Fortuna Mining Corp. (FVI) Earnings Call Transcript & Summary
November 5, 2026
Earnings Call Speaker Segments
Carlos Baca
executiveThanks, Matthew. Good morning, everyone, and welcome to Fortuna Mining's conference call covering financial and operational results for the third quarter of 2026. On behalf of Fortuna, joining us today are Jorge Alberto Ganoza, Chief Executive Officer, Director and Co-Founder; Kevin O'Reilly, Chief Financial Officer; Cesar Velasco, Chief Operating Officer, Latin America; and David Whittle, Chief Operating Officer, West Africa. You can find today's webcast presentation along with the Q3 2026 results materials on our website, fortunamining.com. Before we get started, please be aware that statements made on today's call are subject to the reader advisories contained in yesterday's news release, the webcast presentation, our management discussion and analysis, and the risk factors set out in our annual information form. Unless otherwise stated, all financial figures we discuss today are in U.S. dollars. Eric Chapman, Fortuna's Senior Vice President of Technical Services and a qualified person as defined under National Instrument 43 to 101, has reviewed and approved the technical information discussed on this call. Today's remarks will give a concise overview of our third quarter results and the priorities guiding the business through the balance of the year. With that, I'll hand the call over to Jorge Ganoza.
Jorge Durant
executiveThanks, Carlos, and good morning, everyone — appreciate you joining us. During Q3, we made significant progress on the growth initiatives underpinning Fortuna's coming phase of expansion, led by the Seguela plant expansion and Diamba Sud construction. We're on track to achieve an increase of about 60% in yearly gold output, reaching roughly 0.5 million ounces per year starting in mid-2028. That growth comes from projects we control, from ounces already in our mineral inventory, and is supported by development plans that are technically simple, experienced teams, and the financial means to deliver. Looking at operations, the quarter was marked by a production shortfall at our Seguela mine in July and August. Those operational challenges were confined to the quarter, and the corrective steps and actions taken by management have already led to better execution. Keeping our operating performance consistent while delivering this growth for shareholders is our priority. First, a note on safety. At our Seguela mine in July, we recorded 1 lost time injury involving a light vehicle accident. As at September 30, our year-to-date total recordable injury frequency rate stood at 1.23, which is below our corporate target of 1.37. I want to commend our teams at Caylloma and Lindero for achieving 1,950 days and 1,080 days, respectively, without lost time injuries. That's essentially nearly five and three years without a lost-time injury. What they've achieved shows the ongoing dedication to safety that we observe throughout every one of our operations. Our obligation stays the same, making sure each person returns home safely; during the third quarter we generated 69,665 gold equivalent ounces and continue to be on track toward our yearly production guidance between 281,000 and 305,000 ounces. Turning to finances, adjusted EBITDA came to $165 million and adjusted attributable net income was $51 million, equal to $0.17 per share. Each of those figures was below the prior quarter, which mirrors reduced sales and lower volumes, realized nickel prices, increased costs and greater share-based compensation. That item was a noncash charge caused by the 24% increase in our share price over the quarter. Even with those pressures, the Seguela production shortfall, we produced $90.8 million of free cash flow from ongoing operations. Over the first 9 months, Fortuna brought in $954 million in sales, $585 million in adjusted EBITDA, and $350 million in free cash flow from ongoing operations. Adjusted attributable net income came to roughly $238 million, or $0.79 per share. That cash generation provides the financial base for the growth program I'll turn to now. Our focus is on delivering our next phase of growth. So at Seguela and Diamba Sud, we're advancing that strong growth strategy with concrete execution milestones. For the approved Seguela expansion, engineering and procurement work is moving forward, and at Diamba Sud we're working through the outstanding approvals and getting ready to build. In July, we took the final investment decision at Seguela on a $109 million plant expansion that will lift processing capacity by 30%. The plan calls for completion and commissioning in Q3 2028, with the aim of turning out over 200,000 ounces of gold per year at that mine. At Diamba Sud, the government released the key notice of admissibility on November 2. That notice verifies it has examined our application for an exploitation permit and that every document met the legal prerequisites for the approval process — both legal and technical prerequisites for that process. We expect to obtain the exploitation permit in Q4. Talks regarding the mining convention are also well advanced, and that convention embraces the 2016 Mining Code along with provisions that will stay stable for ten years. We are continuing preparations to secure the project timeline targeting first gold in mid-2028. To underpin that schedule, the Board of Directors has given management authorization to move forward on contract awards worth $250 million, with execution distributed over the construction timeline. We are also coordinating with the office of the President of Senegal and the Office of the Minister of