Electrosteel Castings Limited (500128) Q3 FY2026 Earnings Call Transcript & Summary
February 6, 2026
Earnings Call Speaker Segments
Operator
OperatorLadies and gentlemen, good day, and welcome to Q3 and 9 Months FY '26 Earnings Conference Call of Electrosteel Castings Limited. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Hiral Keniya from EY LLP. Thank you, and over to you, sir.
Hiral Keniya
AnalystsThank you, Iqra. Good evening, everyone. On behalf of Electrosteel Castings Limited, I welcome you all to the company's Q3 and 9 months FY '26 Earnings con call. To discuss the performance of the company, we have with us from the management team, Mr. Madhav Kejriwal, Whole-Time Director; Mr. Sunil Katial, Whole-Time Director and CEO; Mr. Ashutosh Agarwal, Whole-Time Director and CFO; and Mr. Gaurav Somani, General Manager, Finance. Before we proceed with this call, I would like to draw your attention to the fact that today's discussion may contain some forward-looking statements that are subject to various risks, uncertainties and other factors, which would beyond management's control. We kindly request you to bear in mind that there may be uncertainties while interpreting such statements. We would now start the session with opening remarks from the management team. Afterwards, we will open the floor for an interactive Q&A session. I will now hand over the conference over to Mr. Sunil Katial for his opening remarks. Thank you, and over to you, sir.
Sunil Katial
ExecutivesGood afternoon, everyone, and thank you very much for joining us today. At the outset, I would like to mention that this is a period of resilience for the company as well as ductile iron pipe sector, where we are navigating short-term challenges, which now gradually are getting better visibility on the road ahead. For the quarter, our sales volume of ductile iron, cast iron, fittings was down by 3.5% quarter-on-quarter basis and realizations also declined. Thus, it has impacted our top line, which was partly compensated by the sale of intermediary products such as cokes, sponge iron, pig iron and ferroalloys. I would like to share our perspective on the current environment and how we are positioning ourselves going forward. Over the past few quarters, the domestic water infrastructure sector has gone through a challenging phase, as all of you know. And this quarter also reflects that environment. Demand for ductile iron pipes has remained subdued, largely due to temporary delays in government spending under JJM at both central and state levels. Drinking water and urban infrastructure projects, which are closely linked to government funding, saw much slower execution during this period. As a result, industry-wide production levels were impacted and also the pricing remained under pressure. As mentioned in our earlier con call, I would like to emphasize that this slowdown appears to be temporary rather than structural. We all know that during the budget discussion when the government has come out with whatever are their plans regarding the funds on JJM and all that. And definitely, the focus of the government remains, which definitely is bringing a better sentiment to the whole water infrastructure sector. We are now seeing definitely early some signs of improvement after that. Funds releases under these key water supply programs like AMRUT and JJM are just starting to resume in the remainder of this year. According to multiple recent reports, the Government of India has revised the Jal Jeevan Mission budget outlay for the current financial year '25-'26 to approximately INR 17,000 crores in the revised estimate, which may be released before March '26. In the budget presented on 1st of February, '26, for the next year, INR 67,600 crores has been allocated against JJM. These developments reiterate our confidence that the recent slowdown was largely administrative and fiscal in nature and not due to any shift in policy intent at the government level. We expect demand conditions to improve gradually with a stronger rebound expected from now onwards. Coming back to our performance. Despite these headwinds, Electrosteel has managed its operations with disciplined prudence and a lot of focus on cost reductions. Our strong footing in the overseas market has helped us in strengthening our exports. Export volumes during the quarter was up 11% Q-on-Q basis. Our balance sheet remains strong, reflecting the company's financial resilience and conservative approach during these challenging times. Looking ahead, the long-term outlook for the water sector remains positive. India's structural drivers such as rapid urbanization, rising per capita water demand, climate resilient infrastructure needs, replacement of aging pipelines, interconnectivity of different rivers, et cetera, continue to be very strong. We are also eyeing for demand for pipes coming from river linking in coming few years. The government's continued focus on improving safe drinking water to every household and strengthening sewage and water network supply supports sustained demand over the medium to long term. So with this, I would like to hand over the floor to Mr. Ashutosh Agarwal, our Whole-Time Director and CFO, for taking you through the financial highlights. Thank you very much.
