Ganesh Housing Limited (526367) Earnings Call Transcript & Summary

July 16, 2024

BSE Limited IN Real Estate Real Estate Management and Development earnings 49 min

Earnings Call Speaker Segments

Operator

operator
#1

Ladies and gentlemen, good day, and welcome to Ganesh Housing Corporation Limited Q1 FY '25 Earnings Conference Call hosted by Go India Advisors. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Rajat Gupta from Go India Advisors. Thank you, and over to you, Mr. Gupta.

Rajat Gupta

attendee
#2

Yes. Thank you, Michelle. Good afternoon, everyone, and welcome to Ganesh Housing Corporation Limited earnings call to discuss the Q1 FY '25 results. We have on the call with us today, Mr. Rajendra Shah, Chief Financial Officer; Mr. Neeraj Kalawatia, Vice President, Finance; and Mr. B. Ravi, Corporate and Financial Advisor. We must remind you that the discussion on today's call may include certain forward-looking statements and must be, therefore, viewed in conjunction with the risks that the company faces. I now request Mr. B. Ravi to take us through the company's business outlook and financial highlights, subsequent to which we'll open the floor for Q&A. Thank you, and over to you, sir.

B. Ravi

executive
#3

Thank you, Rajat. Good afternoon, ladies and gentlemen. It gives me great pleasure to welcome you to the Q1 FY '25 earnings call. I'm sure you would have had the opportunity to go through the presentation uploaded on the exchanges as well as the website. It is indeed a pleasure to state that this was yet another rewarding quarter for Ganesh Housing. Building on its performance quarter-on-quarter for the last 10 quarters, Q1 of FY '25 was well on the expected lines. Let me begin by providing an overview of the real estate sector. India continues to be a driving force in the global economy, contributing about 8% to the GDP in 2023, projected to rise to over 9.23% by 2030. The residential market has continued to strengthen with demand reaching a 11-year high during H1 '24. Premium housing products priced over INR 1 crore have emerged as the largest segment, accounting for about 41% of the sales. The real estate sector has emerged as the top choice among foreign portfolio investors that, is FPIs, due to the consumption-driven CapEx streams. The Ahmedabad residential market has shown significant resilience and growth in the first half of 2024. According to a report from Knight Frank, primary home sales reached a post-pandemic high of 16,113 units in 2023 and in [ HY ] 2024 itself, about 9,337 units have already been sold. This is a 17% increase compared to the same period last year, marking a 10-year high for half yearly sales. A notable trend is the shift towards premium segment, premium housing products priced over INR 1 crore, now make up about 20% of the market compared to 11% a year ago. This shift is driven by the introduction of new lifestyle-oriented projects, offering better amenities and larger spaces, meeting the elevated demand and resulting in robust sales. As we move into the second half of 2024, the Ahmedabad residential market is well positioned to sustain its growth trajectory. Factors such as high affordability, comparatively lower prices per square feet and an improving local economic environment supports this optimistic outlook. In line with these trends, Ganesh Housing is actively contributing to the sector's growth. Recently, we completed the Malabar Exotica project ahead of schedule, which resulted in significant revenue bookings during the fourth quarter of FY '24 and continued strong performance into the first quarter of FY '25 also. The sale deed execution of Malabar Exotica is in currently in progress and is anticipated to be completed within this quarter. Malabar Retreat launched in Q4 FY '24 has met with the exact anticipated response. We have presales of over INR 72 crores and cash receipts of over INR 7 crores. The trend of bookings for such premium apartments generally increase after the first floor and the sample house is done. Hence, we expect that these bookings should pick up in the Q3 and Q4 of this financial year. Further, as always, we are confident that this project also will be completed well as ahead of its schedule. Our commercial venture, Million Minds SEZ continues to progress ahead of schedule. As already said, the marketing of these rentals for the space to large IT companies is on scheduled start in Q3 of this year. Looking ahead to FY '25, we are on schedule to announce the phased launch of our Million Minds residential projects, Phase 1 in the third quarter and Phase 2 in the fourth quarter of this financial year. These 2 projects collectively span a development of about 1.8 million square feet. Furthermore, the plans for the commercial project, One Thaltej, is in the approval stage. With a saleable area of 1.8 million square feet, this project is expected to generate anticipated revenues about INR 2,100 crores and a targeted completion by H2 of FY '24, as said earlier. There's a particular update in our Godhavi township projects, except for the fact that the surrounding areas, as we had told you in the last quarter, are continuously abuzz with activities, proving that our strategy to postpone its launch to the HY FY '26 is correct. Overall, Ganesh Housing remains committed to leveraging these opportunities to foster the growth of both the company and the Ahmedabad real estate sector. We are confident that our initiatives including the Million Minds commercial and residential projects, Malabar Retreat, the township project at Godhavi, the commercial project One Thaltej and the strategic land sales will drive value for our stakeholders. We have already laid out our plans for the next 5 to 7 years and are progressively systematically going in that direction. Now for the financial highlights of FY '25 Q1. We have registered the first quarter revenue of INR 221 crores, an EBITDA of INR 156 crores and a PAT of INR 114 crores. Though the revenue is lower than the corresponding first quarter of FY '24 or Q4 of FY '24, it would be appropriate to mention certain important aspects in this direction. The corresponding first quarter of FY '24 was an exceptional quarter with a whopping INR 161 crores of PAT and hence, it's not exactly comparable to Q1 of FY '25. Secondly, if you see the sequential numbers, that is Q4 of FY '24 and Q1 of this year, the PAT has increased which is in line with the trend seen in Q2, Q3 and Q4 of FY '24. So the revenue from the completed projects also has seen a 40% growth Q-on-Q. Thirdly, we'd like to mention that even in this year, that is FY '25, we expect to achieve a 30% to 35% growth in PAT over FY '24, that is over the INR 460 crores FY '24 what we achieved, we see a 30% to 35% growth in PAT as the coming 3 quarters of FY '25 are expected to be better quarter-on-quarter. Despite the significant CapEx in our ongoing projects, we have successfully maintained a strong financial position with surplus cash flows. The cash flows remain strong and will continue to improve in the coming quarters. Finally, I would like to mention that Ganesh Housing is well equipped to continue its path of profitable growth, thanks to its strong brand, innovation, strategic capital management, robust financial health and dedication to operational excellence, all supported by established governance framework. We are committed to continue our track record of exceptional performance, executing unique and value-added real estate projects and be the leading brand in the years ahead. As it is said in Bhagavad Gita, [Foreign Language]. Meaning, whatever actions great persons as leaders perform, the others follow. Whatever standards they set, all the world pursues. That is our goal. With this, I request the floor to be open for questions. Thank you.

