Endeavour Silver Corp. (EDR) Earnings Call Transcript & Summary
November 10, 2026
Earnings Call Speaker Segments
Allison Pettit
executiveThanks, operator, and good morning to all of you. Before we begin, I'd like you to look at our MD&A, which contains cautionary language about forward-looking statements and the risk factors tied to those statements. You can find our MD&A and financial statements on our website at edrsilver.com. Joining us today are Dan Dickson, who serves as CEO of Endeavour Silver, and Elizabeth Senez, Endeavour Silver's CFO. After Dan gives his formal remarks, we'll open up the call for your questions. Dan, over to you.
Dan Dickson
executiveThanks, Allison, and good morning to all of you. In the third quarter we produced more metal, and with metal prices stronger, we achieved considerable growth in cash flow from mine operations. Cash costs for the quarter and all-in sustaining costs for each silver ounce came down relative to Q3 2025 and to the earlier quarters of 2026. Above all, these figures show the steady operational gains we had expected at Terronera across 2026. At Terronera, grades have risen gradually through the year, recoveries now meet feasibility study targets, and our cost profile has kept improving from one quarter to the next. We see additional chances to optimize the operation and anticipate incremental gains over the coming several quarters, yet Terronera is increasingly showing the consistency and predictability that a steady state operation should deliver. That marks an important milestone, since the mine keeps performing in line with what we expected. We achieved these quarterly production results even with two operational disruptions in the third quarter. At Terronera, operations were halted temporarily for 12 days in August as we worked alongside the local community to resolve their concerns; we believe our relationship with that community is still positive, and it mattered to us that every concern was heard, understood, and properly addressed. In our view, those discussions deepened mutual understanding and built a solid foundation for avoiding similar disruptions going forward. I would like to use this moment to acknowledge and thank our leadership team in Mexico for the professionalism and dedication they showed during these discussions and for how they represented our company. At Guanaceví, a crack found in the trunnion cut our capacity over the last nine days of the quarter. Naturally, that is not ideal. Even so, we hit our planned timeline for the replacement and hope to recover part of that production in the fourth quarter. On a consolidated basis, we now expect annual production of between 7.8 million and 8.1 million silver ounces along with 42,000 to 43,500 ounces of gold, which represents silver equivalent production of 13.7 million to 14.3 million ounces in 2026. This revised outlook reflects results so far and what we expect in the fourth quarter. The temporary operational disruptions did contribute to the revised guidance, but they tell only part of the story. At Guanaceví, silver grades have stayed below plan all year; that stems partly from natural variability in the ore body, but it also reflects the opportunities created by the higher metal price environment we have seen in 2026. With metal prices stronger, we have been able to mine lower-grade material economically that might not have been attractive when prices were lower. We have followed a similar approach across our operations wherever it makes operational and economic sense. Such decisions can affect near-term production grades, but the longer-term benefit is the chance to recover more ounces from mineral resources we already have and potentially to extend mine lives. We've also updated our direct operating cost guidance for Terronera, now set at a range of $170 to $180 per ton, and on a consolidated basis, direct operating cost guidance stands at $155 to $165 per ton. Once again, we anticipate that downward trend will persist. That said, the elevated cost per ton during the first six months of the year proved simply too large to offset. At Terronera, grades, recoveries, and operating efficiencies have all been improving, while cost per ton keeps declining. Our emphasis stays on extending that momentum through the quarters ahead, along with additional chances to enhance operating performance and reinforce cash flow; keeping that refreshed outlook in view, let's examine our third quarter production and financial results more closely. During Q3, the company produced 2 million ounces of silver along with 10,000 oz of gold, which brought total production, base metals included, to almost 4 million ounces of silver equivalent. Silver output rose 19% versus a year earlier, and gold production climbed 39%. Total revenue came in at $185 million, 29% higher than Q3 of last year, with realized average prices of $62 per ounce of silver and $4,290 per