Endeavour Silver Corp. (EDR) Earnings Call Transcript & Summary
August 1, 2024
Earnings Call Speaker Segments
Operator
operatorThank you for being with us. I’m the conference operator. Welcome to the Endeavour Silver Corp. conference call on financial results for the second quarter of 2024. Please note that everyone is in listen-only mode and that this call is being recorded. Following the presentation, you’ll have a chance to ask questions. To enter the question queue, press star followed by one on your phone’s keypad. If you require help at any point during the call, you can reach an operator by pressing star, then zero. At this time, I’d like to hand the conference over to Allison Pettit, Director of Investor Relations. Please go ahead.
Allison Pettit
executiveThanks, Operator, and good morning to all of you. Before we begin, I'd like you to review the precautionary language in our MD&A concerning forward-looking statements, along with the risk factors tied to those statements. You can find our MD&A and financial statements on our website at endeavoursilver.com. Joining us on today's call are Dan Dickson, CEO of Endeavour Silver; Elizabeth Senez, our Chief Financial Officer; and Don Gray, Endeavour's COO. After Dan's formal remarks, we'll open up the call for questions. Dan, over to you.
Dan Dickson
executiveThanks, Allison, and hello everyone. Endeavour Silver had a productive second quarter. With gold hitting fresh record highs and silver beginning to trail that move, our cash flow and balance sheet ought to keep gaining from these elevated prices. At Terronera, we made substantial headway on the surface infrastructure of the upper platform, and by June 30th overall project progress had hit 65%. Commissioning at Terronera remains scheduled for Q4 2024, and we can't wait for it to add to our production profile next year and turn into a cornerstone asset. Silver equivalent output for Q2 came to 2.2 million ounces, made up of 1.3 million ounces of silver plus 10,500 ounces of gold. We're well placed to land at the upper end of our 2024 production guidance. Silver equivalent grades have matched expectations, with gold grades a touch higher and silver grades a touch lower. We anticipate this pattern to hold going forward, so we look for a comparable production profile in the second half of the year. Top-line revenue came in at $58 million, a 17% year-over-year increase, driven by stronger metal prices than in Q2 2023. Cost of sales was $48 million, 28% above Q2 2023, reflecting the strength of the Mexican peso, which pushed up labor, power, and consumable costs, along with continuing inflationary effects from 2023 that carried into 2024.
Dan Dickson
executiveOver at Guanaceví, material we bought from local miners rose to 18% of throughput and made up $5 million of our cost of sales. Back in Q2 2023, purchased material came to $1.5 million. As precious metal prices have gone up, both the availability and the costs of that purchased material have risen. Buying local material brings a number of benefits, and management anticipates that purchases of material will stay elevated for the foreseeable future. Higher prices also translate into higher royalty expense, and because we are generating mining profits, our special mining duty has increased, and these are affecting our cost metrics. Direct operating costs — our mining, processing, and site administrative costs — are in line with management's expectations. Cash costs and all-in sustaining costs gain from the higher gold credit than was estimated at the beginning of the year, which offsets the higher royalties, special mining duty, and greater purchased material. The company posted a net loss of $14 million for the three-month period ended June 30th, 2024, versus a $1 million loss in Q2 2023. After excluding certain non-cash and unusual items, along with items subject to volatility that are unrelated to the company's operations, the adjusted loss was $1.0 million, compared with adjusted earnings of $1.6 in Q2 2023.
Dan Dickson
executiveSince we'd already put out our production and construction numbers, today's big move in the share price came as a surprise, and honestly the size of it is still a bit hard to explain. With precious metal prices higher, there's obviously an expectation of stronger earnings, and I think this is one data point over time where we will meet those expectations. As of June 30th, 2024, the company's cash position stood at $68 million, with working capital of $65 million. The company raised $14.7 million through share issuances, mainly to fund Terronera, and during the quarter the company completed its first drawdown of the Terronera Senior Secured Debt Facility, drawing $60 million. After the reporting end, the company completed a second draw of $15 million and has an additional $45 million committed and available for future drawdowns expected in the third or fourth quarter. As I mentioned earlier, the Terronera project reached 65% completion with more than $204 million in the project budget spent to date. Project commitments totaled $260 million, which is 96% of our $271 million capital budget, and remains on track for commissioning in Q4 2024 as we continue to advance on schedule. Over 1,250 meters of underground mine development were completed in Q2 for a cumulative total of 4.5 kilometers, and our mine crews continue working in portals one, two, and four declines.
