Sam Ramraj
executiveThanks, Michelle, and hello everybody. With us on the call today are our President and Chief Executive Officer, Pedro Pizarro, along with Executive Vice President and Chief Financial Officer Maria Rigatti. Other members of the management team are also joining us. You can find materials for today's call at www.edisoninvestor.com. Those materials include a Form 10-K prepared for the remarks Pedro and Maria will make, along with the teleconference presentation. Our regular business update presentation will go out tomorrow. On this call, we will be making forward-looking statements regarding the outlook for Edison International and its subsidiaries. Actual results might differ materially from what we currently expect. Factors that are important and could lead to different results are described in our SEC filings. We ask that you read those carefully. Certain outlook assumptions are included in the presentation, as is a reconciliation of non-GAAP measures to the closest GAAP measure. When we get to the question and answer session, please keep to one question and one follow-up. I'll hand the call over now to Pedro.
Pedro Pizarro
executiveThank you very much, Sam, and welcome this afternoon to all of you. To begin, I want to express that our thoughts remain with each person affected by the Southern California wildfires that occurred recently — among them our very own 18 employees who were left without homes; our gratitude goes out to the first responders, to our teammates, and to every community partner who has started down the lengthy road to recovery. At Edison, safety stays our foremost value and our top priority, which encompasses keeping the public safe, keeping customers safe, and keeping our workforce safe. As SCE works tirelessly on rebuilding following the Eaton and Palisades fires, it keeps achieving enormous strides. Now, regarding the Eaton Fire, what it will cost has not yet been established, and the inquiry into it is ongoing and quite intricate. To help figure out what may have sparked ignition — among the possibilities being a connection to equipment belonging to SCE — the company is looking at the evidence at hand. As part of that review, engineers along with photogrammetrists, meteorologists, and additional specialists are going over imagery, footage, and further material. Our expectation is that completing the entire investigation will require multiple months, perhaps more, and neither the county nor SCE has a specific schedule for wrapping up their separate inquiries; take, for instance, one useful subsequent step, which entails additional inspection and testing of the de-energized transmission line close to the reported location of origin, so that the equipment can be checked for items such as arc marks or absent metal. Even so, that could require numerous weeks still, since it depends on reaching agreement about a protocol with plaintiffs, lawyers, and other stakeholders who have an interest. Throughout this whole process, we are dedicated to transparency. Even as this inquiry proceeds, our view is that SCE operates its electric system in a reasonable manner. Notably, in many rulings, the commission has acknowledged that the prudence standard does not call for flawlessness. Our belief is that prudence stems from how sound a utility's decision-making process is, and from whether its broader policies, systems, and practices align with what a reasonable utility would do — and there is a CPUC president who backs our reading. Should it be concluded that transmission equipment belonging to SCE was tied to the Eaton Fire's ignition, then, based on what we have examined so far, we are certain SCE would demonstrate in good faith that its conduct regarding its transmission facilities in the Eaton Canyon area matched what a reasonable utility would do; that is the yardstick used to judge the utility, as set into statute through AB 1054. On page three, you'll find several useful links relating to details about SCE's wildfire mitigation, disclosures from the company, legislation, and additional resources. The devastating toll of the recent wildfires highlights how vital grid resiliency is, along with the steps SCE has taken to strengthen its system in service of the communities it supports. SCE keeps carrying out its strong, risk-prioritized Wildfire Mitigation Plan, which California's Office of Energy Infrastructure Safety has approved and the CPUC has ratified. This has greatly reinforced efforts to guard against wildfire dangers and to react whenever they arise. SCE has installed over 6,400 miles of covered conductor by now, and it has hardened close to 90% of the distribution lines located in areas with high fire risk. Beyond that, there have been substantial investments in operational steps across transmission and distribution — things like vegetation management, plus a broad network of weather stations and high-definition wildfire cameras with AI capabilities that give SCE and fire agencies better situational awareness. We're going to keep putting money into SCE's crucial efforts aimed at making its system safer for customers and communities. When it comes to the regulatory framework, SCE has gotten its safety certification approved on time annually, and that gives a presumption of prudence along with a cap on liability for reimbursing the Wildfire Fund. We feel confident about the fund, and we think it's doing what it was meant to do — protecting wildfire victims, customers, and investors. The fund holds $21 billion in claim-paying capacity, and California IOUs have mostly left it untouched. I also want to stress that the fund supplies liquidity for paying claims. So if the utility ever needed to pay claims, it wouldn't be forced to tap its balance sheet. Shifting to the legislative side, California has repeatedly shown a deep commitment to backing customers and the investor-owned utilities that serve them. Throughout my 25-year career at Edison, I've seen firsthand how the state leads in tough moments — from the energy crisis in the early 2000s, to the pressing need to build new generation resources in the mid-2000s, to navigating the financial crisis in 2008, to handling natural gas spikes in the mid-2010s, and to steering the state through the COVID pandemic. What's important is that Governor Newsom drove the effort in 2019, together with his colleagues in the legislature, to pass and implement AB 1054, and that stands as the model every state should follow for tackling wildfire risk. If we determine that SCE's equipment ignited the Eaton Fire, which hurricane-force winds then spread despite firefighters' best efforts, this catastrophe is exactly the scenario AB 1054 was built for — acknowledging that wildfire risk can never reach zero; this legislation transformed the regulatory and financial picture by balancing wildfire cost recovery against utility accountability and customer protections. Many stakeholders come out ahead, and I'd like to highlight three broad areas. First, customer and community safety gain from the risk reduction delivered via the WMP and the safety certification process. Second, communities that experience losses tied to wildfires linked to utility equipment have a source of funding for claims payments. And third, investor-owned utilities taking part in the fund gain from a structure that offers liquidity for claims payments, a clear prudence standard, and a liability cap — all of which underpin financial stability and long-term investment in the grid at the most affordable cost to customers. The scale of the recent wildfires has put the fund's long-term durability squarely in focus. We've been in active discussions with major stakeholders — other utilities, the governor's office, and legislative leaders — to work out ways to keep the community safe, handle customer costs effectively, and bolster investor trust in California's utilities. We believe policymakers will implement the improvements required to strengthen AB 1054, the regulatory framework that leads the industry. Before we turn to our financial results, I want to mention a new addition to our board of directors that was announced last week. Jennifer Granholm, who served as U.S. Secretary of Energy, will be joining the boards of directors of both EIX and SCE. Jennifer brings deep expertise in energy technology, energy policy, safety, and sustainability. We're delighted she's coming onto our boards, and we're eager for the guidance she'll offer given her grasp of the technical, political, and economic forces shaping our industry today. I'm aware that many organizations seek Jennifer's time, so I value her confidence in our company's strong future. In 2024, Edison International's core EPS came in at $4.93, which was above the midpoint of our guidance. That continues our record of hitting or beating annual EPS guidance across the last two decades. We also remain confident in our capacity to achieve our 2025 EPS guidance and to deliver a 5%- 7% core EPS CAGR through 2028. Maria will cover our financial performance and outlook later.
