Drax Group plc (DRX) Earnings Call Transcript & Summary

February 29, 2024

London Stock Exchange GB Utilities Independent Power and Renewable Electricity Producers earnings 82 min

Earnings Call Speaker Segments

Will Gardiner

executive
#1

Thank you, and good morning, everyone. Welcome to the presentation of our 2023 Full Year Results. I'll begin on Page 3. You're all acquainted with the purpose and ambition of our company. I want to open with those, as we invariably do, because they fundamentally steer everything we do. Our business model aligns shareholder returns with positive outcomes for nature, the climate and people. So today we're taking a somewhat different approach in this presentation. As usual, we will go through our performance and our strategy. But beyond that, today we'll devote a little more time to reminding you of the fundamental strengths of our business, the critical role it plays in the UK power system and our capacity to generate long-term returns for shareholders. I will also emphasise our commitment to operating our business safely, sustainably and compliantly. Moving to Page 4. We delivered a strong financial performance in 2023, with a strengthened balance sheet, additional returns to shareholders and the continued development of our strategy. We're delivering for multiple stakeholders. We provided 8% of the UK's renewable power, and we play a key role in supporting the UK power system, and we expect that to remain true for a long time.

Will Gardiner

executive
#2

Today we run a solid operation, with cash flows over the long term that support the balance sheet and the dividend, plus growth opportunities that fit with net zero. I’d like to take a moment to describe what the business looks like now. In the UK, we hold a key FlexGen operation that sits at the heart of the British power system, and it is going to matter more as the country moves toward a power system with more renewables. The first piece of that operation is our non-biomass FlexGen and energy supply portfolio: Drax Energy Solutions, Cruachan, our hydro business, and eventually our OCGTs. We are aiming for recurring EBITDA above £27 million each year after 2027, with only limited commodity exposure and upside from volatility and higher power prices. The second piece of the business is pellet production. Although 2023 proved a difficult year, we remain bullish over the long term about the opportunities in that market, and for that part of the business we are also targeting more than £250 million of EBITDA each year after 2027. Taken together, that adds up to over £500 million in recurring earnings and cash flows from non-biomass generation after 2027. And naturally, on top of that, we have biomass power generation at Drax Power Station, which we expect to produce substantial cash flows from contracted positions across the coming three years and then to stay critical to the UK system for many years after that, with the bridging mechanism in place and in the end with BECCS.

Will Gardiner

executive
#3

All of this gives us a solid base for the balance sheet and for growing the dividend, both right now and over the longer term. And thanks to that strength, we anticipate paying off or refinancing the debt that comes due in 2025 at some point during 2024. At the heart of our strategy sit flexible generation, biomass and BECCS. By 2030 we see chances to put more than £4 billion to work, and to go further after that. Our ambition is still to reach over 20 million tons of carbon removals worldwide. And we keep aiming for BECCS to be operating in the UK and the U.S. by 2030. I should note that this represents a change to the timing of our investment program compared with what we laid out at last year’s Capital Markets Day. So if we go to Page 5, let me take you through this business, which describes where we stand today. First comes flexible generation and energy supply. Cruachan hydro, ultimately our open cycles, and our energy supply business are all independent of biomass and are central to helping run the UK power system as renewables expand. I’d like to highlight our energy solutions business, which is built on Drax Energy Solutions, a top renewable supply company serving large industrial and commercial customers, and which also takes in our renewables and commodities business — picked up when we bought Opus Energy in 2016 — along with our expanding electrical vehicle charging business.

Will Gardiner

executive
#4

And once more, for the period after 2027, we're aiming at recurring EBITDA above £250 million generated by that segment. That segment has started to carry limited commodity exposure, along with upside tied to volatility and to higher power prices. Our pellet production, then, forms the second part of the business. Capacity exceeds 5 million tons, we run operations across four major ports, and today we hold third party contracts totaling more than 17 million tons. Through this business we gain exposure to expanding opportunities in sustainable aviation fuels, or SAF, and also in BECCS, and within both of those segments we anticipate substantial demand for sustainable wood pellets. That also — this business also plays an essential role in our integrated supply chain, whose value has been demonstrated repeatedly across the last several years amid market volatility. Biomass generation, or the Drax Power Station, makes up the third part of our business. Once again, it benefits from robust forward power hedges that underpin steady cash flows, and we anticipate further value from power generation that is currently unhedged across 2024 to 2026. And past that, meaningful long-term value once the bridging mechanism is secured and BECCS is subsequently in place.

Will Gardiner

executive
#5

And so, when you put that together with our FlexGen business, that gives us 4 gigawatts of flexible generation. We're the biggest provider in the UK of flexible generation and 24/7 renewables, and we generate more than 20% of the UK's renewable dispatchable power. And once more, we have £4 billion of investment options, which I'll cover in more detail shortly. And underpinning all of this is a strong balance sheet — one that is strengthening, as Andy will explain — along with a dividend that has grown at 11% over the last seven years. So what are the characteristics of our flexible generation business? I'm now on Page 6. So if you look at the map on the left, it's a geographically spread collection of flexible generation assets, with pump storage and hydro in Scotland and, ultimately, the open cycles across the middle of the country. As you can see in the chart on the top right, today we're delivering more than £300 million — I should say, in 2023, we delivered more than £300 million of EBITDA, and Andy will walk you through the details of that. And actually, almost — if you include the backcasting that we have done, what we expect the open cycles would have done if they had been operating in 2023, the number is almost £400 million.

Will Gardiner

executive
#6

So 2023 turned out to be an especially robust year for us. We gained from selling peak and off-peak spreads forward in the pumped storage operation, and we don't anticipate that repeating annually. Still, the way earnings have evolved — which you can see in the chart at the upper right — shows system needs that keep growing, tied to system support services, something we've discussed extensively before. We see that continuing as a key characteristic of this business both near term and long term. Also, when you examine earnings across the past three years and factor in the backcasting of the open cycles, the FlexGen business would have produced more than £800 million of EBITDA during that three-year span. It has climbed sharply alongside power prices, and we anticipate that normalizing toward our target of greater than £250 million each year. Now let's turn to the lower right-hand portion of that chart — the key takeaway we want to leave you with is that we create value essentially through system support, which accounts for roughly 60% of that pie, the darker blue section in the bottom right.

Will Gardiner

executive
#7

And then just 15% — the light blue slice in the upper right — comes in via power prices. So at the core, we're not exposed to commodity prices. That makes us a distinctive participant in the system, and vital for UK energy security, and all of that once more sits outside biomass and the related subsidy regime. Turning to Page 7, I wanted to walk you guys through a bit of the history of what we hold in pumped storage and hydro, and how appealing that investment has been for us. We put in roughly £700 million when we acquired this business from Scottish Power. Across the last five years, it has produced effectively, or more than, £700 million of adjusted EBITDA. That investment has paid back within five years, and we expect it to generate very substantial returns going forward. On the upper right-hand side of that page, Cruachan II made real progress — or rather, the plants for Cruachan II made real progress — in 2023. We've secured our planning consent in Scotland, and we still expect FID in 2026 and operations to begin in 2030. That essentially would give us a further 600 million megawatts — sorry, 600 megawatts of additional capacity, backed by a £600 million investment.

