Earnings Call Speaker Segments
Tor Karlsen
executiveThanks for joining the Desert Control Q3 2023 and year-to-date company update webcast. We'll be going through the Q3 report along with the interim financial results for the fiscal period ending September 30, 2023. You'll also hear a few updates regarding Q4 2023. After the presentation, there will be a Q&A session, and we encourage you to send in questions through the Q&A function. Ahead of the official Q3 update agenda, Desert Control's CEO will give a short company presentation by way of introduction.
Ole Sivertsen
executiveThank you, and I appreciate you joining us for the Q3 company update. To begin, I'll give a quick recap of who we are and what we're trying to achieve, and then we'll get into the Q3 update. Our planet is drying out. Fertile land is dying, and water scarcity speeds up in a vicious cycle. Droughts and land degradation cost hundreds of billions of dollars each year, and governments put substantial money into protecting agriculture, which requires more than 70% of all the fresh water on earth. Once soil becomes sand, growing food and sustaining life demand even more water. Under 15% of water stays in the soil long enough for plants to use it. The bulk of it drains away quickly into the depths, which washes out nutrients and drives up costs, reduces productivity, and lowers the quality of plants and food. Liquid Natural Clay, or LNC, is a nature-based solution for upgrading sandy soils. The liquid wraps every grain of sand in an electrical charge that clings to water much like a magnetic force, forming a soil structure that holds water and nutrients the way a sponge does. A single treatment can last 5 years or more when maintenance programs are followed. Work to deploy LNC begins with analyzing the target area, setting objectives, and determining how results will be measured.
Ole Sivertsen
executiveThen we put together a soil improvement prescription tailored to how the target area currently sits, and that prescription becomes the basis for a customized LNC solution aimed at hitting the objectives we want. After that, the LNC gets made right on location with mobile processing units, then spread across the land using standard irrigation techniques — the very same approach you'd use to get water out to a field. Everything comes as a turnkey soil improvement project, bundled with a range of monitoring and maintenance services. LNC cuts water and energy consumption by as much as 50% while boosting nutrient efficiency, which means bigger yields, better plant quality and more profit. LNC rests on 12 years of R&D, plus 5 years of independent validation and field pilots that produced consistent results. The total available market is enormous. Our first focus is the United States and the Middle East, going after sandy soil areas hit by drought and water scarcity. The first customers are farmers, landowners and governments. Our business model is direct sales through turnkey projects priced per hectare or per number of trees, paired with assorted services that create extra revenue streams. In the Middle East, we work via partners under a royalty-based license model. Thank you once more for joining us.
Ole Sivertsen
executiveI'm Ole Kristian Sivertsen, the CEO of Desert Control, and I'll walk us through the agenda for today, which consists of four parts. To begin, I'll go over the Q3 highlights. After that, Leonard, our CFO, will guide us through the financial update. Following that, I'll provide a short outlook, and then we'll wrap up with the Q&A session. For the Q3 company update, we'll organize it into three sections: Corporate, Middle East and United States. Let's begin with the Corporate updates. Desert Control finished the third quarter with a strengthened financial position, after a capital raise of NOK 67.5 million and a subsequent repair issue bringing in an extra NOK 8 million. That capital raise, together with the results of the strategic review conducted beforehand, has secured over NOK 100 million in added liquidity for the company. Combined with gains in cost efficiency, this ensures funding for the company's commercialization phase through the first half of 2025. Now to the Middle East. The move to the licensed operator model in the Middle East is gaining traction, delivering operational efficiencies and market responsiveness. Key technical and operational personnel have moved over to the partners, with a limited team left in the UAE Desert Control entity to support the final steps of the transition.