Pedro Pizarro
executiveAlso, the board today declared EIX's first-quarter 2025 dividend on common stock of $0.8275 for each share. Before declaring it, the board followed its usual practice of weighing many different factors and possible outcomes. Our present dividend policy and outlook remain unchanged, and this strikes a balance between the competitive dividend investors anticipate and putting SCE's earnings back into the infrastructure that meets customers' needs. A dividend that keeps growing at a steady pace like this shows how confident we are in our financial outlook, which helps us raise capital at attractive costs and delivers direct rate benefits to customers. Turning to regulation, we're quite pleased that the CPUC approved the TKM settlement agreement unanimously, which lets SCE recover roughly $1.6 billion, equal to 60% of wildfire claims payments and related costs from a wildfire predating AB 1054. This approval points to a constructive framework for cost recovery in California; indeed, after the vote, CPUC President Reynolds offered notable comments regarding cost recovery and AB 1054. She pointed out that state law makes SCE, much like public entities, responsible for damages from a fire started by its electrical system, yet when the utility has acted prudently, customers bear those costs. She further observed that thanks to AB 1054, going forward the Wildfire Fund would handle claims comparable to those in TKM. SCE plans to submit its TKM securitization application during March. The Woolsey cost recovery proceeding has begun. From the prehearing conference, intervenors taking part flagged focus areas and engagement similar to what occurred in TKM. Should the ALJ accept the schedule that SCE and intervenors jointly put forward, the key upcoming filings to monitor are intervenor testimony expected in early June and rebuttal testimony expected in mid-July. That proposed schedule also contains a motion seeking approval of a settlement agreement or a joint statement of stipulations of issues, due in mid-August. As with TKM, the utility remains willing to discuss settlement if a fair and reasonable result is possible, and we're eager to keep you informed about developments in this significant proceeding. Alright, I'll wrap up by noting that SCE is committed to working alongside affected communities on both near- and long-term approaches to rebuild stronger, even as we keep carrying out core operations and meeting the commitments we've set out for you. I'm eager to provide further updates during the year; with that, Maria, I'll hand things to you for the financial report.
Maria Rigatti
executiveAppreciate that, Pedro. Before getting into the numbers, I'd like to pause and acknowledge how hard our team has worked handling the Southern California wildfires situation. Everyone on our management team feels deep gratitude toward the colleagues who joined forces to get the lights back on and support customers through recovery. Now, onto what I planned to cover today: results for the fourth quarter and the full year 2024, where we're directing attention in 2025, SCE's forecasts for capital and rate base, plus our guidance for 2025. Looking at Q4, EIX posted core EPS of $1.05. For all of 2024, core EPS came in at $4.93, which landed above the midpoint of the range we had guided to. You'll find the year-over-year variance analysis laid out on Pages 6 and 7, with more detail available in our earnings news release. These solid results show we know how to run this business, and they stretch our record of hitting annual EPS guidance across the past two decades, which Page 8 illustrates. Strong financial performance was only one of many things we achieved during another year of excellent execution in 2024, as Page 9 shows. SCE kept making headway on strengthening the grid and improving system safety for customers, installing more than 800 mi of covered conductor and pushing total deployment past 6,400 mi. On the regulatory side, several encouraging things happened. To start, TKM settled on time, a topic Pedro covered earlier. Next, the utility essentially finished resolving Woolsey claims and submitted its cost recovery application. Then the CPUC handed down a final decision in the 2022 CEMA proceeding, adding $0.14 to 2024 EPS. After that, the utility kept advocating forcefully in the 2025 GRC and worked out many issues with intervenors. Finally, as a sign of confidence and dedication to hitting our long-term EPS growth target, we boosted the dividend by 6.1% in December — marking the 21st year in a row of an increase. Page 10 lays out the main areas management will focus on in 2025. Helping the people and communities hit by wildfires sits at the very top. Rebuilding and coming back stronger — restoring infrastructure and returning power to those areas — matters enormously. SCE will keep up its wildfire mitigation efforts as well, along with a focus on operational excellence aimed at lowering costs for customers. Progress on the regulatory front will continue too. This year, we anticipate SCE will get decisions on its 2025 General Rate Case, its WMCE filing, and its Cost of Capital application covering 2026 through 2028. On top of that, the utility will submit an application for its Next-Gen ERP program. SCE will keep moving forward on resolving the Woolsey cost recovery proceeding as well. Now let's shift to SCE's capital and rate-base forecasts, which appear on Pages 11, 12, and 13. The 2025 GRC serves as the primary engine behind the outlook through 2028. SCE's capital plan centers on swapping out infrastructure that's getting old, so that reliability and safety for customers hold up. It also keeps up grid hardening spending to lower risk and boost resiliency, while growing the grid so the system is prepared for load growth both now and down the road as customers use more electricity. I'd