Construction Partners, Inc. (ROAD) Earnings Call Transcript & Summary
May 8, 2020
Earnings Call Speaker Segments
Rick Black
executiveThanks, operator, and good morning to all of you. We're glad you could be with us on the Construction Partners conference call, where we'll go over what happened in the second quarter of fiscal 2020. You can also hear this call via webcast — there's an audio link on the Events and Presentations page within the Investor Relations section of constructionpartners.net. Anything recorded here reflects information only as of today, May 8, 2020, so keep in mind that time-sensitive details might not still hold true by the time anyone listens to a replay. I'd also like to note that remarks during today's discussion which aren't historical facts — things like expectations, future events, or future financial performance — count as forward-looking statements under the safe harbor provision of the Private Securities Litigation Reform Act of 1995. During today's discussion we'll be making forward-looking statements that are inherently uncertain and beyond the company's control. Actual results could differ materially. For our disclosure regarding forward-looking statements, please see the earnings press release issued today. The company's filings with the Securities and Exchange Commission describe these factors along with other risks and uncertainties in detail. Management will additionally reference non-GAAP measures, adjusted EBITDA among them. You can find reconciliation to the closest GAAP measures at the end of our earnings press release. Construction Partners undertakes no obligation to publicly update or revise any forward-looking statements. With that, I'd like to hand the call over to Construction Partners' Executive Chairman, Ned Fleming. Ned?
Ned Fleming
executiveRick, thanks, and good morning to all of you. With me on this call are our President and Chief Executive Officer, Charles Owens, along with our Chief Financial Officer, Alan Palmer. Before we get into things, I want to briefly offer where we stand and how we see this truly unprecedented period. Most importantly, our thoughts and prayers go out to everyone who has been affected most severely by the COVID-19 crisis. We're making every effort to safeguard the health and safety of our team members and to support our communities as they work toward recovery throughout this crisis, and we're particularly grateful for the tireless efforts of first responders and healthcare workers. All of us have been genuinely inspired by these individuals. Over the past several weeks, the pandemic has shut down an enormous number of companies and sectors, yet firms operating in infrastructure are classified as essential. As a result, because our workforce has shown resilience and the safety measures we put in place to address the present pandemic have proven effective, our business has experienced just slight interruptions, and we anticipate it will remain resilient throughout this crisis. Prior to Charles and Alan covering the 2020 second quarter results, I want to share a view of the business and how it has responded historically when the economy has declined; this was a solid quarter that came in line with what we expected. When we get to the back portion of this fiscal year, CPI has traditionally brought in 60% of its annual revenue during that stretch, and margins tend to widen. The outlook for 2020 that we'll get into shortly will capture how the company keeps performing strongly; we have confidence that the company can keep growing year over year, and we've updated our fiscal year 2020 outlook so it accounts for the fresh visibility into the business that we now have. We've talked before about how CPI's business model stands apart from others. Thanks to the core elements of the business and the more than two decades we've spent running it, CPI offers a number of important strategic factors that have propelled the business throughout its history. To start, there's demand within our operating region for projects focused on fixing and maintaining roads, and those projects have infrastructure funding already secured. Next, this kind of road repair and maintenance work tends to repeat itself. Also, these are shorter jobs rather than huge mega projects. On top of that, we're vertically integrated when it comes to producing hot mix asphalt as well as on the services side. And finally, we hold an edge in 35 separate markets, where we gain from scale, know-how, technology, vertical integration, and the ability to shift crews and equipment around. Together, these things have produced steady, profitable growth. And all of it happens under the guidance of a seasoned executive management team, with leaders throughout the entire organization collaborating alongside a highly skilled, diligent, and steady workforce. Every one of those elements together is why we feel sure this way of operating holds up well, no matter what the economy or competition throws at us. That said, it's fair to say the pandemic and the financial instability now spreading throughout the nation are unlike anything any of us has lived through. We certainly don't see ourselves as immune to the crisis currently developing, but our history of applying this approach, in our view, distinguishes us and provides a solid path forward. As we make our way through these shifting economic circumstances, we'll keep exercising caution; having said that, I'd like to hand things over to Charles and Alan so they can walk us through the results for our second quarter, and after that we'll take your questions. Charles?
