operatorAt this point I'd like to pass the conference to our Chief Executive Officer and Managing Director, Barrie van der Merwe. Please go ahead.
Barrie van der Merwe
executiveThank you, Travis, and good morning to everyone. We appreciate you being with us today. There is nothing that matters more than making sure our people get home safely each day. Although we keep working through efforts aimed at bettering both our TRIIR and our severity rate, we know far more remains to be done. By means of our leadership development program, a sustained emphasis on critical controls and management's verification of them, risk assessment and management, and engagement with frontline staff, we are dedicated to fostering a robust safety culture. As of 30 September, the group TRIIR stood at 1.42, a 6% increase from 1.34 in the June quarter, and we keep working to push that trend lower. Back in July, when we last spoke, I laid out our reset plan. We talked about altering the mine plan to boost productivity and lower cost, cutting execution risk, setting up suitable inventory buffers, and enhancing operational stability, all while putting margin ahead of volume. In the September quarter, we began to observe some payoff from that effort. Curragh ROM production hit its highest quarterly figure in six years. Strip ratios came down, mining costs came down, inventory levels went up, product quality and mix got better, and earnings climbed. All of these are leading indicators that the reset is delivering results. Looking at the business now, Curragh ROM production is no longer the main problem.
Barrie van der Merwe
executiveDuring the quarter we generated 4.2 million tonnes, which is the largest amount since September 2020. What we need to do now, and the chance we have, is to turn that into saleable met coal tonnes with high margins by lifting CHPP throughput, recovery, and consistency of operation. The outcomes we anticipated are coming through from the revised Curragh mine plan. Performance in open-cut mining got better, strip ratios came down, and moving less waste in the south fed straight through into reduced costs. Mining cash costs likewise fell by roughly $18 million q-on-q, since coal with a lower strip ratio in the south meant less overburden movement and better productivity. That gives us support to put money into waste mining in the north next year so we keep positioning it for greater productivity. Inventory was also built up by us over the quarter. At Curragh, ROM inventory rose by 600,000 tonnes, reaching approximately 830,000 tonnes by the end of September. Under the reset strategy, these stockpiles make the system more stable, give continuity and flexibility before the wet season, and generate future saleable production as CHPP performance keeps getting better. Reliability and runtime of the CHPPs are beginning to improve, and some of those gains are carrying through into higher-value metallurgical coal output, which the additional 200,000 tonnes of HCC production q-on-q demonstrates.
Barrie van der Merwe
executiveWe still see meaningful upside left in the CHPPs, with roughly a 10% targeted gain in uptime and rate, plus a yield increase to be delivered over the months ahead. The effort centers on automating raw coal reclaimers so feed rates rise, revising plant control logic to fine-tune sequencing, completing repairs on key critical equipment, enhancing maintenance workflows, and refreshing operating guidelines along with trigger action response plans. Our approach to plant improvement is programmatic. Open-cut mining is performing near the level required, and the CHPPs are closing the gap to release the inherent value. At Mammoth, progress is slower than we had hoped. Extensive faulting in two panels keeps affecting the mine, and since this is a comparatively new underground operation, we are still developing our grasp of the geology. Although development rates and production outcomes suffered during the year because of this, we stay hopeful about this asset's long-term potential. With our backing, the operator, Eclipse, has put in place a detailed improvement program, and there is considerable emphasis on lifting productivity, development rates, and operational consistency, alongside related management changes to drive the plan. More improvement is needed, yet Mammoth remains a significant source of possible future upside for our business.