Will Gardiner

executive
#8

And lastly, in the lower right, there's some more recent news. We have a new project, actually, to upgrade two of the units at Cruachan — units 3 and 4 of Cruachan I, which is what's operating today. That refurbishment project involves roughly an £80 million investment. It will raise the capacity of Cruachan as it stands today by approximately 40 megawatts. So that's two 20 megawatt expansions across two of the existing units. They'll enhance reliability and operability, and we expect it to be delivered over the next three years — that is, between now and 2027. That investment is backed by a 15-year capacity market contract, which was received a couple of days ago, and it gives us around £221 million of contracted revenues across that 15-year period. And we expect this to be a fairly attractive investment, with the potential to deliver post-tax returns greater than 20%. Turning to Page 8, let me say a bit more about our pellet production business and how we get to that £250 million of expected EBITDA. So, once we finish the expansion of Aliceville, which is commissioning now, along with the new plant we're building at Longview in Washington State, we'll have capacity greater than five million tons, and we expect to be able to deliver five million tons of production from those assets.

Will Gardiner

executive
#9

Over the longer term, our goal is 8 million tons, though we will only pursue that once we can see clearly how the bridging mechanism and BECCS in the UK will work, along with new third-party long-term contracts. After that, we are aiming for 4 million tons of long-term supply. I will go into this a little further, but we are finding solid opportunities in the markets where we already operate and some very compelling new ones in biofuels, sustainable aviation fuels, and BECCS. As is the case today, this sits at the heart of our business in 2 ways. It delivers meaningful support and considerable optionality across our vertically integrated supply chain. We anticipate that will remain the case with BECCS and the UK bridging mechanism, and it also gives us exposure to a global biomass market that we view as highly attractive and growing. To illustrate where that market is heading: the first point I would make is that we have begun supplying a new 500,000 ton deal into Japan. As Andy will cover in greater detail, the pricing on that contract aligns with the pricing we believe will let us hit that £250 million EBITDA figure.

Will Gardiner

executive
#10

The second item I want to highlight is that we have signed a letter of intent covering the sale of as much as one million tons of biomass to a major European utility, spanning several projects, among them biofuels and sustainable aviation fuels. And once more, on that front — having announced this letter of intent, we are holding active discussions regarding additional biofuels and SAF products, in both the U.S. and Europe. Active talks are likewise underway with respect to supplying BECCS projects, in the U.S. as well as Europe. So we're quite excited about the expanding pipeline we have for third-party sales in the wood pallet space. Once again, our long-term target in this business is more than £250 million of EBITDA, achieved through a mix of higher production volumes, better margins on legacy third-party contracts, and new sales at appealing market prices in those emerging markets for SAF and BECCS. Andy will walk you through further detail on some of the figures in this section. Turning to Page 9, I'd like to take you through a bit of what we foresee in our biomass generation business, effectively across the coming few years. So we hold strong contracted revenues exceeding £2.8 billion over the next three years, plus a further £1.2 billion of associated renewable support.

Will Gardiner

executive
#11

For 2024 we have complete hedging in place, and for 2025 we’re nearly there as well. Beyond the £2.8 billion we referenced as we deploy our head, we’d anticipate creating considerably greater value from generation that will be hedged from now through 2026. We have every confidence that DPS matters enormously to UK security and supply, and let me expand on that point a little. It stands as the country’s biggest renewables source and is flexible too. With 2.6 gigawatts of capacity, that makes it roughly 80% of the size of Hinkley Point C, which, as everyone is aware, is now set to come online in 2030 rather than 2027 — or at least that is the present plan. As electrification of the economy advances and power demand grows, the U.S. — apologies, the UK requires additional power, additional renewables, more adaptable energy systems and more methods for taking carbon out of the atmosphere. And Drax Power station, equipped with BECCS, is able to assist the government in hitting its ambitious greenhouse gas removal targets. All of these elements support our expectation of long-term value stemming from a bridging mechanism and from BECCS too. Turning to Page 10, the last page of this opening section. We see highly appealing growth opportunities, as I noted, that once again align with the world’s goal of reaching net zero.

Will Gardiner

executive
#12

Our goals haven't changed: we want to lead globally in BECCS, lead globally in sustainable pellets, and lead the UK in flexible dispatchable power. Over these past few months, we've reviewed our portfolio, how we think the timing will unfold, and the UK government's program. I'd like to clarify how our timing and phasing look given that — given how we've assessed those factors and how they've shifted. So first, on BECCS, we still aim ultimately to do 20 million tons. We still expect one unit in the UK by 2030 and one unit in the U.S. by 2030. All of that, of course, depends on the right government support being in place and/or PPAs for power and carbon, which is the primary support mechanism for the U.S. business. On flexible generation, the open cycles are coming online this year. We have the Cruachan I and II expansion by 2027, and we have Cruachan II by 2030. And again, a major step forward last year was the government's announcement of the cap and floor minded-to position on that.

Will Gardiner

executive
#13

So once more, the opportunities for investment there have us really enthusiastic. And last of all, in pellets, our aim is to reach 8 million tons once we have clarity regarding the future on the bridge with BECCS and regarding future long-term supply on <<inaudible>>. So having said that, I'll hand things over to Andy for the financial and operational review.

Andy Skelton

executive
#14

Thank you, Will. Good morning, everyone. So, beginning with the financial summary on Slide 12, we've achieved strong financial results, with a stronger balance sheet and more returns to shareholders. Our adjusted EBITDA, excluding EGL, came in at just over £1.2 billion, which is up 66% compared with the prior period. Including EGL of £205 million, adjusted EBITDA rose 38% to just over £1 billion. And of that £1 billion, close to 40% came from our FlexGen and energy supply portfolio and pellet production. We produced £1.1 billion of cash from operations during the period. That figure includes a collateral inflow of £155 million. And in 2022, we delivered £320 million, though that was after a collateral outflow of £400 million. So excluding collateral movements, our cash conversion rate has been 95% to 99% across those two years. So very strong cash conversion — these future earnings and our cash flows give us a solid foundation for maintaining our credit rating, investing in our core business and strategy, and delivering growing and sustainable returns to our shareholders. The board has proposed a final dividend of £0.139 per share, which brings the full year dividend to £0.231. That's a 10% increase year on year. Our leverage has fallen further to 1.1x on the basis of adjusted EBITDA, including the EGL, and refinancing activities are progressing well.

Andy Skelton

executive
#15

We anticipate paying off the debt that comes due in 2025 by generating cash and through refinancing during 2024. Now, turning to Slide 13, which covers the high-quality asset base. I'll devote the bulk of my time here to walking through how strongly we performed financially in 2023 and to emphasizing the durability of upcoming earnings and cash flows stemming from the high-quality assets we already hold. The total column over on the right, though, presents a breakdown of 2023 performance that lines up with earlier periods, and every standard year-on-year bridge appears in the appendices. Beginning with the first column, FlexGen and Energy Solutions: our pumped storage and hydro operations kept performing strongly, producing yet another year of growth, with adjusted EBITDA of £230 million, up 35% from £171 million the year before. What mainly drove that substantial rise was a high level of activity at Cruachan, which provided system support services along with greater volumes of power generation. Because of where Cruachan sits, its flexibility, and the range of services it is able to offer, it holds strategic importance for the UK power system. Data on National grid system support services reveals considerable growth in what system support services are worth across recent years, and we expect that trend to persist.