also like to call out a number of extra capital deployment opportunities that serve customer needs across the years ahead — ones we've talked about previously and that the plan does not yet reflect. Estimates for these projects have been refined by SCE, which adds at least $1 billion to these opportunities. The next-gen ERP project I referenced a moment ago is one of those investments. Later this year, the utility also intends to submit an application for an Advanced Metering Infrastructure program, aimed at replacing and upgrading the first generation of smart meters, which have reached the end of their useful lives; beyond that, we expect added system needs on the distribution grid, including for system restoration and expansion. On top of that, SCE has over $2 billion of FERC transmission projects under development. Shifting to SCE's 2025 GRC, the utility is waiting on a proposed decision from the ALJ. Our optimism holds that a proposed decision might arrive in the first half of the year. To restate what we've said previously, SCE presented a compelling case, and even taking intervenors' positions into account, SCE's rate-based growth would still align with its range case forecast of 6%. After SCE secures a final decision from the CPUC on the GRC, we will update our capital plan, financing plan, 2025 EPS guidance, and EPS growth forecast. Now on to EPS guidance — Page 14 lays out our 2025 core EPS guidance along with modeling considerations. You'll notice the guidance range has been revised; it is merely our earlier range of $5.50-$5.90, plus the incremental $0.44 tied to the recently approved TKM settlement. As we've noted previously, that $0.44 consists of a $0.30 one-time true-up for historical interest expense and the $0.14 annual reduction in unrecoverable interest expense. While SCE awaits the GRC decision, let me remind you that revenue will be recorded at 2024 rates adjusted for the change in ROE. Because of that, quarterly results comparisons ahead of a 2025 GRC decision carry no real meaning. A true-up will be recorded once a final decision comes through. SCE has set up a memo account to track revenue differences until a final decision arrives, and it will be retroactive to January 1st. I'll briefly cover the parent financing plan. This year, EIX has $800 million of debt maturities, some of which were pre-funded via a debt offering last December. Turning to our longer-term outlook on Page 15, you'll see we've also folded the benefit from the $0.14 interest expense reduction stemming from the TKM settlement into the 2028 EPS range. Because this yearly interest decrease will continue and forms part of our baseline, our 5%-7% core EPS growth target stays in place, measured from a larger base of $5.84. The Eaton Fire's origin is still being investigated, and we won't speculate about what might result, but AB 1054 was passed so California's utilities stay financially sound in situations such as this one. Thanks to the supportive regulatory framework and procedures this law put in place, no utility would need to draw on its balance sheet when tapping the Wildfire Fund for claims payments. On top of that, how much a utility might owe the fund in reimbursement is limited. Finally, under the prudence standard, a utility is considered a prudent manager when it holds a safety certification, and SCE holds one. With these elements and the supportive regulatory framework in mind, our confidence in the financial outlook holds as we keep backing wildfire response, recovery, and rebuilding efforts. Core earnings growth continues to be driven by SCE's core operations and the central part it plays in the clean energy transition. That's all from me. Over to you, Sam.
Sam Ramraj
executiveMichelle, could you please start the Q&A portion? Just a quick note — we'd ask that each person stick to a single question plus one follow-up, so that everyone waiting gets a chance to speak.
Nick Campanella
analystNick Campanella here. I appreciate you letting me join. Clearly, many people have been asking what the Wildfire Fund's role would look like if equipment played a part in this fire. I understand it's still very early, yet the 10-K does note that several lawsuits have already been filed. Do you have any sense of what the damages figure might look like as a starting point? If not, when do you think that will become clear? Thank you.
Pedro Pizarro
executivePedro Pizarro here — thank you for raising that, and I'll keep my answers brief. It's simply far too soon. The first step is finishing the work of establishing whether our equipment actually played a role, and after that, a process would follow to figure out what possible liabilities might exist, and pinning down timing is genuinely difficult. Perhaps this addresses some of the other questions that come up, but as an illustration, you may remember that with earlier fires, getting an investigation report from the official fire authorities — something that could help someone reach conclusions — has taken 12 months-18 months. Whether liability gets established hinges largely on plaintiffs filing legal actions, and that can take a while, so a fair amount of time may pass before anyone has a sense of even what the low end of a range could be.
Nick Campanella
analystGot it. Thanks. And so, I realize you're pursuing legislative fixes in the upcoming session; and clearly, this is a broader matter that the state needs to address overall, and many competing interests will be involved. How would you characterize the present policy landscape and the discussions you've had with folks, and have those talks been productive regarding reaching a resolution by the end of August? And perhaps you could elaborate on what you believe would be most beneficial, whether that's boosting the Wildfire Fund or some form of reinforcing a liquidity backstop. That's all I've got. Thanks.
