Erdene Resource Development Corporation (ERD) Earnings Call Transcript & Summary

August 17, 2026

Toronto Stock Exchange CA Materials Metals and Mining earnings 56 min

Earnings Call Speaker Segments

Operator

operator
#1

We appreciate everyone joining us today. I'm the conference operator speaking. You're tuned into the Erdene Resource Development call covering financial and operating results for the second quarter of 2026, also available as a webcast. Please note that everyone connected by phone is muted and can only listen, and this session is being recorded. Once the presentation wraps up, we'll open things up for your questions. If you'd like to enter the question queue, just press * followed by 1 on your keypad. And if you require help at any point during this call, you can reach an operator by pressing * followed by 0. Those of you on the webcast can submit questions through the chat feature there. At this point, I'll turn things over to John Vincic.

John Vincic

unknown
#2

Thanks, operator, and good day to all of you — we appreciate you being on the call. Just a few administrative notes before we start. You can download the presentation that goes with today's call from the company website, www.erdene.com. The press release, the financial statements, and the MD&A for this quarter have all been posted both on Erdene's website and on SEDAR+. I should mention that when management discusses how the Bayan Khundii Gold Mine is performing operationally, those remarks are at the Erdene Mongol level — that's the 50/50 joint venture between Erdene and Mongolian Mining Corporation. Also worth noting: forward-looking information appears in this conference call, and it rests on the company's current expectations, estimates, and beliefs. Non-IFRS performance measures may also be used in our remarks. We ask that you look over Erdene's latest disclosure materials, which include the company's most recent annual information form, for the risks tied to this forward-looking information and to the use of non-IFRS performance measures. And please note that unless we say otherwise, every dollar amount discussed on today's call is in Canadian dollars. Speaking from Erdene today are Peter Akerley, President and Chief Executive Officer, and Robert Jenkins, Chief Financial Officer. Peter, over to you.

Peter Akerley

executive
#3

Thanks, John, and good day to all of you. We appreciate you being with us today. Erdene Resource Development is a minerals producer in its growth phase, concentrating on building a business across several mines and commodities in the Khundii Minerals District of Southwestern Mongolia. The groundwork for that effort was laid by bringing the high-grade gold mine at Bayan Khundii into commercial production earlier this year. From this first open pit, we foresee substantial opportunity for further growth by extending the mine's life and expanding operations, and I'll walk you through that during today's call. With over 20 years of exploration work and a demonstrated development record in the country, we have confidence in the value we can bring to all stakeholders as we keep developing the Khundii Minerals District. Now let me take you through the key points from our Q2 2026 operating results, along with a look at our growth plans for the remainder of the year. We turned in a solid second quarter, with production rising and mining performance improving at the Bayan Khundii Gold Mine, which we co-own alongside our strategic partner, Mongolian Mining Corporation. On slide 5 you'll note that the mine generated close to 12,000 ounces of gold during the second quarter, which represents a 37% gain over Q1 2026.

Peter Akerley

executive
#4

Feed grades came in at 2.4 grams per tonne — that's a 25% gain over Q1, driven mostly by the team concentrating on better mining efficiency, and I'll get into that further on upcoming slides. We keep delivering enormous progress in pursuit of a 3.5 gram per tonne feed grade by year-end. So far the process plant has done extremely well, running at the throughput we anticipated and beating expectations when it comes to gold recoveries. Strong operating cash flow is being produced by the joint venture company, which permitted its first debt repayment within the last few weeks, and at the corporate level we hold plenty of liquidity after our $29 million financing in Q1. At Zuun Mod, our large-scale molybdenum-copper project, we're still on schedule to complete a preliminary economic assessment within the next 60 days, and we anticipate it will highlight this asset's scale and economic potential. The molybdenum market more broadly is quite robust, supported by solid demand and growth fundamentals. Along those lines, offtake interest has come in from a number of Asian counterparties, which shows how appealing our project is, sitting close to key markets where demand keeps growing. Turning to growth, the Khundii Minerals District is still at an early stage in its discovery life. Several opportunities to grow resources — ones that might underpin mine life extensions and plant expansions — are being worked on by our exploration and development teams.

Peter Akerley

executive
#5

I'll pass those along as we go through the presentation today. On slide 6, you can see that total plant throughput came to 153,000 tonnes of ore, averaging 1,682 tonnes per day — that's 94% of capacity in the second quarter. Gold recoveries have held steady at 96% in every quarter since first production, and that's above our 93% target. All told, Bayan Khundii produced 11,709 ounces of gold, which is 37% higher than the prior quarter. Since first gold was poured in September 2025, we've produced almost 28,000 ounces of gold. Silver output in Q2 came in at just over 3,300 ounces, broadly in line with the quarter before. Realized prices averaged $4,493 per ounce for gold and $72 per ounce for silver. Moving to slide 7, during Q2 the mining team moved 3.8 million tonnes of material, up 19% from Q1, and mined 247,000 tonnes of ore at an average grade of 1.4 grams per tonne — a 59% rise in ore volume versus Q1. Several improvements across the mining effort drove this: growing experience in high-grade selective gold mining, sharper precision when defining and mining the high-grade zones, better blasting techniques and program design, and ore tracking with high-precision GPS have all delivered greater efficiency along with less dilution and loss.

