operatorGood day, everyone, and welcome to EnBW's conference call with investors and analysts covering the results for the first half of 2025. This is Valentina speaking, your Chorus Call operator. I'd like to remind everyone that participants are in listen-only mode throughout and that this conference is being recorded. A Q&A session will come after the presentation. To register a question, you may press star and one on your telephone at any point. Those of you watching the webcast can send questions in writing through the corresponding field. If you need operator assistance, please press star and zero. Recording this conference for publication or broadcast is not permitted. At this point, I'm happy to turn things over to Marcel Münch, SVP Finance, M&A, and Investor Relations. Please go ahead.
Marcel Münch
executiveGood afternoon, everyone. Thanks, Valentina, and thanks to all of you for being with us today as we go over EnBW's results for the first six months of fiscal year 2025. It's my pleasure to pass things to Thomas Kusterer, our Deputy CEO and CFO, in just a moment; he'll take you through our presentation. Then, as usual, we'll open the floor for your questions. Thomas, over to you.
Thomas Kusterer
executiveThank you, Marcel. I want to give everyone a warm welcome today. Thanks to our integrated setup, EnBW kept delivering resilient financial results in the second quarter, once again posting solid earnings at the half-year mark. Adjusted EBITDA came in at EUR 2.4 billion, essentially matching what we had expected, which lets us reaffirm our guidance for the full year. Meanwhile, our CapEx plan is moving forward nicely. That shows how we are executing our strategic agenda and reinforces the leading position we hold in the transition to climate-neutral energy. Gross investments rose 25% compared with a year earlier, reaching EUR 3.1 billion, and 88% of that was aligned with the EU taxonomy. Consistent with these investment activities, we have secured EUR 4.7 billion in equity and debt funding since the start of the year, which adds to our strong operating cash generation. With robust support from our shareholders, we completed a EUR 3.1 billion capital increase in July. That will strengthen our capital structure further and provide a solid base for our substantial investment program while keeping our credit metrics intact. Beyond that, we raised an additional EUR 1.6 billion through long-term debt financing and keep diversifying our portfolio across a range of instruments and currencies. Among the latest transactions in July were a EUR 500 million sustainability-linked bank loan backed by the Italian export credit agency, SACE, along with a EUR 500 million green hybrid bond.
Thomas Kusterer
executiveThat drew remarkable investor interest, and we truly appreciate the response. That leads me to the highlights past our solid financial results for the first half of fiscal year 2025, which appear on page three. With robust progress in carrying out our strategy throughout every segment, EnBW keeps actively contributing to the energy system's transformation, further reinforcing our well-balanced and integrated portfolio. EnBW is a crucial enabler of sustainable, secure, and affordable energy going forward. Having added almost 220 MW, mostly from onshore wind and solar, during the first half of the year, EnBW now runs 6.8 GW of installed renewable capacity. That equals roughly 60% of our overall generation portfolio. Our pipeline stays well-filled. With 1.7 GW presently under construction, we are positioned to steadily grow our installed capacity across the coming quarters. A major contributor will be He Dreiht, our 960 MW offshore wind farm. With sea cabling finished and wind turbine installation underway, the project should deliver first power in autumn of this year. Beyond that, our Mona Offshore Wind Farm Project in the U.K. has received its development consent order. Mona is the first project from the U.K.'s round for-lease round to gain approval, and we anticipate a response on our second project, Morgan, within the next week.
Thomas Kusterer
executiveMeanwhile, we keep lowering the carbon intensity of the thermal plants we run. Having divested the Lippendorf facility, which has close to 1 GW of capacity, EnBW becomes free of lignite starting at the close of 2025 — an important milestone as we work toward exiting coal entirely by 2028. By the end of the year, our coal-fired generation capacity will be down by roughly 40% in only 2 years. Alongside that, we are steadily swapping those plants for flexible CCGT capacity that is hydrogen-ready, so that power supply stays dependable down the road. Since power generation is changing fundamentally, we are adjusting and growing our grids to match. Our marquee transmission efforts are moving along nicely. ULTRANET is more than 85% complete and scheduled to be commissioned in 2026, and work has started on the SuedLink stretch in Bavaria. On the distribution side, Netze BW, our biggest grid operator, has renewed upwards of 260 concessions, which locks in the long-term basis for dependable regional and local service. Remarkably, since 2020 we have not lost even 1 concession. Lastly, in retail and e-mobility, we installed more than 800 additional fast-charging points throughout Germany during the first half of the year, which further cements our leading market position in the DACH region. Let's now go back to the financials on page four.