Ashutosh Agarwal
ExecutivesThank you, Katialji. Good afternoon, everybody, for joining this call for Q3 and 9 months results of Electrosteel Castings Limited. Some brief information on our agenda. Sales volume of DI pipe, fittings, and CI pipe during this quarter stood to 1.34 lakh tonnes, down by 31% year-on-year basis, which impacted the financials of the company also. For 9 months, sales volume was 4.36 lakh tonnes, a [ 26% ] reduction as compared to corresponding period. The decline in the volume was primarily due to slowdown in the domestic market. However, export piped volumes grew by 11% year-on-year basis, partially offsetting the weakness in domestic market and providing support to overall business performance. During the quarter, other income includes income and provision written back to the extent of INR 28 crores received from South Eastern Railway on account of railways sidings. On stand-alone level, gross debt stood to INR 1,436 crores. This decreased by INR 455 crores from the previous quarter due to lower working capital requirement. Long-term debt stood to INR 406 crores and short-term debt stood to INR 1,030 crores. Net debt at a stand-alone level stood to INR 812 crores. During the quarter, arbitration award of INR 370 crores received by the company on account of wagon scheme with respect to South Eastern Railway, which was unencumbered and released to the company. I will now take up to you consolidated basis the results for Q3. The total income stood to INR 1,526 crores, lower on year-on-year primarily due to reduced volume in the domestic market. EBITDA stood to INR 88 crores with an EBITDA margin of 5.8%. PAT was reported at a loss of INR 22 crores. This includes an exceptional item of provision made for INR 38 crores towards new level lows. On the consolidated basis, the performance for 9 months are as under. Total income stood to INR 4,602 crores, EBITDA INR 474 crores, and EBITDA margin 10.3%. PAT INR 145 crores and PAT margin 3.2%. On a stand-alone basis for Q3 results, total income stood to INR 1,290 crores, lower year-on-year by 23% due to the lower volume as stated earlier. EBITDA, including other income, stood to INR 83 crores with EBITDA margin of 6.4%. PAT reported INR 20 crores -- loss of INR 20 crores. As stated earlier, Q3 and 9 months results includes exceptional item on account of provision of INR 38 crores on account of new labor laws. Highlighting on stand-alone performance of 9 months are as under. Total income more or less INR 4,000 crores, EBITDA INR 442 crores, EBITDA margin 11.1%, PAT reported to INR 142 crores. With this, I would like to open the floor for question-and-answer session. Thank you very much.
Operator
Operator[Operator Instructions] The first question is from the line of Rajesh Agarwal from Moneyore.
Rajesh Agarwal
AnalystsAny idea how much the payment of JJM has been reduced in starting January because a lot of EPC contractors were saying they have received money and what is the pending amount?
Madhav Kejriwal
ExecutivesThe amount -- this is Madhav. At the moment, the INR 17,000 crores has not yet been released. Whatever money EPC contractors are getting is from the side of the state government because the state governments had the budget prepared. They just could not go ahead with it because the central shares were not being released. Even as of now, the INR 17,000 crores is pending cabinet approval, which we are very optimistic that it should happen in the next 4 to 5 days or maybe 1 week at best. And after which the central share of INR 17,000 crores will be released.
Rajesh Agarwal
AnalystsIf both are released, then the complete money gets released by this year -- by March?
Madhav Kejriwal
ExecutivesSir, so the INR 17,000 crores is the central share. There will be approximately a similar amount, you can say around 45% -- I mean, central to state is about 50-50. So you'll have around INR 34,000 crores spent this year as opposed to the initial budget, which was INR 67,000 crores by the central and another INR 60,000 crores, INR 67,000 crores by states. So there's a severe drop of almost INR 90,000 crores for this financial year in the total spending between state and center.
Rajesh Agarwal
AnalystsOkay. So as soon as you feel that the amount gets released, will it result into fresh tendering or fresh orders?
Madhav Kejriwal
ExecutivesMost definitely, sir. I'm quite sure that come quarter 2 in the next financial year, things will start looking healthy again. Even the first quarter of next year, we are very sure that things will definitely be better off than quarter 3 and quarter 4 of this financial year, which I'm pretty sure is going to be the lowest point for our operations.
Rajesh Agarwal
AnalystsSir, third question. A lot of contractors were saying, because I heard them in the con call, once they get the money they will evaluate whether they want to take fresh orders or not. So what's your comment or view on that? Because they said they've burnt their fingers, the money is not coming. So they may evaluate if they have to take fresh orders or not.
Madhav Kejriwal
ExecutivesSir, it's a situation of once bitten, twice shy, I would say. Once they -- and every businessman, sir, if they see opportunity as much as they want, they will not be able to prevent themselves from stepping into it. At the moment, things are seeming very pessimistic. You must understand that the humans are very sentimentally driven like how the markets are. Logic doesn't always drive our decisions. But in the mid to long term, I'm very certain that things will go back to being normal.
