Data Patterns (India) Limited (DATAPATTNS) Earnings Call Transcript & Summary
August 8, 2025
Earnings Call Speaker Segments
Operator
operatorGood day, everyone, and welcome to the Q1 FY 2026 earnings conference call for Data Patterns (India) Ltd, hosted by Go India Advisors. I'd like to remind everyone that all participant lines will be in listen-only mode, and after the presentation wraps up, you'll have a chance to ask questions. If you require any help during this call, just press star then zero on your touchtone phone to signal an operator. Please be aware that this conference is being recorded. At this point, I'll hand the conference over to Ms. Monali Jain from Go India Advisors. Thank you, and over to you, ma'am.
Monali Jain
analystThank you, Pari. Good morning, everyone, and welcome to the Data Patterns (India) Ltd Earnings Call, where we'll be discussing the Q1 FY 2026 earnings. Joining us on the call are the company's senior management: Mr. S. Rangarajan, Chairman and Managing Director, and Mr. Venkata Subramanian, Chief Financial Officer. We'd like to remind you that today's discussion may contain certain forward-looking statements, and these should therefore be considered alongside the risks the company faces. At this point, I'll invite Mr. Rangarajan to walk us through the business outlook and financial highlights, and after that we can open the floor for Q&A. Thank you, and over to you, sir.
Rangarajan Srinivasagopalan
executiveThank you, Monali. Good morning, everyone. It's a pleasure to have all of you join us for the Q1 FY 2026 earnings call. I trust you've had a chance to go through our earnings presentation, which can be found on the stock exchanges as well as our website. Before Venkata walks you through the financial performance, I'd like to begin with a few key updates and some strategic commentary from my side. We've had a reasonable start to the year, even though certain customer approvals were delayed, which affected how quickly revenue was recognized. That said, the quarter came in line with what we expected. Our order book is now at a solid INR 1,079 crore, and since the financial year began, we've received more than INR 320 crore in orders, including some from BrahMos and the MoD. Our export order book continues to be healthy at over INR 100 crore, and international markets are showing growing traction. With operations continuing as they are, we're seeing greater urgency from the government when it comes to procuring and deploying indigenous defense equipment, and some of that fits well with what we can offer. That said, for companies to take meaningful part in these opportunities, it's essential to have fully developed products and to have completed internal trials prior to submission. This highlights our strategy: we have to build first in order to be eligible to win.
Rangarajan Srinivasagopalan
executiveAt Data Patterns, we've consistently put money in ahead of where the market was going, to widen the market we can serve — particularly in spaces where no domestic products exist today. Our aim is to spot those opportunities, build on our core competencies, and create differentiated capabilities that deliver a sustainable edge. R&D and product development remain areas of deep commitment for us. We've already put more than INR 120 crore into new product development work, centered on building indigenous capabilities across radar systems, EW, communication systems, and air model systems. Thanks to our ongoing product development efforts, we now have products of international quality. We're optimistic that testing of these products will happen soon and could potentially bring bigger contracts. These initiatives fit with our long-term strategy of scaling our total addressable market, and we're pursuing that with discipline and foresight. At the same time, our focus on profitability and on creating value for our stakeholders stays unwavering. In closing, the environment is shaping up positively, both at home and around the world. Our pipeline is strong, and we're confident we're looking at full-year growth guidance of 20%-25%. Revenue growth will sustain healthy EBITDA margins in the 35%-40% range. With that, I'll now hand things over to Venkata, who will take you through the financials in more detail.
Venkata Subramanian
executiveThanks, and good morning, everyone. I'll walk you through the key financials for the first quarter of FY 2026. Revenue in Q1 FY 2026 was INR 99 crore, roughly 4.6% lower year-on-year, as delays tied to customer approvals pushed out dispatches and revenue recognition. Cost of goods sold fell 30% year-on-year, helped by favorable product metrics. EBITDA was approximately INR 32 crore, a margin of 32.3%, which shows operational efficiency despite the lower top line. Net profit was INR 25.5 crore, a PAT margin of 25.7%, reflecting our ongoing emphasis on profitability. We anticipate a pickup in execution and revenue growth starting in Q2, supported by a strong order book and visibility. As I said earlier, we stay firmly on track toward our stated guidance of 20%-25% revenue growth. With that, I'll now open the floor to questions. Thank you.
Operator
operatorThanks. We’re moving into the Q&A portion now. If you’d like to ask something, press star and one on your touchtone phone. To take yourself out of the queue, press star and two. We ask that participants use their handsets when posing a question. Ladies and gentlemen, we’ll pause briefly while the queue is put together. Our first question comes from Dipen Vakil at Phillip Capital. Please go ahead.
Dipen Vakil
analystGood morning, sir, and thanks for giving me this chance. Sir, my first question relates to this quarter: of the INR 183 crore in order wins, the bulk came from contracts on the AMC side, on the services side. Could you share more detail on these contracts regarding how long they run and their cyclicity, or when we can expect them — what does the ordering pattern look like, and are they given out annually? Can you shed a bit more light on these orders?
Rangarajan Srinivasagopalan
executiveThe primary AMC contract that came to us is from BrahMos. It covers a five-year AMC, though it's a pre-dated AMC that began last January. I believe January or March.
Dipen Vakil
analystFebruary.
Rangarajan Srinivasagopalan
executiveRegarding February — typically we handle the AMC for BrahMos over a 3-year to 5-year span, and this particular contract runs for 5 years, billed on an annual basis.
Dipen Vakil
analystSo should we expect comparable contracts to arrive every 5 years, or is it every year?
Rangarajan Srinivasagopalan
executiveSo what this five-year contract covers is orders that have been executed plus post-warranty work. These contracts have come through for work we executed earlier. We also have orders for additional BrahMos deliverables this year. We're also expecting more BrahMos orders, because more orders are now coming in for BrahMos from the Air Force and Navy. We expect those back-to-back orders from our Data Patterns as well. We're also expecting seeker orders. It's a question of the older orders for which we get AMC. As and when new orders come and their warranty period is over, we get an AMC again. It's a comprehensive AMC that we get from BrahMos. It's been going on for 10 years+ now.
Venkata Subramanian
executiveA handful of products still have warranty coverage running. As soon as that warranty period ends, we'll secure AMC contracts for those systems as well.