Charles Owens
executiveI want to thank Ned, and I wish everyone a good morning. Our attention stays fixed on keeping our employees, our customers, and the people and communities in which we reside, serve, and labor safe and well; we feel good about the results for our second quarter. In that quarter, we bought 2 hot mix asphalt plants located in the Florida panhandle. Out of those 2 sites, we intend to go after an assortment of public, private, and Department of Defense projects; on top of that, liquid asphalt will be provided to both plants by our asphalt terminal in Panama City, Florida. Also, we made public our intention during the quarter to build a glass sand manufacturing facility next to one of our aggregate facilities in Georgia. Material from the mine will be processed at the new facility to yield furnished-ready sand of a quality high enough for use in glass manufacturing. This new facility shows how our team can find creative answers to meet what our customers need. Geographic diversity is an advantage to our business model and the construction project work we do, since we run operations across multiple states in 35 distinct local markets. By market, our business model provides us the flexibility to go after private as well as public projects. Moving forward in fiscal 2020, we intend to keep chasing control profitable growth through our 3 primary levers: performing additional work in our current markets, completing strategic acquisitions, and growing via greenfield opportunities; we keep holding conversations with companies inside and outside our current footprint that could become future acquisitions. Finally, we are glad that a national conversation is presently taking place regarding the necessity of federal infrastructure funding in our nation. Public awareness of the need to properly fund road repair and maintenance projects has been shown by recent gas tax increases in a number of states; since the FAST Act expires later this year, we think federal lawmakers understand the economic and public safety gains that come from backing infrastructure projects, and we have confidence they will arrive at a long-term funding solution before this year ends for the repair, maintenance, and improvements of one of our country's most valuable assets, our routes. Prior to handing the call to Alan, I want to thank our leaders and our more than 2,300 employees for their commitment, dedication, and hard work, which lets us carry out our strategy amid these challenging times; and with that, I would like to pass the call to our CFO, Alan Palmer. Alan?
Alan Palmer
executiveThanks, Charles, and good morning to all of you. Let me begin by going over the main performance numbers for the second quarter. Our revenue rose to $168.7 million for the quarter, which is $4.4 million more than the equivalent quarter a year ago. That growth figure includes $11.6 million in revenue tied to acquisitions that closed after March 31, 2019, and that was partly offset by a $7.2 million decline in revenues within our existing markets. Gross profit came in at $21 million for the second quarter, roughly $1.2 million above the same period a year earlier, driven mostly by greater revenue and an improved gross profit margin. General and administrative expenses totaled $16.8 million in the second quarter of 2020, versus $14.8 million last year. That $2.0 million rise came mainly from a $700,000 increase in management payroll and benefit costs, $700,000 related to acquisitions made after March 31, 2019, and $400,000 in non-cash stock compensation expenses. Net income was $1.5 million, compared with $4.2 million, while earnings per share came to $0.03 versus $0.08 in the same periods a year ago. These shifts stem chiefly from the increase in general and administrative costs I just described, along with $2.2 million of unrealized losses booked in quarter two on swap arrangements. On those swap arrangements, we took a $1.4 million non-cash charge to interest expense tied to an interest swap on our outstanding debt, plus an $800,000 non-cash charge to other expense connected to fuel swaps we entered into to capitalize on historically low diesel fuel prices; we carry these derivative instruments at fair value and recognize changes in fair value in current earnings. Financial volatility during March 2020, driven by COVID-19 and other macroeconomic factors, had a significant impact on these derivative instruments. Adjusted EBITDA grew to $14.2 million, compared with $14 million in the prior-year quarter. The quarter two adjusted EBITDA margin was 8.4% this year, versus 8.5% in the second quarter last year, and it was affected by our non-cash fuel hedge charges and the quarter's increases in our general and administrative expenses, as discussed earlier. Now let me turn to the balance sheet. At March 31, 2020, we held $53.8 million of cash and had $4 million of availability under our $30 million revolving credit facility after deducting outstanding letters of credit. At quarter's end, our debt to trailing 12 months EBITDA ratio stood at 0.83; on April 30, we borrowed $18 million under our existing credit facility; we will stay focused