Endeavour Silver Corp. (EDR) Earnings Call Transcript & Summary

May 7, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 26 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone being on the line. I'm the conference operator, and I'd like to welcome you to the Endeavour Silver conference call covering financial results for the first quarter of 2026. Please note that everyone joining is in listen-only mode, and this conference is being recorded. Following the presentation, we'll open things up so you can ask questions. If you'd like to enter the question queue, press star and then one on your telephone keypad. And if you require assistance at any point during the call, you can reach an operator by pressing star and then zero. At this time, I'll hand the conference over to Allison Tedford, Vice President, Investor Relations. Please go ahead.

Allison Pettit

executive
#2

Thanks, operator, and good morning to all of you. Ahead of beginning, I'd ask everyone to look at our MD&A for the cautionary language about forward-looking statements and the risk factors tied to those statements. Both our MD&A and our financial statements can be found on our website at edrsilver.com. Joining us on today's call are Dan Dickson, Endeavour Silver's CEO, Elizabeth Senez, our CFO, and Luis Castro, Endeavour's COO. After Dan gives his formal remarks, we'll open up the call for questions. Dan, over to you.

Dan Dickson

executive
#3

Thanks, Allison, and hello everyone. For the first quarter of 2026, Endeavour Silver posted outstanding results, with records set in production as well as revenue. That robust performance produced considerable cash flow, which highlights the company's impressive growth path. Since the Kolpa plant expansion is now largely finished and Terronera is running close to its designed expectations, we're moving into an exciting period for the company, and we look forward to carrying this momentum forward as the year goes on. During Q1, Endeavour generated just under 2 million ounces of silver along with 12,000 ounces of gold, and with base metals included, that came to 3 million silver equivalent ounces. That's a 78% rise over Q1 2025, thanks to the additions of Kolpa and Terronera. Revenue came in at $210 million, up 230% from the prior year, alongside cost of sales of $116 million, mine operating earnings of $94 million, and mine operating cash flow before taxes of $115 million — a 400% increase from Q1 2025. Our all-in sustaining costs, net of by-product credits, stood at $37 this quarter. That's a 51% increase versus Q1 2025, a period when Kolpa and Terronera were not yet part of Endeavour's production portfolio. It's also worth noting that these costs came in 9% lower than Q4 2025, mainly because of the ramp-up of operations at Terronera, with efficiencies gained over the course of the quarter, and we expect these costs to come down further as we keep optimizing operations through the year and capital expenditures return to normal levels.

Dan Dickson

executive
#4

For the first quarter, Endeavour posted adjusted net earnings of $59 million, equal to 21 cents in adjusted earnings per share. Direct operating costs per tonne and direct costs per tonne both came in high this quarter. To make clear what these costs mean, direct operating costs per tonne take in direct input costs tied to mining, milling, and site-level G&A. When we refer to direct costs per tonne, that covers royalties, mining duties, and buying third-party material. Metal price movements affect our direct costs per tonne significantly. As an illustration, with a $1 rise in silver, cost per tonne goes up roughly 90 cents at Terronera, $3.80 at Guanaceví, and 50 cents at Kolpa, clearly reflecting higher royalties, mining duties, third purchase costs, and federally required profit sharing. Our direct operating costs per tonne climbed 30% in Q1 versus Q1 last year, driven by adding Kolpa and Terronera to our portfolio. Both assets had higher operating costs in Q1 than we anticipate going forward. In the first quarter, Kolpa installed and commissioned a new three-stage crusher and ball mill, lifting plant capacity above 2,500 tonnes per day. Some additional plant expansion expenditures remain; however, these will fade as we move through 2026, and we expect cost metrics to show benefits beginning this quarter.