Operator

operator
#4

[Operator Instructions] The first question is from the line of Rishith Shah from Nuvama Wealth.

Rishith Shah

analyst
#5

Sir, 2 questions from my end. Actually, for the first question on the Malabar Retreat, so we said we have kind of did a presale of around INR 72 crores, INR 7 crores collection. So just a little bit on the project as a whole, so what is the expected GDV and the expected construction cost of the entire project? And secondly, what is the scheduled completion time line from when we start looking -- seeing the revenue flow into the P&L?

Neeraj Kalawatia

executive
#6

See, the total sales value of this project is around INR 450 crores, and the cost of the project is somewhere around INR 340 crores. And this is, like, say, the 2 towers of the premium segment with [ Commercial-4 ] building. And with each unit is around having a minimum carpet area of 2,400 square feet. And in terms of the target time line to complete the project, that is -- as per our estimated schedule, we have taken a 3-year period. But as you see in last 3, 4 projects, the way we have completed our project, we will complete that project ahead of the schedule itself.

B. Ravi

executive
#7

So it could be well into March, FY '27. It could be in the third -- or fourth quarter of FY '27.

Rishith Shah

analyst
#8

Okay. Great. And during this period, we kind of intend to exhaust the inventory, I mean, sale during the construction period, right?

Neeraj Kalawatia

executive
#9

Yes, that's our mission. That's our plan also.

B. Ravi

executive
#10

Yes. Mostly that happens with us. When project is about to get completed completely, in these kind of projects, we would have sold at least 80% to 85% of the inventory. We will keep some remaining base units for -- meaning, some friends and family. But 80% to 85%, we will be exhausting by the time we have completed major construction work.

Rishith Shah

analyst
#11

Awesome. Yes. Sounds great. And the second question, so we kind of saw -- as you were explaining, we saw dip in the revenue maybe sequentially as well as year-on-year. So the fluctuation in my sense would be, again, in the land sale part. So can you give us a split? I mean, what was the land sale in the quarter and how it compared to the previous quarter and year-on-year as well?