Andy Skelton

executive
#16

This week, we secured a capacity market agreement lasting 15 years for a refurbishment of Cruachan Units III and IV, and that deal will lift those units' capacity to 240 megawatts. We're expecting CapEx of roughly £80 million plus capacity market income exceeding £220 million, which underpins strong double-digit returns. Then next, profitability at our customers' business rose considerably, with adjusted EBITDA of £72 million compared with £26 million a year earlier. That came from a strong showing in our I&C business, where the volume of power sold is up 7% to nearly 16 terawatt hours as we keep growing our high-quality I&C customer base. Supporting this earnings growth were higher power prices alongside consistent margins and reduced balancing costs, plus substantial earnings from our renewable PPA portfolio. The customers business buys REGOs from our generation business and earns a suitable margin in 2023, having gained from higher REGO income. We foresee additional growth opportunity in Energy Services. Also, in September we bought BMM Energy Solutions, which installs EV charge points. This acquisition bolsters our end-to-end EV charging offering, in line with our commitment to help customers meet their net-zero ambitions. The renewables PPA portfolio acquired alongside Opus is now run within our I&C business.

Andy Skelton

executive
#17

Also, over the course of the year, we moved £145 million of goodwill to reflect that shift. Strong future cash flows underpin it. As we said before, we halted new gas supply sales in Opus, with supply volumes down substantially year on year through an offboarding process that was carefully managed. So after the PPA portfolio transfer and the gas supply exit, we booked a £69 million noncash impairment in Opus, and that appears as an exceptional charge. Altogether, in 2023, our existing FlexGen assets produced £302 million of adjusted EBITDA. More than 80% of that earnings figure is tied to capacity market payments, system support, renewables and energy services. What that means is under 20% was contributed by power. Work on our three new build OCGTs is ongoing, and these assets are able to play a meaningful system support role, delivering combined capacity of roughly 900 megawatts, and we'll earn £275 million from a 15-year capacity market agreement that started in quarter four of this year. On top of that, our earnings come from peak power generation and system support services. We keep evaluating options for these assets, including a possible sale. Even so, an exercise that backcast the OCGTs' value across the last three years indicates they would have added, on average, adjusted EBITDA of more than £70 million annually.

Andy Skelton

executive
#18

So, if you factor in the average three-year backcast earnings for the OCGTs, illustrative earnings for 2023 rose to more than £372 million — and they go up even further when you add the expected income from the Cruachan III and IV refurbishment project. Our target for post-2027 recurring adjusted EBITDA from FlexGen and energy supply is above £250 million. On Slide 27 in the appendices, you'll find details of capacity market payments already secured for this portfolio through the period to 2042, and those come to roughly £600 million. That figure rises to £850 million on an illustrative £35 per kilowatt clearing price for future auctions over that period. These values are in 2023 money and are subject to indexation with UK CPI. So, turning to the second column on pellet production: 2023 was a tough year for our pellets business. The year before, we delivered £134 million of EBITDA from 3.9 million tons of production, which works out at about £35 of EBITDA margin per ton. In 2023, that fell to £89 million of EBITDA from 3.8 million tons, or just under £25 of EBITDA margin per ton. We went into the year expecting production to increase, thanks to the full-year impact of plants that were commissioning during 2022.

Andy Skelton

executive
#19

But volume got hit during the year by downtime that ran above what we'd planned, plus wildfires and port strikes in Canada and hurricane damage at the Port of Baton Rouge. That meant extra costs for us, mainly higher repairs and maintenance, and fixed cost per ton went up as well. On top of that, 2023 brought a larger share of shipments tied to lower value legacy contracts. The bulk of those deals were inked back when market prices sat lower, and although price escalations do apply, cost inflation has squeezed margins. As renewal time arrives for these contracts, we expect the EBITDA margin to expand. With better output from our existing plants and roughly 600,000 tons of new capacity coming from the Longview and Aliceville expansion projects, we think future production can get to around 5 million tons. Market forecasts point to significant demand growth as markets such as BECCS and SAF start to accelerate, and we believe the value of our pellets keeps rising. To sum up, we are targeting post 2027 recurring EBITDA of over £250 million per annum, based on around 5 million tons of production and an improved EBITDA margin per ton. Drax brings around 20 years of experience in biomass and a robust, diversified global supply chain, giving us a firm operational foundation for delivering these plans.

Andy Skelton

executive
#20

Next, looking at the third column, biomass generation: adjusted EBITDA increased 34% to £703 million, and that figure comes after EGL of £182 million. Biomass availability came in at 90%, up from 87% during the prior period, though it reflected two significant planned outages during the year compared with one in the prior year, and generation volumes declined to roughly 11.5 terawatt hours. For 2024 our RO units are fully hedged, and for 2025 they are almost fully hedged, with more than 20 terawatt hours locked in at attractive prices across those two years. We anticipate the CfD unit will operate at a high load factor over the coming years, subject to securing the biomass, and we also expect added longer-term value from the bridging mechanism and BECCS. Across these existing assets, we continue to foresee £2 billion of free cash flow in the period through 2031. We define free cash flow as adjusted EBITDA, less maintenance CapEx, including the balance of OCGT investments, interest tax EGL, and notably a growing and sustainable dividend throughout. So moving to Slide 14 and the balance sheet, we keep a strong focus on cash flow discipline and on maintaining a robust balance sheet. Our available cash and committed undrawn facilities at year-end of £639 million give us substantial headroom over our short-term liquidity requirements.

Andy Skelton

executive
#21

Back in January, we agreed to extend our £300 million revolving credit facility by one year, which gives us additional committed liquidity running through 2026. Nothing has been drawn on that facility since it was set up. During 2023, we established a liquidity facility to handle the working capital tied to power trading, and by year-end £120 million had been drawn. As we see more collateral unwinds over the course of the year, we expect to repay that amount in full during 2024. At year-end, net debt stood at £1.1 billion, a leverage ratio of 1.1 times calculated on adjusted EBITDA including EGL. That's down from 1.6 times in 2022. We're making solid headway on financing activities, and it reaffirms that appetite for Drax credit is strong. In November, we agreed with existing lenders to extend our CAD ESG-linked term loan, pushing it out from 2024 to 2026 while cutting the value to CAD200 million. In January, we repaid £144 million of the UK infrastructure term loans from surplus cash, ahead of maturity dates in 2024. In February, we closed a £258 million term loan on competitive terms with a group of six banks. One tranche totaling £165 million matures in 2027 and carries an option to extend by two years, and the second tranche totaling £93 million matures in 2029, and we'll use these funds to repay the 2025 bond maturities.

Andy Skelton

executive
#22

Fitch and SMP have both reaffirmed our corporate credit rating at BB+ with a stable outlook. In addition, DBRS gives us a BBB- stable investment grade corporate rating. The strength of the group's assets, earnings and cash flows gives us a solid foundation for carrying out our strategy. We've aimed for the greatest possible flexibility in the capital structure, and during this year every piece of the group's debt can be repaid at little or no cost. Turning to Slide 15 on capital investments, our expectation for CapEx in 2024 is a range of £410 million to £450 million. Maintenance CapEx for 2024 comes to £100 million, which is below the 2023 level and mainly reflects one major planned biomass outage rather than two as in 2023. And as mentioned earlier, several significant capital projects in pellets reached completion during 2023 following the unplanned downtime. Growth and enhancement CapEx should come in at about £290 million. We anticipate commissioning our three OCGT projects in the second half of the year, with CapEx for the year of roughly £90 million. Work on our Longview pellet plant carries on through 2024, with CapEx in the region of £150 million, and for the Cruachan 3 and 4 refurbishment project, we expect to spend approximately £30 million of CapEx this year.

