#1

Hello, and welcome to the conference call covering Electrovaya's financial results for the second quarter of 2022 and the analyst discussion. Right now, everyone attending is in listen-only mode. After the formal presentation, there will be a question-and-answer session. Should you need help from an operator at any point during the call, just press star zero on your phone's keypad. Please note that this conference is being recorded. I'll now hand things over to Richard Halka, Executive Vice President and Chief Financial Officer. Thank you. You may begin.

Richard Halka

executive
#2

Thank you, Darryl. Good morning to all of you, and thanks for being with us on today's conference call, where we'll be going over Electrovaya's financial results for Q2 of fiscal 2022. Dr. Sankar DasGupta, our Chairman and CEO, is hosting today's call, along with Dr. Raj S. DasGupta, our Chief Operating Officer, and me, Richard Halka, Executive Vice President and CFO. Electrovaya put out a press release on May 10, 2022, covering business highlights and financial results for the three- and six-month period that ended March 31, 2022. Should you want a copy of that release, it's available on our website. And if you'd like to look at our financial results, our financial statements, management discussion and analysis, and annual information form, those documents can be found on the SEDAR website, www.sedar.com. Just as on prior calls, our remarks today fall under the usual provisions governing forward-looking information. We'll be sharing information about our views on trends in our markets, including how large they are and their potential for growth, as well as our competitive position in our target markets. While we believe the expectations reflected in such forward-looking statements are reasonable, these statements carry risks and uncertainties, and actual results could differ materially from those expressed or implied in them.

Richard Halka

executive
#3

You can find more details on elements that might make actual outcomes diverge materially from what we expect, along with key factors and assumptions used in preparing forward-looking statements, in the press release our company issued for the Q2 fiscal 2022 results. You can also find them in the latest annual information form and management's discussion and analysis, under risks and uncertainties, and in other public disclosure documents we've filed with Canadian securities regulatory authorities. And one more thing: unless we say otherwise, every figure talked about on this call is in US dollars. At this point, I'll hand things over to Sankar.

Sankar Das Gupta

executive
#4

Thanks, Richard, and good morning to all of you. Despite all the worldwide supply chain problems that we keep hearing about, the momentum we expected for fiscal year 2022 has already begun. Our March quarter came in 47% above March 2021. Purchase orders we currently hold now exceed $25 million, which is more than CAD 31 million. We're making solid progress toward significant revenue growth across the next half of the year, doubling what we posted last year and anticipating finishing the year in the $21 million-$25 million range. Orders from a wide range of customers keep arriving every week. What's the reason? All five of the company's pillars are working together in unison. Pillar one is technology. The Infinity battery platform technology we have is relevant on a global scale, delivering the highest safety and the highest longevity without sacrificing energy or power. Technology is where our advantage lies, and it's what led our OEM partner, the largest in the world, to sign the strategic supply agreement with us. Producibility is pillar two. More than 3,000 vehicles are powered by us today, and we have the capability to produce thousands of batteries. Producibility is no longer a risk, even though COVID and the supply chain remain challenges. Our third pillar, which matters greatly to us, is greenhouse gas reduction.

Sankar Das Gupta

executive
#5

Every one of our electric vehicles typically runs 24 hours a day, seven days a week, and on average roughly 12 to 16 times longer than an electric passenger car — which means Electrovaya is cutting greenhouse gases at a rate equivalent to about 50,000 electric cars every year. Were I the policy maker, I would give greater preference for climate change mitigation to these hardworking electric vehicles. Our Infinity battery line offers exceptionally strong safety and longevity, and it is the product going into electric forklifts and later into electric buses and other applications. We were an evangelist in climate change and are delighted that finally the world is waking up. Had they woken up sooner, it would have been better for all of us and all other species. Better late than never. The fourth pillar, an important pillar, is the market. It's emerging. This calendar year, 2022, every week we are receiving purchase orders, and our purchase orders in hand exceed $25 million, and we are well on the way to doubling last year's revenue. As I mentioned earlier, we anticipate we'll come in at the $21 million-$25 million of revenue by the end of September 2022. The fourth important pillar is finance for growth.

