EDP Renewables, S.A. (EDPR) Earnings Call Transcript & Summary

February 28, 2024

Euronext Lisbon PT Utilities earnings 72 min

Earnings Call Speaker Segments

Operator

operator
#1

Good afternoon. We welcome you to the EDP Renewables Full Year 2023 Results Presentation Conference Call. [Operator Instructions]. I now hand the conference over to Mr. Miguel Viana [indiscernible]. Please go ahead, sir.

Miguel Viana

executive
#2

Good afternoon, everyone. Thank you for attending EDPR 2023 Results Conference Call. We have here with us our CEO, Miguel de Andrade; and our CFO, Rui Teixeira. We will run you through the key highlights on the update of -- on the execution of our strategic plan and the financial performance of the year. We'll then move to Q&A in which we'll be taking your questions, both by phone and the written questions that you can insert from now onwards in your conference web page. This call is expected to last close to 60 minutes. I'll give now the floor to our CEO, Miguel de Andrade.

Miguel de Andrade

executive
#3

Thank you, Miguel. Good afternoon to everyone, and I think it's good that we can talk and update you on what's been happening in 2023 and also the company's update and outlook for the year. And I'd start off by saying that 2023 was a challenging year for the renewable sector in general, but also EDPR in particular. And I don't think there's any sugar coating to it, and I won't try to. I'll give you a balanced and realistic view of where I think the sector is and where EDPR is. As you know, we've been regularly briefing you on the year and the fourth quarter didn't go particularly well either. There were several issues that negatively impacted us and that we've been working through and are continuing to work through, and I'll go through that in detail in the presentation. There are also some positives that I will highlight. So I would start off just by going -- just before going to the bulk of the presentation to Slide 4, just saying 2023, as I said, is definitely challenging. So moving forward to Slide 4. First, I think if you look at the capacity additions, we had a strong fourth quarter in 2023. We added 1.7 gigawatts of renewables, which is quite an impressive volume for a single quarter. And so we ended up the year with a total of 2.5 gigawatts of annual capacity addition. So this is what we'd previously anticipated at the 9-month results release. Going forward for '24, we have very good visibility on the execution of our 4 gigawatt target. We already have 85% of this capacity currently under the construction. And the last couple of months, we've seen also the normalization of the solar panel supply chain in the U.S. So we had a pretty adverse environment over most of '23 and seems to have normalized now. Regarding balance sheet, as you know, in 2023, we reinforced our capital structure with EUR 1 billion equity raise and we've also successfully implemented a new script dividend policy, which we -- so it would be the second year. We just came out with the news release for that this week. On asset rotation, I think it was a particularly strong year, great execution by the teams and reflecting, I think, the value of the assets. And I remember this time last year, when we were getting a lot of questions on the demand for asset rotation, if you could still keep it up. And yes, I mean, the answer was clearly in 2023, we had 3 great transactions, contributed to a total of EUR 1.7 billion of proceeds, EUR 460 million of gains and an average gain of 60% on invested capital. So Again, a year on -- I think we can look back and say it was a great year for asset rotation. And it's clearly above the 20% to 25% target return for asset rotations that we assumed in the strategic plan. We continue to see strong interest from investors. And in the beginning of 2024, we already announced the closing of 1 transaction. We've signed another one. We expect them to close in first quarter of '24, totaling -- a total of around $1.1 billion in terms of enterprise value. But '23 was also marked by quite a few material headwinds. And we shared them over the last couple of quarters, and now we're actually showing the numbers impact. We had a well below average wind resource with the negative impact of around EUR 200 million in the 2023 EBITDA, mostly penalized by the El Nino effect on the U.S. wind resource. I think we flagged that already, I think, in the first quarter numbers of last year that, that was beginning to happen. We had a cost associated with the delay on the transmission line permitting in the wind project in Colombia. We have the bottlenecks on the solar panel supply chain in the U.S., and we have a countercyclical callback taxes in Europe. So altogether, these headwinds represent about a EUR 400 million negative impact on our 2023 EBITDA, and this seriously distort our underlying P&L. Finally, in late December, we announced an agreement for a transaction that comes -- I think it will allow us to simplify the corporate structure. It's definitely earnings accretive from day 1. So we bought back 49% of a 1 gigawatt portfolio of wind farms that we operate in Europe around EUR 570 million. The implicit enterprise value per megawatt multiple was around 1.2x, and we expect the transaction to be closed in the second quarter of this year. So now I'll go deeper into these topics, and I'll start off just by taking a step back. And looking at the big picture. First, we had some positive news coming out of the comp in December, essentially talking about tripling the renewables capacity between 2022 and 2030 to reach the 1.5-degree target. And so that commitment was, say, signed by more than 130 national governments. We have the European Union coming together and also agreeing to triple that. So I think that broad tailwind continues to be there, and we continue to see it pushing the sector forward. Solar PV and wind is expected to account for 95% of global renewable expansion. And that's where we are placed. So we're well placed to take advantage of that. And in general, the generation costs continue to be below both fossil and nonfossil fuel alternatives. There's also been upward revisions of the '23 to '27 targets for renewables in countries like Brazil, Germany, the U.S. for large economies where we're present. In the offshore, we also expect the upward price revision auction coming up in around 6%. The price cap increased by 66%. And in the U.S., we're also seeing a significant increase in the pricing, including inflation updates over the construction stage. So we are seeing conditions improve materially for auctions, both onshore and offshore. We saw in 2023, also the approval by the FERC or the Federal Energy Regulatory Commission overrule to speed the interconnection processes. As you know, that's one of the issues which is holding up a lot of projects for the sector. And that's the first major change to the interconnection requirements in 2 decades. So work is being done by the different regulators to try and get -- streamline the permitting and the licensing initiative. And in Europe, I think the European Commission has also come out with a goal recommending a 90% greenhouse gas emissions compared to 1990 of around 90% -- so 90% reduction for 2040 compared to 1990. So things seem to be going in the right direction. The broad macro wins are there. Now it's really about execution. And so if we go on to the next slide, I think if we look back, we are continuing to scale up significantly versus what our growth rate was in the past. As I say, over the decade, 2010 to 2020, we're growing around 700 megawatts a year. We're now -- we just did 2.5 gigawatts, that's still a significant increase versus what our historical growth is. And as I said, we are very confident on the 4 gigawatts for 2024. I mentioned to you, 85% is under construction, 15% is expected to start over the next few months. It's got a big way to solar DG projects that normally have an average construction time of around 6 months. And I think it's important to say also that most of the solar panels have already been delivered to the project in the U.S., and so that gives us a bit of high degree of confidence there. I'll move forward to the next slide on asset rotation. So here, as I mentioned, very strong gains, around 60% gains on invested capital through transactions, Spain, Poland and Brazil. I won't go through in a lot of detail because I think we've already given information over the course of last year. So this is not news for most of you. I would just highlight that in the beginning of '24, we've already closed those 2 additional transactions, so around 500 megawatts, EUR 1.1 billion enterprise value. Let's say, the other transactions for '24 have already been launched and we expect to get the gains and the proceeds to be at least in line with our strategic plan target. If we move to Slide 8. Just give you a highlight on the buyback of the 49%. I think it was a good opportunity that we had to take