Eco Wave Power Global AB (publ) (WAVE) Earnings Call Transcript & Summary

December 5, 2023

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings

Earnings Call Speaker Segments

Inna Braverman

executive
#1

Thanks. I appreciate everyone being on our Q1 investor call. To kick things off, I'd like to provide an update on operations and what's coming up in the near term. Some of you likely already know that construction has been completed on the EWP-EDF One project, located at the Port of Jaffa in Israel. Funding for EWP-EDF One came jointly from EDF Renewables Israel, which holds a 50% stake in the project, and from the Israeli Ministry of Energy, which designated our technology as pioneering. Installed capacity for this project comes to 100 kW, and it consists of 10 floaters. Back in August 2023, the power station was formally linked to Israel's national electrical grid — the first occasion in Israel's history when electricity generated from wave power fed into the country's national grid. Right now, our engineering team is calibrating the power plant's automation system while also testing how the equipment holds up and operates. Roughly seven days ago, that team put the power station through its paces during a storm that brought waves reaching as high as 3.5 meters. The floater mechanism sustained no damage throughout that storm, which demonstrates how durable the technology is. Furthermore, while testing, we hit a peak energy level of approximately 32.4 kW delivered to the grid, along with a steady average output of roughly 10 kWh. For this initial testing phase, those results look promising, and we anticipate a substantial rise in production once the testing phase concludes. Our next planned launch will take place at the Port of Los Angeles. At present, we have one floater mechanism plus a completely assembled energy conversion unit situated on the Port of L.A. grounds. Over Q1, we completed the civil engineering design for attaching the floaters to the marine structure at the Port of L.A., working alongside KPFF, a civil engineering firm based in California, which formally signed off on the safety of our design. The detailed design together with KPFF's approval has been handed over to the Port of Los Angeles, and we're now awaiting the last required licenses from both the Port of L.A. and the Army Corps of Engineers. As soon as those come through, we'll build 7 more floater mechanisms and move straight into installation in Los Angeles. The Port of L.A. effort will mark our first formal entry into the U.S. market, which we consider a highly strategic market for Eco Wave Power. This is particularly true considering that, per the United States Energy Information Administration, wave energy alone could meet 66% of all U.S. energy needs. It's also worth noting that at the start of October 2023, California Governor Gavin Newsom signed California Senate Bill 605 into law — a historic milestone for wave energy in America. Under this law, the California Energy Commission is tasked with assessing whether wave and tidal power can work in California, along with what it would cost and what benefits would come from deploying such technology across the state's coastline; and now, turning to one of the projects we're most thrilled about. In Portugal, we've signed a concession agreement covering a 20-MW power station located in the city of Porto, and we expect this to be our inaugural commercial-scale deployment. The plan is to begin by building 1 MW and then step up progressively until reaching the full 20 MW — a size that has never before been constructed anywhere in the wave energy sector. We're delighted to report that every approval needed to start execution work on our initial 1 MW in the city of Porto has now been obtained. Consequently, we are in the process of putting an execution bond in place for this project, and after it is set, a 24-month window will be available to us for constructing the entire project. Our expectation is that this endeavor will demonstrate wave energy's ability to be cost-efficient, dependable, environmentally sound, and readily linked to the national grid; beyond that, we aim to demonstrate profitability from our first commercial scale venture, which would establish wave energy as a meaningful contributor to the global renewable energy mix. Over this stretch of time, Eco Wave Power has additionally secured two grants. The first comes from the European Union under the NI CBC Mediterranean Sea Basin Program, while the most recent one comes from the government of the U.K; together they total $1.83 million, which will be divided among the various partners in the grant consortium, among them Queen Mary University of London, Toshiba, Hitachi, and other leading global companies. Regarding our newer collaborations, I'd like to share that our partnership with Lian Tat Company in Taiwan is moving forward according to plan. In October 2023, the President of Taiwan attended Lian Tat's exhibition of Eco Wave Power technology at the Taipei International Exhibition Center and stated that the Taiwanese government would vigorously advance the development of forward-looking renewable energy, including wave power. Wave Power and Lian Tat are presently working toward Eco Wave Power's official visit to Taiwan as well as toward identifying a first site for a planned joint wave energy pilot; additionally, we have gotten purchase orders and finished feasibility studies for world-leading organizations, among them Rogan Associates, a Greek company that ordered a feasibility study for a 2-MW wave energy project at the Port of Heraklion in Greece, JESA Engineering from Morocco, which ordered a feasibility study for a port in Morocco, Chevron Corp, which issued a purchase order for a feasibility study concerning installation of Eco Wave Power technology on an offshore gas drilling platform in Israel, and the most recent purchase order comes from Shell, which ordered a feasibility study intended to explore wave energy potential in the U.S. and around the globe. Money generated by every purchase order, along with the feasibility studies tied to them, is going to show up in the report for our fourth quarter, which comes out at the start of 2024. I believe it's worth pointing out that while Eco Wave Power has made considerable headway, we've likewise recorded a sizable drop in our net financial loss across the nine months of 2023. Over this month, our net loss came to approximately $1 million, versus roughly $2 million of net loss during the equivalent stretch a year ago. Right now, more than at any prior point, we stay strong, resilient, and deeply devoted to pushing our wave energy projects forward. Kindly be aware that going forward, we'll hold quarterly calls on a consistent schedule, providing updates about fresh strategic collaborations, our operational and forthcoming wave energy projects, plus new grants and orders, since we want to share our mission and achievements with investors on a consistent basis. Should you have questions following the call, or if you'd like a script of the call sent to you, feel free to reach out to us. Details for contacting us can be found on our website. Thanks for joining.

This call discussed

For developers and AI pipelines

Programmatic access to Eco Wave Power Global AB (publ) earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Eco Wave Power Global AB (publ) or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.