Sankar Das Gupta

executive
#6

We're very pleased that our lender has shown such generosity and confidence in Electrovaya that they raised our credit line by more than 50%, taking it from CAD 7 million to CAD 11 million. For growing the business, this is essential oxygen, and it's great for our shareholders that we avoided diluting them through a costly equity raise. We're grateful to our finance partner. The fifth pillar of this company is our highly dedicated team, who are passionate in their efforts to fight climate change mitigation. Throughout the last two years of COVID, they showed up for work daily and never shirked, which they could easily have done. They carefully and scientifically organized both their work and the premises, so that to the best of my knowledge, no COVID transmission occurred in the workplace. Our battery's cycle life and safety, along with our technology, are crucial differentiators for us. These are game changers and fundamental to both our present and future success. Our addressable market, as it emerges, is several $10 billions, and sophisticated, knowledgeable corporations — the Fortune 500 companies — are letting Electrovaya take charge of their mission-critical operations. I'll now hand the call over to Richard to review our fiscal 2022 and second quarter results in greater detail. Richard?

Richard Halka

executive
#7

Thanks, Sankar. For the second quarter of fiscal 2022, revenue came in at $4.3 million, or CAD 5.4 million, versus $2.9 million, or CAD 3.7 million, in the fiscal second quarter ended March 31, 2021 — a rise of 47%. Looking sequentially, Q2 fiscal 2022 revenue grew more than three-fold from $1.3 million, or CAD 1.6 million, in the fiscal first quarter. We expect sales to climb quickly during the second half of fiscal 2022 as output is scaled up to satisfy existing demand. As Sankar noted, purchase orders on hand for delivery right now total over $25 million, or CAD 31.5 million. Sankar also pointed out that supply chain challenges and inflationary pressure show up in our Q2 2022 gross margin of 25%, against 32% for Q2 2021. That decline stemmed from several factors, among them inflationary pressure on material cost, higher shipping and logistics cost, and foreign exchange movements. Management has acted to ease inflationary pressure, for example by ordering key components needed for 2022 deliveries, which locks in current prices and avoids additional component price increases. One more factor behind the weaker margin this quarter was that some sales had been priced at 2021 levels and were then delivered in the first quarter, before the price increases made in 2022 to offset inflationary pressure.

Richard Halka

executive
#8

Keeping gross margin around 30% is what we're aiming for. As Sankar noted, we recently made an amendment to our credit facility. The working capital facility went up from CAD 11 million to CAD 14 million. That boost helps cover working capital needs so we can speed up production and satisfy current demand. Management figures the liquidity we have available — combined with collecting $3.9 million in accounts receivable, turning $5.2 million of inventory into finished goods that can be sold, and getting another $3.7 million of inventory that's in process and for which deposits were paid within prepaid expenses — gives us enough working capital to back the growth we expect. At this point I'd like to hand the call to Raj for his closing comments.

Raj S. Das Gupta

executive
#9

Thanks, Richard. As Sankar and Richard both noted, the revenue we're generating right now comes mainly from what we call our Infinity platform. That platform rests on a group of proprietary cell technologies from Electrovaya, and those technologies deliver better safety and longer cycle life than comparable lithium-ion options. Because of that, the platform fits especially well for demanding electric vehicles — things like electric material handling vehicles, electric buses, electric automated guided robots, and long duration energy storage, along with plenty of other uses. Every one of those is a multi-billion-dollar market that's expanding quickly. That said, we all know the electric passenger car market is changing fast, with battery-powered electric vehicles taking the place of the internal combustion engine. In that market, Electrovaya's strategy is to get in successfully by leaping ahead on technology. To be specific, Electrovaya is developing a solid-state battery that could turn into a disruptive technology for this sector. Our work is moving along well and fast. We're filing key patents and growing our IP base. We're producing hundreds of coin cells, and we've now scaled up to larger single-layer and multilayer pouch cells. Cycle life and performance look excellent, and the cycle life trend is expected to exceed what the electric passenger market needs, which targets roughly 800 cycles or more while retaining 80% energy capacity.