Andy Skelton

executive
#23

Like Will said, engagement with the UK government regarding BECCS at Drax Power Station continues to be positive. We are taking care with any further investment while we wait for more clarity on that project. And finally, I should note that no costs are being capitalized yet for the possible investment in the Cruachan expansion, which recently received planning consent. So, turning to Slide 25 and capital allocation, the policy we launched in 2017 has not changed. Our strong financial performance and cash generation help us maintain credit ratings and pay a dividend that grows and is sustainable. It also puts us in a good position to invest in the core business and move our strategic plans forward. With £1.1 billion of cash generated from operations, we raised shareholder returns to £236 million in a year, including a £150 million buyback. Our policy is to pay a growing and sustainable dividend, and over the seven years since that policy began, dividend growth has averaged around 11%. The fourth leg of the policy is returning surplus capital to shareholders, and we weigh several factors here, including upcoming debt maturities, the quantum and timing of our capital deployment, any dilution of share capital for employee share incentives, and any inflows from divesting non-core assets.

Andy Skelton

executive
#24

That said, I’ll now turn things over to Will.

Will Gardiner

executive
#25

Thanks, Andy. I'd like to take a few minutes to discuss safety, compliance, and sustainability — areas that are fairly critical to our business, and we understand how important they are. We also understand the chances we have to keep building and enhancing our systems in those areas. First, turning to Page 18, let me address safety. Keeping our people safe is always vital. We measure our safety results using a leading indicator along with a lagging one. The leading indicator is the near investment and hazard identification rate, calculated mainly from how many environmental safety and process safety observations we record throughout all our operations and all our sites. Its aim is to foster the positive reporting culture we've tried to establish across the group. And when we look at our puppets, our scorecard, you'll see that our results there were strong in 2023. The lagging indicator is the total recordable incident rate, shown on the left side of the page. We did better in that area than in 2022, but it still falls short of where it needs to be.

Will Gardiner

executive
#26

Basically, we're emphasizing how important safety is and that every colleague needs to stay focused on it, and we aim to do better on that front in 2024. Moving to Page 19, here's a brief update on regulation and compliance. I'd like to say a few words about the National Audit Office's review of the government's biomass strategy. There are really just a couple of points. The first is that the review acknowledged and restated how vital biomass is to the government's future energy strategy. It also set out chances to enhance and build out assurance and standards, in line with what the UK government has said. And we'll keep working with the government, as we have been and as is appropriate, to support further improvements in those areas, which we back 100%. Second, on the right-hand side, a few thoughts about Ofgem. First, I just want to ensure everyone knows we get audited annually on biomass sustainability. The most recent audit took place in May of last year, and it evaluates how we comply with the renewables obligation scheme. In that audit, we were given a good rating, which is the top rating you can get.

Will Gardiner

executive
#27

And once more, I want to reassure you that this matters enormously to us, and we dedicate considerable time and effort to getting it right. As you're aware, the investigation by Ofgem into the biomass profiling data is ongoing, and we continue to cooperate closely with them. Again, two things to note: there's genuinely nothing new to report, but I do want to ensure everyone understands this concerns the profiling data we supply to the government alongside, not sustainability. A few words on sustainability and how we keep building our capabilities there. Sustainability is truly a key enabler for the group — both for what we do today and for our strategy going forward. Over the course of 2023, we have kept making progress and enhancing our reporting and disclosure. So we have met the TCFD reporting requirements. A TNFD pilot has been finished, and we've in fact received approval from SBTi for our own science-based targets. Our annual report and accounts contain far more detail on all of these points. And again, we recognise these activities are fundamentally critical to our success as a group. We also recognise there is always more work to do, and we keep at it.

Will Gardiner

executive
#28

Along those lines, in 2023 we collaborated with the environmentalist Jonathan Porritt and the organization Forum for the Future. We requested that they advise us regarding the conditions required for BECCS to be delivered successfully for all stakeholders, and in their report they laid out 30 conditions that they consider important. And we have reported back on the majority of these, with which we generally agree, and we will be reporting back on the remaining conditions over the course of the next few weeks. So recognizing the progress we have made with our reporting and disclosure, we have seen an improvement in our CDPR carbon disclosure project carbon rating from B2A. But again, we are still working on that and there’s always more to be done. The final section is a few words just to update where we are in our strategy. And I’ll start with what’s happening in the UK, the Drax Power Station on both bridging and on BECCS. Just to review some of the key things that happened during 2023 and what we expect to happen during 2024. So the first thing to highlight is that the government reiterated, I would say, or pulled together really for the first time, a comprehensive statement of its biomass strategy.

Will Gardiner

executive
#29

They carried that out in August. To me, it matters a great deal to acknowledge that the approach hasn’t shifted for quite a while. As long as I’ve been appealing—and well before then—biomass has remained at the heart of the UK’s strategy in a consistent way. Still, it was excellent to see all of it affirmed and restated together in a single document within the biomass strategy. After that, in December, they set out something like their stance on the BECCS business model—or rather the consultation on that model—along with a refresh regarding the CCS project’s sort of process, plus the track one extension and track two. Once more, solid headway on CCS. In January, approval came through for our BECCS project at Drax Power Station. We got our DCO, and again we’re very thrilled to have it. It also matters considerably to acknowledge that the Secretary of State employed extremely plain wording in that document when restating how vital BECCS is to the UK’s net zero goals, and likewise the significance of greenhouse gas removal—and all of that aligns entirely with our 2030 objective of having BECCS online at the Drax Power Station by that time.

Will Gardiner

executive
#30

As I believe everyone is aware, traditional reviews have been initiated regarding both the DCO and the biomass strategy. Those have come about as we anticipated, and we do not believe they will affect our project's critical path. One last thing, around 20 — what has occurred up to now is that the consultation concerning the bridging mechanism got underway earlier this year. It actually wraps up today. Once again, we are quite pleased with the pace at which that has happened. In my view, the government clearly appreciates how important it is to bring that process to a timely conclusion. We are engaged in very thorough bilateral talks, heavily data driven, on how that could operate for us. And once more, I would describe those discussions as progressing well. So what do we anticipate occurring in 2024? There are three things I would highlight. First, we would anticipate the bridging mechanism talks being finished and a bridging mechanism being settled with the government before the year is out. But obviously elections are coming, which could affect the timelines. So it would be foolish of me to make a promise. Still, we fully appreciate that in business, and the government is very focused on collaborating with us to reach a swift conclusion to that process.

Will Gardiner

executive
#31

The second item on our list is being selected in 2024 as either a Track 1 expansion or a Track 2 project, which lets us continue advancing into 2025. Specifics of our Power BECCS project get worked through in that year. To achieve that, we likewise anticipate the Power BECCS business model will achieve meaningful headway across 2024. My last point is that considerable activity will surround transport and storage infrastructure, on both the Track 1 expansion and Track 2, and we anticipate genuine strides in those areas this year. So, once more, looking back, being picked as a Track 1 project, like the Green Day, would have been great, and we weren't. But regarding the activity and the headway we've achieved on the new approach I've just described, we're extremely pleased with how that has gone and how it is going, and we look forward to incorporating many of those steps in 2024. Please turn to Page 23. There are just a couple of points I wanted to emphasize concerning the clear importance of the Drax Power Station. The chart on the left really underscores how vital the Drax Power Station is for UK energy security.