Rajesh Agarwal
AnalystsAnd sir, suppose the budget, which has been reduced, what you sold INR 90,000 crores now it has come to INR 17,000 crores. Now this has been extended up to '28. Suppose we take the run rate of INR 60,000 crores, INR 60 crores for next 2 years, '27 and '28, you feel that is sufficient for us to complete full orders -- pending projects.
Madhav Kejriwal
ExecutivesSir, INR 60,000 crores would be central's share and another INR 60 crores, you can say, will come from the state. Although, from the current requirement, it seems that the states will have to provide a bit more because the outlay total is, I think, approximately INR 8.5 lakh crores to INR 9 lakh crores. The center has only allowed for another INR 1.6-odd lakh crores. So as against, I think, INR 2 lakh crores or INR 2.5 lakh crores that was needed. You can say that there will be a 40-60 or 35-65 split between the central and state going forward over the next 2 years.
Rajesh Agarwal
AnalystsAnd sir, the corruption case and everything, that has been sorted out?
Madhav Kejriwal
ExecutivesI'm sorry, I can't -- could you repeat the question, please?
Rajesh Agarwal
AnalystsSir, there's a corruption case, the files are pending with the PM to release the money and that has all been sorted out?
Madhav Kejriwal
ExecutivesYes, sir. I would look at the progress. If you see over the last 3 to 5 months, we've been hearing a lot of news about irregularities that have come up in JJM, which has caused the pause button to be pressed. Now they have come up with many, I would say, very prudent prerequisites to release of fund, which will make sure that this does not happen, including channelizing payments through the SPARSH platform directly to the contractor from the center rather than channelizing it through the accounts of the states. So this will allow for better control and for smoother operations.
Rajesh Agarwal
AnalystsSir, apart from JJM are you seeing traction in any other business, any other sector? A lot of DI pipe manufacturers are saying there are a lot of -- huge export orders for Middle East. So are we supplying to Middle East or not?
Madhav Kejriwal
ExecutivesAbsolutely, sir. Around 40% of our exports are to the Middle East. In fact, we are the largest exporters into the Middle Eastern market, even if you take into consideration the Chinese. So Electrosteel as a company exports more into the Middle East than any other organization. Of course, there are indigenous manufacturers who are supplying more into the market than we are. But as exporters, we are the largest.
Rajesh Agarwal
AnalystsAnd how is the realization there for export orders -- realization?
Madhav Kejriwal
ExecutivesIt would be with the current dulled down situation of the domestic market, it's marginally better, but usually, it's the same. Certain specific countries have more stringent requirements, so they allow you to derive a small premium. But overall, it would be similar to the domestic market, please.
Rajesh Agarwal
AnalystsAnd sir, the last question, the realization was pressured due to demand or there's any other reason for the realization to be under pressure?
Madhav Kejriwal
ExecutivesIt's just a demand/supply mismatch.
Operator
OperatorThe next question is from the line of Eshaan from Aakash Emprise.
Eshaan Kulshreshtha
AnalystsSo, sir, I could see that the gross profit have fallen by 1,222 basis points Y-o-Y. Can you share some -- like, can you throw some light on why it has fallen?
Madhav Kejriwal
ExecutivesSo it's largely down to 3 things, please. One would be the reduction in the per tonne realization. Number two, would be the overall lower production levels due to muted demand. And I would say number three, there has been some corrections even at the end of certain raw materials, which are stabilized, and that's why the overall revenue per unit has gone down. So it's mainly these 3 factors. Katialji, if you'd like to add anything to that, please?
Sunil Katial
ExecutivesNo, no. Fair enough. I think these are the major reasons. But the crux of this is a mismatch because of the manufacturing capability in the country and the demand going practically to around 50%. Because if we see overall, the JJM component in the total water requirement is close to 50%. And I mean, so far due to whatever anomalies have been found in the execution of water infrastructure projects, the funds against JJM have been put on a total hold so far. So it has reduced the demand so substantially, I think which has created a practically NSR collapse. And the stock swelled with every supplier. So everybody came under a cash crunch and a business issue. So definitely, these are the major reasons. But I think looking forward, now we are expecting now things should be really looking up.
Eshaan Kulshreshtha
AnalystsUnderstood. Sir, do you expect the gross margin to get back to the similar levels of around 50% or something like, once the cycle gets stabilized?