Barrie van der Merwe
executiveMoving on to Buchanan. The biggest thing that shaped how the group performed this quarter was the geological fault we hit in the south longwall, which is one of the two panels running at that mine. The roof conditions that came out of it cut ROM production by roughly 700,000 tonnes compared with the June quarter, and it had a material impact on output of premium low-vol met coal products. The disruption also pushed up operating costs, because of extra support requirements and void fill activities, and it lowered the operation's ability to recover fixed costs across the production base. We've now successfully worked through this issue, and the learnings have been embedded for the future. It should be seen as an isolated event, and we don't expect it to recur at the same scale. The operation has moved past the faulted area, longwall advance rates are back to normal, and we don't see the quarter's performance as representative of the asset's underlying quality, capability, or long-term economics. Despite these challenges at Buchanan and Mammoth, and with more opportunity still remaining in the Curragh CHPPs, the group brought in approximately $44 million of EBITDA earnings during the quarter. That was our strongest quarterly earnings performance since the June quarter of 2024, and a substantial improvement on the $7 million delivered in the previous quarter.
Barrie van der Merwe
executiveFour main factors contributed to this gain. First, stronger benchmark prices for metallurgical coal lifted realized pricing, and our product mix kept getting better. On a quarter-over-quarter basis, the PLV index rose roughly $10 per tonne. It has since gained another $20 a tonne, which is a good sign for the December quarter. Second, the Curragh reset is bringing costs down. Reduced strip ratio in mining and better execution of the mine plan cut waste movement and boosted productivity. Mine cash costs fell by approximately $18 million versus the prior quarter. Third, we are seeing early gains from better plant uptime and steadier operations, which means more high-value met coal is produced and we lean less on selling lower-value thermal coal, with HCC output 200,000 tonnes higher quarter-on-quarter, helping drive a 2% gain in the group's realized price relativity to the index. Finally, we added another 600,000 tonnes of ROM stock at Curragh to strengthen system stability and prepare us for the wet season. These results are more proof that the reset strategy is steering the business the right way. With the year now in its final quarter and the reset program beginning to take hold, we are revising our FY '26 guidance.
Barrie van der Merwe
executiveFor the full year, we're anticipating saleable production in the range of 14 to 14.5 million tonnes, with mining cash costs between $105 and $110 per tonne. This revision isn't a sign that the underlying quality of our assets has deteriorated. At Curragh, the open-cut mining system is running better than it was six months ago, and Buchanan experienced an isolated geological issue. On the whole, ROM production is stronger and more resilient. Inventory levels are appropriately higher. The product mix is getting better, mine plan execution is also improving, and costs are coming down. Instead, what this revision reflects is the effect of a slower ramp-up at Mammoth, driven mainly by the geological conditions I mentioned earlier; the ROM impact at Buchanan in the September quarter; and the time it takes for the reset plan, particularly CHPP performance, to fully show up in saleable met coal production; along with our deliberate choice not to bypass coal that can be washed later to deliver higher margins. On top of that, a stronger AUD and higher diesel costs, which are outside our control, pushed costs up materially, and Sandeep will unpack that later. Our focus is on margin, not total product tonnes, and as I said earlier, we're not chasing a total tonnage number at the expense of mix.
Barrie van der Merwe
executiveDuring the September quarter, our saleable output came to 3.4 million tonnes, which was 700,000 tonnes lower than the prior quarter, and yet EBITDA still came in materially better. As we close out the year, we anticipate holding over 1.5 million tonnes of ROM inventory at Curragh, which positions us nicely for the wet season and for overall system stability as we move into the new year. Before passing things to Sandeep, just a brief note on the markets. The met coal market stayed constructive right through the September quarter. The Australian PLV HCC benchmark came in at an average of roughly $248 per tonne for that quarter, versus roughly $238 during the June quarter. Since the quarter ended, pricing has firmed further, and we anticipate solid flow-through of those higher prices into December. Near-term volatility in the market will no doubt persist, but the medium-term outlook remains underpinned by growing steel demand in India, limited growth in global supply, and the absence of any significant new met coal developments worldwide. Our view that the outlook for high-quality met coal stays attractive is unchanged. I'll now pass you to Sandeep, who will cover financial performance, liquidity, and the balance sheet.
