Enlight Renewable Energy Ltd (ENLT) Earnings Call Transcript & Summary
February 26, 2024
Earnings Call Speaker Segments
Operator
operatorGood day, and thank you for standing by. Welcome to the Enlight Renewable Energy Fourth Quarter and Year-End 2023 Financial Results Conference Call. [Operator Instructions] Please be advised that today's conference is recorded. I would now like to hand the conference over to your speaker today, Yosef Lefkovitz. Please go ahead.
Yosef Lefkovitz
executiveThank you, operator. Good morning, everyone, and thank you for joining our fourth quarter and full year 2023 earnings conference call for Enlight Renewable Energy. Before beginning this call, I would like to draw participants' attention to the following. Certain statements made on the call today, including but not limited to statements regarding business strategy and plans, our project portfolio, market opportunity, utility demand and potential growth, discussions with commercial counterparties and financing sources, pricing trends from materials, progress of company projects, including anticipated timing of related approvals and project completion and anticipated production delays, expected impact from various regulatory developments, completion of development, the potential impact of the current conflict in Israel on our operations. And financial condition and company actions designed to mitigate such impact, expected changes in Clenera's leadership and the company's future financial and operational results and guidance, including revenue and EBITDA, are forward-looking statements within the meaning of U.S. federal securities law, which reflects management's best judgment based on currently available information. We referenced certain project metrics on this earnings call and additional information about such metrics can be found in our earnings release. These statements involve risks and uncertainties that may cause actual results to differ from our expectations. Please refer to our 2022 annual report filed with the SEC on March 30, 2023, and other filings for more information on the specific factors that could cause actual results to differ materially from our forward-looking statements. Although we believe these expectations are reasonable, we undertake no obligation to revise any statements to reflect changes that occur after this call. Additionally, non-IFRS financial measures may be discussed on the call. These non-IFRS measures should be considered in addition to and not as a substitute for or an isolation from our results prepared in accordance with IFRS. Reconciliations to the most directly comparable IFRS financial measures are available in the earnings release, the earnings presentation for today's earnings call which are posted on our Investor Relations web page. With me this morning are Gilad Yavetz, CEO and Co-Founder of Enlight; Nir Yehuda, CFO of Enlight; Jason Ellsworth CEO and Co-Founder of Clenera; and Adam Pishl, COO and Co-Founder of Clenera. Gilad will provide some opening remarks, and we'll then turn the call over to Jason and Adam for a review of our U.S. activity and then to Nir for our review of our fourth quarter and full year results. Our executive team will then be available to answer your questions.
Gilad Yavetz
executiveThank you all for joining us today for Enlight's Fourth Quarter and Full Year 2023 Earnings Call. In 2023, we continue to deliver on the Enlight story, above market growth and above-market project returns. Moreover, we built the necessary foundation to take the next major step in 2024 and beyond. Enlight is now on the cusp of another major expansion as we begin the construction of several flagship solar and storage projects, particularly in the United States. I will first review the important achievements we've made in 2023, and we'll then describe our outlook in 2024 and beyond. Let's start with our strong full year 2023 financial results. Revenue for the whole of 2023 grew 33% over last year to $256 million. Net income grew 157% to $98 million and adjusted EBITDA grew 45% to $189 million annually. We also saw significant growth in our operating cash flow, which reached $150 million for the full year, an increase of 66% over '22. In the fourth quarter, revenue grew 21% over last year to $74 million. Net income grew 48% to $16 million, and adjusted EBITDA grew 8% to $47 million. Overall, we delivered strong growth and profitability in 2023 even amidst a challenging macroeconomic backdrop. Driving the growth in our financial parameter was our project's addition. In 2023, we connected over 480 megawatts across Israel, Europe and the U.S., a growth of 33%. This included Genesis Wind in Israel and Apex Solar in the U.S., while we also ramped up production at Björnberget in Sweden. As of today, we have 1.9 gigawatts of operational duration as well as our first operational storage project with a capacity of 277-megawatt hours. This result testifies to the strength and resilience of Enlight geography and technology diversification, combined with our developers plus IPP model. As a result, we benefit from