on keeping sufficient liquidity and a strong balance sheet to support our ongoing operations and to allow us to execute on growth opportunities as they arise. Cash provided by operating activities was $20.5 million for the six months ended March 31, 2020, an increase of $15.2 million from the six months ended March 31, 2019. During Q2, capital spending came to $10.9 million, versus $12.4 million during the comparable period a year earlier. For fiscal 2020, our capital expenditures have been brought down into a $40 million to $42 million range. Not counted in that figure is the $11.5 million paid for equipment that had previously been under operating leases. Included, though, is $4.1 million tied to the glass sand manufacturing facility Charles discussed, plus $1.8 million for upgrades to plant and equipment connected with the Florida acquisition we completed in March. As of March 31, 2020, project backlog stood at $579.1 million, which compares with $539.1 million on December 31, 2019, and $584.8 million on March 31, 2019. Within the present $579.1 million in backlog, roughly 60%, or $360 million, should be finished over the rest of this fiscal year. Our construction backlog is made up mostly of recurring maintenance-related projects, which tend to be the ones we favor, and opportunities to bid on work of this kind keep appearing in our markets. Bear in mind that our backlog tracking covers 35 separate markets, and in each one we aim to hold six months to nine months of backlog. We stay disciplined as well, keeping our strategic attention on recurring maintenance and repair work. In the past, backlog has grown through our second and third quarters, since these projects are usually led from February through May. Turning ahead, operations in Q2 were mostly untouched by COVID-19, yet how public and private construction projects fare over a longer horizon remains unclear right now. Because gasoline demand has fallen, hurting gas tax receipts, the consequences for state and municipal road repair and maintenance projects are not clear either. That might hinder our capacity to take on extra repair and maintenance projects, which normally begin and finish in the latter half of our fiscal year. On the private side, delays are possible given uncertain economic conditions throughout our markets. Weighing these factors alongside our present project work and existing backlog, we are updating our fiscal year 2020 outlook for revenue, net income, and adjusted EBITDA as follows. Revenue between $820 million and $830 million, against $783 million in fiscal year 2019; net income between $30 million and $34 million, against $43.1 million in fiscal year 2019; and adjusted EBITDA between $88 million and $91 million, against $92.3 million in fiscal year 2019. To sum up, we feel good about our second quarter results and keep seeing favorable market trends and project demand in fiscal 2020. With that, we're ready to take questions. Operator?
Andrew Wittmann
analystGreat. Good morning.
Alan Palmer
executiveGood morning, Andy.
Andrew Wittmann
analystI believe what's likely foremost in everyone's thoughts is essentially what you both just mentioned, plus an economy that's slowing down; now, this business has existed for 20 years, though it wasn't publicly traded that entire span. Therefore, I was hoping you might discuss with us the 2009 period and that most recent significant slump, and perhaps explain how your revenues as a public company held up then, specifically on an organic basis. I'm aware you took advantage of that slump, completing some M&A; thus, in total, I believe the company grew, yet I suspect most listeners want clarity on what the organic growth figure was. So, if you could frame that, perhaps by examining one of your steadier operating subsidiaries. In my view, your wiregrass operating unit functioned as an organic operating unit back then. I was simply hoping you might quantify or provide some context regarding how it performed.
Alan Palmer
executiveYes, Andy, this is Alan. You brought up the public aspect, and one thing we've observed — we observed it in that stretch and we've observed it in other stretches when an economic downturn occurs that mainly impacts the private work side — is that frequently, the public work side is somewhere we can secure extra work since that side tends to be more stable; during some of those stretches, there was additionally a shrinking in gas taxes being collected, which is something we're definitely looking at confronting right now, but what we observed is that nearly all the reductions in DOT budgets targeted the large projects where you have lengthy timelines to develop plans, so they'd reduce the planning, the money spent on plans, acquiring right of ways; and in fact, in certain instances, we observed additional money flowing toward repair and maintenance-type projects. So usually, when a slowdown occurs, there's a focus on performing plenty of repair and maintenance-type work and keeping those construction employees working; and certainly that's what we observed in '08, '09 and '10. And we expect that this could unfold once more throughout this pandemic time.