Sunil Katial
ExecutivesHonestly speaking, we are thinking it will be somewhere midway. It's yet to be seen, because -- I mean, it takes a bit of time because it will not immediately recover, it will gradually recover. It is for sure that it will have a correction, because at the moment, where the whole business proposition is there all around. This industry is in a very unstable type of zone. Practically, everybody is in business trouble. So we are expecting NSR definitely will improve, but it will take some time. It will gradually start improving and possibly somewhere midway it will stabilize. It won't be to the level where it was 1.5 years back or so. That's what we think.
Madhav Kejriwal
ExecutivesJust to add to that, please, we also are looking at a situation where, going forward, we'll be able to capitalize better on our product portfolio with the addition of ductile iron valves that we will be introducing in the domestic market. So I suppose we can be looking at a 30%, 35% gross margin number.
Operator
OperatorThe next question is from the line of Rajesh Bhandari from Nakoda Engineers.
Rajesh Bhandari
AnalystsI wanted to know [Foreign Language].
Madhav Kejriwal
Executives[Foreign Language]. Because we have to get it approved at the commission level, at the union level, which takes a 6 months to 1-year time period. So that might cause some delayed additions. It's difficult to quantify what will be the benefits because we are unaware of the details of what is being signed. There have been some smaller things that are to benefit us, such as our trade deal with Oman, which is going to open up that market -- which will make us more competitive in that market. And similarly, with the U.S. market trade deal happening, I'm hoping that our other products like fittings and such will get a slight boost. These are not going to make a substantial difference. But definitely, once we get more details, we'll be able to identify opportunities. And I'm sure that we will work towards trying to take as much advantage of that as we can.
Rajesh Bhandari
Analysts[Foreign Language]
Madhav Kejriwal
Executives[Foreign Language] other markets like irrigation and river linking will take over. But the sudden full stop on the outflow of capital by the government was a big turning point for us as our performance shows on the financial front.
Rajesh Bhandari
AnalystsWhat was the reason, why they had blocked the payments?
Madhav Kejriwal
ExecutivesOfficially, last year, the JJM had finished. And they had to extend it considering the progress that was done. But when they went into the details to see what work has happened, what has not happened, it had come to the manifest that there are a lot of irregularities in the implementation. [Foreign Language]
Rajesh Bhandari
Analysts[Foreign Language]
Madhav Kejriwal
Executives[Foreign Language] At the company level, I don't think there's so much of a problem because all our payments, majority, I would say, 95% of them are backed up by LCs or BGs. At the government level towards the contractors, I would say approximately INR 30,000 crores, INR 35,000 crores is pending, which should all be geared up with -- around INR 30,000 crores to INR 35,000 crores would be pending for the works. So I think with this INR 17,000 crores central share and INR 17,000 crores that will come from the state, all of this will get geared up. So we'll start the next financial year on a fresh note. This is why we...
Rajesh Bhandari
Analysts[Foreign Language]
Madhav Kejriwal
ExecutivesExact figure -- Gaurav, why don't you share the exact outstanding for domestic?
Gaurav Somani
ExecutivesRajeshji, as Madhavji mentioned, we don't have much of outstanding on account of JJM. Most of our receivables, in fact, you can say all our receivables are either LC backed or bank guarantee backed. And we have received collections on time. So we don't have significant any outstanding on account of these.
Sunil Katial
ExecutivesSo usually it is impacted for a business impact. The opportunity has been lost to do business. [Foreign Language].
Rajesh Bhandari
Analysts[Foreign Language].
Gaurav Somani
Executives[Foreign Language].
Rajesh Bhandari
Analysts[Foreign Language].
Gaurav Somani
Executives[Foreign Language].
Sunil Katial
ExecutivesAll inclusive, including pipes and everything.
Rajesh Bhandari
Analysts[Foreign Language] changes in inventories of finished goods stock in trade and process work.
Gaurav Somani
Executives[Foreign Language].
Rajesh Bhandari
Analysts[Foreign Language].
Gaurav Somani
ExecutivesFrom opening to closing.
Rajesh Bhandari
Analysts[Foreign Language].
Gaurav Somani
Executives[Foreign Language].
Rajesh Bhandari
Analysts[Foreign Language].
Madhav Kejriwal
ExecutivesSir, valve is, I think when -- the integration work between our team and their team has picked up quite well. We've also formed a small team over here for the domestic market. Our approval processes have started for the markets that TIS was not in, mainly it would be the Spanish, French, U.K. markets and the Middle East and Indian markets. These are the places where we are seeing that we can contribute largely in. [Foreign Language] I think another 3 months to 6 months, and we would be able [Technical Difficulty].
