Thanks for joining us for Endeavour Silver's conference call on our Q1 financial results. <<operator_script>> At this point, I'll hand things over to Galina Meleger, our Director of Investor Relations. Galina, the floor is yours.

Galina Meleger

executive
#2

Thanks, operator. Good morning, all, and welcome to the Endeavour Silver conference call on our 2020 first-quarter financial results. Joining me today are Bradford Cooke, the company's Chief Executive Officer; Dan Dickson, our Chief Financial Officer; and Godfrey Walton, our Chief Operating Officer. Before we begin, I'm obligated to note that some remarks on this call will include forward-looking information as defined under applicable securities laws. Those may cover statements about how Endeavour is expected to perform in 2020 and in later years, such as revenue and cost figures, silver and gold production, grades and recoveries, and the timing and expenditures needed to develop new silver mines and mineralized zones. We neither intend to nor assume any duty to update such forward-looking information, except as applicable law requires. So, on behalf of Endeavour Silver, thank you once more for joining our call. I'll now hand things over to our CEO, Brad Cooke.

Bradford Cooke

executive
#3

Thank you so much, Galina, and hello everyone, welcome to this call discussing our first-quarter financial results. Let me begin by noting that the figures we published today indicate we are not yet through the difficult period, though we achieved considerable progress in Q1, in both our operations and our financial results. Allow me to elaborate. Operationally speaking, we performed considerably stronger than in either Q1 or Q4 of last year. Our Q1 output was broadly consistent with the annual guidance we had issued before the government ordered our mining activities suspended. Among the main highlights of our operational results was the steep reduction in cash cost, which dropped 37% versus the same period a year earlier. That mainly mirrors the gains from our operational turnaround and our move into higher-grade ore bodies at Guanacevi, our biggest silver mine. All-in sustaining costs declined by just 5% as well, which mirrors the sustaining CapEx that remains elevated as we invest to deliver a comparable turnaround at Bolanitos during the coming 3 months, relative to what we have already accomplished at Guanacevi. I want to note that of the large net loss reported on the headline, close to half stems from a foreign exchange event.

Bradford Cooke

executive
#4

So essentially, the Mexican peso’s 25% depreciation reduced the value of our peso receivables and also created a deferred income tax expense. Among other extraordinary items affecting our bottom line were the care and maintenance costs at our now closed El Cubo mine in Q1, which remain elevated. Going forward, those costs are expected to come down. At El Cubo, there really is no further severance left, and a meaningful decrease in security costs is on the way. Mine depletion remains high — relatively high — because our reserve lives are short, and through our exploration group we are trying to extend those reserve lives. From that standpoint, Guanacevi has been a success. And although the government shut us down on April 1, the government in Mexico has now declared that municipalities with fewer non-COVID-19 cases can look toward restarting on May 18. And because all 3 of our mines sit in such municipalities, we are now in advanced planning stages to return our 3 mines to production in May. So turning to the first quarter highlights. Metal production came to 857,000 ounces of silver and 8,500 ounces of gold. On an equivalent basis, that is 1.5 million ounces of silver equivalents at an 80:1 ratio, and 1.8 million ounces at the current 110:1 ratio, which generated about $22 million in revenues.

Bradford Cooke

executive
#5

As I mentioned, cash flow and net income came in negative, largely because of the substantial foreign exchange expense. At quarter end, our balance sheet showed $15 million in cash, $27 million of working capital, and long-term liabilities. We carry certain term loans secured on equipment. On operating costs: for the quarter, we essentially finished with a cash cost of $7.85 per ounce of payable silver, while all-in sustaining costs landed at $18 and change. A few additional quick operational highlights. I noted earlier that the turnaround at Guanacevi is now finished — we can check that box. And the operation that lost the most money last year actually earned a little on a mine-site operating basis in Q1. Turning to development projects: in June, we do expect to put out the final optimization of our pre-feasibility study along with the economics in it, drawing on our in-house expertise and an independent engineering firm. So Terronera continues to move forward steadily. On the exploration side, we have some decent drill results coming from both Guanacevi and Bolanitos. Those releases should arrive over the next few months. That covers the quarter's highlights. And now, operator, I think we should just open the line for Q&A.

Operator

operator
#6

<<operator_script>> Our first question comes from Heiko Ihle at H.C. Wainwright.

