executiveThank you, and good morning, everyone, and thanks to all of you for being on the call. I'll give a brief introduction and overview, and after that I'll pass things to Andy, who will walk you through the numbers along with some of the operating points. Then I'll return to discuss a few of our investment opportunities and say more about capital allocation, and we'll wrap up with questions. Now, Page 3. Our purpose is one you're all familiar with: enabling a zero-carbon, lower-cost energy future. I'll begin there, as I always do, since it fundamentally guides everything we do. Our strategy and business model are built to deliver attractive returns for shareholders while realizing that purpose. We have a strong, cash-generative core business with a track record of achieving those joint objectives. Now, looking ahead, we have opportunities to invest in that core business to enhance shareholder returns as well as deliver positive outcomes for climate, nature, and people. And critically, our people are at the heart of Drax, where I want everyone to feel a valued member on a winning team with a worthwhile mission. So turning to Page 4. We have had a strong year.
Will Gardiner
executiveStrong safety results matter on their own, and they also support solid operational and financial outcomes. That's why it was encouraging to see our total recordable injury rate fall to 0.24 in 2024, down from 0.38 in '23. Our power output was 25% higher than in 2023, and together with a big gain in pellet production, that has lifted adjusted EBITDA by 5%. We made our balance sheet considerably stronger by adding GBP 700 million of new debt maturing in 2027 and later at appealing rates — a sign of the market's confidence in our long-term business. Those proceeds went toward repaying roughly GBP 900 million of shorter-dated facilities. Shareholder return is a commitment we hold to, and we deliver it by applying our capital allocation policy with discipline. Today we're announcing a 12.6% rise in dividends per share, and we're continuing a GBP 300 million share buyback, which shows the value we believe the business holds. The recent CfD agreement for the Drax Power Station is a good deal for the U.K., and in my view it's also a good deal for us. Importantly, it marks a significant inflection point for our company. So, taken together with FlexGen and pellet production, we're announcing today an upgraded target for recurring adjusted EBITDA of GBP 600 million to GBP 700 million from these 3 businesses post 2027, reflecting greater confidence in earnings visibility after '27.
Will Gardiner
executiveWe're also still enthusiastic about long-term growth opportunities tied to the energy transition and security of supply, and we'll keep committing suitable development spending toward them — and that spending sits additional to, or outside, the post-2027 target for FlexGen, pellet production and biomass generation that I just referenced. The key point, however, is that I want to stress our capital allocation policy. We are dedicated to delivering appealing returns to shareholders, and we'll keep delivering them. Moving to Page 5. A year ago, we started describing our business in a different way, and I want to restate that story. Flexible Generation and Energy Solutions is performing well and already sits at the target level of GBP 250 million of EBITDA on a pro forma basis. In Energy Solutions earlier this month, we reached agreement on selling all of the residual SME meters, which means the business will rest on I&C, renewable, and EV solutions. That has simplified the business considerably. The business is performing very well, with good performance in I&C, and we've taken important lessons from that simplification process. Our pellet production business has enjoyed a great year, and we have confidence in the future while recognizing there is work to do to deliver that target.
Will Gardiner
executiveWith the CfD bridge agreement in place for Drax Power Station, we're confident about delivering EBITDA of GBP 100 million to GBP 200 million over the bridge period, and I'll give you more on that shortly. So once more, across those 3 businesses, our target now is GBP 600 million to GBP 700 million of adjusted EBITDA after 2027. And I'd like to stress again that this target is set before we account for development expenditure on growth, which you'll find in the fourth column on that page — we have attractive options there that we still believe present meaningful opportunities to create long-term value. In our FlexGen business at Drax Power Station, which could host both the data center and BECCS, it's unique within the U.K. and holds 4 gigawatts of grid access. And when you consider electrification and growing power demand, along with its significance for energy security, affordability, and decarbonization — the so-called energy trilemma. We keep assessing options for creating long-term value from the site. And naturally, we remain very excited about the opportunities in global carbon removals, which we'll be executing through Elimini, our new carbon removals business. Moving on to Page 6.
Will Gardiner
executiveThe heads of terms agreement for a CfD that backs post-2027 operations marks a really encouraging move, and it affirms what Drax Power Station and biomass bring to energy security and decarbonization, while also being a cost-effective answer that saves bill payers billions across the agreement's term. Through this agreement, we'll sell roughly 6 terawatt hours' equivalent evenly over the year so as to hit the baseload reference price, and we'll receive or pay the gap between that baseload reference price and the CfD strike price — what's known as the pump. When demand runs high, we'll in fact run all 4 units to generate and sell as much power as we can at elevated peak prices. And when demand is lower, we'll create value by purchasing power back at cheaper off-peak prices. Operating this way, we'll help bolster energy security, give the power system flexibility, and secure a higher average price per power than the CfD strike price. We anticipate the system growing more volatile going forward as electricity demand rises and additional intermittent capacity comes online, which opens up more chances for us to do more and to earn more.
Will Gardiner
executiveAlso, we intend to hold a few sessions for investors and analysts alongside our commercial team so that the mechanics of the agreement can be explained. Continued evolution of sustainability standards is part of the agreement as well, and we strongly back that. Some have suggested that hitting supply chain emissions targets would mean we must purchase additional European biomass rather than U.S. biomass. I want to be quite clear that this is not the case. No matter where we source from, our expectation is that our supply chain will meet those emissions targets, and we are confident it will. Lastly, to give a bit of a description of the process going forward, we expect the government to lay secondary legislation — a statutory instrument for parliament — in the coming months, which will give them the power to award CfDs to biomass generators. And after that, the agreement will go through a subsidy control mechanism process. Moving to Page 7. I'm sure all of you have seen this, but I just wanted to emphasize and highlight the recent launch of our new sustainability framework. This is a very important large-scale piece of work, which supports our commitment to develop and enhance our approach to sustainability across the 3 pillars of climate, nature, and people.
Will Gardiner
executiveTake a look at it, please — it contains substantial targets in all 3 of those areas, and it's something we're strongly committed to. And once again, we intend to set up sessions so we can walk analysts and investors through it. Now I'll hand things over to Andy.