Rajesh Bhandari
Analysts[Foreign Language].
Operator
OperatorSorry to interrupt you. Rajesh sir, sorry to interrupt you, can you rejoin the queue for more questions?
Rajesh Bhandari
AnalystsOne last question. Is it permitted? [Foreign Language] valve business or future prospect as a shareholder, what can I expect from the company?
Madhav Kejriwal
ExecutivesSir, currently, the turnover has seen a growth -- they follow a calendar year. So if you look at the growth of revenue calendar year-wise, we've seen an approximate 10% growth from the previous year's operations. So, I'm assuming that with the synergy that will come after the approvals are in place for the other reasons, as I mentioned, 15% to 18% growth rate year-on-year for the next 3 years to 4 years is quite achievable.
Rajesh Bhandari
Analysts[Foreign Language]. This is my last question.
Madhav Kejriwal
Executives[Foreign Language]. As they say the demand for water and alcohol is perennial. So, I'm quite optimistic...
Rajesh Bhandari
Analysts[Foreign Language].
Madhav Kejriwal
ExecutivesTemporary slump, sir I suppose.
Rajesh Bhandari
Analysts[Foreign Language].
Madhav Kejriwal
ExecutivesI'm quite certain.
Operator
OperatorThe next question is from the line of Pujan Shah from Molecule Ventures.
Pujan Shah
AnalystsSir, just wanted to understand first of all is that last year we have seen the changes to JJM that was INR 17,000 crores flow has been done by the government and still the government is estimating the INR 67,000 crores. So is that a right understanding that the government has allocated a budget from INR 50,000 crores to INR 67,000 crores, or it is -- likewise that it is a historical state and the spending was done by the state government.
Operator
OperatorLadies and gentlemen, the line for the management got disconnected. Madhav sir, just stay on the line and connect him back.
Sunil Katial
ExecutivesOkay. Meanwhile, I'll address the issue. So, in fact, the basic understanding of Jal Jeevan Mission is that 50% by the state and 50% by the center. So earlier, it was that center was generally sending the funds first and then the state was accordingly apportioning equal amount and then executing the project. But thereafter, it has been found out that there were some diversions in these funds. That is why all these delays and last few months, whatever happened resulting into a non-issuance of the funds for JJM. So going forward, now the central government is saying that first state should come forward and give a plan and also show the allocation on their part, and then only the funds will be allocated by them. So they have put the onus on the states by issuing a circular to that extent. So in view of this last 1 month's development, whereby the government now is really trying to finalize all this. We are expecting that possibly the share of the states may go in excess of 50% in the times to come. So that's how it is looking like.
Pujan Shah
AnalystsSir, just wanted to dig down deeper on this. So assuming that INR 60,000 crores has been allocated by the government, that justifies that half of will be spent by the state and half of will be spent by the central or this INR 67,000 crores will only spend by the central only?
Sunil Katial
ExecutivesNo, no, no. Equal amount. I'm saying INR 67,000 crores is the central kitty, the states have to spend possibly more than INR 67,000 crores. So it will be INR 135,000 crores actually put together.
Pujan Shah
AnalystsTotal. Okay. Got it. And sir, just wanted to understand right now what to -- you've seen -- I understand the demand scenario. But wanted to understand also the supply constraint and supply side as well. So there is also one of the product which is the OPVC, which is saying that, that could replace the DI pipe. I understand that it is a very difficult task and tall task to shift from this product. But I am coming with the same question is -- that once there is so stringent things which will be going on. And once the EPC players have a very stringent control on their spend, will the shift to that new pipe, which is called OPVC, the reason being that would be a cost control measure for EPC player and the cost benefit for them? Or it is just a haywire, it won't happen this way.
Madhav Kejriwal
ExecutivesI would say that with the new requirements that are there to allocate funds for these projects, which include a long-term O&M period, the EPC contractors will prefer putting a ductile iron pipe which is proven in its durability and its strength over and above an OPVC pipe. If it was a dig, lay and forget kind of project, they might still go ahead with [Technical Difficulty].
Sunil Katial
ExecutivesI think the line is having a problem.
Operator
OperatorYes, sir, your voice is breaking.
Sunil Katial
ExecutivesHello. And okay, to clarify, I mean, apart from the longevity of service of ductile iron pipes, there is also an issue of microbiology and all that. Actually, the water quality and the -- I mean, loss of micro plastics into the water, all these are under very, very strict, I mean, checkup from medical and hygiene point of view. So its not looking like that this sector really will be able to replace.