Ole Sivertsen
executiveWhen it comes to Desert Control, these are mainly administrative actions tied to winding down the last remaining local entity in the UAE, and that work is expected to wrap up before the year is out. The LNC production units that the partners bought have now been handed over. Our partner in the Middle East, based in the UAE, expects to kick off some LNC projects before year-end, possibly in both the UAE and Saudi Arabia. Progress is also being made by our Saudi-based partner. As we said before, they expect to become fully operational in Q1. Their LNC production units have reached KSA, and employees are being onboarded. Every payment from the partners connected to the strategic review has been settled and collected, and the shift toward the licensed operator model is moving forward as planned. Increased commercial traction is already being driven in the United Arab Emirates and Saudi Arabia by the new go-to-market model. New opportunities have been fostered by the regulatory approvals secured in the UAE, and more doors are opening, particularly in the public sector. The Middle East license partners share an optimistic view on sales growth over the coming quarters, and several promising opportunities involving large entities are moving ahead. Now let's turn to the United States. In the U.S., the team has diligently carried out the sales strategy centered on the customer conversion model.
Ole Sivertsen
executiveDuring Q3, five additional technical pilots got signed, which means we've now hit our targets for three quarters in a row, with 15 pilot projects signed in total. The pipeline is shaping up well to keep that performance going, and our strategy is shifting toward turning technical pilots into extended deployments in 2024. Efficiency gains in LNC production and application have also risen steadily over the course of the year, and projects now cover a growing variety of crops and use cases. R&D efforts and the ongoing 5-year program with the University of Arizona are likewise carrying on with good momentum. As we head into Q4, the high season for agriculture in Yuma, we're planning 6 remaining technical pilots for LNC implementation. Before we continue, let's take a look at the overview of the U.S. pilot portfolio. As of Q3 2023, 15 Stage 1 technical pilots are signed, plus 1 extended pilot that's in the Stage 2 commercial pre-project phase. Of those 15 pilots, 11 are in agriculture and 4 are in landscaping. Let me give you a summary of where the Stage 1 technical pilots stand right now. LNC has been deployed for 9 pilots that are now in the monitoring and performance evaluation phase. The other 6 pilots are slated for LNC application over the coming weeks and months, together with further pilots being signed in Q4.
Ole Sivertsen
executiveOn the golf course side, two of those pilots have now asked us to submit proposals for broader Stage 2 pilot deployments. We expect the shift from technical pilots into Stage 2 pre-projects to get underway in the new year. From what we've seen so far, the strongest business cases should initially sit within high-value permanent crops as well as landscaping. When it comes to the forage market, that's made up of commodity crops, which are extremely sensitive to price and exposed to considerable market swings. The main drivers are probably going to tie straight back to whether water is available. As for the row-crop market, most pilots there are still waiting on LNC implementation over the coming weeks and months, just as we head into the Yuma winter vegetable cultivation season. A number of these involve high-value specialty crops, where efficiency in water use — chiefly aimed at raising yields — is going to be the central driver. Another space drawing a lot of interest is the idea of turning low-value farming land, restricted to low-value crops like forages, into soil capable of supporting high-value specialty crops such as vegetables. We're in the process of putting together dedicated pilot programs so we can dig into that opportunity further. Turning now to the Stage 2 extended pre-project with Limoneira Company: Limoneira began with a Stage 1 technical pilot involving 50 trees at the Yuma ranch in July 2022.
Ole Sivertsen
executiveBack in December '22, we deployed LNC for a commercial pre-project involving 2,000 trees at the Cadiz ranch, and then 2,000 trees followed at the Yuma ranch in Q1 of this year. As you probably know, Limoneira shut down their farming operation at Cadiz earlier this year, so the LNC commercial pre-project's focus was consolidated into the Yuma ranch. There could still be opportunities for LNC and Cadiz down the road, should a potential new client take a lease on the ranch. In the meantime, our focus with Limoneira stays on Yuma. The performance of the LNC treated land has consistently delivered solid results on soil moisture data and water retention, and our relationship with the Limoneira team has remained a strong partnership built on shared values and objectives. This year's harvest has run late because of a colder than normal start to the season, and it was challenged by extreme temperature peaks later in the year. Harvest data is therefore still being collected and analyzed. Around the end of the year, we expect to wrap up dialogues with Limoneira, assessing the future scale and timing of extended LNC deployment for the Yuma ranch. As we communicated previously, the future LNC rollout for Limoneira, based on the positive outcome of the pre-project, is anticipated to develop in stages.