Andy Skelton
executiveThank you, Will, and good morning to all of you. I'll begin with the financial summary found on Slide 9. We have, once again, turned in strong results both financially and operationally. Adjusted EBITDA rose 5%, reaching GBP 1.064 billion, which mirrors a high level of activity in renewable power generation and system support as well as betterment in pellet production. Our balance sheet remains robust. At year-end, net debt to adjusted EBITDA stood at 0.9x. Significant cash is being produced by the business through operations, giving us a solid foundation for investment in our core business and for delivering appealing returns to shareholders. Cash generated from operations during the year exceeded GBP 1.1 billion. A final dividend of 15.6p per share has been proposed by the board, taking the full year dividend for 2024 to 26p per share, an increase of over 12% year-on-year. A company collected consensus for 2025 was published by us last week. We feel comfortable within the consensus range, assuming continued good operational performance. Turning now to performance by business. A target was set out by us in February of last year to deliver more than GBP 500 million per annum of post '27 recurring adjusted EBITDA from our FlexGen and Energy Solutions and pellet production businesses.
Andy Skelton
executiveAs Will mentioned earlier, earlier this month we reached a nonbinding head of terms agreement for a CfD covering Drax Power Station's operation from April 27 through March 31. In light of what we expect from that deal, our target now is recurring post '27 adjusted EBITDA of GBP 600 million to GBP 700 million. That figure leaves out investment opportunities, which take in development expenditure in Elimini, innovation and capital projects. Robust system support earnings provided the foundation for results in pump storage and hydro. Our I&C Energy Solutions business keeps delivering a strong performance. As Will pointed out, most of the meter points in the SME business were sold in September '24. And last week we agreed terms to sell the meter points that remain. Those sales take effect from May of '25, subject to regulatory approval. In pellet production, we grew volumes and margin and posted record adjusted EBITDA. The strong showing in biomass generation mirrors a 27% rise in renewable generation and the ongoing contribution Drax Power Station makes in supporting the U.K. power system. Moving to Slide 11. We still aim for more than GBP 250 million in post '27 recurring adjusted EBITDA from FlexGen and Energy Solutions, and the strong performance in 2024 supports hitting that target.
Andy Skelton
executiveGeneration output from our pumped storage and run-of-river hydro assets rose versus the earlier period, and those assets turned in a strong performance. When system need and commodity prices swing sharply — as they did between 2022 and '23 — our assets are positioned well both to back the system and to capture value. Adjusted EBITDA for Energy Solutions came to GBP 51 million, and that figure included $81 million of earnings from our I&C business. Beyond delivering renewable energy, the I&C business offers EV services and other value-added offerings, including asset optimization. Those earnings show a steady margin against contracted energy supply prices, and over time we anticipate growth in earnings from EV and other services. FlexGen and Energy Solutions together produced adjusted EBITDA of GBP 188 million. Combined with the GBP 50 million of target post-'27 earnings from our 3 new OCGTs and GBP 15 million in capacity market income from refurbishing Cruachan Units 3 and 4, the illustrative earnings rose to more than GBP 250 million. The GBP 80 million investment to refurbish and upgrade Cruachan Units 3 and 4 remains on track. A 15-year capacity market agreement valued at over GBP 220 million underpins the project, which will deliver 40 megawatts of added capacity by 2027 and enhance unit operations.
Andy Skelton
executiveWe expect our 3 new-build OCGTs to come online during 2025. That is later than we originally planned, mainly because the relevant authorities have delayed the grid connection. Together, these OCGTs will deliver 900 megawatts of capacity and will be paid under 15-year capacity market agreements valued at more than GBP 250 million. On top of that, we will generate revenue from peak power generation and system support services. In our view, as older thermal generation assets are retired and reliance on intermittent renewables grows, alongside rising power demand, the need for dispatchable power and system support services will keep increasing, and we see this as creating a long-term earnings opportunity and value from the group's flexible generation assets. Moving on to Slide 12. During the period, we have already locked in capacity market agreements running to 2042 with a value of GBP 600 million. That figure could rise above GBP 1 billion if, upon renewal, we obtain new capacity market agreements at a price equivalent to the 2024 T-4 auction of GBP 65 per kilowatt. These values are stated in 2024 money, so they are subject to indexation with U.K. CPI. Turning now to pellet production on Slide 13. In 2024, our pellet production business achieved strong progress, with better operational performance and profitability.
Andy Skelton
executiveOutput volumes rose to 4 million tonnes, and 2.4 million tonnes of that went to Drax Power Station. The margin we earned on onus supply gives a better picture of what long-term, large-scale supply is worth in today's market. On our legacy third-party contracts, the margin we earned is lower. Together with a lower cost of production, that pushed the achieved EBITDA margin per tonne of production up to GBP 36. And as a reflection of all this, adjusted EBITDA climbed to GBP 143 million. As Will mentioned earlier, we expect onus volumes to average roughly 2 million tonnes a year over the term of the CfD agreement for post-'27 operations, and that gives a strong underpin to hitting our target earnings. Delivering that GBP 250 million target assumes we will keep working to maximize production from the capacity we already have and will drive operational efficiencies across our supply chain, and that will include greater use of technology. Second, that we'll renew lower-margin legacy third-party contracts at better pricing and/or secure sales into new markets, which includes SAF. Finally, we'll add incremental capacity once the demand profile becomes clear. Bookings rates forecast show demand for biomass rising by more than 30%, from 50 million tonnes in 2024 to 65 million tonnes by 2030, and this reflects markets such as SAF and BECCS starting to accelerate.
Andy Skelton
executiveWe're still optimistic about the long-term picture. After '27, Drax needing less third-party biomass supply could create a supply-demand imbalance over the medium term. However, as a producer, a user and a seller of biomass, we think we're well positioned to create value. We're building a pipeline of sales opportunities for SAF, which we believe could be a major market opportunity for biomass pellets. During the year, we agreed heads of terms with Pathway Energy on a multiyear agreement that could see Drax supply 1 million tonnes of biomass pellets each year for production of SAF at their proposed plant in Port Arthur, Texas. In the future, we could potentially supply 2 additional projects, delivering a further 2 million tonnes of pellets per year to Pathway sites through to 2030. And now looking at Slide 14. In 2024, Drax Power Station generated over 5% of the U.K.'s electricity, around 10% of its renewable power and on certain days, over 50% at times of peak demand. Adjusted EBITDA of GBP 814 million was an increase of 16% compared to the prior period and it reflects a higher level of renewable power generation and system support services in response to a greater system need.