back 100% control, gives us quite a bit of additional flexibility simplifies the ownership structure. It's cash flow and earnings accretive day 1 and it gives us more flexibility for hybridization, repowering and even on the energy management side. So we're expecting this for the second quarter. But as you can see, pretty healthy numbers, double-digit cash yield and around EUR 40 million expected contribution to net income. If we move to supply chain. So supply chain, definitely a much stronger position, I think than we were maybe 9 months ago. We had to reconfigure the supply chain in the U.S. because you know we had a large dependency on LONGi panels as a result of significant delays in the imports of those panels. We went back and we recontributed to -- so now we have 9 different suppliers for the 2024 deliveries between the U.S. and Europe. They're all aligned with ESG audit requirements and traceability and the manufacturing origin. So I think that's really something that's important is to make sure that we don't get caught up in any issues around UFLPA's, the Uyghur Forced Labor Prevention Act or tariffs in the U.S. So some of these modules are already produced in the U.S. And we've diversified the polysilicon, including origins from the U.S., Germany and Malaysia. So I think overall, we're in a better place or more resilient place now in relation to the supply chain. And as I say, if you see here on Slide 9, at the bottom, we've got the 70% of the solar panels already delivered, which is what I mentioned on the -- some relation to the previous slide. So that, I think, positions us well. I think if you look at costs on the right-hand side, it's also important to see that the costs have been coming down for solar panel prices significantly. We've recently closed framework agreements on about 1 gigawatt of solar panel volumes for late '24 or early '25 deliveries, mostly in Europe. I think it's record low prices. So I think that also places us well for the growth there. If we move to Slide 10, talking about risk and hedging and long-term contracted. So -- as you know, we normally have a policy of being quite contracted and hedged going forward. That sometimes has a downside if prices spike, and we don't capture all that upside. But it also has an advantage, which is when prices fall, we also don't get as much impacted. So we've kept a high rate of long-term contracted and hedge electricity sales. Normally, we target long-term contracts of at least 15 years maturity and we try to lock in at least 60% of the cash flows for the investment of NPV with this contracted profile. Specifically in relation to '24. So 90% of the expected generation is already contracted or hedged and in '25, 85%. Only 50% is related to European electricity markets, which is mainly Spain. The rest of the merchant exposure is mostly U.S. and Brazil, where electricity prices have -- the volatility has been less significant. And I think it's also important to note that this residual exposure to spot electricity prices is associated with the low-risk volume management of renewables generation intermittency. So that obviously, there can be -- can blow more or less. In the case of blows less, you want to make sure you're not overhedged. And so that is typically where we want to be. Regarding prices, they were above EUR 80 per megawatt hour for 2024, above EUR 70 per megawatt hour in 2025. So significantly above the current forward prices. So that is part of the downside, but it's part of, let's say, in relation to a smaller volume. The average maturity portfolio of the long-term contract is around 13 years. So I think that provides quite a lot of stability to the revenues. Since 2022 for renewable projects to be delivered going forward for '24, '25 and beyond, we are investing in what we think are better conditions, higher PPA prices assuming already a higher cost of capital. And so obviously, having also higher absolute returns. So I think this will end up being a pretty good project. So 61% of the projects, the secured capacity, the decisions were taken since 2022. So as I say, taking advantage of these assumptions. These projects were approved at an average of over 1.4x WACC. They will be entering operations from late '24 onwards. And so I think we might benefit from a slight improvement of market conditions if there's an easing of supply chain pressure or lower interest rates versus the 2023 peak levels. Overall, we continue to see attractive returns based on our investment criteria, not just within the portfolio of secured projects, but also projects under development that we haven't yet secured for commissioning in '25 and beyond. Go to Slide 12. This is a point, which I think is important. Obviously, in a market where energy prices are reducing at least on the merchant side. And where there have been delays, it's really important to be focused on efficiency. And making sure that we are mitigating the impacts of the delays in the project. So on one hand, we've been making sure that we are focusing the growth. So around more than 90% of secured capacity for '24 to '26, we're expecting to come from 10 core markets and just -- and 60% from 3 core markets, which is basically the U.S., Spain and Brazil. So leveraging there on the critical mass that we have in those markets. In terms of organization, we are leveraging on the EDP & EDPR synergies. So particularly in terms of back office and some global functions to make sure that we're not duplicating teams or not duplicating functions. So I think that's allowing us to streamline let's say, the operations and the overheads and really make sure we are the leanest, most efficient company possible. In terms of cost efficiency, we are implementing a series of cost efficiency savings, including the lane of head count that given a slower growth. And so we are estimating savings of more than EUR 30 million already in 2024 and growing. And on O&M, we're also seeing increased availability and also a leaner cost structure there. That's more on the efficiency and on the organizational front. On the technologies, hybrids, we continue to see a lot of potential for hybrid. So we've now reached 107 megawatts of operational wind and solar hybrid projects in Poland, Portugal and Spain. We're the first ones to actually have hybrid projects in Portugal and in Spain. And we continue to work to materialize our 1 gigawatt of hybridization pipeline. So those are, let's say, quick wins that will have quite a lot of value just because of the sharing of the infrastructure in terms of the interconnections and access roads and so forth. In terms of storage, we've already installed 16 megawatts in the U.S. We have around 200 megawatts under construction also in the U.S., and we're working also in the pipeline in the U.K. And then in terms of solar DG, the generation installed capacity, both in APAC and in the U.S. has increased over 50% year-on-year. So we do have leverages -- or we do have synergies in this business line, together with EDP to establish a global platform. And in terms of contracts, I mean, in many cases, these are relatively large contracts. So in '23, we closed the largest U.S. corporate sponsorship of a distributed PV with Google. And we have quite a highly publicized contract of around 500 megawatts, and that's something that we're working on to make real over the next couple of years. Finally, in this section, just another word on OW. So we currently have 2 gigawatts of wind offshore projects under construction in Europe. And around 1.7 gigawatts of projects in advanced development stage in both Poland and in the U.S. Under -- starting the under construction, we have 3 projects in France, I mean they are progressing as planned, the CODs in capacity. Increase of around 100 megawatts, which means that we have a project which could reach almost 500 megawatts in total. And finally, on South Coast wind, used to be called Mayflower project. That's the project in the U.S. of Massachusetts. It's an advanced stage of permitting and interconnection. The revenue is not secured. As you know, we canceled the PPA last year, and that's part of the numbers last year. and we are analyzing the potential bid into the first multistate PPA auction in the U.S. So it's a rollout in Connecticut and Massachusetts. That bid is expected or let's say that PPA auction is expected around the end of March. So like both onshore, but also for offshore, we do follow the strict investment criteria. Namely in terms of target risk and returns. And we're also obviously aim to minimize the timing between PPA contracting and FID. So it's obviously very important. I think we've seen that very clearly in the sector over the last year. The importance of trying to line up both revenues and costs to mitigate that potential disconnect in case there's a market disruption. So I'll stop there for now. I'll pass it over to Rui to go through the 2023 numbers, and then I'll come back for closing remarks. Thank you.

