executiveGood morning, everyone, and welcome to Entra's first quarter presentation here in Oslo. As we always do, we'll begin with some highlights from the quarter. Rental income for this quarter is up by 32%, NOK 781 million compared with NOK 591 million in the same quarter last year. Net income from property management rose 17% to NOK 433 million. During the quarter, our external appraisers raised the property valuations by 3.6%, which leaves us with net value changes of NOK 3.146 billion for the quarter. Profit before tax came to NOK 3.583 billion. Net letting in the quarter was negative, at NOK 17 million. I'll come back to some more details on that a bit later. We started 1 redevelopment project and 1 refurbishment project during the quarter. We also successfully closed the transaction, the acquisition of Oslo Areal, as well as the divestment of Hinna Park. Our Board decided to pay out the semiannual dividend of NOK 2.6 for the second half of last year, leaving us with a total of NOK 5.1 for the full year of 2021. That dividend is to be paid out on May 3. As I said, we have signed — sorry, new and renewed leases for around NOK 65 million this quarter.
Sonja Horn
executiveWithin this, NOK 24 million sits in our projects, roughly 30,000 square meters. During the quarter, contracts totaling NOK 69 million were terminated. One of those was a NOK 52 million contract with KPMG, tied to one of the buildings we picked up through the Oslo Areal acquisition. That was also as expected when we worked on the acquisition, which leaves us with net letting of negative NOK 17 million for the quarter. Occupancy stays high at 97.3%. And our average lease duration is presently 6.4%, or 6.6% when you include the projects. The biggest contract signed this quarter was a renegotiation involving a parking facility in Trondheim for 4,300 meters. At Stenersgata, Sopra Steria signed for an additional 4,000 meters through an option to increase. And at Kristian Augusts gate, in the Tullin quarter, a private tenant has signed for 1,600 meters. Telenor, 1,600 meters in one of our Trondheim buildings, where we will also begin a refurbishment next quarter. And at Cort Adelers gate, an architect firm signed for 1,500 meters. We began the Vahls gate refurbishment in the first quarter. That building is located about 7, 8 minutes' walk from the Central Station.
Sonja Horn
executiveThe municipality of Oslo's building and planning authorities have been using it, and they held an option for a further 10 years. We're pleased that a new 10-year term has been signed, given that this part of Oslo is set for a very exciting transformation over the coming 10 years. So at this point, the project is fully leased. For this project, we're aiming for a BREEAM-in-Use Excellent rating. Project cost is estimated at NOK 775 million, including the initial value, with a yield on cost of 4% here. This project is expected to be completed in the second quarter of next year. In Trondheim as well, we've begun redeveloping a building at Kongens gate 87. The tax authorities used to rent this building before they moved into one of our other projects. And we were glad to see Microsoft become the first tenant to sign a contract here. The pre-let ratio now stands at 22%, though we've clearly noticed considerable interest in the building since we announced the project's start. The estimated project cost here is NOK 235 million, with a yield on cost of 5.6%.
Sonja Horn
executiveAnd here, we'll be aiming for a BREEAM Very Good rating. This project is also set to finish in the second quarter of next year. Now, on to the projects we currently have underway. At St. Olavs plass, nothing has changed in our project during this quarter. At Tordenskiolds gate 12, as you can see, we've pushed back the completion of this project by some time, which moves us into the fourth quarter. But this won't have any effect on the estimated project cost or the yield on cost for this project, given that we have sufficient buffers in place. Turning to Stenersgata 1, let's begin with the good news. Here, we've raised occupancy to 79%, as Sopra Steria exercised their option to take additional space. Unfortunately, we also have to report a significant cost increase on this project. To explain, we need to go back a bit to the beginning. This project sits on top of an existing shopping mall that is owned by a third party. So the complexity involved in this project is very high. When the previous tenants moved out of the building, we were in a position to renegotiate a new contract with an existing tenant, which occupies a big part of this headquarter building of Entrehera fostusa.
Sonja Horn
executiveWe were able to work out an agreement in which they extended their occupancy at Fostusa by 10 years, and simultaneously they signed a substantial lease covering over 50% of the space in the new redevelopment for a 10-year term. Back then, the building permit for the redevelopment was not yet in hand. That meant we chose to kick off the redevelopment in a more step-by-step manner, beginning with the interior fit-out and then proceeding to the exterior work once the building permit was secured. As a result, on this project we did not rely on the standard turnkey fixed-price contracts that Entra typically uses for projects of this type. Regrettably, during COVID we observed that the municipality of Oslo faced enormous difficulties in managing building permit processing while all of their staff were working from home. Consequently, on this project the building permit arrived with a delay of as much as 9 months, and the final building permit only came through in the first quarter of this year. So we have to acknowledge that we substantially underestimated the risk and complexity involved in this project. And because of that, we have now raised the project cost by NOK 150 million. Broadly speaking, this breaks down into 4 groups.
