COPT Defense Properties (CDP) Earnings Call Transcript & Summary

February 6, 2026

New York Stock Exchange US Real Estate Office REITs earnings 49 min

Earnings Call Speaker Segments

Venkat Kommineni

executive
#1

Thanks, Jonathan. Hi, everyone, and thanks for joining COPT Defense's call, where we'll go over what happened in the fourth quarter as well as the full year. Joining me on the line are our President and CEO, Steve Budorick; Britt Snider, our Executive Vice President and COO; and Anthony Mifsud, our Executive Vice President and CFO. You can find reconciliations between GAAP and non-GAAP financial measures that management covers on our website, inside the results press release and presentation, and in our supplemental information package. Just a note that anything forward-looking we say on today's call carries risks and uncertainties, which get discussed in our SEC filings. Actual events and results might come in materially different from those forward-looking statements, and the company isn't taking on any duty to update them. Steve?

Steve Budorick

executive
#2

Good afternoon, and thanks for being with us today. For the company, 2025 proved to be yet another excellent year, since we beat virtually every one of our operating and financial metrics. On a per-share basis, FFO came in at $2.72, amounting to $0.06 more than the midpoint of the guidance we initially provided, and that reflects 5.8% growth relative to 2024's results, marking a seventh straight year in which FFO per share has risen. Same-property cash NOI rose 4.1% versus the prior year, helped by a 40 basis point gain in average occupancy. We completed 557,000 square feet of vacancy leasing, equal to 47% of the space that stood vacant when the year began. In addition, we signed 477,000 square feet of investment leasing, with a weighted average lease term of 13 years. Toward new investments, we committed $278 million of capital, spanning 5 projects across 4 different markets, and those projects are 81% pre-leased. Notably, 4 out of those 5 projects are expansions involving tenants we already have. Late in December, we committed about $155 million toward 2 build-to-suit projects located in our Fort Meade BW Corridor and San Antonio markets. To begin with, we committed $66 million to a fully pre-leased development with ARLIS, the University of Maryland's Applied Research Laboratory for Intelligence and Security, so that they can expand their footprint within our park. This 110,000 square foot project will grow our Discovery District campus, which presently totals 415,000 square feet and is 98.4% leased; the new ARLIS facility is set to operate as the Capital Quantum Benchmarking Hub, where quantum computing prototypes will be tested and evaluated for national security purposes through a partnership involving the State of Maryland and DARPA, the Defense Advanced Research Projects Agency. During 2024, the University of Maryland was awarded a $500 million contract from the DoD in support of ARLIS and its mission of tackling complex national security problems. Next, we committed $88 million toward a 132,000 square foot fully pre-leased development project in San Antonio involving an existing Defense/IT tenant. Our team performed tremendously in adding incremental density to our high security 1.1 million square foot campus, which was already fully leased, thereby creating this further development opportunity. Taken together, our active developments, plus the projects placed in service or acquired during 2025, will produce an incremental $52 million of cash NOI on a stabilized annual basis, which will come to fruition as projects get completed and placed into service. This incremental NOI will phase in from 2026 through 2029, with 2029 being the first full year to benefit from the entire amount. Of that figure, $48 million is contractual, while the remainder comes from leasing up the availability that is left at 8500 Advanced