Dan Dickson
executiveWe’ve now driven development through the Terronera vein, and test stopes have begun to be developed. Up on the upper platform, construction of the surface mill and infrastructure stands at 88% complete; concrete and structural steel erection are entirely finished, and mechanical piping plus electrical installation are progressing well. Excavation of the key trench for the tailings storage facility embankment is roughly 95% done, and the lower platform sits at nearly 50% complete. Concrete work on that lower platform is set to begin early in Q3 and remains the critical path toward commissioning in Q4. As of June 30th, 87 of 95 procurement packages are complete, so what lies ahead is really a matter of execution and productivity across the next 6 months. The company expects to commission using temporary power, with the LNG and power generation becoming operational after commissioning. Temporary power has been planned for and should be available for Q4. In a similar way, other minor structures will be under construction while commissioning takes place. Finally, on the community relations side, with support from the local community remaining a major commitment, a planned operator training program has been set up. A comprehensive plan for training and support services is being prepared for groups and individuals who want to form businesses able to supply local goods and services within the community.
Dan Dickson
executiveOnce more, regarding a thorough Terronera construction update, I'd really suggest heading to our website. There you'll see our quarterly photo gallery, which highlights the newest developments, the progress, and details about Terronera. And before we get to the Q&A portion of today's call, I'd also like to point out that in May we released our 2023 sustainability report, called "Transformation in Motion," which offers an in-depth look at Endeavour's sustainability commitments, its performance, and the continuing approach to responsible mining. The complete report and the company strategy are available to view on our website, under the Sustainability tab. So with that, Operator, I'm glad to open the floor to questions. Operator, please let's move on to that session.
Operator
operatorThank you. If you'd like to get into the question queue, you can press star, then one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, kindly lift your handset prior to pressing any keys. To take your question back out, please press star, then two. Our first question is from Jake Sekelsky at Alliance Global Partners. Please go ahead.
Jake Sekelsky
analystHi Dan, and hello to everyone on the team. I appreciate your time in addressing what I'd like to ask.
Dan Dickson
executiveSure thing, Jake. Glad to answer those.
Jake Sekelsky
analystTo begin with the finished goods builds in the quarter, I'm just wondering: did you hold back ounces in hopes of better prices during this quarter, or was that simply a matter of timing?
Dan Dickson
executiveIt's really just a matter of timing. I think our most recent shipments headed out around the 28th. Nothing was sold ahead of time. And clearly, given where we stand in terms of constructing Terronera, we aren't delaying sales, and we don't anticipate delaying sales right now.
Jake Sekelsky
analystAll right, that's useful. Then just regarding foreign exchange, I'm curious: has the peso fallen far enough that you'd consider starting to set up wider hedges for the whole company, or would you rather wait for it to weaken a bit further?
Dan Dickson
executiveI do believe the Mexican peso will experience a bit more softness, purely because of government policy, though pinpointing the timing of when that softness emerges and how long it lasts is always hard. Right now, we don't intend to take on additional FX hedges. Under the debt facility, our build required us to enter into FX hedges, and once we move into operations, we're required to put some operational FX hedges in place, but we haven't yet decided when that will happen. Once again, my view is that the Mexican peso will weaken somewhat further, but we'll see.
Jake Sekelsky
analystUnderstood. All right, that covers everything on my end. Appreciate it once more.
Dan Dickson
executiveAppreciate those questions, Jake.
Operator
operatorLucas Pipes at B. Riley has the next question. You're up.
Lucas Pipes
analystThanks a lot, Operator. Good afternoon, everybody. Dan, my first question is somewhat big-picture regarding the operating climate in Mexico. Clearly, an election took place. The administration has not yet assumed office, but I was wondering whether, perhaps now that the election is behind us, there might be somewhat greater clarity about regulatory priorities coming from the incoming administration. Thank you so much.