Raj S. Das Gupta

executive
#10

We expect to go beyond that goal. Cycling of our pouch cells happens with no pressurization required, and that is fairly important. Last, we have begun work on designing the manufacturing process for the Electrovaya solid-state battery technology. To sum up, the rest of fiscal year 2022 will matter greatly for scaling production of our Infinity platform products and also for advancing our next-generation battery technologies. During this stretch, we look for our revenue to keep climbing steeply as we ramp output and deliveries. That brings our prepared comments to a close. Richard Halka and I would now be glad to take part in a question-and-answer session. Operator, please open the line for questions.

Operator

operator
#11

Thank you. At this point we'll move into a question-and-answer session. Should you wish to pose a question, please hit star one on your phone's keypad. A confirmation tone will let you know that your line has joined the question queue. If you'd prefer to withdraw your question from the queue, you can press star two. Those of you on speaker equipment may need to lift your handset before you press the star key. Kindly hold for a moment while we gather your questions. We have our first question on the line. It's Jeffrey Campbell from Alliance Global Partners. Please go ahead with your questions.

Jeffrey Campbell

analyst
#12

Morning. The January press releases said those $6 million in orders through the OEM channel would be finished by 3/31/2021, and clearly that didn't occur. I wanted to ask, did that stem from the production delays mentioned in yesterday's press release, or was it something different? And second, where do those orders stand right now — have they been finished and delivered at this point?

Raj S. Das Gupta

executive
#13

The orders in question related to fresh distribution center locations. Construction timelines, as we all know, are subject to change. Delivery of our products could not proceed at one of those locations because it wasn't ready. Basically, that accounted for most of it. We also experienced a few supply chain hiccups on our side at the same time.

Sankar Das Gupta

executive
#14

Jeffrey, so they didn't take it by March, but they're going to take it?

Raj S. Das Gupta

executive
#15

They'll take it toward the end, yes.

Sankar Das Gupta

executive
#16

<<inaudible>>

Jeffrey Campbell

analyst
#17

All right, let me revisit that question. Where do the orders stand right now—have they shipped already? If they haven't, what's your expected timeline for getting them delivered?

Sankar Das Gupta

executive
#18

The distribution center belonging to them is going to be ready quite soon, and they'll be taking those orders. We will get them delivered at some point.

Jeffrey Campbell

analyst
#19

What I'd say overall is this: the main factor behind those orders not being delivered when expected has truly been postponements coming from the customer's end.

Sankar Das Gupta

executive
#20

Jeffrey, we are set to double production, and, well, that's really what I mean.

Raj S. Das Gupta

executive
#21

You're right. Jeffrey, that project has two distribution sites; we delivered one of them in full, and for the other, we were asked to hold it back.

Jeffrey Campbell

analyst
#22

Understood. All right, when it comes to the supply chain difficulties that were mentioned yesterday, looking at the bigger picture, would you say they're tied more to China's manufacturing swinging back and forth because of COVID, to the conflict in Ukraine, perhaps some mix of both, or to something different?

Sankar Das Gupta

executive
#23

It's a worldwide phenomenon, you know, and it ties into shipping and such as well. What we're observing, Jeffrey, is that the difficulties are easing up. We feel positive about that.

Jeffrey Campbell

analyst
#24

All right. On that $25 million sitting in the order book, what's the timeline you're working with right now to turn those orders into revenue? In other words, is this $25 million something that could be finished by the close of the fiscal year? If that's the case, your guidance or vision would appear somewhat low. Or does this order book roll over 12 months? I'm just trying to get a feel for the timing here.

Sankar Das Gupta

executive
#25

Absolutely. Jeffrey, it’s progressing nicely. Things are going well. You see, our goal is to grow revenue by more than 2x during this year. Should a few orders shift from September into October, that truly isn’t a concern. We deliver an extremely high-quality product, and customers are strongly focused on getting it. We really aren’t seeing any production difficulties.