recurring and growing income from our IPP, while our greenfield development activity fuels continued growth at high returns. In 2023, we also saw a rapidly improving outlook for electricity demand. Electricity demand is rising in the U.S. for the first time in 2 decades, driving increased PPA pricing. Moreover, equipment costs have come down significantly, while the cost of finance is now in decline. As a result, we expect to see continued demand for our projects at attractive returns. We demonstrated that in 2023 by successfully amended PPA pricing upwards from over 1.8 gigawatts by an average of 25%, while signing new PPAs at even higher levels. Our pipeline of large-scale projects and competitive access to the grid allows us to continue to capitalize on the need for electricity with favorable prices. At the same time, panel and battery pricing fell considerably throughout the year. These trends have continued to consolidate in the fourth quarter. Higher PPA pricing and lower construction costs contributed to the improving project returns, which we expect to reach 10% on an unlevered basis for project reaching COD between 2024 and 2026. On top of that, in the fourth quarter, we saw nearly 70 basis points decline in interest rates. When overlaying this with our unlevered project returns of 10%, we can generate average levered equity IRR in the mid- to high teens and, in some cases, even higher. In 2023, we also continued to convert additions to our mature portfolio. Our greenfield development team converted 871 megawatts and 2.7 gigawatt hours from our large development pipeline into Mature Projects. The additions included several major flagship projects in the United States, such as Roadrunner and Country Acres, which will commence construction in 2024. And finally, substantial financing is required to sustain and accelerate such growth. And in 2023, we successfully raised capital from a diverse set of sources. Given the constrained financing environment, this constitutes a notable achievement. We raised $271 million in equity through an IPO on the NASDAQ at the start of the year and secured over $0.5 billion in project finance and tax equity. Also important was the completion of our first asset sell-down in the U.S. and some sell-downs in Israel totaling $19 million. While this initial disposal were small, this set the precedent for sell-downs to become an increasingly important source of funds in the future. To sum up, 2023 was the year in which Enlight delivered on its above-market growth and above-market returns story. We secured various sources of financing, expanded the portfolio of projects to be built in the near term and improved future project returns, all amid a challenging macroeconomic environment. Looking to 2024, we forecast further revenue growth and profitability. We expect to add 543 megawatts of generation and 1.6 gigawatt hours of energy storage to our operational assets, among them, Atrisco project in the U.S. This represents our major move into energy storage with 580% growth in this segment. Moreover, we expect to commence construction on upwards of 1 gigawatt and 2.9 gigawatt hours of capacity in 2024, which reflects an over 55% increase on our current operational generation and 1,040% increase on our operational storage. This includes major projects such as Roadrunner, Country Acres and Quail Ranch in the U.S., Gecama Hybrid in Spain and several standalone storage projects in Israel and Italy. In total, including Atrisco, these projects are expected to generate $307 million in revenue and $221 million in EBITDA in their first full year of operation. This is a massive step in the growth of the company and therefore, execution on this project is our highest priority. These new builds will also help diversify Enlight current geographical mix, introducing significant U.S. exposure while adding a major element of solar and storage to our technological mix, which is largely wind today. In 2024, we also expect to convert more of our large development pipeline into Mature Projects. Examples of this include our unique portfolio of solar and storage in PJM in the U.S., totaling 1.4 gigawatts and 2.2 gigawatt hours of storage. This project which benefit from exceeding the lower interconnection costs, has been moved to PJM interconnection fast track, significantly easing the repairs to further development. In addition, we have additional large-scale solar and storage projects across the Western U.S. and wind projects in Europe that are approaching maturity. The depth and breadth of our development pipeline is a strategic resource for Enlight with 15 gigawatts and 25 gigawatt hours of storage of potential. It ensures that we maintain a sizable buffer of imminently available mature projects in which we can work. Finally, it is important for me to stress that with the capital we raised last year, we have all the equity needed to fund 2024 activity. We will have to secure significant product finance commitments. However, the success in raising project finance during 2023 provides us with confidence that we will achieve