Thanks, Michelle, and good day to all of you. Joining us on the line are our President and Chief Executive Officer, Pedro Pizarro, along with Executive Vice President and Chief Financial Officer, Maria Rigatti. Other members of the management team are also with us on this call. I want to note that our executives are participating from various locations today, so we appreciate your patience should any technical issues arise. You can find the materials for today's call at www.edisoninvestor.com, which include our Form 10-Q, the prepared remarks from Pedro and Maria, and the teleconference presentation. Our regular business update presentation will be sent out tomorrow. On this call, we will be sharing forward-looking statements regarding the outlook for Edison International and its subsidiaries. It's possible that actual results may differ materially from what we currently expect. The key factors that might lead to different outcomes are described in our SEC filings. We encourage you to review those carefully. Within the presentation, you'll find certain outlook assumptions and a reconciliation of non-GAAP measures to the closest GAAP measure. When we get to the question-and-answer portion, kindly keep to one question and one follow-up. At this point, I'll hand the call over to Pedro.

Pedro Pizarro

executive
#2

Okay, thank you, Sam. Before I get into the quarter, I want to mention the senior leadership shifts we made public last week. Kevin Payne, who serves as SCE's President and CEO, intends to step down on December 1, following 35 years at the company. Kevin made a tremendous mark on the utility — especially through a focus centered on customers, directing our efforts to reduce wildfire risk, and championing and pushing forward the company's clean energy approach. I'll truly miss my close friend, but I'm very pleased about our strong pipeline of talent: Steve Powell is set to take over from Kevin as President and CEO, while Jill Anderson, who right now is Senior Vice President of Customer Service, will move into Steve's role as EVP of Operations. By elevating people from within Edison, we'll get a smooth handover, and in my view both Steve and Jill carry outstanding experience into these positions. I realize quite a few of you have already gotten to know Steve and Jill, and lots of you will get a chance to meet them at EEI's Financial Conference next week. Now, on to the quarter. Today, Edison International posted core earnings per share of $1.69, versus $1.67 during the same period last year; that comparison isn't really meaningful, since in the quarter SCE booked a true-up tied to the final decision in track 1 of its 2021 general rate case, and that true-up reaches back to January 1. Taking into account how we've performed so far this year plus what we expect for the rest of it, we're tightening our 2021 EPS guidance range to $4.42 to $4.52. In addition, we're reaffirming our longer-term EPS growth target of 5% to 7% through 2025. Maria is going to walk through our financial results thoroughly in her report. So, beginning with past events. SCE today put out 2 updates tied to the 2017 and 2018 wildfire and mudslide events. Page 3 of the slide deck gives a full summary. To start, SCE changed its best estimate of potential losses to $7.5 billion, up from $6.2 billion. As we've said in our ongoing communications about this matter, we reassess that best estimate every quarter. Given the continuing and highly intricate litigation process, we carefully weigh fresh information as it comes up so we can give all of you our best estimate. Drawing on extra information gathered across a wide range of claim types during the quarter, plus an agreement with the CPUC Safety and Enforcement Division, or SED, which I'll cover shortly, SCE updated how much it estimates total potential losses could be. Even though that total estimate went up this quarter, SCE kept making significant headway, resolving claims and finishing roughly $485 million in settlements. SCE has now resolved around 70% of the estimated exposure tied to the 2017 and 2018 events. I want to stress that we don't require equity beyond the 2021 financing plan we previously disclosed in order to cover the larger estimated losses. Maria will take up this subject later in the call. Next, the utility came to terms with the SED, settling probes related to the 2017 and 2018 wildfire and mudslide incidents along with 3 additional 2017 wildfires. As previously disclosed by us, the SED investigated whether SCE complied with applicable rules and regulations in areas impacted by the Thomas, Koenigstein, and Woolsey Fires. There was a chance the CPUC would launch formal enforcement actions seeking fines and penalties over alleged violations, but as part of our best estimate, we could not estimate the size or the timing. The newly signed agreement, pending CPUC approval, would eliminate that uncertainty. Its total worth is $550 million, made up of roughly $110 million as a fine, $65 million in safety measures funded by shareholders, and SCE agreeing to give up its ability to pursue cost recovery for $375 million of uninsured claims payments, drawn from the $5.2 billion total in the current best estimate. Under the SED agreement, SCE admitted no imprudence, negligence or liability regarding the 2017 and 2018 wildfire and mudslide events, and it will pursue rate recovery for prudently incurred actual losses beyond available insurance, excluding the $375 million waived under the SED agreement. Although SCE contests a number of the alleged violations, securing an agreement removes one more uncertainty. Now let me turn to the Southern California wildfire season. SCE keeps making solid headway executing its Wildfire Mitigation Plan, or WMP, and its PSPS action plan. Year-to-date, SCE has installed more than 1,000 miles of covered conductor, which brings the cumulative figure to 2,500 miles since the program began. During the last 3 years, the utility has swapped out roughly 25% of its overhead distribution power lines in high fire risk areas for covered conductor. SCE has additionally completed another yearly round of inspections in high fire risk areas, plus extra inspections focused on dry fuel areas. That led to approximately 195,000 assets receiving 360-degree inspections within SCE's high fire risk area. SCE also remains on track to achieve most of the goals laid out in our WMP by year-end. The scorecard appears on Page 4 of the slide deck. All these continuing mitigation efforts keep bolstering our confidence in our utility's overall improved risk profile when it comes to wildfires. Moving to Page 5. We call attention to the metrics we presented last quarter, which serve as proof points of how SCE believes it has lowered wildfire risk for its customers; we have added one more metric. Reflecting on prior wildfire events and taking into account the utility's current PSPS protocols, we cannot quantify the damage that would have been averted. If we take red flag warning days as a stand-in for the times the utility would deploy PSPS under today's approach, then for blazes exceeding 1,000 acres tied to its infrastructure, SCE would have stopped more than 90% of the structures that were damaged or destroyed. That said, in our view, a far more meaningful exercise is evaluating how much overall risk SCE has cut going forward. We've laid that out on Page 6. All told, when you factor in physical mitigation steps like covered conductor, operational steps like tree removals, inspections and vegetation management, plus the use of PSPS, SCE puts the reduction in the likelihood of losses from catastrophic wildfires at 55% to 65% versus pre-2018 levels. That figure comes from a recent analysis drawing on risk management solutions, an industry-leading wildfire model and SCE's data on the actual mitigations deployed and mitigation effectiveness, which let us quantify the risk reduction. Risk can never be fully eliminated, but the utility does expect to bring risk down further and to lessen the need for PSPS in achieving that reduction through continued grid-hardening investments. As California keeps moving toward a clean energy economy, sustaining and even boosting system reliability becomes essential, especially given greater reliance on electricity. SCE collaborated closely with the Governor's office, CAISO, the CPUC, customers and many stakeholders to avert rolling outages last summer, when the state and the entire West once again saw record temperatures.

