Garden Reach Shipbuilders & Engineers Limited (GRSE) Earnings Call Transcript & Summary
May 31, 2022
Earnings Call Speaker Segments
Operator
operatorGood morning, everyone. My name is Inba, and I'll be moderating this conference. Welcome to the Garden Reach Shipbuilders & Engineers Limited Conference Call, which Concept Investor Relations has arranged to discuss the company's Fourth Quarter and Full Year ended March 31, 2022. Joining us today are Shri Commodore P. R. Hari, Indian Navy Retired, Chairman and Managing Director, Additional Charge; and Shri R.K. Dash, Director, Finance. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I'll turn the conference over to Shri Commodore PR Hari, Chairman and Managing Director. Thank you, and the floor is yours, sir.
P. Hari
executiveGood morning, everyone, and thank you for joining us. I am Commodore P. R. Hari, Chairman and Managing Director of the company. Joining me are Shri R.K. Dash, Director Finance; Shri Sandeep Mahapatra, the Company Secretary; and Mrs. Aparajita Ghosh, Additional General Manager, Finance. I extend a warm welcome to all of you on this conference call, where we will discuss the company's financial performance for the fourth quarter and for the year that ended on 31st March 2022. To begin with, I feel truly honored to be speaking with investors today — this marks my first such interaction since I took over as Chairman and Managing Director of the company. Before I turn to the company's financial results, allow me to walk you through the projects currently underway and how the shipyard typically performed during 2021-'22. Turning to the projects in hand, on the shipbuilding side — our core business vertical — we are executing 6 projects at the same time. Among these is the prestigious P17 Alpha, the advanced Frigate program, covering 3 ships for the Indian Navy. There is also a 4 ship project, Survey Vessel Large, for the Indian Navy; 8 ASW Shallow Water Crafts, again for the Indian Navy; 1 Fast Patrol Vessel for the Indian Coast Guard; 1 Ocean Going Passenger cum Ferry Vessel for the Co-operative Republic of Guyana; and 8 Patrol Boats for the Fisheries Department of the Government of Bangladesh.
P. Hari
executiveThe most recent two — namely the Ocean Going Passenger cum Ferry Vessel for the Government Republic of Guyana and the 8 Patrol Boats project for the Government of Bangladesh — were secured through competitive bidding. Beyond that, in a bid for next-generation Ocean Going Patrol Vessels for the Indian Navy, we have also been declared L2. And under the tender condition, during the current year we will be concluding a contract for 4 of these OPVs. Turning to the other verticals, we hold orders on the Portable Steel Bailey Bridges in the Bailey Bridges division, an ongoing project for manufacturing of 1-megawatt diesel alternators by the Diesel Engine division at Ranchi and, of course, deck machinery from the Deck Machinery division. As my predecessor stated during earlier interactions with the investors, ship repairs have been a focus area, and I am happy to inform that we have taken off in the right direction with orders coming in from the Indian Coast Guard for refit of their vessels. Coming to 2021-'22, it has been a challenging year. Of course, the intensity of the challenges posed by COVID pandemic have been lesser than the previous year. However, in the first half of the year, especially the first 2.5 to 3 months, we too have been impacted by the second and third waves of the COVID pandemic.
P. Hari
executivePlus, there were the related constraints placed on us by both local authorities and the central government. Just like the prior year, we got through those difficulties by means of creative construction and operating approaches — everything from staggered working hours and curtailed shifts carried out at dispersed sites to reduce our workforce, and we emerged without harm while output continued without interruption. I'm pleased to tell you that every project milestone planned for completion in '21-'22 has been met successfully. Turning to shipbuilding, allow me to explain that within a shipbuilding process, KEEL laying and launch are 2 key milestones. Laying of the KEEL, or KEEL laying, refers to the key block being positioned in the building berth or building dock, and around that steel block the hull of the ship takes shape. The following major step is the launch of a ship, when the full hull form of a ship has been assembled — she, as we refer to the ship, she. The vessel is placed in the water for the first time. Once more, I'm glad to report that in '21-'22 we laid the KEEL of 6 vessels, large ships, and also launched the first Survey Vessel Large on 5th December 2021.
P. Hari
executiveAs I said before, ship repairs remain a key focus area. Let me tell you that in 2021-'22, we completed refits on 4 ships — 3 for the Indian Coast Guard and 1 for the Government of Mauritius, the CGS Barracuda. Over the past year — that is, '21-'22 — we successfully installed and commissioned a 250-ton Goliath crane. That crane was sourced through a global tender from Korea. What's interesting about it is that this massive crane was delivered fully assembled by sea aboard a 38-meter <<inaudible>> ship and then moved onto the GRSE premises. After that, it was successfully installed and commissioned in June '21. The reason I'm highlighting this particular crane is that it is the key capacity enabler and is used extensively in production activities, where large-size units and blocks are moved for erection. On 8 April 2021, Zoroaster, a Fast Patrol Vessel, was handed over by our Honorable Prime Minister to the President of Seychelles. I'm pleased to share that the guarantee refit of this vessel was also completed within that same year, by March 2021-'22, at GRSE. During the year, we finalised 4 major MoUs — Memoranda of Understanding — 2 with global shipbuilders for collaboration on ship design and construction.
