Appreciate that, Marvi. Hello, everybody, and thanks for being on this Ferroglobe Third Quarter 2024 Conference Call. I'd like to say sorry about the wait. There were technical problems with our operator's phone line, so our apologies for that. With me on the call today are Marco Levi, who serves as our Chief Executive Officer, and Beatriz Garcia-Cas, our Chief Financial Officer. Prior to beginning with a few prepared remarks, I will read a short statement. At this point, please go to Slide 2. Any forward-looking statements management makes on this conference call rest on current expectations. Factors that might lead actual results to differ materially from such forward-looking statements are described in Ferroglobe's latest SEC filings and the exhibit attached to those filings, all of which can be accessed on our website, ferroglobe.com. This discussion also contains references to EBITDA, adjusted EBITDA, adjusted gross debt, adjusted net debt, and adjusted diluted earnings per share, along with other non-IFRS measures. Reconciliations of non-IFRS measures can be located in our latest SEC filings. Marco?

Marco Levi

executive
#2

Thanks, Alex. I appreciate everyone being on the call today, and thank you for your interest in Ferroglobe. Q3 proved to be yet another strong quarter. Adjusted EBITDA came in at $60 million, compared with $58 million during the previous quarter — an increase attributable to better realized pricing, stronger spreads in manganese alloys, and reduced energy costs. When it comes to contracted volumes, prices typically trail the indexes by two or three months, varying by product. That said, demand in end markets is still muted, and pricing keeps weakening, which — as we mentioned last quarter — will weigh on our fourth quarter results. Based on what we've delivered so far and where we stand now, we are reaffirming our 2024 guidance range of $150 million to $170 million. We anticipate gains from better ferrosilicon volumes and pricing in the US, thanks to the ferrosilicon trade cases we brought earlier this year. The favorable ruling from the US Department of Commerce led to duties being placed on all ferrosilicon imports from Russia, Kazakhstan, Malaysia and Brazil. To be more specific, in June the US applied anti-dumping and countervailing duties of 283% and 748% respectively to all ferrosilicon imports from Russia; regarding Brazil, Kazakhstan and Malaysia, preliminary anti-dumping duties of up to 22%, 6% and 9%, respectively, were announced on November 1. The steps being taken are expected to greatly reduce incoming shipments of ferrosilicon priced artificially low, and to create fairer conditions—something that helps domestic manufacturers such as Ferroglobe. Thanks to the new rules, we expect conditions in the U.S. FeSi sector to get better in early 2025, after channel inventory has been worked through and fresh orders come in. Having a flexible footprint makes us resilient, so we can navigate the near-term situation well and modify output to align with present demand. One piece of that modification is reducing production in France by roughly a month ahead of schedule, which allows us to get the largest possible rebate under our French energy agreement. We've kicked off a fresh S&OP effort — that stands for sales and operation planning — as one piece of a broader push to lift the company's results. It centers on planning for demand, getting the best deals on raw materials, running production, moving goods and selling them. Running Ferroglobe this way, as one tightly connected operation, brings expenses down and frees up working capital, which lifts our financial results and cash generation. Meanwhile, our multiyear brownfield growth projects are still on track, aimed at adding silicon metal capacity here in the U.S. so we can meet the bigger demand we anticipate arriving over the next several years from solar and EV batteries. CRU projects that demand will rise to 365,000 tons by 2029, an increase of almost 140,000 tons. Beyond adding capacity, this cutting-edge furnace should rank as North America's most efficient and cost-competitive. It will draw on decades of technological know-how and expertise that Ferroglobe, the West's top silicon metal producer, has built up over the years; our permit application remains on schedule for filing within the next few months. Keep in mind that approval typically requires about 18 months, and building adds another 24 months. Going forward, we anticipate improvement in end markets in the second half of 2025, apart from the U.S. FeSi market, which should begin improving in the first half thanks to the trade case we mentioned. The World Steel Organization forecasts that worldwide steel demand will rebound by over 3% in 2025 when China is excluded. Better conditions are also anticipated in the aluminum market during the second half, since interest rates keep coming down and the auto and construction industries ought to start growing. A Bloomberg analyst projects global aluminum demand will rise 3.3% in 2025. We're happy to