Dan Dickson
executiveRight. I mean, that's accurate. There was an election on June 2nd. The Morena Party came out on top, and the results were probably even stronger for them than what had been anticipated initially. Claudia Sheinbaum is the incoming president. She's effectively AMLO's successor, and watching how closely she adheres to the platform over her first couple of years in office will be interesting — and the expectation is that she'll stick with it fairly closely. She's said privately, and it's now sort of seeped into press coverage, that on mining she'll necessarily be more pro-mining than AMLO was. She is definitely more pro-business. But the reforms that got put in place and have been lost through a bunch of amparos — we're still waiting on the Supreme Court's decision. There's been some chatter that those will be repealed but re-put in front of the legislature in the fall. So some uncertainty is still coming through the current government. How this changes, we'll probably be able to see that better over the next six months. I think when it comes to Mexico, there's been a lot of rhetoric coming out of AMLO. I think that's going to dissipate. But ultimately, it's still one of the best jurisdictions in the world to operate from a mining standpoint.
Dan Dickson
executiveOnce more, my view is that a number of the compliance obligations being introduced, or that will eventually land, within those mining reforms won’t have a major effect on Endeavour, simply because we have teams capable of managing them. That said, until it actually arrives and is either properly approved or properly enacted into legislation, commenting is hard.
Lucas Pipes
analystThanks for sharing that view—it's useful. You mentioned the extra $45 million that becomes available at Terronera during the second half of 2024, and I was wondering whether that release is tied to any particular project milestones, and if it is, whether you might comment on them and go into some detail. Thank you.
Dan Dickson
executiveNo, nothing specific has to be hit as a milestone for that. The banks are represented by the independent engineers. Reports are something they produce, and they review the monthly reports we send, and they will work through those, and the stations we need to do are in place, but all of it is still on track, and we expect that to be ready over the coming, as I mentioned, six months.
Lucas Pipes
analystGreat, Dan — I really appreciate the remarks from you and the team. Wishing all of you the best of luck.
Dan Dickson
executiveAppreciate the questions, Lucas. Nice to hear from you.
Operator
operatorCraig Hutchison from TD Cowen has the next question. You may proceed.
Craig Hutchison
analystHey everyone. I just wanted to ask about the underground development rates. It seems like they improved quite a bit during the second quarter. Earlier on, you had some underground geotechnical problems at the start, but could you comment on how that situation is going now? Are you on the plan, ahead of it, or behind it? Just any sense of how the underground development work is progressing?
Dan Dickson
executiveYeah. No, Craig, that's a genuinely sharp point. In the end, we're now monitoring progress against the plan. At the beginning, whenever you first get going on something like this, there's a bit of a learning curve — simply getting a handle on ground conditions and water conditions. I'd say the ground conditions match, or perhaps even exceed, what our technical reports projected. Water and water management align with expectations, or maybe come in slightly under. So matters have gone fairly smoothly. Some days go well; some don't, but we're meeting our targets and anticipate finishing mine development so that we can more or less reach our tonnage expectations for 2025.
Craig Hutchison
analystAll right. On the broader progress front, you're saying we're roughly 65% through the year to date — but could you walk us through how you actually get to that figure? I'd assume it blends dollars spent against your budget along with the milestones, yet with only about three or four months left before commissioning, I just want to gauge whether closing out the remaining 35% is genuinely doable across this final three-to-four-month stretch.
Dan Dickson
executiveSure, that's a reasonable question. Speaking in plain terms, if you take the 53% you had at the close of the first quarter, we're now effectively at 65%. That gap is consistently 12%. Apply that across the following two quarters and you arrive at 77%, or a move from 65% to 77%, which falls short of 90%. One item that won't be finished while we're commissioning — though it will likely be done a bit afterward — is ultimately our LNG and power generation plant. We experienced some permitting delays there. Diesel generators will carry us at the start of commissioning and possibly into commercial production. So in the end, we aren't on track for 100% at commissioning. As I mentioned, there are a few minor structures. A maintenance shop comes to mind — it will still be under construction during commissioning, and our expectation is that it will continue being built while we're in there. So don't think of it as reaching 100% completion before commissioning. It's probably closer to 85%–90% when we get there. Even when we move into commercial production, it isn't necessarily the case that we'll be at 100% complete either.