Thomas Kusterer
executiveAs I just said, we're on track for 2025, and for the group we delivered adjusted EBITDA of EUR 2.4 billion in the first half of the year, which is pretty much in line with what we expected, driven in particular by our grid business. Low-risk activities — our grids plus the renewable business — kept developing positively. During the first half of the year they contributed EUR 1.8 billion to our earnings, roughly 4% higher year over year, and made up 75% of total earnings. Now let's take a closer look at how our three business segments performed, beginning on slide five. In sustainable generation infrastructure, adjusted EBITDA came in at EUR 1.1 billion after six months. As expected, earnings declined, mainly because of lower realized tax generation margins and also because of weather conditions that stayed unfavorable through the second quarter. Turning to renewables, adjusted EBITDA was EUR 525 million. Earnings were lower year over year, driven by offshore wind conditions that remained weak throughout the first half of the year and by limited rainfall in the second quarter, which weighed on our run-of-river power generation. Improved performance in pump storage and solar power generation partly offset this.
Thomas Kusterer
executiveAdjusted EBITDA for thermal generation and trading came in at EUR 556 million. Lower realized tax margins and a subdued trading performance are weighing on earnings, though a solid LNG business and the first earnings contribution from our newly commissioned grid stabilization plant in Marbach provided some balance. Let's briefly review our thermal power generation hedge levels for the years ahead. For 2025, we are almost fully hedged. For 2026, the hedge ratio is over 80%, and for 2027, it falls between 40% and 70%. We have also begun hedging first volumes for 2028, reaching up to 30%. This approach stays fully aligned with our well-established and proven hedging policy. Turning to system critical infrastructure on slide six, which comprises our electricity and gas transmission and distribution grids. Adjusted EBITDA for system critical infrastructure reached nearly EUR 1.3 billion in the first half of 2025, which corresponds to a 12% increase year over year. This robust performance was mainly driven by higher earnings from our investments in grid expansion, along with lower costs for energy losses in the grid. Given our strategic focus on expanding both transmission and distribution grids, personnel as well as operation and maintenance costs trended higher during the period, partially offsetting the segment's overall earnings growth.
Thomas Kusterer
executiveNow let's go into the specifics regarding how we're building out smart infrastructure for customers, which you can see on page seven. For our retail segment, adjusted EBITDA came in at EUR 233 million at the six-month mark. Compared with the prior year, earnings rose 35%, and that was fueled by a bigger contribution from our e-mobility business along with better earnings from our B2C activities. As we look toward the second half of the year, we anticipate somewhat higher costs in our B2C operations, which will weigh on margins in this segment. Now let's turn to the earnings drivers down to adjusted net profit on slide eight. Adjusted net profit attributable to EnBW shareholders reached a solid EUR 632 million. At the same time, it stayed below the prior year's levels. The main reason was higher financial expenses in the adjusted financial result, which reflected a market valuation effect and slightly higher interest expenses stemming from an increased financing volume. Let's move to slide nine for a brief look at our investment. During the first six months, EnBW's gross investments amounted to EUR 3.1 billion, which clearly shows a ramp-up in investment activity consistent with our planned CapEx program. Versus the previous year, that's an increase of 25%. Over 40% of our gross investments in the first half of the year went toward sustainable generation infrastructure, mainly into developing and constructing offshore projects in Germany and the U.K., as well as three hydrogen-ready gas power plants in Baden-Württemberg.
