Downer EDI Limited (DOW) Earnings Call Transcript & Summary

February 26, 2023

Australian Securities Exchange AU Industrials Commercial Services and Supplies earnings 51 min

Earnings Call Speaker Segments

Grant Fenn

executive
#1

Okay, good morning, everybody. I'm Grant Fenn, the Chief Executive Officer of Downer, and joining me are Michael Ferguson, our Chief Financial Officer, and Peter Tompkins, our incoming CEO, who takes over the role after this call. There's plenty to get through this morning. I'll start with an update on the utilities contract matter, then give a summary of the last six months, including a look at some of the challenges in the operating environment we've faced. After that, Michael will take you through the financials in more detail. I'll then cover the outlook, and we'll wrap up with Peter discussing Downer's strategies for realizing shareholder value, which we raised at our AGM last November, and then we'll open the line for questions. Let me begin with an update on the utilities contract issue. On 8th of December, Downer reported that we had identified historical misreporting of revenue and work in progress on one of our maintenance contracts. This morning, we've released an update to the ASX, and I'd encourage you to read it if you haven't already. The root cause and contributing factors have now been established. We've reviewed our broader workbook across the group, and I can confirm we believe the issue is isolated to that single contract.

Grant Fenn

executive
#2

I can also verify that post-tax earnings were overstated by roughly AUD 1.7 million during 2020, AUD 8.8 million during 2021, and AUD 11.7 million in FY 2022. Comparative financial information has been restated so the correction is incorporated in underlying results. There are contributing factors that give context to, but do not excuse, what happened here, and we have acted quickly to make sure it will not happen again. We are strongly focused on remediating the contract. A detailed recovery plan is being put into action. The new contract management team, together with external business improvement specialists, is working closely with our operations teams and our customer to address how the contract is performing. We have agreed and documented a commercial reset of the contract with the customer, and this, combined with planned operational improvements, indicates that the contract is not onerous. We will now move to slide five here on the first half financial results. As we have discussed a few times over the course of the last six months, the first half of 2023 has been very challenging, with significant parts of our business affected by rain, storms, and flooding, and the labor productivity hangover from COVID. Our cash conversion at 8.5% is way off our normal half end position, but very clearly, due to substantial subcontractor payments on completion of our Sydney Growth Trains project and a couple of large customer receipts expected in late first half being received in January.

Grant Fenn

executive
#3

Later in the presentation, Michael will go into greater detail on the financials for each business unit as well as group operating cash flow. That leads us to the following slide, which walks you through, in some detail, what the business has been contending with. Wet weather produced a 40% rise in lost shifts, along with lower product volumes in our road services business. I'll say a bit more on that when we get to the next slide. In utilities, widespread flooding and rainfall have led to these site closures and project delays in the water business, and the wet conditions have also brought about reduced worker utilization across our outdoor activities, including meter reading services. Naturally, we look to mitigate these effects by drawing on annual leave and arranging training when rain is forecast. As you know, that does not lessen the material impact on the business. The labor market is still difficult, and this is not a problem that affects Downer alone. Job vacancies remain above normal levels, especially in casual roles and in particular geographies. During the half, we have had to depend more heavily on outsourced labor, along with greater overtime. On a positive note, all of our enterprise bargaining agreement renewals have settled inside the range we expected and comfortably within our CPI price escalators.

Grant Fenn

executive
#4

Randstad Employer Brand Research places us in the top 10 employers, and The Australian Business Awards also named us an employer of choice. Let me just advance to the following slide. These two charts illustrate how lost shifts have grown and how outsourced labor has risen compared with earlier periods. There's now a clear company-wide focus on tackling this. Turning to transport. This unit remains the group's powerhouse, delivering 44% of revenue, and its outlook is very strong. As we've already noted, persistent severe wet weather significantly affected the roads business's performance in this half. With the wet weather easing, substantial road rehabilitation opportunities are beginning to emerge in Australia, and New Zealand will need a significant effort to recover from the recent floods and storms. On 6th of February, the Rail & Transit Systems business was named preferred applicant for the multibillion-dollar Queensland Train Manufacturing Program. That's a very significant win, and it will cement our position as Australia's largest passenger rollingstock maintainer for the next 30 years. Peter will go into that in more detail later.

Grant Fenn

executive
#5

On February 22, we announced an agreement to sell the Australian Transport Projects business to a wholly owned Australian subsidiary of Gamuda. The sale price reflects an enterprise value of AUD 212 million to Downer. Moving to utilities. Several factors led to a disappointing result, among them a loss on the power maintenance contract I mentioned at the beginning of the presentation, plus provisions on weather-affected water infrastructure projects and projected losses on a New Zealand wind farm. I expect utilities to grow substantially in the years ahead, with plenty of opportunities arising from the energy transition. Downer is the market leader in power transmission services, and we've recently entered the New Zealand transmission market through a contract to deliver transmission services to Transpower. Our telco business performed well, with revenue growth led by NBN and Telstra contracts. Our facilities business now accounts for 38% of revenue and, pleasingly, came in above expectations for the half. In September, we were awarded a 7.5 year contract to deliver maintenance services to the South Australian Housing Authority, covering approximately 27,000 social and public housing dwellings and valued at over AUD 630 million. We'll now move on to our work in hand slide.