Heiko Ihle

analyst
#7

This might be a somewhat unusual question, but you mentioned elevated maintenance expenses at El Cubo. Given all the social distancing challenges we're facing globally, how much of a potential saving could there be — is there a way to have workers from Bolanitos handle some of that maintenance work, which would cut some costs and at the same time help create the distancing you're likely required to do?

Dan Dickson

executive
#8

Heiko, this is Dan. What really mattered for us in Q1 at El Cubo was simply keeping the whole fleet properly maintained, bringing the mill up in the plant, and getting everything cleaned up. We haven't moved to closure or anything along those lines — we're basically leaving everything as it stands. We also incurred roughly $200,000 in severance costs for what we spent at El Cubo, plus depreciation on the plant, light vehicles, office and IT equipment. So going forward you'll notice care and maintenance costs at Cubo dropping considerably. I believe our staff there is around 10 security people and 10 individuals. That makes 20, 25 people in total at the site. Guanajuato, or Bolanitos, and El Cubo sit about 45 minutes apart. So in that setting, that's genuine social distancing. Ultimately, then, what matters most for us at Cubo going forward is simply keeping the site secure and monitoring the tailings facility, with the town right there. But you're looking at $200,000 for next quarter versus the $1 million we just spent.

Bradford Cooke

executive
#9

And because of that, the sizable cut also covers fewer security personnel. And the figures Dan gave match what we have right now, correct?

Dan Dickson

executive
#10

Absolutely.

Bradford Cooke

executive
#11

Efforts remain ongoing on our side to identify a path toward bringing Cubo back online. That will need us to carry out certain land acquisitions and/or exploration work. It is a work-in-progress. So there is nothing to report on that front yet, though this is precisely why Cubo stays on care and maintenance.

Heiko Ihle

analyst
#12

Perhaps I'm just an incurable optimist, but I have this sense that the mine will eventually reopen at some point. I don't want to pry open Pandora's box too far here, yet I'll raise it because you included it in the third paragraph of your earnings release, noting that nearly half of the net loss stemmed from the 25% devaluation of the Mexican pesos. At what point — and the answer could be never — at what point would you ever think about hedging certain currencies or doing something similar, simply to prevent future large-scale effects and swings that some people reading earnings releases might take somewhat out of context?

Bradford Cooke

executive
#13

So, the peso devaluation is kind of a mixed bag. It hurts our assets, but it really helps on the cost side. So a weaker peso doesn't bother us one bit. And we wouldn't hedge the peso. It would have an effect on our costs. We believe the peso is headed toward more and more depreciation against the dollar.

Heiko Ihle

analyst
#14

All right, I get that. But I mean, there could still come a moment when the situation flips against you. And simply having won up to now doesn't guarantee that you'll stay ahead permanently, right?

Bradford Cooke

executive
#15

I mean, conceptually speaking, that's a reasonable question, but practically, we've spent 16 years in Mexico, and the peso has moved in just one direction — nothing else. Back in 2003 it stood at 10:1. Today it's 25 — 24:1.

Operator

operator
#16

Joseph Reagor from Roth Capital Partner has the next question.

Joseph Reagor

analyst
#17

To follow up on what Heiko was asking regarding currency, I'm curious what share of your overall costs you'd expect to gain from a weaker peso as we move ahead?

Dan Dickson

executive
#18

Yes. This is Dan. Joe, thanks for asking. Labor accounts for 30% of our costs and is directly tied to our cost of sales. So a 25% cut in our labor costs for the foreseeable future can be built in pretty quickly. Then, of the remaining 70% of costs, roughly half comes from sources out of Mexico and is tied to the Mexican peso. Eventually, you'll see those costs adjust a lot quicker than what you'd typically see from a labor standpoint. But generally, we're expecting about 45% to 50% of our costs to be affected by the depreciation of the peso.

Joseph Reagor

analyst
#19

All right. So in a way, if we remain at this level through Q3, we might see costs come down by 10% to 12%?

Dan Dickson

executive
#20

Absolutely, that’s a reasonable point.

Bradford Cooke

executive
#21

Yes. And bear in mind that the bulk of that depreciation landed during the final 2 weeks of March. So it struck our assets immediately, yet it hadn't reached our costs at that point. It is only now starting to affect our costs.

Joseph Reagor

analyst
#22

All right. Now regarding COVID-19, what's the outlook for capex in Q2? Since you had your mines closed for nearly half of that quarter, my expectation is that capital spending comes in lower, and the full-year capex guidance you gave at the start of the year has likely been brought down overall too, correct?