Madhav Kejriwal
ExecutivesI was mentioning that logics that are required to allow for the payments to go through smoothly, which include a stringent plan on O&M, operations and maintenance, [Technical Difficulty] towards ductile iron which usually have a lower lifespan and generally more fragile as a piping material.
Sunil Katial
ExecutivesI think connection has a serious problem. Actually, Mr. Madhav, in fact, is not in station. He's not in the office. He has joined from a remote place, and that's why we are sorry for these intermittent disturbances. I think we all want to address to your points. So that is why -- I mean we are all there, and he is also from an remote location, so we are sorry...
Pujan Shah
AnalystsNo, no, that is perfectly fine, sir. Just last point coming to this is, considering the current realization, overproduction and everything is happening with us. So just wanted to understand when should we expect a normalization coming back going forward? And what are new strategies we have been keeping in mind considering the scenario which is happening right now?
Sunil Katial
ExecutivesTwo points there. One is -- your first point first that we are expecting that now onwards actually gradually the rebouncing of the situation should start. And as very rightly said, the whole of ductile iron pipe sector is in a bit of a problem. So it may take a bit of a time, maybe 3, 4 months, that's what we are thinking. But the market sentiment has started already getting waves of positivity, not only from the budget declaration that the government's focus remains, but also from all these European Union [Foreign Language] that is creating a positive wave only. So it may take a bit of a time, maybe 3 to 4 months' time for things to really shape up back. That is one part. And second is that we are definitely thinking that we should also have a diversification. So we should add to our product basket. So we are also trying to work towards adding more products to our kitty to bring a better stability to our overall business. In the times to come, I'm very sure that we'll be able to give you more of information once we have finalized those.
Pujan Shah
AnalystsAnd sir, sorry but this is my last question. Just want to understand, is there a possibility just to want to get your view on OPVC because can we add as a product category in our portfolio, which will help ultimately the EPC players to selecting from one company and ultimately we can supply -- ultimate have a diverse product diversification. Is that a possibility we have been looking at it or we have been not looking currently?
Madhav Kejriwal
ExecutivesKatialji, am I properly audible now, please?
Sunil Katial
ExecutivesYes, yes. You are.
Madhav Kejriwal
ExecutivesMay I take the question?
Sunil Katial
ExecutivesYes.
Madhav Kejriwal
ExecutivesSorry about my connection. So sir, there have been multiple times that we have studied the opportunity of getting into plastic pipes, but we firmly believe that for the applications or in the markets that we are, ductile iron pipes is the best material that can be used. And we are -- so we believe that to get into a pipe product that would oppose our bread-and-butter product would not be the most feasible thing to do. If we had a network of retail businesses and we were already investing in the retail plastic pipe, then we could add this to our portfolio. But with our current line of work, it does not fall well into place. And we, as an organization, also don't believe that OPVC per se is a great alternative. It's very commercially viable up to a certain diameter, but that diameter constitutes a small percentage of our sales.
Operator
OperatorThe next question is from the line of Radha from B&K Securities.
Radha Agarwalla
AnalystsSir, regarding the coal block case, INR 250 crores was declared and your result block states that even this INR 250 crores has been challenged by JSW. That is on one hand. And on the other hand, I do understand that the soft costs are yet to be finalized, but considering everything INR 1,200 crores of assets is still sitting on your books. So given the scenario, how much of write-off do you think should be done in this financial year-end of these assets? And how much in reality are you expecting the compensation?
Madhav Kejriwal
ExecutivesMa'am, I think it's a little early in the day to be answering that question. As you can see that there are some clear numbers that are coming out and these numbers are exactly what is reflected in our books. Of course, the person who has to pay will always try to delay the payments. So they are doing their part of what they can do, and we'll have to do our part. Eventually, what will happen is difficult to predict, but all we can say at this moment is that whatever numbers that are reflected in our books of accounts is what, after multiple scrutinizes, is coming up by the nominated authority at the ministry level also. So our numbers are definitely ones which are holding true and are in good faith.
Radha Agarwalla
AnalystsThe second question is in the 9 months, as you highlighted that you have executed about 4.2 lakh tonnes of DI. So out of this how much of the payments have you received and how much is pending? And is there any pending of last year's receivables?
Madhav Kejriwal
ExecutivesI couldn't quite get that question. Could you repeat that, Radha, please?
Radha Agarwalla
AnalystsYes. I'm saying that in the 9 months, you have executed about 4.2 lakh tonnes of DI side. So out of this, what percentage of payments have you received? And how much is pending? And is there any pending receivables for the last year's execution?