Grant Fenn

executive
#6

The backlog we hold amounts to a sizable AUD 39 billion, and that figure takes in our projection for the newly announced Queensland Train Manufacturing Program as well. It stretches far into the future, over 90% of it comes from government or government-linked sources, and it spans a range of industries. At this point I'll pass things to Michael, who will take you through the financials, and after that I'll return to discuss the outlook.

Michael Ferguson

executive
#7

Thanks, Grant. Good morning, everyone. I'll begin on slide 13 by summarizing how the group performed on an underlying basis for the half year FY 2023. As Grant mentioned, Downer has faced a difficult period. Total revenue reported by the group came to AUD 6.1 billion across the six months to 31 December 2022. That figure was up 2.9% versus the prior corresponding period. Underlying EBITA fell 24.5% to AUD 133.6 million, giving an EBITA margin of 2.2%. Several factors across the group weighed on margin, among them labor availability, elevated cost to serve, continued wet weather, and project losses in utilities. I'll cover some of these in greater detail on the next slide. Net interest expense came in at AUD 40.3 million, made up of roughly AUD 30 million of bank and DCM net interest plus AUD 10 million of lease interest. An improved average cost of funds brought this down by 12%. The effective tax rate stands at 26.7%, which remains under the Australian statutory rate of 30%, reflecting non-taxable distributions from joint ventures taxed at a lower corporate rate in New Zealand. Downer posted underlying NPDA of AUD 68 million, a figure 28% below the prior corresponding period. The Downer board has declared an unfranked interim dividend of AUD 0.05 per share, a payout ratio of 54%.

Michael Ferguson

executive
#8

Turning to slide 14, which sets out how each of our segments performed. The urban service businesses at Downer posted EBITA of AUD 182.5 million, down AUD 21.8 million compared with the prior corresponding period. Transport came in at EBITA of AUD 88.7 million, a fall of 14.5%. Wet weather, labor market challenges and higher transport and logistic costs were a key driver behind the margin deterioration. That was particularly evident in our roads business. Long-term rail maintenance contracts delivered solid revenue and margin performance, but that was not enough to offset challenges in other areas of the segment. Utilities recorded an EBITA loss of AUD 5.2 million. A number of factors sit behind this disappointing result. Utilities recognized losses on three projects in the half. The power maintenance contract associated with the revenue recognition issue, a water construction project, and a wind farm project in New Zealand. The quantum of these losses is set out in the slide. Further, there were losses in the meter reading business associated with labor availability and productivity. Utilities revenue growth of 12% was driven by NBN and Telstra work within the utilities tech and comms business, which continues to perform strongly. Facilities performed well during the period.

Michael Ferguson

executive
#9

EBITA rose 11% to AUD 99 million, driven by robust results in the government, health, and education segments. Beyond that, the power and energy division is experiencing new contract growth after a stretch of weaker activity. Further details on how each division performed can be found in the appendices of this presentation. On slide 15, we reconcile Downer's statutory result against the underlying result. The gap between statutory and underlying figures stems from the non-cash fair value movement on the Downer contingent share obligation liability, which arises from options issued in connection with the Spotless minority acquisition. That treatment matches earlier periods, and no other individually significant items exist. Turning to slide 16, operating cash flow: Downer posted operating cash flow conversion of only 8.5% for the half, far short of our target and of historical actual cash conversion levels. As Grant mentioned, several substantial factors affected first half operating cash flow. The first concerns timing — specifically the timing of payments to our subcontracting partner upon completion of the Sydney Growth Trains project. Across the half, we paid out $78 million, with the corresponding cash inflows having come in over the past three to four years.

Michael Ferguson

executive
#10

The second item concerns $22 million in settlements tied to a pair of liquidated damages claims that had been provided for in earlier periods, both connected to renewables projects. Item three involves a $40 million effect from altered collection timing with two major customers—cash we would typically have received during December. The fourth item we flagged is a $40 million slippage in claim positions. That slippage stems from two particular contracts in transmission and transport projects where receipt timing was originally agreed with the customer to land inside the period, yet the cash actually came in early during the second half. Working capital also rose over the period, inventory in particular. Given how broad Downer's business is, the portfolio effect generally offsets our cash flow timing factors in any given period. Having all these individually material factors culminate within one period produced a disappointing cash result. Across the half's low earning space, every one of these items materially affected conversion. We will maintain a strong emphasis on cash collection and conversion through the second half so that it returns to traditional levels.