Pedro Pizarro

executive
#3

Several key California energy organizations — among them the CAISO, the California Energy Commission, and the CPUC — have signaled that more capacity will be required to get through summer 2020, excuse me, summer 2022, when conditions turn extreme, such as the heat, drought, and wildfires that we've witnessed time and again across the last few years. To speed up building of new capacity, an emergency proclamation came from the governor asking the CPUC to collaborate with load-serving entities so that energy storage construction for 2021 and 2022 could move faster. Toward that goal, on top of locking in more than 230 megawatts of additional capacity from third parties, SCE intends to build roughly 535 megawatts of utility-owned storage ahead of this coming summer. That marks a substantial boost in incremental capacity aimed at lowering the danger of statewide customer outages during summer 2022, which extreme weather events and persistent drought conditions would cause. Although the governor put his signature on the biggest climate package in state history, one containing 24 bills and more than $15 billion for climate, clean energy, and wildfire preparedness funding, much more remains to be done, and that need continues. So I want to call attention to a paper we put out not long ago, titled "Mind the Gap: Policies for California's Countdown to 2030." This policy paper represents Edison International's most recent effort to pinpoint the policies and actions required to help California cut emissions and decarbonize its economy. Within it, we laid out state and federal policy recommendations that California needs in order to hit its 2030 climate target, a foundational way point on the state's path toward decarbonizing its economy by 2045. Even though California has made headway in lowering GHG emissions, bridging the distance between where we are now and the 2030 goal demands a major step up in effort. That means quadrupling the 1% average annual reduction in GHG emissions the state has achieved since 2006 — quadrupling it to 4.1% per year from 2021 to 2030. Quite an ambitious ask, yet it can be done. It will take market transforming policies and incentives to push forward critical areas, including decarbonizing the power supply, getting the grid ready for shifts in usage and rising demands, and electrifying transportation and buildings. As the sole all electric investor-owned utility in California, SCE is positioned well to lead this transition. We'll keep working in close partnership with policymakers and stakeholders to find ways to improve funding, planning, standard setting, and other approaches so that the equitable and affordable transition to a clean energy economy is successfully achieved. On the affordability point, our analysis indicates that an electric led transition is the most affordable pathway, because electric motors and appliances are more efficient, which will cut customers' total costs across all energy commodities by 1/3 by 2045. Edison International is committed to reaching net 0 GHG emissions across Scopes 1, 2 and 3 by 2045; and that encompasses the power SCE delivers to customers along with Edison International's enterprise-wide operations, supply chain included. All of this keeps us in step with the wide-ranging measures required to tackle climate change and secure a dependable grid. We're also going to keep working with leaders at the state, national and global levels to push the clean energy transition forward — which explains why, right now, I'm on the phone with all of you from COP26 in Glasgow, Scotland, where I'm here on behalf of both Edison and EEI. With that, Maria will give her financial report.