Andrew Wittmann
analystUnderstood, thank you. As you’re speaking with your state and local customers at this point, I know the situation is shifting quickly, but what feedback have you gotten from them regarding their capacity and willingness to keep projects moving thus far? Are you noticing that they’re perhaps taking longer to respond to submitted RFPs, or slowing down RFPs that you might have anticipated? What has the actual behavior been from those customers that you’ve observed through May 8?
Charles Owens
executiveHi, Andy, Charles here. Looking at it from a DOT perspective, there’s a slight deceleration we’re observing; and clearly, because fuel-related tax revenue isn’t coming in, I believe everyone has adopted a more cautious pace, yet we continue to see places where taxes were already established, and funds have essentially been set aside for efforts such as city and county. We’re still witnessing a portion of that, but lettings and bidding for work are still taking place. And regarding the commercial side, the private work side, when this initially happened, a few projects were placed on stand down and hold, similar to how we’d handle certain things in phases, and that persisted for roughly two weeks to three weeks, after which they shifted to full speed ahead. So those folks are feeling positive about their projects. And at this moment, I can’t think of any projects where we’ve had to delay our stock work.
Andrew Wittmann
analystThanks, that's great. My final question is really about figuring out how falling crude prices could work in your favor, since clearly you burn through a great deal of diesel and fuels, plus your liquid asphalt too. So Alan, could you walk us through perhaps what share of revenue fuels account for, what share liquid asphalt accounts for, and what you're observing in those markets? We can all see diesel prices, sure, but asphalt is somewhat harder to read. Just discuss how that might help your margins, or whether it already is helping; put another way, can you hold onto those savings, or do your customers end up gaining more from them than you do?
Alan Palmer
executiveYes. Regarding diesel, like you mentioned, it's quite visible since the published prices are there for anyone to check. So here's something we did — and I brought this up in my earlier remarks — typically, we hedge part of our diesel fuel, somewhere between 40% and 50% of what we use, through short-term swaps and purchase contracts, and given the unprecedented collapse we witnessed in March, we secured some considerably longer contracts on that, extending well into and through our fiscal year 2021. What that means over the long run is we'll be purchasing diesel, even throughout 2021, at a price far lower than what's baked into many of our bids and far lower than what we've paid historically. The near-term effect came about because diesel continued falling and oil actually turned negative, so we had to record roughly $800,000 in non-cash charges, which hurt this quarter, though the longer-term upside is that we'll purchase that fuel at a greatly reduced cost. So that piece is pretty clear. When it comes to asphalt cement, as I've noted previously, although it's tied to oil prices, it doesn't move in direct correlation the way diesel does. Typically, through the winter months, liquid asphalt declines owing to reduced utilization, which is among the reasons we installed the terminal, and we observed that this year — December, January, February, and usually it wraps up around March. We watched that occur, yet with oil prices falling, we've kept seeing that price decline further since then; however, as we've stated previously, the bulk of asphalt cement functions as a pass-through expense on our jobs. When it declines, we can hold onto a portion of those savings on projects that aren't indexed, and to some degree that showed up in our first-half results. But the bulk of the decline actually occurred at the point when it would typically be rising again in March, and instead of climbing, it kept falling — we saw that through late March, April, and it's still dropping even now. So over the past 60 days, the state indexes have come down somewhat. Should that remain low, and we believe it will, we ought to pick up a bit of margin from it in the back half, though typically it isn't a significant figure, since roughly 40% of our contracts are going to be hedged — meaning, tied to the index. From a financial perspective, we had anticipated that our revenue would be cut by somewhere around $3 million to $4 million across this last six months, and there would be a price reduction of roughly $3 million to $4 million as well. That's among the factors behind our lowered revenue estimate — we're accounting for what asphalt cement pricing does, since we have to hand part of that back to the states.
Andrew Wittmann
analystGot it. Cool. Thank you.
Alan Palmer
executiveThank you.
Michael Feniger
analystHi, everybody. Thanks for taking my questions. We keep hearing that road and highway work has held up fairly well, given that there isn't much traffic out there. So that's one area where the DOTs have continued moving forward on projects. I'm wondering whether that matches what you're seeing, especially given some of your remarks about delays in letting. So, are projects you're currently working on seeing delays right now? Or is it more about caution and worry that building up that backlog during this quarter, and possibly the next one as well, might be a problem because of what you highlighted earlier — gasoline being down and the tax receipts?