Pedro Pizarro
executiveYeah. Well, hi, thanks, Nick; and I definitely get the questions. Let me begin by noting it's quite early. As you might expect, the SCE team remains heavily focused on the primary priority, which is assisting the community in staying safe and rebuilding more resiliently. I'd add, though, that when I look back at what happened in 2018 and 2019, when the state put together SB 901 and afterward AB 1054, we're luckily beginning from a much different place now. Policymakers, I think, firmly grasp how crucial it is to have utilities in solid financial shape to bolster the state's economy. That means keeping the lights on and powering the economy, but also aiding the state's objectives for shifting to clean energy. So there's that foundational recognition of why financial health matters for businesses like ours and our counterparts. That's a crucial baseline that we can—it's something that, in my view, needed more work back in 2018. On top of that, you're witnessing dedication to examining these matters. We're very grateful that the governor has kept Ann Patterson in his office. She was simply a very considerate individual to serve as the lead for the governor's office on wildfire topics. We're aware that the administration has now brought in Guggenheim to supply financial analysis assistance, the same financial advisory role they filled when AB 1054 was being put together. As I said, we're already talking with legislative leaders who, I think, broadly recognize that additional steps are needed here, and I think you also brought up, Nick, that this involves a wide range of matters, and honestly, I'm not clever enough to know, standing here today or sitting here today, what the optimal route is. Honestly, we'll be depending on the governor and his team for their guidance and what the finest strategy is here. But we'll definitely push for short-term fixes. There are various tools, as you might guess, to help bolster the strength of the AB 1054 framework. Likely many different tools that might be used. But we'll stay involved with them. And it gives me considerable reassurance that they, for their part, are putting the proper resources to work on this problem.
Nick Campanella
analystNick Campanella here — appreciate you sharing those perspectives.
Michael Lonegan
analystMichael Lonegan speaking now — hello, and thanks for giving me the chance to ask my questions.
Pedro Pizarro
executivePedro Pizarro responding — hey there, Michael.
Michael Lonegan
analystClearly, you are looking into multiple potential causes behind the Eaton Fire, among them the possibility that a transmission line which was not in use might have been re-energized. In that Section 315 letter, you pointed out that you are moving right away to reinforce and bring consistency to how grounding is handled. I was just curious whether you might describe a few of those measures you were putting in place that you believed required reinforcement. Even though you want to carry out these measures, it sounds as though you have a great deal of confidence that you will keep the presumption of prudence. I was just wondering whether you could offer more of your perspective regarding that confidence.
Pedro Pizarro
executiveYes. Let me take the second portion of that first, just to underscore it. Naturally, Michael, we know what we know as of now, correct? Yet given what we know as of now, we are confident that we could make, or SCE could make, a good faith demonstration that it has operated the system reasonably; and like I stated during my remarks, when we consider that, it truly concerns how the entire system is operated together with how that applies to the particulars of whatever ignition occurs. I take great pride in what Steve Powell and the SCE team have accomplished across the past several years to keep making the system stronger. And should you look back to the point when this period for California began, with those first devastating wildfires during 2017, we adopted an approach that prioritized risk, correct? Thus we keep learning constantly. And under an approach that prioritizes risk, SCE pursued shutting the gaps carrying the greatest risk first, then proceeded further down the list. So we are continually seeking to learn. I believe we noted in the 315 letter a few of the measures taken right after the fire reached the ignition point. Let me offer a single illustration, which perhaps extends somewhat past your question. Yet as an example, that evening when ignition occurred, we put our PSPS protocols into action, and those performed effectively. We had already adopted a more cautious position as we entered this windstorm. We adopted a still more cautious position as we moved into the second and third windstorm events, so in the same way, we are examining everything related to our system and constantly seeking chances to learn, whether that involves how inspections are conducted, grounding, and so forth. Steve Powell, is there anything you wish to add from an operational standpoint regarding what we are doing going forward, or do you believe that addressed it adequately?
Steve Powell
executiveI'd simply put it this way: as with every ignition and every fire, our aim is to gather whatever lessons are available, no matter if they involve equipment we operate or equipment owned by others, and then figure out how to fold those lessons into what we do over the year. Looking at what's in place for this year, and has been in place every year, we've strengthened how we handle vegetation and how we carry out inspections. As a season approaches, we assess conditions — so my thinking turns to next summer and the coming fire season — and we'll be checking which areas have the driest fuels and where risk runs highest, so that we can apply extra mitigations, which means additional vegetation work and additional inspections. So I'd say many of these are existing practices that we're simply intensifying and deploying in more locations; even so, we'll keep seeking ways to further harden the grid and identify other measures we can adopt, ensuring safety as we move toward the next season.
Pedro Pizarro
executiveRight. That's excellent, Steve. Michael, perhaps one additional small item could be useful at this point. You have heard us promise openness. Therefore, while we keep gaining knowledge, and when it makes sense, we will share whatever we can. Yet we understand that, as happened with earlier fires, litigation might arise in this situation. Litigation is going to arise here. Consequently, we must be careful not to move faster than that process. Thus, striking the proper kind of equilibrium between avoiding trying individual points in the court of public opinion and still offering maximum openness to the public.
Michael Lonegan
analystThanks. So, for my second question, I'm curious whether you're worried that the wildfires could affect how things turn out in the GRC. Among the general public, there seems to be a belief that EIX might be responsible for igniting the fire. Given the attention that could generate—particularly with residents about to face higher insurance premiums—do you believe that makes the commission less inclined to approve a rate increase? And separately, do you also expect that getting a settlement among the different parties in the Woolsey filing will become more difficult?
Pedro Pizarro
executiveYeah. I don't believe so. And seeing the TKM approval with Maria was encouraging. Let me hand it over to you.
Maria Rigatti
executiveOkay, Michael — we've made a lot of headway on the GRC. All our filings are in, and the interveners have submitted theirs too, and as I think you've noticed, we've managed to reach agreement on a fair number of items with those interveners. A dozen distinct topics are addressed by 20% of the O&M items and 8% of the capital items. Our expectation is that this will keep going just as it did before, and we're anticipating a proposed decision in the first half of the year. Turning to the Woolsey cost recovery application, a prehearing conference took place in December. Right now we're waiting on a scoping memo. The intervenors and SCE have both signed off on the schedule for it. We still expect that to advance along its own separate track.