Ole Sivertsen
executiveWhen it comes to the Yuma ranch, those stages will probably tie back to particular fallowing programs and the accompanying timeline for replanting acreage, as blocks step by step exit the fallow program. Sustainability stands as a crucial cornerstone for Limoneira, and their whole team sits at the leading edge of figuring out how to produce the finest lemons in the most sustainable manner, and that is what the team lives and breathes daily. We look forward to wrapping up conclusions on the next steps alongside Limoneira in the near future. Now we'll move to the financial update, and I'll hand things over to our CFO, Leonard Chaparian.
Leonard Chaparian
executiveThanks, Ole, and thanks everyone for being with us on today's call for the quarterly update presentation. You can find the figures laid out in detail in the financial report that came out earlier this morning. Those key financial figures will be walked through in more depth on the slides that follow. The company ended the third quarter with a positive cash balance of NOK 35 million and carries no interest-bearing debt. Also, it's worth noting that, tied to the agreements in the Middle East, together with the capital increase and repair issue, we expect to receive roughly NOK 100 million in the fourth quarter. Of that amount, NOK 92 million has already been secured as of today. Since the company is gradually winding down its operations in the Middle East, the quarterly report separates the financials for ongoing operations from those of discontinued operations. In addition, the comparative figures have been restated so readers get a clearer comparison. As you can see, activity in the Middle East, shown in the discontinued operations cost line, has dropped substantially, and that decline is expected to continue through Q4. Finance income is mainly tied to unrealized foreign exchange gains and on intercompany loans. With our Middle East operations being phased out, the assets held for sale are presented as a separate line item on the balance sheet.
Leonard Chaparian
executiveOther current financial assets are made up of fixed income funds, and as I mentioned before, cash and funds together come to NOK 35 million at the close of the year — that is, at the end of the third quarter of 2023 — and we carry no interest-bearing debt. That said, as I noted earlier, during Q4 we will receive roughly NOK 100 million. Right now, NOK 92 million of that sum has already been secured. This affects our runway, which is now stretched through the first half of 2025. Total reported equity of NOK 52.5 million is equal to 60% of total assets. Cash flow from operating activities — now split at the outset between continued and discontinued operations — reflects the operational profit and loss adjusted for depreciation and amortization, which highlights where the company stands today in cash terms. We have also received roughly NOK 1 million as a tax refund from the Research Council of Norway, plus about NOK 3 million as a partial payment from H-EART under the agreements I mentioned earlier. The cash flow in this section shows funds being released to bank deposits in order to support the operation. In addition, during this quarter the company closed a private placement with H-EART amounting to NOK 10 million. No other significant capital sources were added during the third quarter.
Leonard Chaparian
executiveIf you want more detail on the Q3 financials, the full Q3 report is available. Updates on how the Desert Control share has performed and on the top 20 shareholders can be found on our web page. One thing to keep in mind: because of the significant capital raise done in Q4, the company's ownership structure has changed materially, and that change isn't reflected in the Q3 report. Thank you.
Ole Sivertsen
executiveThank you. Now, before we wrap up with the Q&A, we'll move on to outlook. I'll break outlook down into the same three parts as the company update: Corporate, Middle East and United States. Let's begin with Corporate. We expect the last administrative steps involved in dissolving the remaining company entity in the UAE to wrap up by the end of the year. Looking ahead, the restructured organization and corporate functions will concentrate on backing the commercialization activities now underway in the United States, and on supporting our partners as they drive commercialization in the Middle East. Now to the Middle East. Our new go-to-market model is already generating stronger commercial traction, and a handful of partner-driven LNC projects, pilots and proof-of-concept implementations should kick off over the coming months. A number of initiatives in the UAE are taking shape as well, in line with the upcoming COP28. Momentum is building in KSA too, and the local Saudi partner expects to become fully operational in Q1. As we said earlier, the Middle East license partners hold an optimistic view of sales growth over the coming quarters, and several promising opportunities with large entities are moving ahead with growing commercial traction. Now turning to the United States. Going forward, Desert Control's strategic focus in the United States shifts toward moving technical pilots into later development stages, evolving toward commercial deployments at a larger scale.