Mines to organize an on-site ceremony in late November that will mark the formal start of construction. The sizable and prospective Bambadji concession brings additional exploration upside to our Senegal platform. That acquisition was completed during the quarter for $206 million. This is a property we acquired from Barrick. And we have already mobilized 6 drill rigs, which are running infill programs across the Kabewest, Wari and Latifa prospects. Getting that initial resource estimate out for Kabewest before the year closes is what we're focused on in the near term. That prospect lies just 2 kilometers away from where the Diamba Sud plant is slated to be built. We entered this investment phase for our growth projects from a position of balance sheet strength. As of the end of September, our cash stood at $443 million, total liquidity was close to $600 million, and net cash came in at $260 million — a drop of about $160 million versus the previous quarter. The Bambadji acquisition is the main reason cash and net cash came down. Over the coming 2 years, we anticipate putting about $750 million toward growth and mineral exploration. The cash we have on hand and the free cash flow the business generates put us in a strong position to pay for these programs — no need to issue new shares or stretch our balance sheet with too much debt. This growth is meant to deliver real value to our shareholders, and it rests on a clear funding plan. We didn't buy back any shares in the third quarter. So far this year, we've returned $106 million to shareholders by repurchasing 10.8 million shares. Once we kick off the growth capital projects and get them moving, we'll put share buybacks on hold. Growth comes first in how we allocate capital, then returning value to shareholders through buybacks when opportunities arise, all while keeping the balance sheet strong. We'll weigh chances to restart repurchases based on what the projects need for funding and the liquidity we have available. Heading into Q4, momentum is building noticeably across our growth initiatives and exploration efforts. We look forward to announcing additional milestones as those projects advance, and we'll do that while maintaining the operational and financial discipline that underpins our production and business. On that note, I'll turn things over to Kevin, our CFO, to take us through the quarter's highlights.
Kevin O'Reilly
executiveThanks, Jorge. I'll begin with the income statement. For the quarter, adjusted attributable net income came in at $51.2 million, or $0.17 per share, which matched the $51 million recorded in the third quarter of 2025 and represented a 47% decline from the $75.5 million posted in the second quarter of 2026. On a quarter-over-quarter basis, the main item I'd like to flag regarding net income is how noncash costs affected it — namely depreciation and depletion, along with share-based compensation. Depreciation and depletion rose to $866 per ounce, up from $609 per ounce in the prior quarter. That resulted in $15 million of additional cost. The higher depletion largely stemmed from planned mining sequencing at Seguela and Lindero, where we saw greater amortization of stripping costs that had previously been capitalized; we expect this trend to carry into the fourth quarter as Seguela keeps sourcing ore from the Ancien and Koula pits. The other significant noncash charge was share-based compensation expense, which totaled $10.9 million in the third quarter versus a recovery of $0.3 million in the second quarter, driven by a 24% increase in the share price and the related mark-to-market adjustments. Those noncash costs in the quarter go a long way toward explaining adjusted earnings per share of $0.17, set against relatively robust operating cash flow per share of $0.43. Now turning to the remaining lines of the income statement. Sales declined quarter-over-quarter because of lower production and a lower realized gold price — $4,281 per ounce versus $4,447 per ounce in the second quarter. Cash costs also came in higher quarter-over-quarter, driven by greater processing costs at Lindero stemming from increased cyanide consumption to improve leach kinetics, along with rental costs and more waste movement at Seguela, though lower royalties partly offset these. A foreign exchange loss of $2.5 million in the quarter was mainly attributable to purchases of U.S. dollars for repatriating funds out of Argentina, and the 47% effective tax rate was broadly consistent with prior quarters, with the drivers behind our effective tax rate being the same ones covered in our second quarter update — specifically deferred tax accruals in Argentina and withholding taxes. Cash costs climbed to $1,244 per gold equivalent ounce from $1,034 in the second quarter. Consolidated AISC came to $2,286 per GEO, an increase of $129 from $2,157 in the previous quarter. The quarter-over-quarter rise mainly reflected lower production at Seguela, which would typically deliver lower-cost ounces, plus higher share-based compensation of $10.9 million versus the recovery noted for the second quarter. Share-based compensation by itself added $160 per GEO to the AISC increase. Comparing AISC for the quarter against our guidance, I want to stress the ongoing effect of external factors. Measured against the assumptions behind our annual guidance, external factors added $220 per GEO to third quarter AISC. That chiefly reflected $116 from share-based compensation, $42 from higher consumable prices — mainly diesel — and $45 from macroeconomic factors affecting peso-denominated costs at Lindero. That temporary halt at Seguela likewise added roughly $45 per GEO to