ounce of gold. Mine operating earnings hit $69 million versus the $16 million posted a year ago, and mine operating cash flow before taxes reached $95 million, a gain of 139%. Cash costs amounted to $16.55 per payable ounce of silver, net of byproducts, which is a 9% decrease relative to Q3 last year. All-in sustaining costs were $29.54, also down 3% from a year ago. The company recorded $54 million of operating earnings against $2 million a year ago, and earnings before taxes were $40 million compared with a loss of $38 million in Q3 of last year. Turning to direct operating costs per ton, we've achieved progress across the year. Consolidated costs fell from $187 in Q1 to $162 in Q2, and now stand at $152 in Q3. That figure was still 5% higher than Q3 last year, which mirrors the changed operating mix, since Terronera is now included and Bolañitos is no longer among our operations. At Kolpa, grades and recoveries have stayed consistent, while greater throughput helped push direct operating costs down to $138 in Q3, versus $153 during the first half of 2026. Those economies of scale are counterbalancing any pressure we face on the labor side. At Terronera, as I noted earlier, direct operating costs kept falling, hitting $156 in Q3, down from $169 in Q2 and $195 in Q1. Contractor demobilization and workflow enhancements helped lower costs earlier in the year, and during Q3 we finished the LNG plant, which let us convert our power generation from diesel to LNG. Beyond cost, we're encouraged by the consistent gains in Terronera's grades, recoveries, and operating efficiencies across the last three quarters. We anticipate additional improvements in the quarters ahead, with opportunities to bolster both operating performance and, clearly, cash flow. Because of the higher metal prices, we're mining material at Terronera that isn't part of our resources, and the goal is to extend mine life. Additional drill results are anticipated during the fourth quarter, and we're eager to share them over the coming weeks. At Guanaceví, direct operating costs came in at $188 per ton, which reflects reduced throughput along with appreciation of the Mexican peso. In the same way, we're continuing to drill at Guanaceví, and those results will be shared over the coming weeks. Turning to our balance sheet, we finished September with $288 million in cash and $247 million in working capital, which gives us a solid foundation to support our operations and move our growth initiatives forward. We also turned our project loan into a $25 million secured revolving credit facility. That facility carries an accordion feature allowing up to an additional $75 million, which brings the maximum potential facility to $100 million. This provides added flexibility to fund working capital, operations, permitted acquisitions and investments, and the advancement of Pitarrilla. Pitarrilla represents a major growth story for Endeavour Silver. Our management team visited the project last week, and the feasibility study is close to completion. We expect to put out a news release imminently. Along with the financial flexibility I just described, Pitarrilla is central to our long-term growth, and we look forward to sharing that next update. In closing, I believe the third quarter truly showed the progress we've made as a company throughout 2026. While we definitely faced some challenges along the way, we're seeing the benefits of the work we've put into our operations. Terronera keeps improving, our cost profile has moved in the right direction, and we're generating significantly stronger cash flow; with Pitarrilla's feasibility study nearing completion, we're approaching another milestone for Endeavour. We believe Pitarrilla has the potential to be a transformational asset for the company, and we're excited about what lies ahead. I want to thank our employees and operating teams for their continued hard work and commitment, and our shareholders for their ongoing support. We'll now open up for questions. Operator, please open up the Q and A session.
Heiko Ihle
analystHello. Thank you all for fielding my questions; I appreciate it. Greetings from Zurich. Both in the release and earlier during this call, you discussed the cost per ton at Terronera. Clearly, we moved from nearly $200 to effectively a bit above $150 in Q3. You lifted the direct operating cost guidance at site to $170-$180. Looking a little at the longer term, how much additional cost savings can we see at site? What are the next steps, and what do those cost savings consist of? What are they based on? I suppose we could roughly estimate Q4's results by subtracting Q1 through Q3 and then applying the direct operating cost guidance for the full year 2026. If you're aiming a little higher, could you perhaps offer some color on what you think we might see next year and which factors could push pricing one way or the other, please? I know that's a lot.