Dipen Vakil
analystUnderstood, sir. Regarding the order pipeline, you also noted that a strong pipeline exists at present, and that the government recently granted AoN for a fire control system for BrahMos. Sir, is it possible for you to tell us, out of that INR 2,000-INR 3,000 crores of order inflow you expect within 18 to 24 months, how much we can achieve above INR 1,000, INR 1,200 crores in this year, which would help us sustain decent execution visibility going forward? Could you give us some more clarity on that?
Rangarajan Srinivasagopalan
executiveWe have several contracts that we are in the process of executing, and we expect them to come through. There's the Sweeney contract, for instance. We still don't have that order yet — we haven't received it. Discussions on a back-to-back basis are ongoing. We expect that contract perhaps within the next three to five, six months. That one should also land this year. Then there are several contracts for airborne radars, for which we have completed development. Those are also expected to fructify within the next five, six months. In a similar way, we have a list of what we call the order pipeline, where we are the single vendor. Those contracts are supposed to happen. Our belief is that in the next six, seven, eight months — probably before the end of the year or in early next year — we should receive some INR 1,000+ crores of orders. The other thing we have also done is development — product development — using the funds raised from the market. All of these are reaching some level of maturity. We expect there will be some development contracts for these orders for flight testing. We have a list of such contracts. I don't know whether I can tell you exactly which line item or what value it is going to be.
Rangarajan Srinivasagopalan
executiveThis order pipeline we're discussing — whether you look at it as INR 1,000 crores, INR 2,000 crores, or INR 2 to 3 billion — rests entirely on contracts of that type.
Dipen Vakil
analystUnderstood, sir. That is genuinely quite encouraging. Many thanks, and I will return to the queue. Thank you.
Operator
operatorThanks. Our following question comes from Hardik Rawat at IIFL Capital. The line is yours — go ahead.
Hardik Rawat
analystAppreciate the chance to speak, and good morning to everyone. I'd like to start with the delays that came up. Could you tell us precisely which orders caused those delays in customer testing, and how much revenue recognition slippage showed up in the quarter?
Rangarajan Srinivasagopalan
executiveI'd rather not identify the customer or the value. On value, I can say it's roughly INR 27 crore. Testing has just begun for them. Work got underway 10 days ago. Customer acceptance is now in progress. If everything proceeds as it should, we ought to be able to build it in the coming quarter. That's the plan. At a minimum, we aim to build it each quarter, and this quarter is when we intend to. Inspections were delayed considerably, which kept us from doing this over the last one year. Inspections have now begun. With luck, it will get built this quarter, in all probability.
Hardik Rawat
analystUnderstood, sir. Sir, one more question came up about our order inflows. What you've said is pretty encouraging. It would be reasonable to assume that an order for the complete system worth roughly INR 15 million+ is what I had in mind — INR 15 million-20 million overall.
Rangarajan Srinivasagopalan
executiveSome contracts are probable. Regrettably, we cannot specify the precise timing regarding that contract, since certain delays are occurring that lie outside our control. Yes, INR 15 billion may materialize, perhaps a bit lower or a bit higher. That hinges on how the government actually advances such products. Beyond what we have already completed, additional products are headed to MoD FET. This forms what is termed part of the tender. They are undergoing a field evaluation trial on EW. A few products are going to EW. One EW product we crossed successfully. We anticipate the grant will open somewhat. Hopefully, we will make an effort and secure the order. More are in the pipeline this coming month and the next one. All of these are products 100% designed in-house. They are not from other companies that we import and integrate. It has been designed in-house. We anticipate some traction in EW programs covering ELINT and COMINT and ground systems. Requirements of that kind exist. Likewise, single tendering requirements exist for radar warning receivers, which will be airborne for SU530 and other platforms. Those too are expected.
Rangarajan Srinivasagopalan
executiveThe schedule can shift from time to time, apart from the pipeline we already discussed. These operations have led to fresh requirements from MoD. We're involved in those kinds of contracts as well at this point. We likely began work on these products — truck-mounted systems — more than two years ago. Those specifications are being satisfied, and we keep refining them so we hit the international specs and satisfy what the customer needs. We anticipate additional contracts in those areas too. On top of that, our seeker for BrahMos has passed its drive test successfully. We look for some contracts to come through in the next month ahead. Following that, once delivery takes place, we're discussing around a hundred systems and so on. At present, most seekers — in fact all seekers — for BrahMos are imported ones. The aim is to make this indigenous. Should that come about now, I anticipate a substantial rise in orders as we move through the coming year.
Hardik Rawat
analystUnderstood, sir. Sir, when it comes to BrahMos, if we were to receive an order for, say, 100 of these systems, what value might that order carry? What could the potential order size be?
Rangarajan Srinivasagopalan
executiveIt's a little early for that. Let me get nearer to the point. First, we'll have the development order executed, and then as that date approaches, we'll be in a position to tell you the size of the order, because I don't want to predict the value of business before the inquiry comes from BrahMos. That would not be correct. All I can say is it will be substantial. These are all the things that will give me yearly. What I see we're trying to do is — you can't have a one-year contract order book for that. That does not order well for defense agencies, especially in capital goods. You need to have at least three, four years of order book, and only then can we invest in scale. We are doing the ulta here in India because we need to have products and to address the market. We are actually putting our money and developing hundreds of crores. We are putting money and developing, getting the products online, then going through evaluation trials and things like that. It's a very hard way of growing. That's the only way accessible to us. Otherwise, it has to be only collaboration. We have taken the hard route and going through what we think we are competent and where there are no such products available in India.
Rangarajan Srinivasagopalan
executiveOur aim is to stand apart in that regard, and we're investing our funds and energy into creating products here. This approach differs from what others are doing. My belief is that within the coming five, six months it will prove out. We'll observe traction building across each of these areas.
Hardik Rawat
analystThanks for that. Sir, I have one final question before I return to the queue. Our employee cost, as you know, has shown an estimated 27% increase year over year. I just wanted to get a sense of what's behind that. Is it because of headcount, or is it purely wage inflation?