Dan Dickson

executive
#23

Yeah. No, that's fair. For the quarter, I mean, at the end of the day, all the mine development we had in the plans is still there. It's just that everything gets pushed back by 6 weeks to 7 weeks. So in Q1, we spent or had total additions of roughly $9 million. In Q2, it'll likely be nearer to $5 million, simply because of that 6, 7-week delay.

Joseph Reagor

analyst
#24

All right, let me switch topics for a moment. The royalties from Guanacevi, measured as a share of revenue, rose sharply during Q4 of last year, and they remained high in Q1 of this year. Does that reflect mining taking place in a zone where you pay a larger royalty? Is this merely a temporary matter? Or is some other factor involved?

Bradford Cooke

executive
#25

No, that's spot on, Joe. Brad here. We brought on a new property last year named El Curso, along with a new discovery that we advanced during Q4 and have been mining since late last year. That specific property carries a fairly high royalty payable to a Mexican group, while the remaining parts of the Guanacevi operating unit come with far, far lower royalties. So that's the whole story. In Q1 we chose to focus on mining the El Curso zones, purely because the grades there are phenomenally higher. That said, our plan for this year also includes returning to a more balanced blend of Curso and other ores. Take Milache, for example — we've nearly caught up on mine development there. As a result, it should be able to send a larger percentage of tonnes to the plant going forward, and Santa Cruz Sur is now likewise in the advanced stages of development and ought to contribute more as well. Perhaps not during Q2, since we essentially lost 7 weeks standing still, but definitely from Q3 onward.

Joseph Reagor

analyst
#26

All right, that helps. And then one final item. I’m aware you folks drew somewhat on the ATM during Q1, and a bit more as Q2 began. How much remains accessible to you on that front?

Dan Dickson

executive
#27

We’ve put a new base shelf in place. You’d have noticed that on April 27, it was finalized. That cleaned out what was left on that ATM — roughly $500,000. So that ATM program has now come to an end.

Operator

operator
#28

We'll take our next question from Chris Thompson at PI Financial.

Chris Thompson

analyst
#29

Yeah, look, it was a tough quarter. I’ve got a couple of questions here that may also be tough. First, on the standby costs, I assume for the 3 operating mines. Dan, you mentioned $5 million for Q2. Is that the cost we should expect?

Dan Dickson

executive
#30

That isn't cost. Those were capital expenditures for Q2. So under our initial 2020 guidance, the total capital spend for 2020 was going to be $32 million in Q1. We spent $9 million. Joe's question just asked how much our cost of capital -- we're going to spend on capital in Q2. Typically, that $32 million gets split pretty evenly across the year. So $8 million to $9 million a quarter. And just because we've been shut down for 6, 7 weeks this quarter, I don't see that spend being larger than the $5 million just for Q2, but that -- we still need to get to that 32%, and maybe that goes into 2021 a little bit, Chris. But that won't change because of COVID. We still have our mine development programs that we have to get done and get accelerated so we can maintain these production levels.

Chris Thompson

analyst
#31

All right, I appreciate you clearing that up. So just turning to Guanacevi — and congratulations, by the way, on getting those costs down. Clearly, Santa Cruz Sur and Milache are now in production. I believe you noted in your remarks that P4E lagged the plan. I'm simply trying to figure out what share of mill feed that represents. Is it a small piece or a big one?

Bradford Cooke

executive
#32

Right, so we'll have to clarify that. What we utilize internally is the continuation of the Porvenir Cuatro ore body onto the El Curso property. That ore body is what we refer to as P4E — Porvenir Cuatro extension. And it's possible that during Q4 it remained under development, though I don't believe we described that particular one as being behind plan. Possibly SCS. Possibly Santa Cruz Sur.

Dan Dickson

executive
#33

At Santa Cruz Sur, we're a bit behind on the development side. And that simply showed up in March, when silver dropped to the 12 handle, we concentrated on boosting output from El Curso, which carries better gold grades and better silver grades, and then more or less shifted our attention away from Santa Cruz. So we'll resume the development work that feeds into Santa Cruz. And in the end, what we're after, what we were after originally and depending on where prices head, is essentially 1/3 of our production coming from Santa Cruz Sur; 1/3 coming from Milache; and a 1/3 coming from El Curso. And what we've never had before -- or I shouldn't say never, what we haven't had lately, Guanacevi, Chris. It's that flexibility. So the moment we got stuck in 1 area, we weren't reaching our tonnage, and in Q1, we're just under 1,000 tonnes per day. And our target is to reach 1,200 tonnes per day. So having Santa Cruz Sur catch up on development lets us hit 1,200 tonnes per day for the next 8 months, so to speak.