Peter Akerley

executive
#6

The front-end mobile crusher is running steadily now, and that has cut down on stockpiles of oversized material that carries somewhat higher-grade ore. On top of that, through the quarter and on into July, we keep widening the pit sideways, which produces low- to mid-grade material and puts us in position to move into higher-grade zones and hit target head grades of 3.5 grams per tonne by year-end — something that ought to mean more metal produced and reduced unit costs. As of June 30th, 2026, the mining fleet was made up of 18 dump trucks, 5 excavators, 3 dozers, and the support equipment that goes with them. We're quite happy with how mining performance has improved lately, but we're also going after chances to grow resources close to the mine. On slide 8 you can see that our near-term focus is two areas next to the Bayan Khundii Mine: Khundii West, which includes Ulaan and Dark Horse. Deep drilling and expansion drilling at both have been limited, since our attention these past few years has been on building the mine. They belong to the same Bayan Khundii hydrothermal system, and we expect them to add ounces that support extending mine life and possibly expanding capacity at the Bayan Khundii plant complex. At Dark Horse, we'll be testing along the 3-kilometer strike length to grow the near-surface oxide resource for CIP and, potentially, heap leach processing as well.

Peter Akerley

executive
#7

Khundii West offers significant potential to extend the Bayan Khundii pit toward the west, which would set the stage for a considerably larger pit. At first, the westward expansion will proceed from Bayan Khundii, and later on it could bring in both the Khuvyn Khar and Ulaan resources, contingent on an agreement with Erdenes Alt — the party holding that narrow triangle of ground situated between the Khundii and Ulaan licenses. A 12,000-meter exploration program has received approval for the second half of 2026, targeting these areas. I'll now walk you through a few specifics of that program. Slide 9 shows, on the left, a plan map of the Bayan Khundii deposit extending into Striker West, with a cross-section of that area on the right. Thanks to a revised pit that reflects the current gold price, the Striker West resource is now part of a planned development. Even so, close-spaced and expansion drilling in this area has been limited, as the section illustrates. The highlighted boxes represent substantial mineralized zones, as the table reports, and they take in significant zones lying outside the defined resource as well as the highest-grade zone reported in the area, including intersections of 22 meters of 6 and 42 meters of 7, respectively.

Peter Akerley

executive
#8

We'll kick off a 9,000-meter drill program in the next few weeks, and its purpose is to give us the data we need to boost confidence in how continuous those high-grade zones are and, in certain cases, to move new material into resources and reserves. With this program, we'll be able to develop the final plans and design for the Striker West expansion at a later stage in the development of the Bayan Khundii Mine. We're also in discussions with Erdenes Alt — the Mongolian state-owned company that holds the narrow strip of land sitting between the two licenses — and the focus there is on bringing the resources of the Khuvyn Khar license into a potential collaborative super pit. That development would reach into deeper resources than the current design at Striker West, and the western extension of that pit would cross into our Ulaan license, where we currently have a reported resource of 78,000 ounces indicated and 38,000 ounces inferred at a grade of 1.9 grams per tonne at the 0.7 cutoff, with room for further expansion. As you can see on slide 10, only 2.5 kilometers north of Bayan Khundii lies the Dark Horse area, which hosts the Dark Horse South satellite reserve, currently a 50,000-ounce high-grade gold deposit at surface. That deposit sits within a 3-kilometer mineralized trend with multiple adjacent gold-mineralized structures exposed at surface, which gives us exceptional exploration potential, as we highlighted in our March update and as shown on the slide.

Peter Akerley

executive
#9

That drilling gave us some highlights, including very high-grade near-surface intercepts: 9.6 grams per tonne across 19 meters, and 28.7 grams per tonne across 3 meters, in areas that are expanding the resource limits. At Dark Horse South, grade control drilling is now underway, and it supports mine plans to bring this high-grade satellite deposit into the mill feed in H2 2027, which is ahead of the original year 3 sequencing in 2028. Adding this very high-grade satellite deposit will give us the ability to deliver higher grades to the BK plant in 2027. At Dark Horse North, 500 meters north of the planned Dark Horse pit, the mineralized area covers 700 meters of strike length, with oxide material extending to 100 meters depth, and it hosts both high-grade material suitable for the CIP plant and also a substantial volume of lower-grade oxide material that appears amenable for feed to a potential heap leach development. Continuing northeast of Dark Horse, the mineralized structure has been traced over an additional 1.7 kilometers at Altan Arrow. This area and adjacent structures to the south will be subject to a 3,000-meter drill program later this year, as shown on the plan map on slide 10. Altan Arrow is at an earlier stage of exploration.

Peter Akerley

executive
#10

That said, those shallow oxide zones that carry gold and silver are quite promising, and they might deliver extra resources capable of feeding the heap leach facility. Samples from Dark Horse are being put through heap leach amenability testing over at Blue Coast Research in British Columbia, and early results point to solid recoveries that would serve the heap leach facility well. The broader Dark Horse region represents a sizable, lightly explored piece of the BK complex, offering outstanding upside for continuing to grow ounces and lengthen the mine life at the BK CIP plant, along with a genuinely realistic chance to boost output by bringing in a heap leach facility. We have put in place cornerstone open pit reserves at Bayan Khundii and Dark Horse to carry the initial mining period, and we hold the associated infrastructure needed to support both an extension and an expansion of the Bayan Khundii complex. With 10 kilometers of interconnected structures mapped so far, the Bayan Khundii epithermal system remains in its exploration stage, carrying superb growth potential. As shown on slide 11, I would also like to remind everybody about the potential and the plans for the Altan Nar deposit, which sits only 16 kilometers north of Bayan Khundii. That deposit holds an indicated resource of 313,000 ounces at 2.16 grams per tonne gold and 15.7 grams per tonne silver, and in addition another 210,000 ounces of inferred resources.