Dan Dickson

executive
#5

In Peru, we have been feeling strain when it comes to bringing in and keeping skilled workers, which has affected labor costs, training costs, and overall efficiencies. We anticipate this will persist, though the extra expenses will be offset by efficiencies from operations that are updated and expanded. At Terronera, operations are at an early stage. During Q1, we underwent a major shift from a construction and startup team to an operations team, adjusting and reducing personnel. Mine and plant metrics have improved steadily through ongoing measurement, review, and adjustments. As the operation settles into a consistent day-to-day rhythm, cost efficiencies are expected. With one-time capital investments finishing in the first half of the year, we expect operating cost metrics to come down. With higher ore grades anticipated in the second half, we also expect meaningful improvements on a cost per ounce basis. Exploration drilling has restarted at Terronera, and we expect to provide an update later this quarter. I should mention that we have not yet transitioned our power generation to the LNG plant, but expect to before the end of this quarter. We hold the necessary authorizations and intend to commission the LNG vaporization plant this month. At Guanaceví, cash flows exceeded $20 million this quarter. The mine saw higher operating costs per tonne, largely because of lower throughput, with small increases in our absolute costs.

Dan Dickson

executive
#6

From an operational standpoint, royalties, purchased ore, mining duties, and the profit share make up a substantial portion of that cost structure, so we did see increases there. Step-out drilling is now underway, and we also expect to share results later this quarter. As of March 31st, cash stood at more than $232 million, while working capital came in above $173 million, giving us a solid and stable base to drive our ongoing initiatives. We remain committed to moving progress forward at Pitarrilla, where consistent investment in exploration, studies, and economic evaluation keeps advancing, and we expect to deliver an economic evaluation in the third quarter. To close, our strong financial footing, the successful expansion of the Kolpa plant, and the steady improvements at Terronera have placed Endeavour in an excellent position to hit our production targets this year. These achievements reflect our unwavering focus on operational excellence and our continued dedication to delivering long-term value for our shareholders. I want to thank everyone for their continued support and engagement, and with that, I'm happy to open things up to questions. Operator, let's move on to the Q&A session.

Operator

operator
#7

Thanks. If you'd like to get into the question queue, you can hit star, then one on your phone's keypad. A tone will sound to confirm your request. Should you be on a speakerphone, lift your handset before you press any keys. To pull your question, press star, then two. Our first question is from Heiko Ihle at H.C. Wainwright. Go ahead. Hi team, Keis Bonzurn here, covering for Heiko, who's on a flight at the moment. Thanks for taking our call.

Dan Dickson

executive
#8

Glad to take the call. Thanks. Sure thing. On the first question about the grade step-up at Terronera — next week we'll be midway through Q2. Do you have any observations on what you've been seeing with grades on site over that stretch? Q1 and Q2 grades are fairly comparable. For Q2, we're expecting a modest increase over Q1. The genuine step-up in grade, though, comes in the back half — Q3 and on into Q4. Great, thanks. Second question, perhaps somewhat philosophical: as Terronera nears nameplate capacity, could you discuss what you observed and learned through the ramp-up that might prove helpful as you bring other assets into production? And as a bit of an added incentive for that, is there anything you now expect to add to the Pitarrilla feasibility study that a year ago you wouldn't have anticipated? How much time do you have for the things we learned over the course of the Terronera build-out? As an organization, I believe this is our first build from scratch, and there's plenty of learning in it. A lot of that we can apply — in fact, during Q4 and into Q1, we did a post-mortem, or post-review, of the construction covering things we can improve, and we can carry that over to Pitarrilla.

Dan Dickson

executive
#9

Continuity matters a great deal, clearly, and Don Gray retired during this year; Luis Castro took his place, and Luis has 21 years of service with the company. Plenty of the people still here were part of building Terronera. Should we be able to advance Pitarrilla on the schedule we believe applies, with construction beginning at some point in 2027, we would gain from the processes, protocols and procedures that Terronera puts in place. In my view those will be stronger as we go forward, and as a company we are simply in a much better position to undertake a second build, so to speak. We're well positioned. The largest piece of that is really grasping all of the permits that were needed. As we proceeded, we initially secured our MIA at Terronera around 2015, 2016. Pitarrilla already holds its MIA. A number of additional permits are needed in connection with that MIA, particularly for the tailings storage facility, and we are working through that process, aiming to secure it by Q1 of next year. Beyond all of that, there are roughly 100 and another 30-some-odd permits that you figure out how to work through and how to navigate with the government.