Michael Ferguson

executive
#11

Moving on to the wider cash flow picture on slide 17. Net core CapEx, lease payments, and IT investment came to $166.4 million, consistent with earlier periods. Cash on hand at the close of the period stood at $450.4 million, and together with undrawn facilities of $1.2 billion, that gives Downer substantial liquidity of $1.6 billion. Slide 18 provides an overview of Downer's debt profile. The group's weighted average debt duration is 3.4 years, and the maturity profile appears in the graph to the right of the slide. After Downer's refinancing activity in the first half of FY 2022, we have no maturities due in FY 2023 and very little in FY 2024. Net debt to EBITDA of 2.3x has climbed sharply in the half, driven by both higher debt and lower earnings, particularly from the utilities losses. Although it stays within Downer's capital allocation framework target range of 2x-2.5x, it sits above what we consider the current optimal level. We will keep focusing on lifting profit performance and operating cash flow performance in the second half in order to bring net debt down. Downer remains in compliance with all debt covenants. The proceeds anticipated from the sale of Australian Transport Projects will strengthen key financial metrics.

Michael Ferguson

executive
#12

Much appreciated. Grant, over to you again.

Grant Fenn

executive
#13

Thanks, Michael. Moving to the outlook now. It's fairly clear that FY 2023 has been tough for us when it comes to giving accurate guidance, what with weather and shifting conditions. So, to sum up, back in August 2022, our guidance for FY 2023 was 10%-20% underlying NPATA growth, subject to a number of factors. At the AGM on 8th of November, our business forecasts and our view at that time still supported that guidance. On December 8, we announced, as part of the release about the utilities issue, that trading in October and November had shown guidance was unlikely to be achieved, and we reset guidance to AUD 230 million NPATA, excluding the impact of the utilities contract issue. Since the 8th of December, as part of our half year reporting process, which was finalized over the weekend, Downer has carried out a detailed reforecast review and considers it appropriate to further adjust guidance for the following items, several of which we've already discussed today. Losses tied to the utilities power maintenance contract. While the contract isn't considered onerous, additional losses have been incorporated into the forecast, and will affect H2 in that forecast until the contract reset and recovery plan takes effect.

Grant Fenn

executive
#14

We think there's an increased chance of losses on water projects because of prolongation costs that might not be recovered. Based on very recent feedback from customers, there's a slowdown in government minor capital works, and the effect of the recent storms and flooding in New Zealand, which we believe will ultimately be very positive for the business when it comes to rework, but that really won't be the case for the rest of the four months in the six months, I should say, of FY 2023. Downer now expects underlying full year 2023 NPATA to come in between AUD 170 million and AUD 190 million, assuming there are no further material COVID-19, weather, labor, et cetera, disruptions, and excluding any restructuring costs that might arise from what Peter is going to talk to you about now. I'll now hand over to Peter to take us through the forward view of Downer.

Peter Tompkins

executive
#15

Thank you, Grant, and good morning. First, let me state that my belief in Downer and its people is enormous. This company is genuinely great, with extraordinary capability and opportunities. We won't avoid acknowledging that today's results are disappointing. Last week I told our staff about a major restructure of the business, and I'll go into more detail on that shortly. These changes are significant, and I'm confident we have the plan to make our business more efficient and profitable. I assure you we are addressing the current challenges with energy and intense focus. I am absolutely committed to taking decisive action so our business becomes more resilient to the factors affecting Downer. I've been with Downer for 14 years, holding risk management, commercial and senior operational roles. I feel confident and clear in my thinking about the performance drivers we need to concentrate on. I'll now update you on where I stand with my plan to improve business performance and realize value for shareholders. At our AGM last November, Downer committed to exploring strategies to realize better value for shareholders that properly reflects the exceptional businesses and capability at Downer.

Peter Tompkins

executive
#16

In my capacity as the incoming CEO, I'm fully dedicated to this path forward. From my review of the business, three priority areas have emerged that I see as essential to Downer's success going forward. First, we need to reset the operating model by combining our Australian and New Zealand operations under a sector-led structure, which will let us deliver better solutions for customers, rebalance our cost base, and build a one-Downer approach. The second piece is keeping up our push to simplify the portfolio — we've already made solid progress there, and I'll touch on that soon. Third, and perhaps most important, will be a relentless drive to lift margins and make sure we take a disciplined approach to managing risk. Let me be clear: our risk management framework is very good, but I think we can improve how risk is handled through greater accountability for operational excellence. Turning to the transformation program I announced last week: we've committed to a body of work aimed at delivering at least AUD 100 million in benefits in FY 2025. Those benefits rest on several initiatives, one of which is the merger of our Australian and New Zealand operations, which is now underway.