this. With macroeconomic conditions now more settled, our all-in interest rate for project finance now stands at 5.25% to 5.75%. In 2024, we also plan to execute large asset sell-down, either of minority or majority stakes in the U.S. project, further underpinning the company's financial position. As Enlight continues to grow, our ability to self finance also gathered steam and larger IPP provides more operating cash flow, while additional conversion of project increases the potential for sell-downs. Both these represent sources and funds for future growth and when combined with our extensive pipeline of developing projects, provide a path for growth without the need for external capital. Turning to our 2024 guidance. We expect revenues between $335 million and $360 million, 36% higher than in 2023 at the midpoint and adjusted EBITDA between $235 million and $255 million, 30% above that of 2023 at the midpoint. Growth continues to be robust as we add new projects to our operational portfolio. Nir will describe in detail the assumptions that underlie this guidance later in the call. To tie it all together, in 2024, Enlight will harness its resources to grow considerably in all markets, but especially in the U.S. And as before, we aim to continue delivering on our twofold objective, above market growth and above market project returns. Before handing the call over to Jason for his remarks. I'd like to comment on the Clenera leadership transition we announced in January. After more than 10 years the CEO of Clenera, Jason accepted a call from the Church of Jesus Christ of Latter-day Saints to serve as a full-time mission President in Chile. He will leave his post with Clenera at the end of June. Clenera's COO and Co-Founder, Adam Pishl will assumed the role of CEO. Adam is an amazing leader and responsible for building Clenera beside Jason during the last 10 years. We anticipate a smooth transition over the next 6 months as Adam and the amazing Clenera leadership team remain and continue to move the company and its project forward. I thank Jason for his leadership and expertise in creating and cultivating Clenera. His vision, leadership and tireless work coupled with its talented and dedicated propel the company to make a huge impact on the U.S. renewable market. Adam has always been a big part of Clenera success, and I'm fully confident in his skills, experience and leadership and his ability to take Clenera to the next level, which we, at Enlight, shall continue to support and accelerate. Jason?
Jason Ellsworth
executiveThank you, Gilad. I will certainly miss working with you and the rest of our amazing team at Enlight and Clenera. Regarding our U.S. business, 2023 was foundational. And in 2024, we expect to launch from that foundation into a period of significant growth. During 2023, we successfully completed Apex Solar, a 106-megawatt project located outside Dillon Montana. Apex was the first project completed together by Enlight and Clenera in the U.S. We also made progress toward completing our Atrisco Solar project in New Mexico. As of today, equipment supporting the full 364 megawatts is installed and work is underway to finalize mechanical completion. Further, during the fourth quarter, we closed tax equity and debt financing on Atrisco Solar, raising $300 million of construction and term debt and $198 million in PTC tax equity. The transaction, which released $204 million of excess equity back to Enlight's balance sheet demonstrated our continued access to competitive project financing, including tax equity. We have reached a mutual resolution of a supplier matter on the 1.2 gigawatt hour battery storage portion of Atrisco, and now expect the solar site will reach COD in third quarter of '24 and the storage installation in fourth quarter of '24. Our overall project portfolio in the U.S. advanced steadily in 2023, with approximately 10 gigawatts through system impact study. We signed PPAs on 806 megawatts and 2 gigawatt hours that will enter construction in 2024. This includes Country Acres, a 392-megawatt and 688-megawatt hour project delivering to Sacramento Utility District in California. Roadrunner, a 294-megawatt and 940-megawatt hour facility contracted with AEPCO in Arizona and Quail Ranch, a 120-megawatt and 400-megawatt hour project that represents the second phase of our Atrisco facility in New Mexico and delivers to PNM. The full 806 megawatts and 2 gigawatt hours will start construction during 2024, launching a new phase of Clenera's expansion and growth in the U.S. In addition to advancing and constructing projects in the U.S., we improved returns by amending many of our existing PPAs. Over the past 18 months, our team successfully raised prices by an average of 25% on contracts covering 1.8 gigawatts of capacity, strong utility relationships and large-sized projects that are deliverable in the near term made these pricing negotiations possible. And as Gilad mentioned, we are also experiencing economic tailwinds by way of falling equipment prices. Since the beginning of 2023, we've seen our solar panel prices drop by