Gateway. Britt will walk through the very strong pipeline of activity we have for RG 8500. As we look at 2026, we are setting the midpoint of our FFO per share guidance at $2.75, which implies growth of $0.03, or 1.1%, over 2025's outstanding results. Within our guidance, we are absorbing a $0.09 rise in financing costs. Had that impact been excluded, 2026 FFO per share would have come to $2.84, representing 4.4% year-over-year growth. Anthony will walk through the particular assumptions baked into our guidance, though the year has begun very well for us when it comes to capital commitments and investment leasing. During January, we dedicated $146 million toward one more development at the National Business Park that is entirely pre-leased, again alongside a Defense/IT tenant already in place. That project is yet another highly secure, specialized building whose total will reach 236,000 square feet. Then earlier this week, we signed a lease covering the whole of NBP 400 with a current tenant — a top 10 U.S. defense contractor — for 148,000 square feet, running almost 11 years. Now to the Defense budget. Three days ago, President Trump put his signature on the FY 2026 Defense Appropriations Act. The base budget comes to $841 billion, which is $8 billion more than the President initially requested. If you add the $113 billion of allocated DOD funding contained in the Big Beautiful Bill, the total Defense Budget exceeds $950 billion — the biggest defense-based budget in our country's history, and a 15% rise year-over-year. We expect the President's fiscal year 2027 budget request to arrive within the next few weeks, and he has publicly stated the need for a $1.5 trillion Defense Budget. No matter where the final figure lands, his remarks deliver a robust policy signal regarding the President's dedication to boosting Defense investment, and we anticipate the defense budget's overall size will keep growing across the next 3 years. Importantly, the initial FY 2026 Defense Appropriations Act drew very strong bipartisan backing, an acknowledgment of the global threat environment's growing complexity. A recent Wall Street Journal editorial carried the title "a serious Defense Budget at last," and it drew attention to new technologies spreading in ways that endanger the U.S. homeland, among them hypersonic missiles, space and cyber weapons, drones and the weaponization of AI. What that editorial concludes lines up perfectly with the administration's peace through strength philosophy and acknowledges that putting money into Defense costs infinitely less than a war does. With that as the backdrop, we still expect the priority missions our portfolio supports to be well funded over the near and medium term so national security is safeguarded. Those missions take in intelligence, surveillance and reconnaissance, cybersecurity, missile defense, space activities, among others. Space is the newest war-fighting domain, and securing uncontested dominance in this theater matters enormously to the country's defense; in support of that objective, we expect the $175 billion multiyear Golden Dome initiative along with the relocation of Space Command's headquarters to Huntsville to fuel growing demand from government and contractors alike at the Redstone Gateway for the foreseeable future. Before I hand the call to Britt, let me look back at how we performed over the past few years. In 2019, we entered our era of growth, having largely finished our strategic reallocation plan, and our FFO per share that year was $2.03. Seven years on, the middle of our 2026 guidance lands at $2.75 — up 35%, which works out to a compound annual growth rate of 4.4%. Looking from the starting midpoint for the 2023 range through the 2026 guidance ranges, FFO per share should climb at a compounded rate of 4.9%, and that figure sits more than 20% above the projection we gave back in 2022. With that, I'll hand things over to Britt for some specifics.