Michael Lonegan
analystThank you for taking my questions.
Pedro Pizarro
executiveThanks, Mike.
Pedro Pizarro
executiveHey there, Paul.
Paul Zimbardo
analystHello. Good afternoon, everyone. I'd like to spend a moment on the balance sheet portion of things. Clearly, the cost of capital on your end has shifted considerably since our previous conversation. If you do succeed with the Next-Gen ERP, the AMI, how should we think about funding any additional capital should it end up in the plan?
Maria Rigatti
executiveWe've really been modeling many of those scenarios both before and after what happened in January. And we continue to view our financing plan — the one shown on a page in the deck you've got — as still very much in line with that. If we get more and more chances to put capital to work thanks to items such as Next-Gen ERP, etc., that will be financed at SCE consistent with our authorized capital structure; and at EIX, we'll examine where our credit metrics stand at that moment. I believe you're aware that our credit metrics have been trending into that 15%-17% FFO to debt range. The most recent reports, S&P reports, likewise place us in that range across the 2025 through 2028 period. So we feel we're in a solid position there. Naturally, rating agencies are assessing the business environment in California, but I don't believe that affects our balance sheet strength right now.
Paul Zimbardo
analystAll right, got it. And so, if there are obligations that do arise out of what happened in January 2025, how should we think about funding those? Would that be similar to what you've done before — things like hybrids, JSNs at the parent level, preferreds? Any color you can offer on that situation would be useful. Thanks.
Maria Rigatti
executiveOf course. Of course, Paul. So that is one of the truly significant distinctions between a fire before AB 1054 and one that takes place after AB 1054. The Wildfire Fund exists, clearly, to pay claims, so that individuals who were harmed by the fire can be compensated without delay. But it also exists to back the utilities' balance sheets. So there's a mechanism in place whereby, after we draw on our customer-funded self-insurance to whatever degree we must make claim payments, we would then turn to the Wildfire Fund. And they already have a process established, and it is highly efficient. As a result, we would draw on the fund rather than issue debt the way we did for the 2017 and 2018 events. So I believe there's a really, really substantial difference in how that would look.
Pedro Pizarro
executiveRight, Paul — that's honestly among the central elements of AB 1054, and Maria did a great job walking through it.
Paul Zimbardo
analystThank you, team.
Pedro Pizarro
executiveHey, Steve.
Steve Fleishman
analystThank you. Hello, Pedro and Maria. I suppose, maybe following a similar line, do you have any idea where the rating agencies stand regarding what the revised effect of these fires could be on ratings? And if there were, say, some form of risk rating that resulted in some form of downgrade, how does that affect your financing plan when it comes to cost, or anything significant for your financing costs? Thanks.
Maria Rigatti
executiveCertainly. So, I mean, I genuinely believe that the rating agencies — clearly, we keep in contact with them and speak with them, but they've been quite candid in other settings too. They've spoken with a number of you. They've definitely attended conferences. And they're emphasizing climate risk in general. So not only California, but throughout the nation, they are concentrating on climate risk and climate events. I believe they are definitely watching what is happening in California. I believe you're aware that S&P has us on negative outlook, and so we are working to get through the process and provide more information to them, clearly. Again, it isn't about the metrics. It's about, sort of, how they perceive, sort of, the climate risk in California and more widely. I think if you consider, sort of, what effect any of that would have on our financing plan, it's a cost matter. If you think about SCE and SCE's need to finance rate-based, we actually are entering a cost of capital cycle, so we're submitting an application in March, so anything that would need to be revised relative to SCE's cost of debt would be revised through that process and would be captured through that process. I think from an EIX standpoint, we've been running a number of different scenarios, I think, including to examine the longer-term 2025 through 2028 period, and we can handle what's happening to the rates and to the spreads within the range that we've already provided. So I think that we're still on track for all of that as noted in the prepared remarks.
Steve Fleishman
analystAlright. Then here's another question on a different topic — regarding what you said, Pedro, about needing weeks just to collaborate with the attorneys to determine the approach for investigating and getting the lines down so more investigation can happen. Could you — it appears as though you and they might simply head over, observe, and take a look — perhaps elaborate on what the problem actually is there.
Pedro Pizarro
executiveOh, how I wish that were possible, Steve. Truly. The situation is more complex than that. As you might expect, several plaintiffs are involved, along with several attorneys representing them. Their concern is ensuring that they, plus other stakeholders, have any relocation of those lines — anything performed involving equipment belonging to SCE — carried out in a manner that keeps the materials' condition intact, rather than ruining it or complicating examination of it somehow; thus a set of lengthy negotiations occurs with that entire group to settle on procedures for which line gets handled and at what time, plus the method for taking it out, what you might check prior to making contact with it, the way you make contact, who observes when contact happens, the location where you place it, and which items later get shipped to a laboratory. That's simply how things are. Such situations are quite typical in matters like these; and while working through that, despite our desire to accelerate it to the greatest extent feasible, it will probably require additional weeks; so I hope that provides a bit of insight, Steve. Still, I have strong confidence that the SCE team would be on site by tomorrow, relocating items, handling it so as to maintain the capacity for all parties to trust that it was performed correctly. However, here we genuinely require complete consensus from every party regarding the particular actions and safeguards. And therefore we aim to accomplish that honorably.
Steve Fleishman
analystMakes sense. Thank you. Understood.
Pedro Pizarro
executiveYeah. Thanks, Steve.
Ryan Levine
analystHello, everyone. In what ways do you anticipate that the occurrences from the previous month are going to alter what we spend on capital expenditure line items as well as operations and maintenance expenses over the next several years?
Pedro Pizarro
executiveRyan, are you asking about this from the standpoint of how much supply is available and the quantity of materials, or is there some other way you're looking at it? Just one moment.