Peter Tompkins

executive
#17

Right now, we operate a pair of transport businesses, a pair of utilities businesses, a pair of facilities businesses, and a pair of corporate head offices — each with its own leadership team. Under the new Trans-Tasman sector-led business units, we'll have standalone transport, facilities, and utility businesses of significant scale, which will speed up efficiencies and bring our technical and management capability together within their specialist areas. That simplifies our operations, supports sector-led growth, and enables a standardized approach to managing our portfolio. Bringing together our corporate functions across both regions will also remove a substantial amount of duplicated work and, again, simplify how we support our operational teams. Other key areas covered under our target are fleet, property footprint, and procurement. We've set up a project team to support the business through this transformation program, and we've brought in external support to help us accelerate achievement of the benefits and to provide the framework and measurement of progress. Now to portfolio simplification. As mentioned, we're making very good progress here, and this aligns with my view of how best to create a business with a narrower focus on core markets. As Grant discussed, last week we announced the sale of our Australian Transport Projects business to the Australian subsidiary of constructor Gamuda.

Peter Tompkins

executive
#18

This shows the built-in worth of Downer's portfolio and also opens the door to more structural simplification and cost reduction. We're also progressing the possible sale of Repurpose It, in which Downer holds a 45% stake. It's a leading waste-to-resource company, and it has already drawn considerable interest from the market. Turning now to operational excellence and risk management: Downer has outstanding businesses occupying market-leading positions. While our strategic positioning is strong, given our exposure to energy transition, defense spending, and government outsourcing—each of which offers high growth potential—our performance hasn't measured up, and we have to identify ways to become more profitable. That holds true notwithstanding the major pressures coming from weather, labor shortages, and supply chain issues. We've set a target of lifting our average EBITA margin to at least 4.5% company-wide in FY 2025, which ties back to our planning, budgeting, and accountability frameworks. Several initiatives are central to this. One is the AUD 100 million benefit delivered through operating efficiencies and synergies. Another is continued simplification of our portfolio, focused on exiting lower margin operations. Importantly, compliance with our integrated management system, The Downer Standard, will also ensure consistency in process around our project execution, risk management, and system efficiency.

Peter Tompkins

executive
#19

One element of the transformation program is ensuring our teams return to fundamentals and concentrate on the work that generates stronger performance, while making certain the new management team is held accountable for it. Given the current environment, we've been reducing our risk appetite and raising pricing to account for uncertainty. Although substantial opportunities exist in areas like energy transition, we aren't hurrying into them. Take, for instance, building high voltage transmission lines out to the renewable energy zones — a field where our expertise is considerable — yet right now the risk allocation on these very large projects doesn't match our risk appetite, so we're waiting for that to improve. As I mentioned earlier, risk management ranks among my key priorities. Our new sector-led business units will carry the scale, specialization, and accountability for performance, operational assurance, and frontline risk management needed to support this. Senior management faces a greater degree of accountability, particularly regarding job selection and tendering and delivering the tendered margins. I've displayed here a timeline summarizing what I've just described, especially concerning our transformation targets and the margin improvement that we have mapped to an FY 2023, 2024, and into 2025 timeline.

Peter Tompkins

executive
#20

This timeline will be our way of keeping shareholders informed about how things are progressing, and the next major opportunity to update you will be our Investor Day in April. Some really positive news: one of the notable recent announcements was that Downer was selected as preferred applicant for the Queensland Train Manufacturing Program. Pardon me. Once the Queensland project is awarded, Downer will operate the biggest passenger train fleets along Australia's eastern seaboard, having delivered 119 Waratah trains in New South Wales so far, and with completion of 70 High Capacity Metro Trains in Melbourne now past the halfway mark. Through the new Queensland contract, Downer will design, manufacture, and commission 65 passenger trains and simulators together with our key subcontractor, Hyundai Rotem. We will design, build, and commission the train manufacturing facility on the Fraser Coast as well as a maintenance facility on the Gold Coast, and we will provide through-life support and maintenance for the new fleet for an initial term of 15 years, with a potential term of up to 35 years. Our proven experience collaborating with international rolling stock suppliers, along with our industry-leading engineering and maintenance practices, will be brought to bear in delivering this new contract and, importantly, in supporting local manufacturing capability in Queensland.