Peter Akerley

executive
#11

The shallow nature of this deposit is a big part of what makes it so appealing. About 90% of the resource lies within 150 meters of surface, and it stays open at depth. That gives us flexibility on development: we could truck selected ore to our existing plant at Bayan Khundii, put a flotation plant on site to make a concentrate, or do some mix of both. With roughly 14% of the gold inventory at Altan Nar sitting in oxides, it could also serve as a feed source for a proposed heap leach operation at Bayan Khundii. Growth is really the story here. The resource today is limited to only two zones, Union North and Discovery, along a mineralized corridor running 5.5 kilometers long and 1/2 kilometer wide, with over 20 targets identified along trend. No exploration has happened along that corridor for the past several years, since our focus has been on Bayan Khundii. Our 2026 metallurgical program is now finished with excellent results, and an AI-based evaluation of the property is underway, with planning for a large-scale exploration program in 2027. Altan Nar offers the chance to grow existing resources and the optionality to develop a deposit that feeds high-grade material into an expanded gravity circuit at the Bayan Khundii plant, complementing the existing CIP plant and a possible new heap leach plant.

Peter Akerley

executive
#12

With the effect of elevated metal prices, first-year depletion at the Bayan Khundii pit, and the latest drill results from Dark Horse all factored in, we recently revised the mineral resource estimates for the gold projects Erdene Mongol holds in the Khundii Minerals District — covering the Bayan Khundii deposit, the Dark Horse deposits, Ulaan, and Altan Nar, as you can see on slide 12. Given that the operating cutoff grade at the Bayan Khundii plant sits in the range of 0.7 grams per tonne, the most useful view is to examine resources at that cutoff and treat what remains of the low grade as stockpiled for future blending or as possible feed for a heap leach facility. The table shown summarizes the updated gold resources across the Erdene Mongol deposits. It's important to keep in mind that although the Bayan Khundii and Dark Horse resources are based on actual costs, the other deposits won't convert to reserves on an equal basis. Even so, it gives a helpful snapshot of the potential for extending mine life at Bayan Khundii. The global resource contains 835,000 ounces at 2.9 grams per tonne and 9 grams per tonne silver in the measured and indicated categories, plus a further 265,000 ounces at 1.5 grams per tonne inferred.

Peter Akerley

executive
#13

We think this makes a strong case that we can push the mine’s operating life past 10 years. On top of that, there’s headroom to raise output via three main expansion routes: optimizing the CIP plant, installing a gravity circuit, and possibly adding heap leach processing down the road as we keep building resources in the area. For 2026, we’re aiming for roughly 50,000 ounces of gold. Going forward, we want to hit the 3.5-gram-per-tonne processing grade target by the end of the year and carry that into 2027, with grade improvement coming into play as Dark Horse is developed. Also worth noting: Erdene retains a 5% NSR on all minerals produced from our licenses in the Khundii Minerals District once production reaches 400,000 ounces. In September, our three large mineralized deposits and the related prospects in the Khundii Minerals District will be featured at a Khundii GeoSymposium that we’re hosting together with the Canadian government in Mongolia. We’re assembling experts from around the world and expect to come up with fresh ideas and exploration approaches for the district. We’re confident that the exploration opportunities across the Bayan Khundii, Dark Horse, and Altan Nar areas, together with our track record of exploration success in the region, underpin delivery of these ambitious yet achievable goals.

Peter Akerley

executive
#14

We view the Bayan Khundii complex as the basis for additional finds in this expansive, lightly explored area, and we believe it can support our company's growth over the long term. Let me now address the exploration and development projects Erdene controls, especially the enormous Zuun Mod molybdenum-copper project. As slide 13 illustrates, Zuun Mod ranks among Asia's biggest undeveloped molybdenum-copper deposits, situated a mere 200 kilometers from China, which consumes more of both critical metals than any other nation. The deposit outcrops at surface and sits within a considerably larger copper porphyry system. We picture a large-scale open pit with a low strip ratio that would supply molybdenum and copper concentrates to the Asian market and could take advantage of infrastructure already built in the Khundii Minerals District. With that in mind, our preliminary economic assessment is well along. Work on mineral resources, mining, metallurgy, and marketing is largely finished, while process engineering, power, infrastructure, and modeling remain in progress. We anticipate delivering the PEA in mid-H2. In our view, this study represents a significant chance to reveal Zuun Mod's value to Erdene shareholders. As slide 14 shows, Zuun Mod appears poised to begin operations in a setting of constrained supply and rising demand.

Peter Akerley

executive
#15

When you consider how molybdenum is used in specialty steels for energy, defense, and construction, plus emerging applications in the computer chip industry — including as a replacement for tungsten — prices have risen considerably over the last 2 years and have held steady above US$30 a pound for the past 6 months. At that price, Zuun Mod stands out as a very attractive project, and its location just 200 kilometers from the world's largest molybdenum consumer adds further support. The timing is compelling. A number of China's moly mines are nearing end of life, and the supply deficit that results, together with rising demand, is underpinning historically strong molybdenum prices. Other projects in our portfolio include the Khuvyn Khar copper prospect and the Tsagaan Suvarga property in the Oyu Tolgoi district. Khuvyn Khar, situated 4.5 kilometers northwest of the Zuun Mod project, is a high-grade copper discovery. We have brought on Quantec Geoscience, a global leader in geophysics, to carry out an extensive survey beginning in late Q3 that will deliver deeper targets for follow-up as we look to build on the intersection of 30 meters of 1.25% copper we reported earlier this year. At Tsagaan Suvarga, only 10 kilometers from the Oyu Tolgoi mine, which is on track to rank as the fourth largest worldwide by the end of the decade, we recently completed our maiden drill program.

