Hello, and welcome to the webinar with Critica Limited. I'm Dan Walverton, the Investor Relations representative for Critica. And today, we will be discussing the Jupiter rare scoping study, which was released at ASX yesterday, the 20th of October 2026. This follows the Mount Lindsay scoping study, which is leased on the 29th of September. So put critical in the position of having 2 major announcements out in the space of a few weeks. And so this session today is an opportunity for you to hear from the CEO, Jacob Deysel directly and ask questions. So with that, I'll hand over to Jacob, who's going to walk us through a presentation. And following that, we will open it up to Q&A.

Jacob Deysel

executive
#2

Thank you very much, Dannika. Good morning, everyone, and thank you for joining us. just to make sure my slide is actually sharing and we can be seen. So thank you very much for that. I think we originally targeted the Jupiter scoping study to be out by the end of September quarter. and it's a few weeks longer than anticipated. And I want to thank the shareholders upfront for their patients. It was important for us to work through this thoroughly and put something forward that we believe we can stand behind. I think in a matter of a few weeks, Critica has now delivered 2 scoping studies across 2 100% Australian critical metal projects. That's a great milestone in itself. But in many respects, the real work really starts now. The scoping studies are the catalysts really. They give us the economics, the capital requirements, the development pathways. We need to have more meaningful discussions with potential customers strategic investors, government funding and funding partners. And I think that's an important point to emphasize upfront. We know that from the time that we started looking at Jupiter, it's a very large rare earth resource. What we now have is the first time we have economics that we have put around this. We've got a development business case, and that's what we'll focus on today. Just all normal disclaimers. I think if -- just before I jump in to Jupiter, just to put a little bit in context the announcement of yesterday, we have now delivered 2 scoping studies, Mt Lindsay, Tungsten and Tin in Tasmania, delivered approximately $1 billion after NPV tax -- after-tax NPV, 55% IRR and a preproduction CapEx of about $245 million. And now Jupiter have a very different project in Western Australia. The Jupiter scoping study delivered just around a EUR 2 billion mark as far as NPV is concerned. 8% IRR after tax and estimated preproduction CapEx of about ZAR 556 million. So collectively, within credit card, we've delivered 2 projects worth approximately $3 billion after-tax NPV -- but importantly, we don't see these 2 projects competing with 1 another. They are exposure, giving us exposure to different critical minerals, different end markets, potentially different customers and strategic partners and therefore, also sources of capital. And I think they've got different time lines. They are scheduled differently. Now why do these projects matter? And I think for me, this is a much more commodity supply chain story as opposed to a commodity pricing story. The West is building a 21st century economy around the 20th century supply chain. It is fragile. It is politically exposed and it's significantly concentrated. And if you can look at the slide on the left-hand side, you'll see just in terms of the minerals we are talking about. And this is at the same time when there's significant demand for these specific minerals and there's very limited substitution opportunity, and we see demand across defense, AI, data centers, advanced manufacturing, electrification and of course, all of this feeds into one technology. And increasingly, the issue is not about the access to these commodities. It's about custody of supply. And I think that's at a time when Critica put 2 of these projects forward when the waste is really locking at finding a secure supply chain. Now on this slide, just very briefly, it's all about jurisdiction. It's about where we are located. And I think location in both these instances and for both these projects really matter. Let's jump into the economics. And just as for Mt Lindsay, I think that for Jupiter, the economics really surprised us. The base case delivered $2 billion NPV, 48% after-tax IRR and a payback of roughly about 2 years. And that's against that CapEx of $556 million. So if you look again at the ratio there, that's a 3.6x in PV to capital. And more importantly, over the life of mine, $12.3 billion in revenue, EBITDA of $6.25 billion, after -- and significant $4.2 billion in terms of after-tax cash flow. But more importantly, I think the development case is only based on a very small portion of the Jupiter y source only 6%. So let's look at what really drives the economics. And I think pricing is extremely important. And I think this is where we've taken a specific conservative approach. Pricing, obviously, looking at the pricing itself, it drives the economics, but we haven't used today's spot prices, we haven't looked at specifically what Critica think those spot prices should be. We've selected a long-term pricing here the pricing assumptions are important because we've deliberately tried to keep the base case quite grounded. We have used independent Argus price deck forecast, which really runs real prices from 2026 through to 2040. That's in real 2026 dollars. And that gives us a model value of around for our basket for here umbra or mixed rate of carbonate of around $8 per kilogram. And then further to that, we didn't just allow for assumption in terms of 100% payability. We've applied a further 75%, which we -- a payability, which we think is conservative. SP-2 And importantly, I think important for us is that we know that Critica's Jupiter specifically present a number of alternative byproducts None of those have been taken into consideration within the base case, and we'll talk a little bit more about that. I think there's a very strong foundation here in terms of the development of Jupiter. So it's not just all about economics. And I think this is where Jupiter's location become a real advantage for us. We're an established mining region, the established workforce services in this area, infrastructure. The regulatory framework is very well developed