Ryan Levine
analystPrecisely. Correct. Yeah. Just like you put it.
Pedro Pizarro
executiveAll right. Steve, I don't really have a view on that. It seems like it's probably somewhat soon. I'm not certain it would fit within the wider California or Western economy. I don't believe we've got an answer. There could be a slight effect, but from where we are at this moment, I don't think it's a huge impact; Steve, do you have any other takes?
Steve Powell
executiveRight. Ryan, I would say that when you look at the magnitude, clearly the effect on those communities is enormous. There's a great deal of work ahead of us. Even so, it isn't at a size that matters for the total plans we carry out annually—consider the total line miles we completed just in the last year, with covered conductor by itself accounting for 800 mi. The conductor needed to address this situation is far smaller than that—by a factor of ten compared with those kinds of effects. So compared with our overall plan, it's a minor quantity, and it isn't something capable of affecting supply chains more broadly.
Pedro Pizarro
executiveAlso, Steve, I think it makes sense to mention that every residence and customer site capable of being hooked back up has already been hooked back up. As a result, much of the rebuilding work ahead will focus more on houses and sites that have to be constructed again, and that isn't something that gets done in a single night. There's a process involving choosing locations and obtaining permits for those buildings themselves, so that's likely the bigger bottleneck in this situation, which tells you it isn't a matter of months. For these neighborhoods, it will probably take years. And by the way, from Edison's standpoint, it isn't only what Steve and his group will be doing to ensure the electricity side of this is handled correctly — as an organization, we also want to be present alongside those neighborhoods through our charitable contributions, through our involvement more generally, since, as I said before, this isn't merely something close to where we live. For many of us, this is where we live, and we will be part of the solution here.
Ryan Levine
analystThank you, and I have one more question. Regarding the location, is there a set place where it will be decided how the protocol proceeds when it comes to examining the equipment and other associated items tied to the Eaton Fire?
Pedro Pizarro
executiveYes. This is taking place via the court system. There is a judge who has been assigned. From what I understand, the talks about the particular protocols are occurring as part of her supervision; in fact, I think a court hearing on this took place only yesterday. Yes, only yesterday. I think she stated that, if I'm remembering right, the following conversation will happen in roughly a week. So this is a court process.
Ryan Levine
analystThank you. Appreciate it.
Pedro Pizarro
executiveThanks, Ryan.
Pedro Pizarro
executiveHello, Shar.
Constantin Hemmrich
analystHello there. Good afternoon, everyone. This is Constantin speaking. We truly appreciate the chance to ask our questions. Perhaps to begin, building on the previous question, in a somewhat more theoretical vein. Regarding when a possible AB 1054 drawdown might occur, considering the record of claims and settlements, as you noted, do you think several years will be needed? And would that afford stakeholders additional time to weigh things and to obtain the strongest assurances regarding the constructs?
Maria Rigatti
executiveWell, Constantin, I believe that when folks begin to look ahead, we have not yet established what caused the fire. But looking ahead, if this were a fire covered under AB 1054, I'd say it's too soon to say when people will begin filing claims and entering a process. That is my strong view. The initial step we would take is that we hold $1 billion in self-insurance funded by customers. Therefore, we would draw on that for the initial $1 billion in claims payments; and only after that would we move to the AB 1054 layer. So I believe we do know that the processes exist for approaching the fund and for submitting claims to be paid. Yet I believe it's too soon to say precisely when we would reach that stage.
Pedro Pizarro
executiveYes. I believe Maria addressed the core of what you asked quite effectively. I also detected another dimension in your inquiry, something like: would that consequently afford the parties in Sacramento additional time for deliberation? The opposite side of that coin, though, is that we feel a genuine urgency right now. Part of what we'll be communicating is that, honestly, the market has moved extremely fast; and our view is that showing dedication to either extending the framework or implementing modifications would serve California's interests best. Once again, I'm not standing here laying out specifics like A, B, and C, correct? What we are laying out is the problem itself. And from the standpoint of the market, that means rebuilding investor confidence in California. Honestly, I think this benefits not just how California utilities are viewed, but how the California economy overall is viewed; we consider it critical that action—or at minimum the earliest steps—take place before long. So although there is technically a timeline you were inquiring about when viewed holistically, regarding when Sacramento should act, our attention is definitely on action in the near term, at least concerning those first steps.
Constantin Hemmrich
analystThank you for that. I genuinely appreciate it. My intent was more along the lines of identifying the strongest possible assurances; however, I don't believe urgency remains an open question at this stage. That point has come through quite clearly. Still, I really do appreciate it. And perhaps, just as a brief follow-up, when it comes to regulatory proceedings — with the cost of capital issue arising in the state, and with markets clearly not moving in a favorable direction — does that have any bearing on how the filing lands? And do you perhaps foresee any inclination to push back the proceeding in order to ease some of that pressure?
Maria Rigatti
executiveConstantin, we are proceeding with the filing. March is when it's due. You will see us submit it, just as we've done previously, and we'll include everything — both the quantitative side and the qualitative side. Obviously, recent events have had an effect on the cost of capital. That is something we'll address as well. Ultimately, I think the approaches Pedro described earlier — those represent solutions to the cost of capital. I'm not sure the answer can be found solely and only by way of the cost of capital proceeding. Our applications will contain thorough discussion of these events.
Pedro Pizarro
executiveRight. Perhaps one additional point here is — once more, I raised this in connection with another question too. I continue to emphasize that the PUC moved forward with approving the TKM settlement according to the timeline. That occurred despite the fires having already happened. In my view, this marks a significant moment for their consistent leadership, which they are demonstrating and delivering. Since, honestly, that plays a role in assisting investors to maintain confidence in how long-lasting the California framework is. I genuinely appreciate it. Not just the TKM approval, but also those very considered remarks from President Reynolds that I referenced earlier.