B. Ravi

executive
#12

Yes. So you're right. Till the time, though the bookings may be there, the cash flows may be there, unfortunately, because of the accounting standard we cannot book the revenues till the time it is completed. And therefore, yes, the revenues from these projects may not come exactly the way the bookings happen. However, yes, as we had said, the strategic land sales is happening. Even this quarter, I think, about INR 46 crores, INR 50 crores are from the completed projects and the balance of about INR 160 crores was from the land sales. And in the coming quarters, things could continue. And maybe another -- moving 4 or 5 or more till the time, let's say, the new projects have come on stream. So this quarter, it is about INR 160 crores of land sales and about INR 46 crores, INR 50 crores of project sales.

Rishith Shah

analyst
#13

Okay. Okay. And the project sales was largely related to Exotica, right?

B. Ravi

executive
#14

That's right. Yes. But -- that's a 40% increase year-on-year. Last year, in the first quarter, it was about INR 32 crores-or-so. Now it is more than INR 46 crores, that's about 40% growth.

Rishith Shah

analyst
#15

Right. And last question, any new project additions in site in the near term, do we see?

B. Ravi

executive
#16

No, no. All that we have announced remain. As I just mentioned, all those projects are on schedule. And so these are the ones which we have -- we're still going to do. Let's say, it is One Thaltej or residential, 2 projects this year. These are the 3 projects which will start this year. I think else is anticipated at this point in time. Of course, the SEZ will continue. It's going on really well. That would -- that is slated to complete, as we said, maybe less than a year from now.

Rajendra Shah

executive
#17

Yes, and if we -- if the response is good, we may prepone some of the launches of next phases of SEZ commercial or SEZ residential.

Operator

operator
#18

[Operator Instructions] We'll take the next question from the line of [ Satyam Wadera ] from Profitmart Securities.

Unknown Analyst

analyst
#19

How does we plan to manage the operational aspects of the commercial SEZ project, while concurrently constructing the residential projects and completing the remaining phases of commercial projects within the SEZ?

Rajendra Shah

executive
#20

Yes, by operations, you mean arranging finance for the same. Right now, we are sitting on -- meaning we have a financial closure for Phase 1 of commercial SEZ has already happened. Meaning, we have enough cash balance which will take care of entire cost of construction of Phase 1.

Unknown Analyst

analyst
#21

For residential?

B. Ravi

executive
#22

Residential will come out from the bookings itself, right?

Rajendra Shah

executive
#23

Yes, presales of resi itself will give enough cash to start construction of...

B. Ravi

executive
#24

See, the majority of the cost is already incurred long back in the land itself. So that has already been spent for -- there's no cash outflow for that. Only for the construction is what we need to spend. And more often than not, this comes in either from the approvals which are already there from our other businesses, other sales and the cash flows or from the booking itself. So it funds for itself.

Operator

operator
#25

[Operator Instructions] We'll take the next question from the line of Gunit Singh from Counter Cyclical PMS.

Gunit Singh

analyst
#26

So can you please share the revenue potential from projects being completed in FY '25 and separately in FY '26?

B. Ravi

executive
#27

Please repeat.

Gunit Singh

analyst
#28

Can you share the revenue potential of projects that will be completed in FY '25 and also FY '26...

Rajendra Shah

executive
#29

So, Gunit, in FY '25, in fact, after we have completed Malabar Exotica, which is only few flats of Malabar Exotica for which agreement is yet to happen, are remaining. After that, we have new projects, which is launched after that is Malabar Retreat, which will take at least about 2.5 years from now to get completed. So we don't expect any revenue from projects to further come in rest of the FY '25 or '26 for that matter.

Gunit Singh

analyst
#30

FY '27?

B. Ravi

executive
#31

But there will be sales from the past completed projects.

Rajendra Shah

executive
#32

Yes. We hold some inventory of some of the past completed project like Maple Tree and Maple Trade Centre, which is market value of that is roughly about, say, INR 40 crores to INR 45 crores. We can encash that and that can reflect in our, meaning, project revenue. But other than that, for FY '25 and FY '26, I -- we don't see any project revenue. But at the same time, we are seeing a lot of traction and a lot of attraction in terms of whatever land bank we are holding, which are getting sold at very decent prices and which is going to give us continuous kind of EBITDA margin and decent EBITDA margin.