announce that we've secured a deal to supply silicon metal to a significant new customer based in the Middle East, supporting their renewable energy project. This highlights how solid our market position is and shows we're making real progress expanding within the solar supply chain. It's a big opportunity that will help us accelerate growth going forward. In September, we distributed our quarterly dividend for Q3 at $0.013 per share. We also repurchased a modest amount of stock under our buyback program and established a 10b5 share repurchase plan. Our third ESG report is coming out shortly and reflects our dedication and the strides we've made on several fronts. Our decarbonization strategy targets a reduction of no less than 26% in combined Scope 1 and Scope 2 carbon emissions by 2030, measured against where we stood in 2020. At our Sabón silicon facility, we've made the shift to bio-carbon — a clean option that's also cost-effective — to support those reduction targets. By 2026, the new bio-carbon production plant ought to be operational, and it's being financed with considerable backing from the Spanish government. In addition, we've made solid headway on traceability for silicon metal, spanning the entire value chain from raw materials all the way to finished goods. Let's move to the next slide. Revenue for the third quarter landed somewhat under what we saw in the second quarter, driven by lower volumes in each of the three segments. Despite weaker demand, our performance was solid, with adjusted EBITDA climbing to $60 million. In the third quarter, operating cash flow came in at $11 million—an improvement of $9 million over the previous quarter. Free cash flow stood at negative $10 million, which is $10 million better than the second quarter. Later on, Beatriz Cos, our CFO, will walk you through these numbers in more depth. Let's move to the next slide. Now for silicon metal: Q3 revenue declined 5%, landing at $196 million compared with $204 million in Q2. Adjusted EBITDA increased 17%, supported by realized pricing that was 5% higher than the prior quarter. During the third quarter, our average price for silicon metal increased 3% in Europe and 7% in the Americas versus the second quarter. Index prices in the U.S. fell about 15% in Q3, whereas Europe saw no change. Because contracted volumes realize prices with a three-month delay, a gap opened between the index and what we actually realized. Total shipped volumes were down 9%, and shipments declined in each region. Europe came in 6% lower and the U.S. 9% lower. On silicon metal, results are uneven. Chemical and electronics demand is stable, but aluminum is weak in both Europe and the U.S. for the near term. We believe that broad-based stimulus in the U.S. Along with rate reductions, those factors in China should begin driving stronger demand in the latter portion of 2025. Let's move to the next slide. Now shifting to our silicon-based alloys business. This segment posted adjusted EBITDA of $2 million during Q3, down from $10 million in Q2. The primary driver of that decline was weaker absorption of fixed costs. In both Europe and North America, average realized prices were flat quarter over quarter. Currently, the European FeSi, Ferrosilicon Standard Index has reached its lowest point in four years, reflecting soft demand and a surge in imports, mostly from Central Asia; these products have gained market share through predatory pricing. To keep a level playing field, we keep pushing on possible trade measures within the EU. Shipment volumes in both the U.S. and Europe fell 1% during the third quarter, as industrial activity stays muted. According to the most recent World Steel Association report, EU steel production was up 0.2%, while the U.S. recorded 1.2% growth in September. Near-term, we see the European market holding stable, whereas the U.S. market should gain from the FeSi trade case and a stronger economic outlook in 2025. Inside the silicon alloy segment, the foundry keeps delivering the strongest performance. Next slide please. Next, turning to manganese alloys. In Q3, revenue declined by 9%, landing at $90 million, with the main pressure coming from a 24% reduction in European shipment volumes due to weak demand. That was partially counterbalanced by a significant 16% price gain during the third quarter, which resulted in adjusted EBITDA of $28 million — a 100% increase versus the prior quarter. After the South32 GEMCO mine ceased operations in late March, manganese ore prices spiked dramatically, and since then they've dropped around 60%. Our third-quarter results continued to gain from this situation, since we sold lower cost inventory at elevated realized manganese alloy prices. Demand fundamentals are still soft and are expected to remain that way throughout Q4 and into the first half of 2025. Even so, we still expect the spread to stay positive; at this point, I'd like to hand the call to Beatriz Garcia-Cos, our Chief Financial Officer, so she can walk through the financial results in more detail. Beatriz?