Peter Tompkins

executive
#21

At the bottom of this slide is a graph we've included that shows the indicative revenue and delivery profiles for the project scopes. As you can see, over the next few years, we will be mobilizing the delivery. Excuse me. The delivery of the manufacturing and maintenance facilities will be mobilized, and those facilities will be completing at the same time as we ramp up to full production of the fleet. Manufacturing of the new fleet will be completed ahead of the 2032 Olympic and Paralympic Games. Together with my new leadership team, we are clear on our immediate priorities and are demonstrating progress against the key focused areas just outlined. The next 12 months for Downer will be defining, and I am confident that it will be a period of positive change. As mentioned in the outlook statement, we expect to incur a material level of restructuring costs in the second half, which we will update the market on at Investor Day. The three points I want to leave you with here today are that the board and the management team are aligned on the need for change, and I have a strong mandate. The restructure announced last week is a critical part of how we will simplify our business and create value.

Peter Tompkins

executive
#22

And lastly, we're tackling the challenges just described with vigour and sharp attention. Also, since today marks Grant's final day, I want to express appreciation for the 12 years he has spent at the helm of Downer. You have guided the company through several difficult stretches, and you played a key part in assembling the impressive collection of businesses that exists now. Grant, all of us appreciate the stable leadership and the vision you have given Downer. At this point I'll open the line so you can ask questions of Grant, Michael, or me.

Operator

operator
#23

Thank you. Should you want to pose a question, kindly press star one on your phone and hold until your name is called. To withdraw your request, simply press star two. In case you're using a speakerphone, please lift the handset before asking your question. Our first question is from Andrew Scott of Credit Suisse. Please proceed.

Andrew Scott

analyst
#24

Good morning, gentlemen, and thank you for taking my questions. My first question concerns the resolution regarding the accounting irregularities. I just want to get a bit more clarity on something. When it was explained to us on December 8th, essentially it was characterized as revenue being recognized before the work was finished and costs not being matched to it. If that contract is in a relatively steady state, it doesn't make sense to me that so much profit would be overstated in the later years. Could you help me understand precisely how that mismatch occurred and why it kept increasing in the later years, given that the contract is a steady-state contract?

Peter Tompkins

executive
#25

Yes. Thank you, Andrew. Let me note upfront that there's only so much detail we're able to share on this. Regarding your question, I'd push back on the idea that the contract has been in a steady state — I don't believe that's actually true. The volumes, across various areas and mix, have been fairly volatile, especially when it comes to how much storm work and similar activities we've been doing. The contract truly has not been at a steady state.

Andrew Scott

analyst
#26

Thanks. Just to build on what was just said — when you mention that the contract management team was replaced, my assumption is that those people are no longer with the company as well. And would I be right in thinking that your comment about not being able to go into certain details points to additional steps still to come?

Peter Tompkins

executive
#27

No, no. No. This one. No. Right — the management team has departed, and a fresh one has taken over. As stated in the release, an action plan is now far along. We have renegotiated the contract with our customer, and at this moment we are squarely in the midst of enhancing productivity on the Downer side. All of that is underway right now. Everything is happening right now, Andrew.

Andrew Scott

analyst
#28

Thanks. If I could, just one more question — it's about that mention of sustaining, or minor capital works, for government customers. Is that one particular region? I suppose one of the things about this business that you discuss is that government gives you dependable revenue. The fact that there's some slowdown in some of that capital works is a little concerning. Is it one particular geography, one particular government, or does it span broadly across the business?

Peter Tompkins

executive
#29

No, it's all together, and it concerns how the budget is being spent.

Andrew Scott

analyst
#30

All right, thanks.

Operator

operator
#31

Thanks. We'll take our next question from Scott Ryall at Rimor Equity Research. Go right ahead.

Scott Ryall

analyst
#32

Hi there, and thanks a lot. My first question is for Michael, I think. I'd like you to walk us through something — I've raised this before, but the revisions to guidance since December 8th, along with the contractual problems we ran into during the first half, make me wonder... well, they really raise doubts for me about how frequently you receive financial data from each business unit, and about how good that data is. And then, a question for you and Peter: does any spending need to go toward raising the quality of the financial data you receive every month?

Michael Ferguson

executive
#33

The problem, as I see it, isn't with how good the financial data is. What's happened is that circumstances shifted between those dates, and that's what drove the change in the forecast. If you look at what's changed from December 8th through today — the effect of the second half OM&A contract — I believe we flagged when we issued guidance in December that this wasn't baked in and that we still had planning work to do on it. The problems we've identified with the water projects came up only very recently, and so did the government spend matter. The problem isn't—

Scott Ryall

analyst
#34

Alright.

Michael Ferguson

executive
#35

When it comes to how good the data is.

Scott Ryall

analyst
#36

Could you remind me of that?

Michael Ferguson

executive
#37

What we're dealing with here comes down purely to shifts in the surroundings where our business runs.

Scott Ryall

analyst
#38

All right. Just to refresh my memory, what’s the length of time needed for you to receive the monthly data, and what kind of data comes to you every month, if you don’t mind?