Gunit Singh

analyst
#33

For like also, for FY '25 and '26, our revenues would come only from sale of our land banks?

B. Ravi

executive
#34

FY '25 for sure. And FY '26, we need to see how the second part of the year, how the Godhavi, the whole project start because that is slated for the H2 of FY '26 as we said. If that comes in as scheduled, then yes, there will be project sales from that also. So that could be quite a major revenues coming from project sales at that point in time. From the [ be a ] residential ones which we have announced, there may not be anything in FY '26. But from the new sales, which -- for the new project of Godhavi, yes, we will see projects sales.

Gunit Singh

analyst
#35

All right. Sir, so you mentioned that PAT to grow by 30%, 35%. So what kind of revenue sales are we looking at from land bank in FY '25? And also, can you share the revenue potential for projects being completed in FY '27?

B. Ravi

executive
#36

Yes. What is the second question? Please repeat.

Gunit Singh

analyst
#37

Can you share the venue potential of projects being completed in FY '27?

Rajendra Shah

executive
#38

INR 450 crores.

B. Ravi

executive
#39

FY '27 from -- yes. No -- in FY '27, yes. FY '27, the project which will be completed would be Malabar Retreat, and that would be having about INR 450 crores or INR 470 crores of revenues, which could be coming in FY '27. And from -- in FY '25 that you asked, the revenues which we see, I have given you a guidance for the PAT 30%, 35%, which looks to be definite. The exact value of the revenues is slightly difficult to tell because of the various price ranges in the land. But we do expect it to be about 10%, 15% higher than what we have registered in FY '24. That's our expectation.

Gunit Singh

analyst
#40

All right, sir. My Last question would be what is the value of -- what is the current market value of the land bank which we hold overall as per your internal estimates?

B. Ravi

executive
#41

Well -- I've always maintained one particular sentence in this, it is very difficult to say. It can range from INR 15,000 crores, INR 20,000 crores and beyond. And with every quarter, the value only increases by over 10%, 15%, 20%. But frankly, the value of that comes in along with the development of the project itself. And in that the value of that land is much more than that. So once it's executed, it can be much more valuable than that. That's the way we would say. And in the next 7 to 10 years, we already have projected that land bank, which we have to be used in the various projects, -- and that is going to give us all the revenues which we have -- which is there in the presentation already.

Gunit Singh

analyst
#42

All right, sir. So unconstructed, we can consider baseline to be minimum INR 15,000 crores -- INR 15,000 crores, INR 20,000 crores?

Rajendra Shah

executive
#43

Yes, yes. Surely. Yes, much higher than that, but conservatively, yes, INR 20,000 (sic) [ INR 20,000 crores ].

Operator

operator
#44

The next question is from the line of [ Deepesh Sancheti ] from [ Manya ] Finance.

Unknown Analyst

analyst
#45

Since you have a lot of cash in the books, what is the -- first I want to know what is the average cost of the company incurring every year to accumulate land parcels? And ahead of that is like how does the company plan to allocate its capital between ongoing projects, new developments and potential land acquisitions?

B. Ravi

executive
#46

[ Deepesh ], we lost you. The third question, see, I think you'll have to repeat. I'm sorry, the line was bad. Can you just repeat your question?

Unknown Analyst

analyst
#47

Yes. I wanted to know since you have a lot of cash in the books, how do we plan to allocate that capital between ongoing projects, new development and potential land acquisitions?

B. Ravi

executive
#48

Yes. See, the ongoing projects and new developments are almost the same as we say because every new development will have an increased cash inflows also, except for the SEZ commercial, if we decide to do the second part of -- second phase of SEZ also on a rental basis, then yes, we will need a cash flow for that. But otherwise, it will be paying for itself like just the residential one because we'll be selling and we'll be collecting cash. Having said that, the -- see, all the cash flows obviously would first be applied for the ongoing projects itself. And we also have to look at opportunities to acquire new land, which is always -- I think -- because that's the raw material for the future. So as of March '24, if you'll see, we have got various amounts which has been allocated, I think almost like INR 400 crores, INR 500 crores or more allocated for the land acquisition. So at that time, we had quite a few surplus amount available. In this year, we also -- we see a good amount of cash surpluses coming in. And the way the costs are going to be incurred between the allocation between the land and the projects could be in the ratio of about 30 to 70, probably. So 30 in favor of maybe land acquisitions, for which maybe additional money may have to be given or it will be just getting the executed -- the land -- the sales deed in our day for advances already given. But about 70% of this cash flows will be used for the ongoing projects, including much we are announcing, which will be starting rather. I hope I was clear in that. So I hope I've been -- I made myself clear. Have I answered all your questions?