Beatriz Garcia-Cos

executive
#3

Appreciate that, Marco. Ahead of discussing what we delivered in Q3, I'd like to brief you on where things stand with our repurchase efforts. During the period, approximately 117,000 shares were acquired by us, paying an average of $4.22 apiece. Given the murkiness currently present in the markets we serve, we've chosen to proceed carefully with these buybacks. As soon as indications of recovery and clearer sight lines emerge, our plan is to shift toward a more aggressive approach. Above all else, we're focused on maintaining a robust balance sheet, which puts Ferroglobe in a solid position to ride out the current downturn and also lets us put money into expansion areas such as solar and electric vehicles once those chances arise; in addition to the buyback program we control at our discretion, we set up a 10b5 plan that allows buying while a window is closed, provided specific conditions are satisfied. Just to remind everyone, running our daily operations takes between $120 million and $150 million in cash. Looking at 2025, the €35 million SEPI loan we have in Spain reaches maturity through two installments, with the initial half payable in Q1 and the rest in Q2. Now, please direct your attention to Slide 10, where we'll walk through the income statement. In Q3, our revenue fell 4%, landing at $434 million. We experienced reduced shipment levels in each of the three business segments during the quarter, though improved pricing for silicon metal and manganese alloys helped counterbalance softer demand. Consumption of raw materials and energy used in production held steady, and in Q2 it represented 59% of sales, largely because of greater energy compensation received in France. Expenses related to staff rose by $5 million during the third quarter, reaching $72 million, mainly as a result of profit-sharing programs in Europe. Adjusted EBITDA came in at $60 million for Q3, compared with $58 million the previous quarter. In the quarter, roughly $20 million was generated through our 2024 French energy agreement, lifting our EBITDA by that identical figure. Because we shut down our French operations earlier than planned, we now anticipate the energy agreement will deliver roughly $60 million of benefit this year, versus the roughly $40 million we had previously projected. Moving to the next slide. Adjusted EBITDA for the third quarter came in at $60 million, a 5% gain over Q2, mainly on the strength of better realized prices. Compared with the previous quarter, silicon metal prices rose 5% and manganese alloys climbed 16%, while silicon alloys held steady. The improvement in third quarter sales prices reflects higher index prices during the second quarter, since indexes and realized prices are separated by a two- to three-month lag. Our adjusted EBITDA took an $8 million hit from volume, which came from weak demand in all three of our segments — silicon metal volumes dropped 10%, silicon-based alloys fell 3%, and manganese alloys declined 21%. Head office and non-core business cost us another $5 million in adjusted EBITDA because our mining operations moved less volume. Let's turn to Slide 12. Free cash flow for Q3 landed at negative $10 million, dragged down by $21 million of cash consumed by working capital; an $11 million partial collection from the French Energy rebate helped offset some of that; we expect to bring in another $20 million during Q4, and the remaining $30 million should arrive in early 2025. CapEx outflows during the third quarter totaled $21 million, compared with $22 million the quarter before. On September 27, we paid $2.4 million, which works out to a $0.013 per share dividend, and our Q4 dividend of $0.013 per share is set to be paid on December 27. Let's move to the next slide. We closed the third quarter holding $121 million in cash, lower than the $145 million we had at the close of the second quarter. Our positive net cash position went from $64 million down to $32 million in Q3, while adjusted gross debt stayed modest, finishing at $89 million as of September 30. Next slide, please; and now I'll hand the call back to Marco.

Marco Levi

executive
#4

Alright, thanks Beatriz. Turning to the main points on Slide 15, we delivered yet another solid quarter, posting adjusted EBITDA of $60 million, driven by higher realized prices for manganese alloy and silicon metal compared with the second quarter. On the US ferrosilicon anti-dumping matter, the ruling is now final where Russia is concerned and preliminary for Brazil, Kazakhstan and Malaysia; we believe this successful trade case will give Ferroglobe a significant boost in the US during 2025 and afterward. Our production is being managed so that it aligns with present demand, and we are taking a proactive approach to cost control. Given lower interest rates along with encouraging projections for steel and aluminum, we foresee improved market conditions in the latter half of 2025; meanwhile, we keep carrying out our capital return policy through continuing dividends and buybacks. Operator, thank you. We're ready to take questions.

Lucas Pipes

analyst
#5

Many thanks, operator. Hello, everybody. Marco, to start with, I'd like to ask about the US expansion you brought up during the prepared remarks. Might you give a little more detail regarding the cost and the capacity? I believe you talked about a timeline when it comes to permitting, but it would be great if you could restate a few of those points. Thanks so much.