AISC. Turning to consumables: like others in the sector, we have experienced inflationary pressure on the price of consumables and materials. Even so, the effect on our cost structure has varied from site to site. Those pressures have bitten hardest at Lindero. Diesel accounts for roughly 10% of the cost of mobile equipment and power generation. Against the assumptions built into our guidance, diesel costs there have climbed by about 60%, and explosives have been a second factor, up roughly 30% versus guidance. At Seguela, inflation has been milder, since government controls on diesel pricing have capped the rise in fuel costs, though we have felt some pressure on mining costs, where our rise-and-fall arrangements with mine contractors went up over the course of the year. For the quarter, of the roughly $42 an ounce in inflationary pressure, Lindero represented about 85% and Seguela the remaining 15%. We anticipate AISC will trend lower in the fourth quarter as Seguela puts its third quarter problems behind it and Lindero holds its performance steady. That said, reflecting the external factors already covered, we still foresee AISC running about 5% above the upper end of our guidance. Zooming out to the full year, continued diesel price pressure, elevated royalty costs and macroeconomic effects in Argentina are expected to leave us 8% to 10% above the top end of guidance. Excluding those external factors, AISC would land at or slightly above the top end of our guidance, which is $1,975 an ounce. On to cash flow. Notwithstanding the difficulties of the quarter, the business kept showing its capacity to produce cash, with $90.8 million of free cash flow from operations and $126.7 million, or $0.43 per share, in net cash from operating activities before working capital changes. Free cash flow from operations rose from $85.7 million in the second quarter, chiefly because of the timing of tax payments at Seguela and lower sustaining capital expenditures. For the fourth quarter, we do expect sustaining capital expenditures to climb back to roughly $30 million to $34 million, and we also anticipate higher growth CapEx as work progresses at Diamba Sud and the Seguela expansion. Wrapping up with the balance sheet, and echoing what Jorge said earlier, we have ample capacity to fund our $750 million growth program over the coming 2 years, given a strong liquidity position of just under $600 million, supported by a robust business that has produced $350 million in free cash flow year-to-date; that gives us a platform to fund our growth organically and to support a target of a 60% increase in annual production by mid-2028. Over to you, Jorge.
Jorge Durant
executiveAppreciate that, sir. David, would you mind bringing us up to speed on how things stand with the West African business?
David Whittle
executiveThanks, Jorge. Before we get into operating results, I want to restate that keeping our employees and contractors safe and well is still our top responsibility. Our attention is on controlling critical risks, strengthening safe work practices, and making sure effective controls are applied consistently throughout all our operations and projects. At Seguela, third quarter operations were impacted by a temporary site-wide stoppage that resulted from a blockade by artisanal miners in early July, and also by reduced equipment availability from one of our mining contractors. Those structures cut mining volumes and restricted access to higher-grade areas within the pits; we put several initiatives in place to address these issues, and by September mining volumes had returned to planned levels. The bulk of mining activity occurred across the Antenna, Ancien, Koula, and Sunbird pits, from which we extracted 6.5 million tonnes of waste alongside 340,000 tonnes of ore, giving us a strip ratio of 19.1:1. We also moved an extra 623,000 tonnes of waste at Sunbird South so we could gain access to the underground portal area. During the quarter, Seguela turned out 33,744 ounces of gold, putting 402,000 tonnes through the mill at an average grade of 2.67. The lower metallurgical recoveries that resulted from the Koula ore feed have now been resolved, and by October recoveries had returned to their earlier levels. For the quarter, Seguela posted a cash cost of $947 per ounce of gold and an all-in sustaining cost of $1,917 per ounce. So far this year, cash costs and all-in sustaining costs are $754 and $1,807 per ounce of gold, respectively. Now that mining volumes, access to higher-grade ore and recoveries have been restored, we anticipate a strong finish to the year and a return in the fourth quarter to the production levels we saw in the first half. Seguela is still on track to hit the low end of its 2026 production guidance. We also made substantial progress during the quarter on all 3 of our major growth projects in the region. At Seguela, we obtained the environmental permit for the underground project and filed all the documentation requested in support of the mining permit application. That application has now been referred for ministerial approval, and permitting is still on track to wrap up this year. For the project, we've brought the team on board and placed the orders for the mining equipment, and development is still on track to start in Q2 2027. We gave the green light to the major expansion of the Seguela processing plant, and it's moving forward on schedule. Lycopodium — the firm that designed and built the current plant — is carrying out detailed engineering, and 75% of the owner's project team has now been onboarded. We've picked vendors for the key equipment and infrastructure packages, and work on the supporting