Thomas Kusterer
executiveHalf of our CapEx went to system-critical infrastructure, with the focus on growing and modernizing the transmission and distribution grid. As noted earlier, major projects here were the building of our DC transmission project, SuedLink and ULTRANET, plus the German hydrogen core network. The rest of the investments were directed at smart infrastructure for customers, chiefly backing the ongoing build-out of our e-mobility charging infrastructure. Investments and co-financing contributions from partners — especially for TransnetBW, our transmission grid operator, and our offshore wind farm, He Dreiht — came in below the prior year, in line with their respective share and in the equity capital contribution. Now let's briefly review retained cash flow on slide 10. Retained cash flow came to roughly EUR 1.1 billion in the first half of fiscal 2025, which corresponds to an 18% rise year on year. Even though adjusted EBITDA declined moderately, retained cash flow gained from lower tax outflows thanks to refunds received for previous periods. That brings us to the development of net debt. As shown on slide 11, net debt has climbed to approximately EUR 15 billion since the end of 2024, driven mainly by high investment outflows. This was partly offset by our solid cash generation in the first half of the year, along with a reduction of adjusted working capital.
Thomas Kusterer
executiveKeep in mind that this number has not yet taken into account the beneficial effect from our capital raise of EUR 3.1 billion in July 2025, since that transaction closed after the reporting date. That leads me to the final slide, where we address guidance for 2025. As I noted at the start of the presentation, we are reaffirming our full-year guidance for fiscal year 2025. A strong second quarter that builds on a good beginning to the year. We have confidence in the outlook, both at the segment level and for the group overall. At this point, I'll turn things back over to Marcel.
Marcel Münch
executiveThank you, Thomas. Ladies and gentlemen, we'll now start the Q&A session. In addition to the familiar option of asking questions directly in the call, we now also added a chat function for your convenience. For more detail, I'll hand back to Valentina now.
Operator
operatorWe’re going to start the Q&A portion now. If you’d like to ask something, press star and one on your phone. A tone will let you know you’re in the queue. To take yourself out of the queue, press star and two. Those calling in should switch off loudspeaker mode and also mute the webcast volume while posing a question. People watching through the webcast can send questions in writing using the corresponding field. Anyone with a question can press star and one now. Our first question is from Andrew Moulder at CreditSights. Go ahead.
Andrew Moulder
analystYeah, thanks. Hey there, Thomas. And hello, Marcel.
Thomas Kusterer
executiveHey there, it’s genuinely nice to hear from you.
Andrew Moulder
analystNext time I'll go through the chat function, but I figured I'd give the old-fashioned approach a shot first.
Thomas Kusterer
executiveAbsolutely not. In fact, I wouldn't permit it.
Andrew Moulder
analystI’d like to circle back briefly on your guidance. I mean, you’ve reaffirmed the guidance, which is great. You’re only at roughly EUR 2.4 billion EBITDA for the first half of the year. Looking back historically, the second half of the year is usually weaker than the first half. I’m just wondering if you could say a bit more about—I mean, should we be expecting guidance to land at the bottom end, so around EUR 4.8 billion, or is there something in the second half that will make it better than the first half and get us more toward the middle or top end of that range? That’s my first question. I’ve just got a couple more if I could.
Thomas Kusterer
executiveSure, happy to.
Andrew Moulder
analystOn a general note, I wanted to ask—I came across this news concerning a German infrastructure fund, roughly EUR 100 billion. Is there anything you can share on that right now, or is everything still being discussed and we're simply waiting to see how it plays out? Any details you could offer on that would be appreciated—for instance, whether you think it might, I don't know, perhaps reach you somehow via some form of KfW funding or something like that. Actually, I guess I have two further questions. On CapEx, I'm just curious how much of your CapEx—of the figure you mentioned, I believe up to around EUR 50 billion—how much of it is actually going into Transnet? You don't really split it out between transmission and distribution. You only ever really discuss the grid segments. You have 60% going into networks, which is about EUR 30 billion, but how much of that EUR 30 billion would go to Transnet rather than to your distribution businesses? I think my last question, and it's something I've raised before, but I just wanted to know—you spoke about the offshore wind farms in the Irish Sea, but you're in partnership there with, and bp, in its own words, is now talking about being capital light in low-carbon energy.