Rangarajan Srinivasagopalan
executiveNo, the driver here is headcount. It's wage revision plus headcount. Look, if we're aiming to go from INR 700 crore to become a INR 5,000 crore company over the next, say, four years, five years, we have to do more than just build products. We're developing products upfront, taking them through flight test, getting them qualified, so that orders can start coming in over the next two to three years' time. Once that's done, we also need people in place to make sure we produce the kind of — we can't scale the way we are now. All of these are complex products. Even though we use automatic test equipment to produce them in numbers as we go along, the types we make are so large. This isn't the same kind of product that's made in 100,000 pieces, which becomes very simple. The types are so large, and there are so many of them, and all of them are complex. Having quality people, trained people, to do this is essential. We begin recruiting people, training them for their requirement as we go along. The second thing, and the third thing we're also doing, is creating infrastructure, production infrastructure, in anticipation of these contracts happening. We'll be spending now so that we're able to deliver three years from now, or two years from now.
Rangarajan Srinivasagopalan
executiveThe contract really comes down to delivery. If you can’t deliver, you can’t just jump from INR 700 crore to INR 1,500 crore or INR 2,500 crore all at once. That isn’t practical. You can’t do it. We have to build the infrastructure and make sure the delivery model is working. All of this is being done deliberately, and we’re moving forward with investment in people and training. That’s why the cost is rising.
Hardik Rawat
analystUnderstood, sir. Thanks very much. I still have additional questions. I'll follow up with you again. Thank you, sir.
Operator
operatorThanks. Our next question comes from Amit Dixit at Goldman Sachs. Go ahead.
Amit Dixit
analystHi there, and good morning to everyone. Appreciate the chance to ask. Sir, I have a couple of questions. First, when I examine how order inflow has been composed, during FY 2024 and 2025 it came mostly from the production side, whereas in Q1 FY 2026 it has been weighted toward services. I'd just like to get a sense of whether that's the sort of pattern we should expect going forward, with services also making up a significant share, or whether it's simply that some orders got pushed out and we should see the usual mix return to 70%-75% coming from production. Any services we do receive would, naturally, be additional or on top of that.
Rangarajan Srinivasagopalan
executiveLook, the kind of business we run can’t really be a service-oriented one, since not many contracts have actually been delivered to customers. What’s been delivered today—largely over the last 10, 15, 20 years—has gone to DRDO. That doesn’t, as you know, later turn into a services contract or an AMC contract. Services contracts only begin once it reaches the actual users. That has just started. Our life with the users has just begun. Direct deliveries to MoD, Army, Air Force—that’s happening now. That will then mature into services contracts. What you see in BrahMos is the long term. Since 2006, we’ve been delivering BrahMos launches. The services contract is happening as more and more BrahMos deliveries occur, and more services contracts come from that. It’s one of the few contracts happening this way. Many more should happen only once we put, populate more hardware orders with the users. This will happen over the next few years. Our main order book will consist of actual delivery contracts as well as development contracts. I think from this year onwards, development contracts will become fewer, and we think delivery production contracts will become more. We took a lot of development contracts earlier.
Rangarajan Srinivasagopalan
executiveAll of these should hopefully reach maturity as production contracts within roughly the next year or so as we move forward. And now that we're handling our own in-house development work for MoD requirements, we anticipate that direct delivery contracts will come about, and that production contracts will come about with the MoD.
Amit Dixit
analystUnderstood. The second question concerns the recent AoN that was recorded at INR 67,000 crore. When we examine it, a number of items genuinely sit within your remit. Could you give any broad sense of the TAM that you would attribute to that INR 67,000 crore? Then, regarding execution, we observed that Q1 FY 2026 was weighted toward BEL. Will that kind of revenue profile hold across the year, or was it specific to this quarter alone?
Rangarajan Srinivasagopalan
executiveI’m not able to comment on the AoN, because when you combine those contracts, what is realistic to expect from them is something I won’t be able to address. We focus only on contracts we can access. The AoN order isn’t just published as a matter of course. We don’t really examine it very seriously. I can’t comment on that. As for the second area you’re referring to, everything hinges on the type of contract—whether it’s BEL, HAL, or MoD—and on how timely their delivery requirement is. That’s what it depends on. It won’t necessarily be only BEL-oriented or oriented toward any other organization. It depends on the mix of contracts we receive. Ours is not a business with quarterly revenue. That’s why we’re saying that toward the end of the year, many contracts will be delivered toward the end of the year, maintaining whatever positioning we’ve taken—say 20%-30% growth. Actually, what I expect is that top-line growth is farther. My own worry is on the bottom line. We want to meet 18%, 30%, 20% bottom line growth. That’s what we plan to do. That is where our focus is, and also to increase the scale of the business.
Amit Dixit
analystAll right, got it, sir. Thanks, and best of luck to you.
Operator
operatorThanks. Our following question comes from Jyoti Gupta at Nirmal Bang, whose line is now open. Go ahead.
Jyoti Gupta
analystGood morning, sir. My question follows a similar line regarding BEL. There were two things I hoped to clarify. First, given that you deliver across several platforms, is there a reason the margins came in slightly below what I had anticipated? Are we seeing thinner margins from BEL than from the other platforms, or was this quarter simply a bit of a washout? Second, you will be delivering the EW radars for HAL, and it appears the count is five, but if the LCA Mark 1 numbers rise for FY 2026 — which is likely given that the engines will arrive on schedule, higher than we expected; we were anticipating five LCAs, but I think we should be looking at something like seven to eight LCAs this year — would that not also help you lift both revenue and profitability? Please share your thoughts on that.
Rangarajan Srinivasagopalan
executiveAlright. Regarding your first question, you mentioned that our margins had declined. In fact, they've risen. Gross margins are now at 80%. I think we've performed quite strongly on gross margin.
Jyoti Gupta
analystYes, you do.
Rangarajan Srinivasagopalan
executiveWe're discussing EBITDA. EBITDA is a different matter, since the top line declines. Costs stay unchanged, which means EBITDA declines. Gross margins have gone up, so profitability has in fact risen rather than fallen. Whenever revenue rises, EBITDA will rise too, since the company carries a fixed cost that will increase. I don't think profitability is a concern for us right now. Whatever you deliver, we'll move over at risk. It doesn't matter which organization it is. We have IP-driven products. Our profitability has only increased. The issue is that revenue has declined owing to non-delivery of certain items, owing to delays in customer acceptance. That is what was explained earlier as well. That is in fact the reason we could not deliver what we want to deliver. That is being compensated in the next quarter. Some of the orders we have taken up have required a long lead time for manufacturing, design, development, and manufacturing. It doesn't fall into the quarter-to-quarter category. This will happen over the course of this year. The larger orders — one order we've already executed last year. One of the large orders, INR 180 crore, we expect to execute this quarter or next quarter.