Andy Skelton
executiveDrax Power Station generated 14.6 terawatt hours of electricity — that's up 27% versus the prior period. On the RO units, we're fully hedged for 2025, and more than 80% hedged in 2026. All told, 20 terawatt hours are locked in at an average price above GBP 93 through Q1 2027. Beyond that, we anticipate the CfP unit running at a high load factor over the years ahead. These robust forward power hedges, along with a GBP 0.5 billion working capital benefit stemming from the end of the RO scheme at Drax Power Station in 2027, support more than GBP 1 billion of post-tax operating cash flows between 2025 and 2027 — and that comes before the new low-carbon dispatchable CfD agreement begins. Turning now to the balance sheet on Slide 15. We stay strongly focused on cash flow discipline and on keeping the balance sheet robust. Available cash and committed undrawn facilities stood at GBP 806 million at year end, giving us substantial headroom above our short-term liquidity needs. Over the year, we arranged more than GBP 700 million of new debt maturing in '27 to '29, and we repaid upwards of GBP 900 million of shorter-dated maturities, which meaningfully extends the group's average maturity profile past 2027.
Andy Skelton
executiveThere aren't any significant maturities coming due soon. Our solid financial results and ability to generate cash help us keep our credit ratings where they are. In the second quarter, Fitch and S&P both reaffirmed the group's issuer credit ratings at BB+, and DBRS reaffirmed them at BBB low — each with a stable outlook. Turning to Slide 16 on capital investment: capital expenditure came to GBP 330 million, which breaks down as GBP 212 million of growth spending and GBP 83 million of maintenance. Within that growth figure, GBP 90 million went to the OCGTs, over GBP 60 million went toward pellet production capacity, mostly at the Longview site, and GBP 30-plus million went to the Cruachan Units 3 and 4 expansion. As part of ongoing investment to keep our generation assets running well, a major planned outage on 1 unit at Drax Power Station wrapped up in August of '24, and that unit came back into service ahead of schedule. No major planned outages are scheduled for 2025. For 2025, we expect CapEx to land between GBP 180 million and GBP 220 million. Finally, on Slide 17, capital allocation: we'll stay disciplined in how we allocate capital as we work to maximize value.
Andy Skelton
executiveBack in 2017 we introduced this policy, and it hasn't changed since. There are 4 pillars to it. The first is balance sheet strength. What we mean by that is holding on to our existing credit ratings, which we see as in line with our longer-term goal of a 2x net debt-to-EBITDA ratio. The second is investing in our core business. We keep looking at ways to develop our portfolio. Beyond the group's options for expanding long-duration storage at Cruachan, that might also take in other storage solutions such as batteries, which could add to the range of services the FlexGen business is able to offer. Third is a dividend that is sustainable and growing. For the full year, the anticipated dividend represents 12.6% growth in dividend per share. Since the policy began, across the last 7 years, dividend growth has come in at an average of roughly 11%. Lastly, we will return surplus capital to shareholders. In August we kicked off the share buyback program, under which we'll purchase as much as GBP 300 million of Drax shares across a 2-year period. We're nearly halfway through it, having repurchased more than 23 million shares, and the third tranche is due to start shortly. With that, I'll pass things back to Will.
Will Gardiner
executiveThanks, Andy. Moving to Page 19, I'd like to lay out a bit more of a framework for how we're looking at our investment opportunities. First, it's important to recognize that the energy transition is generating a wealth of short-, medium- and long-term investment opportunities capable of delivering attractive returns, and they also line up with our capabilities, our purpose and our strategic objectives. We're also mindful of the need for focus, for managing risk, and for prioritizing those investments with the highest return and the fastest payback, particularly given the growing uncertainty we see not just in the U.K. but around the world. So first, our short-term opportunities excite us. As you know, and as we've mentioned several times already, we're midway through our GBP 300 million share buyback, and we still see considerable value in our shares. Beyond that, we're making incremental investments in our pellet business to bring down cost, and then in our trading capabilities to drive efficiency and faster decision-making. We're commissioning the open cycles, the OCGTs, which we believe matter more now than ever as the value of flexibility rises. So when I think about the medium term, the core investment thesis during my time at Drax is the growing value of flexibility, complementing intermittent renewables and flexible nuclear.
Will Gardiner
executiveAs older dispatchable fossil fuel plants retire, more renewables come online, and power demand rises structurally, we're now witnessing that dynamic unfold. We're stepping up to it through a 40-megawatt expansion at Cruachan — a GBP 80 million initiative from which we anticipate a return above 20%. On top of that, we see additional chances to build out and expand our dispatchable asset portfolio in a market we consider increasingly appealing. Grid-connected batteries lasting 2 hours or longer strike us as a potentially attractive addition to that portfolio, and we'll examine opportunities both to develop and to acquire in this area. Turning to pellets, work continues on the Longview project, while at the same time we're evaluating the medium-term supply-demand picture tied to it. Over the longer term, I'd say our top long-term priority is securing a definitive independent future for Drax Power Station past the CfD bridge. A data center is one possibility there, and I'll say more on that shortly. Beyond that, we keep developing additional growth options for FlexGen and carbon removals. We stay positive about the opportunities from FlexGen, among them Cruachan 2 and the Cruachan extension on BECCS in the U.K.
Will Gardiner
executiveAnd on a worldwide basis, all of that, in our view, is going to be necessary to tackle the conflicting pressures of the energy trilemma. With that said, we intend to be fairly selective about the investments we make in order to keep those options open. And as we've consistently stated, every investment in those longer-term opportunities will depend on the right long-term framework and more certainty. Let me also mention that the government's recent announcements regarding a review of greenhouse gas removal technologies, along with the direction of travel on the long-duration storage cap and floor mechanism, as well as the initial policy steps of the Trump administration, have all raised the degree of uncertainty. To restate that point, we are very conscious of it. Having said that, we wish to preserve these options, and we'll commit capital to them once we're satisfied with the risk return profile compared with the other opportunities I've already covered. I'd add that where we identify alternative routes to progress our strategy in carbon removals, FlexGen and pellets that carry more certainty, less risk and more immediate cash flow generation, we're strongly drawn to that. At bottom, our capital allocation policy underpins all of this, and I think we've applied it with considerable discipline over a good while now.