Sonja Horn
executiveTo start with, roughly NOK 50 million comes from the building permit delay, since we've had to carry out a number of reconfigurations and the contractor's on-site rig has been kept in place for a fairly long stretch. And naturally, prices have also gone up during those months. Second, about NOK 50 million stems from the new requirements tied to the building permit we obtained. A big portion of that concerns the facade. Our original plan was a system solution for the facade, and we had also locked in the price for it in the market. Now, though, we'll be putting up a tailor-made facade. On top of that, there are new entrance solutions, outdoor solutions and sidewalks, where the quality levels have been raised and the costs are higher. Third, NOK 15 million results from our decision to add extra environmental solutions so we can be sure of meeting the EU taxonomy requirements. And last, roughly NOK 35 million comes from the fact that we plainly underestimated how complex the solutions in this project would be. One instance is that we were aware we'd need to divide the technical solutions between the shopping mall and the office building.
Sonja Horn
executiveAnd it's clear to us at this point that the complexity involved in this work was underestimated on our part. One more thing worth noting is that we've maintained every risk buffer at the identical level on this project, since some complexity remains in it, and also in light of the challenging market conditions and the supply chain circumstances we anticipate ahead. So at this point we feel comfortable that delivery of the project will happen within the revised estimate. The projected yield on cost for this project has consequently fallen from 4.5% to 4.3%, and it remains a highly profitable undertaking for us at Entra. Moving to the next item on the list, Schweigaards gate 15. Here too, a red arrow appears on the projected project cost. In this case, we've raised the cost by NOK 60 million. This is a redevelopment that we chose to launch at a quite low pre-let ratio of 31%, given that the property sits immediately beside Oslo's Central Station, and also in view of the underlying dynamics at play in the letting market. On the letting front, throughout the pandemic, what we've seen is that every one of our letting processes takes considerably more time. And so letting at this project has likewise been pushed back.
Sonja Horn
executiveWhat this means is that we've opted for what we refer to as the stop standard clause within the fixed price turnkey contract — in other words, we'll finish out the vacant space up to a set level. And the turnkey contractor, naturally, has faced considerable pressure on this project through COVID and also, given the present market climate, with input costs rising. So with any change orders on this project, we foresee that the prices we'll be charged will be disproportionately high. Beyond that, future tenant adaptations will likewise have to be procured in today's market conditions, which is the reason we've raised the cost by NOK 60 million. Our buffers on this project — the risk buffers — remain intact, so we feel comfortable with the revised estimates. The good news, then, is that the letting market has been very strong, and we anticipate fully offsetting the higher costs via increased rents on the vacant space that remains. Across the other projects on the list, no changes have been reported this quarter. At Holtermanns veg 1 in Trondheim, our pre-let ratio stands at 29%. Here too, we'll apply the stop standard contract, though given that this is a standard product in a newbuild project, the completion ratio is considerably higher and the remaining cost to be managed in the current market environment is far smaller.
Sonja Horn
executiveSo at this point, we believe those risk buffers are adequate. I wanted to present this image to you since there's a yearly award in the Norwegian property sector — sort of an Oscar — where the real estate developer of the year gets nominated. And this year, Entra won that award for our project, Rebel, receiving it for the work we've carried out in that area of the city. The jury's reasoning is available for you to read in the presentation letter. So just a few remarks about the market situation. Right now, it's extremely, extremely hard to give a very firm outlook given the current market environment. We clearly see that visibility has become much more blurry once again, as we move from one crisis to the next. COVID is history in Norway, almost forgotten. Still, it's far too early to properly assess the long-term effects of the Ukraine situation. The challenges have shifted from industries being affected by COVID lockdowns to what we see as supply chain challenges and price shocks hitting industries with a strong dependency on raw materials and energy. At the moment, the Norwegian economy is performing very well. GDP growth is expected to reach as high as 4% in 2022.