Michael Ferguson

executive
#39

Absolutely. We receive granular data throughout the organization. Yes, flash reporting reaches us on working day four, after which we move through the wider reporting, and then typically a reforecast happens roughly 3 or 4 weeks following month end.

Scott Ryall

analyst
#40

Okay, so what details show up at that point, if you don't mind?

Michael Ferguson

executive
#41

It's purely financial projection data along with earnings and details on projects, and it's quite thorough.

Scott Ryall

analyst
#42

All right.

Michael Ferguson

executive
#43

This isn't about how accurately the business can forecast. What's been the problem is new issues that came up concerning the utilities contract, and then problems in the environment that we've identified and quantified.

Scott Ryall

analyst
#44

Yeah. All right. There has been plenty of that, I suppose. Peter, one final top-down question. The reorganization—collapsing the Australian and New Zealand structures, as you described—looks quite sensible to me. Could you explain why, in your opinion, that was never done before?

Grant Fenn

executive
#45

Grant here — I can probably handle that part, and then Pete can wrap it up. This is something that has always sat in the background as a possible cost-reduction opportunity. We haven't pursued it while we've been growing the business there, and the reason is that historically we've had some concern about how we'd ensure the New Zealandness of the business is preserved. Our New Zealand business has grown and performed very, very well in recent times, to the point where we're market leaders in almost everything we do there. We believe now is the moment to make this change without carrying the risk that we... certainly the scale of risk we previously saw. It's not that we won't care about making sure the New Zealandness — the sense of the New Zealandness of our business in the eyes of the New Zealand government — isn't something we won't be thinking about. Of course we will be, and we'll make sure, as we make this change, that that aspect of our revenue generation is maintained.

Grant Fenn

executive
#46

We’ll be putting in considerable effort to ensure those relationships and so on are preserved, along with how our New Zealand customers see decision-making. Peter, perhaps you’d like to pick up from there.

Peter Tompkins

executive
#47

Yeah, Scott, I’m with you on that. It makes sense, and I share Grant’s view that we need to go about this in a way that guarantees, you know, the business has one clear focus, while also making sure we’ve got the scale and representation across every geography. You know, right now I feel confident that we have the team and the capability to pull that off.

Scott Ryall

analyst
#48

Alright, thank you. That's everything from me for now.

Operator

operator
#49

Thanks. Our following question comes from Rohan Sundram at MST Financial. You have the floor.

Rohan Sundram

analyst
#50

Thanks. Morning, team. I have a couple of questions. Maybe I'll begin with the guidance. The implied impact for the second half is AUD 100 million to AUD 120 million. How much of that comes from seasonality as opposed to a genuine improvement in the outlook? Would you consider that representative at all as a base for growth? I'm just trying to get a sense of the level of normalization we might see here.

Grant Fenn

executive
#51

Right. Look, there are elements of both in there. To be honest, I don't think we can really sit down and walk through it precisely, line by line, saying how much of each is present. Okay? These are detailed forecasts that came up from the business unit, and both of those elements will be in there.

Rohan Sundram

analyst
#52

Alright. Regarding the asset sales, thanks for the remarks, Peter. What's the reasoning behind the choice to divest Repurpose It?

Michael Ferguson

executive
#53

So, it’s really quite a.

Grant Fenn

executive
#54

There are additional owners.

Michael Ferguson

executive
#55

That's a valuable business. We hold a stake in it, and, well, we feel this is a really good moment and chance to move ahead with it.

Grant Fenn

executive
#56

Right, so we aren't the sole owner in that situation, correct? A few individuals hold stakes as well. You know, those issues are also things we need to handle here. It's a really solid asset that, you know, we expect will draw quite a lot of competition in the market.

Rohan Sundram

analyst
#57

All right, thank you everyone.

Operator

operator
#58

Thanks. Our following question comes from Anthony Longo at JPMorgan. Go right ahead.

Anthony Longo

analyst
#59

Well, good morning to all of you. To pick up where Scott left off a moment ago regarding the restructuring and the question of why it hadn't happened sooner — I suppose I'd just like to grasp what will make this instance different. I mean, this company appears to have been restructuring perpetually. Peter, given your historical position, you noted that you bring risk management experience. So what assurance can you offer investors that we will genuinely witness execution on this occasion?

Peter Tompkins

executive
#60

Look, I think what you're getting at is how the business has evolved in terms of the way it's been organized previously. You know, there were very good reasons for that. What we're discussing now is a transformation program, you know, that's heavily centered on building highly scalable sector-led businesses, and that's tied to, you know, a transformation program. I mentioned earlier, you know, the target regarding the 4.5 EBITA margin. What you're seeing here is the mobilization of a very, very clear and well-defined project that the leadership team is backing and that we've, you know, also kicked off with the support of some external help.