Will Gardiner
executiveNow let's turn to Page 20. Over the following couple of pages, I'll discuss how our portfolio lines up with some of the developments taking place in the market. The decarbonization of the system through renewables is a success story, and the U.K. has led the way. Naturally, though, it brings challenges and costs along with it. Having more wind on the system creates intermittency and calls for more active management — curbing wind during certain periods and providing incentives for thermal generation in others. That is pushing up the expense of running the system, and at the same time it creates an opportunity for us to do our part by providing the services the system requires. This has sat at the heart of our strategy for a long time, and as this page shows, the data gives it full support. Across the past 6 years, we've witnessed a 50% rise in terawatt hours of wind generation, a 600% rise in hours of negative pricing, a doubling of system costs, and also a doubling of pump storage activity. So our confidence in the value these opportunities can generate keeps growing, and we can see that reflected in our reported numbers. Since 2019, our FlexGen and Energy Solutions business has produced more than GBP 850 million of EBITDA, against capital investment of under GBP 200 million during that same period.
Will Gardiner
executiveAcross our pump storage, hydro, gas and biomass portfolio, we're doing more — and those assets give us exposure to what drives value throughout the power system. Moving to Page 21, there are exciting chances to expand this portfolio through incremental investment over the short and medium term. First, there's the 40-megawatt expansion at Cruachan, which I've discussed. Second, we have the opportunity to put money into Cruachan 2, which I've also discussed. Batteries are the third area — one we've probably said less about, but I want to spend a bit of time on it now. We're also assessing ways to broaden the range of services we offer, batteries included, and those could be added fairly quickly, complementing the current portfolio and letting us deliver a full range of services to the grid over a wider technology base. Batteries suit our portfolio well. They give us a short duration storage opportunity that capitalizes on our strong trading and optimization characteristics, and we believe there are nice synergies with the rest of the portfolio. Moving to Page 22. For roughly a year now, we've been examining the opportunity to develop a data center. Our proposition — large-scale 24/7 renewable power, secure infrastructure, plus proximity to the national fiber optic network — strikes us as attractive, and we have a short list of developers with whom we're discussing the opportunity.
Will Gardiner
executiveWe expect this to start likely ahead of 2030, with a 100-megawatt development that could eventually grow to 1.2 gigawatts over the course of the 2030s. And at the Drax Power Station we can supply a long-term behind-the-meter power source under an offtake agreement. BECCS could complement it as well. Those 2 things aren't mutually exclusive. In the same way, it also fits with the post-2027 CfD agreement, with no need for extra generation capacity to back up a 100-megawatt data center. Even setting aside generation capacity from our biomass units, we want to stress the value present at the site. The grid access carries value. And I'd point out that Harworth, a different site, recently struck a deal to sell 48 acres of land with grid access to a data center developer for more than GBP 100 million, which on a comparable pro forma basis would come to more than GBP 500 million for 250 acres of powered land at Drax. So we're engaged with developers right now, and we're aiming for MOU and due diligence at some point later this year, and we'll update you once we have more news. Moving to Page 23. We continue to target more than GBP 250 million over the long term for our pellet production business, and we made good progress in '24.
Will Gardiner
executiveOur output rose from 3.8 million to 4 million tonnes, and margins also got better. The CfD agreement for the Drax Power Station provides significant support, and post 2027 we anticipate drawing roughly 2 million tonnes from our U.S. plants, once more at a price in line with our target margin. Yet, as noted before, additional work remains before the remainder of that target can be delivered. Production at our current capacity must go up. Incremental capacity needs to be added once the demand profile becomes clear, and for that our Longview project stands as an appealing option. Existing legacy contracts with Asian customers must be renewed at better rates and/or a sales pipeline into new markets, sustainable aviation fuel or SAF included, must be identified. Beyond all this, we intend to bolster those efforts with work aimed at operational gains and efficiencies throughout our supply chain, drawing on AI as well as other forms of technology. As an example, we are studying biomass chemistry and seeking methods that would let us enhance pellet quality while extracting sugars, potentially creating a secondary revenue stream through sales into an array of new markets, animal feeds and ethanol among them.
Will Gardiner
executiveOur positive view on pellet sales over the long term is unchanged, though we do acknowledge that shifts in demand from Drax Power Station after '27 might create some imbalance between supply and demand in the medium term. And, as Andy said, since we produce, consume and market biomass, we think we're positioned well to capture value that could arise from any supply chain disruptions. Turning to Page 24, I'll say a little more about sustainable aviation fuels. Once again, the potential of this market excites us just as BECCS does. In our view, pellets face multiple new market opportunities. To be specific about the SAF sector, forecasters project that by 2030 this could be a market of about 5 billion gallons. That projection rests on mandates from the U.K. and the EU, along with targets in North America and Japan. For some context, that amounts to under 5% of the overall aviation fuels market. Consider what that means where pellets are concerned. More than 100 million tonnes would be needed to equal 5 billion gallons. Producing 5 billion gallons of SAF would require over 100 million tonnes of pellets. To be clear, though, we don't anticipate that pellets will be the source for all of that SAF.
Will Gardiner
executiveActually, roughly 5%—or somewhere between 4 million and 5 million tonnes of pellets—would go into producing then about 5% of that SAF, with the remaining feedstock supplied by waste, fat, and cooking oil. That gives you the macro picture. From a micro standpoint, or from where we sit, we again hold the heads of terms with Pathway for a 1 million tonne per year pellet contract beginning in 2019, serving a plant in Texas. It appeals to us since it's domestic to the U.S. It sits close to our Drax assets, meaning it moves through our supply chain. What's more, our arrangement with Pathway could potentially bring in a couple of extra sites, which means there might be as much as 3 million tonnes per annum during the 2030s from that single customer. As a reminder, our long-term goal for pellets production stands at 5 million tonnes. So with 2 million at Drax plus 3 million via SAF, you could get there even before counting additional European and Asian demand from other uses. Moving to Page 25 and on to Elimini. So Elimini, our carbon removals company, enjoyed a good year in '24. It was formally launched—a very exciting launch process in New York at Climate Week—and we also set up our headquarters in Texas.