Rui da Silva Teixeira

executive
#4

Thank you, Miguel, and good afternoon to you all. I would like to take you through the 2023 results now. And if we move just to Slide 15, as we already anticipated in the previous presentations, 2023 operational performance has been heavily impacted by the El Nino weather event in North America. It impacted that obviously these low wind volumes had a negative impact, a substantial one, close to EUR 0.2 billion of EBITDA. But there are 2 important messages I would like to convey with the chart on the right-hand side of the slide. The first one is that El Nino is cyclical. It's a cyclical phenomenon. We are aware of it, and we already incorporate these sort of events in our long-term forecast of our net operating hours. So it is captured in our P50 NPV estimations when we go for a financial investment decision for our projects. The second one is that our historical data shows that the slope of removal resource deviation is zero. So there's no evidence that our portfolio is exposed to a declining with speed. And that obviously, we do have the short-term financial impact by the volatility, the normal volatility of wind and particularly impacted by this type of phenomenon, weather phenomenon as the El Nino. But it doesn't mean that we have an onward trend of portfolio profitability. For 2024, we do expect a gradual recovery towards more normalized levels of resource. If we now move to Slide 16. Along with other -- with lower wind resources, EDPR performance in 2023 was also impacted by other headwinds that we have talked about 70%, the first one, U.S. solar project delays caused by the supply chain issues that Miguel already discussed, impacted our EBITDA by about EUR 50 million -- EUR 51 million this year. For 2024, we do not expect additional costs from COD devices. As around 70% of the equipment has already been delivered for the year's installations. And the construction schedule foresees a gradual ramp-up of the U.S. solar capacity and generation volumes over 2024. Clawbacks in Europe had an impact of EUR 106 million of -- at EBITDA level in 2023. Effectively lower than what we initially expected in the beginning of the year. You may recall that we were estimating a potential of EUR 300 million of impact, and this was on the back of lower prices throughout 2023. For 2024, Polish clawback is -- has added, so it will not be active in 2024. Romania will continue to have an impact into noncash impact as we -- after we unwind the hedges. So if there will be an impact, but again, it will not be a cash one. The clawback pure impact, what we call the effective application of a clawback will not be material at all given where we are in terms of price conditions for 2024 or price forward curve for 2024. Spain, as you know, reintroduced the 7% tax on generation revenues and this will imply around EUR 15 million impact in 2024. But all in all, the big number, the EUR 106 million that we had at EBITDA level is going to reduce materially as we move to 2024. Lastly, we have incurred costs with delays in Colombia. This amounts to about EUR 53 million in 2023 P&L. This is related to the short position that we have, given that we have the delivery commitment -- the energy delivery commitment, but we don't have the operating reform. We are in advanced stage of negotiation with the majority of the offtakers aiming to reduce that short position. In parallel, we have been hedging an important -- driven by the project delays that -- of course, we consider this as a nonrecurring impact. And I'm sure we can provide you some more details, if you ask so. Also, as Miguel already said, we expect to get transmission line environmental permit in the second half of 2024 and continue with construction to have these projects fully operational, I would say it by late 2025. On Slide 17, recurring EBITDA was about EUR 1.8 billion. That's a 14% drop year-on-year. This has a positive impact from the asset rotation gains EUR 460 million, which are very much above the target that we set for our business plan. And also the EBITDA growth or -- I'm sorry, evolution was driven by an increase in terms of the 12% year-on-year installed capacity. But of course, we had that negative impact from lower renewable resources, also lower average selling price, about minus 6% year-on-year, with Europe coming down from the abnormal peak prices in 2022 and this was partly compensated by the 8% increase in realized prices in the U.S., mainly coming from the new additions at higher prices. Also some temporary headwinds in Europe and the Americas that we already -- that I already explained. Also to highlight the reduction of share profits from associates, and this is driven by the reduction of the wholesale electricity prices in U.K. versus, again, a very extraordinary level in 2022 and the PPA cancellation penalty that we booked back in Q2. So all in all, this justifies the drop in EBITDA to EUR 1.8 billion. On Slide 18, the net expansion investments of EUR 2.9 billion. I think it's an important number too, of how it shows really that we carry on with the growth, even though we have these headwinds. By the end of the year, net debt was at EUR 5.8 billion. That's an increase of around EUR 0.9 billion versus December 2022. Mainly driven by the growth effort with this overall EUR 4.2 billion of expansion CapEx on a gross basis, partially offset by the asset rotation and also the tax equity proceeds. Maybe here, I think it's important to highlight that 2024 started with a strong balance sheet position. Obviously, with the EUR 1 billion additional asset rotation already executed and signed for the year. That are basically reducing the January debt to about -- to the levels of the 2022 year-end. We will have more proceeds from this asset rotation transaction through the year, along with a strong contribution from tax equity proceeds as the U.S. projects get to COD and I expect here more than EUR 1 billion contribution. If we now move to Slide 19. Financial results amounted to EUR 313 million in 2023 decreasing 30% versus 2022. There are some impacts here, currency, as we have been rebalancing the -- as you know, the -- on the net hedge investment of the U.S. dollar exposure. Also some reversion of the negative impact on -- of ForEx and derivatives back in 2022 as well as higher capitalized financial expenses in line with the current project timings. Average cost of debt increased to 4.8%, driven by a higher gross debt of around EUR 1 billion year-on-year. And EDPR debt has 82% of the stock at fixed rate. And it's important to mention that our financial liquidity, and that includes cash and committed credit lines that continues to cover refinancing needs beyond 2026, and that more than 70% of our debt matures post 2026. So if we now move to net profit. Net profit totaled EUR 513 million versus EUR 671 million back in 2022, impacted by the top line headwinds, partially compensated by the strong execution on the asset rotation side as well as the improved financials. Nonrecurring accounted events that net profit were mainly the PPA cancellation in Massachusetts from Q2 and this is at EBITDA level. The impairment in Colombia this quarter and the Romanian provision at depreciation and amortization, and this is related to the tax buyback in Romania. Lastly, as announced yesterday to the market, the Board of Directors will propose in 2024 General Shareholders' Meeting to continue with this group dividend program that we introduced last year, the results corresponding to the year 2023, providing, I would say, once again, with a flexible remuneration system for our shareholders that can opt between cash or shares. And with this, Miguel, I would hand back to you for closing remarks. Thank you.