infrastructure is under way. At Diamba Sud in Senegal, early works have been continuing. The owner's construction team is fully onboarded, and its core comes largely from the group that delivered Seguela on time and within budget. The access road at the site has been finished, and work on the 329-person accommodation camp is moving forward, with completion expected in the first quarter of 2027. SENET was chosen as the project's EPCM contractor and has been given a limited notice to proceed with early works. Orders have now been placed for long lead mechanical equipment, among it the SAG mill and primary crusher, which protects the overall project schedule. Manufacturing of the HFO power station generators continues, while the other 5 generators have passed factory acceptance testing and have been shipped. The EPCM contracts for the process plant and power station, along with the bulk works contract that has been awarded, totaled $250 million — about 60% of overall project CapEx — and can be executed as soon as the final investment decision is reached. This means we are positioned to transition rapidly from early works into full construction, provided we obtain the exploitation permit and secure final Board approval. Regarding exploration, Jorge has already addressed the Bambadji acquisition. Work also continued at Diamba Sud, where drilling at Southern Arc keeps delivering positive results beyond the existing pit designs. Those findings will be incorporated into our year-end mineral resource and mineral reserve. At Seguela, after a very effective drilling program at Sunbird Underground and Kingfisher, the rigs have been shifted to the underground opportunity at Ancien, to the early extensions at Antenna, and to further generative targets. With a strong mineral reserve and mineral resource base behind them, Diamba Sud and Seguela make up the production foundation of our West Africa platform. Together, these assets underpin Fortuna's goal of roughly 60% growth in yearly output, hitting an annualized rate of 500,000 ounces of gold equivalent starting mid-2028. With that, I'll return things to Jorge. Thank you.
Jorge Durant
executiveThanks. Thanks, David. Cesar, would you mind walking us through how LatAm performed?
Cesar Velasco
executiveAbsolutely, and thanks, Jorge — good afternoon, everyone. In Latin America, as Jorge mentioned earlier, both Lindero and Caylloma kept up strong safety results through the third quarter. Now to the operational numbers. At Lindero in Argentina, we produced 26,000 ounces of gold, which is 25% higher than the second quarter. That fits with what we expected — output being weighted toward the back half of the year. Over the first 9 months, production came to 68,400 ounces. The operation is still on track to hit annual guidance of 92,000 to 102,000 ounces. This quarter's results showed the operating gains we anticipated after the primary crusher reliability work finished earlier in the year. Lindero put roughly 1.9 million tonnes of ore onto the leach pad — about 19% more than the second quarter — at an average gold grade of 0.63 grams per tonne. That works out to about 37,800 contained gold ounces placed on the pad, an 18% rise quarter-over-quarter. The gain came from better mechanical availability across the processing circuit plus stronger crushing and stacking rates. Through the first 9 months, Lindero placed about 99% of the gold ounces planned for that period on the leach pad; that result, along with the usual timing of leach pad recovery, backs our expectation of stronger output for the rest of the year. Cash cost came in at $1,449 per ounce of gold, a bit below the second quarter, while AISC fell 18.5% quarter-over-quarter. The drop in AISC mainly came from higher production, lower sustaining capital expenditures, and no repeat of the concentrated crusher-related spending booked in the second quarter. External cost pressures and macroeconomic factors — and this, as Kevin noted, includes appreciation of the Argentine peso plus higher diesel and explosives costs — keep partly offsetting the benefits of better plant reliability, higher stacking rates, and increased gold production. Exploration and resource development at Lindero also turned up encouraging results. The 2026 infill drilling program grew from an initial 6,000 meters to 8,500 meters across 31 diamond drill holes after several early holes hit higher-than-expected mineralization. Results included 0.96 grams per tonne of gold over 350 meters in hole LDH-272 and confirm that mineralization extends below the current reserve pit design. We're targeting an updated block model and pit design for completion by year-end, which will support a revised life of mine plan and updated mineral resource and mineral reserve estimates planned for the first quarter of 2027. Turning to Caylloma in Peru. Throughput held steady, while higher silver grades and recovery drove strong production. Silver output climbed 7% quarter-over-quarter to 247,400 ounces. Lead production reached 8.4 million pounds and zinc production totaled 11.4 million pounds. Gold equivalent production rose to 9,900 ounces, bringing year-to-date output to 28,900 gold equivalent ounces. As you can see, Caylloma is well positioned to exceed its annual guidance of 29,000 to 33,000 gold equivalent ounces. Costs stayed contained. Cash cost fell to $26.12 per silver equivalent ounce — that's a 6% drop quarter over quarter — and AISC came down to $43.19 from $44.90, even with treatment charges and capital spending running higher. As of October 31, the tailings #3 expansion stood at 71% complete and is still on track to wrap up by year-end. Over to you, Jorge.