Ole Sivertsen
executiveWe’re aiming to turn roughly 50% of Stage 1 technical pilots into Stage 2 extended commercial pre-projects, and around 50% of those Stage 2 projects into bigger-scale deployments. For technical pilots secured this year, we expect conversion to start in 2024. Near year-end, we expect to wrap up talks with Limoneira, evaluating the future scale and timing of the extended LNC deployment for the Yuma ranch as previously mentioned. To sum up, the financial base we secured in Q3 lets us stay focused on speeding up commercialization in our initial target markets, the Middle East and the United States. We had a strong third quarter, which strengthens the overall outlook. We’ve brought in more than NOK 100 million, placing the company on a strong footing for all of 2024 and the first half of 2025. Looking ahead, we stay firmly committed to driving market adoption of liquid natural clay by building trust through demonstrating the ability to improve both sustainability and the bottom line for clients in agriculture and landscaping.
Tor Karlsen
executiveWe're going to begin the Q&A portion now, and we'd ask everyone to submit questions through the Q&A function. A question has come in already, which is: why aren't we told the names of the new pilots.
Ole Sivertsen
executiveWe've shared and communicated names on pilots as we've gone along. But now that we're starting to grow in the number of pilots, we find it more useful to communicate the aggregated status of pilots by crop type and by agriculture and landscaping, so it becomes easier for our shareholders and stakeholders to follow the overall progression of our work.
Tor Karlsen
executiveThanks. At the moment, no questions have come in yet. So if you have any, just type in here. Yes, then one is arriving. When do you expect to bring in revenue in 2024?
Ole Sivertsen
executiveYes. So, I mean, we've already begun generating a smaller amount of revenue from the Stage 1 technical pilots. Those are quite small in scale and size. And we'll keep delivering projects of that kind going forward as well. So we still hold to our target of 5 technical pilots per quarter. And then, as I said, our focus moves toward converting those pilots into larger-scale Stage 2 opportunities, which will bring somewhat bigger revenue figures than the technical pilots, along with revenue from the first anticipated stages of large-scale deployments. As I mentioned in my update, we also expect to see some projects and revenue generation beginning already in the coming quarter here in the Middle East, where we will then, in 2024, start to see a growing revenue contribution from the license model as well.
Tor Karlsen
executiveThanks. We're getting quite a few questions now. This one is similar to another that came in, though what's different is this: the question asks when you anticipate generating revenue from the projects and the cooperation to the point where outside financing is no longer required.
Ole Sivertsen
executiveYes. That is sort of a question that hinges on many factors, correct? But let me begin by again covering our prognosis of the customer conversion model as an illustration, right? So there are 3 phases to the customer conversion model. Stage 1, technical pilots, which are pilots from which we earn no profit or which we partly co-finance so as to get a volume of projects going. We request payments from the clients, but those payments are small, and the projects are small in size as well, right? Then for the Stage 2 pilots, such as the pre-commercial project with Limoneira, there our objective is to aim for cost coverage, more or less breakeven on those extended pilots, and then positive revenue -- positive cash flow contribution revenue on the projects from the Stage 3 deliveries, right? So those conversion models, as we see the rollout and deployment of that, will see a larger number of Stage 3 deployments coming in towards the end of 2024 and into 2025, that starts to generate a significant positive contribution to our business. We also have solid anticipations and expectations for developing the business in the Middle East together with our partners. Now this is a different model, where it's a royalty-based revenue that has a different impact directly onto our profitability.
Ole Sivertsen
executiveAnd that’s going to take effect in the period ahead as well. But again, that still doesn’t get at what you asked about the timing of when external financing won’t be necessary, correct? What I mean is that everything hinges on the growth strategy and a whole host of other factors, right? When the addressable market is big enough, you might choose to keep putting money in, and so on, to speed things up and push the business ahead faster. So I hope that gives you a fuller picture of how I see your question.
Tor Karlsen
executiveThanks. And a small follow-up on that: are you expecting any license or royalty income during 2024 from the Middle East partners? And roughly which quarter would that land in?
Ole Sivertsen
executiveYes, we certainly expect royalty revenue from the partners in 2024. We can see projects on the horizon that have a strong chance of getting underway in the months and quarters ahead. And as I said earlier, we expected royalty revenue to begin early in the year, with a revenue outlook that builds gradually from there.