Miguel de Andrade

executive
#5

Thank you, Rui. So in relation to 2024 guidance. First, I'd say that we reiterate the 4 gigawatt installations for 2024. This at 85% is already under construction, 100% secured with long-term revenues in the DG part is also beginning to progress. The second is to say that we start off with a strong balance sheet position. And we have a capital increase. We've got EUR 2.4 billion of asset rotation proceeds executed in signs as of today. We've had another EUR 0.5 billion of tax equity proceeds also cashed in. And we will continue to execute significant volumes of asset rotation proceeds and tax equity during 2024. So I think that's a positive message and something that we continue to see in the market. Despite the 2024 strong expected installations, we do have a lower cumulative capacity added versus the business plan. So that leads us to estimate a lower volume of renewable generation in the year to around 40 to 42 terawatt hour range, even so that's a year-on-year growth of around 15% or more than 15%. And despite the higher weight of the long-term contracted and hedged in generation in our portfolio, there has been a material decline, and I'm sure you've all seen that in the market over the last couple of months of electricity prices in Europe. As I mentioned earlier in the presentation, so Brazil and the U.S., there wasn't such a high increase. There isn't such a -- there isn't also a decrease. That leads us to estimate the average selling price for the global renewable generation portfolio as a whole, the EUR 53 to EUR 55 per megawatt hour. So we don't normally provide guidance at this point in terms of EBITDA or net income, but let's say this is some sort of help to try and get a view on how we're seeing 2024 as of today. So as Rui mentioned, we do see some headwinds continue to maintain in 2024. Although, obviously, it's a lower size in '23. We've been working through a lot of these issues, but we will continue to have some PPA costs in Colombia. We have no -- but don't forget that we also have some of the hedges in Colombia. So this is not -- it's not such a straightforward calculation there. We have noncash costs with hedges due to clawbacks in Romania and also some residual El Nino effects in early 2024. We're assuming an El Nino of let's say, just 1 year. And so that would come off sort of over the next 2 quarters. So in relation to guidance for '24, our recurring EBITDA showing a moderate year-on-year growth with a higher underlying contribution, excluding capital gains. So we had a lower underlying in '23 and higher capital gains in '23, as you know. And in '24, we expect that the capital gains would be, let's say, in line with what we had in the business plan. And obviously, that means that the higher -- there will be a higher underlying contribution from the business. to give us a moderate year-on-year growth for '24. So I'm not trying to sell you a big story. I'm just saying that I think we -- '23 is definitely a bad year in terms of the underlying. Obviously, we had then a good contribution from the asset rotation, '24 , we've seen the underlying improve versus '23. Going forward, we will continue to grow. We will continue to invest. Based on the investment criteria. I think we've always been very clear about that. I think we've been disciplined about that. We take relatively conservative projections in terms of energy prices for the future. And we will be focusing on projects that give us those returns and prioritizing returns over volumes. That's something that I also want to leave that message that we are here to create value and we are here to grow but making sure we're getting the returns that we want. And I'd stop there. And we can turn it over to Q&A and going in depth wherever you want. Thank you.

Miguel Viana

executive
#6

Yes. I think the first question comes from Manuel Palomo from BNP. Manuel, please go ahead.

Manuel Palomo

analyst
#7

I will ask 3 questions, if I may. First one is on the average selling price, you expect a decline from EUR 61 megawatt hour to somewhere between EUR 53 and EUR 55-megawatt hour in '24. My question is what are drivers for the decline? I understand that partly should be some merchant exposure, but I wonder whether you still see some pressure on PPA prices. That's the first question. Second, it is just a clarification on the asset rotations for year '24 after your recent statements Miguel, about the asset rotations. You see also in the slides that asset rotations in '24 will be in line with business plan, does it mean that it will be closer to the EUR 300 million rather than the above EUR 400 million that we saw in 2022 and 2023. And lastly, I wanted to ask you about your views on the returns for the assets because one of the big concerns that the market would have is that -- well, there's some merchant exposure, but also there's some exposure to forward curves beyond termination of PPAs. I wonder whether you could shed some light on this and whether you are now assuming lower overall returns for your fleet.