approximately 25% and battery prices by more than 30%. We continue to focus on converting our early-stage development projects into mature projects. As an example in PJM, we are advancing a portfolio of projects totaling 1.4 gigawatts and 2.2 gigawatt hours capacity that have negligible interconnection costs, prices in the regions where these projects are being developed are high due to a growing appetite for renewable energy and limited availability of feasible interconnections. With final interconnection agreements expected by the end of 2024, we anticipate achieving attractive PPA terms on these assets. In the Western U.S., we continue to see significant utility demand for our solar and storage projects with power demand continuously on the rise our roughly 10 gigawatts portfolio of developing and Mature Projects, all with advanced interconnection puts us in prime position to meet rising demand with attractively priced generation. Finally, as previously announced, I will be stepping down from my position as Clenera's CEO at the end of June; Adam Pishl, Clenera's co-founder and current COO, will take my place. I'm supremely grateful for the years I've had to work with Gilad, Adam and the Clenera and Enlight teams. The company is an industry leader because the organization and its partners are comprised of what I consider to be the most dedicated, talented and genuinely good people in the business. Both Gilad and Adam are dear friends and trusted leaders. I'm excited to see all the great projects and exciting developments they deliver in coming years. Now I'll let Adam Pishl introduce himself and add some comments.
Adam Pishl
executiveThank you, Jason. Leading alongside Jason for nearly 2 decades has been an incredible journey. Together, we have built 3 renewable energy companies, developed hundreds of solar projects, and most importantly, have built an incredible team of professionals who are now leading Clenera into its greatest period of growth. While execution is our highest priority for 2024, Enlight and Clenera continue to invest in our growing development portfolio that will take us through the next decade and beyond. I am passionate about renewable energy, this incredible organization and our dedicated team and I'm excited about this expanded role. I am confident in our 2024 execution plan and look forward to sharing more of this developing growth story during future earnings calls. Thank you. And I'll now turn the call over to Nir.
Nir Yehuda
executiveThank you, Adam. In the fourth quarter of '23, the company's revenue increased to $74 million, up from $61 million last year, a growth rate of 21% year-over-year. Growth was mainly driven by new operational projects compared to last year, while being offset by a decline in revenue caused by much lower electricity prices in Spain relative to the prices observed in the same quarter last year. Since the fourth quarter of last year, project in the U.S., Hungary and Israel started selling electricity. The most important of this is Genesis Wind, which contributed $9 million to revenue. In addition, Björnberget which barely sold power in '22 contributed $6 million in this quarter. Gecama generated revenues approximately $14 million in revenue. However, its contribution fell 36% year-over-year due to much lower Spanish power prices compared to Q4 '22 and relative to expected prices in Q4 '23. We sold power in Spain at an average price of EUR 50 per megawatt this quarter versus EUR 115 per megawatt in the same period last year. In addition, we were impacted by the slower-than-expected ramp-up in production at Genesis Wind and the Israel Solar + Storage cluster. Fourth quarter net income increased to $16 million, a growth rate of 48% year-over-year. Three noncash items this quarter, a mark-to-market loss related to interest rate hedges on the financial growth project at Atrisco storage of $8 million, gains related to the reduction in expected earnout payments linked to the acquisition of Clenera of $12 million and a loss of $5 million due to the impact of Israeli Shekel volatility on foreign currency liabilities. These figures are all net of tax. In the fourth quarter of '23, the company adjusted EBITDA grew by 8% to $47 million compared to $43 million for the same period in '22. Aside from the positive factor which affected our revenues growth, the year-over-year decline in revenues at Gecama as well as slower-than-expected ramp-up at project in Israel and $3 million increase in overhead resulted in lower profit margin and slower growth in adjusted EBITDA year-over-year. We recorded $2 million as final payment recognized from the sell down of Faraday completed last quarter. Looking to our balance sheet. Enlight completed a large financing during this quarter with the closing of both Atrisco Solar in the U.S. and our Solar + Storage project in Israel. This was a combined $511 million in project finance, from which $325 million of excess equity capital will be cycled back to Enlight. This transaction strengthened our balance sheet and reinforce the financial footing needed to deliver