Craig Hutchison
analystAll right, that's excellent. I appreciate the background. Perhaps this is my final question. Regarding the commissioning happening by year-end, are you expecting to generate the first concentrate at that time, or does that slip further into early Q1 of next year? Thank you.
Dan Dickson
executiveYeah, that's getting fairly specific. I'd say most people would probably like to hear us say we expect some concentrate before the year is out, and that's roughly our expectation. Obviously, going from commissioning to commercial production depends on capacity and on making sure we hit our capacity numbers in order to declare commercial production, but of course some concentrate would be produced during commissioning. It's a question of how much and precisely when that timing lands.
Craig Hutchison
analystAll right, that's excellent. Well, I appreciate it, everyone, and best of luck.
Dan Dickson
executiveAppreciate those questions, Craig.
Operator
operatorHeiko Ihle from H.C. Wainwright has the next question. Go ahead, please.
Analyst
analystHi Dan, Case here from H.C. Wainwright. Heiko is on the road at the moment and wasn't able to join the question line, but thanks for fielding our questions.
Dan Dickson
executiveGlad to do that.
Analyst
analystRegarding the Terronera drawdown, specifically the remaining $45 million, could you share some insight into when you anticipate taking the rest of it? My assumption is that at least a portion of that amount will be required during this quarter.
Elizabeth Senez
executiveHello, Elizabeth Senez here. Yes, our plan is to draw down during this quarter.
Analyst
analystDo you have any sense of the size, or are you just figuring it out as you go?
Elizabeth Senez
executiveSure. It remains to be seen how that spending unfolds, though most of the construction outlay will land in what's left of this quarter. So yes, that's what we'd expect.
Analyst
analystAll right, thanks a lot. This is my second question and the final one, Dan. It might come across as somewhat philosophical, but as of right now you folks have obviously finished a substantial portion of Terronera. Could you perhaps share some detail with us regarding what went better, and maybe what went worse, throughout the construction phase, and possibly any line items that led the team to alter something connected to construction midway through?
Dan Dickson
executiveSure, that's a pretty broad question. I mean, on any given day some things seem to go more smoothly, and on other days things seem to go worse. And I think our operations group, or our construction group, has done an outstanding job of consistently figuring out backup options when necessary, or even third options, and examining alternatives, since clearly nothing follows a straight line and nothing turns out precisely the way you planned it. Nothing particular springs to mind regarding major shifts. It's simply the sequencing of various items where we make tweaks, whether from a concrete perspective. Clearly, the site footprint at Terronera is quite compact, and it requires considerable planning regarding when we move equipment in, because in the end we have a laydown area down in Puerto Vallarta, and typically items don't sit up at Terronera for more than 48 hours. So we refer to it as just-in-time construction, and some of that, some of the excellent engineering work we've completed, clearly the timing. We had some releases down at the tailings facility. It came later than anticipated purely because of some archaeological work that was required, geotechnical work. I think each day there are things the guys are making calls on that differ somewhat from what the plan says.
Dan Dickson
executiveI have to give Don Gray and his crew a lot of credit for how smoothly that has gone. I even consider the mine plan and the various versions of it, how we might be more efficient there, and we came up with seven separate, distinct mine plans — and that will keep shifting, because once we get into Terronera, we're getting into what is our reserve of 96 million ounces, and the best part of that reserve sits at the base, which is the target we're aiming for, and it's roughly 20 meters thick. It isn't that the ore body stops there. It's simply that our estimates stop there, given our level of confidence from drilling. As we move into that, hopefully we'll drill out further when we find additional depth, and that will alter our mine plans once more. So I believe our team has done a phenomenal job of staying flexible and adjusting as we go, but everything lines up, and once again, we're on track for commissioning in the fourth quarter.
Analyst
analystGreat, thanks a lot. That response was excellent. I appreciate it.
Dan Dickson
executiveThat's fine. Appreciate it, Case.
Operator
operatorTrevor Ward, a private investor, has the following question. You may proceed.