Tor Karlsen
executiveThanks. Then I have another question: Desert Control quite frequently wins international awards or competitions. So why aren't we seeing any stock exchange announcement about those?
Ole Sivertsen
executiveI mean, some of those things might be suited to press releases. But from our perspective, we don't want to flood stock exchange announcements with a lot of updates of differing significance, right? For us, winning business and signing contracts matters more, along with issuing stock exchange releases about meaningful revenue-driving accomplishments, rather than diplomas, recognition, and international awards. Those are always nice. And our main aim with them is to raise the profile of the challenges we're tackling and to establish thought leadership in a way that translates into revenue generation and supports our commercialization. So that's what's important about this. And for us, being involved in and nominated for various things is good. But the key result we get from it is that we get in front of potential future clients and get our message out that way.
Tor Karlsen
executiveThanks. One more question ties back to something you said earlier when you were describing the model. What I'd like you to clarify is the distinction between the commercial pre-project and the commercial projects.
Ole Sivertsen
executiveRight. The Limoneira case works well as an illustration of that. Their Stage 1 technical pilot involved 50 trees, so quite a small one — and that's because growers are extremely protective of their soil and land, since those are the lifeblood of their operation, correct? They want a small-scale test to confirm it holds water — pun intended — and doesn't create any issues or difficulties before proceeding. Now, given that they've completed that at a very small scale on very large farming operations, the following phase, the Stage 2 commercial pre-project, has two validation goals. First, to confirm scalability — that you can genuinely deploy it across a whole irrigation block, going from 50 trees up to 2000 trees, or from a quarter acre to 40 acres or 50 acres — and to confirm the operational delivery for that. Second, this is the point where you really want to see the business case come together: the cost of implementing the LNC being offset by lower operational costs as well as savings on water, fertilizers, energy consumption, et cetera. And on top of that, achieving this without any negative effect on yield — or, ideally, with a positive one.
Ole Sivertsen
executiveSo from those data sets, that’s where the choice gets made that this is something we’ll take across every one of our farms, or across several bigger areas, as a full-scale commercial project.
Tor Karlsen
executiveThanks. Then one more thing on that: can you give us some detail about how the process works for bringing on those first technical pilots? And do we already have a steady pipeline of such opportunities?
Ole Sivertsen
executiveYes. So as far as bringing on those first technical pilots goes, we certainly have a consistent flow of them. And from our side, a big part of it is making sure we pick the right ones too. So, as I mentioned in the pipeline overview, you could see we now have them organized into categories, with 3 in forages, 3 in vegetable crops, and 3 in permanent crops. And then we're looking to grow in permanent crops as well. Citrus is there now, and there are many citrus varieties we can expand into. There are other kinds of fruit trees. There are nuts. There are vines, right? So that's the strategic view, where we consider it from the standpoint of business value potential, and then we prioritize where we want to put emphasis on growing our technical pilot base. Bringing them on is a multi-step process. We have to identify a suitable client, one with crops or land that we assess together with the client, that can offer a potentially good future opportunity where we think there will be strong feasibility for the LNC. And then we set those objectives and then kick off the project with them and then kick off the usual like performance monitoring.
Ole Sivertsen
executiveAnd so, even with those 50 trees, we actually installed soil sensors and cut back on water measurements, which allowed us to keep monitoring continuously and show — as I mentioned — that it does indeed hold water.
Tor Karlsen
executiveThanks. And we’ve got a group of questions that ties back to the pilots as well. One of those is: do you expect the 3-stage model to continue for the foreseeable future? Or are you able, to some degree, to take the outcomes from the earlier technical pilots and use them to demonstrate to potential new customers that it holds up, so that step 1 can be skipped?
Ole Sivertsen
executiveOh, yes, definitely. I think this comes down to roughly comparable parallels with the diffusion of innovations model on the curve many of us have probably encountered — that bell-shaped curve — where the initial 2.5% represent the innovators, followed by the early adopters, then the early majority, and after that the late majority. And eventually, you've demonstrated it to the thought leaders, and to those we've singled out in the technical pilots, to a point where everyone else will come along, correct? Now, I think what we'll need is to establish those sorts of local proof points in particular local markets and inside particular segments as well, right? So once we've got sufficient proof in vines or citrus, for instance, I genuinely believe we won't be going through Stage 1 and Stage 2 — instead it will move more directly into larger scale deployments, and that will then develop and expand, more or less, sector by sector.