Sandeep Deoji
executiveThanks, Barrie. Financially, the September quarter was a step forward even though production was lower and we had operational disruptions at Buchanan. The key takeaway was how much earnings improved. As Barrie noted, group earnings went from $7 million in the June quarter to roughly $44 million in the September quarter — our best quarterly result in over two years. Several things drove that: better pricing, reduced mining costs at Curragh, stronger product mix outcomes, and building unsold coal into inventory, which included our choice not to bypass ROM production as low-value thermal coal. Coal revenues rose to about $558 million in the September quarter, versus $506 million in the June quarter. Group realized met coal pricing climbed to $184 per tonne, compared with $171 per tonne the quarter before. Australian realized met coal pricing rose to 75% of the PLV benchmark from 72% in the June quarter, which shows continued progress on optimizing product mix. Turning to costs, total mining cash costs at Curragh came in around $18 million below the June quarter, reflecting the lower strip ratio under the revised mine plan. Per tonne, group mining cash costs were up at $113 per tonne, since fixed costs were spread across fewer tonnes, primarily at Buchanan, where unit costs climbed to $132 per tonne on lower volumes.
Sandeep Deoji
executiveOur updated cost guidance for the full year is now $105 to $110 per tonne. That figure includes roughly $5 per tonne tied to reduced volumes, plus about $7 per tonne stemming from a stronger Australian dollar and elevated diesel fuel costs. Earnings came in much stronger, yet cash flow was still weighed down during the quarter by a number of timing issues and one-off items. Vessel loading at Curragh was delayed by 10 to 14 days because of port congestion. Roughly 600,000 tonnes of coal sat at port awaiting shipment when the quarter closed. Those postponed vessels accounted for about $50 million in revenue, and most of them have now sailed in October. We kept putting substantial money into inventory as well. ROM inventory at Curragh rose by about 600,000 tonnes, reaching roughly 830,000 tonnes by the end of September. During the quarter we also made the semiannual interest payment on our senior secured notes and paid our yearly insurance premiums. Finally, production volumes at Buchanan were hit by the geological disruptions, which in turn affected revenue and cash generation. As Barrie explained, a large share of the inventory build was intentional, though CHPP constraints and port congestion played a part too. Holding inventory at these levels helps keep the system stable, gives us more operating flexibility, and puts the business in position to gain from future gains in plant performance, all while creating a buffer of inventory before the wet season arrives.
Sandeep Deoji
executiveOnce you adjust for those items and leave out the prepayment arrangements, the underlying business would in fact be cash-flow positive for the quarter. Underlying financial performance came in stronger than the cash flow results might first imply. Liquidity improved substantially during the September quarter. Available liquidity rose by $57 million over the quarter, reaching roughly $155 million by the end of September. That increase was supported by the $75 million Glencore prepayment arrangement that closed in August, and it reflects management's ongoing emphasis on keeping adequate financial flexibility as the reset program moves ahead. Net debt fell to $553 million, versus $606 million at the close of June. Note that our net debt measure does not include the liabilities tied to the Glencore and Stanwell prepayment arrangements. We face no significant debt maturities until the senior secured notes come due in October 2029. Capital expenditure for the year should land near the bottom end of our $150 to $175 million guidance range. Our focus stays on preserving liquidity, generating cash, and repairing the balance sheet. The business may not be precisely where we want it yet, but the trajectory is plainly improving. With operational improvements continuing and inventories being converted into sales, we expect stronger earnings and cash conversion going forward.
Sandeep Deoji
executiveAt this point I'll pass things over to Barrie, who has a few closing remarks for us prior to taking questions.
Barrie van der Merwe
executiveThanks, Sandeep. During the September quarter we made solid progress and delivered some outcomes in open-cut mining and on cost, while building the inventory levels we need and enhancing our product mix. There is still work to do at the CHPPs and Mammoth, and that is taking a little time, but a plan is in place and we are carrying it out. We look forward to the benefit of higher pricing coming through in the December quarter, which will support cash flow, along with strong production and effective cost management. The potential of our long-life, high-quality assets and the potential we are unlocking continues to excite me greatly. Travis, please open the line for questions. Thank you.