Britt Snider

executive
#3

Thanks, Steve. We closed out the quarter with solid occupancy — 94% across the whole portfolio and 95.5% in the Defense/IT portfolio. On a year-over-year basis, occupancy rose 40 basis points portfolio-wide and 10 basis points in Defense/IT. Our buildings continue to be heavily leased, with the total portfolio at 95.3% and Defense/IT at 96.5%. The lease percentage for the whole portfolio climbed 20 basis points relative to the close of last year, powered by remarkably strong vacancy leasing; I also want to call out our whole team, whose work drove these excellent outcomes on both the vacancy side and investment leasing. As a matter of fact, we signed 557,000 square feet of vacancy leases over the year, beating our original goal by 40%, or more than 150,000 square feet. Within Defense/IT, we signed 424,000 square feet, which by itself topped the 400,000 square foot initial target we'd set for the entire portfolio. The vacancy leasing we completed amounted to 47% of the inventory available to us at the start of the year for the whole portfolio, and 58% inside Defense/IT. Half of that leasing involved secure space, cyber activity, or some mix of the two. In Defense/IT, more than half of our vacancy leasing and 90% of our investment leasing was done with tenants already in place. Leasing activity was broad-based across our markets. Notably, we signed about 110,000 square feet in our Navy support market, equal to 73% of the inventory available in that group when the year began. A lot of you have been asking about this market over the last several quarters, and we came through. The lease rate in this portfolio rose almost 200 basis points across the year, while the occupancy rate rose more than 400 basis points. We also signed more than 130,000 square feet in our other segment — the strongest level in more than a decade — representing 29% of the inventory available at the start of the year. That matters because this segment carries the biggest chunk of vacancy in the portfolio. Leasing wins in the other segment included more than 40,000 square feet at our Tysons Corner property and close to 90,000 square feet in Baltimore. Year-over-year, the leased rate in our other segment rose almost 300 basis points and the occupancy rate rose nearly 400 basis points. For 2026, we've once again set a vacancy leasing goal of 400,000 square feet, equal to 1/3 of total available inventory when the year begins. Our leasing activity ratio stands at 74%, which works out to 870,000 square feet of prospects against 1.2 million square feet of availability, and 10% of that activity sits in advanced negotiations. Now on to renewal leasing. We signed 2 million square feet for the year, with tenant retention of 78% and cash rent spreads of 1.1%. In Defense/IT, we signed 1.9 million square feet for the year, with tenant retention of 79% and cash rent spreads up 2.7%. A slowdown on the government's side in handling lease renewals we had anticipated during the fourth quarter — among them 700,000 square feet of secure full building leases in San Antonio — hurt our tenant retention and cash rent spreads versus what we had guided. To put numbers on what those postponed renewals cost us: tenant retention would have come in at 84%, more than 600 basis points better, while cash rent spreads on renewals would have been 2.4%, over 130 basis points better. For 2026, our guidance takes a midpoint of 80% for tenant retention and cash rent spreads rising 2% at the midpoint. Government leases totaling 2.2 million square feet come due in 2026, and we anticipate renewing practically every one of them. Close to 1 million square feet within that figure sits at our San Antonio campus, made up solely of secure full building leases with the government that lapse in the first quarter of 2026. That lease group represents 1/3 of the square footage expiring in our Defense/IT portfolio this year and more than 40% of expiring annualized rental revenue. On that nearly 1 million square feet, we anticipate 100% retention, since the lease economics are already settled. Once more, all that's left is for the government to complete the paperwork, and we're confident that will get done and this set of leases will be renewed during the first quarter. Now to our large lease retention — on Slide 20 of our flip book, we give an update on leases above 50,000 square feet expiring from mid-2024 through year-end 2026. Taken as a whole, we now anticipate tenant retention above 95% across all 4 million square feet of these large lease renewals, since we expect 100% retention on the 12 leases still remaining, totaling 1.9 million square feet — every one of them with the U.S. government, and half located at our San Antonio campus. On top of that, since this disclosure began 3.5 years ago, we've renewed more than 4 million square feet of large leases at a retention rate above 97%. Shifting to development: we kicked off 3 developments in recent months, and our active development pipeline stands at close to $450 million in capital commitment. That active pipeline covers 880,000 square feet and is 86% pre-leased. With the full building lease at NBP 400 now executed, 5 of our 6 development projects are 100% pre-leased. The sole development still holding available space is our 8500 Advanced Gateway project in Huntsville, which we just built as an inventory building in one of our most occupied parks; construction at 8500 Advanced Gateway began a year ago, and the roughly 400,000 square feet of prospects for the remaining 125,000 square feet of availability shows how strong tenant demand is at Redstone Gateway. Right now, the project sits at 20% pre-leased. In Q4, we signed a lease for 32,000 square feet with a Defense/IT tenant, and that tenant's technology is central to the Golden Dome initiative. We're also deep in negotiations on another 32,000 square foot lease with a different defense contractor — one that's likewise supporting Golden Dome and has rented from us for more than 20 years. That deal would push the pre-lease rate at 8500 Advanced Gateway up to 40%. Planning and design work is already moving forward for our next inventory building at Redstone Gateway. And as soon as 8500 Advanced Gateway gets close to 60% pre-leased, we anticipate breaking ground on that next inventory development. Then, finally, at 8100 Rideout Road in Huntsville — an inventory development we delivered last year — we're in advanced talks with one of our top Defense/IT tenants about expanding into the remaining 27,000 square feet of availability. If that gets signed, the sole space left open across our 2.4 million square foot Redstone Gateway operating portfolio will be one 10,000 square foot suite, and we're in advanced negotiations with a defense contractor for that space. Our development leasing pipeline — which we define as opportunities we consider 50% likely to win or better within 2 years or less — currently stands at nearly 1 million square feet. Keep in mind, that pipeline was at 1.3 million square feet when last quarter ended. Since then, we've completed over 650,000 square feet of investment leasing, and we brought in another 300,000 square feet of high probability prospects. On top of that, we're tracking an additional 1 million square feet of potential development opportunities. This activity should let us keep a solid development pipeline going in the near and medium term. With that, I'll turn it over to Anthony.