Peter Akerley

executive
#16

That 11-hole, 2,700-meter program came through successfully: eight of nine shallow holes at the Web prospect hit gold mineralization, defining a 1.5-kilometer trend, while a deeper hole in the central portion of the license cut native copper plus a propylitic alteration zone. Given those results, Erdene in July added another year to its option for acquiring as much as 80% of the license. These projects may be earlier stage, yet they carry enormous potential for value creation for Erdene shareholders. To sum up, the Bayan Khundii complex forms our foundation, but our future lies in the extensive exploration pipeline across the Khundii Minerals District. Expansion across the gold exploration targets that Erdene Mongol holds, together with progress at our Zuun Mod, Khuvyn Khar, and Tsagaan Suvarga projects, offers meaningful opportunities for extending and optimizing mine life, as well as new discoveries that will generate sustained value for our shareholders. At this point I'd like to hand the call to Bob for the quarter's financial highlights. Bob?

Robert Jenkins

executive
#17

Thanks, Peter. Turning to slide 16, I'll walk through the financial highlights for the quarter that ended June 30th, 2026. Before diving into the specifics of Erdene's financial results, a quick reminder for everyone on the call: Erdene's investment in Bayan Khundii is held via a 50% joint venture interest in the Mongolian company Erdene Mongol LLC. This slide contains financial excerpts that represent 100% of the joint venture operations for Erdene Mongol, along with consolidated results for Erdene Resource Development, which reflect our proportionate share of Erdene Mongol's performance plus our corporate operations. Unless otherwise noted, all figures are in Canadian dollars. Beginning with Erdene Mongol, during Q2 the business brought in US$53 million of revenue from sales of nearly 12,000 ounces of gold and more than 3,300 ounces of silver, at average sale prices of US$4,493 and US$72 per ounce, respectively, which equals $75 million Canadian dollars. Q2 revenues came in 32% above Q1, driven by larger sales volumes even though metal prices were modestly lower. For the quarter, total cost of revenue was US$24 million, or Canadian $33 million, roughly US$2,000 per ounce sold. Because sustaining capital expenditures were minimal in the period — we are still within the first year of operations — all-in sustaining costs do not differ materially from that figure.

Robert Jenkins

executive
#18

All told, our cost for each ounce came in roughly 20% below Q1, which reflected both higher output and the mining efficiency gains Peter described a moment ago. At the close of the quarter, Erdene Mongol held US$40 million in cash, while project debt stood at about US$120 million, equivalent to $175 million CAD. After the quarter ended, the company repaid US$10 million against the project's $50 million working capital facility, which is now fully drawn. Now that the mine is producing cash, our capital allocation priorities will involve paying down the project debt as well as putting money into the expansionary exploration programs Peter discussed earlier. Moving to Erdene's consolidated financial results for Q2, income attributable to our share from Erdene Mongol came to $11.2 million, which is 60% above Q1, driven by greater sales and reduced unit costs, partly offset by weaker gold prices. In Q2 2026, exploration and evaluation expenses at Erdene Resource Development — the work our team performs on controlled properties — came to just over $700,000, versus $900,000 during the 3 months ended March 31st, 2026. That sequential decline stemmed mainly from the timing of payments made to technical staff under the corporation's incentive compensation program, partly offset by greater activity tied to exploration at Tsagaan Suvarga. Corporate and administrative expenses, which reflect Erdene's public company costs, came to $1.6 million in Q2 2026, versus $1.6 million in Q1 2026.

Robert Jenkins

executive
#19

The main reason for the change from one quarter to the next is greater spending on marketing and investor relations, along with expenses tied to the company's annual general meeting, held in May. All told, Erdene produced $10 million in net income, or 15 cents per share, during the second quarter, versus $4.8 million, or 7 cents a share, in the first quarter. At the close of the quarter, Erdene held $28 million in corporate cash and a strong liquidity position to expand the business while awaiting returns of capital from our investment in Erdene Mongol. On June 30th, the company began a normal course issuer bid, permitting repurchases of as much as 10% of the company's free-trading stock. From that date through now, Erdene has repurchased and canceled nearly 100,000 shares, paying an average of $5.20 per share. We think the market price of our shares can, at times, fail to reflect the company's inherent value, and we will repurchase selectively, since we view this as an efficient use of capital to boost shareholder value. That wraps up the review of our financial performance for the second quarter. I'll now hand the call back to Peter.