Will Gardiner

executive
#32

The pink shaded region represents expected peak demand according to National Grid’s Future Energy Scenario, so it is clearly anticipated to increase as the economy electrifies through the broader effort to address climate change. The blue bars indicate the expected amount of existing de-rated capacity minus expected retirements, and obviously significant reductions are coming. We then showed Drax Power Station — how important it is to current capacity — along with those hatched areas. New capacity will arrive, but there is potential for numerous delays in that regard. So I think it is very clear to us, and I think clear to many people, that Drax Power Station will be absolutely critical for UK energy security, well, throughout the 2030s. And then the couple of remarks on the right actually derive from a study we commissioned from Baringa concerning why we believe BECCS at Drax is a value for money option for the UK economy. So first, it is the only credible option for near-term large scale carbon removals to allow the UK to achieve its target of 5 million tons of greenhouse gas removals by 2030.

Will Gardiner

executive
#33

And we have examined what economic gain comes from pursuing that compared with alternative decarbonization choices. The Baringa report anticipates that the country would save roughly £15 billion versus the next best option, which works out at £25 per household annually across 20 years. Once more, that matters for security of supply, represents solid value for money among decarbonization options, and Drax Power Station has a highly appealing future ahead. Moving on to global BECCS, here is a quick update on developments there. I think the main things we have accomplished are that we keep advancing our first sites. We anticipate entering a feed study at some point during this year. You will have noticed that we have signed several agreements covering options on fiber, so fiber, transport and storage, and site location are all progressing very positively across 2023. And we anticipate that carrying on through 2024. We are building the infrastructure and the team for global BECCS expansion. That business now has a headquarters in Houston, Texas. We have brought in — appointed a President, Laurie Fitzmaurice. She came aboard in January, early February, and she has been a wonderful addition to the team, already hitting the ground running.

Will Gardiner

executive
#34

It's great to have Laurie with us. Once more, our target for FID is 2026, and we also aim to be online in 2030. If you turn back to Page 25, here's an overview, or conclusion. So again, 2023 was a strong financial year for us — we delivered strong shareholder returns, a strengthened balance sheet, and we kept developing our strategy. We deliver for all stakeholders as a key part of the UK power system, and we expect that will hold true for many years. As I think we've emphasized, we have a very strong and attractive cash generator business today, with long-term cash flows that underpin the balance sheet, plus the growth opportunities we have, which again are very much aligned with net zero. That comprises the FlexGen business in the UK, which sits at the center of the UK power system and which, again, we expect to become more important as we move to greater levels of renewable power generation. We're targeting recurring EBITDA of greater than £25 million random through the 2030s from our non-biomass plus FlexGen and energy supply business, as we've mentioned. And we're also targeting greater than £250 million of EBITDA over that same period from our pellet business, as we see attractive opportunities in SAF and in BECCS, as well as a chance to keep improving the profitability of our current business.

Will Gardiner

executive
#35

And lastly, biomass generation at Drax Power Station. Over the coming 3 years, we anticipate that will produce meaningful cash flows from contracted positions, and for a long time it will stay critical to the system. Every one of these activities gives our balance sheet a strong foundation, supports growth in our dividend, and underpins our capacity to put money into the attractive opportunities we have throughout our strategy in biomass, BECCS and flexible-generation. So many thanks for your time, and Andy and I are very open to whatever questions you may have.

Operator

operator
#36

Our first question from the conference comes from Dominic Nash at Barclays.

Dominic Nash

analyst
#37

Morning to you. I hope my voice is coming through clearly on your end?

Will Gardiner

executive
#38

Yeah, we have that, Dominic. Thanks.

Dominic Nash

analyst
#39

Great, thanks. Appreciate the presentation — thorough as usual. If possible, I'd like to kick off with three questions. First one concerns Cruachan, that 40 megawatt expansion you announced. You secured the capacity market yesterday. Is it reasonable to think that this will essentially be a sort of prorated profit contribution relative to the existing 440 megawatt — so roughly a £10 million EBITDA figure you're looking at? And you mention you're evaluating business models for the additional Cruachan 600 megawatt expansion, on top of that 480 megawatt. Could you walk us through the pros and cons of the regulatory models versus the merchant model under consideration? And why not simply press the button now and take the merchant route on that one? That's question number one. Question number two, on the bridging mechanism. Obviously the consultation closes today. My understanding is the government put forward four options under review — a CFD, a CFD with a cap, a cost plus basis, fixed margin, et cetera, et cetera. Could you give us some color on what your response to the government is regarding your preferred model, and give us some color on how the actual discussions are progressing?

Dominic Nash

analyst
#40

What method will they use to arrive at that figure? And lastly, regarding the cash flow figures, I believe at the last CMD we said essentially that we start from £1 billion of debt. From 2030 to 2031 we have £7 billion of CapEx. Existing assets would produce £2 billion of cash flow, and new assets contribute £3 billion. Then we sort of say, well, we can work out the arithmetic there. And essentially, as I recall, you’re guiding to net debt of £3 billion, more or less, by 2030 to 2031. Now you’re essentially removing £3 billion from that CapEx figure. So it drops from £7 billion to £4 billion. I take that to mean you’re not — it means you won’t begin construction on additional BECCS units. But I presume the new assets may contribute somewhat less, yet you’re now — is it fair to read this as now guiding to a company that is net debt free by 2030 to 2031, safely <<inaudible>>? Is that a reasonable assumption? Thank you.

Will Gardiner

executive
#41

Thanks, Dominic. I believe that likely addresses everything anyone else was going to ask, so we'll go around in turn. I'm going to hand the fourth question to Andy, giving him an opportunity to kind of get his numbers straight on all of that. I can handle the first three. So regarding the expansion of Cruachan, I would say, when it comes to the operational impact, I think the answer is yes, and it will operate very much the same way as the current assets do, and that extra capacity ought to deliver earnings in line with what we've had so far. But I would — I mean, again, it's important to separate out the capacity payments because obviously those are — those differ significantly from the ones we already have. So that <<inaudible>> is kind of an obvious point, but I think it's an important one to raise, right? As for the business models for Cruachan II, I mean the — I guess I would perhaps sound a note of caution on the whole merchant space. I mean the — attempting to do that without any kind of long-term contract, I think that's quite unlikely.

Will Gardiner

executive
#42

I mean, I think we're essentially discussing builds that take five years, with completion around 10 years. As I've mentioned previously, this is an asset where — if you were to rent it on a fully merchant basis, you're effectively — you're taking on something that exposes you to the system through national grid in ways that are hard to forecast and predict. So we believe having some form of support matters. And at present — there's growing interest in synthetically created 24/7 green power, which, as you know, is what's called ATC in the U.S., or 24/7 renewable power in the UK, where holders of wind and solar assets would actually prefer to sell, particularly to their large I&C customers, 24/7 products of that kind — and there are parties interested in pursuing something along those lines, right? But I'd say that remains at an early stage of exploration, and there's no question that a capping floor from the government backing that project is — we believe those would produce an attractive risk-reward profile for us. So I think that would still very much be the plan of record, Dominic, but we would be looking — we are looking at other things as well, I'd say, just to ensure we get to the right place on that one.