Miguel de Andrade

executive
#8

Thank you, Manuel. So -- I'm not sure -- quite sure I got the last question. So you're talking about the deals -- the returns on the asset rotations and whether there's exposure to merchant post PPAs or something? I didn't quite catch that.

Manuel Palomo

analyst
#9

Sorry. No, I was -- I meant to ask about the returns of your asset fleet, not the asset rotations, but the existing fleet in general terms.

Miguel de Andrade

executive
#10

Okay. So on the first price -- on the first point around pricing, the reasons for decline. It's essentially on the merchant component. So obviously, the PPAs are what they are and the hedges are what they are. So although we have limited merchant exposure, the prices were obviously much higher than previously, and now they've come down. And so it's a small volume, let's say, but it's a big delta. And so that then impacts obviously the average selling price. Particularly, if I'm not mistaking off the top of my head, but it's around 4 terawatt hours in total, 50% of that is in Europe and sort of 50% of that in Spain. And if you look at the deltas of price movement over the last couple of months, that basically is what is driving the change in the average selling price. So roughly, that's sort of the explanation. On the second point, so yes, just to clarify, that's exactly what I was saying. So we've had great asset rotation deals last year. We had them also in 2022, clearly above EUR 400 million. Like we do, we never count on extraordinary gains or anything like that. I mean if it comes, it comes, that's great. That's upside for us. But in terms of guidance, we definitely don't want to create any expectations. So what we're saying is the asset rotations for '24, let's say, in this guidance last year, which is the moderate EBITDA growth. We are assuming doing around the EUR 300 million mark that we had in the business plan. So we're not taking a more aggressive approach there. So what it means, if you back that out, is that you have a slightly better underlying performance, obviously. So you have a decrease in the asset rotation gain, but you have an increase in the underlying. On the third point. So I think -- basically on the returns. And if I understand, I still can't quite understand the question. But from what I understood, the exposure to merchant post PPAs and how that impacts the returns of the projects, right? So yes, I think there, the comment I would make is that 60% -- around 60% of our NPV is contracted, which means that there's 40% either with the PPA -- well, typically with the PPA, which means that there's 40 projects, 30 years you lock in a PPA for 15 years, which will typically cover around 60% of your NPV. The remaining 15 years represents 40% of the NPV, which is exposed to merchant. And there, I mean, I can tell you, our prices are well aligned with market -- with other markets, independent consultants and other things like that, sometimes even below that. So it already factors in the penetration of renewables -- aggressive penetration of renewables in the future. Things like what we call the solar adjustment factor, wind adjustment factor. So when -- assuming that there's a lot of renewables that that's going to pressure the lower prices, that's all factored into the numbers when we run the models. And so just to be very clear on that. And in terms of the absolute returns, I think one of the interesting things is to look at the PPA prices we've been locking in over the last couple of months, even in this declining wholesale prices. So in Spain, recently, prices for wind around EUR 55 and solar EUR 42; Germany EUR 70; U.K. EUR 70; Italy EUR 78; France EUR 75; Singapore, there's a couple of projects, but between EUR 58 and EUR 62 and giving us high single-digit IRRs. In the case of the U.K., it was actually double-digit IRRs. So good IRR minus WACC spreads clearly above the 200 basis points and also with a high NPV contracted. So in many cases, even above 60% NPV contracted. So this is just to give you sort of a sense of what we're seeing in the market at the moment. Does that help?

Miguel Viana

executive
#11

I can go to the next question. I believe the next question comes from Javier Garrido from JPMorgan.

Javier Garrido

analyst
#12

Yes. Good afternoon. In Europe, which is where we are seeing the collapse in prices. Can you give any indication of what is the price that you are using as a reference for your guidance for merchant in Spain, what is the wholesale price or the capture price that you are assuming for the Spanish market in '24? The second question has to do with -- also with the guidance, that range of terawatt hour versus prices. Is it fair to assume that if the output comes towards the lower end of the range we should expect achieved prices coming closer to the higher end of the range because it's reasonable to assume that you will have less merchant output in the mix. And then the third question is about below the EBITDA line. I understand you are not willing to provide guidance, but you can provide some indication of the moves, because in financial results, there is quite a lot of action that you have taken to manage top line. So you can give some indication of where we should see net financial costs in '24? And also of minorities, given the CTE deal, it makes sense to see reduction in minorities. If you can cast any light on the lines below EBITDA, that would be very helpful.

Miguel de Andrade

executive
#13

Thank you, Javier. So I'll do first 2, and then I'll ask Rui to comment on the -- below the EBITDA. So on the first one, I mean, we're using, basically, updated for prices. So it's -- we're not making any specific assumptions or modeling, we're just taking what we're seeing in the market at the moment for the year. Both in Spain and in the other markets. On the second point, so yes, I understand your rationale. So lower volumes overall, I would just say though that the relative percentages, so it depends where the lower volume happens. But if there was a lower volume then it's not clear that we have the higher achieved prices because, as I say, it depends whether it's coming in more contracted or whether we have more merchants. If we had lower volumes in the geographies where we have more merchant then yes, then -- is the delta wouldn't be as large. And below EBITDA, Rui, if you want to comment.

Rui da Silva Teixeira

executive
#14

Javier. I would say there are roughly EUR 0.1 billion less depreciation, EUR 0.1 billion less minorities and EUR 0.1 billion lower taxes and financial costs, round figures.

Miguel Viana

executive
#15

I think we can go for the next question. Next question comes from Alberto Gandolfi from Goldman. Alberto, please go ahead.