Anthony Longo

analyst
#61

All right, thanks — I appreciate that. Second, regarding the transport business divestiture: my understanding is that it was announced at 8:00 after market earlier this week. From a first look, that multiple appears fairly light compared with what we believed might be attainable. Could you give us some additional context on the proceeds from that transaction, and then, ultimately, how those proceeds will be used?

Michael Ferguson

executive
#62

Yeah, this is Michael. I mean, I’ve got a couple of points about the multiple. We felt pretty good about that multiple. You know, that business, for Downer, does roughly AUD 1 billion — a bit over AUD 1 billion in revenue — at a 2%-3% margin. Compared with comps, we thought the… it was actually a very good price, so.

Anthony Longo

analyst
#63

Okay, that's reasonable. And lastly, on the guidance front—this is close to what Scott asked—how much confidence do you have now in offering visibility on the guidance range, given that you put it out in December and, of course, circumstances shift, but isn't it somewhat concerning that, with just a month to go, you're looking at an 18% cut at the midpoint within a single month?

Grant Fenn

executive
#64

The details have been emphasized, you know, so that reflects how we see things at this point. We provided the reconciliation over there, so it's clear to you what has taken place.

Anthony Longo

analyst
#65

Yes. All right. I suppose we'll hand it back to the Operator. Many thanks.

Operator

operator
#66

Thanks. Our following question comes from John Purtell of Macquarie. The line is yours.

John Purtell

analyst
#67

Morning, Grant, Peter, and Michael. I have a few questions, please. Michael, perhaps to begin with gearing, which has clearly risen to 2.3x. How do you expect that to profile through the second half? Clearly, the transport project sale is there, but you also have the material restructuring costs. Will there be more of a cash effect from those in 2024, or will that also fall in 2023?

Michael Ferguson

executive
#68

Yes, John, we're still sorting out exactly how large the cash impact from restructuring costs will be in 2023. My sense is it won't be material to gearing. As for that spike, the rise in net debt clearly came from cash performance, but the LTM EBITDA decline contributed almost an equal amount. I think that as cash conversion gets back to normal and earnings performance improves, we'd expect it to come down. And of course, if we close transport projects before 30 June, that should have a fairly positive effect on it too.

John Purtell

analyst
#69

Thanks. On that second item, you mentioned some additional problems — a water project in New South Wales, I believe, plus a wind farm in New Zealand. Could you give a bit more detail on what those issues involve? I appreciate they're likely partly tied to weather, but is there a way to shield yourselves better through contracts against that kind of thing going forward?

Grant Fenn

executive
#70

Okay, let me just address the water project. That began a while back and has been repeatedly hit by flooding at several sites. Until quite recently, we obviously held the view that the revenue from it would ultimately cover the costs. The most recent forecast cost to completion—including our detailed assessment of prolongation costs and what we'd call a conservative view of what we can recover from the customer on claims—that's the position we've taken. I think if we'd been looking at a dry stretch, we wouldn't be facing this loss, John. It's as straightforward as that. It's been absolutely hammered. While we believed we could work our way through it, as we've put together this final forecast cost to complete, that's the answer that has emerged. That's where we stand.

John Purtell

analyst
#71

All right. My last question concerns the review that has been carried out, both internally and externally — I’m simply trying to gauge how extensive it has been. You have clearly examined revenue recognition, especially in the area where a material weakness existed. But has there also been a wider review beyond that, I mean of revenue recognition more broadly? So yes, that is the final question there. Grant, I want to echo the earlier remarks and wish you all the best going forward.

Grant Fenn

executive
#72

Thanks, and thanks, John, regarding that second point. On the earlier matter, let me assure you first of all—I'd direct you to the ASX release, and I really do need to stay largely with what's in that document and not stray too far past it. As you can imagine, we do discuss certain conclusions we reached in that ASX release, John, and those speak directly to the issues you raised. You can well appreciate that our position is that those matters have been handled adequately.

John Purtell

analyst
#73

I appreciate it.

Operator

operator
#74

Thanks. Our following question is from Reinhardt van der Walt of Bank of America. You have the floor.

Reinhardt van der Walt

analyst
#75

Morning, everyone, and thanks for taking my questions. I just wanted to ask about the fixed-price, lump-sum exposure in the current backlog. I saw that this presentation doesn't include that disclosure. Could you perhaps offer some commentary on where the recovery risk stands right now?

Grant Fenn

executive
#76

Honestly, I don’t think it was ever really made clear to me that we had removed it. Maybe we can follow up with you on that. In the ordinary course, this isn’t a business that builds in a hard dollar amount. Even under the utilities contract we’ve discussed here, risk is shared.

Reinhardt van der Walt

analyst
#77

All right.

Grant Fenn

executive
#78

That's fine.