Operator
operatorThank you. Should you want to pose a question, kindly hit star one on your phone and hold until your name is called. To withdraw your request, press star followed by two. In case you are on a speakerphone, please lift the handset before asking your question. Our first question comes from Bikash at Primus Asset Management. Go ahead, please. Good morning. Can you all hear me?
Barrie van der Merwe
executiveYes, thank you, Bikash. Hello. Thanks, Barrie. Appreciate the update. I have a few questions of my own. I gather there were some unexpected operational disruptions during 3Q. How do things stand for us going into 4Q, or at least for the quarter so far? Could you give us an update on how recovery is progressing on those fronts? That covers my first question. Second, regarding the inventory build you mentioned, how much more is expected in 4Q? Could you repeat that last part, Bikash? The inventory build-out you plan to do — how much has already been completed in 3Q, and how much more is expected in 4Q? All right. On the first part, thanks for that. Obviously we're focused on the third quarter right now and breaking that down. We'll report on the last quarter, the December quarter, when it happens, but I think if you look at history, the December quarter is typically a strong one for production. Then, with the guidance we issued today regarding saleable production, and given that we guided quite a bit on where inventory stands and where we expect it to finish, that ought to give you a solid sense of what we're anticipating for the last quarter, which is going well so far.
Barrie van der Merwe
executiveThat covers that point. Regarding the inventory buildup at Curragh, at the close of September, as we mentioned, it stood at roughly 830,000 tonnes, and we expect it to reach approximately one and a half by the time we get to December. Following the mine plan, it will simply run down. Understood. On your mining cost, I'm still working through the figures, but based on what I've read and what I'm seeing, along with your comments, it came in around $18 million lower year on year. Could you elaborate on how I should interpret that — sorry, $18 million lower quarter on quarter? How should I compare those figures for the September quarter against the June quarter? Look, perhaps that comes across as a rather detailed modeling question. Perhaps you could catch up with Chantal afterward so we can make sure we address that one properly for you, Bikash, if that's fine. Understood. One further question concerns hedging. Are you considering any hedges given where met coal prices sit, and locking in some yields?
Sandeep Deoji
executiveNope, there's still nothing regarding coal pricing. As for FX, we do occasionally think about it with a short-term view, though we hold no long-term hedges. Got it. I'll rejoin the queue. Thank you. Great.
Barrie van der Merwe
executiveMuch appreciated.
Operator
operatorThanks. Our following question is from Glyn Lawcock at Barrenjoey. Go ahead, please.
Glyn Lawcock
analystGood morning, Barrie. Barrie, would you mind giving us some detail on Mammoth and the faulting situation? You mentioned that faulting exists in the two panels you're in right now. What drilling has taken place so far, and is this simply a matter of drilling and having just missed the fault, and do you have any view of the medium-term outlook where faulting is concerned? Thank you.
Barrie van der Merwe
executiveThanks, Glyn. We’ve spent a fair amount of time on that over the past two weeks. With mining projects and pre-feasibility work, there’s a certain drilling density that goes along with it, and all of that was carried out properly. There are gaps between those holes, and since gaps exist, you end up finding things in between that you weren’t expecting. What I think is happening, particularly in the North Main section where the team is working — it’s a mains development reaching the northern part of the mine, which positions it for the future — is that the faulting simply carried on for a longer distance and proved more complex than had been anticipated. Faulting in the south was less intense. I think the team has learned a great deal from working through this. We have some plans on the equipment side for next year involving using different equipment, bringing it in on hire at certain times, to better handle this type of ground as well. Then, as I mentioned in the discussion piece, some changes have been made in the management of that mine to also ensure we cover and respond to the faulting appropriately. I think it’s fair to say that if you look at the productivity outlook for Mammoth against what we originally thought when the investment was approved, it will be somewhat lower.
Barrie van der Merwe
executiveAs I mentioned, we remain hopeful that it could prove to be a solid asset, provided we figure out how to handle these circumstances correctly.