Anthony Mifsud

executive
#4

Thanks, Britt. For 2025, our FFO per share came in at $2.72. That figure beat the midpoint of our revised guidance by $0.02 and topped our initial guidance by $0.06. Several factors helped the year: lease commencements arrived sooner than we had anticipated, we succeeded in converting expected nonrenewals into renewals, and net operating expenses came in lower than expected, helped by nonrecurring real estate tax refunds. Other positives included the Stonegate acquisition completed in late October, added interest and other income from investments, and reduced net interest expense tied to the timing of development funding. Those gains were partly offset by greater interest expense stemming from our October bond offering. Same-property cash NOI rose 4.1% during 2025, comfortably exceeding the 2.75% midpoint of our original guidance. That result came from a 40 basis point gain in same-property average occupancy along with operating expense savings, which also gave FFO per share a boost. Same-property occupancy closed the year at 94.2%, essentially matching the midpoint of our updated guidance and coming in 20 basis points above initial guidance. A 10 basis point dip during the quarter stemmed from a handful of previously discussed nonrenewals in the Fort Meade BW corridor, and each of those was under 30,000 square feet. In October, we sold $400 million of 5-year unsecured notes with a yield to maturity of 4.6%. Those bonds priced at a credit spread of 95 basis points and currently trade at spreads tighter than our higher-rated office peers. We will use the offering's proceeds to retire our $400 million 2.25% bond, which affects 2026 FFO per share given the higher interest rate on the new bond versus the maturing one. Our September choice to prefund that maturity came from our conservative, risk-averse approach and the narrow execution window that any issuer faces early in the first quarter. That choice wiped out any execution risk and also erased any underlying treasury rate risk. When we priced the offering, the 5-year treasury stood at 3.67%, and since our deal priced, the 5-year has traded at or above that level on 90% of trading days open for issuance. Turning to guidance, we anticipate another strong year in 2026. We are setting FFO per share in a range of $2.71 to $2.79, which implies 1.1% growth at the midpoint. The $2.75 per share midpoint reflects a $0.17 rise in NOI from rent increases and lease commencements in the operating portfolio, partly offset by nonrecurring real estate tax refunds, plus NOI gains from developments and one acquisition placed into service during 2025 and 2026; this is partly offset by $0.09 from higher financing costs, $0.015 from delivering NBP 400 into the operational portfolio, and $0.03 from the net effect of lower interest and other income on investments and higher G&A. Same-property cash NOI is expected to rise 2.5% at the midpoint. The nonrecurring real estate tax benefits in 2025 affect this guidance, cutting the 2026 growth rate by 100 basis points. For same-property occupancy, our expectation is that it will finish the year in a range of 93.5% to 94.5%, staying fairly level across the year. When it comes to how we'll deploy capital in 2026, our plan is to put between $200 million and $250 million toward projects currently active as well as those planned for the future, along with committing $225 million to $275 million of capital into new investments. Our stance on the AFFO payout ratio is a conservative one — it has come in at an average of about 60% across the last 2 years, and for 2026 the forecast calls for it to land below 65%. With that level, the portfolio keeps throwing off enough cash to cover the equity portion of the investments we anticipate making while keeping leverage neutral. Last, I want to spend a moment on what happens when we bring our development NBP 400 into service this year, and on how we generally handle cost capitalization for development. NBP 400 goes into service on April 1, which is 1 year after the core and shell of the building were finished. At that date, our policy — which has been in place a long time and requires us to do so — means we cease capitalizing both interest and operating costs tied to that project. That creates a $0.015 hit to 2026 FFO per share, and our guidance already accounts for it. Under our policy, we capitalize interest and operating expenses, with real estate taxes on properties under development or redevelopment making up the biggest piece. We keep capitalizing such costs right up until a property turns operational, which we define as whichever comes first: 90% occupancy or 1 year after substantial completion of core and shell. Over time, only a modest share of our total interest expense gets capitalized — capitalized interest has averaged about 5% of gross interest across the last 3 years — and looking at 2026, we project capitalizing under 8% of our gross interest expense. Although delivering NBP 400 will lower total portfolio occupancy by 60 basis points for a while starting in the second quarter, and will also weigh on FFO per share during the second and third quarters, our guidance bakes in the assumption that the lease we recently signed with a defense contractor kicks off in the fourth quarter. In our view, the way we treat capitalized costs on development and redevelopment projects shows our conservative commitment to following GAAP standards and keeps us from piling up excess basis in our projects, which would erode the yields we expect; with that, I'll hand the call back to Steve.