Dan Dickson
executiveYeah. No, absolutely. Thanks for asking, Heiko. I hope you're enjoying Zurich; some of our team is there at the moment. At Terronera, the updated guidance really reflects the first half of the year and a longer stretch in which we had expected to have LNG power generation running somewhat earlier; that raised our costs on an annualized basis. As I mentioned, you saw $153 in operating costs for Q3. We expect that figure to keep declining; we won't see the same size of reductions as between Q1 and Q2 and then Q2 and Q3, but room for improvement remains. A key item that stands out is the LNG facility, which started up in July for the lower and upper platforms and eventually for the mine late in the quarter. During Q4, across all 91 days, we'll essentially be running on the LNG diesel plant. We're also advancing our waste development, which we refer to as Waste Dump 2, situated just outside Portal 4. At present, and through the entirety of Q3, we hauled material to the opposite side of the plant, ultimately close to our tailings facility. In Q4 we'll be able to eliminate those 2 km, ideally sooner rather than later, and begin placing waste there during Q4. That ought to trim some of our operating expenses. Clearly, the peso's level will matter most down the road; lately the peso has weakened. With luck that trend keeps going, or at minimum stabilizes around the mid-18s. In the end, our complete 2027 guidance won't be released until January of next year. I'd rather not get too far ahead of that, since management is still reviewing the 2027 plans and costs. Even so, there's still room to cut costs at Terronera, which is great.
Heiko Ihle
analystYou kind of stole my follow-up there. Honestly, my next question was going to be about the exchange rate — I mean, we're sitting at 18.6, 18.7 at the moment. What I really wanted to ask was which exchange rate you folks are applying to your Q4 figures.
Dan Dickson
executiveRight, none of the assumptions we set at the start of the year when we first put it out have been altered, and if I remember correctly — I do believe it's 17 that we're using in our estimates.
Heiko Ihle
analystCool. Yeah, I realize that was quite a mouthful. I will rejoin the queue. Thank you all so much.
Dan Dickson
executiveAppreciate the question, Heiko.
Wayne Lam
analystYeah, thanks. Morning, everyone. So, regarding the revised production guidance, it sort of seems like the midpoint implies a small drop in Q4. My assumption is that means flat production quarter-over-quarter at Terronera and Kolpa, plus lower output at Guanaceví, simply because of the downtime. I was just wondering, is that on the conservative side, since I would have thought there'd be a bigger step change at Terronera as you move into the higher grades? Or should we expect grades to stay relatively flat around the $150-ish level, with more of a step change coming in 2027 once you get into the La Luz vein?
Dan Dickson
executiveYeah, that's a really fair question; we've published what our range is. With any range, you always want to finish at the high end and effectively beat what people are expecting. On Terronera, though, it's fair to think of grades as roughly flat versus Q3. We're hoping they rise a little when that comes through. Looking ahead to 2027, two developments should unfold. First, we'll move further into the high-grade chute and pull more tons from it. Second, we expect to bring in La Luz somewhere between mid-year and year-end — we're still working out the timing, since we're drilling at La Luz and trying to establish the depth we want to develop to. All told, we expect 2027 to deliver grades that remain above where we stood in Q3.
Wayne Lam
analystAll right, great, thanks. Perhaps just regarding the costs, I'm not sure whether I missed it, but what were the revised cash cost and AISC guidance on a consolidated basis, and specifically at Terronera? I wasn't certain if that had been left out on purpose.
Dan Dickson
executiveWe left it out on purpose, simply given the number of where we're sitting and where we placed our original assumptions in January. We haven't gone out and rechanged and updated all the assumptions from January, only the production expectations for the year.
Wayne Lam
analystOkay. So when we look at operating cost per ton, the biggest factor is a 30% rise at Terronera. I suppose it would help if you could explain how much of that comes from the LNG plant as opposed to other things, and then how much we ought to add to the cost simply because of the $36 silver price, using the guidance rather than the spot price?
Dan Dickson
executiveSorry, Wayne. I think I misunderstood you a bit. Are you asking about the consolidated cost per ton and trying to get a handle on what changed there?
Wayne Lam
analystNo, at Terronera specifically. When you consider the operating cost per ton increase, what portion of it comes from the LNG plant? And that we can now begin removing from our costs since it's in place.
Dan Dickson
executiveYeah. So really, the decrease, how much the LNG and switching from diesel gensets to LNG, what share of the drop from $165 to $153 is attributable to the LNG plant. It's somewhere between $8 to $10, depending on how much LNG and how much diesel we're using per ton.