Dan Dickson

executive
#10

I believe we can pull that off much faster than was the case at Terronera. What we learned in terms of knowledge at Terronera has us excited, and we believe it can be put to use at Pitarrilla. As for the second part of your question, right now nothing new at Pitarrilla has come as a surprise. A great deal of work had already been completed. SSR had put in $145 million. They had completed a pre-feasibility study on an underground operation in '09. In their feasibility study that was 2012, they did considerable work on an open pit operation. We have now been examining this for 3 years, and so nothing over the last 6 months to 8 months has stood out to us as surprising. We have a solid sense of how the plant will look and what the mine's capacity is, and that will be disclosed in due course when we release, in effect, the feasibility study or 43 to 101 feasibility study later this year. Thank you so much. I'll hop back in the queue. Thank you for your questions.

Operator

operator
#11

If you'd like to ask something, just press star followed by one again. Our following question is from John Tumazos of John Tumazos Very Independent Research. Your line is open.

John Tumazos

analyst
#12

Congrats on the higher output and the cash pouring in and all of that good stuff. A few other firms down in Mexico have hit some rough patches. One outfit's plane got shot down a month back, and another had a really tragic event in January. You're running operations in at least 4 sites. Is there some special formula behind how well you operate and your strong security record?

Dan Dickson

executive
#13

I get

John Tumazos

analyst
#14

He's asking why certain regions of Mexico perform so much stronger than others.

Dan Dickson

executive
#15

So that's really the detail behind it: certain regions of Mexico are safer than others. That doesn't mean we've been problem-free. Back in February, a code red was declared in the state of Jalisco after a cartel captain was killed, and then on the Sunday after that, blockades went up across 22 different states. Puerto Vallarta, along with the state of Jalisco and the area surrounding Puerto Vallarta, was hit hard, with highways blocked. There were some unfortunate incidents involving citizens, though by and large citizens weren't targeted. The point was to target the government, I suppose, to demonstrate that cartel's power. From our standpoint, it disrupted our supply chains, and we halted operations for 3 days so that any safety incidents could get to a hospital. As I said, it's not that we haven't been affected, but overall the areas where we operate haven't seen significant violence. We have a team, a security team, in place that gives us intelligence, and we make different decisions depending on what's going on in Mexico and in the various states.

Dan Dickson

executive
#16

To reiterate, we've operated at Guanaceví for two decades with extremely minimal disruption from all of that. In January we actually divested our Bolañitos operation, so we're no longer present in Guanajuato, and then in Jalisco, as I mentioned, we sit an hour and a half away from Puerto Vallarta, which is regarded as a highly safe region apart from that 2-day incident. Roughly 3 million Americans and Canadians travel to that region each year, and we're quite pleased to run operations there. We stay vigilant, keep listening closely, and work to grasp everything that's going on.

John Tumazos

analyst
#17

Do you see any cost differences across your sites because of logistics costs—for instance, where you might steer clear of a rough area or something along those lines?

Dan Dickson

executive
#18

There isn't really anything that stands out as significant. I remember back in '08 or '09, we made certain that we avoided passing through a particular town, and that tacked on roughly 35, 45 minutes of drive time on the way up to Guanaceví, which sat about 4 hours out. In the end, what we spend on security between Terronera and Guanaceví, and now at Kolpa as well, ends up being quite comparable. Many of the same protocols and procedures are being followed, so from a significance angle, I'd say no.

John Tumazos

analyst
#19

Thank you, and I'm sorry to be raising these questions at all, but certain matters are on investors' minds.

Dan Dickson

executive
#20

Yes, that's a completely reasonable thing to ask. Those come up frequently when we sit down with investors, and I'm glad to address them.

John Tumazos

analyst
#21

I appreciate that.

Operator

operator
#22

Soundarya Iyer from B. Riley has the next question. Go ahead, please.

Soundarya Iyer

analyst
#23

Hey team, nice work this quarter. I was tied up on a different call, so I'm not sure whether this has already been asked, but regarding Guanaceví, grades have dropped quite a bit compared with a year ago. Purchases of third-party material are also up by nearly 1/3. When would the economics of that ore shift and begin to dilute margins to the point where we halt third-party ore buying, or do we keep it up?