Steve Budorick

executive
#5

Thank you. To wrap things up, I'd like to recap what we achieved and the main points we want to leave you with. 2025 brought remarkable results, with robust performance delivered throughout every segment of the portfolio and every department of the business, producing year-over-year growth in FFO per share of 5.8% and marking our third straight dividend increase, which amounts to a 10.9% rise across the last 3 years; looking at 2026, we believe it will mark our eighth year in a row of FFO per share growth; once again we've set a vacancy leasing target of 400,000 square feet, an ambitious objective considering how little unleased space remains in our portfolio; tenant retention should stay solid at 80%, and we plan to deploy $250 million of capital into new investments, with $146 million of that already committed. Our liquidity position is still very robust, and we intend to keep self-funding the equity portion of our capital investments. We now forecast compound annual FFO per share growth of close to 5% from 2023 through 2026, and we've gotten off to an excellent start already. We look forward to delivering another year of strong results. Before I finish, I'd like to say something about the loss of my dear friend and former colleague, Roger Waesche. It's with sadness that Roger died unexpectedly on January 8. A great deal of the foundation we've relied upon throughout the past decade stems from the leadership and vision of Roger Waesche. Roger spent more than 3 decades with the company, holding a broad range of leadership positions, ultimately serving as the company's third Chief Executive Officer from 2011 and 2016; there's no reason to romanticize him beyond who he actually was, because that was more than sufficient. A devoted husband and father, a person of deep faith and integrity, a passionate and steadfast friend, someone of remarkable intelligence and generosity, and a colleague and leader who genuinely cared about everyone he met. All of us fortunate enough to have worked with and beside Roger are better for the experience. He is deeply missed. Operator, at this point, please open the line for questions.

Seth Bergey

analyst
#6

So, maybe I'll begin with what's happening in the development pipeline. Are you beginning to notice possibilities coming from Golden Dome, along with the fresh defense appropriations sort of slowly making their way into the visibility of that pipeline? Or would you say projects tied to that are still yet to materialize?

Steve Budorick

executive
#7

Both, I'd say, Seth. Britt mentioned the substantial prospect backlog for RG 8500, around the 400,000 square foot mark. A lot of those, possibly even the majority, relate to Golden Dome; I see them as sort of first-stage footprints, preliminary steps to enter the fray; and then later on, I expect bigger requirements once awards get made and contractors scale up to carry out the real building of Golden Dome.

Britt Snider

executive
#8

Let me also tack on a few points there. What I'd say is they're genuinely pushing hard to speed that effort along when it comes to contracting. Take the Missile Defense Agency's Shield contract — that one might give DOD considerably greater latitude to get orders through faster. On top of that, they want to fast track things, particularly for a number of the space-based interceptor contractors, by way of OTAs or some other transactional authority. So in fact — what we're picking up isn't only from the tours, but likewise from the way they're preparing these contracts to be awarded. So count on some velocity this year.

Seth Bergey

analyst
#9

Okay, and my second question concerns the leasing expectations regarding keeping tenants, with 80% as the midpoint assumption. For that 20% you wouldn't keep, considering the sort of tenant you have, where do those occupants go? Is there a stated reason for leaving? Or might that figure simply be cautious based on how retention has looked over the last couple of years?