Alan Palmer
executiveYes. The DOT projects haven't been delayed at all. In fact, quite a few states have extended the window during which we're permitted to work. A lot of our contracts near big cities and on interstates involve work done mainly at night. And in several states where we operate, they've let us shift that work to the daytime. When you do it at night, you might only get to be on the project for roughly eight hours or nine hours, whereas during the day, we can be out there 10 hours or 12 hours. So on some of our projects, we've actually seen the ability to work accelerate; and naturally, as you pointed out, there's less traffic, and for many of these maintenance-type projects, the state's aim is to speed up the work we can perform so they can get the roads into better condition since fewer vehicles are out there. So we're actually viewing that as a real positive. Regarding Charles's remark on the DOT lettings, aside from North Carolina, which has a great deal of information circulating about it, we haven't seen the other states actually push back lettings, though we would expect that, and it could happen later in this calendar year and increasingly into our next fiscal year. We also — we have projects that typically get let during this period, which is what we refer to as book and burn. And so, given what's happening out there, our capacity to secure and book and burn that many projects is something that was taken into account in the guidance we provided, but throughout our fiscal year, ending September 30, we don't expect any reduction in the projects we're able to work on.
Michael Feniger
analystIs there anything on the horizon you think we ought to watch for regarding a second CARES Act or some stimulus package that might rescue the states? I'm wondering how — clearly, infrastructure talks would be a good thing for you folks. But when it comes to what you're directly exposed to and the budgets you depend on, is there anything about DC or CARES Act 2 that we should be tracking that would hit you more directly?
Charles Owens
executiveHi, Michael. Charles here. One item you should consider is that, as you'd expect, gas tax receipts are coming in lower, and that's the funding source for the kind of work we do. If you review much of the research out there, there's roughly a $50 billion gap that we've referred to — think of it as a backstop for DOT — that would be required to offset approximately a 30% drop in revenue. Some of that would apply to 2020, and most of it would land in 2021, simply in anticipation of the shortfall. So that's the first thing. Second, the FAST Act is set to expire at the end of September; therefore, we need a long-term highway bill. Legislators from both parties have looked quite favorably on such highway bills, and I believe that's something we'll truly see come to pass, because ultimately, when lawmakers weigh everything, our routes are an extremely valuable asset, and they'll only keep degrading. At present, our routes earn roughly a D grade. And when they consider it in terms of transporting our goods from one location to another — though the most precious thing we transport is our people and our kids — keeping these roads in place is a massive safety consideration for us, and we're quite confident that even during these tough times, funding will be there to ensure these roads don't fall apart entirely.
Alan Palmer
executiveRight, Michael, I'll piggyback on that. The pair of items Charles mentioned would be legislation still to come that we'd — you'd be watching for. The second item, which has already gotten through as a piece of the CARES Act, is that states have received significant sums of money to sort of prop up their operations, and what's happening in a number of states is they're considering possibly taking a portion of those funds allocated to them and directing it to the DOT, which we hope, even if that $50 billion doesn't come through, would be used to cover some of that gap. So those two are sort of federal-level matters. The other one, involving money already allocated, is possibly tapping some of it so the DOTs can sustain in the near term what their revenue shortfall is. But projects that have already been let and are under contract, those are pretty much funded before those projects get let. So, we don't expect any projects to be halted, the public type like that, since that funding is already there.
Michael Feniger
analystAll right, that's useful, and both of you provided solid background for what Andrew asked regarding 2009. I'm simply interested because this business isn't the same as it was back in 2009. You're running a liquid asphalt plant now. You brought up the glass manufacturing facility. I was hoping for a bit more detail. I'm just asking whether this new venture and this road-related growth introduces operational difficulties we ought to know about, given that you're now running these different kinds of facilities?