Unknown Analyst

analyst
#49

Yes. Just wanted to know what is the average cost of the company incurring every year through accumulate land?

Rajendra Shah

executive
#50

See, it's very difficult to say what is the average cost because the land acquisition are happening in different places where everywhere the rates are different and mostly our land acquisition happening on the untapped areas.

B. Ravi

executive
#51

And structure of acquisition also is different because you might contract for, say, INR 100 crores of land acquisition today, but that INR 100 crores is payable when we -- meaning, vendor does certain things. So it's difficult to say what is the kind of amount we outlay towards land acquisition in particular year. It is a very dynamic thing. Having said that, I would definitely want to add, [ Deepesh ], that the track record of Ganesh Housing has always been to tap those land parcels which have not been in the -- I mean in the eyes of the general public and therefore, more often than not, the price at which it is acquired is one of the lowest ever in the market. That is the reason why all these lands which we have acquired over the period of years are giving us this kind of an excellent EBITDA margins of 70%, 79% and all. So I believe that this kind of -- looking to the track record, the trend would always be the same.

Unknown Analyst

analyst
#52

That's right. So are we planning -- I mean, going ahead, are we planning to hedge ourselves by doing a lot of JVs? And -- or are we still looking at acquisition of land and then developing it?

B. Ravi

executive
#53

No. See, it's always as per the occasion and as per the opportunity which comes in. At this point in time, we have our hands full with all the projects which are there. And yes, the land has to be always kept -- keep acquiring. But if something comes up wherein we believe that a JV will give us -- because of the use of the brand Ganesh, which as I said, is the leader, if that can be used as we get a good project where we don't need to invest in the land, we just become the developer along with them or co-developer, we are open to such kind of projects, too. And look into the future, yes, that kind of things might come up, but nothing which we can announce at this point in time.

Unknown Analyst

analyst
#54

Okay. Just 1 last question was what are the presale figures which are projected for FY '25-'26 from our residential projects, if any kind of guidance would be helpful? And what is the expected time line for occupancy of the constructions commercial projects?

B. Ravi

executive
#55

The first question, and I'll ask you to repeat the second question. But the first question, I think the guidance we would refrain from giving 2 years in advance, we've given it for this year. And I think towards the close of this financial year, we will be able to tell you more correctly or accurately what would be the numbers for FY '25-'26. So I'm sorry, I won't be able to give you any number at this point in time. And the second one, sorry, what you said?

Unknown Analyst

analyst
#56

What is the expected time line for achieving occupancy in our constructions commercial project?

B. Ravi

executive
#57

Yes. So that is expected to complete be, let's say, around quarter 1 of FY '26. And the rentals are -- looking for the rentals, the clients and all starting from Q3, Q4 of this financial year itself. So I think in FY '26, it's a little guesswork at this point in time. But I think going above 30%, 40% rentals -- occupations are already people signing up on the agreements should be possible. That's what we look at. But there again, we would be able to give you a better picture in Q4 of FY '26 because by that time, a lot of traction with the expected or probable clients will come into this SEZ would have happened because that's when the real marketing starts.

Unknown Analyst

analyst
#58

Right. And our focus is only going to be Gujarat and around. Or are we looking at other states also?

B. Ravi

executive
#59

As of now, Gujarat, Ahmedabad.

Unknown Analyst

analyst
#60

Only in and around Ahmedabad?

B. Ravi

executive
#61

Yes.

Operator

operator
#62

We take the next question from the line of [ Mayank Shah ] from [indiscernible] Partners.

Unknown Analyst

analyst
#63

Yes. I had 2 questions. The first is, like what's the confidence of the location of IT SEZ project compared to like a location -- GIFT City or anything?