Andrew Moulder
analystI just want to ask how solid that partnership really is. Are there any indications that bp might pull back from those offshore farms? What would happen in that case? Am I right in assuming you hold a right of first refusal over their stake? If you could clear that up. Apologies for piling on the questions, but thank you.
Thomas Kusterer
executiveAndrew, we always appreciate your questions. Let me begin with the first one about the full-year guidance of EUR 4.8 billion to EUR 5.3 billion. You're absolutely right. Right now we're at EUR 2.4 billion. But I think the point I was trying to make during the call, during my presentation, was that extremely unfavorable weather conditions hurt us in the first half. We assume that's returning to a normal level, which is what we're currently seeing. That's an uplift to the EUR 4.8 billion. Second, He Dreiht will actually be commissioned in the second half of 2025, not fully, but gradually. It will also have a positive impact on our earnings in the back of the second half of 2025. We also assume, actually, that we'll see good performance in both of our other areas, the customer-facing business, but predominantly the networks business. We remain confident, for both our group guidance as well as the guidance at the segment level. Second, the EUR 100 billion infrastructure fund, as you yourself already indicated, still has a lot of unknowns in it. That said, I wouldn't assume we'll have a direct benefit from this EUR 100 billion.
Thomas Kusterer
executiveHonestly, I don't believe that's necessary. That said, we'd expect indirect advantages too, since it should create positive economic sentiment in Germany, which could in turn lift electricity demand. Either way, we'll see an indirect gain from this EUR 100 billion infrastructure fund. That said, I think plenty of uncertainty remains about where the money will ultimately go. On CapEx — the EUR 50 billion — you asked about how it splits between the networks business and the rest. The networks business accounts for 60% of our total CapEx program. We don't break out the precise split between transmission and distribution networks. That said, if you look at the first half of 2025, CapEx for those first six months of 2025 came in at roughly 50/50 between distribution and transmission networks. Your last question, Mona, concerns the offshore projects, Morgan in the Irish Sea, and bp. I believe you're well aware that bp set up a joint venture with JERA — JERA Nex bp. That joint venture is now the partner on our two projects. We have no indication at all that anything will change. On the contrary, we feel quite comfortable with JERA now being on board as an additional party.
Thomas Kusterer
executiveWe view that as a good thing and beneficial for moving these projects forward. There’s no sign at all that bp is looking to exit these projects. Andrew, I hope that was useful and went some way toward answering your questions.
Andrew Moulder
analystYeah, no, that's great. Maybe just one more thing about the Irish projects, then. Do you think you'll be bidding those into allocation round seven, or is it perhaps too early yet to do that?
Thomas Kusterer
executiveTo start with, it's too soon to tell, and second, we wouldn't reveal it in any case, Andrew, since that is, of course, commercially sensitive information. Sorry about that.
Andrew Moulder
analystNo, that answers my question, doesn't it? All right, thank you.
Thomas Kusterer
executiveGlad to help.
Operator
operatorJust a quick reminder — if you'd like to ask a question over the phone, hit star and one on your keypad. Folks, there aren't any further questions coming in on the phone lines. Handing it back to you for any — oh, here's one more, from Andrew Moulder at CreditSights. Go right ahead.
Andrew Moulder
analystYes, hello Thomas. Hello, Marcel. Here I am once more. I figured I would let somebody else have a turn, but given that nobody else came forward, I simply wanted to ask about the German wind auctions. Clearly, the German offshore wind auction failed just recently. I mean, that is obviously not a positive development, but do you think it might actually turn out to be beneficial with respect to how the framework could be altered down the line? Do you expect CfDs to be brought in for the German offshore wind auctions going forward? Thank you.
Thomas Kusterer
executiveThat is a really good question. It could be a signal to both the regulator and the government that the existing framework and auction design may no longer be suitable going forward. We have actually been lobbying already for something to change, because, I mean, we've observed rising costs, we've observed inflation, we've observed higher interest rates and volatile markets. I think the risks right now sit well above the level that we can bear in a project of this kind. A CfD could be the answer to that question, potentially a double-sided CfD. That is something that needs to be discussed with the government and the regulator over the next couple of weeks and months. I think it is a clear indication that the current system is not really built for success, at least not in this market environment.