Trevor Ward
unknownHi Dan, and good morning to everyone. Clearly, this has been a pretty shocking day for individual investors. I'm something of a gambler, so a lot of my eggs are in one basket with Endeavour. When your stock price drops the way it has today, well, I'm personally down almost 33,000 on paper in a single day. Fortunately, since the last time we spoke, I'm actually up overall on my position. But as a layman, someone not well educated, particularly when it comes to buying and selling stocks, I'm just curious — I decided to get into silver. That said, I have bought and sold things over time. So if I manufacture something, like I make surfboards and things like that, if I make a surfboard and, let's say, for instance, with all my costs, it costs me $23 — obviously that's not relative, but say it costs me $23 after all my costs, and then I sell it for $29, I would say that I made $6. So maybe you can explain to me in layman's terms why you don't make the adjustments whereby it's easier for us to understand how you lose money if your overall costs are way less than what you sold the silver for.
Trevor Ward
unknownCould you break that down for me in plain language and explain where those additional expenses are coming from, and why this quarter's losses ended up so large? What I mean is, the market's overall consensus was a profit of $0.04 from you, yet with you posting a loss of $0.06, well, that's pretty devastating for investors. And then you mentioned being curious about why the market reacted the way it did. What I mean is, I get that the whole market is down today, but maybe you could shed a bit more light for me in plain language on how that adds up to such a big loss?
Dan Dickson
executiveYeah. That's a completely reasonable question, Trevor. And I think part of the answer—one of the things in the mining space—is that we discuss cash costs. We discuss all-in sustaining costs. Clearly, cash costs are sort of on an operating basis. All-in sustaining costs factor in G&A, which is our Vancouver cost, exploration dollars that we spend to increase and extend mine life, hopefully grow the mines, and then sustaining capital. And sustaining capital, clearly, from an income statement standpoint, doesn't hit earnings. And we always try to have this single metric that solves or distinguishes the company and allows peer groups to sort of compare themselves relatively quickly. And I think as an accountant by trade, you need a balance sheet, income statement, and a cash flow statement to fully understand what's actually happening with the company. Unfortunately, in the IFRS world or the accounting principles world, there's been a lot more noise that goes through an income statement now than there was before and makes it a lot more difficult for the layman's terms to understand what's going through an income statement and ultimately our financial statements. In our case, for this quarter, we have a $9 million loss related to derivatives.
Dan Dickson
executiveFor the Terronera credit facility, there's a requirement that we hedge 68,000 ounces of gold, and we locked that in at $2,325, I believe, on March 28th. Gold clearly went up over the quarter, which is terrific and a real long-term positive for Endeavour, but we do book a loss on those forward gold contracts of roughly $75 per ounce this quarter. That comes out to a $7.5 million derivatives loss, which has no effect on how we're running today and is plainly outside our control. As I mentioned, over the long run it's likely an advantage. Near term, it's a swing, a mark-to-market item. Gold right now sits close to 2,450. At other points in the quarter, it dropped to 2,325, 2,350. And it's possible that at the close of Q3, when we run through this with gold under 2,400 at that time, we book a gain on those derivative contracts. We also carry FX derivative contracts that flow through our income statement. Taken together, this creates noise, and it's what's behind our $14 million loss for the quarter. Once again, as a management team we view things on an adjusted basis — the items we can actually operate on — and our production costs, on the operating basis we aim for at both operations, came in at $13.43.
Dan Dickson
executiveThat leaves out depreciation. Depreciation, I believe, has to be factored in there — that gives you a total production cost per ounce, and for us that comes to roughly $22. That said, there are other items running through our income statement, and those represent investment in the company's future. We have our exploration properties. Exploration at Pitarrilla is one of the main examples that comes to mind. It ranks among the biggest undeveloped silver deposits anywhere in the world. That work doesn't get capitalized. It gets expensed through our income statement. Once again, that introduces noise, but in our view it delivers long-term value to our shareholders, given that we want to bring Pitarrilla into production. Once Terronera is complete — and plenty of work remains there — we believe that will pay off for shareholders over the long term. So naturally, today's roughly 20% drop is much bigger than what our peers saw, and that is the part we find puzzling, because we did release our production numbers, and those production numbers match expectations. Our Terronera construction — which is much of what people focus on when judging this company's future value — matches expectations.