Will Gardiner
executiveWe’re still optimistic about the opportunity in carbon removals over the long term, but I want to stress that we view these as long-term opportunities. As you can see on the page, the CDR market is expanding. It’s mostly based on BECCS, but it remains small compared with our large-scale greenfield projects. And once more, as I said earlier, the right regulation, commercial agreements and macro political environment need to be in place before we commit capital. So our future development expenditure will probably be slower than it has been. Beyond considering greenfield new-build options, we are examining ways to enter the market with lower risk, lower capital commitments and more immediate positive cash flow. For instance, we’re looking at developing a carbon credit trading desk, which would let us access a wider range of products and revenues before 2030. We’re also exploring other ways of developing CDRs, not just using BECCS. And I would say we’re looking at these will be lower cost and smaller capital investments. So we’re not really looking at direct air capture, if that’s what you’re thinking. But again, we remain very positive on the long-term need for carbon removals and BECCS in the U.K.
Will Gardiner
executiveAnd also worldwide. So because of that, we keep BECCS at Drax Power Station as an option that's well advanced, and we think it can and ought to be a key part of the government's net-zero plans for the 2030s and after. But once more, we need far more certainty before we commit capital. So we're looking to the U.K. government for greater clarity on the process going forward, so the right investment framework is created to move these vital infrastructure projects ahead. Then last, on Page 26, we're delivering appealing returns to shareholders through strong operational performance, substantial dividend growth, disciplined capital allocation and a significant share buyback. We're also delivering for all stakeholders, with opportunities tied to energy security, affordability and decarbonization. 2024 was a good year, offering solid evidence of our appealing business model and supporting the U.K. power system via FlexGen, Drax Power Station and the related pellet supply chain. The heads of terms for a CfD at Drax Power Station mark a very important inflection point. But again, a reminder: we still have work to do to turn those heads of terms into a firm contract. The post-2027 adjusted EBITDA target from FlexGen, pellets and Drax Power Station of GBP 600 million to GBP 700 million mirrors growing confidence in our medium- to long-term outlook.
Will Gardiner
executiveAnd with robust cash flow generation and appealing growth opportunities, we’ll pursue those in a disciplined way so that returns are maximized and risk is minimized. So thank you for listening to that discussion, which was longer than usual, and we look forward to taking any questions. Thank you.
Operator
operatorOur first question comes from Dominic Nash at Barclays.
Dominic Nash
analystLet me start by saying there are a lot of moving pieces at every single level here, and clearly, I think there are going to be plenty of questions. So I'll keep it to 2, but the first one is a bit of a stream of consciousness, I guess, which is, can we just begin with your biomass bridging mechanism? You're clearly going down to 6 terawatt hours. First of all, what's your expectation for extra terawatt hours beyond that 6 terawatt hours that you can run on a merchant basis? And then the next part, linked to that, is clearly, 6 terawatt hours is what, 3 million tonnes of biomass, and you're currently, I think, burning about 7. So I'm trying to get a feel for what your delta is in biomass production. And I know you've said 2, 3 times on this call that there will be a short run of overhang of pellet oversupply as you maintain your 2 million tonnes of self-supply, therefore, third parties get squeezed, which then leads on to the second question, which is when and how are you contracting for your pellets? And as we move into that short-run overhang, are you going to be contracting with yourself at this sort of arm's length sort of market price that could be quite dampened if you end up with that overhang?
Dominic Nash
analystAlso, have the contracts actually been signed? Or is there a chance you're entering into CfDs essentially unprotected, and then — sorry, on that point, have I missed something? I believe you had a goal of 8 million tonnes of pellets by 2030. Given this bridging mechanism, I assume that figure is now more of an aspiration than a firm target — apologies, that's my first question. My second one should be quicker, and it concerns BECCS: to me it appears BECCS is being scaled back. Obviously there's uncertainty, as you've noted, around what's happening in the States with Trump. U.K. government policy seems somewhat less supportive of carbon capture, yet you're increasing flexibility in data centers instead. One source of uncertainty we're seeing is REMA and zonal power pricing. Could you give us a sense of what opportunities and/or what effect that will have on your flexible generation capability — OCGTs, Cruachan — and your possible expansion in inflection? And must you wait for clarity on that before we can form a view of what you'll do?
Will Gardiner
executiveAlright, there are a lot of moving pieces in that question, Dominic, so thank you for it. Maybe I'll begin with the bridge. I suppose the first point to make is that the bridge has both a cap and a floor on how much we'll generate. That's the first thing — 6 terawatt hours is the cap, which I think is probably the key question. Regarding some of the figures we've been citing, I think that by 2027, the actual number at that point in time will be roughly 170, right? That's the actual CfD level. And I think we're talking about biomass cost at around 130, if you want to pick a number, so I guess the real question becomes how often do you or we believe the power price will sit above that 130, right, so that we could generate without a CfD supporting the generation, right? We don't see it as a very big number, given where power prices stand today; we think there is some possibility there. But I'd suggest it's not a big number at best, marginally.
Will Gardiner
executiveI'd say that's likely a baseline figure, correct? What I mean is, as we've witnessed over the past few years, plenty of developments can occur. So it's essentially grounded in the world as we perceive it starting today. Therefore, to achieve those 6 terawatt hours, again, that translates to roughly 3 million tonnes of pellets. We anticipate drawing on approximately 2 million of our own. As for the remaining pellets we hold, the contracts we've effectively got in Asia effectively account for pretty much all the rest of what we currently possess, in terms of that figure of about 4.5 million tonnes. So I'd say our production is well sold, so to speak, right? Regarding the price at which we sell those pellets, it has to be an arm's length price for transparency reasons relative to the bridge, for tax reasons, and so on. But again, that price should also capture the value of a long-term contracted position. That holds true today, and it always will. So to your final question, the railway on the other 10 million tonnes. What I mean is we've been planning for this — and we were also planning to ensure we can have knowable and firm prices beyond 2027 for some time.