Alan Palmer
executiveNo. What I'd say is that we're essentially carrying out the very same activity as back then, only across a greater number of sites. The sole real difference, honestly, is the geographic spread we currently have, and to my mind that's a good thing, since during 2008 and '09 our footprint was limited to Alabama and Florida, whereas today we're also in Georgia and North Carolina. So, 95% of what we do is exactly the same. Regarding the glass sand plant, as we've talked about previously, what it amounts to is simply taking a product we already make at our aggregate facility, and that plant will only alter it a little bit so it becomes usable within a specialty industry. Therefore it won't represent a major chunk of our business. It's really just taking something we already have and applying a minor adjustment. So, we end up with a customer that differs from the one we'd have had previously, or merely a tiny share of that product that gets produced.
Michael Feniger
analystThanks.
Adam Thalhimer
analystHey, good morning, everyone. Congratulations on a...
Alan Palmer
executiveGood morning, Adam.
Adam Thalhimer
analystNice work on a strong Q2, and I appreciate that you're still providing yearly guidance. I'd like to begin with second-half margins; it appears your outlook points to a decline of roughly 150 basis points in each of the two quarters. Does that include some cautious assumptions? Or is there another factor we should know about?
Alan Palmer
executiveI'll get a small laugh out of that. From our perspective, we're sharing whatever is visible to us, but the main driver behind it, Adam, is that normally at this point in the year, we'd have a clearer view of how much work must be booked and burned, since, as we've said, roughly 80% of the contract backlog we expect to finish by September 30 is already under contract. That leaves approximately $77 million still to secure and complete. And this is — this is when that typically gets handled. What we did was examine that and conclude that, given everything happening and that figure being somewhat bigger than usual, we haven't factored in the possibility of winning that unbooked backlog at the same margin as what's in our existing backlog, because we have to bid for it. We have to win it. We can finish it, but we haven't presumed that such contract revenue would carry the same margin as our present backlog, and that accounts for a meaningful chunk of the revenue decline on the back end. On top of that, some of the revenue we'll receive during those final six months comes from the acquisition we completed and the margin on the work we book from it. Although it isn't a large amount of backlog, we're assuming that whatever we book and burn from those facilities will also come in at a lower margin, similar to what the backlog shows, which is honestly around half of our backlog. So that acquisition is creating a bit of a drag; and so, I mean, our forecast rests on what we know and what's visible to us. I wish it turns out to be cautious, but there's somewhat more uncertainty in the present climate regarding our capacity to book and burn that backlog at margins equal to or better than what we now have on jobs underway.
Adam Thalhimer
analystAll right, that's clear. So then, regarding — sure, there's plenty of uncertainty — but what about the potential for backlog growth in Q3? You said building typically happens in April and May. The public side seems fairly straightforward, I think, but what's the private bidding picture looking like at the moment?
Charles Owens
executiveAdam, it's Charles here. Where private work is concerned, folks are continuing with residential-style construction, and in the market we serve, we still see companies pushing ahead on commercial projects too. Anyone can pull up the same reports I can — they say <<inaudible>> is declining and commercial is declining — yet we happen to operate in some solid markets. Those places remain desirable for people. So it's lucky for us that we're located in these growing states. That's part of why the southeast appeals to us, along with the specific markets we're in, since nobody is shielded from the current situation, though certain regions have held up somewhat better than others.
Adam Thalhimer
analystOkay, that's good. And then the final one from me... please go ahead.
Alan Palmer
executiveWhat I was about to mention — right, I was just going to point out, funnily enough, even though next year's backlog is substantial for us, we still need to reach March 31, and our backlog slated for completion in the following year is in fact greater than it's been across the prior two years. So at minimum, we aren't beginning behind the 8 ball for the coming years; and usually, during this quarter — our third and fourth quarter — we are — much of the backlog we bring in is for future years on top of that, which we'll then book and burn. So...
Adam Thalhimer
analystAll right, that's useful context. Then my final question concerns North <<inaudible>> and DOT. How worried ought we to be regarding that scenario on your end? A few of the private folks we know in North Carolina told us, hey, fiscal '20 is holding up fairly well, but folks, fiscal '21 might get really bad in North Carolina. What do you think?