Maria Rigatti

executive
#4

Thanks, Pedro, and good afternoon to all of you. The topics I'll address today include our results for the third quarter of 2021, along with our forecasts for capital expenditure and rate base, plus some updates on other financial matters. Edison International posted core earnings of $1.69 per share in the third quarter of 2021, which is $0.02 per share above what we recorded in the same quarter a year ago. As Pedro mentioned previously, looking at this comparison between years doesn't tell us a great deal, since SCE booked a true-up tied to the final decision in its 2021 general rate case, and that adjustment reaches back to January 1; over on Page 7, on the right-hand side, you'll find SCE's key drivers of third quarter EPS. I'll walk through the main items behind the variance. First, SCE obtained a final decision in the 2021 GRC in the third quarter. Since results for the first and second quarters had been calculated using 2020 authorized revenue, a true-up got recorded in the quarter covering the initial 6 months of 2021. That true-up shows up across a number of line items on the income statement, producing a net earnings increase of $0.35. Footnote 3 lays out the components. Revenues that were higher in 2021 added $0.55, made up of $0.50 tied to the 2021 GRC decision, $0.04 for CPUC revenues connected to certain tracking accounts, and $0.01 at FERC. O&M came in with a positive variance of $0.28, largely from establishing the vegetation management and risk management balancing accounts, partly offset by greater wildfire mitigation costs stemming from how regulatory deferrals were timed in the third quarter of 2020. Depreciation produced a negative variance of $0.20, mostly because of a larger asset base and a higher depreciation rate coming out of the 2021 GRC decision. Income taxes showed a negative variance of $0.41. That figure includes $0.39 of reduced tax benefits tied to balancing accounts and the GRC true-up, which offset revenue and carry no earnings impact. At EIX Parent and Other, the loss per share came in $0.09 above the third quarter of 2020. The main factor there was preferred dividends on the $1.25 billion of preferred equity that the parent issued in March of this year. Let's now turn to SCE's forecast for capital expenditure and rate base growth. On Page 8, you'll see we've updated our capital forecast, mainly to account for the utility-owned storage investment we announced recently. As Pedro said, SCE submitted an advice letter seeking cost recovery for $1 billion of capital spending to build roughly 535 megawatts of utility-owned storage. SCE is asking for expedited approval of that advice letter so the projects have the best chance of hitting their expected online dates for the additional capacity California needs by summer 2022. These projects illustrate perfectly how essential utilities can be in promptly making sure California enjoys a safe, reliable and clean electricity supply. We raised our 2022 capital expenditure forecast by about $900 million and brought the forecast down somewhat for 2023 through 2025, since these storage projects speed up part, though not all, of the capacity we had previously forecasted for those years. Altogether, when we look at the upper portion of our capital plan for the years 2021 to 2025, the net amount added comes to roughly $500 million. On Page 9, you can see that our rate base projection has likewise been revised to account for those storage investments I referred to a moment ago. That revision stands as the main reason the rate base projections for 2022 through 2025 have moved higher. When it comes to 2021, we additionally refined the projection so it captures adjustments tied to the wildfire mitigation tracking account after the 2021 GRC decision took effect, along with quarter-end estimates of spending associated with those accounts. What comes out of these revisions is a $300 million decrease to the 2021 rate base. Taken together, these revisions produce an anticipated rate base growth rate between 7% and 9% across 2021 to 2025. Page 10 gives you an update covering a number of major applications, both approved and pending, for recovering amounts and regulatory assets. Over the coming years, this will generate meaningful incremental cash flow for SCE. Between now and 2024, SCE anticipates collecting more than $1.4 billion in rates tied to applications that are already approved. Roughly 50% of that amount will come back in 2022; regarding the 3 pending applications you see in the middle of the slide, provided regulators decide in a timely manner, SCE anticipates bringing in an additional $844 million by the close of 2023. Finally, we lay out the remaining expected securitizations of AB 1054 capital expenditures. A final decision came through recently for the utility's second securitization application. With that, SCE can securitize $518 million of wildfire mitigation capital expenditures. SCE anticipates finishing this securitization during Q4 of this year or in Q1 2022. Together, the securitizations and the rate recovery of the remaining regulatory assets will let SCE reduce short-term debt and bolster our balance sheet and credit metrics. Moving on to Page 11. During the quarter, SCE submitted an application to set its CPUC cost of capital for 2022 through 2024 and to reset the cost of capital mechanism. SCE seeks an ROE of 10.53%, along with resets to its cost of debt and preferred financing, which would leave customer rates as they are. Under the utility's alternative request, keeping its ROE at 10.3% while resetting the cost of debt and preferred would lower customer rates by roughly $50 million in 2022. Back in August, when SCE submitted the cost of capital request, it halted any other filings connected to the trigger mechanism. Last week, the CPUC instructed SCE to submit the information that would ordinarily have appeared in those other filings. From this point, the commission's next move is to release a scoping memo laying out the issues and the procedural schedule. Now on to guidance. Pages 12 and 13 present our 2021 guidance along with preliminary modeling considerations for 2022. As Pedro noted previously, we are tightening the 2021 EPS guidance range to $4.42 to $4.52. Now to Page 14. We foresee an average requirement of as much as $250 million in equity content each year through 2025. How much we spend each year specifically is going to hinge on what our capital plan calls for during that twelve-month stretch. That big new $1 billion commitment to utility-owned storage really moves up the timetable for the capital investment program and, as I mentioned before, expands the opportunity overall. To pay for this growth, which sits well above the top of the capital spending range we had shared earlier for next year, our expectation is that we will pull forward equity content securities issuance from the 2023 through 2025 period into 2022. Our 2022 equity requirement should fall somewhere between $300 million and $400 million, and once we give 2022 EPS guidance on the fourth quarter 2021 earnings call, we will share more details about the financing plan. Let me also repeat what Pedro said: the SED agreement, along with the update to our best estimate of potential losses tied to the 2017 and 2018 wildfire and mudslide events, does not call for equity beyond the amounts we already announced in our 2021 financing plan. As we disclosed before, our plan is to issue securities carrying as much as $1 billion of equity content in order to support an investment-grade rating. To wrap up, I want to emphasize how important SCE's role is in delivering safety and resiliency. You can see that in the continuing investment in wildfire mitigation that reduces risk, plus utility-owned storage that boosts near-term reliability; these investments show the longer-term opportunity that comes with serving customer needs and clean energy objectives, and they give us confidence to reaffirm our long-term EPS growth rate of 5% to 7% for 2021 through 2025; that is all I have to say.