B. Ravi

executive
#64

It's very, very -- very high -- confidence level is very high because the way it was started off was with the clear understanding that there is huge potential in that area. GIFT City is further 15 kilometers away. This is absolutely in the CBD, the new CBD wherein the entire ecosystem of whether Reliance, Adani, Zydus Cadila, all these people offices and all and very new commercial spaces coming up in and around that Vaishnodevi Circle. so this is a very high confidence. And frankly, looking to this potential only [indiscernible] -- I mean approached us 2 years back, saying that they would like to partner us and take this project to the huge clients that they have. So we believe that we'll be doing very well in that.

Unknown Analyst

analyst
#65

Okay. So I have one more question also. Like cumulatively, what is the launch pipeline like we can expect in residential as well as commercial front in like the current financial year as well as in FY '26?

B. Ravi

executive
#66

Sorry -- launch price, right?

Rajendra Shah

executive
#67

Can you please repeat?

Unknown Analyst

analyst
#68

My question is what is the launch pipeline like we can expect in the residential and commercial front in FY '25 and FY '26?

Neeraj Kalawatia

executive
#69

See, already, we have launched Malabar Retreat at a price of INR 5,400 and that has also given a good traction in terms of the inquiry and initial conversion. Our initial thought of launching that at least INR 5,500 for that residential, so that we are not hiking any price even in the 6 months', 8 months' time also in the FY '25. And maybe FY '26, it will be plus INR 300. That is our current thought. Maybe as we move into that direction and at the launch time, again, we will reevaluate the market and see what brings the right pricing, whether we can hike the price further or not. But INR 5,400 is selling at Malabar Retreat, that's the base price we are talking about.

B. Ravi

executive
#70

And in the SEZ Residential, it's INR 5,500 to start with, and it could go up to INR 5,800 in FY '25-'26, that's what Rajat -- I mean, Neeraj has said. But frankly, the way the whole thing starts is that we do it with an amount, which is a little lower in the initial stages. And as and when the traction goes up with every quarter or something with new bookings, as you know, this is done by everyone, it keeps growing. So the average which we saw in the earlier projects also has been almost like 50% higher than the launch price itself, that's kind of traction we have seen. So let's see how this goes in this project and that too being in a very good ecosystem of the entire 64 acres and very good residential localities and good garden and all that, we should be able to command such prices, for sure. And just to tell you, the other ones, which are, let's say, the Shantigram project, which is very close by, is already talking about higher than INR 6,500 even as of now. So obviously -- and that is just about a 1 kilometer or 2 kilometers away from this place. So we're really -- that is the way it will go. And it has always been going towards that, and we will look into the brand fetch such kind of prices also.

Operator

operator
#71

The next question is from the line of [ Ritwik Sheth ] from [ One-Up ] Financial.

Unknown Analyst

analyst
#72

Sir, few questions from my end, on the Ahmedabad market. What is the kind of share the branded developers like you have in the Ahmedabad market in the periphery? And can you -- who would be the top 3, 4 branded players, organized players in Ahmedabad, if you can throw some light? And where do you see this going over the next 3 to 5 years?

Neeraj Kalawatia

executive
#73

See, post implementation of the RERA and GST and especially post COVID, now the real estate market is now being totally governed and commanded by the top developers and organized players only. Even those who have been in unorganized mode, they have now converted to organized mode only. So basically, if we see even in the presale part during the under construction, only these top developers are commanding better bookings and better realization of their projects. And we see ourselves around the top developers of the market. There are many other developers also who are doing good in their respective area, like Adani is doing in the Shantigram township, then there is [indiscernible] who has been doing in their respective areas. Then there are the likes of the Safal Goyal, [indiscernible]. There are many developers, but around this -- if you see, around 15-odd developers are there who are commanding the major market share in the city.

Unknown Analyst

analyst
#74

So 15, you said, 1-5.

Neeraj Kalawatia

executive
#75

1-5, the top developers I'm talking who are -- by their names, the products are getting sold. The name itself is so trustworthy. Arvind is also there in their respective area.

B. Ravi

executive
#76

Each of them -- I would like to add that each of these top 15 have their own niche at various places. Let's say, for example, Arvind is there, very good at [indiscernible] development side and outskirts, which is there. And some of the Goyals and the [indiscernible] are there in certain residential part of it, in a particular locality. So everyone has chosen their own areas of excellence and areas of development also in terms of the land bank. So all of them and in terms of the ranking, yes, it may be there. But those who have got, let's say, good, best of everything, that's the residential, commercial and the land bank and all that, if you really have to take it in that, then Ganesh Housing sits right on top.