Peter Akerley

executive
#20

Thanks, Bob. If we look at slide 17, safeguarding the wellbeing of our staff, contractors, and neighbouring communities ranks as a foremost priority and serves as the essential bedrock underpinning how successfully we operate. As Q2 2026 closed, 565 employees and contractors were present on site, and 520,000 person-hours in total were logged across that quarter. Measured on a rolling 12-month basis, the lost time injury frequency rate came in at 2 for every million person-hours. That is a decent outcome, yet we will keep pushing continually toward zero. During the quarter, no reportable environmental incidents took place. Our environmental management work stayed concentrated on reducing potentially harmful effects and pushing forward protection efforts, including the endemic vegetation trials being run at the 2-hectare plantation located at the Bayan Khundii Mine. Among the community programs we continue to run is our operator training initiative, delivered alongside Mongolian Mining Corporation and aimed at local employment. More than 180 residents of Bayankhongor Province have participated in a classroom plus hands-on curriculum at MMC's UHG mining complex across the last 2 years, and many of them have gone on to join the Bayan Khundii mining team. Erdene Mongol has likewise been busy backing community partnership efforts. During the past several weeks, the team sponsored Shinest's annual Naadam festival — Shinest being the community closest to Bayan Khundii — and Erdene Mongol has in addition recently granted scholarships to over 50 local youngsters, putting money into educating our community.

Peter Akerley

executive
#21

Slide 18 lays out what we're committed to delivering in 2026, and those deliverables show how dedicated we are to creating value behind our long-range strategy of building a district with multiple mines and multiple commodities. Bayan Khundii is quickly proving itself a dependable gold producer running at steady state. That solid operating base produces consistent cash flow and lets us carry out focused exploration programs throughout our portfolio. That effort, in turn, is clearing the path toward our longer-range aim of growing output and stretching mine life past 10 years. The first half of 2026 was highly productive, and our second half will bring several major catalysts, including: further gains in grade and production, with a target of 3.5 grams as we move through year-end into 2027; getting the Dark Horse deposit ready to speed up for mining in 2027, plus continued expansion of the nearby resources to support both CIP and potentially heap leach; exploration and a potential partner developed to expand westward at Bayan Khundii, leading to an enhanced mine plan; and delivery of the Zuun Mod PEA together with exploration results at the adjacent copper targets. As each of these goals is reached, we expect to unlock substantial incremental value for shareholders. To close, I believe we're well positioned to deliver on these objectives and create value for shareholders and stakeholders alike.

Peter Akerley

executive
#22

So with that said, I'll turn things back over to the operator so we can kick off the Q&A portion. Thanks.

Operator

operator
#23

Just a quick reminder — if you'd like to get into the question queue, you can hit *, then 1 on your phone's keypad. And if you need help at any point during this conference call, pressing *, then 0 will signal an operator. Those of you on the webcast can also submit questions by typing them into the chat feature there. Our first question is from Hanif Jamal of H. Jamal Holdings. Your line is now open.

Hanif Jamal

unknown
#24

Hey, everyone. I've got something to ask Bob. Nice work on the ramp-up — it seems to be going smoothly. Here's my question: were you saying that all-in sustaining costs came in at roughly $2,000 an ounce during this quarter?

Robert Jenkins

executive
#25

You've got that right.

Hanif Jamal

unknown
#26

All right. So on the cost of revenue side, that $33 million — do you expect it to hold steady through Q3 and Q4 of this year?

Robert Jenkins

executive
#27

As we move toward the latter part of the year, Hanif, we anticipate that figure will decrease.

Hanif Jamal

unknown
#28

To be honest,

Robert Jenkins

executive
#29

The way it works is fairly straightforward: a meaningful share of the costs in this business would be fixed, and the grade has come in somewhat under what we anticipated. As we move nearer to that 3.5 figure Peter cited as our target, we would anticipate the ASIC finishing up somewhere around $1,500 per ounce US, assuming those improvements come through.

Hanif Jamal

unknown
#30

Understood. All right, thank you. That covers everything I wanted to ask.

Robert Jenkins

executive
#31

I appreciate that.

Operator

operator
#32

Don MacLean from Paradigm Capital has the next question. Your line is open now. Oh,

Don MacLean

analyst
#33

Morning, guys. Solid advancement during Q2. Peter, I’ve got a few questions about the current operations. I have others too, but for now I’ll keep my focus on current operations. On the grade outlook, you mentioned a target of 3.5 grams by year-end. Do you see that as roughly the stable, steady-state grade the project can sustain?

Peter Akerley

executive
#34

Perhaps begin with the main resource itself, Don. Combining Dark Horse with Bayan Khundii at a 0.7 cutoff, we’re looking at an average grade of roughly 4.5 grams at that same 0.7 cutoff. Once dilution is included, that drops to approximately the 4-gram range. Targeting 3.5 grams is, I believe, attainable by year-end. Among the main factors that might affect this — and possibly improve it — is faster development of Dark Horse next year. We have a very high-grade, supergene satellite deposit that we’re now aiming to bring on sooner, and should it enter the mix by mid-year, then that 3.5 gram figure could be bettered. That target feels comfortable to me. We’ve made strong progress both in controlling dilution and in our engineers and geology teams gaining a clearer grasp of pit sequencing. Moving dirt at the right time and in the right place is, I think, a crucial piece of this too, but yes, I’m confident in those targets.

Don MacLean

analyst
#35

Turning back to the reserve model reconciliation — that exercise in a feasibility study always feels a bit academic, doesn't it? Once you're actually in a pit chasing narrow structures at substantial volumes, it gets very difficult. So how is that reconciliation going — not only on ounces and grade, but also on internal dilution versus blasted dilution?