Dan Dickson

executive
#24

Higher prices, of course, let us target lower-grade rock. The nice part is that we've now been mining at Guanaceví for 20 years, and in the older sections of the mine—North Porvenir, plus what we call Santa Cruz, South, and Central Porvenir—there's material that was left in place that would have graded 200, 225, maybe even 250 g silver equivalent, and you can go back in and extract it. When prices rise, your cutoff grades fall. A few of the grades we're currently taking out—we had 275 g—come more from the depth at El Curso, which sits on Frisco ground, and we also pay a substantial royalty there. As the year progresses, we'll be moving into an area named Milache, which we control 100%. We have a zone close to Porvenir Dos, which we mined back in 2015. We've been working in that area. Part of it is on Frisco's ground, and part is on ours. Naturally, as a management team, we're constantly reviewing grades and cutoff grades, and ultimately margins. Provided that Guanaceví keeps generating a profit—and as I mentioned, we produced more than $20 million of free cash flow there this quarter—we'll keep operating it.

Dan Dickson

executive
#25

At the moment, our reserve base isn't very large. We believe we can make it through 2027 and possibly 2028, and likely stretch beyond that. That analysis is underway. We've begun drilling in several areas, we've started returning to other areas to expand our resources. By the end of the year, we'll have a plan in place covering how much additional time we'll operate at Guanaceví, and I suspect we can keep going there for quite a while, particularly with prices at these levels.

Soundarya Iyer

analyst
#26

Understood — that’s very clear. Just one more question on the Pitarrilla FS. Is the target still 3Q 2026? Since the spend — the $1.8 million spent in 1Q — was fairly low. How do we—

Dan Dickson

executive
#27

We took on quite a few commitments. Our spending in Q1 came in somewhat below what we had anticipated, though we've begun to move that effort forward. We're likely to be a handful of weeks behind — not by any significant margin. We're still aiming for Q3 of 2026. It may turn out to fall more in the latter part of Q3 than the earlier part of Q3, but we'll see how everything develops over the coming couple of months.

Soundarya Iyer

analyst
#28

That's excellent. Thank you. I appreciate you answering my questions.

Dan Dickson

executive
#29

I appreciate the questions.

Operator

operator
#30

Craig Stanley from Raymond James has our next question. You're up.

Craig Stanley

analyst
#31

Thanks. Appreciate you fitting me in, everyone. I believe you said grades at Terronera should improve somewhat during this year's second half. Will La Luz be part of your mining plans?

Dan Dickson

executive
#32

Craig, those are good questions. Right now we are in fact drilling at La Luz. As you likely are aware, it holds roughly 200,000 — 150,000 to 250,000 tonnes within our mine plan, the feasibility mine plan. At present we are doing a bit of drilling at depth so that we can arrive at a more efficient mine plan, simply given the scale, and we are trying to work that out. We pulled the rigs out. During the past quarter we were drilling Terronera, and now that we have assays those rigs are heading back to La Luz. We will probably keep drilling La Luz until mid-year, and after that begin putting together a mine plan for it. My suspicion, given how things are progressing at Terronera, is that La Luz will be pushed to Q1 or Q2 of next year. Again, drill results from Terronera will be out before this quarter ends, and possibly some from La Luz too.

Craig Stanley

analyst
#33

All right. So on Pitarrilla, were you saying that you're kind of hoping the final permits come through in the first half of next year, and that construction would then begin later in 2027?

Dan Dickson

executive
#34

At the end of the day, we have a pretty solid understanding, given what Pitarrilla is and the resources present in those underground sulfide resources that we would be extracting from an underground operation. My sense is the economic evaluation won't be dramatically different from what we've known historically. The real gating factor is the permit for constructing the tailings storage facility, which will be a dry stack facility. We've had ongoing discussions with the authorities about it, and we're hopeful we can work through that fairly quickly. Earlier in the year, we figured perhaps Q1 2027 was when we could secure that permit. Permit approvals in Mexico still appear to be sticky. We've heard many of our peers anticipating permits in Q1, and that never materialized. After that it was supposed to be early Q2, and we're nearly halfway through Q2. I'm becoming somewhat nervous about timelines regarding permits, simply because we haven't witnessed the floodgates open, so to speak. That was our target, and then if we could begin building next year, that would be excellent. At present, we are still moving ahead with our construction camp this year.