the growth of our business in '24. To reiterate, no new equity capital is needed to deliver on our plans for this year. As of the date of today's report, we had $260 million of revolving credit facility at several Israeli bank. None of which have been drawn. This is $90 million above what we reported in our Q3 '23 results. Moving to '24 guidance. We expect annual revenues between $335 million to $360 million, with adjusted EBITDA between $235 million and $255 million. Of our total forecasted revenues, 40% are expected to be denominated in Israeli Shekel, 55% euro and 5% in U.S. dollar. Nothing, our last exposure to the Shekel and the current high degree of volatility in this currency, our guidance is predicated on the average annual exchange rate assumption of ILS 3.8 to the $1 and EUR 1.05 to the $1, which are lower than the current levels. In addition, 90% of our '24 generation output will be sold at fixed price either through hedges or PPA. Our guidance reflects annual growth of 36% and 30% at the midpoint compared to '23, respectively, demonstrating our accelerated growth back in '24 and the years ahead. I will now turn it over to the operator for questions.
Operator
operator[Operator Instructions] Your first question comes from the line of Justin Clare from ROTH MKM.
Justin Clare
analystSo first off here, you did mention plans to execute larger asset sell-downs in 2024. I was wondering if you could give us a sense for the possible magnitude of those sell-downs? How much equity capital you might be looking to raise? And what would be needed to support your 2025 development? And then the projects in the U.S. Quail Ranch, Roadrunner, Country Acres, are those projects that you're looking at for potentially selling minority interest?
Gilad Yavetz
executiveJustin. So first on the sell-down. So yes, as you said, part of our strategy is to perform some sell-downs on our very large portfolio that is maturing next year. So we intend to construct and hold the main project that we are going to construct next year, Country Acres, Roadrunner, Quail Ranch and other projects in Europe and Israel, but there is a potential for additional large sell-downs. Currently, in the current guidance that we provided to the market, we assumed total sell-down of $15 million but of course, the potential can be higher. And it's important to say, based on your second question is that we are already fully funded in terms of the equity ticket that we need to invest for all the growth that we are going to construct next year. So we are talking about roughly 900 megawatts of new project and 2.7 gigawatt hours of new storage projects, all are fully funded, and we do not have to perform any sell downs or any capital raise or debt raise in terms of the corporate in order to raise the equity. It is already in the company. So the effort in terms of finance will be more on the construction debt and the tax equity side, so project finance.
Justin Clare
analystGot it. Okay. Very helpful. And then you did secure a large number of PPA amendments in 2023, I was wondering what we could expect going forward here? Are there additional possible amendment for PPAs, for any of your projects that you're developing here? And then also just wondering on the general trend, we've seen a decline in module prices, battery prices. What are you seeing in terms of the PPA trend? Has that started to level off or potentially decline? Or is demand so high that things are potentially moving even higher here?
Gilad Yavetz
executiveYes. So I can start with an answer then, Jason, you can complement me on the U.S. market, if you like. So basically, what we are seeing overall in the different markets, but especially in the U.S., is that the PPA price curves are continuing to rise. Although natural gas prices have already normalized. This is because we see for the first time in 2 decades, a rise for the demand of electricity in the U.S. market. And we believe these are very positive conditions that will continue to fuel our growth in the coming years. Now that we have amended the majority of our PPAs preconstruction, we believe that the next PPA that we are going to sign are going to be new PPAs, I would say, materially, but the level of pricing in the new PPAs that we have signed recently, and we expect to sign the next year, we expect to maintain the higher level than in the past of around 25%. So again, reflecting higher level of electricity pricing and higher demand for electricity in the U.S. What we see in Europe is that electricity prices are continuing to normalize based on the historical peaks that were in the last 2 years. But still, as we said in previous discussions, the new norm of electricity prices after the decline is still very high comparing our levelized cost of electricity in our projects in wind or solar in Europe. And therefore, the returns are very high. So we expect electricity prices in Europe to continue and normalize on the level of 50 to 60. And this level is still a high level that reflects very good return for our project. Jason, if you want to complement me on the U.S.