here for project development. And Jupiter is less than 10 kilometers from -- so Road, where our 275 kilometers from industrial port at Geralton with significant infrastructure around us. And I think Furthermore, we are probably in 1 of Australia's key rare earth regions. We've got liners, which is here in the Midwest about 475 kilometers inland from us. I look at 250 kilometers with its new refinery at Nava. So I think we've got the resource. We've got the infrastructure that supports it around it. We're in a Tier 1 jurisdiction, and we're in the right neighborhood when it comes to rare earths. Now, the scoping study is underpinned, of course, by enormous scale of Jupiter, the resource itself. We've announced a resource not so long ago, 1.7 billion tonnes, 1,700 parts per million. Within that, included indicate a portion of that at 160 million tonnes. So importantly, the scoping study do not use the whole of the resource. We use a very small portion of it, only 107 million tonnes or roughly about 6%. And more importantly, and I think this was important for us in terms of the Jupiter business case in the scoping study is 97% of the production target sits in the indicated range. So, this gives us, I think, 2 things. Firstly, the development cases of overwhelming supported by indicated material. So there's a good definition around the material we've used in the business case. And secondly, we've got a large resource sitting outside of the current mine plan, which gives us a significant future. optimization and optionality. And when we look at Jupiter, the mining is relatively straightforward. Yes. It's a conventional open pit shallow deposit, a low overburden and really clear mining from a perspective of no drilling and blasting. And that's modeled on an 8 million tonne per annum processing rate supporting around 14 years life of mine. But I think one of the things that's really at the heart of Jupiter and one of our competitive advantages is the fact that it is play host that we can beneficiate first and what that really means is we have progressively and consistently shown that we can reduce the mass with very benign processing by about 95% before hydrometallurgy. And that's a key driver when it comes to capital efficiency moving forward. We have produced mix rare earth carbonate, mix rare oxide products now the scoping study specifically based on a 58% mix rare earth carbonate. And of course, that has a range of the magnet contained, and we'll talk a little bit more about that as we progress. And then, of course, life of mine, we produced around 8,300 tonnes of mix rare earth total contained TR was in the mix of carbonate through life of mine. Now, getting to the production -- or sorry, to -- specifically to the capital, very strong capital efficiency, $556 million against the $2 billion, $2 billion NPV, that's 6.3x NPV. Sustaining capital it's relatively marginal in terms of life of mine and then, of course, we had total life of mine CapEx of just over $66 million, which includes EUR 30 million of closure costs and capital accuracy is a plus or minus 35%. Now this slide for me is very important. And I think, it really shows us we've stress tested the business case. It shows us what happens when some of these assumptions move against us. Again, no surprise that it's relatively sensitive towards your commodity prices and feed grade and then it drops off in terms of the rest of the parameters. But even at a 20% flex on those parameters, we still have a very robust NPV of just over $1.1 billion. But, I think there was a further piece for me that's important when we specifically looked at the development of Jupiter is how do we reduce risk and how do we improve our ability to execute. And I think for me, the fact that we've deliberately developed the business case on 97% indicated resource. We've used an independent August forecast year with average prices '26 to 2040 and 2026 or real terms. We've applied -- further applied a 75% payability to that basket. In terms of our recoveries, we have specifically been conservative in recoveries. And we've modeled in the scoping study about 63%, but our business case only modeled 58%, which is in line with some of the numbers we have achieved. And then, of course, we haven't assumed any revenue from any of the potential byproducts. So the business case from that perspective, we believe, is quite robust. Just briefly in terms of schedule here, the next stage is moving the studies through PFS, DFS and then potential indicate production in 2032. And again, if you compare this to Mt Lindsay, these 2 projects are not competing. They are actually scheduled differently with Mt Lindsay, slightly more advanced and as a result, it gives us access to different critical metals, different customers and potential strategic partners. Very briefly, I spoke about the team last time. But I think behind the projects, we have a strong team that is extremely well around it and very pleased with Rob Ierace that joined us as CFO recently bring a significant amount of ASIC capital market and financial experience. And of course, [indiscernible] that joined the Board, which brings enormous deep commodity trading offtake and financial experience. So I think we've got a very strong team in terms of execution going forward. And I think that will bring me to the end. I think I probably don't want to bore you too long with this. I think there's a lot of questions waiting. But I think for me, we have 2 Australian critical metal projects here, each supported by compelling scoping studies collectively $3 billion in after-tax NPV. But the projects are not competing with each other. These they are at different stages of maturity and therefore, are on different time lines. And phasing them makes sense for us in terms of moving forward. They also give us exposure to, of course, critical -- different critical metals in different end markets and therefore, potentially different sources of capital. And I think lastly, that's where we position Critica today. We've got multiple projects here, multiple critical metals, multiple demand drivers and multiple paths to value creation. So on that note, I'll stop there. I want to say again, the work only starts now, but it's a great achievement to get scoping studies done and thanks to the shareholders for their support and ongoing support.