Alberto Gandolfi

analyst
#16

I also have 3. First, going back again to the '24 guidance, just to be very clear, you're talking about moderate growth year-on-year, just to be 100% right, you're using the recurring 1 point -- roughly EUR 1.85 billion EBITDA. And I was going to ask you, I really like your Slide 16. It really details all the headwinds -- temporary headwinds here in '23, would it be possible to say for you to tell us what similar headwinds have you assumed in the '24 guidance? So do we have EUR 200 million, EUR 300 million, EUR 400 million of temporary effects on 2024 profits? I'm asking this because the original guidance you gave about a year ago for '24 was EUR 2.5 billion. Secondly, going to 2026 now, I know this is not subject of the call to revisit guidance. But can you remind us what power prices you were using for 2026. And what level of hedges and visibility we have right now? Because I remember that, I think the base load price was above EUR 80 a megawatt hour. And again, in Spain, we are below EUR 50 for 2026. So I was trying to understand if we need to take 5, 6, 7 terawatt hour of merchant exposure. And trying to see on a mark-to-market basis where we might end up. So if you help us with the building blocks would be great. And the last question is, I can't help noticing that the divergence of performance between EDP and EDPR is even more pronounced. Is there a psychological threshold beyond which you would just be more inclined, perhaps to combine the 2 companies in a single entity and what would be the rationale? Thank you.

Miguel de Andrade

executive
#17

Thank you, Alberto. On the first one, so on the -- yes, so the base is the EUR 1.85 billion that you mentioned. And in terms of, let's say, the deltas that we still expect for 2024. So we're expecting roughly half of the impact of 2023. I mean, as I mentioned, some of the El Nino we're still expecting to carry on through '24. That's clear. We're not expecting any -- so just going through these -- we're not expecting any additional costs with the PPAs or -- just no delays. Poland -- I mean, we have this highlighted here mainly what we are expecting sort of will continue, let's say, for '24. Colombia will continue to be a drag in 2024. So -- I mean, Rui there, what are the sort of key issues there? But I think those are sort of -- be the key ones.

Rui da Silva Teixeira

executive
#18

Yes, I would say so, Miguel, if you want to, Alberto, just to give you sort of a round numbers, Colombia is likely to keep the EUR 50 million ballpark, the Romania noncash is going to be around -- the clawback noncash is about EUR 50 million. As I mentioned there, you have the 7% tax in Spain that will be about EUR 15 million. So all in all, I would say 0.1 ballpark.

Alberto Gandolfi

analyst
#19

Plus U.S. load factors, right? That's already for Q1 probably about, what, EUR 50 million to EUR 100 million as well.

Rui da Silva Teixeira

executive
#20

I'm sorry, can you repeat Alberto?

Alberto Gandolfi

analyst
#21

Sorry, the U.S. load factors on top of this is -- so it's about EUR 100 million plus U.S. load factors. So we're talking about EUR 200 million to EUR 250 million is probably embedded as a temporary effect in your '24 guidance as a negative.

Rui da Silva Teixeira

executive
#22

No, I would say not that high. But yes, in Q1, we should have some impact in January and February from low wind speeds in the U.S.

Miguel de Andrade

executive
#23

Okay, Alberto. On the second one. So I think you're roughly right. I mean -- so we're looking at the same prices, I guess, that you are in terms of the forwards for '25 and '26. So we don't have a better estimate or guess than you would have. I would -- perhaps the only nuance I would make that we sometimes look at is what is the implied market price based on the gas forwards because the gas is a much more liquid commodity rather than the merchant that you see sort of in the Spanish wholesale price. So the gas might give you just a slightly higher price than the wholesale electricity price. Like the implied electricity price from the gas will give you slightly higher than the wholesale electricity price that you'll see. But yes, but that's basically -- we're assuming the same values that you're seeing. In relation to the third question sorry, but just in related to the second question. But I think the point there that I made on the slide on the long-term contracted hedging is that a big part of our revenues are long-term contracted in hedging terms. So yes, there is that merchant component. The delta is what it is. So I mean you run the numbers on that, but we're not providing additional guidance or methodology versus what you said. On the EDP versus EDPR, I think here the question is really -- we've talked a lot about this quite often. I mean we obviously look at that option constantly. It's a regular thing. I think it would always be important to understand what would be the value behind it. I think we've always said we've been comfortable and we are comfortable with the current structure. We are working on, and I mentioned that in the call on trying to extract as many synergies as possible under the current structure, so integrating the back offices and some of the global functions to get the synergies. Obviously, I'm not going to provide like any specific levels or anything like that where it would make sense. But I mean, in the past, in 2017, I think it was a different market, different circumstances, when we tried to buy the minorities of EDPR. At this point, we've said we are comfortable with the structure and I'd keep saying that. That's not something that I see changing. It depends -- to be honest, to buy for cash, would not make sense. We don't have the balance sheet for that, and it would be in for shares, it really depends on the relative ratio and the truth of EDP is also relatively depressed. And so I think it would depend very much on the ratios. So I'll just leave it at that. It's an option. We analyze it, but doesn't seem like it makes a lot of sense at this moment.

Miguel Viana

executive
#24

The next question comes from Arthur Sitbon from Morgan Stanley.

Arthur Sitbon

analyst
#25

I have 2. The first one is on is -- well, in one of your slides, you talked about current PPA prices that are still resilient to the downward trend on wholesale prices. I guess that's a comment that is applicable to contracts that have been signed so far. I was wondering if you could comment on ongoing negotiations. Are they going according to plan despite the fall in prices. And generally speaking, I think we've seen difficulties to sign good -- PPAs at good prices in a market like Brazil, for example, where power prices were depressed for quite some time. I think we're not there yet in Europe, but I would be interested in getting your view on what, if anything, may prevent European renewables market to turn like the Brazilian one, if ever power prices were to drop further. That's the first question. The second one, just on the guidance on average selling price. So you're talking at the midpoint of EUR 54 per megawatt hour. That's down 12% year-on-year. But you indicate that only 10% of your revenues are merchants. So I'm struggling a bit to reconcile how the price could come down 12%, if only 10% of revenues are exposed. I guess it may be related to the hedges. But yes, any more detail on that would be quite helpful.