Jorge Durant
executiveThank you, and we can move on to Q&A.
Eric Winmill
analystI'd like to ask about Bambadji. It's obviously great to see the resource coming out at the Kabewest end of this year. Do you have any thoughts on some of the other targets and the timing we might expect for drilling there? And then, I suppose, a secondary question: what about the exploration ongoing here at Diamba Sud as well?
Jorge Durant
executiveEric, yes, we — as noted during the call, we've been quite prompt in mobilizing drill rigs; we're basically finished with the drilling at Kabewest, and our rigs — we have 5 core drill rigs and 1 RC working on the property. So the rigs have moved from Kabewest to Wari and Latifa, which are the next targets on our priority list; those are targets that received prior drilling from Barrick over the years. And in some cases we're basically infilling and pursuing the open ends of mineralization outlined by that earlier Barrick drilling, right? So lots of work ahead. But our focus is to be able to show ounces soon; this was a significant acquisition; and as you know, no mineral inventory was reported. It's through our assessment of the drilling done that there's a lot of low-hanging fruit to produce ounces quickly, and that's what's mobilizing us, right? So Kabewest first, Wari and Latifa second, and the team keeps moving and generating drill targets. At least 8 priority areas have been identified for first pass. So Kabewest, Wari, and Latifa are the first 3, and then we'll move on and continue prioritizing. So lots of work, and that's for the Bambadji drill program; we approved an initial $8 million for this fourth quarter. And we'll certainly be looking forward to a very substantial exploration budget for 2027 here. With respect to — I understand Seguela drilling, I think David mentioned we're done drilling Sunbird. Sunbird has been very — drilling at Sunbird has been very rewarding for the company. We've built Sunbird over the last 2 years into our largest resource reserve at Seguela, over 1 million ounces of gold between the open pit and underground. Mineralization remains wide open at depth, but it's deep. So we're making a pause now. Mineralization remains open at depth in excess of 900 meters per kilometer from surface with very good grades, very high grades, but continuing to drill from surface is inefficient; so we'll wait for the underground infrastructure to be developed in 2027 to go back and start drilling from underground; so the drills are moving out of Sunbird into other targets that we have there. As you know, we have multiple targets as well; we have a large property package. We control 35 kilometers on the belt, where we have multiple targets to test. So the focus at Seguela is advancing some of those early-stage targets that we have, but also pursuing open mineralization on some of the existing pits, while pursuing opportunities for underground mining. So at this point we're going to have an underground anchor point for operations — for underground work at the Sunbird deposit — and that should let us go after maybe smaller resources that we're able to mine underground at a few of the other deposits nearby, such as Ancien, even Antenna, even Koula. So as things stand, we've got some rigs testing new targets, and some others exploring for the deep extent of mineralization beneath our pit bottoms, with the aim of producing resources we can mine from underground. So those — that's where the focus sits for Seguela.
Eric Winmill
analystAll right, that's great. I really appreciate the level of detail there; and perhaps just one more thing, if that's all right. On the buybacks specifically, do you have any internal thresholds or views about what you'd like to see on the balance sheet before you become more aggressive and restart the buybacks?