Dan Dickson
executiveIt can be frustrating to see all that extra noise flowing through our income statement, and it does flow through it, but looking at our share price over just a single day is never something I like to do. So even if we're up 20%, that's a great day, but it doesn't mean as much unless you stack it together with one week, one month, one quarter, one year. So again, we wish it weren't down 20% today, which is roughly 15% higher than our peers. I think that will grind back. So stick with us, and I believe we'll be able to deliver on this going forward.
Trevor Ward
unknownAll right, yeah. But what about down the road, then? How many additional derivatives are there? Not that I truly grasp what derivatives actually are, but looking ahead, how much more of this can you still permit for that? I mean, how can we be sure that in the third quarter and the fourth quarter, you don't have all these other derivatives piling up that will lead to losses in later quarters?
Dan Dickson
executiveYeah. And they'll be present. So the 68,000-ounce gold contracts we plan to sell will effectively unwind across 2025 and 2026. So those will be there. If the gold price keeps rising and we see gold at $2,800, I think you'd agree that's a positive for the company over the long term. Ultimately, if it declines, and then a positive for the company over the long term, but ultimately it will generate losses running through our income statement until those unwind. If it moves the other direction, it will generate gains on it. So they will be there. Again, from a layman's standpoint, I'd say they're non-cash items. That doesn't mean we're losing cash off our balance sheet. It means we're recognizing a decision we had to make through a credit facility that lost now or in the future. Under IFRS, we're required to do that on a mark-to-market basis, and that's fine. Again, it unwinds over the next two years, and so I can't promise it won't be there.
Trevor Ward
unknownOkay, okay. So, let’s pause the timing. Fine. Appreciate it. Best wishes.
Dan Dickson
executiveAppreciate the questions there, Trevor.
Trevor Ward
unknownAppreciate it, my friend. Take care.
Operator
operatorIf you'd like to ask something, just press star followed by one again. Our next question is from a private investor, Henry Westendorp. Go right ahead.
Henry Westendorp
unknownMorning. Quite an interesting call. Terronera has all of us pretty excited, but could you say a few words about how Pitarrilla has progressed this year? Is anything happening there, or is it basically sitting on the bench until Terronera is up and running?
Dan Dickson
executiveCorrect, it is advancing. For 2024 we have a $5 million budget allocated at Pitarrilla. Drilling is now underway there. At the start of the year we had a 1-kilometer adit, and we have since extended it. We expect it to cut through some veins and a manto zone during the back half of this year, roughly speaking. That should give us results and a plan we can bring to the market, hopefully before this year is out. We are enthusiastic about it. Clearly, it ranks among the largest undeveloped silver deposits anywhere in the world. Its resource comes to close to 600 million ounces of silver, along with lead and zinc. Our approach is an underground one. We are underground miners. I know that Pitarrilla, and many people in the marketplace are aware of this, was shown to be an open-pit mine in a historical feasibility study completed by Silver Standard or SSR Mining. Once again, our approach is an underground one. I have just begun drilling to confirm certain hypotheses we hold regarding feeder structures and mantos and, once again, we expect to have information released on that by the end of the year.
Henry Westendorp
unknownThat is fantastic. I appreciate it.
Dan Dickson
executiveAppreciate that question, Henry.
Operator
operatorThat brings the Q&A portion to a close. I'd like to hand the conference back to Dan Dickson for any closing remarks. Please go ahead.
Dan Dickson
executiveThanks, operator, and thanks to everyone for tuning in today. To me, Q3 in the latter portion of this year should be an exciting stretch for Endeavour. We're working to get Terronera commissioned and, in the end, into commercial production, which would substantially lift our output profile and, ultimately, lower our cost structure. So once more, thanks for listening, and I hope we'll speak with you all before long.
Operator
operatorThat wraps up today's conference call. You can go ahead and disconnect your lines now. Thanks for joining us, and enjoy the rest of your day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Endeavour Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Endeavour Silver Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Silver Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.