainable yet an expansion permit is, operations become far simpler to reach. And roughly 25 megawatts is the threshold in a great many states. For anyone who already operates a data center and is looking to upgrade it, as long as the added capacity at that one site remains under 25 megawatts, the permitting path is considerably simpler than what constructing a brand-new facility requires.

David Schaeffer

executive
#36

Thank you. I appreciate everyone joining us today. I hope we've addressed every question, and we look forward to meeting you at upcoming conferences. Take care, everyone. Thanks. Goodbye.

Operator

operator
#37

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Cogent Communications Holdings, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Cogent Communications Holdings, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Cogent Communications Holdings, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.