Steve Budorick

executive
#10

If you examine our nonrenewals annually, generally it's the smaller tenants who are exposed to moving since they require slightly less square footage or slightly more. Roughly 70% of nonrenewals involve simply placing smaller tenants into appropriately sized space. A portion of those are nondefense tenants. And frequently, it's our asset managers adjusting their holdings to make room for expansion by larger defense tenants. So some friction always exists there. Yet I should point out that across a decade, we've achieved 80% retention. That's quite a remarkable figure.

Blaine Heck

analyst
#11

To build on the question of possible further investments — more precisely, the approximately $100 million in extra investments you've set aside in guidance for 2026 — what split do you expect between acquisitions and developments within that figure? Also, could you describe the kind of profile and the yields you're aiming for when you acquire something? And apart from the Huntsville activity you mentioned, are there other development projects in the near term that you're currently considering?

Steve Budorick

executive
#12

Sure. As we've said, the pipeline for our developments sits at about 1 million square feet. A large portion of that consists of smaller contractors for 8,500, though a few build-to-suit chances are in there too. On the development side, our yield goals are essentially unchanged; at the point the lease begins, we're aiming for an 8.5% cash-on-cash yield. As for acquisitions, whenever we pursue them, we view them as opportunistic. None are incorporated into our guidance, so to speak. And generally, for us to proceed, the yield from such an acquisition must be higher than what our development opportunities can deliver.

Blaine Heck

analyst
#13

Understood. That's useful context. Now, shifting topics—you folks have consistently said you don't require equity as a funding source for your investment plans. Yet since the stock has done really well so far this year, I'm curious if you'd be more willing to issue shares at these prices. I suppose, where would equity fall among your funding options? And on the other hand, if you were to pursue major developments or acquisitions this year, are there any assets you'd think about selling?

Steve Budorick

executive
#14

Well, that question has a lot of layers. It's great to be in a spot where issuing equity is even a possibility, but it's really a last resort. We have—as we've stated quite clearly, the capacity to cover our anticipated development spending using cash generated internally; we can actually stretch higher in any given year or 2 by slightly raising our debt ratio, which on a pre-lease basis would only be short-lived. As for dispositions, a handful of assets have been plainly flagged as ones we'd like to divest; every one of them sits in the other segment, not defense. When those sales happen depends less on our development—how quickly we find development opportunities—and more on conditions in the markets where those assets are located, where we can achieve an efficient sale and protect shareholder value.

Blaine Heck

analyst
#15

So, to put it a different way, I suppose, you don't believe that being reluctant to issue equity has kept you from pursuing additional projects in any way. Is that right?

Steve Budorick

executive
#16

No, not in the slightest.

Blaine Heck

analyst
#17

All right.

Steve Budorick

executive
#18

Should things somehow reach a point, heaven forbid, where we're forced to put out equity, honestly, for our investors that would be a day of celebration, and everyone will hear about it quite a bit ahead of time, though we don't anticipate that taking place.

Anthony Paolone

analyst
#19

Starting with the 2026 commencements you're expecting. It sounds like the follow-up for 8,500 in Huntsville, perhaps. And beyond that, is anything else in the plan?

Steve Budorick

executive
#20

Well, a few of them are on our radar, but we're not about to reveal their locations to you. Several other opportunities are in the works for us. And yes, you've got that right. Once 8,500 is committed, we anticipate beginning an inventory fairly quickly.

Anthony Paolone

analyst
#21

All right. So I suppose, if we're looking even past '26 — your investment spending has stayed fairly steady across the last couple of years and in your '26 guidance — but when we consider what remains to be spent on the developments currently underway, it sounds like you'll still have a couple of hundred million left to spend once 2026 is over. And then, if you kick off some things this year, that will add to it as well. So I suppose, should we anticipate development spending, or investment spending, perhaps picking up somewhat over the next couple of years?

Britt Snider

executive
#22

On the spending side, yes, since if you check the development chart in our supplement, you'll see that the two buildings we committed to — one in late December and one in early January — have placed in service dates falling in 2027 and late 2028. So you're right, the spending — the significant spending — for those won't happen in 2026; it will happen in '27 and 2028. So there will be incremental funding for the commitments we've made this year, along with the commitments we expect to make in 2026 and beyond.