Sam Ramraj

executive
#5

Michelle, please open the call for questions. <<operator_script>>

Jeremy Tonet

analyst
#6

For my first question, I wanted to ask how the safety enforcement division agreement affects the resolution process for the claims that are still outstanding, if it does at all. And then, is there anything new you can share about when a filing for recovery might become possible?

Pedro Pizarro

executive
#7

Sure; I'll address both of those; we truly don't anticipate that the SED settlement is going to have any effect — that the SED agreement is going to have on settlement activity. And crucially, as you heard from me, we admitted no claims there ourselves of imprudence or anything similar. Regarding when cost recovery might happen, that remains uncertain, since we genuinely have to make our way through a significant share of the claims tied to each of the events. It's possible we could reach Thomas and Koenigstein along one path and Woolsey along a separate one, but my view is that we must get through the majority of the claims for each of the events before we could go ahead and file with the PUC and, as I've stated on earlier calls, the timing is simply very hard to estimate. That said, we've made solid progress. And as I noted, we've gotten through roughly 70% of the claims, yet pinning down precisely when that process will wrap up is tough.

Jeremy Tonet

analyst
#8

Understood, that helps. I'd like to shift direction slightly now — there's been plenty of discussion regarding potential spending on resiliency. Could you share what you currently think the overall pipeline of opportunities might look like, both for capital investments and for resiliency investments?

Pedro Pizarro

executive
#9

Sure. I'd direct you to the rate base projection we gave, that 5-year outlook, and note that things such as the storage project we recently announced support the range we laid out. You heard us restate that expectation of translating into earnings, or EPS, growth of 5% to 7%. So we'd see the opportunity set as sitting inside that range. The storage project demonstrates that at times needs can emerge faster than anticipated, and that we can step in and take a significant action helping the state with resiliency and reliability should next summer turn out to have extreme weather, much as the last couple of summers did. That's merely one sign that occasionally you can be asked to move on these steps more rapidly or in a big chunk, as with a storage project. Still, I'd say we'd keep seeing opportunities landing inside the range we gave. Maria, anything you'd add or frame differently?