Glyn Lawcock
analystThanks, Barrie. If I remember right, that was 2 million tonnes per annum at the start, wasn't it? What's your view now — are we down 10%, down 20%? Any sense of it?
Barrie van der Merwe
executiveLook, I think the goal we're aiming for is a position of 1.8 million ROM tonnes. That's what I believe is achievable if we execute properly, Glyn. That's the target we've set.
Glyn Lawcock
analystNo, that's great. Then perhaps just one for Sandeep. So what's the aggregate once you include the Glencore and prepayment balance? On top of what you've disclosed, how much is that in total now?
Sandeep Deoji
executiveCould you make that clearer, Glyn? When you say in aggregate, what exactly are you referring to?
Glyn Lawcock
analystYou mentioned that net debt leaves out the Glencore prepayment balance. So what figure for the Glencore and prepayment balance would we need to add on top of the net debt figure you disclosed today?
Sandeep Deoji
executiveThe balance at Glencore is likely still sitting at slightly below $75 million. As for the additional prepayments we received from Stanwell, those contributed roughly another $45 million during the quarter.
Glyn Lawcock
analystWe obtained it from the half-year financial results as they stood at that time.
Sandeep Deoji
executiveThat's right. Yes.
Glyn Lawcock
analystAll right. So then, Barrie, you've given us a sense of what '27 might look like today, since you've said the aim is to return to 16 to 17 million tonnes. Would you expect a comparable cost level there? I'd just point out that the original '26 guidance implied $1,500 million of costs, if you took the midpoint of volumes together with the midpoint of costs. You've been running at $400 million a quarter, somewhat below that in the third quarter. So does that mean we should be thinking about 16 to 17, but with a C1 somewhat above what was guided for '16, or do you believe that with all the benefits coming through — you had the $18 million reduction at Curragh in Q3, and so you were at $385 million a quarter, but you need to bring it down to roughly three, I'm not sure, what is $1,500 divided by 4, you need to be below about $350 million a quarter to achieve the guidance you gave us this year?
Barrie van der Merwe
executiveSo we're in the middle of the budget work right now, and it involves a lot of moving parts. On the volume side — and I'm speaking mainly about waste at the BCMS operations — the overall plan is to push it down in the south, get the south to a lower cost, then put some of that back, and perhaps a little extra, into the north. We're still working through the northern part. How much waste we end up mining up there could add somewhat to cost. That's the piece I simply need to see more clearly as we go along. Then, working against that, we've put substantial effort into the procurement side, the mining services agreements with companies such as Thiess and Golding, and those ought to deliver a benefit. I don't want to be too outspoken about cost at this point. I'd prefer to work through it correctly rather than throw out guesses, Glyn. I believe we have a chance to offset the extra waste we need to move in the north against the savings flowing from the improvement program. And then the real game changer, when it comes to cost per tonne per saleable product tonne, is achieving that 10% gain in rate and hours out of the CHPPs, plus perhaps a small yield increase, since we now have a more stable system.
Barrie van der Merwe
executiveTaken as a whole, that ought to put us in a reasonable position on cost per tonne in the coming year.
Glyn Lawcock
analystYeah, no, that’s great. Maybe if I could fit in one last question. Sandeep, I believe during your remarks you mentioned that the quarter would have been cash flow positive even if the Glencore prepayment were excluded — that’s what you said. Could you perhaps expand on that a bit more? You referred to $50 million of lumpy cash flow in the quarter, but $40 million of that is capex anyway, so it’s really only 10. It’s somewhat of a line-ball call. Were you mainly suggesting that without the inventory build as well, it would have been a positive cash flow quarter, or do you think it was still positive even with that inventory build? Thanks.