Anthony Paolone

analyst
#23

All right. Then for my second question, related to everything we just discussed, since things appear to be going nicely for the business. A few years back, you set out that roughly 4% earnings CAGR as a medium-term, or perhaps even longer-horizon, growth rate. Do you figure that still holds? Given all the circumstances around the business, might there be room for that to move somewhat higher? Or how should we be thinking about it?

Steve Budorick

executive
#24

Because of what the refinancing costs are doing, this year amounts to a transitional one. Probably as we get deeper into the year, we'll aim to provide a bit more visibility into what lies ahead for us, yet our confidence is strong that we'll keep delivering the solid growth we've had, and that's what I'd say.

Manus Ebbecke

analyst
#25

When it comes to the demand showing up in your markets, what portion comes from tenants you already have as opposed to ones that are new? Also, have you seen any kind of significant absorption and inbound relocation, perhaps from tech defense tenants, arriving in your markets out of other parts of the U.S.?

Britt Snider

executive
#26

Yeah, I'd put it at roughly 50-50 between existing and new business. Beyond that, certain groups are arriving from elsewhere, Colorado and California among them. So seeing some inflow of players into our markets who never previously had a footprint there is something we find encouraging.

Manus Ebbecke

analyst
#27

Understood. I value what you said regarding possibly receiving a fresh outlook at a later point in this year. That's something we are eagerly anticipating. Still, from your perspective, since demand conditions currently appear quite strong and you are clearly in a position to take advantage of that, how might your tenant composition be expected to evolve if we set today's portfolio against one that could exist 5 years down the road? In what direction do you see that mix possibly moving within your portfolio?

Steve Budorick

executive
#28

Do you mean the tenant mix itself, or is your question about concentration?

Manus Ebbecke

analyst
#29

When you break it down by tenant type — government, tech defense, or traditional contractors — where do you see potential growth coming from beyond the current base? Which of those groups do you expect to capture a larger share moving forward?

Steve Budorick

executive
#30

That's honestly a tough question to pin down. My expectation is it stays about in line with where things stand now — a ratio of 2 parts defense contractor to every 1 part government — and that expansion will show up across a range of different markets.

Rich Anderson

analyst
#31

Yes. This is Rich Anderson. I got cut off there. Steve, first, nicely put regarding Roger, among the finest people I can remember ever working alongside—gentle in manner, modest, yet likely a major contributor, as you said, to shaping what you have today; therefore his impact endures. Now let me get into my questions; regarding Huntsville and where it stands in terms of portfolio size, roughly 2.5 million square feet, while NBP is 4.3 million square feet and expanding beyond that. Considering every force driving movement toward Huntsville, be it Missile Command, Space Command, Golden Dome, do you think you might reach a stage where you simply exhaust the chance to satisfy some of these demand pressures hitting that area? Or do you see chances to grow so you can construct additional space there? I'm wondering what your roughly 5-year view is regarding Huntsville and how large it might grow inside the portfolio.

Steve Budorick

executive
#32

Well, I'm eager for the day I can join a call and explain how we'll handle that expansion. And that expansion will occur; it will simply require a year or 2, Rich; but keep in mind, we're built out to 2.4 million square feet at present. We have a small amount under construction. Our total capacity on land we hold absent structured parking is 5.5 million square feet. Thus we possess 3 million square feet of development runway on the enhanced use land we presently hold. We think there's a considerable chance that once we have used up that development, we can keep growing our enhanced use lease footprint on the base since plenty of land exists. Having our contractor and government campus serves as a widely valued catalyst for the missions at the base. And basically, we operate in partnership with the U.S. Army overall Commands to assist their missions. So I doubt we will ever exhaust the runway there. There could be certain processes we must navigate; nevertheless, we have a lengthy runway in Huntsville.

Rich Anderson

analyst
#33

Alright. When it comes to how the company grows organically, you all have managed to outperform whatever initial target you set at the beginning of each year. Over the past 2 years, I believe it has consistently gotten a bit better quarter after quarter. This year, perhaps the math works out somewhat differently. I'm not certain, but would you agree that from a purely organic standpoint, you've allowed some chances to slip by? And for same-store results to gain a bit of upward momentum as the year moves forward, what needs to occur, and maybe you've also built in some extra caution?