Maria Rigatti

executive
#10

No, I believe that, Jeremy, we've hit every part of that spectrum — we look at resiliency through the lens of more wildfire mitigation; we look at resiliency through the lens of storage, building electrification, since we recognize those kinds of investments must be made. We are going to reach those GHG emissions reductions. So I believe that the entire spectrum is addressed within the capital forecast we've presented to you.

Shahriar Pourreza

analyst
#11

Perhaps I can connect what you disclosed today with your equity requirements. Given that the updated projections for total wildfire liability have risen 1.3%, and the CPC agreement means you won't pursue recovery of a portion of that, regarding the reiterated $1 billion in equity — is that tied to the existing plan through '25, meaning does when the claims get paid affect that equity? And somewhat connected, Pedro, why reach a settlement at this point if you're confident enough about prudence before pursuing recovery?

Pedro Pizarro

executive
#12

Sure. I'll address your second question first, then Maria can cover the equity part. Let me point once more to what I said in my prepared remarks. The SED holds authority and an obligation to conduct investigations. You always face uncertainty when entering those kinds of proceedings. There's also uncertainty about how the CPUC will end up interpreting the facts. As I noted, we disagree with several of the claims, yet we acknowledge a process exists; and we thought it was a sensible, a prudent step for us to remove one more uncertainty; so we see the settlement as a means of accomplishing that. That's truly the reason for doing it now. A chance arose to collaborate with the SED, and you can observe how the parts are structured; we don't expect that to hinder our capacity to pursue cost recovery for prudently incurred expenses, apart from the $375 million that were set aside in the settlement. So once more, it honestly comes down to recognizing there's substantial uncertainty, and at times it's rational and indeed the appropriate move to take an action we might not have endorsed in general under other conditions. But here, by joining the settlement and cooperating productively with SED, we're able to leave that uncertainty behind. Maria, would you like to cover the equity part?

Maria Rigatti

executive
#13

Absolutely. So Shar, prior to now, we had several discussions regarding the 2021 financing strategy and the requirement to raise as much as $1 billion through equity content securities. The purpose was genuinely to underpin the 15% to 17% FFO to debt framework in place at our company. Consequently, when we evaluated the shift in reserve level, we believe that $1 billion of equity content during 2021 continues to be supportive of our broader financing framework goal. Also, we have taken a fairly disciplined approach regarding the way we go about issuing that incremental equity or equity content securities. Concurrently, SCE does issue debt in order to make claims payments. Thus, if you consider the EIX financing plan that backs the metrics, and then SCE's cash flow is connected to, more or less, the timing of their debt issuance for paying claims. At that level, over at SCE, they are essentially matching the pace of their financing plan to the same timeline as when claims payments get made. I think when you consider the equity requirement we have for this year, we have already completed $1.25 billion of that preferred financing to secure a certain amount of equity content, and we will keep assessing market conditions as we carry out the remainder of the program.

Shahriar Pourreza

analyst
#14

Understood. Understood; and then finally from my side, just regarding your views on CapEx and rate base growth between 24% and 25%. On Slide 8 there's what looks like a meaningful step-up in expectations, with the range case holding steady versus 23%. What's captured in that upper end of the CapEx shown on the slide? Any detail on what falls under the GRC as opposed to incremental programs such as reliability storage spending in '22?

Maria Rigatti

executive
#15

Certainly; and you dropped off just a little at the end, at least on my end, but I believe I caught your question, Shar. So as you go further out in time, clearly, at the front end, we have authorized — we have the 2021 GRC decision. Now turning back to the utility on storage. Even in the near term, things can arise that raise your capital expenditure opportunities. But as you get out to '24 and '25, I think, a few dynamics are at play. First, 2024 is a year within this rate case cycle for which we haven't yet received authorization. So although it may resemble quite closely the attrition mechanism that's embedded in 2021 and '22 and '23, we do know some budget based approaches exist that we can use for wildfire mitigation. So that will be our focus and that can widen the range. If you look past that, 2025 is in fact a new rate case cycle; and so items like ongoing law for mitigation, but as we potentially start returning to more infrastructure replacement and similar work, that could push the broader range that you see at the back end. Additionally, there are possible opportunities to file applications outside of the general rate case proceedings; and so everything that I think Pedro referenced earlier around whether there are things around greenhouse gas emissions reductions on the path to 2045 — areas around transportational, education or building electrification or more energy storage or transmission, all of those are things that move the range up and down.