Raj S. Das Gupta

executive
#26

Jeff, that $25 million, you know, it falls inside the 12-month window.

Jeffrey Campbell

analyst
#27

Alright, thanks a lot. Yeah, that's a real help for everyone doing modeling.

Sankar Das Gupta

executive
#28

That's right.

Jeffrey Campbell

analyst
#29

Moving on to how well the Infinity forklift batteries have been doing and that million-mile service projection—as you mentioned, I believe—it looks like a perfect fit for heavy-duty transport, buses included. I was curious: how is the current work on this Infinity coming along, and are you pursuing other partnerships in that space?

Sankar Das Gupta

executive
#30

Yes, Jeffrey, we're pursuing several partnerships in the bus space. As of today, the electric bus market is quite small when set against materials handling. Materials handling is a $10 billion market. The bus market—I realize the press enjoys covering it, and people like it since they see buses on the roads daily—remains a very small market at present. Still, we hope it will expand rapidly as Washington, D.C. and other locations begin responding to demand from climate change programs. Jeffrey, our view is that our technology ought to become the standard for heavy-duty vehicles across the industry.

Jeffrey Campbell

analyst
#31

All right, because this is still early-stage, it sounds like the Infinity bus initiative isn’t truly going head-to-head with Raymond yet in the direct sales channel for materials. Once you gain more traction in the bus market, do you think you’ll have enough materials to serve both markets?

Sankar Das Gupta

executive
#32

Yeah. So we intend to serve both of those markets. Our engineering teams are separate, and in our view this high voltage bus market matters to us, Jeffrey, since it also opens the door to those high voltage electric truck markets, and a number of high voltage applications are on the way.

Jeffrey Campbell

analyst
#33

All right, thanks. One last thing — I didn't want to skip over the exciting developments on the solid-state battery side. The room-temperature performance with no external pressure applied looks like capabilities that none of the current competitors can match. At the moment, what's the timeline for completing the patent portfolio so you have the certainty you're after, and for starting field testing of the pouch configurations?

Raj S. Das Gupta

executive
#34

Regarding the patent portfolio, we probably need about another six months before we finish filing the key patents on our roadmap. As for scaling this up, our focus is that our big efforts are currently going into the pouch cells. We're gradually making those pouch cells larger, producing more of them, and characterizing them extensively.

Sankar Das Gupta

executive
#35

At the same time, Jeffrey, we’ve begun work on the manufacturing-process program as well. On that program, our stance is one of cautious optimism.

Jeffrey Campbell

analyst
#36

All right, that's wonderful. I appreciate it.

Operator

operator
#37

Thanks. The next person to ask something is Shawn Severson from Water Tower. Go ahead with your questions.

Shawn Severson

analyst
#38

Morning, everyone. My first question is really about how economically sensitive electrification in the material handling market is. I mean, I realize this trend is already established and that it delivers an ROI, and maybe your customers would be better positioned to answer this, but what's your view on the economic effect on electrification, if there is any, tied to, you know, the obviously volatile global markets and that sort of thing?

Sankar Das Gupta

executive
#39

Sean, that's genuinely the core issue customers focus on. What's the economic value? What's the return on investment? Our partner, OEM, has a calculator on their website that measures ROI, and you can enter various items and various numbers into it. In the current calculator, it shows—again, it depends on how long you're running the batteries and so on. It shows a matter of months, you know, four months, five months, six months is the ROI. That is so amazingly good that I think the discussion is almost over regarding which technology to choose and how people get into this materials handling structure and strategy. The ROI for the electrified product is very high.

Shawn Severson

analyst
#40

Should an economic downturn occur, this likely remains near the top of the priority list, given the return on investment.

Sankar Das Gupta

executive
#41

Right. In the past, we've occasionally observed that during an economic downturn, that's precisely when folks concentrate more on achieving greater efficiencies. In fact, since we deliver ROI, we could actually witness stronger growth in the number of people adopting more efficient approaches to handling electric material handling vehicles through use of the Electrovaya battery. We may see growth.