Chris Thompson

analyst
#34

Okay, and could you remind us what kind of turnaround time you're expecting for Bolanitos and El Compas? I mean, they're a bit delayed, I understand that. But hopefully they'll obviously follow the same path as Guanacevi — though maybe you could quantify the turnaround time for us there.

Bradford Cooke

executive
#35

Right. The work to turn Guanacevi around began once Q1 of last year wrapped up. So that process essentially consumed a full year. We kicked off the Bolanitos turnaround during Q3 of last year, and that one should require roughly a year as well. Naturally, this quarter was largely already priced in, though we do anticipate a breakthrough in Q3.

Chris Thompson

analyst
#36

Right, okay. So I'm looking at the depreciation — I'm looking at the cash position shrinking at this moment, and it worries me somewhat that time may not be a luxury you can afford for this turnaround. I mean, when do you perhaps simply scale things back and just survive on Guanacevi? I realize that's a hard question, but I have to ask it.

Dan Dickson

executive
#37

No, that's a reasonable question, Chris. Once you work through the Q1 figures, I think you'll see that the cost per tonne at Bolanitos declined to $68.25, or perhaps $68.50, and that's an improvement. From that level we can push it lower still. What Bolanitos lacked this quarter was tonnage. We landed at roughly 87,000 tonnes, and the plan calls for us to reach about 100,000 tonnes. In the end, we have 2 areas: first, San Miguel, which we found last year. Roughly 300 meters of additional development remain there before it hits full capacity and truly adds to Bolanitos. So we're close on that one. Then there's a vein we refer to as Melladito, sitting about 300 meters from being operational. It requires further development as well, but it will provide flexibility and let us move above 1,000 tonnes per day to 1,200 tonnes per day later this year. So -- and Brad mentioned this. It's roughly 3 months before we see Bolanitos turn around. On the cost side we've performed well. Now it simply comes down to restoring those tonnes to the level they've historically reached.

Dan Dickson

executive
#38

We aren't at that point yet. That's the reason we're hoping that by Q3 — around the middle of Q3 — things will get there, simply because of the hold-up from COVID, as I mentioned. Bolanitos, though, sits much nearer to the turnaround, and it is now just reaching that tonnage output.

Bradford Cooke

executive
#39

And, Chris, I’d like to add that cash costs at Bolanitos are already lower. That’s because the operational turnaround—management changes, different mining methods, new equipment—has all made a difference. Even so, we still have high capital spending, namely the accelerated mine development at San Miguel and Melladito. Those 300 meters left at San Miguel aren’t needed to reach the ore. We’re already at the ore. Now we need to drive sills, raises, and ramps, and then it will be fully ready for production. So there isn’t much time remaining, and there isn’t much capital investment remaining, to get Bolanitos up and running properly.

Dan Dickson

executive
#40

Turning to the second part of what you asked about El Compas — perhaps that picture isn't quite so clear where Compas is concerned. For us, Compas contributes a really modest amount of mine output, at 1 million silver ounces. And in Q1, costs ran high. We made a change. We've been transitioning from contractors to employees. So in March we did onboarding and training, and we eliminated the contract for those mining underground. And our mine tonnes actually dropped significantly in March, but we expect that to recover, now that our staff is also in place and ready to go. So hopefully, here in late May, we can get going. At Compas, we can ramp up relatively quickly. And if we can hit the tonnes and grade, then our costs should — again, see things that are hard to see in Q1, those costs are going to come down significantly with the contractors out of the mine.

Chris Thompson

analyst
#41

Alright. Okay, and Dan, perhaps one last question for you. Those equipment leases and loans of yours — were they extended by three months?