Steve Fleishman

analyst
#16

Regarding the reserve set aside for wildfire claims, can you lay out as clearly as you can why that figure rose — and this has occurred a few times now — and why we ought to believe it won't keep happening?

Pedro Pizarro

executive
#17

Sure. Appreciate it, Steve. I believe we touched on this somewhat during the prepared remarks, yet it definitely deserves more emphasis. To put it plainly, the further we work through claims, the greater the number of settlements we complete, the more knowledge we gain. My hope is that the range of uncertainty keeps shrinking. As I noted, we're now handling roughly 70% of the exposure. So each quarter we've been checking whether fresh information exists, additional specifics on particular claims still in the pipeline, and so forth, that would mean the reserves need to be changed. That step wasn't necessary. Between the previous quarter and this one, we held sufficient new information that doing so was correct, the proper action under GAAP, which was to adjust the reserve. As stated in our disclosures, we're giving you our best estimate. Uncertainty surrounds that best estimate. Ultimately, we could discover that figures climb even higher once more. You could discover that they come in below this level. But my hope is that with additional time passing, and once again, with more of the volume behind us, the picture keeps getting sharper; that's likely the most I can offer here, Steve. I recognize it would be ideal if we could give more chapter and verse about what caused it, but because of the active litigation we're involved in, doing so is difficult. Maria, if you'd say anything differently, or Adam Umanoff, if you'd like to join the line from a legal standpoint, please go ahead. Okay.

Maria Rigatti

executive
#18

No, I think, Pedro, you covered it.

Steve Fleishman

analyst
#19

And so, a follow-up question that ties into the SED settlement component. On one side, you've consented to forgo $375 million. On the flip side, that would suggest that, in theory, you could pursue recouping a substantial share of the remaining expenses tied to this, which clearly isn't baked into your plan. So although at first glance this looks like a downside, could it be interpreted as meaning you retain a claim and the possibility to pursue recovery of those costs, or at least some part of them?

Pedro Pizarro

executive
#20

Yes. Steve, we have consistently stated from the beginning that our intended approach is to pursue recovery of costs that were prudently incurred. To achieve the settlement and eliminate this ambiguity, we consented to forgo that $375 million; yet crucially, as I mentioned before, we are not conceding imprudence, nor are we conceding negligence. We are retaining all rights to pursue cost recovery. I cannot give you a specific number today that we will seek to recover, because we must keep going — finish the investigations. I believe I mentioned this in earlier quarters. Whether you believe it or not, it remains the case that I think we still do not possess certain pieces of equipment, since fire agencies continue to hold them. And so — that's simply part of how this process works. But we anticipate that there are definitely a range of compelling arguments that we can — that we would be able to present, and we would anticipate pursuing recovery for all that we feel we ought to pursue recovery for; now the explanation you aren't seeing that degree of, let's call it, assurance reflected in a reserve adjustment that incorporates an assumption of recovery is that, given that these are 2017 and 2018 incidents, and the sole CPUC precedent that predates the AB 1054 period is the one from the San Diego Gas & Electric matter. Under GAAP, we truly cannot presume any CPUC recovery. That's the situation, and you can see we have kept assuming recovery from FERC on the identical set of facts. And that, I think, reflects our view that recovery would be justified given the facts. We cannot presume it from the CPUC in light of the San Diego Gas & Electric precedent, but we intend to present our case. And we've noted previously as well that we think the CPUC's ruling in the San Diego matter conflicted with what we believed the facts in that matter to be. So although AB 1054 gives us a reinforced framework, we do think we've had the capacity from the start, even before AB 1054, to argue for a fair and reasonable cost recovery grounded in facts, and we think those facts will be on our side here.

Ryan Levine

analyst
#21

I suppose that, over the course of the quarter, it appeared SCE got roughly $400 million in cash from the Morongo Transmission asset as payment for using that asset for approximately 30 years. Within the portfolio, are there additional chances like this to bring in capital and help counterbalance a portion of those equity requirements?

Maria Rigatti

executive
#22

Ryan, this is Maria. Yeah, that particular deal had actually been tied to that project going back a very long stretch of time. What set it off was the point at which the project wrapped up and went commercial. So that's what gave rise to the $400 million, and you're correct, it took place during the summer. We recorded — I believe we've touched on this somewhat previously regarding the portfolio as a whole. Essentially, what SCE holds is really customer assets, so being able to sell off a set of assets isn't truly something we can do in the way you're describing. From time to time, I think folks have raised questions about real estate and similar items, but in this portfolio there genuinely isn't such a chance.

Ryan Levine

analyst
#23

Also, in the prepared remarks, you noted that the resolution pace for Woolsey and TKM sped up, and that contributed to the higher estimate. Looking forward, how do you see the speed of the settlement process from this point?