Will Gardiner
executiveWe do have certain option agreements set up with a few third-party pellet suppliers. So I'd say we feel comfortable that our costs are known. And should a market opportunity arise to do better, we'll take advantage of it. Regarding BECCS, what I'd say is that if you look at perhaps the U.S. and then the U.K., I think up until this current administration came into office, our sense had been that the IRA would probably remain in place. And given — sorry, I should mention that the subsidy support for carbon capture embedded in the IRA, that is, the 45Q mechanism, would keep going on the basis that it strongly supports investment and job growth across many red states. I think we still believe that holds true. However, I think the other volatility that we've seen stemming from what the Trump administration is doing, I think that generates a lot more uncertainty than I probably had expected, which comes as somewhat of a surprise to me, given I was expecting quite a bit. So I think we're quite a lot more cautious, as I think many market participants are, about longer-term large-scale investments in renewable technologies in the U.S.
Will Gardiner
executiveThat really is a major concern. Regarding the U.K., I suppose, in fairness, I hadn't anticipated that a review of greenhouse gas removal technologies by the U.K. government would be revealed at the same moment the bridge was announced, correct? And I've had a few conversations with the government on this. My impression is that they want to be confident they're at ease with where policy is heading, which is plainly within their power to decide, and they must be and must do, but once again it introduces extra uncertainty. So beyond having to await the spending review, which we expect in the summer, and the start of the Cruachan 2 process, which again, we anticipate in the summer, we also need to see what comes out of that review. So for me, all of this actually means that, as has been the case, and you know we didn't deploy capital on U.K. BECCS last year because we've been in this situation for a while. So in some respects it isn't a shift in approach. It's simply, I suppose, a sense that the uncertainty could be greater than we had assumed it would be.
Will Gardiner
executiveWhen it comes to REMA, from where I sit there are probably 2 ways to look at it. The first is that any fresh investment—if we were contemplating new development work, meaning new build, building a greenfield asset—I'd say is quite heavily challenged by the uncertainty generated by the possible shift to general pricing, which holds true for—though in fairness, we really have just 1 greenfield build project that hasn't started, and that would be the Cruachan expansion, and there are plenty of uncertainties surrounding that too. So that project is very much in a holding pattern awaiting greater certainty. And once again, we'll likely give the market an update fairly soon on where things stand with it, because of the capital flooring, and we're working through that analysis right now. So we ought to have a bit more visibility on it before long. But then again, there remains a good deal of uncertainty with that one, correct? Yet anything we might pursue in batteries, say, I'd be more inclined toward owning something with a grid connection, with some known cash flows, rather than actually constructing something new, and REMA is among the factors there. As for how REMA could affect our current portfolio, open cycles, Drax Power Stations, and so on, that's difficult to determine, since we don't yet know what the zones will be.
Will Gardiner
executiveThe pricing is still unknown to us. So that’s a factor we’re monitoring. And the timing of when it occurs is also unclear. So I suppose the takeaway is this: with regard to assets already in place, we’ll need to see how things unfold. And for anything we might consider launching, we’d require greater certainty before proceeding. I hope that answers your question at lengthy.
Dominic Nash
analystYes. And sorry for the lengthy questions, and I appreciate your answer. Just to clarify, though: will you be signing pellet contracts for self-supply at a rate that differs from what your third-party suppliers might offer you, given the overhang?
Will Gardiner
executiveThe prices we agree to will be fundamentally in line with where the market stands.
Operator
operatorPavan Mahbubani from JPMorgan has the next question.
Pavan Mahbubani
analystI have 2 questions, please. So regarding the OCGTs, could you give us an update on where things stand with commissioning? And my follow-up on that is, how are you viewing the OCGTs within your portfolio? Because you've previously said these might be assets you'd be open to selling. And in earlier periods, you've mentioned that they may not fit with the portfolio you want to hold toward the end of the decade or further out. Today it sounds like that's pain, but if you could update us on how you're thinking about it? And then my second question concerns capital allocation and leverage — you're spending at a 2x net debt to EBITDA target, but it appears you're quite significantly below that; it's true that your EBITDA figures for the coming years will differ versus the '24 basis. But how are you thinking about the headroom for capital allocation as you approach the end of the share buyback program in the coming months or toward the end of the year — do you think you have the headroom to do more? Or could you discuss how much you're willing to spend on batteries, just so we can get a sense of how you see balance sheet headroom if you view it the same way I'm suggesting, and how you think about splitting that?
Will Gardiner
executiveAlright, I'll take the first one, and I'll ask Andy to handle the second. On commissioning, as you're aware, we have three sites. What I'd say is that they're significantly behind schedule, and the core reason for that delay is our capacity to secure national grid and system operator approval so we can access the grid and bring them online. So that's a matter we're pushing on hard with them, both commercially and operationally. I'm fairly unhappy with where that stands. To give you an example, a few of these sites are now over a year beyond their originally scheduled commissioning date — and once more, that comes down to grid access. That said, we still anticipate commissioning this year. Fingers crossed, the first half for one, and realistically the remaining 2 in the second half. As for how this fits within the portfolio, my view is this: our purpose is to make possible an energy future that is zero-carbon and lower-cost. And in our view, peaking plants help make that possible — they keep the system balanced when there's no wind and no sunshine.
Will Gardiner
executiveSo they do belong in the portfolio, in my view. A key provider sits there — you'll have noticed it in the sustainability framework, where we've pledged that we ourselves will reach net-zero by 2040. So if we retain them — and again, should a tempting bid come along that aligns with how we see expected returns, which, as I mentioned earlier, we believe has gone up rather than down — we'll examine it, and we have to figure out how to guarantee we hit net zero by 2040 while still holding them, assuming they remain in the portfolio. Andy?
Andy Skelton
executiveTurning to your second question, Pavan — we’re beginning with roughly GBP 1 billion of net debt as of the close of this year. As you pointed out, insofar as there is consensus for ’27 at present, it stands at approximately GBP 560 million. That means, on a 2x basis, it supports the debt we’re carrying today. Obviously, we will produce meaningful cash, as we’ve indicated across the period running through ’27, ROC amount included, and that leaves us with ample room to pursue anything when it comes to growing our portfolio. Beyond that, our policy on capital allocation is quite plain, and we will stay disciplined in the way we deploy it. Where there’s surplus cash, what we would look at is clear, and we’ll keep doing that.
Operator
operatorHarrison Williams from Morgan Stanley has the next question.