Wayne Lam
analystAlright, so $8-$10 for the LNG plant — then how much would that offset the pressure you're seeing on labor and consumables?
Dan Dickson
executiveA little bit of it comes from Terronera. Labor pressure on our costs hasn't been that significant; we lock in our union rates in January/February, and that's done on an annualized basis. This year it included an increase of 5%, 6%. Where the impact may show up is that we've actually had fewer staff at Terronera, so our labor costs there have in fact gone down. As for pressure on reagents or steel costs, at Terronera it's been minimal; our efficiencies have offset it significantly, and we're using less steel per meter, so to speak, in our development.
Wayne Lam
analystAll right, great, thanks. Perhaps just one final question. What would you say the latest timeline is for the Pitarrilla study, and would you expect a construction decision soon after that? I realize we've gone through the math previously, and the balance sheet appears solid with almost $400 million in liquidity, but considering the CapEx inflation we ran into with the Terronera build, is there any desire to reduce risk on the balance sheet somewhat further and create a bit more flexibility before plunging headfirst into the next project?
Dan Dickson
executiveOh, plunging headfirst is what we enjoy. There's plenty going on with Pitarrilla. We're extremely near to finishing the feasibility study and securing all required sign-offs and eventually issuing a news release and hopefully filing that feasibility study soon after and avoiding the full 45 days where it just sits there. So, really just completing final reviews and then obtaining QP sign-offs, we should hopefully have a news release out within the next 10 days, if not sooner. Regarding our balance sheet and Pitarrilla, that's right, as I mentioned, we hold close to $300 million in cash. Through that revolver or credit facility we have the capability, in our view, to fund Pitarrilla. The key construction decision point won't be the feasibility study, Wayne. It's ultimately the tailings dam permit. As you likely know, the underground mine has its permit, the plant site has its permit. What we still need permitted is the tailings dam permit, and we have submitted, and we anticipate permits, which is moving through the state of Durango; it's a dry stack facility, so there aren't many environmental concerns relative to conventional tailings. If we can secure that for Q1/Q2 of 2027, that is the gating item for a construction decision. At that stage, we'll be able to establish where we stand in terms of cash flow. Really, from the cash flow we produce, we should be capable of funding Pitarrilla. Again, that depends on the price environment we find ourselves in. If we're at $50 silver, we should be quite strong. We would always examine other mechanisms to make sure we can fund Pitarrilla all the way through to operations, of course, and make that evaluation. Again, we believe we're in very strong shape from a balance sheet perspective and with the cash flow we produce. We expect that Pitarrilla news release to come out within 10 days, and then the construction decision sometime mid-year next year.
Wayne Lam
analystAll right, excellent. I’m eager to hear the update, and I appreciate your taking my questions.
Dan Dickson
executiveHappy to help. Thank you for the questions, Wayne.
Alex Terentiew
analystHi everyone. It's encouraging to see expenses declining. Several of my questions have already been covered, so I'll simply work through the remaining ones I have. One question concerns Terronera. Quite a few things have shifted there, including some exploration. You have the LNG plant. You mentioned adjustments to gold and metal prices along with cutoff grades, and drilling is underway. Will there be one, or do you have plans for a fresh resource update and mine plan to help us understand what to anticipate, not only in 2027 but across the coming years? Because, yeah, I get it — I know that older study is likely, I don't know, whatever, four or five years old at this point, and plenty has changed. So is there any clarity on that?
Dan Dickson
executiveYeah. No, that's a really good question. We actually have fresh resource estimates that are going to come out. We've finalized those. They'll be released early in the new year for Terronera, Guanaceví, and Kolpa, actually.
Alex Terentiew
analystAll right. So for Kolpa, this would be the official first Endeavour stamps, 43 to 101 resource, is that right?
Dan Dickson
executiveThat's right.
Alex Terentiew
analystYeah. Okay. Okay, on the cost side — like I said, it's genuinely encouraging to watch Terronera's costs decline. I think that's a development we've all been anticipating for a while. Over at Guanaceví, I believe costs also dropped, but I'm curious: does that stem from the volume of ore you're buying in rather than processing your own ore during this quarter? I'm simply attempting to gauge how costs might trend through the remainder of this year and on into next.