Shawn Severson

analyst
#42

Thanks for that. And Richard, regarding getting back to a gross margin in the low 30s%, could you walk through what makes up that figure? I know you already covered some of it in your commentary, but you're moving from where we are today back to that low 30s% number, and it would be very helpful if you could break it out by component.

Richard Halka

executive
#43

We aren't going to break out the specifics of those components. What I can tell you is that the bulk order already headed our way, with pricing locked in for this year, matters a great deal. That's going to be one of the biggest drivers. The other thing that hit this quarter specifically — the second quarter — is that we had locked in pricing on a number of those orders back in 2021. Pardon me. Prices have gone up since then, in 2022, so our current sales will show that.

Shawn Severson

analyst
#44

Understood, thanks. My final question concerns solid-state batteries and how you plan to bring them to market. In an ideal scenario, if you were to describe how you'd want this to unfold across the coming 12 to 24 months, what developments would take place on the partnership front? I realize you've said the patent portfolio is in place and that you're continuing to work on it, while also seeking manufacturing. Could you give me a clearer picture of that 12-to-24-month rollout, the appetite for partnerships, and so forth?

Sankar Das Gupta

executive
#45

Shawn, right now what we're doing is getting our patent position, our IP, and the technology fully perfected. On the partnership side, we have less concern. At the moment we're in contact with pretty much all the major Fortune 500 companies, in automotive as well as other areas. Before we launch, it's very important that everything is completely buttoned down.

Shawn Severson

analyst
#46

All right.

Sankar Das Gupta

executive
#47

Specific partnerships aren't something we'll be discussing.

Shawn Severson

analyst
#48

All right. When we think about milestones and catalysts, say across the coming 12 to 18 months, those will lean more toward internal execution at Electrovaya on the platform, in terms of technology and manufacturing. Along those lines in particular, what kinds of things could be announced within that timeframe? I mean, what?

Sankar Das Gupta

executive
#49

Sure.

Shawn Severson

analyst
#50

What milestones ought we to be watching for?

Sankar Das Gupta

executive
#51

Sean, strategic partners are already talking with us right now, so partnerships remain fully on the table for us. What I mean is, all of this will move forward at the same time. We're being cautious about not exposing the technology too much until every detail is fully locked down. That's genuinely the situation. I believe you'll notice our strong emphasis on producibility beginning to show up within the next 2 months. You ought to see bigger production volumes arriving, and you'll see quite a large multilayered pouch cell getting manufactured, among other things. Another point worth noting, Sean, is that Electrovaya carries experience in the manufacturability of lithium-ion batteries. That experience matters a great deal, and very few companies, whether in Europe or North America, possess it. In our view it's crucial that while you're designing the product, you're simultaneously designing for manufacturability. Frequently with solid-state batteries, companies have designed products in the lab, and afterward discovered that producing them economically was extremely difficult. To us, this simultaneous effort — developing and designing the technology while also advancing producibility — is hugely important.

Shawn Severson

analyst
#52

So from that, I take it you're saying there's a real chance to make good use of plenty of the skill sets and supply chain that already exist for lithium-ion, correct? Ones that are being carried over into the SSD, which you're not—

Sankar Das Gupta

executive
#53

That's right. That's right.

Shawn Severson

analyst
#54

We essentially have to build the manufacturing process from scratch, so to speak.

Sankar Das Gupta

executive
#55

Sure — that's exactly the reason things are advancing at such a fast pace.

Shawn Severson

analyst
#56

Perfect, thank you both.

Operator

operator
#57

Thank you. At this point we have no more questions. I'll hand the call back to Dr. Sankar DasGupta now for any closing remarks.

Sankar Das Gupta

executive
#58

All right, that brings us to the end of today's call. We appreciate you joining us this morning, and we hope to talk with you once more when we share our results for the fiscal third quarter. Have a great day. Thanks.

Operator

operator
#59

That brings us to the end of today's teleconference. Thanks for joining us. You can disconnect your lines now. Have a good rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Electrovaya Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Electrovaya Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Electrovaya Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.