Rangarajan Srinivasagopalan
executiveThe development timeline has been about 1.5 years. Building those takes considerable time. It's an extremely complex system. It is taking time. That's the first question. I believe you've misread our numbers. On the second one, or LCA Mark 1A, we don't really do much in LCA Mark 1A or LCA. What we're doing is the cockpit displays, and that's the one thing we will honor and order. They want more for the additional 97, and the inquiry has come in. We haven't quoted because what we already developed and the deliveries have not happened to HAL. Once HAL picks up the delivery and pays us, then we will make quotes for other things. We do have orders for LCA Mark 2. We do the glass cockpit, which is called the Large Area Display LAD order. It's a very modern system, the thinnest system in the world, like an F-35. That will be delivering in the next three, four months' time. We do the machine systems for LCA MARK 2. We have the order to do that. We expect that we should populate LCA MARK 2 with a lot more of our products, including the EW.
Rangarajan Srinivasagopalan
executiveOn LCA Mark 1A as well, we had the EW, and that's performing really well in flight. Regrettably, the government chose to bring it in from ELTA. At present, neither the ELTA radar nor the Uttam radar is under consideration, unless circumstances shift. So, since it's part of the package, we didn't receive the RWR, even though it flies very well. We'll be in the running for the Mark 2, and we're also being looked at for the supply 30 for that. There are quite a few programs of this kind that we're engaged in. With LCA Mark 1A, we're genuinely unsure what our level of contribution would be unless they adopt our new radars and port them onto LCA Mark 1A. All of this is still at the discussion stage. No, at this moment I can't comment on it. We're extremely, extremely bullish on the future. There will be one or two programs we're not part of. At an overall level, if you consider it, since we've completed a great deal of product development, we're very bullish about scaling the company, looking at contracts beyond INR 5,000 crore, INR 10,000 crore over the next few years' time. That's how we're trying to pitch our business.
Jyoti Gupta
analystAlright. Sir, there's one more thing I'd like to get clarity on regarding the jammer port you worked on. Where is it being deployed — I mean, on which platforms is it in use, and what type of order did you receive for it?
Rangarajan Srinivasagopalan
executiveLook, we can’t take an order. Right now the government has no mechanism to place an order with the private sector unless it goes through an RFP and a proposal of RFI, RFP, and an open tender. No matter how important or needed the whole contract is for them, they cannot do this. It is proceeding very well. We have developed the part. It is going through air trials now. Air trials mean, you know, aerodynamic trials and, you know, the liquid coolant trials are all going on. It will be finished in the next one month. Our own methodology of jamming technologies, techniques is being tested. The hardware has been fully realized. That is being tested. Hopefully, in the next one, one and a half months, we should finish it. We’ve also made an offer to Air Force to fit it into the 230. They have taken it very positively because this is a self-protection jammer, which has to be fitted to all the aircraft. All aircraft, it goes on the wing tips of both the, of both the wing tips. It is a 360 degree jamming coverage. Since they’ve done this and they’ve seen it, they’ve taken a very positive view about it.
Rangarajan Srinivasagopalan
executiveInside, they’re talking about how to provide us with a Su-30 so we can conduct trials at no cost and with no commitment. We think that within the next one week, we should receive clearance to make a Su-30 available to us, specifically so we can carry out flight trials. After those flight trials finish, inquiries will begin for equipment that has been flight tested. We believe no other company in India exists. DRDO, of course, is there. They already have a part, and that too is going to go through flight testing. We will have an alternative. We believe we have produced a very good, very modern, low-weight part with better aerodynamics, greater jamming efficacy, and more power. We believe our chances in this are very good. We have to undergo rigorous flight testing. Doing this will take us a year, a year and a half. Because of that, the requirements are large. In January of this year, the MoD escalated back for INR 7,400 crore for the jammer for the EW suite. We have the RWR. We have every antenna, everything on the jammer side, plus the jammer portion was designed in-house. We automatically become a player to be considered as long as we complete the flight testing.
Rangarajan Srinivasagopalan
executiveThe Air Force has committed to providing us with a Su-30 for flight testing. The government is quite supportive when it comes to industry involvement and R&D that's driven by industry. Once validation has been confirmed using five systems on the ground, they're even ready to fund flight testing themselves, and that's a welcome change compared with the last 10 years. We think we're very well placed in that regard. For all of this to come together — since this contract is worth roughly INR 10,000 crore — the requirements exist. We believe we're well positioned in it. All of this will take time to unfold; that's the timeline I've been referring to throughout. This is the upfront money we've taken to develop. We've completed our side of the work. We believe we'll keep performing well. Perhaps a year from now, I'll be in a better position to answer your question more clearly.
Jyoti Gupta
analystAll right, thank you, sir.
Operator
operatorThanks. Our next question comes from Krishna Dojipam at Ashika Stock Services. Please go ahead.
Krishna Dojipam
analystGood morning, sir, and thank you for the chance to ask. Most of what I had has been covered already, but there's one thing: you just said a moment ago that development contracts will decline while production contracts are set to rise. I'm just trying to get a handle on how that shift will affect our margin, sir?
Rangarajan Srinivasagopalan
executiveHonestly, the type of contract we sign for development or production makes no difference, since our company typically funds development on its own. The price quoted covers production value alone. Customers receive that price quote even when the arrangement is a development contract. For most contracts we accept, we do not levy a non-recurring development fee. In my view, gross margins show no distinction between production and development. When production contracts are involved, the government also provides compensation tied to the U.S. dollar exchange rate and appreciation. All of that gets accounted for as well whenever a production contract takes place. Generally speaking, we see no issue arising between margins and which kind of contract is used.
Krishna Dojipam
analystAlright, sir. Could you give us some sense of the size of the orders we should expect from that emergency procurement? How large do we anticipate the order volume will be?