Dan Dickson
executiveYeah. This shows up in the MD&A and in our reconciliation, and we've always aimed to be crystal clear about it: our standard reference point is direct operating costs, and separately we report a direct cost figure. So when we talk about direct operating cost per ton, that covers mining, processing, and indirects, meaning G&A. The direct cost figure includes royalties — specifically the royalties paid to Frisco — along with the 16% special mining duty paid to the governments, and purchased ore is part of that direct cost per ton as well. We take care to keep those two measures distinct, and direct operating costs remain the number we consistently refer to. We did see a drop in direct operating costs at Guanaceví this quarter. Can we keep that up? I certainly hope so. That's what we're aiming for. Because at the end of the day, when you bring in purchased ore, royalties, and the special mining duty, pricing is the real driver. Silver and gold prices are the real drivers there, and those are largely beyond our control. That said, if we're able to hold our costs down at Guanaceví, that would help; we believe we have solid control over the water. Ventilation is excellent. Guanaceví is a very deep mine, so going forward it will always be a relatively high-cost operation. Again, we have drill results coming out in the coming weeks. Those drill results will be included in our resource, and it's a mine that's never had more than a two-year reserve life, and we've been there for 20 years, and hopefully we continue to have a two-year reserve life when those resources come out.
Alex Terentiew
analystOkay, great. Thank you. So just one more question, then, on Pitarrilla, following up on those questions from Wayne. I mean, this year you guys noted that spending was well below what you originally targeted, and I know you're going to have a feasibility study out, like you said, within the next 10 days, hopefully. So I'm sure there'll be more details in there. But how are you kind of positioning your planning here? Have the delays kind of impacted your plans for 2027? I'm just trying to gauge the schedule here and the ramp-up, and you guys putting orders in to kind of get the project construction-ready or moving into construction mid-2027. Just trying to gauge your confidence that that can kind of happen, or are there other things besides the tailings permit that we need to see?
Dan Dickson
executiveYeah. I mean, as you know us, Alex, we're probably a little bit more aggressive on it; now we're in a completely different position as a company compared to when we built Terronera. Ultimately, from our feasibility study, which is a 43 to 101 feasibility study and not probably what historically 10, 15, 20 years ago people would talk about as bankable feasibility studies. From this feasibility study, we've already engaged a firm to push forward with finalizing basic engineering and going into detailed engineering. There are other aspects of the project that we deem to be early work, so road improvements, power lines, work that we started this year that has gone slower than maybe expected, partially because we're waiting for some of the design criteria to be completed that was in the feasibility study. But we need to continue to push on that to make a timeline of, say, production by Q1 2030; so we have a really good feel for what our spend will be in 2027. I don't want to get ahead of ourselves on that. All of that is predicated on if we can get to a construction decision by mid-year 2027. So we have a very good feel for the first six months and doing some of the early work stuff. I think about wells and water, making sure we can get water to site from wells. Again, road improvements, and continuing to push with power lines with CFE. So it's very clear what we need to do, and so we'll have a pretty definitive budget for 2027 when that comes out in January.
Alex Terentiew
analystAll right. That's good to know.
Dan Dickson
executiveI'd add as well that a lot of the engineering firms, given the pricing conditions we're facing, are getting stretched in every direction, and it's a question of whether they have enough staff; so things have simply been taking a bit more time, mostly on the engineering side rather than anything else.
Alex Terentiew
analystAll right, that's all I had. Thanks.
Dan Dickson
executiveAppreciate the questions, Alex.
Dan Dickson
executiveThanks, operator, and I appreciate all of you being on our Q3 financial earnings call. Once again, we're quite enthusiastic about the way Terronera has been developing this year. I believe it matters a great deal that recoveries have gotten better and matched the targets from the feasibility study. Grades have kept improving, just as management expected, and we're hoping for somewhat more gains ahead. In the end, our costs have declined each quarter over the last three. So thanks to everyone for taking part, and hopefully we'll have you with us in January. Bye.
Operator
operatorThat wraps up today's conference call. You can go ahead and disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Endeavour Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Endeavour Silver Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Silver Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.