Will Gardiner

executive
#43

Regarding the bridging mechanism consultation, and just to remind everyone where things stand, four options were put forward. There's the unconstrained CfD; there's a constrained version — capping or colored CfD, meaning a maximum and a minimum amount of generation. Then there's a rate-of-return approach, so a capacity payment approach, correct? I won't go through all the various options now. But from our perspective, I think — we believe that the CfD with a maximum running and a minimum running is really the most attractive option for the UK power system, right, and it ensures you get the generation from the assets that the system needs, but it also lets us optimize across the system to run effectively when power is — sorry, when the system is short of power. So it doesn't make sense to have a construct that effectively puts us on the system when we would potentially be displacing other forms of renewables. And so the key is a system that actually incentivizes us to be there when the system needs that power, and we think the constrained CfD is the best way to achieve that.

Will Gardiner

executive
#44

Andy, I’ll hand it over to you now for the cash flow figures.

Andy Skelton

executive
#45

Yes, Dominic — my take is that by the close of 2031 we’ll sit below two times levered. That does hinge somewhat on when the investments actually land, and I’d expect others to come in under that level too. The real key, though, when you’re deciding on investments here, is confidence — a high degree of it — in future cash flows. That’s what underpins BECCS in the UK through the CfD, along with forward CDR sales for the U.S. projects. So what I’d guide you to is sub two times at the end of 2031.

Will Gardiner

executive
#46

One more point worth making on that, Dominic, since it genuinely applies across every one of the projects. What I mean is, on the details of how the financing is structured for Cruachan II or the various back projects, we haven't disclosed the work we're doing there. Obviously, the figures we've provided to you sit very much at the corporate balance sheet level. And across all 3 of those projects, we believe there are interesting opportunities when it comes to project level financing, which we're plainly working on. So once we reach that stage and have developed those ideas, we'll obviously share more of them with you guys.

Dominic Nash

analyst
#47

Alright, thanks.

Operator

operator
#48

Alex Wheeler from RBC has our next question.

Alexander Wheeler

analyst
#49

Morning, everyone. I’d like three as well, please, all on pellet. First, on the pellet business: if we take 2024 EBITDA as a more normalized year comparable to 2022—call it roughly £140 million—could you walk us through what the EBITDA growth would look like and what the main drivers behind that growth through 2028 would be? Second, again on pellet, what base assumptions about BECCS sit behind your forecast of more than £250 million EBITDA for the pellet business after 2027? Would that figure change if BECCS does not proceed, given the possible shift in market demand for pellets that we might see? And my final question is on your mention of expanding production in the pellet business: what does clarity on BECCS mean for expanding production capacity toward that 8 million tons? Does that come after subsidy confirmation in the BECCS business model? And if so, given £250 million for 5.6 million tons, is it reasonable to assume that at 8 million tons you would be close to £350 million EBITDA? Thank you.

Will Gardiner

executive
#50

Alright, I'll go through those one at a time, and let me know if I skip anything. I think it makes sense to begin with the 2022 help turn, where we posted £134 million and the £35, so EBITDA margin a ton is a good starting point, since, as we talked about, this year brought challenges and headwinds that hit our output and our profitability. But if you begin there, our capacity today ought to let us produce more pellets than we did in 2022. We were commissioning plants during 2022, and this year we should have seen the full-year impact of those, but for the reasons we discussed, we didn't. So the first thing is we need to get more capacity out of our existing plants. But then we also have 600,000 tons of capacity coming online. So together we think we can achieve 5 million tons of output from our plants. If you take 5 million tons, grossed up from 3.9 at that similar margin, you can do the math, and that will make a significant step forward, but it'll still leave you a gap. And the reason for that gap is because our third party legacy contracts are much lower margin.

Will Gardiner

executive
#51

The £35 figure is an average margin across the portfolio. However, those contracts are going to come up for renewal in future years as they roll off. And as we said, a number of them were signed many years ago, with 10, 15 year agreements. And as they roll off, we'd expect to reprice them at margins similar to the rest of the book. And that's just assuming a market price. If you then add in the increment there, I think you can bridge to where that number is. And of course, if not every contract renews, demand is growing. So to go back to demand for biomass, it's growing. There are new markets like SAF opening, and those markets have good ability to pay, and we can sell pellets into those. And we've signed MOUs, and in recent years we've signed contracts at those prices that we're targeting. So that's how I bridge to the sort of 250. On the question about post-2027 BECCS, that 250 million is based on 5 million tons of capacity we have once these Longview and Aliceville expansions are done. It doesn't assume we build any more capacity up to 8 million tons. So if it goes beyond that, then the 250 changes and it increases, and we would expect to get a market price for the pellets.

Will Gardiner

executive
#52

We've consistently stated that our use of pellets will be evaluated relative to their market price. And finally, regarding production capacity, I believe what's needed to support investment in additional capacity is clarity around the subsidy mechanism.

Alexander Wheeler

analyst
#53

Alright, thanks.

Operator

operator
#54

Pavan Mahbubani from JPMorgan has the next question.

Pavan Mahbubani

analyst
#55

Morning, and thanks for the presentation. Two questions from me, if I may. First, following on from what Alex asked about the 250 million guidance covering flexible generation plus supply: could you add a little more detail, perhaps an indicative breakdown of how you expect those profits to develop, given that hydro has clearly had an exceptional year? And I'd say customers may also have done better than you would have anticipated. How do those pieces evolve, and where do the OCGTs fit in based on your back-cast? Some color on how you expect all of that to play out, or what split among those three businesses you would anticipate within the 250 million medium-term guidance, would be helpful. My second question concerns BECCS and the key milestones you've flagged for 2024. Thinking about where we'll be by year-end, could you give a bit more detail on the bridging mechanism? Is your aim to have a contract signed? Will we know the final parameters? Or might the discussion take longer than we have in 2024?

Pavan Mahbubani

analyst
#56

Also on power backs, what kind of position do you anticipate reaching by year-end? Or perhaps by the election? Any additional specifics on that would be useful. Thanks.

Andy Skelton

executive
#57

Alright, so Pavan, on a broad basis I'd be thinking 150 — that's 50 from hydro, 50 from customers, and 50 from the OCGTs — with some give or take around that. But let me walk you through the reasoning. Looking at the year we've just had, the pumped storage hydro performance was clearly very strong at 230. So we're not building in a repeat of those exceptionally high power prices. What we are assuming is that volatility keeps growing in system support services, as we've discussed. And bear in mind we've got the income from Cruachan III and IV, the refurbishment, on top of that. It's also underpinned by strong capacity market income. On customers, again, 72 was an exceptional year, and it benefited from margins that are consistent, but on higher revenue driven by higher power prices. So we're not forecasting that this happens every year. But we are forecasting continued growth in energy services as well. And on the OCGTs, the back-cast was 70. If you assume 50, again, it doesn't assume the peaks are as high as they've been this year, but it does assume continued — we can pick up system support from the volatility and peak running, and it's also backed by very strong capacity market income too.

Andy Skelton

executive
#58

And I think slide 27 is worth a look to see this. It goes back to that 850 million in today’s money for those assets alone, underpinning those future earnings. And the last thing I’d say there is, since we haven’t assumed peak power prices like they’ve been this year, we’re positively exposed then. We’re not assuming it happens every year, but from time to time, as these things happen, we’re positively exposed to that.