Constantin Hemmrich
analystI appreciate that, and I really value the openness along with the updates. In my view, that helps a great deal. Many thanks.
Pedro Pizarro
executiveMany thanks. All the best.
Anthony Crowdell
analystHi there. Afternoon to you, Pedro. Afternoon, Maria. I'll keep this brief. On slide 20, there's discussion of prudence — if someone is deemed entirely imprudent or entirely prudent. I'm wondering whether some in-between position exists in that framework?
Pedro Pizarro
executiveYes. That point matters a great deal. Broadly, when it comes to how this operates, without question. The PUC holds complete latitude to determine a utility entirely prudent according to the facts, or entirely imprudent, or anywhere between those poles. And you may remember, Anthony, that honestly, this is among the difficulties with an earlier PUC in the matter involving the 2007 fires for San Diego Gas and Electric, when an earlier PUC, in reaching its decision, stated that it faced only two options. It could grant either complete recovery or no recovery at all. And afterward, even that same precedent — in, I think, the General Counsel at that time — both offered remarks, once again, subsequently, acknowledging they understood that wasn't true. And the commission possesses discretion, just as it always has. So that's a truly significant element of the framework in play here; and life isn't binary.
Anthony Crowdell
analystGreat. That's all I had. Thank you so much.
Pedro Pizarro
executiveThanks, Anthony. Take care.
Pedro Pizarro
executiveHi, Richard.
Richard Sunderland
analystHello there. Hope you're doing well today. Is my audio coming through?
Pedro Pizarro
executiveYep, I can hear you clearly.
Richard Sunderland
analystThanks. I have a single item to raise. Should no fix come from lawmakers, would you contemplate any adjustments to how PSPS work is carried out, or in other areas, in the event the future fund backstop ends up smaller — since that possibility affects the fund's role as a risk backstop?
Pedro Pizarro
executiveI'll take that, or at least begin, and Steve might add something from a somewhat different perspective. We never stop learning, so we keep seeking actions we believe could be necessary to keep the public safe as our knowledge keeps growing. That windstorm was unlike anything else, correct? Winds reached as much as 100 miles per hour. You heard me say before that before the windstorm arrived, we had already been more cautious with the PSPS criteria — which means SCE stood ready to cut power under somewhat milder conditions than standard protocols require. In fact, at a certain moment during the windstorm, when night-flying firefighting aircraft could not take off owing to how strong the winds were, SCE grew even more cautious about how it applied PSPS. That's one instance where greater caution was introduced in real time according to conditions, right? The team and Steve, perhaps you can say a little about what SCE is doing and about your ongoing learning as we turn to the next WMP update, and so on.
Steve Powell
executiveOkay, Pedro, perhaps I should say this again. If we examine how we reduce wildfire danger — grid strengthening, the decisions we make regarding covered conductor, the locations where we place lines underground, the considerations involved, the improved inspection methods we now use, the amount and placement of vegetation work we perform — each element of our Wildfire Mitigation Plan rests on protecting the public, and on ensuring our network functions without harm. Then, as Pedro mentioned, we gain knowledge over time from events occurring on our network and away from it, and we examine additional potential hazards within the system that previously escaped our notice, after which we incorporate them into our Wildfire Mitigation Plans; we began with a risk-based priority approach seven or eight years ago, concentrating heavily on distribution since that is where most of our ignitions and danger existed. And we have kept progressing downward. As our understanding grows, we will keep evaluating what the following group of mitigations should be. Yet that is mainly motivated by safeguarding the public as we consider the optimal method to operate the system and protect our community.
Pedro Pizarro
executiveRight. Ultimately, that’s the real driver. And as I mentioned, in my remarks, we have confidence that this state will act appropriately regarding the framework.
Richard Sunderland
analystThat's helpful — I appreciate you taking the time to answer so thoroughly. That covers everything I had.
Pedro Pizarro
executiveThank you, Richard.
Carly Davenport
analystHello, Carly. Hey there. Good afternoon. Hey. I really appreciate you letting me ask questions. I have just one too, following up on what I believe Constantin asked before. Could you give any detail about what's assumed in your plan, or simply how you view a possible change, whether up or down, in the CPUC ROE as you head toward the cost of capital proceeding next month — what is reflected across this planning period?
Maria Rigatti
executiveLet me break that into a pair of questions, since you're really asking about assumptions in our planning period. You can see, I believe, the sensitivities included in the deck regarding EPS growth from 2025 through 2028. Across the period during which we've provided those updates and figures, we've had quite a few different ROEs. So we've modeled many scenarios around that; and in our view, the range protects us across a variety of possible results. If what you're really getting at is more about what will be in the cost of capital filing when we submit it in March, I'd simply repeat that it is going to, I'd say, resemble the filings we made previously, meaning we'll perform the quantitative work plus the qualitative work; we'll discuss at length the effects of the January events, how the market responded, and also how we'd consider that with respect to continuing costs. In my view, the commission previously, when we made our filing back in 2019, when we submitted it, we did incorporate the idea of a wildfire adder; yet even then, we stressed that addressing this only through cost of capital won't solve the problem. What really mattered were the structural reforms at that time under AB 1054, which will help the market respond more positively to California. So our approach is truly going to come at it from that fundamental angle.
Carly Davenport
analystThat's genuinely useful. Thanks. I won't ask anything more.
Pedro Pizarro
executiveThank you, Carly.
Maria Rigatti
executiveThanks.
Pedro Pizarro
executiveThank you.
Pedro Pizarro
executiveHello, David.