Marco Levi

executive
#6

Sure, Lucas, I appreciate the question. We can confirm the expansion is going to happen brownfield, since we strongly believe that expanding brownfield will be certainly extremely, extremely competitive. What we estimate is that the needed CapEx comes in 30% to 50% below a greenfield. We're enthusiastic about this, because the technology we have at our disposal lets us believe that the money we put in is going to be exceptionally cost competitive, given the size of the furnace, or furnaces, that we will install at our site. We haven't yet made a decision on the site; however, we are — as we apply, we are seeking permits at a minimum at 2 of our US sites, and we're currently in the middle of the effort to apply for that permit. On average, all of this effort takes roughly 18 months. After that, building the brownfield capacity according to our requirements takes us roughly 2 years. We haven't yet settled on either the site or how much capacity we are going to add. Still, what we expect is that the new capacity will start up no later than the start of 2028.

Lucas Pipes

analyst
#7

That's quite useful. And Marco, if we circle back to the capacity number here — is there any rough estimate you could give as sort of an initial figure? It would help us understand things a bit better.

Marco Levi

executive
#8

Sure. What we're thinking is at least 60,000 tons, though it might end up larger based on which technology we go with.

Lucas Pipes

analyst
#9

Also, when it comes to what capital costs per ton of capacity would look like, is there some kind of rule of thumb for this particular development?

Marco Levi

executive
#10

For a market indication, I can give you $200 million.

Lucas Pipes

analyst
#11

All right, thanks for that. Shifting somewhat toward what we see coming soon. If I caught it correctly, there's some anticipated change in working capital during Q4. Could you perhaps pull it all together for Q4 — market conditions, pricing, working capital — and tell us where you'd anticipate finishing the year on free cash flow? Thanks so much.

Marco Levi

executive
#12

Yes. Beatriz is going to take that one.

Beatriz Garcia-Cos

analyst
#13

Hi, Lucas. Thanks for asking. Regarding Q2, we've already shared news of a working capital release. That release in Q4 is now confirmed. As for how big it will be — I'm referring to total working capital — it's roughly 15 million — that's 1 to 5; that's our current expectation.

Lucas Pipes

analyst
#14

Alright; and how does the operational market outlook for Q4 play into expectations?

Beatriz Garcia-Cos

analyst
#15

Yes; so, as you're aware, during Q4 we're idling our plants in France, correct? So throughout Q2 and Q3 we've been building working capital — sorry, in Q3; and in Q4 2024 we'll be releasing it, since we need to sell out of our inventories, right? And naturally this brings — what we gain from it is the gain on energy, where originally we anticipated getting 40 million. You recall that's what we stated at the start of the year; now we're observing that because of this early idling of our plants in France, we'll be climbing to 60 million for the year.

Lucas Pipes

analyst
#16

Okay. Marco, Beatriz, thank you so much for all the color. To you and the team, continued best of luck.

Marco Levi

executive
#17

Thank you.

Martin Englert

analyst
#18

Well, good day, everyone.

Marco Levi

executive
#19

Hello, Martin.

Martin Englert

analyst
#20

In the silicon-based alloy business, volumes shifted a little, so they came in basically level compared with both the prior quarter and the same period a year earlier, yet fixed cost absorption got called out as a problem. Margins ended up quite squeezed. Could you give us more color there? Is there some interplay involving varying volumes and fixed cost patterns across the regions where you operate that caused this? Or did something different lie behind it?

Marco Levi

executive
#21

Let me begin tackling that, and then Beatriz, please jump in with anything you want to add. In Europe, the ferrosilicon market — most of it feeding steel, setting aside foundry for the moment — as I said, is characterized by extremely weak demand at a low level. And in Europe, additional price deterioration comes from rising — steadily rising — imports, not just from Kazakhstan, which I always bring up, but also from places such as Egypt or Iran. So you have huge inflows of standard ferrosilicon into Europe that, together with soft demand, push prices down; and in fact, during my remarks I noted that this quarter's price level has already hit the weakest point observed over the past 4 years. So margin compression, without question. The US shows a different picture. I'd describe the steel market there as fairly flat. But inventories remain, as we discussed during the previous quarter, of significant materials, Russia among them, and those hold back any price recovery and keep our sales from growing. Given both of these situations, in the US and Europe, we cut our output. As a result, our absorption cost has risen. Beatriz, I'm not sure whether there's anything further you'd like to add.

Beatriz Garcia-Cos

analyst
#22

No — what I'm getting at is that the sole thing worth adding, Martin, is what I told Lucas earlier: the advantage we get at year-end has been helping the silicon and manganese operations, correct? Yet it hasn't done much for the silicon-based alloys operation, since all we've got there is a modest facility in France Plc turning out ferrosilicon products, plus some output in Laudun. So that favorable energy effect hasn't hit our costs the way it has in those other two operations. Which means the consequence lands on fixed costs — insufficient absorption of fixed costs.