Sonja Horn
executiveActivity growth after COVID has been really robust. And we expect employment growth to reach 2.4% in 2022. Of course, going forward there's more uncertainty and less visibility regarding the long-term effects of the supply chain challenges we're seeing, which are causing price pressure, rising inflation rates and higher interest rates. Following the pandemic, though, demand for office has been only minimally affected. And as I said, employment growth in Norway has been very strong, and within office-related jobs it's been even stronger. Right now in Oslo, vacancy levels are low at 6%, and in the city center of Oslo they're even lower. As you can see from the graph at the bottom right in the picture, the new volume entering the market is very low in 2022 and also in '23. And going forward we'll probably see some delays in new supply, given the current increase in construction costs. Now, per our consensus report, market rental growth is expected to be around 6.5% in 2022. And some of the leading market specialists expect growth rates as high as 10%. A few words on the transaction market. What we saw in the first quarter is that activity level actually stayed pretty high throughout the first quarter, partly also explained by the fact that there were some overlays from the fourth quarter.
Sonja Horn
executiveBut starting at the end of March, the market appears to have turned more careful and pickier. The possible consequences of rising interest rates have yet to show up in the transaction market, though they could push yields wider, especially secondary yields. Even so, appetite for central offices—Oslo in particular—stays very robust. On top of that, the defensive traits of property investments, since inflation protection may carry more weight from here on, could matter more going forward. The small amount of new construction reaching the Oslo market, together with expectations of solid rental growth, might likewise offset the potential for yields to rise in Oslo. So, Anders, over to you.
Anders Olstad
executiveThank you. Entra has had quite an eventful quarter, including the completion of the Oslo Areal transaction and the sale of Hinna Park. There are 3 items I want to highlight in the presentation. First, we recorded extraordinary one-off costs amounting to NOK 21 million during the quarter. We also saw substantial value growth, NOK 2.8 billion, on the portfolio side. And finally, an update on where things stand with development on the financing cost. Turning to revenues, NOK 781 million, which is NOK 104 million higher than the fourth quarter. The main drivers, naturally, are Oslo Areal and robust CPI growth, partly offset by the Hinna Park divestment. Measured against the first quarter of last year, we are up a full NOK 190 million. As always, there are 3 primary factors behind that. First, new assets were acquired generating total revenues of NOK 143 million. We sold 2 assets, giving a net revenue increase for the quarter of NOK 131 million. Second, the projects added another NOK 37 million. And we removed a couple of assets from production, so the net contribution from projects came to NOK 34 million.
Anders Olstad
executiveFinally, we saw quite robust CPI growth in Norway, at 5.07%. With that CPI growth, like-for-like was roughly 5.2%, so an extra 10, 12 bps on top of the CPI. Net income for Entra came in at NOK 433 million, with profit before tax of NOK 3.6 billion. I'll return to that in later exhibits. Cash earnings for the quarter, annualized rolling, came in at 8.8%, total 11% CAGR, and an NRV of NOK 235 — again, comparable to the current share price of around NOK 175. So that's a significant rebate on the substant values of the company. Looking at the CAGR for the NRV, it's up 16% since 2014. Including dividends paid of NOK 29 since 2015, the CAGR is 18%. So again, solid and strong value growth consistently over the last 7 years. On the actual P&L, operating cost came in at NOK 64 million versus NOK 49 million in the first quarter last year; we then had to look at the cost percentages. And looking at the cost percentages on the owner cost — on the operating cost, we ended up at 9.3% for 2021.
Anders Olstad
executiveIn Q4 it was 9.2%. Now, in the first quarter, we're at 8.2%. And at roughly the low 8s, that's a level we feel comfortable with. We do expect it to rise somewhat over the course of the year, though. The primary reason is that the Oslo Areal portfolio is run by a third party, and at the close of the third quarter we'll bring that portfolio into our operations. And during the second and third quarters, we'll need to build up our own people and our own systems — we have our systems. We need to build in order to hire people. So during the second and third quarters we'll carry double costs for managing the Oslo Areal portfolio. That will push the cost up somewhat. Second point is on net other income — other costs, we have a positive net of NOK 1 million. Ordinarily, we'd be at around NOK 5 million, NOK 6 million. The reason we're at only NOK 1 million right now is a one-off cost of NOK 6 million. That comes from 1 tenant we temporarily relocated to another location, and we essentially have to accrue the entire NOK 6 million of costs in this quarter.