Madhav Kejriwal
ExecutivesGaurav, apart from our subsidiary payments which sometimes run beyond 8 to 9 months, could you give an answer to how much is pending beyond 9 months in the domestic market? I don't think it would be anything.
Gaurav Somani
ExecutivesNo, nothing. Our debtors, ma'am, it's on time. And in fact, if you see, if you compare it from March end the number which was there, the debtors outstanding, it has reduced during the year. We are receiving collections on time and domestic collections are around, say, 50 to 55 days cycle. So we do not have any outstandings which are overdue.
Radha Agarwalla
AnalystsOkay. And going forward, sir, for fourth quarter, considering the scenario, you said that you are expecting to improve after 3 to 4 months only. Then how do you plan to execute?
Madhav Kejriwal
ExecutivesMa'am, fourth quarter will be more of weathering the storm situation as we have in quarter 3. So we will have to hold the fort for another couple of months till we are able to start seeing improvements, which I'm very optimistic about starting April.
Radha Agarwalla
AnalystsUnderstood. So 50 to 55 days cycle only it is pending, so I'm assuming that...
Madhav Kejriwal
ExecutivesOn the domestic side.
Radha Agarwalla
AnalystsYes, sir. On the domestic side. So I'm assuming that at least for, till first quarter of FY '26, all payments have been received. Is that sort of fair understanding, sir?
Madhav Kejriwal
ExecutivesAbsolutely. Yes, please.
Operator
Operator[Operator Instructions] The next question is from the line of Saket Kapoor from Kapoor & Company.
Saket Kapoor
AnalystsSir, firstly, in terms of the Q4 deliverables, we are -- we will be in line of what we have done for Q3 [Foreign Language]. So we will be in [Foreign Language] that is the pipes and the fittings, which will be delivered for Q4 also? Or can we see any uptick?
Sunil Katial
ExecutivesSaketji, in Q4, by volume, it will be similar to Q3 only.
Saket Kapoor
AnalystsOkay. And sir, in the opening remarks or during the interaction, sir, was mentioning about some portal through which now the entire EPC planning and all is done. Can you mention the name once again, its SPARSH portal or something, Madhavji you were mentioning?
Madhav Kejriwal
ExecutivesThat is not the planning part, sir. That is the payment by the -- of the central share to the contractor will be done through the SPARSH portal, yes. SPARSH platform.
Saket Kapoor
AnalystsOkay. So sir then taking that into account and since the funding is to be released by March, I think so then the uptake should also be -- should be better than what we are planning as of now. We are doing it in terms of our understanding that no money is to be received by March. This is what our deliverables are -- the guidance for deliverables is according to that aspect only?
Madhav Kejriwal
ExecutivesSir, cycle of demand is such, the government pays the contractor and then the contractor pays us. Now the mismatch that has happened is that because our payments are backed by LCs and BGs, the contractors had to pay us, but then they are not paid by the government. So on the pretext of this pending payment is received, the contractors will start further work. So this is more of a relief from a pain for the contractors than a kick starter for demand on an immediate basis. Once this pain is relieved for them, then with the onset delay they will start. So I'm assuming that, that will -- that is the reason why we are mentioning that the uptick will start from April and not within the fourth quarter.
Saket Kapoor
AnalystsOkay. And sir, very categorically, you have mentioned that these are -- we have to weather the storm. So being on the promoter -- representing the promoter side, sir, what are the course correction exercise currently in the organization that you must be putting into implementation or in the programming stage so that we could be a much more efficient organization going ahead. And sir, secondly, I think so there was some embargo over the promoter and our honorable CFO also for participation in the capital market. So that part of the story is now over, that period is over? And now the promoter is...
Madhav Kejriwal
ExecutivesYes, please. That part is over.
Saket Kapoor
AnalystsThat part is over. So what I feel is that a message from the promoters would also be from -- in the point of the valuations at which currently our company market cap or enterprise value is a point of [ creating ] acquisition would have sufficed a lot of nerves for your investors if you are well below 50%.
Madhav Kejriwal
ExecutivesI would agree with that statement, sir. I cannot comment further to that than just saying that I would agree to that. And as for the strategy part, one bit of the strategy is what we did with the acquisition of the Italian company, which is a high-technology valve manufacturer. Although, it keeps us in the water industry, it opens up a broader portfolio, and this is disconnected to only the ductile iron pipe business because valves are used regardless of the material of the pipeline, whether it's plastic, steel or ductile. And this is also a high-technology company. So there is a very strong moat around its product line. As for other strategies, Mr. Katial had mentioned rightfully that we are looking at diversifying our portfolio, and we are working very diligently towards creating a strong organization for all our shareholders, which will be robust against such surges and dips in the future.