Peter Akerley

executive
#36

Yeah. It's taken some time before we felt confident that the grade control models actually match what mining shows, but I'd say only within the past month or so have they begun to align. In the early days, given how much dilution there was, we were falling well short of delivering what had been reported from mine to mill, though over the last few months that has reversed and we're now exceeding it. We're collaborating with the modelers and engineers to further refine those grade control models, and I'd say within just the last few weeks they are beginning to line up. There's been some back and forth among the modelers, the geologists, and the grades the mill reports, but it's coming into line now. Turning to dilution, my guess is we sat in that 30% to 40% range during the first few months and are down in that 20% or less range today. In the end, our goal is to get closer to 10%, and that too is moving the right way. There's still work to do, but yeah, it's lining up. The most recent resource estimate we completed for Bayan Khundii used a vein-type model rather than an intrusive-type model, and overall it came in roughly 10% lower when you look at the lower-grade cutoff.

Peter Akerley

executive
#37

Our high-grade core is still fully preserved, sitting at a grade of 0.7 or above. I hope that addresses what you asked — if there's anything I didn't cover, just tell me.

Don MacLean

analyst
#38

On the whole, the ounces are present, and the grade, when you account for the mining dilution relative to what was initially anticipated in the original model, I suppose,

Peter Akerley

executive
#39

Yeah. Today, when we look at the grade the mine has delivered and that gets reported at the mill, those figures are beginning to align, which confirms the model we use for determining the block grades headed to the mill.

Don MacLean

analyst
#40

Thanks, thanks. Now, focusing on the mill specifically, since that recovery has been excellent. You're running 6% under rated capacity. What we frequently observe with mills is that they can actually operate above rated capacity once the mine is capable of supplying the tonnage. Typically the mine can supply more than the mill is able to process, or they flood the mill, as they phrase it. This is more selective mining. Given what you've observed, do you believe the mill is able to operate above rated capacity, or will it forever be limited by the mine's ability to supply the grade you're looking for?

Peter Akerley

executive
#41

Regarding ore delivery, I don't foresee an issue as we reach the greater efficiency level we just discussed. Our plant's maximum capacity is designed at roughly 1,950 tonnes per day, and we've generally viewed our targeted throughput as approximately 92% of that figure. That brings you, I believe, into the mid-17 range — around 1,750 tonnes per day, slightly above. As you'd have seen in today's announcement, reported throughput was, I believe, 1,686, somewhat below our target, though that figure doesn't factor in the shutdown days during startup. We had, I think, a 3- or 4-day shutdown. Calculated daily, we are surpassing that 1,780, or that 92% of maximum throughput. I genuinely believe that at steady state we can climb somewhat above where we stand today. I'd also note, taking a conservative view, that you'll invariably encounter softer rock in the upper benches, which is where we've been working, so as we progress deeper into this mine, we might encounter somewhat harder rock that would likely hold you nearer to our target. A bit more detail on throughput.

Don MacLean

analyst
#42

Absolutely. That's clear. Excellent. On to better things. There are a few more things I'd like to ask regarding what lies ahead, but I'll hand it back to the operator now in case anyone else wants to ask something.

Operator

operator
#43

That brings an end to questions from our phone lines. At this point I'll hand things to John Vincic, who will put to management the inquiries submitted by email as well as those received through the webcast. John, the floor is yours.

John Vincic

unknown
#44

Thanks, operator. Peter, before you head back to Don for his follow-ups, here's a question that came in from the webcast. The script brings up the heap leach opportunity a number of times: Dark Horse North, Altan Arrow, Altan Nar oxides, and the low-grade stockpiles. What decision gates exist for sanctioning this, and what's the rough timeline, and what did the Blue Coast results actually show?

Peter Akerley

executive
#45

To give a bit of context on Mongolia more broadly, there are six heap leach gold operations running in the country right now — one of them, I believe, is roughly a hundred and some kilometers west of our site. So it's a fairly established technology. People frequently ask us about heap leach in cold climates, yet there are several working operations in-country, and that means several operators with heap leach experience in-country as well. When we initially entered the Bayan Khundii District, or the Khundii District, we didn't anticipate the extent of oxidation we're encountering today, and we're now seeing it across each of our project areas. Dark Horse is the one we've concentrated on most, since that full 50,000 ounces at 7 grams lies within an oxidized supergene, and we started stepping out from there. We view Dark Horse and Altan Arrow — that 3-kilometer trend — as the primary source of ounces for a heap leach, and what we want to see is economic viability using that as the resource base. As I mentioned, we do have multiple sources of additional oxide from the other projects, and we also have the low-grade stockpile expanding at Bayan Khundii, which won't deliver as high a recovery as the oxides do, but we're still observing recoveries around 50% from that 0.7 and less material at Bayan Khundii — another possible source.

Peter Akerley

executive
#46

Once we've finished that drilling in Q4, I expect we'll refresh the resource estimate, and we'd be aiming at roughly 100,000 ounces as a baseline that would justify building a moderate-sized heap leach operation. At Blue Coast, the column leach test isn't finished yet, though we do anticipate recoveries considerably above 60% from the Dark Horse material — maybe into the low 70s — but we'll know more when the final results come in. There are certain synergies we could leverage from the Bayan Khundii facility, and we'd be looking to establish a pad in the vicinity of the Bayan Khundii plant. Our sense is that after making that investment decision in 2027, we'd need perhaps a year or so to get it in place, with 2028 marking the startup of a complementary heap leach production facility.