Anders Olstad
executiveThat's a one-time NOK 6 million sitting in the other costs line. The third thing I'd like to address is admin cost, which comes in at NOK 65 million. During this quarter, we did book an extraordinary provision of NOK 15 million — 1-5 million — covering severance packages for the staff employed at Oslo Areal, and that won't carry over with us into Entra. So that's NOK 15 million in total of one-off additional expense, one-off costs on admin cost, for this quarter alone. And then you'll notice financing costs are up fairly sharply versus Q1 of last year. Basically the explanation is that interest cost right now is roughly what it was in the first quarter a year ago, but debt is up by around NOK 18 billion. I'll return to the debt side in more detail a bit later on. Turning to how revenues should shape up across the next 6 quarters: we completed the Oslo Areal and Hinna Park divestments around mid-January, so you'll see a positive NOK 8 million effect from that in the second quarter as well.
Anders Olstad
executiveAdditional income of NOK 10 million will come from the projects, and here's the interesting bit. Universitetsgata 7-9, a multi-tenant asset we finished last year, accounts for the largest share of that NOK 10 million. What we observe with these multi-tenant assets is that as tenants gradually move in over — typically as much as 3 quarters of the year — revenue won't begin right away, but rather we'll see a sequential rise in revenue. That U 7-9 is now leasing up quite well, though. So it does influence the other multi-tenant assets we'll be completing. After that, you'll see revenue is expected to stay pretty flat across the year. There will be another big step up in the first quarter of next year, mainly driven by completion of Tordenskiolds gate 12 in Oslo, plus the regular CPI effect. In our estimates here, we've assumed 3.5% CPI. March to March, it stands at 4.5% in Norway. So there's likely some conservatism in that estimate of ours for the first quarter, but we've chosen not to ramp it up yet.
Anders Olstad
executiveActually, though, for those who track this really closely, we included 3.5%. Moving on to the balance sheet. This covers the NOK 13.5 billion at Oslo Areal plus the NOK 1.950 billion divestment of Hinna Park, which had been fully consolidated on our balance sheet despite our 50% ownership stake; during this quarter we invested NOK 650 million, essentially in line with last year. Across our projects last year, we invested NOK 2.2 billion in total — NOK 2.224 billion, to be precise. We expect a similar level for 2023, perhaps a couple of hundred million more. We also saw a strong value uplift this quarter, at NOK 2.8 billion. Looking at the pie chart on the right side of this exhibit, nearly NOK 1 billion, or 34%, comes from added value contributed to our long-term project pipeline — that is, unsold assets or unsold potential, which the appraisers have valued, we believe, fairly conservatively, yet it still adds another NOK 1 billion to our balance sheet. Then 27% comes from yield effects.
Anders Olstad
executiveIn the previous quarter, what we observed — and let me step back for a moment — we used 2 appraisers. One appraiser essentially captured the entire impact of the very solid and strong transaction market from the fourth quarter and reflected it in our fourth quarter valuation. The other appraiser more or less used this first quarter to perform the same exercise, so — and that was essentially an uplift on the yield. And it's a fairly broad-based yield, not just in Oslo, but we're seeing the same in Drammen, in Bergen and in Trondheim and in Sandvika. So it's a fairly broad-based yield compression in this quarter as well. Then we have the market rent, again primarily in Oslo, where we do see, as Sonja said, very low new supply entering the market combined with strong underlying employment growth in the office sphere. So clearly, it's good to be a landlord in Central Oslo in the next couple of years as well. And then we have a final effect from the acquisition of Oslo Areal, where essentially we took the — according to IFRS, you take the tax rebate and add that to the balance sheet values. There's almost NOK 400 million there.
Anders Olstad
executiveThat's how IFRS requires it to be handled. So once more, taking everything together, it gives us a balance — or total balance — of nearly NOK 85 billion at this point. Regarding the financing side, I want to step back briefly and explain how we handled it across 2021. During Q1 of last year, a standstill period applied because of the strategic interest in Entra. Essentially, during that quarter no bondholders would subscribe to the Entra papers, in light of the uncertainty surrounding the situation and what lay ahead for our company. In Q2 and Q3, the market became extremely positive, and we issued bonds totaling roughly NOK 11 billion at very attractive prices and with long maturities. Simultaneously, we extended every piece of our bank debt by 1 year. Next, in Q4, we readied the financing for Oslo Areal — we essentially approached our partner banks and requested that they finance Oslo Areal, and we managed it at an average maturity of 2.9 years, with margins we consider attractive. So once again, the worth of long-term relationships with banks cannot and should not be underestimated.