Jorge Durant
executiveYes; on the buybacks, as you're aware, we're about to enter a phase that's very capital-intensive. As we mentioned during the call, over the next 2 years we're going to begin deploying, and we'll put close to $750 million into our growth projects and exploration. So caution is warranted. Caution is warranted on our part. So during the fourth quarter, Q1 2027, and Q2 2027, you'll see caution from us when it comes to the share buyback. Our priority is making sure we can fund the growth organically while at the same time preserving the strength of our balance sheet. And as we move forward with deploying that capital and watching gold prices and how the business performs over the next 2, 3 quarters, we will certainly engage in our share buyback program, but rather than a set target today for an amount of shares, what drives our decision is simply being cautious as we begin the capital deployment, or the more significant portion of it, and prioritizing that and managing — balancing that against retaining a strong balance sheet through the capital phase, right? So we'll always be opportunistic when it comes to the share buybacks, but I'd say we'll be especially cautious over the next 2 quarters, at the very least, with the share buybacks.
Eric Winmill
analystAnd yeah, it sounds like there are plenty of exciting developments on the way. I'm looking forward to hearing the news.
Mohamed Sidibé
analystPerhaps I could begin with Seguela. I was hoping to get a bit more detail on that site-wide stoppage you referred to, caused by the blockade from artisanal miners. Could you shed some light on what set this off? And now that you're back up and producing, what has changed with, say, the local community or perhaps the authorities to help lower this risk going forward?
Jorge Durant
executiveYes. Okay, so on July 10, a police task force — this is a national task force focused on fighting illegal mining — carried out an operation in Kouego village. Kouego is located a few kilometers away from our mine site, and the village hosts a sizable community of migrant artisanal miners. As I noted earlier, the Government of Cote d'Ivoire has a national task force, a police task force aimed at combating illegal mining — not necessarily artisanal mining as such. They ran this operation in Kouego village, and unfortunately, it resulted in a fatal shooting. That set off demonstrations by the artisanal miners at Kouego. They moved toward our site, damaged the entrance to our plant site, entered portions of our premises, and cut off access for about 24 hours until the Gendarmerie broke up the blockade. Management, acting with sound judgment, then postponed personnel rotations and partly stood down the workforce while we evaluated the situation and reopened dialogue. Neither the police nor the authorities told us about the operations they were conducting in Kouego. So to be honest, all of this took us by surprise. Our priority was getting operations restarted safely and keeping a sound long-term relationship with the artisanal mining community. We have no dispute with artisanal miners. We don't have any big artisanal mining operations close to our site. What you find is many small, spread-out diggings, with roughly five to twenty miners at each one doing fairly limited excavation. Over the years we've gotten along well with them, and it's been quite easy to handle. That's why this caught us somewhat off guard. To add to that, the National Task Force's anti-illegal-mining operation set this off. Once activity restarted—counting from when the blockade began through our return to full operations—we got the workforce remobilized and back to standard rotations. All told, that came to roughly six days of downtime following the incident. That's the context I can offer you, Mohamed.
Mohamed Sidibé
analystThat's really useful, Jorge. Then perhaps my second question concerns Bambadji — again, a solid exploration update, and we're aware that an updated resource, or maiden resource, at Kabewest is coming at year-end. Could you remind us how deposits from Bambadji would be integrated into Diamba Sud — what's required at the permitting level, and how you see that potentially working at a high level? Any detail there would be appreciated. I know we're still at the early stages there.
Jorge Durant
executiveYes. What I can say is that this has already been raised with the Minister of Mines, since we view Bambadji as one with Diamba Sud. The Kabewest deposit — where we expect to produce this first resource — sits just 2 kilometers from the Diamba Sud plant site. So it makes complete sense to integrate everything when it comes to permitting and, even more importantly, the mining convention; so this has already been raised with the Minister of Mines, and those discussions are underway right now. So — but they do acknowledge — the Minister of Mines, in conversations I've personally had with him, does acknowledge that ore from Bambadji will be processed at the Diamba Sud plant. We just need to ensure we can get proper alignment on something that makes sense for the long term and makes operating the deposits across both properties feasible and sensible, right? And it's being raised with the authorities, and we're working on it.
Carlos Baca
executiveWith no additional questions coming in, that brings today's call to a close. Thanks for being with us, and for the interest and backing you keep showing toward Fortuna Mining; we value your questions and involvement and can't wait to bring you news on how we're advancing when next quarter arrives. Have a wonderful day.
Operator
operatorThanks to all of you; that brings today’s event to a close. You’re welcome to disconnect now, and I hope you have a wonderful day. We appreciate your participation.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Fortuna Mining Corp. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Fortuna Mining Corp. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Fortuna Mining Corp. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.