Sandeep Deoji
executiveLet me try to lay it out the way you asked. Starting with the cash balance at the close, we finished September at 155. Subtract the 75 that came in from Glencore and you're down to 80. Comparing where things stood at the end of June with where we finished, that works out to $20 million lower. A few items in the quarter were probably one-off, lumpy cash flows — we had extra capital spend on long-lead items delivered at Buchanan. If I normalized that on a run-rate basis, you'd likely add roughly $15 million to cash. On top of that, you had the biannual interest payment made during the quarter. If that were paid monthly instead, I'd probably normalize it at around $10 million too. And similarly for insurance, that's another $15 million. You get to about $20 million positive pretty quickly. Then there's the inventory piece — if we loaded the inventories sitting at port onto ships, as I mentioned, that's about $50 million in revenue. Now, from a working capital assumptions standpoint, you'd probably say that flows into October, but we do have customer arrangements that let us pull that cash flow forward.
Sandeep Deoji
executiveSuppose you factor in an additional $40 million of cash flow for the quarter — even then, you arrive quite rapidly at roughly $60 million positive cash for that quarter.
Glyn Lawcock
analystThat’s great. I really appreciate the level of detail—thank you very much. Thanks, everyone.
Sandeep Deoji
executiveThat’s great.
Barrie van der Merwe
executiveGlyn, thanks for that.
Operator
operatorAs a reminder, if you'd like to pose a question, just hit star one on your handset. We'll now take the following question from Stefan Hansen at Macquarie. Your line is open.
Stefan Hansen
analystThanks. Hello, Barrie. Hello, Sandeep. Regarding what Glyn raised about Mammoth faulting, I was hoping we might spend a little time on Buchanan — the fault you identified there — and, I suppose, on how you currently understand that fault, and on whether there is any danger that this fault extends into other panels and could impact production down the road?
Barrie van der Merwe
executiveStefan, appreciate that. At Buchanan, like I mentioned, I believe the size of this issue is contained, and my expectation is that it won't happen again. If you look at that mine, the ground in the south, in that south panel, has more faulting, and the roof conditions there are somewhat harder than up north. What I think happened here is that the team ran into the failing roof. Part of the challenge in the south is that you can't stop. Once you stop, conditions deteriorate very quickly. The team kept going, attempted to push through it, and during that effort things simply got worse, and we ended up in a difficult situation. As part of that, we did bring in and apply some new void-filling products and technologies. We had to adjust our approach somewhat and do things differently. I think if you take those lessons, Brett and the teams put together a very good TARP plan, covering exactly how we handle these conditions when they arise, which is something that hadn't been as formalized for us previously. I'm confident that if we face it again, we'll handle it in a different way. We will see roof conditions again in the south.
Barrie van der Merwe
executiveThat's simply how it works. I believe we're quite well prepared to lessen that effect going forward.
Stefan Hansen
analystThanks. About that longwall move — is it happening up in the north or down in the south, and what kind of timeframe are we looking at for it?
Barrie van der Merwe
executiveRight, we have one scheduled in the north next month. It'll fall somewhere between November 15th and 20th, and we get that done in the US in roughly 7 to 10 days. The team is prepared. They've actually begun installing some of the shields already. Up in the north, we previously used 700-foot panels. This marks our first 1,000-foot panel. Hopefully that gives us a bit of a lift into next year too. It's started to happen, and the process is fairly quick. The guys are very well-practiced at it. As you move into next year, we'll shift the south in Feb/March.
Stefan Hansen
analystPerfect — thank you so much.
Barrie van der Merwe
executiveAlright, thank you, Stefan.
Operator
operatorThanks. We'll take the next question from Daniel Roden at Jefferies. Go ahead, please.
Daniel Roden
analystHello there, Barrie, and good day to you. I appreciate you taking my question. I just want a quick clarification regarding the indicated guidance for calendar year '27 of 16 to 17 million tonnes. By any chance, does that figure include conversion of the 1.1 million tonnes of stockpile? If it does, would that imply an underlying run rate of 15 to 16?