Tor Karlsen
executiveThanks. And then, from Stage 1 through Stage 3, what length of time do you anticipate that taking? Is that a certain number of years from the beginning to roughly the end?
Ole Sivertsen
executiveIt really varies somewhat depending on the crop and what the pilot is ultimately trying to achieve. Take the Limoneira case we discussed—it began in July 2022, and by December of that same year we had moved into Stage 2. Then in Q1 of this year came the final portion of that Stage 2 rollout. After that, you essentially need a whole cropping season—waiting for the fruit to reach harvest readiness—so you can collect the harvest data, analyze it, and determine whether you're hitting the KPIs and the business case that will show better sustainability along with an improved bottom line. So the timing shifts a bit. Certain crops move faster, correct? We have vegetable crops and similar things where growing them takes considerably less time. The same holds for turf grass, sports fields, and golf courses within the landscape segment, where we observe that merely a number of months following the technical pilot, clients are already asking for proposals to advance to Stage 2.
Tor Karlsen
executiveThanks. And then could you possibly share what you're forecasting for operating cash flow, based on the revenue expectations from a Stage 3 phase and Middle East royalties? And do you expect to reach breakeven in 2024?
Ole Sivertsen
executiveSo, I think regarding a forecast for the future, we remain an early-stage company, correct? That's the reason we didn't begin at this point by providing the quarterly outlook in which you usually predict what you expect your EBITDA to be. It will rise and fall by X percent each month and each quarter over the upcoming period, right? Going into that level of reporting is still too early for us. So on that question, I'll point back to what I said earlier about how we view revenue development tied to the various stages of projects, and the expected progress of our Middle East partners, from whom we also have high expectations.
Tor Karlsen
executiveThanks. On a different note, do you have any plans — would you consider moving up to a bigger stock exchange at some point, potentially, to draw in more investors?
Ole Sivertsen
executiveI'd say that over this past year, we've devoted far too much energy to raising capital and collaborating with our investors. So, briefly, my response is that the plan now is to concentrate on sales generation and commercialization, proving through projects that we can bring value to clients — both when it comes to sustainability and in improving their bottom line — using liquid natural clay in the Middle East for our partners and in the U.S. That's priority number one for us. Anything beyond that — it isn't where our agenda is focused right now, correct? So the emphasis at present is on commercializing, selling, and continuing to develop the business.
Tor Karlsen
executiveThanks. And then here's a broader question we have. As we head into 2024, could you lay out the biggest challenges you expect and how you intend to get past them?
Ole Sivertsen
executiveYeah. So as we headed into 2024, the biggest hurdles we faced just a few months back involved making sure we had adequate funding to carry out our plan for growing the business from here—both in the Middle East and in the United States. That's now been achieved, right? So that's a significant accomplishment we announced this quarter. So the largest obstacle on that front is now gone. There's no longer any question about financing the longer-term plan or about supporting the customer conversion model we'll be driving in the U.S. market. And I think our partners in the Middle East will likely operate under a different model. I don't think it will necessarily be a replica, because in those markets, LNC has been a topic and a subject at the governmental level for a longer period of time. So things may develop differently there. But I think what matters now is making sure our partners in the Middle East are fully empowered to succeed in developing that market. We've spent a long time investing in that market—building infrastructure, building pilots, doing validations, securing product registrations, certifications, regulatory approvals and things like this. And it is fantastic to see that this is now starting to pay off.
Ole Sivertsen
executiveWe're quite convinced that this is the correct model for that region. So one of the areas we'll focus on is backing the partners and giving them the tools to succeed. The other area is achieving successful commercialization in the United States, where we have several pilots underway. We won't convert every one of them, correct? So we'll need to learn fast, iterating as we go, to identify the strongest and best financial business cases for that, so we can then zero in on what I call the optimal product market fit — the sweet spots that can be replicated at a larger level. So I think those are the main challenges, which also represent the biggest opportunities for 2024.