David Arcaro
analystHey. I really appreciate you taking the time for my questions. Hey. I wanted to hear what you think. In your view, what's the fix here? What are you pushing for? I mean, when it comes to what's happening on the legislative side. What are you pushing for? What do you figure is basically required to deliver the certainty that investors want when it comes to some kind of protective financial backdrop for California wildfires?
Pedro Pizarro
executiveDavid, well, I'll say right off that it's still early. Like I said, we're engaged in conversations and we're doing plenty of listening as well, but we are definitely in discussions with fellow utilities, with leaders in the legislature, and so on; and there are likely many different tools that might be brought to bear in this situation. So I don't want to run too far ahead of where things stand; but I believe in the end, one part of what investors keep telling us, and I think you can see it in how valuations have been affected, not only for Edison, but also for Sempra and PCG, is worry that what the LA area just went through were truly massive events. Regardless of whether electric infrastructure played a role in causing them, they were massive events. And in some measure, perhaps they changed expectations about how massive events in California could become. And that then gets people wondering about how long-lasting the fund is and about tools such as the liability cap, correct? As things stand, the liability cap is tied to whether the fund exists. So can we find ways to allow the fund to grow larger when necessary, correct? Whatever route gets you there. Ways to make sure the liability cap holds up, no matter what condition the fund is in. So I think those are a few of the issues. There are likely various tools that could address this. Past the utility side of things, you've already heard leadership throughout the state speak about some of the other pieces that might be included in a solution. And once more, I can't say in the end whether we'll see vehicles in Sacramento that, at least during this first term this year, for this session, deal only with AB 1054, or whether you'll see additional items? I saw that, I think it was yesterday, Mike McGuire, who leads the Senate, put forward a package, a set of bills dealing with insurance reform. You've heard talk regarding building codes and standards, correct? The fact is California is going to keep having to grapple with wildfire risk. Our Adapting for Tomorrow white paper from 3 or 4 years back noted that the state will face rising wildfire risk as climate change produces deeper impacts over the coming several decades, and so I give plenty of credit to the governor and the legislature. They've been focused on things beyond just AB 1054. They've doubled state budgets for firefighting. They're in the middle of further discussion about managing fuel and cleaning forests and things of that nature. Once more, when it comes to building codes and standards, plus defensible space—that's something I noticed in the package I brought up regarding insurance. One of those bills, as I recall, was focused on making sure defensible space exists. Each of these issues will undoubtedly be difficult in its own right; that's exactly why I can't say whether the legislature will come together to tackle a great deal of this simultaneously or handle it one piece at a time. As far as we're concerned, our goal is to ensure we're heard strongly as we help them grasp how urgent it is to show all of you, and the market, that investors need immediate reassurance about AB 1054's strength and durability. And once again, the encouraging part is that this isn't the situation from 2018, when everything had to be built from nothing. We're able to build on what a very strong bill, spearheaded by Governor Newsom along with a previous legislature, established—one that truly created the template for the nation. And it's always preferable to be in a position where the conversation concerns how you adjust and expand something rather than how you build it anew from nothing.
David Arcaro
analystYes, definitely. That's quite useful, so thanks for sharing your perspective. I also wanted to ask — when you consider your capital plan and how you rank various projects and initiatives, would it be reasonable to redirect some added CapEx toward lowering fire risk? I'm referring to Slide 12, which shows how CapEx is allocated across the distribution system. Do you believe there's an argument that wildfire mitigation should once again take on a larger role?
Maria Rigatti
executiveYes. We retain discretion at all times to reallocate the General Rate Case funds, so we set priorities according to what's in front of us once we reach that timeframe. One of the earliest actions you'll likely observe from us involves the restoration areas — we're examining how we reconstruct those communities and assist them, whether in locations where covered conductor is already installed or where we can push forward with certain focused undergrounding efforts; however, I'll pass it to Steve, since he likely has additional views on where we could shift our approach somewhat.
Steve Powell
executiveRight. I believe one key takeaway from the fires — whether we're talking about the Palisades Fire or the Eaton Fire — is that everybody is revisiting their risk models to figure out what has shifted on the risk side. Have we overlooked anything new? When we think about how we rank our capital priorities, the starting point is risk, public safety, reliability, and so on, and that's what tells us where to direct it. So if our risk models indicate we ought to be hardening the grid in a different way or directing our capital spending somewhere else, we'll assess that. It's premature to predict what adjustments we'll make. As Maria said, we definitely have areas where we're rebuilding and beginning anew. In many cases, when we start fresh, our default approach is to put lines underground; so we'll probably see additional undergrounding in spots where we're constructing from scratch; but that really depends on looking at that broader capital allocation; it begins with how we distribute the risk, how we assess the risks, and which mitigations work best. So it's too soon to say how much will change, but this is something we'll revisit, just as we do annually when we reassess our capital plans.
Pedro Pizarro
executiveYes. And Steve, I'd guess that when we're looking back 12 months, 24 months, or 36 months from today, it may not be a neat division, correct? Especially in the neighborhoods that need reconstruction and need it done more robustly. Take, for instance, you already believe your crew has by now swapped out roughly four or five of the existing 4 kV circuits in Altadena for a contemporary 16 kV circuit using covered conductor, correct? So that was a fire-related rebuild, yet it was simultaneously a resilience upgrade. My sense is that portions of a few of those circuits sat in non-HFRA zones. Thus they were reconstructed with covered conductor. That means it's also an enhancement to wildfire risk. So it likely satisfies several boxes, ticks several boxes among the groups you were inquiring about, David, if that's clear.
David Arcaro
analystYeah, that's right. Excellent. I really appreciate it. Thank you.
Sam Ramraj
executiveWe appreciate your participation. That brings this call to an end. Enjoy the remainder of your day. You can go ahead and hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Edison International transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Edison International earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Edison International or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.