Reinhardt van der Walt

analyst
#79

Thank you. Turning to those 4.5% medium-term margin goals, it seems the AUD 100 million in savings from consolidating corporate functions ought to deliver roughly 70 to 80 basis points of that improvement. As for the other 40 to 50-odd basis points that remain, how much of that gain do you expect to come simply from weather returning to normal, and how much would really represent genuine performance improvement within the business?

Grant Fenn

executive
#80

Yeah, well, we've had quite a lot on our plate here, but — sorry, El — well, I'll pass it over to you, though you'll have to handle it.

Peter Tompkins

executive
#81

Look, I think if you just take where we are right now, you know, those EBITDA margins are historically abnormal. What we're pointing out here is that, based on everything we know, we're building buffers and resilience into the organization, and that comes partly from the AUD 100 million of benefits, but also through optimization and simply making sure we're focusing on the things that drive performance. That's a really important factor. I think the other point I'd leave you with is that, you know, as conditions improve, we've been very intentional here to say that 4.5% is not the ceiling. That's where we wanna be sometime in FY 2025.

Reinhardt van der Walt

analyst
#82

All right, thanks.

Operator

operator
#83

Thanks. Our following question comes from Scott Ryall at Rimor Equity Research. You have the floor.

Scott Ryall

analyst
#84

Hi, Peter. I want to follow up on something you addressed earlier — you mentioned bringing in outside support for the restructure. My assumption is that this is a management consultant. Can you share who that is? And how will you set up that relationship so success isn't measured merely by completing the project and then departing with a pretty large fee, which tends to be the norm? I'd like it arranged instead so the business keeps sustainable gains going forward when it comes to profit, profitability targets, and similar goals you've established, please.

Peter Tompkins

executive
#85

Yeah. Scott, you've clearly been eavesdropping on what we talk about around our boardroom table, since those are exactly the topics we've been hashing out among ourselves. On the first one: yes, we've engaged one of the very top-tier external consultants. A key point I raised during my presentation is that we've also stood up our own project team. Beyond that, I've named a chief transformation officer whose job is to make sure that, you know, while our external advisers give us that sophisticated perspective on how to set these programs up, it won't be long before we take over running that program and, you know, we own responsibility for hitting the targets, you know, well into 2024 and 2025.

Scott Ryall

analyst
#86

Alright, apologies — internally, who leads transformation?

Peter Tompkins

executive
#87

Yeah, we’re genuinely glad—sorry about that—that we could name Chris Pemberton to that position. He’s now part of the new leadership group I’ve put together, and he came on board a couple of weeks ago.

Scott Ryall

analyst
#88

Alright, thank you. That covers everything I wanted to say.

Operator

operator
#89

Thanks. We’ll take the next question from Nathan Reilly at UBS. You have the floor.

Nathan Reilly

analyst
#90

Hi Peter. I’ve got a question about the Queensland Rail contract. My assumption is that it’s a fixed-price arrangement, with Downer acting as head contractor. Could you update us on the way you’re handling risk management on that contract—especially since you’re working alongside the new rolling stock manufacturer there? Thanks.

Peter Tompkins

executive
#91

Yeah. Thanks, Nathan. Look, that's a fair question. In that deal, we're the lead proponent, and we're putting in place a commercial model that closely mirrors the one used for our HCMT and our Sydney project, in which we delegate delivery responsibility to our main delivery partners. Yeah, that approach has been a major area of emphasis for us.

Grant Fenn

executive
#92

That applies equally to the train production side and to the facilities as well.

John Purtell

analyst
#93

All right. Is there any risk of hold-ups when it comes to supplying those sets…

Peter Tompkins

executive
#94

Absolutely.

Nathan Reilly

analyst
#95

What you're describing is that it gets pushed back onto the manufacturer.

Peter Tompkins

executive
#96

Exactly. The way I'd put it is that we're taking a consecutive, you know, kind of method toward, you know, making sure we have the strongest, the most, the most solid commercial arrangements in place with our downstream delivery partners.

Grant Fenn

executive
#97

Yeah, Nathan — and look, obviously you and everyone listening on this call realize this isn't the first one of these. Since Waratah, we've completed quite a few of them by now. We figure we have a pretty close handle on exactly what has to happen, especially on our customer's side, to make sure this one works.

Nathan Reilly

analyst
#98

All right, I appreciate you taking my question.

Operator

operator
#99

Thank you. That brings us to the end of the question-and-answer session — we have no more questions right now. At this point I'll return the floor to Peter Tompkins, who will offer some closing comments.

Peter Tompkins

executive
#100

Yeah. Look, I want to express my appreciation to all of you for being on the call today, and I’m eager to keep everyone informed as we move through the rest of the financial year. Thank you so much, everyone.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Downer EDI Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Downer EDI Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Downer EDI Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.