Pedro Pizarro

executive
#24

Yeah, I believe that's something I mentioned before, correct? We keep working very hard on this. However, Ryan, predicting when we'll be mostly finished is simply very tough for us. The positive side is — as we've said on earlier calls — there are structural mechanisms set up for the Thomas, Koenigstein, and Woolsey matters, which let us move through a substantial number of these cases each month, though it remains quite difficult to estimate what that implies regarding the final timeline.

Ryan Levine

analyst
#25

All right. And for the final question, as you keep rolling out the covered conductor program, are you seeing any gains in cost per mile while that program is being carried out?

Maria Rigatti

executive
#26

My sense is that our cost per mile has stayed fairly steady. What I mean is that we haven't observed significant rises, yet we haven't observed declines either. My view is that we truly nailed it quite well when we put together those first estimates.

Michael Lapides

analyst
#27

Let me ask something a bit on the macro side. What you're putting forward, similar to what you did with the GRC covered conductors — your counterpart up north is suggesting more of an undergrounding initiative. I haven't really seen anything substantially new from SDG&E for some time. I'm just wondering whether you believe follow-on legislation is needed, where the state lays out a formal multiyear, perhaps multi-decade approach — comparable to what Illinois does with gas distribution, or Florida does with storm hardening — to help work through the time line, how fast investment happens, cost recovery, and the wider state strategy for wildfire mitigation and prevention.

Pedro Pizarro

executive
#28

Yes; that's a fascinating question, Michael. Let me give you my immediate take on it — I don't believe legislation is required for that. In fact, I'd argue that in many respects, AB 1054 already established that framework, correct? Since it created the entire wildfire mitigation plan process. It includes review by OEIS, plus enhanced ratification from the CPUC. On top of that, this year's state budget carried a line item for an outside consultant advising the governor's office. And that consultant is in fact working alongside the utilities — honestly, it has turned into a productive venue for conversation and for comparing notes, on top of the efforts we undertake, engaging directly with our counterparts at the other utilities. Yet in the end, I see the Wildfire Mitigation Plan framework as where utilities deliver updated information and fresh ideas regarding which tools ought to be used to stop fires, and then that ultimately flows into the ramp in GRC processes. There's another reason — that's my response, Michael — and this matters within the WMP framework. The truth is that the utilities each have quite distinct territories. From the outside, it appears to be one California, right? Yet PG&E covers 70,000 square miles. Ours is 50,000, and Santiago's territory is smaller. But even comparing PG&E with us, and I've brought this up on earlier calls, PG&E's territory — the high-fire risk area portion — takes in far more geography that is much more heavily forested. So, for instance, in their case, they — based on what we understand from our conversations with them — perceive a far greater probability of ignition caused by trees falling onto lines. Such trees might sit well beyond the vegetation management zone, the foliage clearing zone. When it comes to Edison, a large share of the high fire risk area isn't forest — it's chaparral, it's grasslands. Within the Edison area, there's a significantly greater probability of ignition arising from contact with objects, from things blowing into the lines. And that offers a bit of insight into why, for PG&E, when they run the math. And I believe that, by and large, everyone is working with the same mathematical formula, though the variables — what you plug into those variables — differ, correct? So when we examine the cost-benefit comparison between undergrounding and covered conductor or other options, my understanding is that falling trees account for a large share of the added benefit that comes from undergrounding. Where we are, covered conductor delivers substantial risk reduction at a much lower total cost. Beyond that, within SCE's service area, because we had already completed a pole-loading initiative that resulted in poles being replaced, that means for many of our covered conductor projects, there's no need to go replace the pole, correct? That removes yet another cost layer that another utility could face if it has to swap out not just the wires but the poles those wires are attached to as well. That ran a bit long. The key takeaway is that our territories differ quite a bit, our requirements differ; we compare what we're each seeing. I'd say we share the same core principles, yet the figures you enter into that formula produce different outcomes for each company; even so, we remain in touch, correct? And if PG&E keeps gaining more insight and observing different outcomes from undergrounding, it's possible we'd see additional miles enter scope for undergrounding at Edison. So we definitely keep learning on that front. Yes, Maria?

Maria Rigatti

executive
#29

Pedro. And Michael, one additional point, given that you're raising this from a broader, macro angle. Legislation aimed at assisting the utilities may already have been handled through AB 1054, but we continue monitoring, and we would certainly back further legislation that genuinely tackles items such as land management, forest management, home hardening, and development in the Woolsey. Because unless those items get dealt with, achieving a durable, long-term mitigation of this problem simply won't be possible.