Jason Ellsworth
executiveYou bet. Justin, great -- actually, Gilad answered this very well. We have a small number of PPAs that we are discussing potential price increases with. But as Gilad has noted, the emphasis is on the new pricing and of course we are seeing steady growth on the heels of dramatic growth in terms of demand and strong [indiscernible]. Some of what is advantaging the company is our interconnection position where we have project roughly 10 gigawatts through system impact study, projects that are advanced and mature and ready to deliver to utilities [indiscernible] where queues are clogged up and projects are behind schedule with competing [indiscernible] and therefore, giving us the opportunity to deliver at strong pricing. We see long term that this steady increase in demand here in the U.S., along with a limited supply capacity is driving prices incrementally higher year-over-year. So that's for the long term and we're experiencing that on the ground.
Justin Clare
analystGot it. Okay. Very helpful. Maybe just one more, curious on how you're positioned relative to securing the domestic content adder in the U.S., whether it's for the solar portion of a project or the storage part of a project. What's the time frame that we should be thinking about in terms of when that adder could be secured?
Gilad Yavetz
executiveJason, would you like to take this?
Jason Ellsworth
executiveYes, I'll take it. it's another great question. So each of these projects today is when Gilad and Nir are speaking of the economics on these project finance. None of those include domestic content adders as a basis for the [indiscernible] economics. All of that is considered to be upside. We are working carefully along the path of confirming [indiscernible] on a number of these projects, both in terms of storage as well as the overall PV side. Some of that does depend on the advances our suppliers make in terms of their production. And we are seeing that accelerate, but watching it carefully, and we're not getting out over the [indiscernible] there. We're making certain that -- that we're taking products from lines that are stable. The most [indiscernible] is making certain that we deliver on the projects on time and that those projects are producing [indiscernible] in the coming years. So we are carefully pursuing domestic content, but doing it in a way that supports the overall plan. Again, not included in our current forecast by way of revenues or EBITDA.
Gilad Yavetz
executiveJustin, just to reiterate that as the following to what Jason said, I think that we can now disclose that on Atrisco, we finally selected Tesla to build a battery supplier. And as Jason said, the assumption -- the current assumption for the project still is not assume tax equity adder. On the battery, however, we believe that there is a potential for that we will see in the future. So this is some upside that we believe that might be unlocked in the future.
Jason Ellsworth
executiveMaybe worth noting just quickly as well that we have been aggressive about capturing the community, especially community adder and have included that on a number of projects thus far. So that's nice upside to the numbers.
Operator
operatorYour next question comes from the line of Mark Strouse from JPMorgan.
Mark W. Strouse
analystGreat. I'd just like to start by thanking Jason for all of your help since prior to the IPO, and best of luck with your next chapter. Our questions, I think just kind of maybe one multipart question, if I can. The 4Q revenue shortfall, you mentioned kind of a slower ramp at Genesis Wind and the Israeli or the Israel cluster. Just checking, are those now fully ramped? And then on the next part with the 2024 guide, we didn't notice any major project pushouts, but the EBITDA guide is a little bit lower than what consensus expectations were. So just kind of seeing if you can bridge that gap between -- it sounds like asset sales might be part of that driver. Can you talk about any kind of conservatism that you're baking in projects ramping or FX, anything else that you think might be driving that?