Charles Owens
executiveOur thinking aligns somewhat with that perspective. We believe 2020 will be solid as we head toward 2021. Clearly a shortfall is going to exist there, which explains why we're devoting considerable focus and reaching out frequently to our leaders in Washington, because to keep the safety and the routes, our view is that action will need to be taken, and we believe they will act; yet regarding North Carolina, this is somewhat old news, since we've discussed North Carolina now, I believe, for a number of quarters, that all of us recognize they spent beyond their means during one stretch, and afterward matters appeared to be heading in a favorable way and we glimpsed some hope that conditions were improving; and then COVID-19 came along, and that has sort of inserted a shortfall into the picture. Yet North Carolina fundamentally possesses an excellent system, and they truly lack a problem apart from insufficient revenue arriving from taxes. All the pieces are there. So when we get everything moving back into the economy, no funding problem will remain. We'll simply need to push through this period, and we'll just have to — just keep doing what we've done over the past six months. We recognized early on roughly what was happening, and we shifted part of our product mix in terms of what we were doing; and then as we put it, we have 35 distinct regions, and North Carolina is merely one among them, yet we remain quite bullish about North Carolina.
Alan Palmer
executiveRight, thanks. And Adam, building on what Charles mentioned, over the past 6 months, with North Carolina's DOT, before COVID hit we had already shifted away — we cut the share of our business tied to North Carolina DOT by roughly one-third. So even though COVID creates a near-term hit there, we believe, like Charles said, that over the long haul they have a really solid funding mechanism, and they will certainly be pursuing fewer of the big mega projects — they've stated that publicly — but they still have roads up there that must be maintained, and we think that will work in our favor once they work through some of their near-term funding challenges.
Adam Thalhimer
analystGot it. I'll pass it along. Appreciate it, everyone.
Alan Palmer
executiveThanks.
Josh Wilson
analystMorning, everyone. Wishing you and your loved ones good health.
Alan Palmer
executiveI appreciate that, Josh. Same to you.
Josh Wilson
analystTo start, regarding the glass plant, can you provide some numbers on when the money will be spent and share anything about what the financial effects could be?
Alan Palmer
executiveSure. The amount set aside to build the facility is $4.1 million, though we figure it will likely be about 90% finished by September 30, and at this point our goal is to have that glass plant ready sand being produced by October or November. Therefore, aside from the capital expenditure for this year, which we included in our estimate, nothing else is going to occur during this year.
Josh Wilson
analystOkay. Then remind us, when it comes to your states, what portion of your funding is tied to gas taxes as opposed to other revenue streams?
Alan Palmer
executiveAs far as DOT budgets go, I don't have an exact percentage, but between the federal money that gets distributed and state gas taxes, my guess would be 75% to 80% or more comes from that. Some states charge license fees, and Alabama now taxes you for vehicles that don't burn gas, the battery-operated ones, but those other fees, I wouldn't expect them to make up more than 15% of their total budget. So it's mainly from the gas taxes and those — the diesel, interestingly, isn't down that much because truckers are still out there trucking probably more than before since they can rack up more miles because there's very little traffic; it's the gasoline that's down. But I think Charles said that for '21 and — '20 and '21, the backstop the Feds were looking at putting in would replace about the 30% drop. So, I think they're estimating that the average drop in gasoline taxes across all the states, both at the federal and state level would be about 30%.
Josh Wilson
analystDoes that same breakdown apply when we’re talking about local work?
Alan Palmer
executiveGasoline taxes cover only a tiny share of what gets spent locally. The bulk of that funding comes from dedicated levies and sales taxes, since in Alabama right now, under the Tax Act passed not long ago, a portion goes to municipalities and counties. In the majority of states, though, cities and counties draw the money for their road projects from sources other than fuel taxes. They’ll clearly feel some effect, of course, because when sales taxes are the source, those collections could soften — yet among the cities and counties, we haven’t observed a single one pushing back projects so far.
Josh Wilson
analystUnderstood. Best of luck in the upcoming quarter.
Alan Palmer
executiveThanks.
Brent Thielman
analystHi there, thanks a lot. Morning, and I appreciate you taking my questions.
Alan Palmer
executiveSure thing, Brent. Morning to you.
Brent Thielman
analystOne quick thing. Did the Florida business come with any backlog?
Alan Palmer
executiveThere was a bit, though the margins were even thinner. Really, we picked up just roughly $5 million in backlog.