Will Gardiner

executive
#59

Yes. Thank you, Pavan. Regarding your two questions, I can offer a bit more detail on the bridge and on the power back. Let me start with the bridge. I suppose this is how I see it — what the steps are and what is taking place. As things stand right now, once the consultation wraps up, our expectation is that the government will decide, possibly during Q1, on what it will actually look like. That, in turn, should put us in a position where we can genuinely get started. At the same time, talks with the government are already underway regarding data, numbers and so forth, and how that will begin to take shape. Over the course of Q2, we would hope to land on a conclusion regarding the mechanism, as well as potentially some of the numbers surrounding it. I would say we are getting a sort of media in the minds. We absolutely expect that, before the summer in the best case, an actual contract will be agreed and signed, and also before the election. That would be our base high case, so to speak. When the election takes place — and obviously we don't know when that will be — I think it would be fair to assume there will be some sort of a gap while the new team gets itself up to speed, or perhaps not, if it is the same team; we don't know.

Will Gardiner

executive
#60

But really, I think the main takeaway from where we sit is this: first, the officials in <<inaudible>> definitely understand how important this is — both for us, because it lets us get our supply chain sorted, and for the UK, since, as Andy mentioned and as I've been trying to say, we see the pellets market as an appealing one. So the earlier we secure the supply chain, the greater our odds of achieving the best value. So I think that's widely understood. So again, we expect to have a signed contract finalized, with all of that wrapped up, by the end of 2024. On power-backs, once more, there are two elements here, I suppose I'd say: one is where we ultimately land on the infrastructure. So the first thing is government. We anticipate track one expansion and track two projects being selected over the course of this year, kind of near the end of this year. And again, we'd anticipate being picked as one of them, right. Much like what happened with Track 1, after you're selected, you then proceed to the following stage, which is in fact a detailed negotiation with the government regarding your project, which again is a 2025 matter.

Will Gardiner

executive
#61

That's one part of it. The other part is the BECCS business model. So we expect the Power BECCS business model to be defined during 2024. That way, when we actually reach the point of being selected, we can enter into the specific discussions with them about what the terms of our agreement would be. Now, the negotiation of that agreement is going to take, I would say, quite a lot longer than the bridge work, because there are a lot of new things in there. There are a lot of issues around cross-train risk. There's a lot of CCS-type risk that needs to be managed and determined. So that — and I would say, as opposed to the bridge, which we think we can include in factual self quite quickly because it will be built on contracts already and are already known, that will take quite a bit longer, i.e., 2025, potentially into 2026. I hope that helps.

Pavan Mahbubani

analyst
#62

Yeah, that really helps. Thanks. If I could just squeeze in one more question that’s unrelated, please, about — about pellet production, could you remind us how you hedge your foreign exchange exposure? What hedges are in place today, and when do those expire, please?

Andy Skelton

executive
#63

Right. We handle that on a rolling 5-year basis, and carbon is essentially locked in at this point through the close of 2027, 2028, yes.

Pavan Mahbubani

analyst
#64

All right, that’s great. Thanks for answering that.

Operator

operator
#65

Harrison Williams from Morgan Stanley has the next question.

Harrison Williams

analyst
#66

Thanks. Yes. Good morning, everyone. So I have two questions. I think that, given your hedge book, it's clearly a very enviable position for next year. But when we look out to 2026 and maybe try to calculate a bit above spread, you've historically provided some guidance on where all-in biomass production costs would land in pound to megawatt hour. Could you help us on that front, either now or as you look to 2026? So that's the first one. And then the second one concerns the gas plants: can I just confirm that €70 million — does that include the capacity market payments? And as you look, while you say you're still considering the sale of these assets, can you comment on what demand for that has been like? And with the use of that capital, if you could sell it, would that factor into the long-term investment plan? Or would that be something you would consider returning to shareholders more quickly? Thanks.

Will Gardiner

executive
#67

Okay, let me take the second question, and then I'll ask Andy to handle the first one. As for the actual forecasted or back-cast figure for the open cycle, which does include the CM payments — yes, that is an all-in type of number. Second, frankly, our approach here has been that it makes far more sense to have those assets up and running, commissioned, and with some actual operational experience under their belt before we go and test the market again, because that is the moment when we would see the fundamental view of operational risk in the value chain shift. So I don't really have any update on where we think the market for those stands, beyond saying that the numbers we've shown, and the attractiveness of these assets in an environment that is increasingly volatile — my view is they are proving what we expected them to prove, namely that they will be, I think, quite attractive assets as and when that comes. And on the use of proceeds — clearly, as Andy described, our capital allocation policy effectively includes any cash generated from disposals as part of the assessment the Board will do.

Will Gardiner

executive
#68

So when that happens, we’ll review our opportunities, cash position, balance sheet, et cetera, and take all of that into account to assess whether it goes back to shareholders or becomes part of the investment program.

Andy Skelton

executive
#69

Regarding your first question about the all-in biomass cost, I’d say a figure above €100 would be the appropriate number for <<inaudible>>.

Harrison Williams

analyst
#70

That's a fair point. Thank you very much.

Operator

operator
#71

Moving on, our next question comes from Charles Swabey at HSBC.

Charles Swabey

analyst
#72

Hello, and good morning, everyone. Thank you for taking my question. I have three. First, I was wondering whether you could comment on the decline in U.K. carbon prices and what implications that might have for BECCS? Second, I was wondering if you could also bring us up to date on the possible contract renegotiations within <<inaudible>>? And do you have any views on what that situation there means for the biomass market going forward? And thirdly, it was obviously a record year for systems support earnings. I was wondering if you could give any guidance on what to expect on a go-forward basis there and what the impact of lower power prices means for the system support earnings. Thanks.

Will Gardiner

executive
#73

Apologies, Charles, but would you mind going over that third question again? I didn't manage to hear all of it.

Charles Swabey

analyst
#74

Yeah, sorry about that. It concerned system support earnings, and I was wondering whether you could give us some guidance on what to expect going forward, especially given that lower power prices are starting to take effect?

Will Gardiner

executive
#75

All right, let me handle the first two of those, and then I'll have Andy address the third one. So regarding where things stand — obviously, carbon prices across Europe and the U.K. have fallen relative to their historical levels. In my opinion, those prices will ultimately have to be set properly over time, otherwise we simply won't reach the decarbonization goals we've committed to. On the specifics of what this means for BECCS, I'd make a couple of points. First, one of the new developments we're observing in both Europe and the U.K. is a wish to bring BECCS and/or carbon removals into the compliance trading schemes — and that work is underway, correct? At a fundamental level, I believe that's the direction the world needs to take, because when all is said and done, taking a ton of CO2 out of the atmosphere versus putting an additional one in — both are positive outcomes with a comparable effect, and having a framework that lets decision-makers and participants pick between the two in an economically rational manner makes a great deal of sense, right?

Will Gardiner

executive
#76

So that's, I think, where it's headed, correct? Regarding the other piece — it's important to acknowledge that this is, in a sense, another reference point for carbon prices, or I'd say more specifically for carbon removal prices. We're witnessing significant and expanding interest, along with a rising count of transactions, within the voluntary carbon markets for BECCS and for carbon removals in general, direct air capture being one example. And there's — we've announced deals in that space at $300 a ton. The direct air capture deals have been concluded at roughly $500, $600, $700 a ton. So ultimately, every one of these markets will converge so that we can reach net zero. And so how we'd position BECCS in the U.K. is that basically, if we have a CfD for the carbon that has to be agreed at a level which we believe aligns with the appropriate returns for the project and aligns with value for money for the U.K., and that will be sort of — that's how it will be determined. My expectation is that we'll be, over time, consistent with where carbon prices will land.