Andrew Moulder
analystAll right, that's excellent. Thanks so much, Thomas. And thank you, Marcel.
Thomas Kusterer
executiveThanks, Andrew.
Operator
operatorThat's everyone on the phone lines. I'll hand it back to you now for anything coming in from the webcast.
Marcel Münch
executiveThank you, Valentina. As a matter of fact, we have a question — actually two questions — from Michael Charlton, with Santander. I believe we partly addressed this, but let's go into it once more anyway. Michael asked how much TransnetBW will contribute to group EBITDA. Thomas, I think you already mentioned that, and also CapEx in the first half of 2025, and whether it remains fully consolidated. The second question is, Michael said, congratulations on our capital increase. Thank you, Michael. What will the proceeds be used for, and do we plan to recapitalize TransnetBW to support its investment plans, and will our co-shareholders contribute an equal amount?
Thomas Kusterer
executiveI believe you just raised a point there, Marcel. I think the first question has already been addressed by us. Let me move straight to the second one, which concerns the capital increase. As we've mentioned, that EUR 3 billion is in fact the equity required for us to put an additional EUR 10 billion to work over the coming couple of years. The way this EUR 10 billion splits up will be roughly the same as what we've laid out, say EUR 40 billion, meaning 60% goes to the networks business, 30% to generation — mainly renewable energies, though also hydrogen-ready gas power stations — and the remainder is largely customer-facing. That means fast-charging infrastructure. Will we recapitalize TransnetBW? That is our standard practice. That's the way it works, and it depends very heavily on TransnetBW's investment plan. Capital will be increased by us, and our partners are doing the very same thing. It aligns very closely with the participation shareholding levels that we will hold in the company. I hope that answers your question.
Marcel Münch
executiveRegrettably, there’s no feedback loop available to us, so if any follow-up questions come up, kindly put them in the chat. We have another question from Richard Alderman. Could you share your perspective on the potential capacity auction that’s currently under discussion with the EU Commission, and on whether approval has already been given for the first 10 GW? Do you view it as being primarily aimed at CCGT, meaning it would be open to all technologies? Second question: does the regulator need to go through a consultation period regarding the auction’s design and provide for a pre-qualification period? Does that make it feasible or not feasible for it to take place in 2025? Third question: are you planning to bid into the auction?
Thomas Kusterer
executiveAlright, let me begin with the first question. As we understand it, the scheme currently being discussed—along with the CapEx I mentioned, which effectively serves as the foundation for this auctioning process—will center on gas power stations. It won't be mostly CCGT. If I'm not mistaken, it could also be OCGT, meaning open gas turbines. Still, as we just said, it's gas. The figure is 10 GW, and to our knowledge, that has already received approval from the EU Commission. That's my understanding. It forms the basis for the next steps. My assumption is that we'll actually have clarity by the end of this year, with the first auctions happening either at the end of this year or at the start of next year. In any event, I believe we must accelerate the process so that we'll have sufficient gas power plants in the system by 2030. It's already high time. We ought to be very pragmatic in how we structure this process to make sure it happens. I also hope that answered your question, Richard. Anything else?
Marcel Münch
executiveI believe the final question, Thomas, was about whether we intend to participate in the auction.
Thomas Kusterer
executiveYes, I skipped over that question on purpose. Naturally, I’m not going to reveal it, since, well, once again, that information is commercially sensitive as well.
Marcel Münch
executiveThanks a lot. Just to wrap things up, I’ll give it one more second. I don’t believe there are any additional questions in the chat. That brings us to the end. Thank you again very much, Thomas, and thanks to everyone joining by phone as well as online. As usual, if anything else comes up, please feel free to contact our team for further information or deeper discussions. All the best, and enjoy the rest of your day. Bye-bye.
Operator
operatorLadies and gentlemen, that brings us to the end of today's conference. We appreciate your choosing Chorus Call, and we thank you for joining us on this call. You're welcome to hang up your lines at this point. Goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete EnBW Energie Baden-Württemberg AG transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to EnBW Energie Baden-Württemberg AG earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in EnBW Energie Baden-Württemberg AG or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.