Brent Thielman
analystUnderstood. All right. That makes sense. And when it comes to the states you currently cover, is there a significant gap between the amount of private projects you handle and the public ones, compared with the total figures you all report? Or does it look fairly consistent throughout those markets?
Alan Palmer
executiveActually, it varies less by state and more by each of the 35 individual markets we operate in, since that's the lens we use. So, in our more rural locations, private work accounts for a smaller share, simply because there isn't the same level of development you'd find in a Birmingham, a Raleigh, or even a Tallahasee —
Charles Owens
executiveHuntsville.
Alan Palmer
executiveYes, Huntsville — so the differences really depend on each individual market rather than on which state it's in. And luckily, as Charles, I believe, brought up before, several of our markets sit in genuinely high-growth regions. And my sense is that, at least over the near term with COVID, demand isn't shifting all that much; so in that private work, we continue to see demand holding up well and staying strong.
Brent Thielman
analystAll right. And do the margins on that private business differ at all from the public side? Is it somewhat higher since there's less competition? Or am I hoping for too much there?
Alan Palmer
executiveOnce more, it depends on the market, but honestly it isn't — I mean, in certain situations you could see a larger number of bidders, since the qualifications needed to bid on DOT work, plus having quality control and quality inspections and that kind of thing, along with bonding requirements, occasionally rules out some of the smaller players. Yet in many of the markets where we operate, we sell FOB to those smaller competitors whose work is mostly private, and we even hire them as subcontractors at times; so the margin profile really doesn't differ much between the two categories, and that's partly why we have flexibility — we can take on many kinds of work, be it DOT, city, county, or private, and moving our percentages around in given markets doesn't really change the margins all that much. I mean, we aim to keep a sensible margin for the work we perform; and so...
Brent Thielman
analystAll right. All right; Alan, my apologies if this came up already, but it seemed like DSOs ticked up once more. I believe you mentioned process adjustments and possibly certain agencies last quarter that were making a difference there. I'm just curious what led to the increase again, I believe, relative to 1Q?
Alan Palmer
executiveWell, in fact, the method we use for the calculation, which I've discussed previously, is that our March was an extremely strong revenue month for the quarter's average. So, when figuring it using the sales we recorded in that quarter, it actually declined roughly 12 days if you split the quarter by month; thus, we observed gains in March under that method rather than a calculation using total revenue, since receivables rose, yet our March sales versus our December sales were quite different. So, I believe you need to view it in that manner; and so, that was lower by roughly 12 days. And I'm aware that one action we took, which we've completed and are reviewing each week, relates to part of our worry when COVID emerged, which was that, for our private work customers, we had to ensure we somewhat ramped up our attempts to ensure customers who've consistently paid us on time didn't fall behind and didn't become delinquent; so we've tasked the companies with — weekly, we hold a call with the Presidents and CFOs and go over the receivables aging. And then another issue that worried us from a cash flow perspective was whether remote work might delay some of DOTs and the cities and counties because they follow a procedure they must complete, particularly the counties and cities, they must hold commission meetings and similar events. The worry was those could be dragged out further. But up to now, we've essentially seen the reverse of that; we even had — as a bit of an aside, we had one county in Georgia where they were so worried about it, they handwrote checks and sent them to us. So I believe, up to now, we've discovered that our customers have been extremely diligent about ensuring that their disruption, much like what we're going through, has not hurt them, but we track that from CPI with a weekly call with them to ensure that, that doesn't occur.
Brent Thielman
analystAll right. Hey, I'm grateful that you folks are fielding questions. Good luck, and please stay safe.
Alan Palmer
executiveThanks. Same to you.
Charles Owens
executiveAll right. I appreciate all of you joining us on this call. And I simply wish to confirm that — that COVID-19 is being treated with the utmost seriousness by our company as well as our industry, with every precaution taken, and we are putting in serious effort to guarantee the safety of our employees, our customers, and the members of the general public in the areas where we operate. And my thanks go out to each of you, as I mentioned, for participating in this call, and please stay safe, and we will speak with you again soon.
Operator
operatorThank you all for joining, everyone. That brings today’s teleconference to a close. Once time, you’re welcome to hang up your lines. And enjoy a great day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Construction Partners, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Construction Partners, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Construction Partners, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.