Barrie van der Merwe
executiveSo on the inventory level, carrying somewhat more stock is a deliberate strategy for us as a normal course of business. By the end of December, that figure will be higher since we're getting ready for the wet season. Generally, I'd expect us to hold somewhere between 600,000 and 800,000 tonnes of ROM. At the close of next year, you should anticipate that we'll build back up to a fairly high level again. That figure ought to be viewed essentially as the run rate for mining deliveries.
Daniel Roden
analystAlright, no — thank you. You brought up the CHPP program, which falls within the calendar year '27 recovery. So I suppose the question is whether any capital is required for it. Would that be implicitly included within that $150 to $175 guidance range, or is this an additive type of opportunity that you're looking at?
Barrie van der Merwe
executiveSandeep, would you like to discuss capex? Broadly speaking, what are we anticipating for capex, just in general terms?
Sandeep Deoji
executiveHonestly, I wouldn’t say there are any big capital projects lined up for next year. On the capital side, from a guidance standpoint—and of course we’ll solidify this when we issue guidance in February—it ought to land at levels comparable to 2026.
Daniel Roden
analystAlright, no — appreciate that. Perhaps one more on the prepayments: given the current layering between Glencore and Stanwell, and I suppose the precedent payments there, how should we think about — personally I grasp the Stanwell repayment mechanisms fairly well, I think — but how should we think about, across the next 12 or 24 months, how those prepayments get repaid, and what conditions must be met for them to begin being settled?
Sandeep Deoji
executiveOkay, so basically breaking those down separately — the Glencore one, as we already told the market, is a $75 million prepayment carrying roughly a 14% interest rate, and we clear it through coal deliveries across the coming 12 months. The Stanwell arrangement is somewhat more complicated, and as you mentioned, you've worked through the disclosures we've put out on it. That one clearly spans a longer stretch of time too, and when you look at the prepayments coming from Stanwell right now, they're tied to where our liquidity sits. As liquidity strengthens and moves past $200 million, that prepayment will begin shrinking, and once we reach 250 million, the Stanwell prepayment comes to a halt. After that it's repaid through our obligation to supply coal to Stanwell, across a longer horizon running out to roughly 2040, '43, depending on what they nominate.
Daniel Roden
analystAlright. Nope, I appreciate that. I’m going to make my way back over. Thanks.
Operator
operatorThanks. Our following question comes as a follow-up from Glyn Lawcock of Barrenjoey. You have the floor.
Glyn Lawcock
analystHello again, it's Barrie and Sandeep. My apologies, Sandeep, but I wanted to revisit that really good cash flow breakdown you gave — you finished at roughly $60 million positive for the quarter, though I do need to subtract the $45 million tied to Stanwell, correct?
Barrie van der Merwe
executiveAt that point, 15 still remain.
Glyn Lawcock
analystI'm not claiming it isn't positive, Barrie. I simply wanted to confirm it wasn't an underlying 60. It was an underlying 15 positive, not an underlying 60 positive. It is.
Barrie van der Merwe
executiveExactly. That's right. Looked at another way, you could say Stanwell paid a fair price for the coal, and then the business potential is really the 60. You're right. At some point, should we end up with more cash, it has to be returned. Fair enough.
Glyn Lawcock
analystNo. Getting them to pay a fair price would be nice, but yeah, that ship has sailed.
Barrie van der Merwe
executiveGlyn, we never give up.
Glyn Lawcock
analystThat's exactly the kind of thing we want to hear. Thanks once more.
Barrie van der Merwe
executiveThanks, my friend.
Operator
operatorThank you. That brings the question-and-answer portion to a close. I'll return the conference to Barrie for any closing remarks.
Barrie van der Merwe
executiveGood, and thanks to all of you for joining the call. We're going to keep moving forward with the Curragh reset program. I'm eager for the pricing tailwinds that should flow through during this final quarter. Then at some point in October, we'll release the quarterly financials, and we'll talk with you once more early next year, when we report the December quarterly. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Coronado Global Resources Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Coronado Global Resources Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Coronado Global Resources Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.