John Vincic

unknown
#47

Thanks, Peter. Here's another one that came in through the webcast. After the Zuun Mod PEA is finished and released within the coming 60 days, in what way would a company focused on gold finance a sizable molybdenum-copper development project? Could those Asian offtake talks turn into strategic partnerships, and is Zuun Mod competing with Khundii when it comes to capital?

Peter Akerley

executive
#48

That's a fair question. Since it involves the financial piece, I'll hand it over to Bob.

Robert Jenkins

executive
#49

Appreciate that, John. As a quick reminder for everyone joining the call, Erdene holds 100% of the Zuun Mod project, whereas the gold projects sit under Erdene Mongol, our joint venture alongside strategic partner Mongolian Mining Corporation. In light of how well Bayan Khundii has performed, the gold extension and expansion work we went through today will probably be funded inside the joint venture itself, whether through cash generated by operations or debt taken on at the asset level. So with all of that in mind, there isn't really any built-in contest for capital. Perhaps a bit more detail on what's happening at Zuun Mod and our thinking there: we're evaluating multiple funding paths, given that a project at this size is going to need a meaningful amount of capital. An offtake arrangement with a counterparty gives every financier greater certainty and brings down financing risk overall. With the way the moly market looks right now, we've drawn offtake interest from a number of possible counterparties around Asia — China, Korea, and Japan — at least in terms of initial indications of interest. We've also held early-stage talks with the leading development banks in the region, where our relationships are quite solid, and they too have shown some appetite, again at this early point, for moving this project ahead.

Robert Jenkins

executive
#50

Since we're roughly 60 days out from the PEA being released, we anticipate those conversations will genuinely accelerate once it's available in the market and we have solid numbers we can begin to reference.

John Vincic

unknown
#51

Thanks, Bob. We have a question from the webcast about the 5% royalty. Could you clarify that 5% royalty that was mentioned on the call? Is it an NSR that Erdene receives on 100% of JV production after 400,000 ounces has been reached, and how much is it worth?

Peter Akerley

executive
#52

The first part of your question is straightforward to address. I'll take the second one. That royalty applies to every bit of ore coming out of the joint venture licenses. It's structured as a net smelter royalty taken right off the top, with 5% owed to Erdene across 100% of production. Looking at current output or what we aim to produce, the arithmetic is fairly straightforward: multiply the ounces by 4,000 ounces and that gives you our pre-tax payment. At our target of 80,000 ounces annually, that works out to $16 million US each year, though you can run some more imaginative calculations regarding how this might look 4 years from now if we advance some of those other projects. That covers the royalty, John.

John Vincic

unknown
#53

Thanks, Peter. A question about the super pit: for Erdenes Alt to bring Khuvyn Khar and Ulaan into the mine plan, what has to happen, who pays for which parts, and when might that potentially appear in the mine plan?

Peter Akerley

executive
#54

Let me give you a bit of context and paint the picture here: the Bayan Khundii deposit runs continuously toward the west. It extends for well over a kilometer, starting from the northeast side of the pit, crossing West Striker, then across the Khuvyn Khar license — roughly 300 meters wide — and on to Ulaan, where we hold more than 100,000 ounces that would make up the back portion of this. Right now, both the Khuvyn Khar and Ulaan licenses sit at the exploration stage, and to move them forward into mining development, they need to go through that government regulatory process, which both parties have now started. We've held discussions that will take us to a point where, once the mining license is in place and resources are registered, we'll look at jointly developing a development plan, and from there, begin talks on how development would be shared — is it a product sharing arrangement? There are a number of different routes we could take, but I expect that to start maturing in 2027. There's ample room for us to keep developing as we move toward West Striker and Dark Horse over the coming years — that's a few years out from now — but that's the plan we've discussed with the Erdenes Alt folks at this point.

Peter Akerley

executive
#55

Another point worth stressing is that the western region offers considerable room for further exploration, in the deeper zones at West Striker, Khuvyn Khar, and Ulaan too — lots of upside there. It's encouraging to see progress being made with Erdenes Alt on that plan.

John Vincic

unknown
#56

Thanks, Peter. I’ll hand things back to the operator so they can repoll and check whether anyone else would like to rejoin the queue on the live call. Mhm.

Operator

operator
#57

Ladies and gentlemen, just a quick reminder — if you'd like to ask a question, press *1. Our next question is from Don MacLean at Paradigm Capital. Your line is now open.

Don MacLean

analyst
#58

Thanks, operator. Looking ahead, the Altan Nar metallurgy caught my attention, along with the remark that it might serve as potential feed for the Bayan Khundii mill, since it's a sizable resource. You mention a 100,000-ounce threshold for heap leach, yet Altan Nar is considerably bigger than that. Could you give us additional detail on what the metallurgy indicates about the prospect of actually feeding it into the Bayan Khundii mill, as doing so would lengthen the project life substantially.

Peter Akerley

executive
#59

This year our metallurgical testing produced some favorable results on a high-grade sample from Altan Nar, which we ran at Blue Coast, and we also went back and re-evaluated what the cutoff would be given the polymetallic character of the ore and what could be fed into the CIP plant. We've reached the conclusion that roughly 80% of the ore reported would be suitable for CIP processing. The other 20% carries higher arsenic, but it's reasonably well isolated, and we could mine selectively around it. In the higher-grade sample we're seeing 89% gold recovery. That sample sits up in the 5-gram range, though it probably represents about 70% of the ore — it's another high-grade deposit. On an overall basis, we believe we could see 75% recovered from the resources we've reported. I'd also point out that the exploration upside here is enormous. We've tested just a small share of the strike length to arrive at that 1/2 a million ounces, and from an exploration standpoint our 2027 objective is to direct a substantial part of our budget toward growing Altan Nar.