Saket Kapoor
AnalystsA small point about, sir, this river linking project...
Operator
OperatorSir, sorry to interrupt you, Mr. Kapoor...
Saket Kapoor
AnalystsMa'am, I'll just conclude, ma'am. Everybody has got their fair share, ma'am. Allow me to conclude. Sir, when we look at the river linking project part of the story for the state of Rajasthan and Madhya Pradesh, there have been announcement regarding the order tendering and all. So have we seen anything on that front from the EPC players? And any portion of our order book is resembling about the demand from the river linking part of the story, sir?
Madhav Kejriwal
ExecutivesSir, Ken-Betwa, which is between UP and MP are picking up faster than the one between Rajasthan and MP. But like I have mentioned in previous calls, I was a skeptic till 2 years back, but the last 1.5 years and 2 years, I've seen that things are really moving forward. Of course, a lot of things are still at project's DPR stage, but definitely, work is happening now on the ground slowly, and I'm quite optimistic that this will play out. At least these 2, I am very optimistic on the MP -- UP and MP, Rajasthan projects.
Operator
Operator[Operator Instructions] The next question is from the line of Rajesh Agarwal from Moneyore.
Rajesh Agarwal
AnalystsSir, what was the turnover in the calendar year for the valve company. Turnover and EBITDA margins?
Madhav Kejriwal
ExecutivesSo taking everything in line, our turnover was approximately EUR 37.8 million. So you can say close to INR 400 crores, please.
Rajesh Agarwal
AnalystsAnd the EBITDA margins?
Madhav Kejriwal
ExecutivesGaurav, do you have the numbers immediately with you? If can't remember, the color...
Gaurav Somani
ExecutivesIt should be on the higher side of 12%, 13% -- 13% approximately.
Rajesh Agarwal
AnalystsAnd sir, the second question is about the...
Operator
OperatorSorry to interrupt you, please join back the queue. The next question is from the line of Eshaan from Aakash Emprise.
Eshaan Kulshreshtha
AnalystsSo sir, I have one question regarding how much of the coverage in JJM has been done so far? Is it -- like the portal is showing around 80%, so the actual number is 80% only...
Madhav Kejriwal
ExecutivesSir, actual number will be close to 55%, 60%, sir. Because as you might have -- if you see the news, you will see that there is statements that around 60% of 80% is functional -- 60% to 70% of 80% is functional. In fact, that even leads us to a lower number. So you can say around 50%, 55% is what is functional work that is done. For the rest of it, some infrastructure has been built, but those are not functional household tap connections. So they will require some more infrastructure building behind them.
Eshaan Kulshreshtha
AnalystsOkay. And out of which -- out of that, how much is Electrosteel expecting, like is it a substantial share, like 40%, 45%...
Madhav Kejriwal
ExecutivesSo sir, at the moment, around 20% of the domestic ductile iron market is our share. It fluctuates between 18% to 25% depending on how much we export. So that is the current expectation.
Eshaan Kulshreshtha
AnalystsThis is a domestic share that you have.
Sunil Katial
ExecutivesYes.
Madhav Kejriwal
ExecutivesYes.
Eshaan Kulshreshtha
AnalystsOkay. And it is the largest share or...
Madhav Kejriwal
ExecutivesI would say there are -- we are -- there are 2 to 3 players all with similar capacity, sir. So we all have similar market shares -- between 18% to 20%, 25% between 3 players and then everybody else has a 10% to 15% odd market share.
Operator
OperatorLadies and gentlemen, due to time constraints, that was the last question. I would now like to hand the conference over to the management from Electrosteel Castings Limited for the closing comments.
Sunil Katial
ExecutivesThank you, everyone, for joining us today and for your continued trust in our company. We remain committed to driving sustainable growth, strengthening our balance sheet and creating long-term value for all of our stakeholders. We appreciate your support. We look forward for updating you in our progress in the upcoming quarters. And we are hoping definitely the things are going to look up from now onwards. Thank you very much.
Gaurav Somani
ExecutivesThank you, everybody.
Madhav Kejriwal
ExecutivesThank you.
Operator
OperatorOn behalf of Electrosteel Castings Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
For developers and AI pipelines
Programmatic access to Electrosteel Castings Limited earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.