Dan Dickson

executive
#35

Our eventual target is 800 beds. At the outset, I believe we're installing somewhat fewer than that — somewhere around 250 to 300 beds. We continue taking steps to acquire mobile equipment as well as plant equipment, and we're able to carry out both the basic and the detailed engineering correctly on the plant side. We're still moving forward, though the decisive factor for the construction decision is that tailings dam permit.

Craig Stanley

analyst
#36

All right, one final item from me: when you're meeting with institutional investors, does M&A surface more often with Endeavour Silver viewed as a possible target? Because looking across the silver sector, plenty of those companies carry far bigger market caps — Pan American, Coeur, Hecla, First Majestic — and after that it falls away pretty sharply. You sit in that middle tier, before you reach the genuinely smaller producers. I'm just curious, now that Terronera has ramped up, is that topic coming up again more in conversations with clients?

Dan Dickson

executive
#37

When investors ask what our growth plan is, the answer is that we aim to become a senior silver producer. Terronera has indeed ramped up and is meeting the criteria all through the plant. Once those grades genuinely begin showing up and we bring our costs down to where we expect them, I believe our shares hold considerably more value. That value is what we intend to build into our shares. At the end of the day, our management team is fairly young. We remain quite hungry to expand and to find opportunities. Never say never, but the space is so small that only a handful of people can realistically look at us, and only a handful of things are available for us to look at. Our corporate development guy is pretty good. Some days he works hard. He's sitting right in front of me, and we are constantly reviewing things and trying to work out the right combination for Endeavour.

Craig Stanley

analyst
#38

Okay, thanks.

Dan Dickson

executive
#39

Sure thing — I appreciate the questions, Craig.

Operator

operator
#40

Our next question comes from Soundarya Iyer at B. Riley. You have the floor.

Soundarya Iyer

analyst
#41

Thanks, Dan. Sorry to jump in with one more question. I'm just curious about the capital allocation piece. You've got $250 million in cash, and then this has been a record operating cash flow. How are you thinking about dividends or buybacks? Not this year, perhaps, but down the road?

Dan Dickson

executive
#42

That is a reasonable question. As far as we are concerned, we remain in a growth phase. We are genuinely enthusiastic about what Pitarrilla offers us. Once a feasibility study is released in Q3, I believe the market will grasp that. Construction there will require roughly $500 to $600 million. Should we continue producing cash at the current pace, a substantial portion of that amount will be reflected on our balance sheet by year-end, and then naturally cash flows into 2027. Only when Pitarrilla has been constructed, is running, and is generating its own cash flow would we likely begin considering dividends or share buybacks. Right now, we believe the return Pitarrilla can deliver will prove highly valuable to our shareholders, and that is precisely what the cash we are generating will go toward.

Soundarya Iyer

analyst
#43

Appreciate that context. Thanks, and enjoy the rest of your day, everyone.

Operator

operator
#44

That wraps up the Q&A portion. I'd now like to hand the conference back to Dan Dickson for any closing remarks. Please go ahead.

Dan Dickson

executive
#45

Thank you, operator, and thanks to everyone listening in today. In my view, Q1 was a solid quarter for Endeavour, though we still expect more as we move toward the latter part of the year. As we've said, grades at Terronera ought to improve during the second half of the year, Kolpa will be running near 2,500 tonnes per day, and we'll find better rhythm at Guanaceví, Terronera, and Kolpa. In the end, we anticipate a very strong next three quarters, and particularly the second half of the year. We're excited about what we have, we're excited about where we're headed, and I'm looking forward to releasing a feasibility study on Pitarrilla in the second half of the year too. Thanks for joining us today.

Operator

operator
#46

That concludes the conference call for today. Your lines can now be disconnected. We appreciate your participation, and we hope you have a pleasant day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Endeavour Silver Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Endeavour Silver Corp. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Endeavour Silver Corp. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.