Harrison Williams
analystMorning, and thanks for taking my questions — I have two. The first one is about pellet guidance. I think you've hit GBP 36 this year, and you've restated the target of, I guess, GBP 50 per ton. Could you give us some insight into how that develops between now and 2027? Would it be a gradual improvement, or are you beginning to see it more back-end loaded? Maybe another way to ask that: at the end of the period — in 2028, I guess — how much of the five you expect to produce will still be on legacy contracts that are sub-optimal? That's the first question. And the second one: as we think about your discussions with data centers, is it reasonable to use the CfD bridge as a reasonable pricing point? Or are there differences we should be considering in those negotiations?
Will Gardiner
executiveLet me just check that I've got the second question right. So what you're asking is whether the CfD strike price is the correct price to have in mind for the data center?
Harrison Williams
analystYeah, is that roughly the pricing point you'd be looking to hit? Or would you instead expect something a bit lower but considerably higher — well, I suppose you've already given us the volumes. Any additional detail you can offer on that front, I guess.
Will Gardiner
executiveOn the first one, I'll bring Andy back in a moment, but let me handle the second. When you consider the data center situation, the behind-the-meter opportunity essentially means you avoid the third-party charges and other grid fees that someone consuming power through the grid would typically pay, correct? That's meaningful — it likely roughly doubles the cost of wholesale power. So what we really need to do is set a price and reach an agreement with the data center provider that's competitive with what they could obtain from the grid, right? I'd view it much more as a commercial negotiation in which we have to ensure we're offering an attractive option consistent with the other power sources a data center provider could access, right? That's how I'd think about it. Hopefully that covers it. Andy?
Andy Skelton
executiveRight. So at present, we're at roughly 4 million tonnes. And when you break that down, it divides fairly evenly between the southern U.S. and Canada. And to reach 5 million, we'll raise output from our current plants to 4.5 million tonnes. And the bulk of that added volume is going to come from the southern facilities. And we're making solid headway on that front. We lifted production this year, and we commissioned the Aliceville expansion during the year. So we remain on track to produce more pellets out of the South this year than we did last year. So what matters is that those southern pellets will serve the period after '27, running now through '31. So that gives a solid underpinning for those earnings. So the remaining roughly 2 million tonnes of our existing volume is what sits in those long-term Asian legacy contracts. About 1 million tonnes of those will be up for renewal across the coming 5 years. So during that window, there'll be an opportunity potentially to enhance the margins there. The final 0.5 million is the Longview pellet plant expansion, and we'll only finalize and carry that out once we have clarity on the offtake for those pellets. So I think it's fair to say the improvement there is going to be back-end loaded, because it will depend on, first, the timing of completing Longview and the repricing of those legacy contracts that roll over during the next 5 years.
Operator
operatorAlex Wheeler from RBC has the next question.
Alexander Wheeler
analystTwo questions from me, please — or 2 and a small follow-up. The first one: is the thinking very much that you'll be looking to concentrate on the FlexGen business over the years ahead? You pointed out that you're already broadly there on the GBP 250 million EBITDA target for post '27. But given that supply-demand imbalance in pellets that you mention, which might introduce a bit more uncertainty, is it FlexGen where you might focus potential additional investments in the shorter term? And then I suppose my question there is, is it only batteries that represent a potential new opportunity there? Or are there other areas you might be considering? Second point is just a follow-up on Pavan's question — I don't know whether I missed it. Do you have a rough guide as to what the sort of battery investment numbers might be? And then finally, just on the data center point, I know that we're at a very early stage here. But beyond the MOU, if we think about the initial 100 megawatts by 2030, could you just give a sense of what the timings and the moving parts might look like beyond signing an MOU, to the extent that you can?
Will Gardiner
executiveAlright, so regarding where we focus our investments — I think the main takeaway there is that a few distinct considerations come into play. First, we're drawn to investments that offer a degree of known cash flow within our core markets, correct? If such opportunities exist in the pellet space, for instance, they'd interest us, though that would need something with a known offtake — and I don't believe there are many opportunities of that kind in that space, right? Now, in the FlexGen space, we are indeed seeing opportunities. I mean, if you look at our portfolio — pump storage, hydro, open cycles, customers — I think with customers, it's less likely that we'll invest more toward acquisitions of customers. But in the other areas, should opportunities arise that align with where our portfolio stands, batteries included, we would pursue them. On quantums, I suppose the one thing I'd note is that given how uncertain the world at large is right now, we'll be prudent, I think, about the bite sizes — or the size of the bites — we might take. That strikes me as quite important.
Will Gardiner
executiveAnd so one of the points — again, you get earlier cash flows, paybacks that are shorter, returns that are attractive, and less risk tied up in any single given transaction, correct? When it comes to the data center and when it comes to timing, I think the — perhaps that 100-megawatt mark matters, since we could actually — we believe we're actually able to deliver power to a 100-megawatt data center in a manner consistent with how the bridge is structured. Should you go above that size, it gets more difficult, and we have to sort of work out how to accomplish it. As for when we think a data center might be up and running, 100 megawatts is probably how we think about what we might do during the 20s, generally speaking. So again, I think it's quite likely, again, given how long these things take, that all of it will come together in a way where having 100 megawatts well inside the bridge makes sense, right? As for the remaining timing on it, I think it's too early to say, Alex, I mean, precisely where we stand. These discussions are still at an early stage. And so we'd hope to have more that we can share with you this year, but past that, I would say, something in the 20s, though probably toward the back end.
Will Gardiner
executiveAnd then, like I mentioned earlier, growth in the 30s. Did that cover all your questions there?
Operator
operatorWe’ll take the next question from Adam Forsyth at Longspur Capital.
Will Gardiner
executiveAdam, if you’re talking, we can’t hear you.
Adam Forsyth
analystApologies — is this coming through clearly at present?
Will Gardiner
executiveYes.
Adam Forsyth
analystNo problem. Yes, 2 questions. They both really concern how the biomass units will be run starting after '27. The first is whether there's any effect on the Energy Solutions business. Guidance for that business looks largely the same and is folded in with FlexGen. Still, I'm curious whether anything material changes in how you make purchases and how you handle risk there, given the shift in biomass operations. Second, turning to your remark about batteries and the 4 gigawatts of grid connection at the Drax Power Station site: roughly 1.2, nearly 1.3 of that is in fact available at present from the 2 old coal units that aren't running. But I'm wondering whether that's the right thing for us to focus on, or whether you can go further and actually operate batteries alongside the grid connection serving those biomass units?