Jonathan Arnold

analyst
#30

I want to confirm I've got the accrual figures right. The $550 million settlement—now reflected in the best estimate—is that included in the higher best estimate? Is that right?

Maria Rigatti

executive
#31

Correct. Jonathan, the $550 million breaks into 3 pieces. $110 million goes to the general fund as a payment, $65 million covers mitigation activity we'll carry out, and $375 million represents foregone recovery.

Jonathan Arnold

analyst
#32

So I should think about it...

Maria Rigatti

executive
#33

Since no regulatory asset has been recorded against that $375 million, it was already included in our total costs from the 2017 and 2018 events.

Jonathan Arnold

analyst
#34

So effectively, that entire $7.5 billion best estimate includes that piece.

Maria Rigatti

executive
#35

Yes, the whole thing.

Jonathan Arnold

analyst
#36

Yet it isn't counted among what's been resolved. From the standpoint of the gap separating the $7.5 billion and the $2.2 billion, is the whole thing viewed as unresolved?

Maria Rigatti

executive
#37

Well, as far as that goes — everything sits inside that figure, the $7.5 billion; when it comes to cash flows, clearly, there are various timelines within which payments must be made into the general fund, and the mitigation investments must be made. So those cash flows are still ahead of us. My sense is that what you're asking about is the cash flow.

Jonathan Arnold

analyst
#38

So what I'm asking is this — assuming the CPUC gives the settlement its approval, does that $2.2 billion in expected losses still outstanding effectively shrink by $550 million, on the grounds that it's now been settled or is at least no longer up in the air?

Maria Rigatti

executive
#39

It does not. That $2.2 billion that's left will come down only when we actually disburse cash — whether for the settlement, for the general fund, or for mitigation.

Jonathan Arnold

analyst
#40

All right.

Maria Rigatti

executive
#41

So that would still be — Maria Rigatti: That is what lies ahead — indeed.

Pedro Pizarro

executive
#42

So just to be really clear, the SED has viewed us resolved not unresolved.

Jonathan Arnold

analyst
#43

So it's seen as settled. All right. Awaiting approval.

Pedro Pizarro

executive
#44

Clearly awaiting approval, though I'd say when it comes to that $6.2 billion compared with $7.5 billion.

Julien Dumoulin-Smith

analyst
#45

Let me just go over this, because I want us to be completely clear on the equity requirements here and all the moving parts. In the prepared remarks, you pointed out specifically that the '21 financing plan calls for no incremental equity. And then the incremental equity from '22 to '25 you also left unchanged. I'd just like to grasp how those two things reconcile given the fine piece and given — well, I'll keep it open. Could you run through that again quickly?

Maria Rigatti

executive
#46

Of course. Sure. And Julien, I think you know that our stance on putting out more equity and equity-linked securities has been pretty disciplined, and we've been keeping an eye on cash flows and that sort of thing. Also, in the financing plan we laid out for 2021, we anticipated as much as $1 billion in equity content. So once we started looking at and assessing how the reserve level had shifted, we considered what we'd already made public in that 2021 plan, and our view is that it remains consistent even as the reserve level moves, given the goal of strengthening credit metrics over time and the emphasis on that 15% to 17% range. Turning to the equity we mentioned for the coming year—something we'll get into more thoroughly on the Q4 call—that's tied to how we were viewing our equity requirements across the four years running through 2025, given the utility's expansion. Let's step back for a moment and see how those pieces fit together. Earlier, when we presented that EPS CAGR for '21 through 2025, we cited a range of 5% to 7%. Our confidence remains strong that this is the range we're operating within. Regarding the overall equity requirements across that timeframe, we mentioned a figure of as much as $250 million annually, which fluctuates somewhat depending on how much capital was required in a given year. Looking ahead through that span, we're facing an additional $900 million in CapEx for 2022 — clearly a response to what customers need as well as state requirements around reliability — and that comes on top of a capital plan that was already quite strong. Our goal is essentially to pull forward some equity that would have shown up in subsequent years and shift it back into 2022. Again, this is meant to support our metrics. That's the sort of balance we're constantly working to achieve. That's basically my framework for the different components of the equity requirement, and it's also how we reasoned through them while putting together the plan covering the rest of this year and then next year.

Sam Ramraj

executive
#47

Alright, thanks for being with us. That wraps up this conference call. So enjoy the remainder of your day, and everybody please stay safe. You're free to disconnect at this point.

Operator

operator
#48

Thanks. That brings today's conference call to a close. At this point, you're free to go ahead and disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Edison International transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Edison International earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Edison International or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.