Marco Levi

executive
#23

Plus the squeeze on margin, as you put it.

Beatriz Garcia-Cos

analyst
#24

And that margin squeeze as well, right?

Martin Englert

analyst
#25

Could you give us a bit more detail — volumes came in mostly flat. It looks like — tell me if I've got this wrong, but demand-wise, activity in both the EU and U.S. is pretty much flat, yet you mentioned output is down. On ferrosilicon, can you say what the quarter-on-quarter production change looked like within the US or North American footprint compared with the Europe footprint?

Marco Levi

executive
#26

To get you those specifics, Martin, we'd have to pull our figures and come back with the correct production rate. Right now I don't have them on hand.

Martin Englert

analyst
#27

All right, that works. We can return to that later. I appreciate the extra detail. Turning to the US ferrosilicon import tariffs we've been seeing, do you think those tariff levels are enough to adequately shield the US market? And are they roughly in line with what you figured they'd end up being? Beyond that, could you also lay out what you expect in terms of how this affects the market on price and volume if we look ahead to the first half of 2025?

Marco Levi

executive
#28

Well, we have to break this into separate pieces, because when it comes to imports from Russia, the matter is already settled and the total fees go well past what we had anticipated, correct? So a 1000% fee was completely unforeseen, yet that's the reality. And if you examine the volumes in 2023 that Russia sold to the US, imports were roughly 70,000 tons, which is around 30%, 35% of what the steel industry in the US consumes; so that's a fact, it's there, and somebody else will need to supply those volumes — local producers and other producers. On Kazakhstan, Malaysia and Brazil, some conclusions have been predetermined, but they aren't final. So I'm not like that well-known blogger in the US who claims to know what the authorities will decide. I'm waiting for the authorities to inform us what the final rulings are regarding the injuries of Kazakhstan, Malaysia and Brazil. What I can say is that in 2023, these three countries accounted for an additional 70,000 tons of ferrosilicon shipped to the US. And measures will certainly be taken toward these three countries; we need to grasp the size and still grasp the impact. One more thing I can confirm is that we've acquired two new contracts on ferrosilicon standard in the US for 2025, and those contracts are significant. But I'd assume the purchasers are likewise waiting for confirmation of the duties on these three countries before making their decisions on 2025.

Martin Englert

analyst
#29

Regarding those 2 new agreements, if we consider them together, can you give some idea of how much volume you'd expect to pick up each year from them?

Marco Levi

executive
#30

As I mentioned, I'd rather not talk about particular agreements. As I mentioned, the volumes involved are substantial. We're discussing thousands of tons here. However, since the authorities haven't made their final ruling yet — that's expected in November — the customers are holding off until negotiations for 2025 are wrapped up. As a result, I still don't have a concrete figure for how much our ferrosilicon sales will grow in 2025.

Martin Englert

analyst
#31

All right, that makes sense. Based on what you said a moment ago—that you'd rather not go into specifics on the contracts, which I get—is there anything more you can share about that new silicon contract in the Middle East? Did I get that right?

Marco Levi

executive
#32

Correct. It concerns silicon metal and the launch of a silicon—a silicon production, large silicon—polysilicon production facility in the Middle East; we've been asked to join in and we've secured a portion of the business. And that ties back to the fact that our silicon metal volumes can be fully traced, which opened the door for us to pick up some extra new business in the Middle East entirely tied to solar.

Martin Englert

analyst
#33

Regarding that Middle Eastern project, could you remind me what the polysilicon capacity is at the plant?

Marco Levi

executive
#34

As far as I know, it's 100,000 tons, and that will ramp up during 2025.

Martin Englert

analyst
#35

All right. That's great. I really value the thorough information. Thanks a lot, and best of luck.

Marco Levi

executive
#36

Thanks.

Marco Levi

executive
#37

Thanks, Marvi, and I appreciate you getting my last name right. That means a lot. Along with the advantage we get from FeSi import duties entering the US, we anticipate that stronger conditions across the market will take shape during the back half of 2025, once interest rate reductions and the destocking process fully kick in and start driving demand in the following year. Thanks once more for joining us. We can't wait to hear from you on our upcoming call. Have a wonderful day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferroglobe PLC transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferroglobe PLC earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferroglobe PLC or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.