Will Gardiner
executiveStarting with the CfD and what it means for Drax Power Station and the Energy Solutions business — my sense is we don't anticipate any major effect on how that business operates. On batteries, I'd say we're exploring development opportunities while also considering acquisitions. So that's likely the direction — I'd keep both of those possibilities in mind. And I believe that essentially covers that question on its own.
Operator
operatorOur next question comes from Charles Swabey at HSBC.
Charles Swabey
analystI have 2. First, just on the Cruachan expansion — I know you touched on this a bit earlier. But when do you think we might get some more clarity on that? I know we're going to get a few announcements from government this half of the year. But if you could give an indication of maybe when you're thinking a potential FID is possible, and whether you're more or less confident of getting that project over the line compared to 12 months ago? And then the second one, just a follow-up on the data centers. All those conversations you're having with developers, are they involving using Drax Power station as is? Or are there any that are involving BECCS as well?
Will Gardiner
executiveGood questions. On the Cruachan expansion, we’re right now working through how attractive the cap and floor framework looks, both in broad terms and for this specific project we have. I’d anticipate getting more visibility on that during the first half of this year, or around the time of our mid-year results. If I’m asked whether my confidence has risen or fallen, I’d have to say it’s lower than it was 12 months ago. Truthfully, that partly reflects our first quick read of the cap and floor, but it also reflects how appealing the broader macro backdrop is for long-term investments of that size. Turning to data centers, at this stage most of that activity is focused on the Drax Power Station essentially in its current form — either operating it or drawing power from it as it stands. Having said that, we have held conversations, in a general way, with parties about Drax Power and why it might work well for a data center.
Will Gardiner
executiveJust as a point of interest, that’s a big piece of the Pathway project, for making SaaS. So I think Drax Power, as a means of lowering the carbon intensity of what people are doing by adding the carbon removals, is definitely something people are interested in. So it’s probably not in the initial offering, but it could be part of that. It definitely aligns with what we might do with the data center too.
Operator
operatorThat appears to be all the questions we have from the phone line right now.
Will Gardiner
executiveAlright, I see two questions on the webcast, so I'll read them out. At the start of the call, you mentioned that under the new sustainability criteria, you won't need to purchase additional pellets from Europe. Is that measured in absolute terms or as a share of your new pellet consumption under the new CfD? I suppose the first thing I'd say is that the way to think about it is this: when a pellet is made and moves through the supply chain to the Drax Power Station, there's a cap on how much greenhouse gas can be released across that entire process. And for all the pellets we'd expect to source from North America, we believe — and we know — that those can be obtained at levels consistent with that greenhouse gas cap, right? So I suppose the specific answer is that there's no requirement to buy additional pellets from Europe, and there's no effective cap on what we can obtain from North America under that greenhouse gas emissions limit. I hope that answers that one. The first question comes from Hugo Lafaye. The second comes from Martin Young. The CP 2030 report indicates that considerable new generation is required, and there's a need to proceed quickly.
Will Gardiner
executiveThat's something I completely agree with. Engineered removals do feature within the Climate Change Committee's seventh carbon budget. That's correct. Progress on policy has been rather glacial, to use your phrase, Martin. REMA is a good example, and the zonal spikes haven't helped. I understand Drax probably faces less exposure to zonal, but I'd be interested to hear where you stand on zonal — yes or no — given your position. So my take on zonal is this: I believe that's the right approach to the conceptual economic rationale, or the notion that it makes sense for prices to be lower in places where supply exceeds demand and higher in the opposite situation. I can follow that logic, right? The difficulty with REMA, I think, comes in two parts. First is the timing of the entire thing, right? So one part is the uncertainty that arises from not knowing whether and when it will happen and what the effect will be. For new investment, I think the impact is quite dampening. And as I said earlier, Martin, that isn't affecting us much at present. But when we consider things such as the Cruachan expansion, or anything we might pursue on a new build front.
Will Gardiner
executiveAnd as you're aware, there isn't anything else of significance on the new build side in our portfolio right now. That's certainly something to weigh. And from conversations I've had with peers across the industry, folks working on large-scale projects in all the various areas find this to be a very big issue, right? My second point is that even if there's logic to that, then the question for me becomes whether demand can actually respond to those signals, right? So take something like a data center — relocating one near an offshore wind farm because prices are lower. There are plenty of other issues tied to where you'd site a data center. So I think it's definitely a complicated question, right? So I think there's a genuinely substantial trade-off between the benefits of certainty and knowing where you're headed versus the potentially real economic benefits that zonal pricing offers. That's probably somewhat of a fudged answer, but hopefully it gives you a bit of context. Are there any further questions from the teleconference?
Operator
operatorThat brings us to the end of the questions from the phone lines.
Will Gardiner
executiveThat wraps up the questions from the webcast, so thanks to everyone for tuning in. The remark that stayed with me, I suppose, was the one you made right at the start, Dominic, and there are plenty of moving pieces. But if I try to step back and ask how I'd put it, maybe the parts of the core business are moving less than it seems — if that's a fair way to say it. The FlexGen business is what it is and has been that way for a while. As for the pellet business, its trajectory lines up with our targets, and hopefully that is becoming clearer. I accept that the CfD genuinely has to be grasped, and it is a complicated instrument. So we'll take the time with all of you to do our best in helping explain it. Then, to sum up quickly, I'd say it comes down to a shift in how we invest. It's much more a consequence of greater uncertainty, a higher cost of capital, somewhat less enthusiasm from governments and perhaps from corporates about putting their own capital into green investments, and we're adapting to that.
Will Gardiner
executiveWe're seeking opportunities where we can put what we anticipate will be roughly a couple of billion pounds of available cash to work across the coming half a decade — things that deliver attractive immediate returns and carry the right risk-return profile. And we believe there are plenty of interesting ways to accomplish that. So hopefully that gives you a brief summary of where we stand. And I thank you all for listening, and I look forward to catching up over the next days and weeks. I think we have a breakfast with many of you tomorrow. Thank you.
Operator
operatorLadies and gentlemen, that brings us to the end of today's conference. We appreciate you being with us. At this point, you're welcome to disconnect your lines. Goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Drax Group plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Drax Group plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Drax Group plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.