Miguel de Andrade

executive
#26

Thank you, Arthur. So the negotiations, as I mentioned, so we've been managing to cost PPAs at relatively good prices. I mean, the Brazilian example that you gave -- it's -- I mean, it's true, you're having a very high hydro conditions in Brazil, which is depressing the prices. I think that, that -- which is in the top, I think also maybe a function of the El Nino, but that's expected to turn around. So this will be cyclical over time. And we've seen Brazil with like maximum levels sort of at the cap relatively recently. So I think in Brazil, in particular, we think that that's a short-term issue. And once that sort of -- the hydro normalizes, then you have the PLD, which is very sensitive to the hydro conditions reestablished. In any case, one of the reasons that we did also to take profit of Brazil, and we mentioned that at the time, is that, we do have a very good trading in commercial arm in Brazil. And I think that's one of the things where -- or one of the areas where we're seeing quite a lot of value by being able to articulate that with EDPR. So that we have, let's say, renewable projects in Brazil and being able to place that energy with retail customers or sort of B2B customers in Brazil, which the EDP Brazil have that -- those competencies EDPR did not. And I think to take profits, we can do that. We can manage that better. EU like Brazil. Listen, the EU had low prices. I mean, we're now -- we've just come through a peak of energy prices, but the EU was growing quite rapidly also in renewables with prices also in the round EUR 40 to EUR 50 per megawatt hour in terms of wholesale prices. So I think the driver for Europe is it's not just the wholesale prices. I think it's the decarbonization metrics. It's making sure that the company is -- or the actual company commitments to go on decarbonizing. That's driving a lot of the demand for the PPA. So it's a different situation from Brazil where they don't have such a strong focus on that decarbonization, let's say, objective. So the EU -- so I talked about Brazil, but -- and on the EU, I think it's very much demand driven by the EU emissions objectives. On the -- hopefully that answers the question. On the second question. So it's really just a function of, yes, it's not a lot of merchant exposure, but the delta is quite large. So it's a small volume time is a big delta. I think that's the point.

Miguel Viana

executive
#27

So the next question comes from Jorge Guimaraes from GB Capital.

Jorge Guimarães

analyst
#28

I have 3. The first two are related to Colombia and the third one is a more conceptual one. On Colombia, is it possible to tell us if there is any capital investors beyond what has been impaired? And to clarify the situation, you seem to suggest that the negotiations continue, but at the same time, you impair the project. So I would like to understand if you really expect the project to go ahead, what will happen to the capital that was impaired now? And if not, what capital has been left to impair? And the third one is -- there seems to be some type of disconnection between what financial markets are pricing for renewables. And what European Union authorities want for green transition. I don't know if you share this view, but if so, what do you believe that European authorities can do to prevent the low power prices from stalling the growth in renewable?

Miguel de Andrade

executive
#29

So on Colombia. Just to clarify, I mean we did the impairment based on the best information that we have, we are in advanced stage of negotiation of let's say, pushing forward the PPAs to 2027. So I think we have pretty good visibility there. Now the amount of capital, let's say, the book value that we have is around EUR 500 million. Part of that is impaired. The rest we think there's a path to having a viable project, and that's what we're working with together with the Colombian government. And -- I think what's on the critical path at the moment is the environmental -- well, so it's the PPA renegotiations, that's ongoing and information I have is progressing well and then getting the environmental license as quickly as possible and locking in the agreements with the digitus community. So once that's done, then we'd be in a better position to progress with the project. And Rui, do you want to comment to anything else in Colombia?

Rui da Silva Teixeira

executive
#30

Maybe just highlight that the sort of assumptions that we use because, yes, it's important that we have this renegotiation so that we reduce that front position. So that was one important input into the impairment test. Also, I mean, we use a low double-digit return rate to discount the cash flows, so that we are also conservative. But at the end of the day, given where we are, we will still even continue with the project forward. It was prudent to book at this point is roughly speaking, EUR 180 million.

Miguel de Andrade

executive
#31

On the second question, I mean, it's a great question. I think, yes, I mean, obviously, the financial markets are not rewarding renewables at the moment. So I think that's pretty clear from looking at the share price. In the EU objectives, I think things continue to progress. I mean, if we take ourselves back 2 years and I think I've said this a couple of times. So we tend to overestimate how much impact certain things will have in the short term and underestimate how much they have in the medium and long term. And I think this is one of the cases where Europe is taking pretty aggressive steps in terms of changing and improving and simplifying the licensing and permitting regimes and the different member states are doing that. They've come out with a new market design at the end of last year. which for the first time, incentivizes and recognizes PPAs and CfDs as being like an intrinsic part of the market design. That's something which didn't exist in the past. There's been a lot of push to have governments come out with more structured predictable auctions over time to continue to drive the demand for renewables. And so when we go from quarter-to-quarter, can feel like things sometimes are not going as well as expected. But I think when we look back -- certainly in this case, when we look back, Europe has actually taken quite a lot of big steps, and I think they continue to do that. And looking forward, I think those will have an impact. I mean, if we look at the bottom -- if you look at installations of renewables globally, but even in Europe, there was a material increase in 2023. And I think the expectation is that some of these measures go on feed through into the let's call it, the real economy to the companies and to the different member states, et cetera, that the project will continue to progress and accelerate and that there will be financially sustainable and profitable. So I think the EU continue to have that objective. As I've said a couple of times, I don't think it's just the environmental issue anymore. I think it's definitely also driven by national security issues. I was in Berlin recently, and definitely, it's very palpable. The need to continue to drive the renewables growth there and introducing that concept of overriding public interest. And they're giving examples like a German official talking about the fact that in the past when you wanted to build a project you would sometimes get stuck in courts and you were -- basically the judge had to decide between 2 conflicting private views, the local community, which didn't want the project built and maybe the promoter who wanted the project built. Now you've introduced this concept of a public interest. And so the judge can decide between the local community or the public interest. And in many cases, that allows him to unblock the situation and move forward with the project. Okay. So I apologize for -- apparently, the connection was broken. Obviously, it's a signal for us to move on. Hopefully, that was clear my answer. Maybe we can move on to the next question.