Dannika Warburton

attendee
#3

Thank you, Jacob. And thank you to everyone who sent 3 questions through the registration and by e-mail. We have attempted to group them all together in similar questions that we can cover as much as possible. [Operator Instructions] So jumping straight in, 1 of the most asked questions, Jacob, was on how Critica will fund the $556 million for Jupiter, particularly when Mt Lindsay also needs funding.

Jacob Deysel

executive
#4

Yes. Thanks, Dannika. I think that's a good question. And I think -- we approach funding in stage. So we don't need to fund $556 million for Jupiter today, and we don't envisage funding both projects similar through equity at today's market valuation. Our job now is to progressively de-risk these projects going forward and that's through feasibility, metallurgical work, engineering and approvals and more importantly, that product qualification and commercial engagements as far as offtakes are concerned. And that is very important. At the same time, we've been advancing discussions with strategic investors. We -- government funding is obviously a key piece here. Governments are no longer putting these projects just on lists. There's real funding being made available. Offtake linked funding and financial discussions are ongoing. And ultimately, I think funding involves a combination eventually of debt funding, strategic partners, government and joint venture structures as potential. I think the good thing is we have options with both the scoping studies now are delivered, we have the economics and the business cases and development pathways to have much more meaningful conversations with strategic partners and funding pathways for each of these projects. And I think that's the important piece. And that was why the scoping studies have been key catalysts and we are now engaging in those conversations going forward.

Dannika Warburton

attendee
#5

Yes, absolutely. Another frequently asked question was on valuation. What gives you confidence in Jupiter's $2 billion after-tax net present value?

Jacob Deysel

executive
#6

Yes. Well, I think, firstly, the $2 billion NPV is the output from -- it's not a number that we started with. So we did the technical work. We built the mine plan, the flow sheets and developed the CapEx around that and OpEx, of course, in assumptions. And we believe that, that -- those assumptions are quite appropriate and in some instances actually conservative. I mean to, again, talk just briefly on 97% of the production target is indicated. So there's a much better definition around the production target tonnes that's going into the scoping study. 58% overall recovery versus what was actually modeled at 63% design base, so, conservative when it comes to the recovery part. We've applied a 75% to the rare earth basket and we've used the independent pricing deck when we looked at the pricing for Jupiter specifically. And then of course, there's no revenue applied to any of the byproducts. So I think from that perspective, there's quite a bit of confidence in terms of the number. And then of course, if you just look physically at the project itself, as I showed low stripping ratio, the beneficiation piece we can beneficiate upfront. We reduced the footprint of the hydromagnet and that all is contributing to a less capital and better capital-efficient program. And I think lastly, we stress tested that against some of the key variables there and still generated a very robust outcome. So quite confident in the output.

Dannika Warburton

attendee
#7

Okay. And on some of those conservative assumptions that underpin the scoping study, let's dive into those. To start with, I guess, Jupiter has a 1.7 billion tonne resource, but the production target only uses about 107 million tonnes. Why is such a small proportion? And what does that mean for the rest of the resource moving forward?

Jacob Deysel

executive
#8

Yes. Look, I think, again, we've been deliberate in the sense that we wanted to build the scoping study specifically on indicated resource. If you look at the resource itself, there's -- on the invert around where we're developing there's higher grade material around us which can be brought into the mine plan as inferred. But we think it's very important that the business case remained very strong on indicated only. And as I mentioned, the important piece here is that we've got enormous opportunity here to expand and grow the scale of Jupiter because of the resource size that we have. And obviously, as part of the next phase of derisking and developing, that's something we'll focus on.

Dannika Warburton

attendee
#9

Okay. And again, on the economics, how does the Argus long-term pricing assumptions compared with current spot prices?