Will Gardiner

executive
#77

Moving to the second question, regarding Viva, I'd say there are basically two points. First, I'm not in a position to really comment on their current situation. What I believe is generally known is that they're in a forbearance period tied to having missed certain interest payments. The market has its own expectations about how things will unfold for them and for their future. There are two things we're monitoring closely; the first is that our team has handled our biomass supply position quite deliberately, so our deals, I'd say, were fairly well-protected against a good deal of the possible cost shortfall originating from them. That is essentially the consensus reflected in the 2024 and 2025 figures — it incorporates the effect of those risks. We feel quite comfortable with the way we're handling this, both operationally and financially. And should they end up entering bankruptcy, I believe two things would occur. First, they would have to reprice a large number of their pellet sales contracts for that business to reach where it needs to be, correct?

Will Gardiner

executive
#78

As Andy mentioned earlier, that essentially means we’ll affect pellet prices in the market — and probably create upward pressure rather than anything else, correct? So there are two sides to it. First, from our own standpoint on security of supply, we feel fairly comfortable handling that. Then, from the pellet sales angle, I believe it will positively affect that market’s fundamentals for pellet production. What’s the third one?

Andy Skelton

executive
#79

Turning to your systems support question, Charles. That figure was extremely elevated in 2023. I believe the total came to £245 million. Looking back at 2022, the number stood at £175 million. And broadly speaking, as we've mentioned before, across recent years, if you examined it, growth has been running at a double-digit pace. So I'd suggest — that's roughly the range to keep in mind; 2023 was obviously high, but go back toward 2022 levels and then factor in that sort of growth rate.

Charles Swabey

analyst
#80

That’s very clear. Thanks.

Operator

operator
#81

Ahmed Farman from Jefferies has the next question.

Ahmed Farman

analyst
#82

Yeah. Hello, and thanks for the presentation. I guess I really only have a single question. You mentioned something like an expectation of possibly arriving at a result on the bridging mechanism by the close of this year. Could you perhaps put into context for us what the implication would be from a security of supply standpoint if this were to be pushed back by six months or something along those lines? I’m simply trying to get a sense of how we should view it from that angle and how urgent it is to obtain clarity on this. Thank you.

Will Gardiner

executive
#83

Let me walk through three distinct areas, I guess. And at its core, this comes down to choices we have to make about contracting within the supply chain, about how we allocate capital, and about putting money into the power station — plus the timing and method of those choices. So first off, we have to ensure we've got every bit of logistics required for infrastructure, for rail infrastructure. And at some stage, whoever supplies those capabilities is going to have to make separate calls regarding those assets, correct? So when I speak with my port providers — I mean, they keep pressing us to guarantee we're able to commit to them over the long term. Because if not, they'll have to repurpose those facilities, and repurposing a port isn't something you do overnight, right? So that's item one, right? Item two, regarding actual pellet supply, right — we covered this alongside other matters. I mean, that market is increasingly, I think, going to — we believe demand will keep growing. Not much new capacity is entering that market. And so first off, as time passes, we anticipate pricing will climb, as I — as we've, I believe, discussed pretty openly.

Will Gardiner

executive
#84

So from our perspective—and the UK government's—getting an agreement in place sooner lets us lock in our pellets at a favorable cost. That's a value-for-money consideration, which I think matters quite a bit for the entire system, right? As time passes and pellets become more available, guaranteeing that becomes harder for us, since that's a big portion of the overall market, right? The third thing concerns people contracting investment in the plants, because each year, say in late summer, we're planning what we'll do regarding investment in maintenance and outages at Drax Power Station, right? And this year, I think we had some close calls about whether you invest in things with a five year payback, seven year payback, three year payback when those things are right now—this year, I think we made some reasonable decisions and we weren't pushed that hard, right? When we reach this point, let's say, summer of this year, those decisions get harder, right?

Will Gardiner

executive
#85

Since it's really tough to commit capital when the payback stretches over five or 10 years and you have no idea where the power station will end up, right? So basically, as more time goes by and more of these decisions get made, it becomes increasingly hard for us to guarantee that we actually have the plant we need in order to deliver the services that benefit the UK system.

Ahmed Farman

analyst
#86

Thanks.

Operator

operator
#87

That brings us to the end of the questions from the conference call. Now, Mr. Gardiner, may I hand it back to you in case there are any web questions?

Will Gardiner

executive
#88

Yes. I’ll begin with a question from Vincent <<inaudible>> at Lloyds Bank. Regarding the 2024 loan term facilities of £258 million, what are the uses, given that they remain undrawn? That one’s for Andy. Yes.

Andy Skelton

executive
#89

The plan would be to apply them toward paying off the bond maturities coming due in 2025. And in fact, on Page 14 of the slide deck, you can see the portion that remains undrawn — it's in the final two columns — and there you'll notice the sizable batch of bonds maturing at the end of 2025. That should give us a solid chance to make real progress in bringing that down. And as I said, each of those two bonds can be redeemed at or near par.

Will Gardiner

executive
#90

Jenny Ping from Citi has a question, and it comes in roughly three parts. First, could you help us get a handle on how biomass costs will evolve from here? I'll take that in two ways, and I'll hand it over to Andy. One, let's spend a moment on our own cost base in pellets. We've touched on that a bit. I believe we gave a partial answer on that point regarding what biomass will cost at the power station down the road. What Andy mentioned — roughly £100 plus per megawatt hour — is a sensible frame of reference. You noted earlier that a number of the third contracts are rolling off. Could you give us the timing and the scale of those? I suspect that's really pointing to how we expect some of the third-party pellet sales contracts to develop in the Japanese market. Andy can probably speak to that, since it's less a matter of expiry and more a matter of the potential to reprice some of them — we can get into that shortly. And the third piece of the question is: where do we stand on GBP, on pound hedging for the pellet business, where I think Andy said we're well hedged through the end of the subsidy period with our pellet dealing.

Will Gardiner

executive
#91

So, Andy, would you like to handle the first and second items?

Andy Skelton

executive
#92

Yes. Regarding biomass cost, Jenny, we remain focused on ways to bring down our production costs, but my emphasis would be on margin. So when we forecast the £250 million, we expect the margin to stay roughly where it is today, apart from those legacy contracts where we can extend it to that kind of margin. So in hitting that number, we aren't assuming significant cost reductions. But equally, we aren't assuming significant price inflation from where we stand today. We've effectively held the margin at what we believe is an appropriate level. On the second one, the third-party contracts, around 1 million tons of those expire over the next five years, on different dates, and more will be on track. And again, as they renew, we expect to have the chance to improve the margin. And then on the GBP hedging for the pellet business — I mean, on the Drax Power Station it's hedged for five years forward now, and we're pretty much fully hedged through the end of 2027, start of 2028.

Will Gardiner

executive
#93

All right, I don’t see any further web questions. Is there anything else from the call?

Operator

operator
#94

Right now, sir, we don’t have any questions queued up from the conference.

Will Gardiner

executive
#95

Okay, thank you all. I’m grateful for the attention while we walked through what we consider to be these solid — maybe not thrilling, though I’d call them thrilling — fundamentals of our business, and I look forward to catching up with you folks in the coming days and weeks. So thank you very much.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Drax Group plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Drax Group plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Drax Group plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.