Anders Olstad
executiveSo at this point — this basically brings us to now — and for Q1 as well, it has been a really quiet period on our end. Margins have, in essence, widened sharply. And with Entra, printing papers at those margins isn't something we're accustomed to doing. So as of yet, we've chosen to hold off on doing anything and instead, once again, keep up both our tight partnerships and our cushions with the banks we work with. That leaves us today with bank debt slightly above NOK 39 billion, as the graph on the far left shows. The green portion of the bank financing stood at 69% in the previous quarter. Once we added the bank debt — that was regular loans — the green financing now sits at 46%, and we'll raise that again as we gradually roll a large share of the bank debt into new bonds — into new green bonds. Then, looking at the middle graph, EPRA LTV and ICR. As most of you are aware, EPRA published a new LTV definition a couple of weeks back, which in essence states — it counts hybrids and pref shares as debt, rather than as half debt and half equity the way the rating agencies typically do.
Anders Olstad
executiveAlso, every company needs to allocate the right portion of debt and asset values to its joint ventures. So obviously, that 48% figure is in there — it follows the EPRA definition. Entra has no hybrids at all. There are no pref shares either, though we do hold a couple of JVs, and those raised our LTV by approximately 1 percentage point. Under Moody's LTV definition, we come out at 46%, 4-6. So for us once more, the gap between EPRA's LTV definition and Moody's definition is roughly 2 percentage points. ICR lands at 2.9%. Looking at the interest rate on the right-hand side of the exhibit, we sit at 2.28% today. Over the coming 2 quarters that will climb to roughly 3%. Note that this is our all-in financing cost, not merely the base rate. Moving toward 3%, and during 2023, likely with forward rates as they stand, it rises to about 3 — sorry, the low 3.20s. Debt maturity runs approximately 4.5 years. Hedge maturity is roughly 2.8 years. And our fixed rate ratio stands at 46%. So once again, a pretty solid balance sheet on the financing side as well.
Anders Olstad
executiveTo be clear, it's a strong base — a strong balance sheet, rather than a fairly strong one. In the market, we're seeing the CP market remain active. Just last week we completed 1 deal at margins of 55 bps. Bond market margins are active and open. We do observe that margins haven't dropped to levels we'd feel comfortable with. Again, printing expensive bonds isn't something we habitually do. So if we issued a 5-year today, based on the latest numbers, we'd be at roughly a bit more than 110, 115 bps, so to speak. And on the bank market again, I can't stress this enough — we're very pleased with our 5 partnership banks and we'll keep up our relationship with them. I believe that wraps up the financing portion, Sonja. Thank you.
Sonja Horn
executiveThanks, Anders. All right, a few final comments. So, as I mentioned, there’s limited visibility regarding how the supply chain difficulties will play out, along with pressure from inflation and interest rates in the market. It appears the investment market has turned more cautious and selective, especially over the last couple of weeks. And interest, of course, in central office properties in Oslo is still strong. We clearly observe very strong market rental fundamentals in the letting market, particularly in Oslo then. And going forward, we expect solid income growth from our ongoing projects. We’re also pleased to see that we still have a large long-term pipeline of projects underway in Entra, further strengthened by the acquisition of Oslo Areal. So that wraps up today’s presentation. And I believe we may have some questions, Tone.
Tone Omsted
executiveStarting with the first one — going forward, do you see any potential for additional cost increases in the projects you currently have underway?
Sonja Horn
executiveOkay, so at this point we've gone back and revised — taken another look at — the project calculations across all of our projects. And with what we know today, we feel quite comfortable with the estimates in those calculations. So we believe we should be in good shape.
Tone Omsted
executiveAnd then, second, in what ways will rising construction costs impact the schedule for your project pipeline moving forward?
Sonja Horn
executiveOkay, we will obviously be using the time we now have in the second quarter to take stock of the market and observe how it develops. On our newbuild projects, we would need to see that any potential rise in construction cost is then also funded via higher rent levels. Whether it takes a while before the letting market catches up with that is still to be seen, though it could potentially also hold back some newbuild projects given the market environment. Then again, if we look at the material components, there is also a slight distinction between newbuild projects, where you would typically need more materials such as concrete and steel, so newbuild projects will probably be hit harder than refurbishments, at least over the coming months. But it is too early to draw conclusions. We will assess it over the next quarter. So that wraps up the questions for today. Thank you all for joining us, and we look forward to seeing you next quarter.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Entra ASA transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Entra ASA earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Entra ASA or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.