Rangarajan Srinivasagopalan
executiveIt's extremely hard to forecast, Pam, since emergency procurement carries a whole set of requirements, and we can meet some of them. Those things must be demonstrated. Field evaluation trials need to take place. Should you clear the field evaluation trials, the contract then goes to whoever quotes lowest. All of these are competitive bids. The majority of emergency procurement contracts are awarded either to PSUs or to direct imports via an Indian agent, or to a made-in-India type of company. We hold our own designs, with IP that belongs to us. In EW, we have put in a great deal of work. In the same way, procurement for certain avionics systems is under way right now, and they are taking part in efforts of this sort to replace imported systems with Indian capabilities. As for what we will deliver in terms of contract book, I am unable to say. We feel confident that in EW we will manage to convert some of these, because all of the development has been done in-house. Our thinking is that we ought to be cost-effective. We will only know once the commercial bids are opened. I cannot really spell out how large the contract values will be. This has to emerge quarter-to-quarter, as and when we win the contract.
Krishna Dojipam
analystAlright, sir, just one final question — it’s about the export side. Now that we’re seeing the NATO rearmament plan, and since we already know we’re doing a substantial amount of exporting to the U.K. market, I’m just trying to understand how we’re going to scale up there, and whether we’re now seeing better opportunities in exports as well. Like earlier, I remember you saying our focus is domestic demand — are we now shifting that focus toward export?
Rangarajan Srinivasagopalan
executiveOur emphasis continues to be on the domestic market, since a very large untapped opportunity exists there. In various forms, 80% of our defense requirements get imported. Even when the label finally reads Indian-made, many systems and subsystems within it come from abroad. The aim is to concentrate where we possess competencies, technologies, and IP capabilities. That is how we can set ourselves apart from the rest of Indian companies. We want to keep our attention there, because the need is immediate and it is also a long-term need for us to show we can meet those needs. We will do that. That said, we do not wish to ignore exports. We would like to pursue export business. This NATO country you mention — those requirements exist simply to scale up defense equipment and so on. They already have a local supply chain. Breaking that supply chain in order to build available systems is extremely difficult. New technologies are normally something they try to develop inside their own country. No country likes importing defense equipment or different technologies. Nobody likes to import. Western countries do not import defense technologies from outsiders. What it really amounts to for companies in India is manufacturing contracts that lower their costs. That is genuinely what takes place. Although we do manufacturing as well, our focus is not a pure play EMS line.
Rangarajan Srinivasagopalan
executiveWe're an organization driven by IP. We try to add value, then build IP, and then sell. Wherever that's possible, we're attempting to do it. Yes, in the U.K., we've been doing some work. We expect that to increase. We're also trying to do more work with that same U.K. company. They're transferring certain technologies and manufacturing. These are value-driven products — not, you know, manufacturing for manufacturing's sake. Similarly, we're trying to also look at collaborations in certain disciplines where we can not only look at contracts abroad, but more importantly, these can get, you know, indigenized and made Indian company for Indian markets. We can produce them. We're looking at some opportunities. We have to expand our scale. We go along. We'll put a marketing organization for it. This is a slightly longer-term goal. It takes us three years to put a marketing infrastructure and then address U.S. and European markets. What we can do is once the products are done in India, full products are done by us, we can also sell to Far East Asian countries. Other than Western countries, we can also sell the contracts and systems too. There is automatically a byproduct of what we do in India can get exported because all products are technologically advanced and second to none.
Rangarajan Srinivasagopalan
executiveWe ought to be able to serve that market, though it will require a somewhat longer period. First we need validation in India, and after that we can take it abroad.
Krishna Dojipam
analystGot it, sir. Thank you very much. That's all from me.
Operator
operatorThanks. Before we move on to the next question, a reminder to participants: you can press star and one to ask a question. Our next question comes from Jai Chauhan at Trinetra Asset Managers. Go ahead, please.
Jai Chauhan
analystHi there. Can you hear me?
Rangarajan Srinivasagopalan
executiveYeah.
Jai Chauhan
analystMorning, and thank you for taking my question, sir. I have just one thing I'd like to ask. Given that firms such as Astra Microwave are likewise active in RF Microwave and radar drones, what would you say sets you apart most when you're bidding against other vendors, and how does that process actually work, sir?
Rangarajan Srinivasagopalan
executiveLook, RF and microwave are areas we play in as well. It's not the only thing we do—we actually enjoy those areas too. We began with a subsystem and certain portions of the system. At this point we're graduating into a company that delivers complete systems. Over 100 mechanical engineers on our team handle mechanical design work covering thermal and structural. We assign people to design full systems for radars, overpassing, and everywhere. In the same way, there's IP for EW, IP in radar, IP in communication. Those, I think, are the differentiators. RF microwave isn't where we stop. We do RF microwave too. That isn't the sole endpoint of what we do. Our aim is building complete systems.
Jai Chauhan
analystOkay, sir, got it. So if I look at a competitor — take Astra as an example — they're also building full subsystems in the radar areas. I just want to get a sense of how that plays out in the tender process when you're applying for the key competency you hold in that particular product. How do you go about winning tenders for that? Is it split among the companies? How exactly does it work?
Rangarajan Srinivasagopalan
executiveLook, businesses fall into two categories. The first type sells directly to the end user, who purchases the entire piece of equipment rather than individual system parts. The second type is where you design something and hand it over to a development agency — organizations like DRDO. Those agencies design the system themselves and then put the subsystems or components out for tender. All of us compete for those component subsystems. What you're describing applies to that second category, where you're bidding on core tenders with DRDO for components — that's the lowest-fourth type of business. A few of them come your way because you possess a capability nobody else has, and those become single-vendor cases. Others go through open tender or limited tender, and competition takes place. Honestly, it all hinges on the end use. We've been trying, and we've worked alongside DRDO for 25 years, gaining a great deal of knowledge from them and through their contracts. At this point, I believe the moment has arrived to stop focusing solely on DRDO markets — we also need to pursue the MoD market, which is now accessible to Indians. Merely 15 years ago, that wasn't the case; Indians were shut out. They insist on complete systems only.