Don MacLean

analyst
#60

That's a pretty different perspective from how I've at least been viewing things. How other investors have viewed Altan Nar, I can't say for certain, since treating it as a concentrate involves an entirely separate process and quite a bit of extra infrastructure, while tapping into the Bayan Khundii mill preserves a substantial amount of capital. You'd think that more than makes up for the gap in recovery.

Peter Akerley

executive
#61

Better recoveries, along with our reassessment of the deposit that gives us that more amenable ore, have genuinely shifted how we're thinking, and in a trade-off study we find that this route beats trucking it into the CIP. You're right that if building Bayan Khundii cost us $120 million and we factor in inflation, and assume a plant of similar size, we'd likely be looking at somewhere in the $140 million to $150 million range by the time Altan Nar gets built — capital we don't have to put in. The haul distance is just 16 kilometers. The oxide cap might turn out to be quite valuable for us too, at roughly 12% of resources being oxide near surface, and there's lots of room to grow that. We're getting excited about this opportunity. Clearly, we could speed up that production, and we could supply some high-grade material for blending upwards in the early days. I really like the optionality that's beginning to take shape with Altan Nar, which, as I laid out in our presentation, would definitely give us the ability to go well beyond 10 years with the combined resources we have available.

Don MacLean

analyst
#62

So what comes after this, Peter? I take it you'll be running additional metallurgical testing on samples that are lower grade and more representative of the deposit?

Peter Akerley

executive
#63

We will, but the first thing I want to accomplish is to be sure we have finished that exploration program in a much more thorough way, and after that characterize the ore we hold on the basis of that bigger resource, and then put money into the metallurgical work. So in 2027 the focus is going to be Altan Nar for both of those items, and ideally, as you come out the back end of 2027 into 2028, you can put a pin in this, let's say what is a conceptual option for going to the CIP, put a pin in that and begin to really develop that plan for trucking ore into Bayan Khundii down the road.

Don MacLean

analyst
#64

Great. On Zuun Mod, I realize you don’t yet have the PEA answers available, but I have a couple of questions. From your conversations with investors, do you believe the market is assigning any value to this?

Peter Akerley

executive
#65

No, I think some people find it interesting, but honestly I don't believe our valuation amounts to much beyond what that 6-year gold production profile shows. We've never released an economic study, and ideally, as we enter that phase in September, we'll be in a position to prove out that value, while also starting to examine what corporate opportunities exist for restructuring or spinning out. We'll be taking a closer look at that, since I think it could be the route we need in order to crystallize full value for Zuun Mod.

Don MacLean

analyst
#66

It's somewhat like comparing chalk and cheese with the gold side, though projects on that scale typically are quite responsive to the price you observe or that gets used in the study. There's a substantial gap between, say, the 3-year average prices and the current spot, which would indicate this has considerable sensitivity to the metal price. Do you have any sense of how the project economics look — are they appearing encouraging in the low $20s, or is it far too early to say, low $20 a pound for moly?

Peter Akerley

executive
#67

My view is that for this project to be appealing, you really need to be around the low $20s. The 3-year trailing figure — and Bob, it may be 5 — is $22.50, somewhere in that vicinity. At present, spot is nearer $32 or $33. We're fairly at ease that somewhere between those two figures, this project turns quite robust. Considering the demand we observe over the long term, and we've carried out considerable marketing work ourselves on the ground in Asia, talking with the whole industry, we genuinely feel positive that long-term demand will keep going and that the growth rate will keep going at close to 4%, which will create a need for roughly the equivalent of what we intend to produce from Zuun Mod once it comes online each year. I believe we're at the right time and the right place — we sit on the border of the biggest consumer, which is in deficit, and they've imposed export controls on molybdenum. In our conversations with those users, the end users who bid on our concentrate today, I think from a market standpoint it's a good moment, yet I'd also like to revisit the point that, if you look back 10 years ago, this project was viewed as too remote, but as of today a metallurgical coal haul road within 30 kilometers of Zuun Mod has just been completed.

Peter Akerley

executive
#68

We've now shown that you're able to bring power in from the grid. Infrastructure has shifted quite a bit, and it couldn't sit in a better spot than right next door to a nation consuming more molybdenum than any other and unable to locate enough of it. We're excited about what Zuun Mod is about to deliver for us.

Don MacLean

analyst
#69

It will be quite interesting to watch how that turns out in H2. It might catch a lot of people off guard, me too. That's excellent. Thanks so much.

Peter Akerley

executive
#70

Appreciate it, Don.

Don MacLean

analyst
#71

Wishing you success for the third quarter.

Peter Akerley

executive
#72

Thanks for that.

Operator

operator
#73

Everyone, just a quick reminder — if you'd like to ask something, hit *1. That's *1. We don't have any more questions right now. At this point I'll hand things back to Peter Akerley for some closing remarks.

Peter Akerley

executive
#74

I appreciate all of you being here today. We’re eager to talk with you again in a few months, and as usual, until then, if anything comes up, feel free to contact Bob or me. Have a great day, and thanks.

Operator

operator
#75

That wraps up today's conference call, everyone. We appreciate your joining us, and please go ahead and disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Erdene Resource Development Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Erdene Resource Development Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Erdene Resource Development Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.