Jacob Deysel

executive
#10

Yes, I think the first point, we don't see simply this is a commodity pricing story. I think it comes back to -- this is a structural supply and demand chain security story. Rare earth supply and processing remains extremely concentrated while demand is broadening across defense advanced manufacturing, AI and the likes. And of course, Jupiter is targeting production in 2032. So we're not applying today's spot prices, we don't think that's appropriate, yes. We are actually applying an average independent August price deck here, which is average '26 to 2040 in '26 real-time dollars. And that's how that basket price was made up -- and then further to that, we apply a 75% payability to that. So we think in terms of the pricing, that's quite conservative.

Dannika Warburton

attendee
#11

Yes. And again, on pricing, just to follow up. How should investors think about the difference between Chinese domestic prices and ex China rare earth pricing?

Jacob Deysel

executive
#12

Yes. We're seeing quite -- we're seeing this bifurcation, price bifurcation happening between China and domestic pricing and the value of site supply outside of China, of course, China dominates a significant part of the supply chain there's been export controls, there's license restrictions. And they've demonstrated that material that's available domestically and in China is not necessarily available to the international appliance and customers on the same terms and the same pricing. And I think that is important. Further to that, I think it's important because Jupiters is being developed as an Australian source of non-Chinese supply. So, Western governments customers in the West are increasingly focused on not simply on the lowest-cost commodity price here, but really on security, diversity and custody of supply. And we don't assume that today's elevated China prices will continue indefinitely. And that's why we've chosen the price deck as we have. But at the same time, we don't believe that today's China domestic price necessarily represents the appropriate long-term value for secure or non-Chinese supply chains. And that's why I think using independent pricing decks using a 75% viability is ultimately important for us as far as the business case is concerned.

Dannika Warburton

attendee
#13

And I guess pricing is 1 thing, but selling the product is quite another. You've produced [indiscernible] samples. How confident are you that the product is salable and numerous investors of our how close you are to securing offtake?

Jacob Deysel

executive
#14

Well, I think the important point is that we have actually physically produced products from Jupiter material. So this is no longer just theoretical. We actually have physical products. We've produced a 58% mix rate earth carbonate keeping Jupiter material and some of that material is being distributed to potential to potential customers for qualification purposes. So we are seeing quite a bit of interest in customers and off-track partners. And I think, again, it comes back to -- the scoping study was a significant piece here that we had to deliver because this is where we can start talking about potential volumes development time lines, economics and define that pathway to production, and that's important. And so that's the next step. And yes, as far as OpEx are concerned, there's a lot of conversations happening at the moment. And when the time is right, we'll disclose that to the market.

Dannika Warburton

attendee
#15

Okay. Noted. Steve Tom, Gary and a few others about how confident you are in the metallurgical recoveries assumed for Jupiter?

Jacob Deysel

executive
#16

Look, I think we actually -- I'm very pleased with the metallurgical performance and specifically what has been achieved up to date. If you think about the last 18 months, we've been reporting on our progress that we've made in terms of metallurgical recoveries and performance. And the scoping study is really bringing all of that together. And I think we've been very transparent about what we've achieved and what's actually gone into the financial model. The scoping study, again, as I mentioned, it was actually modeled on a 63%. We actually -- the financial piece was modeled on 58%. So we've added in some conservatism in there. And those recoveries are 69% recovery through on the beneficiation piece. We've already achieved some 70%, 71% previously and 84% on the range hydrometallurgy. So overall, I think that's very important. And it is, again, were Critica to Jupiter stands out is the fact that we can beneficiate upfront, and that drives our capital efficiency. And we've consistently been showing that we can approve that 95% rejection upfront and of course, we've been producing mix rare earth carbonate, mixed rare earth oxides, and we've got physical sample available now. So quite -- there's a lot of confidence in terms of what we've achieved and what's gone into the scoping studies.

Dannika Warburton

attendee
#17

Okay. And the scoping study excludes iron, gallium, scandium. But how much upside do you think these minerals could add?

Jacob Deysel

executive
#18

Yes. Look, I think all 3 has potential upside. But more importantly, I think when you look at the scoping study, none of those have been included, and we've got a very robust outcome. Of course, we've already produced a 64% in concentrate. We've dispatched some of that to potential customers at the moment. Gallium is particularly interesting for us. We've previously reported to probably one of the largest resource it comes to Gallium 70,000 tonnes contained within the resource. We have extracted 63% of that in our actual hydrometallurgy process. So the next steps is obviously how do we take that through into a final product. And that's part of the next phase of work. So quite excited about potential byproducts from Jupiter.

Dannika Warburton

attendee
#19

Okay. And a live one. Can Critica realistically advance Jupiter and Mt Lindsay at the same time. And does the company intend to develop both itself?