Gilad Yavetz
executiveYes, thank you very much for the question. So for -- I would say just in general, in terms of our guidance and the general way we look at the market and the company right now, I would say that after 15 years and founding the company, I think that the conditions that right now we see in the market and also for the company are maybe the best condition we've seen. We are seeing a very nice and accelerated growth, but also based on scale and very high returns. So if you look at our presentation, you can see that the average unleveraged return of our projects for the whole next 3 years is around 10%, meaning that the leverage return, the IRR will be in the midst of the teens or maybe higher. I think this is very good, I would say, a number, especially for the large scale that we are going to build. And for the ones that we are entering into this year, and this is a large capacity of almost 1 giga of generation and almost 3 giga of energy storage. So we are talking about even a higher IRR. So first, yes, there was some shortfall in the fourth quarter, but we still grew 40% on average between the EBITDA and the revenue. And we are going to grow 35% next year. I think this kind of continuous growth will continue based on high returns. And based on that, we are very positive. On the EBITDA, there is no particular reason why the EBITDA is 30%. There is no trend. I would just like to point out that currently, a big portion of our revenue mix is coming from the wind projects in Europe that are partially based on merchant price forecasting and on a tax mechanism that we include in our cost of sales. So basically, it reflects -- the net price is reflected in the gross margin, but we see the gross price in the revenues and then the tax -- the price after tax in the EBITDA. So last year, since the electricity prices were dropped a little bit more rapidly. Also, the tax mechanism created a lower tax on the net electricity price that reflects -- is reflected in our EBITDA. You see that we were more or less like our forecast or I think in the mid of the forecast. But on the revenues, it came a little bit short. So I think that in terms of the growth of the company in the next year, we still see a very, very accelerated growth, based on, I think, high returns. In terms of the projects that are coming to operation and ramping up. So I would say that in the large wind farms and maybe also in solar, I think, on the broad terms across geographies, we still see some supply chain issues. I think that the big suppliers such as Siemens, General Electric and other suppliers are still struggling a little bit after the COVID-19 with their supply chain. And this caused our project performance to ramp up, I would say, in 3 or 4 quarters to the full capacity and the availability rather than 3 months or 3 to 6 months before. This is not affecting the overall return of the project, the multiyear return of the projects that is still forecasted to be very high. so -- or according to plan. So this is something that we will take into consideration in the project in the next few years until we see that supply chain is being, I would say, normalized across geographies.
Operator
operator[Operator Instructions] The question comes from the line of Maheep Mandloi from Mizuho.
David Benjamin
analystThis is David Benjamin in for Maheep Mandloi. I have a question on your strategy with tax equity transferability versus traditional tax equity. Can you talk a little bit about where you guys are now and where you see that trending over the next year?
Gilad Yavetz
executiveYosef will refer to that. Thank you, Maheep.
Yosef Lefkovitz
executiveYes. So thank you, David. What we're seeing in the market is the move towards traditional tax equity with credits being transferred through the bank's transfer desks. So the banks will come in and monetize the accelerated depreciation and some of the other attributes and the cash flow, obviously, in the pre-flip period. But what they will look to do is syndicate the transfers to Fortune 500 customers who the bank services elsewhere. Now what we think is important to emphasize is the move towards the transfer market will also accelerate the path to construction finance. While in the past, construction finance was predicated on full tax equity commitments, the ability for tax equity providers to use transfer and syndicate those credits will enable us to access construction capital earlier, and therefore, reduce the peak equity that we need for projects. I think that's where this is headed and the conversations we've had with the major banks.
Gilad Yavetz
executiveAnd just as in addition, I would say that I believe, because of the position of Enlight as a public company, and its positioning in the market is such that we feel that once there is a bottleneck in tax equity, in the market, players like Enlight get prioritized. So this is why we believe we were able to complete tax equity last year with Atrisco and based on favorable terms. In the future, I think that tax transferability will ease up a little bit of bottleneck but still player like us will be able to play between the traditional structure and the transferability. And it's important to say that once we sell down more assets and we generate more profit on the corporate level, we will be able to monetize these profits in terms of depreciation, also in the tax transferability structure, and thus, I would say, create also a good alternative in terms of our tax structure versus the regular or traditional tax equity. So I think that we are positioned very well today in the market to be able to select between the traditional structure and the new structure and be able to execute on the project on time based on that.