Dan Dickson

executive
#42

Yes. Yes. Altogether, we hold $11.5 million in equipment loans, and every bit of that relates to the turnaround and to refreshing our fleet. And we went to Sandvik. And just to be careful at the start of the COVID-19 and the shutdown April 1, the government had come out and said shutdown until April 30, but as we've seen globally, those goalposts have continued to change. And we want just to protect ourselves. So with Sandvik, we approached them immediately, and they're very happy to work with us on it. And we just delayed principal payments by 3 months. So we didn't have to pay any of that until August, and it just gives us a little bit of flexibility. Now I think we're probably being too conservative. Those are in place now as is. And with us, hopefully getting -- going here May 18 we'll be fine. But at the time, you're looking for any alternatives to save cash, in case this would have gone through the summer in Mexico.

Operator

operator
#43

Craig Hutchison from TD Bank has the next question.

Craig Hutchison

analyst
#44

I believe you've covered most of what I wanted to ask. Still, I'm curious about one thing: after the Mexican government gives you approval to resume those operations, how much time do you expect it will take before you're back running at full capacity?

Bradford Cooke

executive
#45

Godfrey, if you're on the call, would you like to take that question?

Godfrey Walton

executive
#46

Sure, Craig — appreciate the question. We're putting in some preliminary work so that the startup goes a bit more quickly. That said, I'd figure it takes roughly, let's say, 3 weeks before things are up and running properly. There were a few maintenance items we handled while the shutdown was on. So Guanacevi ought to come back very, very fast, though Bolanitos and Compas are likely the slower operations to restart. Compas, then, perhaps closer to 3 weeks to 4 weeks. Bolanitos, likely 2 to 4. And as for Guanacevi, my sense is it will be running in around 2 weeks.

Craig Hutchison

analyst
#47

All right, that’s great. Then to continue on the ATM question: I understand you said the new shelf sterilized the prior ATM. Can you now draw on the new financing ATM, or does that remain...

Dan Dickson

executive
#48

On the base shelf — yes, regarding that base shelf capacity, as of now we have not filed a prospective supplement for our new ATM program, or — so a new prospectus has to be filed before a new ATM can be put in place.

Craig Hutchison

analyst
#49

Alright, so right now that isn’t in place. Got it.

Operator

operator
#50

We'll take our next question from Alliance Global Partners, from Bhakti Pavani.

Bhakti Pavani

analyst
#51

I only have a few questions. Given the ramp-up timeline at each of the individual mines, once those restrictions are lifted, during that period, are there any stockpiles currently on site that you might be able to process while production ramps up?

Bradford Cooke

executive
#52

Appreciate that question, Bhakti. This is Brad speaking. And on this particular item, I might hand things over to Godfrey.

Godfrey Walton

executive
#53

Bhakti, appreciate the question. Yes, at Guanacevi we hold roughly 15,000 tonnes of stockpiled material. So that will get processed quite fast. In addition, we have stockpiles — smaller ones — at Bolanitos and at Compas. Those will be drawn on to bring the plants online. And after that, the development work underway before we reach full ramp-up will help feed the tonnes as we move ahead from there.

Bhakti Pavani

analyst
#54

Understood. Then for the second question, looking at it from a cost perspective: when operations resume, do you anticipate any extra expenses to meet or reduce the impact of COVID safety measures?

Godfrey Walton

executive
#55

Godfrey here. We aren't anticipating much in the way of additional expense. Some will be there, sure. Even so, we've put in place quite a few measures for checking temperatures as well as disinfecting and cleaning, so costs have risen slightly. Still, when you look at the big picture, that amount is modest rather than significant.

Operator

operator
#56

That wraps up the question-and-answer portion. Brad Cooke, I'll hand the conference back to you for any closing remarks.

Bradford Cooke

executive
#57

Thanks, operator, and thanks to everyone for tuning in today. Once again, we're not out of the woods yet, but the quarter showed good progress. At Guanacevi we're ahead of schedule. And although we had to shut down in Q1 -- or sorry, Q2, and we'll get a later start, mid- to late May for the 3 operations is what we're expecting. I think Bolanitos, within the next 3 months of operations, will also show the turning of the corner that we forecasted previously. So operationally, I think it's a work in progress, but we've managed to tick the Guanacevi box. And we fully expect to tick the Bolanitos box this summer. Keep your eyes peeled for news coming up in May, June. We have good drill results coming from Guanacevi. Good drill results coming from Bolanitos, and a final pre-feasibility update on Terronera. So with that, operator, let's wrap up the call.

Operator

operator
#58

That wraps up the conference call for today. Your lines can now be disconnected. We appreciate you joining us, and enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Endeavour Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Endeavour Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.