Miguel Viana

executive
#32

So we have now the next question from Enrico. We have still 3 questions. If you can just make one question in order to accelerate here a little bit and give opportunity for everybody to make questions. Please go ahead. Maybe we can go to the next question, which is from Fernando Garcia, Royal Bank of Canada.

Fernando Garcia

analyst
#33

Yes. I have several from -- about Colombia. So I wanted to know there what is the situation of the turbines for this project. So now you say that you are expecting to get all permitting in the second half of the year. So can you be more specific on that? And then can you tell us from getting old permitting, what are your expectations in order to build that project? How long can that take? So you say as well that in terms of the PPAs that you are advancing the position to boost the PPAs to 2027. Then from that 2027, how many years will cover that PPA after and it will be with the same pressures that you have before? And finally, on the arbitration process, can you provide some information such as timing that you expect in this arbitration? And what are you asking in this arbitration?

Miguel de Andrade

executive
#34

Thank you, Fernando. So let me take a couple of these and Rui can complement. So on the turbines -- I mean the turbines have been locked in, they're locked in before with Vestas and we actually have them physically already in Colombia. So that's, say that's given. In terms of the permitting, we're expecting the environmental license to be obtained by around October. In terms of the PPAs, the advanced negotiation -- yes, so it's pushing them to '27. I think the question was how many years, I think they're 15-year PPAs. In terms of the timing of the arbitration. So what we would expect is to get or to renegotiate or to get an arbitration to decide that the remaining PPAs that haven't renegotiated with us, that their conditions should be changed to be aligned with the ones that we have renegotiated, so at least that. In general, on the PPAs also, I think your question was around prices and how long, but in general, maintaining prices, but just extending it a bit further in providing some additional volume because the PPA didn't cover the full expected volumes of the project. I think -- hopefully, that answers your questions.

Miguel Viana

executive
#35

So we have last question from Gonzalo from UBS.

Gonzalo Sánchez-Bordona

analyst
#36

Did you say Miguel, this was the last question. So I was going to stick to 1, and maybe I have 2.

Miguel Viana

executive
#37

No, you can do 2. No problem.

Gonzalo Sánchez-Bordona

analyst
#38

Perfect. So first one is on the deal you did with CTG. I'm assuming that now with longer-term power price is probably lower than it was just a few weeks or months ago. You might find that rebuying some of the minorities might be a bit cheaper and if that is the case, what kind of timing volumes involved we'll be looking at? That is the first one. And second one is related with the very interesting data you brought on Slide 15 on the evolution throughout the years of the portfolio in El Nino phenomenon. I'm guessing your guidance for 2024 is based on the recovery that you expect based on this chart. But I was looking at, for instance, the period 2014, 2015, where you see a more steep or deeper fall from the previous high level to the following low level. So I was wondering if you have some alternative scenario in which it takes a bit longer to recover based on methodological models or anything like that? And if that is the case, what is kind of a secondary scenario? Things don't go under your base case assumptions for 2024. What kind of impact or volatility we could expect on the numbers for 2024?

Miguel de Andrade

executive
#39

Thank you, Gonzalo. So I'll take the questions, and if we can complement, I think, on the El Nino. But on the CTG, let's say, in terms of that deals, Yes. So I think this was a good deal, as I mentioned. I think it was fair and with the good multiples. If we find other alternatives or other options that are like this. Yes, it's accretive day 1. It's cash flow positive day 1. It's -- it seems to -- well, it ticks all the boxes. So it definitely contribute to the bottom line. So we would be open to doing additional deals. I mean, this type if it makes sense, and if we get the right conditions for it, but we don't -- say I'm not disclosing anything specific at the moment. On the second, on the El Nino. So -- listen, predicting meteorology and climate is an impossible science or a pretty -- very difficult science. But the expectation, let's say, the typical correlation looking at what's happened in the past is that there would be -- the Q1 and Q2 would still be impacted by the El Nino, but then it would start shifting to La Nina, so the opposite effect by Q3 and Q4. So that would potentially lead to above average volumes in the U.S. But listen, that's -- I wouldn't place any guidance on that just because I think we'd like to predict based on EUR 350 million, which is the average, in this case, we are in an El Nino. So I think we can say that, obviously, the El Nino will continue at least for another 1 or 2 quarters. But exactly what it will do after that will be -- we might have some small correlations, but not something I would -- they make a big bet on. In any case, Rui, if you want to comment?

Rui da Silva Teixeira

executive
#40

No, I think, it basically -- meaning there is no statistical evidence right now that suggests that the El Nino would be prolonged, if any, as Miguel said, this has to be La Nina. So for the forecast or sort of the guidance that we are providing here, we're basically taking the view that for the rest of the year, so let's say, somewhere around Q2 and then definitely Q3, Q4, we should go back to sort of EUR 350 million scenarios.

Miguel Viana

executive
#41

So I think you can move to closing remarks, Miguel.

Miguel de Andrade

executive
#42

Okay. Listen, thank you. Sorry, I went on a little bit longer maybe than what we expected, but just to say we know 2023 was challenging. We continue to have some of those same challenges in 2024. That's clear. We are working through a lot of these issues. Rui, I think, set out very clearly what are those headwinds, and we will go on solving them. Total focus is on execution, making sure we are able to deliver. I think we do have the 4 gigawatts that we are working on very hard to deliver this year. We had a great year in 2023 in terms of asset rotation. So I think that shows just a general structural demand and appetite for these type of assets. But I think we keep our eye on the ball and focused on the medium and long-term goals. And so writing out some of these challenges and the economic cycle. And so that's very much what the team is all focused on. And certainly, that's what myself and Rui are very focused on, and we'll keep you up to date, I guess, now at the first quarter numbers. I mean, we're not expecting anything great for the first quarter because of these challenges that I talked about, but hopefully, we will see some recovery over the rest of the year, and we'll keep you updated as soon as we know any more information. Thank you.

This call discussed

For developers and AI pipelines

Programmatic access to EDP Renewables, S.A. earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.