Operator
operator[Operator Instructions] Your next question comes from the line of David Paz from Wolfe.
David Paz
analystThank you. Good morning. A couple of quick questions. Just on the CO Bar interconnection issue, can you just -- sorry if you've disclosed this already, but provide an update on the timing and any further studies or anything else that's needed to achieve the 2026 COD?
Gilad Yavetz
executiveYes. So what I can say is that there is no change in our assumption or forecast for CO Bar. So we will start constructing CO Bar in '25 and believe that we reach COD by the end of '26 and the growth that we forecast for '24 and '25 is not based on that. So this will only, I would say, support the additional growth that is needed for '26. And of course, following that year. So no change in our forecast right now on CO Bar.
David Paz
analystOkay. And just for your other projects in the U.S. I think this interconnection issue was surprised if I recall correctly. Are there any other projects where we should be watching? Are you awaiting for any studies that could impact, I mean...
Gilad Yavetz
executiveYes, I think that we can point out to very good news that we received in our PJM portfolio. As you know, majority of the portfolio in the U.S. comes from the WECC states, but there were always areas of development in PJM and milestone. And recently, in the last quarter, we got very good, very positive milestones in PJM projects totaling more than 1 gigawatts of generation and around 2 gigawatt hour of storage with 5 projects getting into the fast track in terms of the interconnection queue and with network upgrades that are less than $5 million per project, which is a very, very good result for PJM. We believe that this potential that is unlocking in a new market for us, opens up a lot of alternatives for us either to go on and construct this project or maybe following our sell-down strategy to use that because of their high valuation and perform sell-downs to recycle equity into our growth in the West. So these are very, very good news that we got recently and is reflected in our presentation in Slide 14.
David Paz
analystYes, that's great. That actually was my last question related to that slide. Can you maybe just talk about the growth that you see beyond what you've laid out here? Are there other projects that are maybe in the advanced, I guess, the stage behind early stage? And in particular, just how are these arrangements, particularly with the data centers being -- how are you -- what do those look like in terms of the economics you're seeing? Do you directly contracted the -- like bilaterally with these data centers? How do you provide the service?
Yosef Lefkovitz
executiveSo David and then Jason, feel free to chime in afterwards. I think on the data center side, whether the demand is direct from the data center businesses or through the utilities that service them, we see massive demand through Virginia and broader PJM, but particularly in the Virginia region, which, as we know, is if not the biggest data center market in the world. The interconnection advantage that we've developed in PJM, particularly these projects in Virginia, gives us a unique opportunity to provide power to the AI data center massive growth and need for power that we're seeing, and that's putting us in the driver seat on terms and offtake. So whether that's ultimately sleeve through the utility or directly from the data center providers, we're in a very strong position on those projects. In addition, there are some other projects outside of PJM in the West Coast. We've got another major project in Arizona called Snowflake, which is another gigawatt interconnection. We've got a gigawatt interconnection in Pacific Northwest, which is uniquely positioned to serve the big data center markets in the Northwest, the Microsofts and Amazons of the world. So the portfolio is very well positioned to echo Jason's comments at the beginning to service the massive demand of electricity that we're seeing coming particularly from the data center market, but also broadly across the U.S. in the coming years.
Jason Ellsworth
executiveAnd I would note that in -- particularly in the West, we've been successful at maintaining a busbar PPA standard, and that's unique across our portfolio, and we'll continue to be a strength of the company, given our strong interconnection positions. So obviously delivering the busbar and all sleeve through utilities to date that [indiscernible] future, but we continue to find that as an effective way forward.
Operator
operatorThere are no further questions. I would like to hand back to you Yosef Lefkovitz for closing remarks.
Yosef Lefkovitz
executiveThank you, everybody, for your time today. We will be at the Bank of America Power and Utilities Conference in New York early next week, and we look forward to seeing many of you there. Thank you.
Operator
operatorThis concludes today's conference call. Thank you for participating. You may now disconnect.
This call discussed
For developers and AI pipelines
Programmatic access to Enlight Renewable Energy Ltd earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.