Tor Karlsen
executiveThanks. Then here's a totally separate question: could you share what you're expecting when it comes to COP28?
Ole Sivertsen
executiveThat's nearly a political kind of question, honestly. And I believe there's consistently plenty of awareness surrounding these COP gatherings. Then, does the question come down to whether I expect global leaders to reach agreement on actions that will genuinely be carried out? That, I think, is a broader conversation. What I do observe, though, is that it matters a great deal that the COP event is being held in the Middle East — a part of the world on the front lines of climate change, a region home to 5% of the global population yet holding under 2% of the planet's available freshwater resources, to give one example. A region that imports roughly 90% of the food it consumes, and so on. So my belief is that this will push to the forefront discussions about how to speed up progress on food security, on water security, and on climate action efforts tied to backing things like the Middle East green initiative, et cetera. So I think the impact will be positive. These gatherings are political events to a large degree, but they also generate a great deal of awareness about turning these ideas into reality. I think some possible regulatory changes may also emerge from the event in the Middle East.
Ole Sivertsen
executiveOne area we're really eager to see how things play out is the actual pricing of water and water tariffs — that's something that could shift. Water is also a big part of the CO2 equation, given desalination and energy usage, both for producing fresh water and for distributing it; it's an important component. So those are a few of the expectations.
Tor Karlsen
executiveThanks. Then there's one more question about the pilots. Are you the ones reaching out to clients first, or do they come to you? If that's the case, what does securing a typical pilot look like, including how much time is needed for in-person meetings and so on?
Ole Sivertsen
executiveIt's a mix, correct? The first pilots were mainly launched when the University of Arizona hosted these events they call field days, where farmers, growers, and companies would come see the LNC validation project underway on the Yuma Mesa. That's how a lot of it got going. Even now, we see a solid blend of initiatives arising or pilots being spotted via our R&D and field validation efforts. Some arrive through word of mouth, plus a mix of really hard, targeted sales work from our team in that region. So I mean, these are small projects. This kind of pilot is set up in a manner that's very typical in agriculture, right? Every provider — whether supplying seeds or another input or product in agriculture — always runs a small test, a small trial. Farmers and growers are therefore quite accustomed to it. So the Stage 1 technical pilot doesn't necessarily require much time or many meetings, since it's a familiar model. But then, when it comes to carrying out the pilot after we've agreed to proceed, we then have to figure out when the timing is optimal for the farmer, because he's got a lot happening in the field — maybe he says he's a bit hesitant to do it while the field is planted.
Ole Sivertsen
executiveWhat I'd prefer is to handle that while getting the ground ready ahead of my upcoming planting and so on. There may be a bit of a delay before the LNC is actually in the ground and you begin that period of monitoring and evaluating performance.
Tor Karlsen
executiveThanks. Earlier you said we don't know whether that 3-stage process — the technical pilot, then pre-project, then large-scale project — will be the model in the Middle East. But are there any projects in the Middle East where the early stages have already been completed, with the potential for large-scale projects?
Ole Sivertsen
executiveYes, there are — there definitely are. We've also run a number of pilots in the Middle East over the years. And now that the MoCA certification and the regulatory approvals are in place, among other things, some of those are coming into play, and we're beginning to talk about larger deployments. So, to that question, the answer is definitely yes.
Tor Karlsen
executiveThank you. Now here's a more basic question. Why is LNC not being adopted by everybody? Is it that they are unable to work out the higher yield home ? Or does the upfront cost come across as too large?
Ole Sivertsen
executiveSure — you can work out the yield in advance, but when you factor in an upfront expense of several thousand dollars per acre, that's a meaningful outlay relative to the other input costs a farmer carries, like annual fertilizer spending and similar items, correct? And then, looking at how they record this on their books, a number of them treat it more as a CapEx investment — as an upgrade to the land. With that kind of investment, they want to be certain everything is in place and that they've done proper due diligence to validate it will perform on their ground. So I think it's similar to any new innovation: you need to build a sufficiently large base of progressive early-stage innovators and early adopters moving forward, which is what we're doing through our customer conversion model. And I think a further set of lighthouse projects — that's really where the Middle East can make a very strong play, with some very, very, very large organizations that are launching initiatives to deploy LNC. Just the stamp of such reference deployments will change things dramatically.