Unknown Analyst

analyst
#77

Right. Okay. Got it. And these top 15 developers would have lion's share like 70%, 80% of the total market in Ahmedabad would be these top 15 players, right?

Neeraj Kalawatia

executive
#78

See, it's not like that with every player. Like -- there are only a few players who now -- who follow the strategy what we follow, holding the land bank for a much, much longer period and then went into development. There were many of the developers -- they acquire and then wait for some time and then they launch it immediately -- went for -- land holding period is not that great for those players. So it's like a different strategy for different developers, not like one solution fit to all.

Rajendra Shah

executive
#79

And Ahmedabad market is very, very segmented. You will hardly see very large developer commanding more than 10% of market share. So it's very highly unlikely.

Operator

operator
#80

We'll take the next question from the line of [ Aarti Kamani ] from Profitmart.

Unknown Analyst

analyst
#81

Yes, I got my answer. Thank you.

Operator

operator
#82

We'll take the next question from the line of Prit Nagersheth from Wealth Finvisor.

Prit Nagersheth

analyst
#83

Just 1 question. Sir, you mentioned that One Thaltej is under approval. So any sense of time line for One Thaltej?

B. Ravi

executive
#84

One Thaltej?

Prit Nagersheth

analyst
#85

Yes.

B. Ravi

executive
#86

We had said last earnings call that would be there in Q2 of this year. I think -- Q2 or early Q3. It is -- sorry, we had announced it's H2 -- it's absolutely on schedule for H2.

Prit Nagersheth

analyst
#87

For H2, so you are saying post Diwali, around Diwali timeframe?

B. Ravi

executive
#88

That's right. Correct, correct, correct.

Operator

operator
#89

[Operator Instructions] We'll take the next question from the line of Yasmin Shah from Antique Stockbroking.

Yasmin Shah

analyst
#90

I had a couple of questions. First thing is on the SEZ, what is the potential sales one can look at in the next 2 years in terms of assuming you sell the entire inventory or whatever is your target from Phase 1 and Phase 2, what is like for Phase I and then for Phase 2? And my second question is, do you have any plans to enter into a market apart from Ahmedabad, Gujarat?

B. Ravi

executive
#91

Okay. Let me take that. So the second question first. No. At this point in time, we don't have any plans. We don't have any concrete plans going out of Ahmedabad, but an opportunity coming up with a very good return or something, we will always go and we keep -- we do evaluate projects outside of Ahmedabad off and on. And if we find something, we may choose to go. But right now, there is nothing. Question number one, there are 2 things in SEZ: one, if you have been talking about SEZ commercial, then it is all -- at this point in time, Phase 1 is all there only in the -- it's on lease basis. We're not going to sell anything. If you're talk about SEZ residential. Yes, Phase 1 and 2 will be launched in the third and fourth quarter of this financial year, that will start seeing bookings of the same type like Malabar Exotica, Malabar -- all that, which will start from FY '26 first quarter or last quarter of '24 -- sorry, '25. So this is what -- I hope I have cleared the doubt that if it is SEZ commercial, it's going to be all that -- on these spaces as of Phase I. Phase II, we'll see in the traction for Phase 1 SEZ commercial has been picked up very well, there is a lot of demand for the rental, Phase 2 also may go on the same line, but it isn't fixed as of now. The residential will always be an outright, sale basis.

Yasmin Shah

analyst
#92

Right. So on the first phase, in terms of leasing income, what can one expect assuming that [indiscernible] out, say, 40%, 50% or 70%, whatever your target?

Neeraj Kalawatia

executive
#93

See, on a full potential basis of 100% occupancy, it will give us a rental -- annual rental of INR 70 crores.

B. Ravi

executive
#94

On a conservative basis, INR 70 crores, 100% rentals on a conservative basis, frankly, it can be far more. We have -- because we haven't given is -- we have given a very low estimate of this. But if you start on a 40-50 basis, it will also -- it will follow the same percentage, which INR 70 crores is for full, 50% is around [ INR 35 crores ]. But as then when the larger spaces go, the rentals can actually go up also. And therefore, first 40:50, maybe at a rate which is leading to around INR 70 crores' amount. But as we know, that amount can also increase. So between INR 70 crores to INR 80 crores or more can be the full rentals.

Yasmin Shah

analyst
#95

That's per annum, right?