Jacob Deysel

executive
#20

Look, I think importantly, we don't see them as competing projects. We see them as 2 quality assets at the moment. That gives us a lot of optionality. They are on different time lines, the different definitions. Therefore, they can't coexist. In terms of ultimately how do we move forward in terms of funding or building, I think we've got a lot of options at the moment. And that includes a lot of conversations we're having at the moment, strategic investment project level partnerships, joint ventures or offtake linked financing. There's a wide range of financing options available. But again, we needed to get to the scoping study because everyone we are talking really want to get an understanding of the economics. They want to understand the volumes. They want to understand the time lines here. And this allows us to have much more meaningful conversations. And of course, where as far as possible, we want to tap into various alternative financing models here, so that we manage dilution and maximize shareholder value.

Dannika Warburton

attendee
#21

Thank you for addressing that. We've had a number of questions come through on the Q&A anonymously, so I can't point out names. But 1 from Locklin in the Q&A was on time lines. And from questions that have come through, could you please address why Jupiter shows first production in 2032. Isn't that a long time for investors to wait?

Jacob Deysel

executive
#22

Yes. Look, I think that's the indicative time line for us at the moment. But that's not where value gets created. I think we've got a large resource here. We've got strong metallurgy. We've got physical products, we've got a defined flow sheet. And between now and production, there's a number of catalysts, which are value accretive, I think. And so as we continue to derisk the project, I see a number of catalysts where when investors will gain value through the projects -- project development and derisking of the process.

Dannika Warburton

attendee
#23

Okay. And I guess, continuing on with that, Ben, with the -- how the list of the economics demonstrated for Jupiter and Mt Lindsay, why isn't the share price reflecting that value do you think? And could you talk to what you're doing about it?

Jacob Deysel

executive
#24

Yes. I think I don't want to sound like a broken record. But as I said earlier, I think, in many respects, the work really starts now. Delivering the 2 scoping studies was a very important catalyst because it in every -- almost every conversation we've been having with interested parties, the conversation ultimately comes to, well, what are the economics? Can we talk about economics. So now for the first time, we have the economics. We've got that for both projects got the development pathway. So we're going to have much more substantive discussions around development, the capital, the requirements, products offtake and how these projects could ultimately be funded and we've been very proactive across the executive and the Board in taking the Critica story to the market, engaging with institutions with strategic investors, potential customers, governments and the broader investment community. I think the difference now is that we have a much platform that we can talk and have these discussions from. And ultimately, the market determines the share price and what we control is what we can deliver and how effectively we communicate that to the market. There are obviously factors around the market. So stage of where the projects are funding visibility, register broader critical metals market. And our job is progressively address those through execution. So, our focus is very clear at the moment, keep delivering, keep engaging in broader invest -- brought out that investor base, convert the scoping study cases into increasingly mature derisk and financeable projects. And I think that will give the market increasing evidence and reassurance of wood Critica and our projects are becoming.

Dannika Warburton

attendee
#25

Can't agree more. Jacob, to close, could you give investors milestones over the next 6 to, say, 12 months that they can hold you to Yes, absolutely.

Jacob Deysel

executive
#26

Look, I think it's all about execution. When I joined Credicard, that was the vision. It's how do we execute on our projects. We've delivered scoping studies now but the real work is starting. We've assembled what I believe, a very strong team technically, commercially, financially, there's deep project development experience within the team. And I think that if I have to talk about 3 milestones, probably first is advanced product qualification and then getting products out into the hands of potential customers and progressing that qualification piece. The second 1 is advanced offtake and strategic discussions, including strategic investors, government support funding here and opportunities where we can create value. And then thirdly, is continue to materially advance the projects through its paces. So this is where I talk about the catalysts in terms of further derisking those projects technically, commercially, really looking at optimization of development pathways and more importantly, I think, is evaluating some of those byproducts opportunities that we have to further give us upside as far as the business cases are concerned. So I think we've demonstrated how quick the team can move to advance these projects. We now intend to really keep the momentum and keep that pace. And those are probably catalyst that stands out for me that should holders accountable for in the next 12 months?

Dannika Warburton

attendee
#27

What's happening. Thank you, Jacob, for the presentation. We hope that everyone who joined the call found it valuable. If you do have any further questions, please feel free to e-mail Jacob and myself, our details are on the bottom of the ASX announcement. We'll close it there and a replay will be provided to you. So thank you again.

Jacob Deysel

executive
#28

Thank you very much. Thanks, everyone.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Critica Limited transcript — plus 261,000+ transcripts from 13,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Critica Limited earnings transcripts and 261,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Critica Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.