Tor Karlsen
executiveThanks. And then, could Desert Control possibly qualify for U.S. programs under which farmers receive government support to use LNC?
Ole Sivertsen
executiveYes, there’s an opportunity there, and that’s another reason why our work with the University of Arizona, for instance, matters. These programs function in a way that requires a certain degree of validation and confirmation of the solutions before substantial government funding flows into them. So, as some of you might recall, Arizona has had a water efficiency and irrigation efficiency grant, for example, offering a certain number of dollars per acre that a farmer can receive in grants and support through this program. And LNC is being assessed for these kinds of programs. The next step we need to finish is getting our first peer-reviewed publications out that will back this up, and that will put us in a strong position to be fully qualified for these types of programs as well.
Tor Karlsen
executiveThanks. Now, on the margin question: are you managing toward a specific target margin that investors could anticipate from Stage 3 projects or corporations?
Ole Sivertsen
executiveHonestly, it's still early to be offering guidance on that before we've carried out any of them. We expect to begin in the new year with the potential first Stage 3 delivery, right, when we'll be bringing all the validated actuals of that into play. But -- I mean, historically we've sort of shared some expectations around this and some gross margin estimations in our financial business models. We don't see any significant change from that. But I'd like us to have completed the first couple of deliveries on Stage 3 before we begin sharing guidance on this.
Tor Karlsen
executiveThanks. And on the licensing model as well, could you share some insight into how revenue generation from that model should be viewed?
Ole Sivertsen
executiveRight. So we’ve put out a fairly detailed FAQ — frequently asked questions — that lays out the licensed operator model. It also covers what to expect regarding how the royalty percentage gets calculated, and so on. You can find that on our website. It’s pretty straightforward and simple, right? It’s a percentage of sales from the licensed operators, plus potentially other services and component deliveries that will drive that revenue. The biggest driver is going to be the royalty on sales at a certain percentage. And in the FAQ, we’ve shared quite detailed information.
Tor Karlsen
executiveThanks. One final question from me: during COP28, do you have any arrangements in place with Mawarid, or with prospective customers?
Ole Sivertsen
executiveSo the UAE COP28 team — the group organizing COP28 — invited me, and Expo Live did as well. We had also been involved with Expo 2020 through the Expo Live program for innovations for good and the Good Place Pavilion. So they've asked me to give some presentations there and to take part in some panel discussions. Expo Live has also asked me to moderate a session that brings together a couple of Expo Live participants to discuss their journeys, the progress we've achieved, and what we expect to see happen after COP 28 in terms of sustainable innovations. So I'll be there, and naturally I'll also be working hard to connect with stakeholders, potential clients, opportunities, and influencers within the industry.
Tor Karlsen
executiveThanks. I know I said that would be the last one, but we’ve got a runner-up question here. It’s this: when should we expect to start hearing about success stories coming out of the Middle East and the U.S.? That could bring more publicity and attract new customers.
Ole Sivertsen
executiveYeah, I think regarding how well the current rollouts are going and the move toward bigger deployments, we'll be sharing those as we go. So whenever significant contracts get signed, they'll be announced on a rolling basis. And I completely agree this could raise visibility with new customers. And as we've seen in a few of the more recent interviews that we've also put out on our social media, we see the positive impact of satisfied clients who are excited about what they've experienced up to now — that's a really important part of how we're moving this forward. The customer's voice carries the most weight.
Tor Karlsen
executiveThanks. And thanks to everyone for the really solid questions today. So I believe we'll wrap up the Q&A portion now, since nothing further is left.
Ole Sivertsen
executiveThanks, Tor, for walking us through the Q&A here. Before we wrap up the session, I just want to remind everyone to take note of the disclaimer related to forward-looking statements. And to close, thank you all for joining the Desert Control Q3 2023 company update presentation.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Desert Control AS transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Desert Control AS earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Desert Control AS or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.