B. Ravi

executive
#96

That's right, per annum.

Yasmin Shah

analyst
#97

Yes. And second question is how much was the investments you have planned or you've already done in the Phase I SEZ?

Neeraj Kalawatia

executive
#98

Of commercial, you're saying?

B. Ravi

executive
#99

Yes.

Neeraj Kalawatia

executive
#100

We have already invested -- we have already invested around INR 180 crores in the development of the Phase I till date.

Yasmin Shah

analyst
#101

INR 180 crores, okay?

Neeraj Kalawatia

executive
#102

Yes, yes, yes.

Yasmin Shah

analyst
#103

Right. And any further investments are required or this is about it?

Neeraj Kalawatia

executive
#104

Yes. Yes. The development is going on.

Rajendra Shah

executive
#105

We have reached to, I think, about 40% level of completion. So we will still require to invest more.

Yasmin Shah

analyst
#106

So probably double of this amount is something fair to assume, right?

Neeraj Kalawatia

executive
#107

Something near to INR 300 crores or around INR 325 crores.

Yasmin Shah

analyst
#108

Okay. Got that. Lastly, if you do develop the Phase 2, what is in terms of -- if I have to say in terms of potential there, revenue potential there or in terms of million square feet, if you could guide?

Neeraj Kalawatia

executive
#109

See how we are planning right now is that there will be each phase of 1.3 million safe of the construction with probably a leasable area of 8.5 lakh square feet as per the international standard because what -- because the entire designing is being done by the Tishman Speyer. And the rental is around INR 70 crores, which we have presumed right now as to the current rate, we have estimated that only as a conservative basis right now, but only once we see the entire traction of the Phase 1, then we'll get to know how much rental escalation can be there potentially on that side.

Yasmin Shah

analyst
#110

No, that I got it. I'm talking about the residential part -- that [indiscernible] million square feet, like the..

Neeraj Kalawatia

executive
#111

Residential is 9 lakh square feet of the development of each phase, with -- each phase has a sales potential value of INR 500 crores. So taken together, both the Phase 1 and Phase 2 will have a INR 1000 crores of the sales value.

B. Ravi

executive
#112

At 1.8 million square feet.

Operator

operator
#113

[Operator Instructions] We'll take the next question from the line of Yasmin Shah from Antique Stockbroking.

Yasmin Shah

analyst
#114

Sorry, sir, I forgot to ask what's the cash balance at the end of the year or end of the quarter, sorry?

Neeraj Kalawatia

executive
#115

See, FY '24 end, we were having a INR 430 crores of the cash balance. So out of that, around INR 60 crores is still there.

Yasmin Shah

analyst
#116

And for your future development, you will need to take on some debt, right?

B. Ravi

executive
#117

No, no. This amounts -- see, every quarter, there are cash accruals coming up, right, because of the sales and profitability that we have said. So -- and also whenever we do the residential, the amount will be funded by itself. So looking at the way these projects as planned, already the amounts required, which is therefore SEZ Phase 1 -- is commercial, is already in our bag. We don't need any money for that. And residential phases, as and when we launch, our internal accruals as well as the collections from the clients of the booking will ensure that we do not need any additional or extra money from the outside, which means no debt and no equity either.

Yasmin Shah

analyst
#118

Right. And sir, you had given guidance, I joined in a bit late, on your -- for this year in terms of bottom line, right, in terms of -- that was around 30%?

B. Ravi

executive
#119

Yes. 35% -- 30%, 35% increase year-on-year. That means FY '24 was INR 460 crores. We see 30%, 35% increase in the PAT in FY '25.

Operator

operator
#120

Ladies and gentlemen, I would now like to hand the conference over to the management for closing comments. Over to you, sir.

B. Ravi

executive
#121

Thank you all for joining on this call as well as showing so much of keen interest in the company. It's a great company, which is -- the performance has always been good, the deliverance well ahead of schedule, the quality of top notch, just living to its brand. I think we will definitely continue to perform the same way and look forward to having you all on the call next time, too. Thanks a lot. Have a good day.

Operator

operator
#122

Thank you, members of the management. Ladies and gentlemen, on behalf of Go India Advisors, that concludes this conference. We thank you for joining us, and you may now disconnect your lines. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ganesh Housing Limited transcript — plus 251,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Ganesh Housing Limited earnings transcripts and 251,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.