Rangarajan Srinivasagopalan
executiveWhat we're concentrated on right now is getting to full scale. To reach that scale, you'd need to be a company of INR 10,000 crore. Doing that through components and subsystems alone would be extremely hard. It would consume a great deal of time. In every area, another competitor shows up with costs just a bit lower, and you end up losing the order anyway. Moving from development into production also takes a long stretch of time. So we made the choice to create a competency matrix along with product capability, and to build the product for the end user. That's the game changer, and it's where we're directing substantial funding and development work. The company is transforming from a vendor of components and subsystems into a system vendor. That's what's taking place. That's the shift we'll witness over the coming two to three years. Data Patterns will be making a total change in how we conduct business, moving from what we've done for the last 20 years to what we'll be doing over the next 10 years.
Jai Chauhan
analystUnderstood, sir. I have it. Appreciate it. That is everything from me, sir. Thank you.
Operator
operatorThanks. Our next question comes from CA Garvit Goyal of Nvest Analytic Advisory, on the line. Go right ahead.
Garvit Goyal
analystHi there. Greetings.
Rangarajan Srinivasagopalan
executiveCorrect.
Garvit Goyal
analystThe first question concerns the delay occurring this quarter because of some customer approval. You brought up some trials that are underway. What I'm asking is this: we're saying testing is taking place now, and at the same time, we're saying Q2 is when we'll begin ramping up. What gives you that confidence that even if the testing doesn't lead to execution in Q2, we'll still be able to grow in Q2? That's my first question.
Rangarajan Srinivasagopalan
executiveI really don't believe you've grasped the subject we were discussing at all, since the point was the holdup in handing over one single contract across roughly the past year. Quarter after quarter we kept pushing it back, and the reason was that the customer's acceptance slipped. That's the topic we raised. At this point the customer is visiting our office, and acceptance is taking place. Naturally, the products will satisfy the requirements. This is a production order, not a development order. There's no development involved here. What we're discussing in 2025 is repeat production, the same thing we first delivered in 2005. The sole reason for them to come is acceptance. I cannot ship without acceptance. That's how the delay came about. They are here now. So long as they keep being here and acceptance continues through September, we ought to be able to dispatch absent acceptance. None of this relates to Q3 or Q4.
Garvit Goyal
analystActually, my question is somewhat different from what you took it to mean. I’m simply trying to get at this: you said that starting in Q2, ramp-up will occur. We’ll be able to see decent execution, correct? I’m just trying to understand — this quarter was hit by customer delays, and that delay is still ongoing in Q2. What gives you confidence that from Q2 onward we’ll be able to execute in a decent way? Is it some other project we’re working on, or another contract that we’ll be delivering? That’s what I’m trying to understand.
Rangarajan Srinivasagopalan
executiveSure, any contract can have issues. This is the Indian government we're talking about. Any contract is possible. The Indian government is not something I control. All I can do is respond to questions based on how things look today. If the inspection team doesn't show up again tomorrow, there could be a delay. That's outside my control. We don't expect that to happen, since there's an urgent need on their side to develop. They're already 2 years behind schedule on developing everything. The customer is shouting at the customer. Our hope is that they won't create any obstacles to delivery on our end, because there's urgency to pull and a pull from the customer and customer. No matter what I say, ultimately, when it comes to government PSUs, they're the ones who decide when they pick up a product and when they don't. I can't be certain it will happen. Right now, based on whatever indications we have, I don't think they're going to raise a problem in the next quarter, quarter three. They don't have a problem, because they need the products urgently.
Garvit Goyal
analystUnderstood. Regarding margins, why is there a price shift in margins on a why basis? I'd like to understand the main reason behind the change. We're still holding to our annual guidance, so I just want to grasp the primary reason our margins are low on a why basis.
Rangarajan Srinivasagopalan
executiveLook, product mix is what determines margins. At times, we accept contracts whose margins are very low or below normal, since we believe that over the long term this product will hold value for the company. I can build some IP. I can build an order book that will scale multiple times and scale the company. Some contracts with low margins get taken on the basis of certain strategic decisions. Ideally, most contracts we don't take with low margins, because if it is going to be L1 business, we're mostly not there. In most of the businesses we can compete as well, but our focus is on trying to build more products, more IP-driven products, which are differentiated from the rest of the competition. That is how we are trying to take contracts. That is the first part. On the second part, what you are talking about, year-on-year, it's come down. What has happened is that because of that one or two contracts taken with, you know, lesser margins, say last year over last to last year, the PAT percentage or EBITDA percentage might have come down. What has not happened, if you look at, is my overall PAT has gone up 20%, 25% as committed by you.
Rangarajan Srinivasagopalan
executiveThe PAT has risen. Where margins are concerned, it comes down to the blend of contracts you've deliberately taken on to make sure it brings value to the company. For this quarter, our gross margin is higher, yet because revenue is lower, the EBITDA margin is lower. That's what I said in my first answer to Philips. That's just how it stands.
Garvit Goyal
analystUnderstood. Turning to products, your annual report this time highlights a number of new offerings. I'd like some clarity there. In the PPT as well, you noted that certain new products are undergoing testing, and from those we should be able to secure some orders. On the products front specifically, I just want to get a sense: for these products, is Data Patterns the only company in India holding this kind of portfolio?
Rangarajan Srinivasagopalan
executiveFrom what I understand, that's correct.
Garvit Goyal
analystWho exactly are the customers for these products — I mean, could you tell us which areas we're serving with them?
Rangarajan Srinivasagopalan
executiveSo, take fire control radars, airborne ones. We're seeing upgrade possibilities with the SU530 and the MiG-29, for both the Air Force and the Navy. That could extend to LCA Mark 2 as well, if they decide to purchase it. That call belongs to DRDO — we can't make it on their behalf. We're making the case for this, and once the capability product is in place, we'll pitch for it. In the same way, EW — again, for the upgrade contracts, plus a new aircraft being designed here in India, we can pitch for both. The reason we pitch for the upgrade contracts, and products have been issued, is that no single Indian company holds a complete product suited to looking at the upgrade. Second point: the upgrade opportunity is a volume business, and it will be finalized within the next two years, three years, which is a substantial business — more than INR 10,000-INR 15,000 crore. Where there's an open market and neither the competency nor a product exists in India, in the private sector, we said we can do this. Other companies have to come in with the multinationals, import foreigners — but foreigners won't work with the Russian companies, Western companies.