Steve Budorick

executive
#34

Well, same-store is a fight won by small margins; it comes down to square feet renewed, commencements happening weeks sooner or later, and tiny differences in rents. It's difficult to claim we're letting anything slip by. Our team performed exceptionally well last year, securing the optimal result across roughly 150 separate transactions. At the same time, our operating teams must hold expenses steady and challenge tax assessments. Same-store growth amounts to close-quarters combat. I believe we've issued a strong, reliable projection, and we'd love to exceed it, but I don't think we've made it look prettier than it is.

Rich Anderson

analyst
#35

All right, my final one is about that $950 billion defense budget tied to the OBBB. What I'd like to know is whether you can give some sense of when this begins to show up in your results — when it starts affecting the bottom line through leasing and the real opportunities available to the company? Clearly, it's a wonderful long-term foundation. But should we think of it as a process lasting 2 or 3 years before it actually appears and reaches your FFO line?

Steve Budorick

executive
#36

Sure. Our longstanding message has been that once an appropriation happens, the effect on our demand comes 12 and at times 18 months later. That's especially true given some of the major funding items happening at present, since the money is directed toward new programs. Those programs first need to be conceptualized, then go through contract competitions, and the defense contractors must bid for the contract, win an award, make it through a protest, and ultimately receive an adjudicated outcome before they are able to lease space. So 12 to 18 months — this is truly a very strong indicator that demand from our side will stay quite healthy, or perhaps get even better, across the coming 2 years.

Britt Snider

executive
#37

Rich, one more thing I’d mention is that there are a few — for instance, take what I brought up before, Golden Dome and also Golden Fleet, though that one matters less in our case. Even so, with those 2 efforts, they’re figuring out how to move those dollars through the program more quickly; as a result, when it comes to Golden Dome, we definitely could see upside from it earlier than that.

Rich Anderson

analyst
#38

That's basically what prompted me to ask, since it seems a bit political that all of this is taking place, even though it does have support from both parties, and I understand that when it comes to the spending bills. But I was simply curious whether — considering the geopolitical situation right now, perhaps you might expect to realize the advantages from this appropriations bill and similar items in less than 12 months, though I suppose you're sticking with your current position on that for the time being.

Steve Budorick

executive
#39

Well, I believe what Britt described is that you'll end up seeing a combination of the two; however, one point that is absolutely unambiguous is that this administration has a very strong sense of urgency; therefore it might happen faster than what we've typically observed, yet it's difficult to promise you that it will.

Dylan Burzinski

analyst
#40

I realize the plans for the Iowa data center have been delayed somewhat, but I'm just curious whether there are additional markets you might target to acquire parcels of land for upcoming development possibilities on the data center front?

Steve Budorick

executive
#41

At this time, no. We are always assessing possibilities, yet nothing is under serious consideration.

Dylan Burzinski

analyst
#42

And now, I suppose, just one final item regarding the plans for office dispositions. I believe what we've been hearing throughout the past several months is that things are getting better in debt capital markets, and bidding tents are becoming more crowded. I'm just kind of wondering what you think about bringing 2100 L to market, since I understand it's mostly stabilized at this point.

Steve Budorick

executive
#43

Well, pricing for assets in the D.C. market hasn't yet been indicated at a level that gets us excited. So my expectation is that won't occur for 12 months, though that building is positioned extremely well by us. It's a wonderful development featuring excellent tenants. And once capitalization rates get close to the point that makes sense for our shareholders, we're able to act on it.

Steve Budorick

executive
#44

Appreciate everyone being here on this call. Since we're all at our offices, just reach out to Venkat if you want to set up a further conversation with us. Enjoy the rest of your day.

Operator

operator
#45

Appreciate you all, everyone, for joining us on today's call; that brings the program to a close. You're free to hang up now. Have a good day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete COPT Defense Properties transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to COPT Defense Properties earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in COPT Defense Properties or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.