Rangarajan Srinivasagopalan
executiveSo the market at that point is just India. DRDO is likewise developing its own offerings in these areas, since the Air Force and the Navy have both provided funding for them to create products through those channels. They're pursuing this in parallel. We're in the industry as well. It's a product development program funded by industry — funded by us — and our thinking is that we'll likely build something ahead of the curve that meets the requirement and goes beyond the specifications. That's the kind of gambit we've taken on, building products. Those are all sorts of products that you see. This is unique within an Indian industry context, though not unique to the Government of India. The Indian government is doing its own thing too. We're trying to pitch our systems against theirs to see whether this can match their requirements and whether we can secure an order book that is substantial.
Garvit Goyal
analystUnderstood, sir. Thanks so much. Best of luck with the question.
Operator
operatorThanks. Just a reminder for everyone: if you'd like to ask something, you can hit star and one on your touchtone phone. Our next question comes from Rupesh Tatiya, who is on the line from Shree Rama Managers PMS. Please go ahead.
Rupesh Tatiya
analystHi, sir. Thanks. I appreciate the chance to ask. Two questions from me: one about BrahMos, and one about MPA, Maritime Patrol Radar. On BrahMos, sir, I believe I heard you mention that you're on 1 subseeker order. What I'd like clarified is whether that order relates to BrahMos or to BrahMos NG.
Rangarajan Srinivasagopalan
executiveI believe my statement was misunderstood. The BrahMos seeker order has not come to us yet. There was a seeker order we had, and it has now been tested and shown to be successful. Inquiries are coming in at this point. Our expectation is that the contract will take place within the next month or thereabouts. Once that contract is concluded — whether as a pre-development contract or a production contract — we expect production orders to begin flowing in, and that represents a sizable value. Making it a success is where our focus lies. Development work on those activities has already begun, so that we can deliver an outstanding product for the BrahMos seeker. With hope, we will get a product.
Rupesh Tatiya
analystIs this the BrahMos, or is it the next-generation BrahMos NG?
Rangarajan Srinivasagopalan
executiveRight now, BrahMos NG isn’t part of the Indian picture. We haven’t even signed any memorandum of understanding with the Russian government or NG. As I understand it, it’s still not in play. Yes, an NG exists, but I don’t think we have it with us.
Rupesh Tatiya
analystI mean, I came across a few news pieces indicating that in a couple of days, some manufacturing facility is going to be announced.
Rangarajan Srinivasagopalan
executiveNews articles? I really don't know. 90% of them I just can't believe. Even though I work in that same field, 90%, 95% I'm unable to believe. Each week, every two days, there are articles popping up. I genuinely don't know where they're getting that data from, honestly.
Rupesh Tatiya
analystSo this is about the BrahMos gimbal ARH, right? Can you give any timelines around those orders?
Rangarajan Srinivasagopalan
executiveA few initial orders should come through within the next 1 to 2 months. They're expected to reach out to us to negotiate. After we deliver this and the system gets qualified, they indicated they'd place production orders. Perhaps a letter of intent for production will also be placed alongside that. We'll wait and see how things unfold. My thinking is that maybe 6 to 9 months from now, we ought to receive a production order. Again, that's just my guesstimate. Ultimately, BrahMos has to decide when it will happen and when the approvals come through for the first lot that we deliver. I think within that timeframe, we should be able to manage it. That's my thinking. Your second question could concern the maritime patrol radar. Our portion of the work is finished and handed over to DRDO. DRDO is bike testing it. Bike testing has not yet been completed. Because bike testing remains incomplete, at this present moment, the Navy intends to import the radars on ELTA. Negotiations between HAL and ELTA are underway. Negotiations are going on now. We may miss the bus on the patrol radar, since it's up to DRDO when they will position the radar and who the Navy flight tests.
Rangarajan Srinivasagopalan
executiveProvided it happens on schedule, it could potentially be taken into account. Should there be a delay, however, then it won't be taken into account. What DRDO is telling us is that apart from the Navy, the Coast Guard also has a requirement for 30+ radars. That too is likely to happen. As for timelines, that's something I'm not in a position to comment on.
Rupesh Tatiya
analystRegarding this MPA, which program is that in reference to? Are you discussing the Dornier 228 upgrade, or is it NUHII? That part isn't clear to me.
Rangarajan Srinivasagopalan
executiveThe Dornier 228.
Rupesh Tatiya
analystSo on the Dornier 228, what you're basically saying is that we may have missed the bus there.
Rangarajan Srinivasagopalan
executiveThat isn't something we can confirm. Right now, no contracts have been placed. We've only completed the hardware side there; they're adding the software and conducting the flights, so nothing moves forward until DRDO gives its approval. It won't be taken into consideration unless DRDO certifies to the Navy that every flight test has been finished and wrapped up. All of us are hoping they've flight tested it and granted the approval.
Rupesh Tatiya
analystThose 30 radar orders — which platform will they be tied to next, first from ELTA and then from another standpoint up to
Rangarajan Srinivasagopalan
executiveCoast Guard.
Rupesh Tatiya
analystThe fourth lot could come with the ELTA radar. And from the second lot on, that citizen might be there.
Rangarajan Srinivasagopalan
executiveNo, no, no. There isn't a first lot and a second lot. One belongs to the Navy. The other one belongs to the Coast Guard. Which second one does the Navy purchase? The Coast Guard. We don't know. The Coast Guard is a separate organization. They aren't required to take inputs from what the Navy has done.
Rupesh Tatiya
analystOkay, so last few questions from me, and these relate to NETRA. On NETRA — perhaps Mark 20, Mark 1, and Mark 2, all 3 of those programs — could you share some sense of where each stands, what our role is, and when we might start seeing orders?
Rangarajan Srinivasagopalan
executiveThe choice of which company gets the contract rests with DRDO. FlightPo1, ESM — that's EW — we already have. ESM and RWR are already on FlightPo1 and NETRA. Should they decide to move ahead with NETRA 1 and NETRA 2, that would turn into a contract for us. Everything else among the subsystems goes out to tender. The radar and primary radar, the carrying radar, all of those are tendered if it happens at all. Award will be on an L1 basis. We'll bid for it, but we're not forecasting any of that, since with any L1 contract, whether we win is unknown. Into the pipeline it does not go.
Rupesh Tatiya
analystWhat sort of timelines are we looking at? I mean, the count of aircraft that you're able to — since my hope is that following the operations in Dur, there will hopefully be additional requirement.
Rangarajan Srinivasagopalan
executiveThe program was approved 2 years ago now. And again, on account of the money sanctions, it has been sent back to CCS once more. After CCS gives its clearance, it may well be taken up. As for the timeline, I'm not in a position to comment. The best course is for you to speak with government officials.
Rupesh Tatiya
analystAll right. All right, I appreciate it. Thanks for taking my questions.
Operator
operatorThanks. Our next question comes from Rahul Jain at LionRock Capital. Go ahead, please.
Rahul Jain
analystHello there. Is my voice coming through okay?
Rangarajan Srinivasagopalan
executiveYeah.
Rahul Jain
analystThanks for the chance to ask. I'm still fairly new here. Last quarter you kept referring to an order pipeline worth roughly INR 20 million to INR 30 billion across the coming 18 to 24 months. Could you help me understand which programs matter most, so I can gauge when those orders might actually land? Alternatively — clearly the India defense budget is rising — but are there particular areas we ought to track to better grasp what opportunity lies ahead for Data Patterns over the next few years from an ordering standpoint?
Rangarajan Srinivasagopalan
executiveAlright. To take your second question first: our pipeline isn’t built from budgets — defense budgets play no part in it. That figure is simply too large, and there’s no way for us to narrow it down to what will actually materialize or where we could serve the market. Numbers of that kind aren’t something we use. Contracts are what the pipeline consists of. What we anticipate will be repeat orders stemming from those contracts already delivered and approved — developed, you know, and handed over to the customer. We expect that repeat order to come through. All of it rests on what our earlier deliveries have achieved. That pipeline is the one we discuss. It’s where the order ought to come solely to us and to no one else — these aren’t competitive bids. Right now, I can’t give it to you line item by line item, since we don’t have inquiries for them. Those inquiries still have to arrive, and we shouldn’t get ahead of the customer. It’s sensitive information as well. We can’t talk about it publicly.
Rahul Jain
analystAlright, so — I get it. Radar clearly makes up a major portion of the business, right?
Rangarajan Srinivasagopalan
executiveRadar, EW, and plenty of other subsystems plus avionics—everything you’ve already delivered—all of that is going to come into repeat. We have done this for naval systems. A lot of work is carried out with DRDO, you know. All the VMR, repeat orders are going to happen either through HAL or Bharat Electronics. They will serve as the overall agency responsible for putting the systems together. In the end, it will land with one of those companies. As for the timing and the value proposition, I won’t be able to tell you. I have some idea, but I can’t state it precisely in this open discussion.
Rahul Jain
analystAlright, thanks.
Operator
operatorThank you. Everyone, that was the final question we had for today. Because of time limits, I’ll now turn the conference back to management for their closing remarks.
Rangarajan Srinivasagopalan
executiveI appreciate everyone's time. Thanks for your patience, for joining the call and posing questions, for hearing out our commentary, and for the interest you've expressed in Data Patterns. Let me wrap up by saying once more that we remain quite bullish regarding the markets ahead and the work we're undertaking here. I believe we're getting many things right at Data Patterns. Our product is a differentiated one. We're developing capabilities in a very distinctive remainder of India. The products we're building match what Western nations provide across Europe and the U.S. As a product, we feel that what we're striving to create will be second to none. India has an enormous need to manufacture within India. Even as we speak of making in India, the procedures needed to align with make in India are likewise extremely demanding. It must meet a sort of Indian content quality standard. Design in India content isn't spelled out. It likewise permits imports to come in from many sources, add some value here, and be sold to India. That too lets plenty of imports take place. We've chosen the difficult path of seeking to design and develop in India and serve the market with Indian IP.
Rangarajan Srinivasagopalan
executiveIf Indian IP gets developed, then we can export that to other parts of the world as well. We think that's the approach to take over a longer horizon. We've chosen the longer path and the more difficult one, given that we've been operating for many years. Thanks to ISRO and DRDO, we built up ground-up development. Our product development has been done in-house. The competencies are built in-house. We decided that this is the correct path. Because India has a huge untapped market, I think we should be able to capture a percentage of that market. We have products that address the market. That's the reason we took INR 500 crore from the market to carry out product development activities. That money is being spent wisely, and we are counting the pennies as we spend it. We built the products in EW. It's a very, very modern product for an EW suite. We also developed fire control radars for SU530. We're already doing the replicated systems, transferable SDR, and a whole lot of other products. We make two programs for EW ground-based and radars, which we are trying to participate in. I'm sure some of them may be successful.
Rangarajan Srinivasagopalan
executiveThe total addressable market we're pursuing across all of this exceeds INR 20,000 crore. I think even a slice of that market is substantial. Of course, we wouldn't be content with just a slice — we'd like to capture the entire market. Since we're ahead of others, we're working out how to make that happen. Customer response has been positive. The Navy and the Air Force in particular have responded very positively to every product we've been demonstrating and showing them. They're willing, and they're extending their full support to us. They're making aircraft available so we can look at the upgrade and type testing, and on that they'll likely spend more money than what we've spent on the product development exercise itself. I think everything looks good at this point. The products are turning out very well. Converting these large opportunities into orders that contribute to our revenue is going to take some time. We're also building infrastructure, developing the capability to manufacture them, building people to ensure delivery, and supporting these systems as well. All of it is happening in parallel. We're investing strategically ahead of time, so that within the next three years the company scales to a multi-thousand crore company revenue.
Rangarajan Srinivasagopalan
executiveThat's exactly where our focus lies. After so many years in this industry, our aim is to lead it moving forward. We're also going to concentrate on bringing exports down—wait, rather, on growing exports—so that we aren't solely reliant on Indian government contracts, and we're able to distribute. That spans numerous other agencies, and we belong to a bigger organization based outside India. Going forward, we'll direct our efforts toward building an organization that is also export-friendly. That's the concept. That's the strategy. We're working toward it. Right now, we believe we're headed in the right direction. That's everything I wanted to share with you. Should you have any further questions, kindly send them to Go India. We'll be glad to provide answers. Thank you again for tuning in and for your interest in Data Patterns. Thank you, everyone.
Monali Jain
analystThanks. Speaking for Go India Advisors and this conference, we appreciate your participation — and at this point you're welcome to hang up your line.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Data Patterns (India) Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Data Patterns (India) Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Data Patterns (India) Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.