P. Hari
executiveWe wrapped up a Concessional Agreement with Kolkata Port Trust covering a strategic lease of 3 drydocks. Our purpose in taking these drydocks over was to give ship repairs a boost, and the results speak for themselves — across the last 3 months we are already running at nearly 90% occupancy on these docks. We also entered into an agreement with the Border Roads Organisation, DGBR, covering 27 modular bridges. That marks a breakthrough for us in the modular bridges segment, and we anticipate additional orders from the Border Roads Organisation for these bridges. Turning to our performance — our demonstrated performance — the Department of Public Enterprises has rated us Excellent in the MoU ratings for the year ended 31st March 2021. Glad to share with you once more that we are the only defense shipyard to receive an Excellent rating. And just 1 of the 2 defense public sector undertakings to receive an Excellent rating. And 1 of the 14 among the 200-plus PSCs to receive an Excellent rate. Now on to the plans for the current year and beyond. As I said earlier, we are carrying out 6 shipbuilding projects. On the prestigious P17 Alpha project: the first vessel, launched in December 2020, is now in outfitting and has already reached 37% physical progress.
P. Hari
executiveThe second ship is scheduled to launch next month — or rather, during July '22 — with construction at roughly 27%. The third vessel remains on course to launch 3 months early, in May 2023. Turning to the Survey Vessel Large project: as I noted before, the first ship launched in December 2021 and has now reached close to 50% physical construction progress. The second ship launched just 5 days ago, on 26th of May, and we plan to launch the third ship in November this year, with the final ship in April '23. As for the ASW Shallow Water Crafts project, concurrent construction of 4 of the 8 ships has already advanced, and we intend to launch the first and second ships by October '22 and March '23, respectively. The Guyana Ocean Going Passenger cum Ferry Vessel is well on track, with the launch planned for 15th of June — that is, the coming month, in another 15 days — and delivery of this vessel is planned for February '23. As mentioned, we are also undertaking a project of a Fast Patrol Vessel; the Fast Patrol Vessel has already raised around 70% physical construction and was launched on the 2nd of May, earlier this month, and delivery of this vessel is planned in Jan.
P. Hari
executive'23. On the Bangladesh Boats project for the Fisheries Department of Bangladesh, we're building 6 Patrol Boats, and delivery of these vessels is scheduled for August this year. On the ship repair side, as I said, 4 refits were completed last year. And this year, right now we're carrying out a refit of 1 Coast Guard ship, and we expect the ship repair business to gain strength in the days ahead. Now moving to the financial highlights. 2021-'22 was a successful year for the shipyard in terms of financial performance, having posted the highest-ever revenue from operations at INR 1,758 crores, up INR 617 crores and registering growth of 54% from the previous year. The same applies to total income, which reached INR 1,918 crores, an increase of 45% over the last financial year. I'm happy to inform you that we've also posted the highest-ever PBT and PAT at INR 257 crores and INR 190 crores, respectively. Our EBITDA has grown by 24%, and earnings per share has climbed from INR 13.40 per share to INR 16.55, again, the highest-ever. The highest revenue per employee of INR 98 lakh was again achieved during this year, as against INR 60 lakhs during the last year.
P. Hari
executiveAnd the employee cost at VOP has fallen by about 23.78%, down to 16.61 percentage. So to put it briefly, 2021-'22 was a very successful year for us when it comes to both physical and financial performance. Thank you. Back to the moderator, please.
Operator
operator<<operator_script>> Our initial question comes from Harshit Kapadia, who is on the line from Elara Capital.
Harshit Kapadia
analystSolid execution despite difficult conditions. First, sir, could you go into more detail about the order pipeline for our shipbuilding business? That's my first question.
P. Hari
executiveWhen it comes to our current order book, as of 31st March we personally hold orders valued at INR 24,072 crores. Regarding shipbuilding, as I said before, there's the P17 Alpha project — 3 ships carrying a remaining order book value of roughly INR 15,780 crores. After that come 4 ships under the Survey Vessel Large project, 8 ASW, Anti-submarine Warfare Shallow Water Crafts, 2 export orders — one covering Passenger cum Ferry Vessels for the Government of Guyana, and 8 Patrol Boats for the Bangladesh Fisheries Department. Beyond these, we likewise hold an order for a Fast Patrol Vessel for the Indian Coast Guard. As I noted earlier, last year we delivered a Fast Patrol Vessel to the Government of Seychelles. That vessel, then, is being built as a substitute under an earlier project for the Indian Coast Guard, from which we redirected it to the Government of Seychelles. That, briefly, covers the order book on the shipbuilding front. Turning to orders in the pipeline — as mentioned before, we have been declared L2 in the next-generation Ocean Going Patrol Vessel projects for the Indian Navy.
P. Hari
executiveAnd under the tender terms, GRSE will construct 4 of those vessels. So the value of this order comes to roughly INR 3,200 crores. We anticipate signing this contract within the current year. Beyond that, we are expecting RFPs to arrive from the Navy as well as the Coast Guard over the coming days. That covers domestic shipbuilding as far as the pipeline of orders goes. We are also pursuing export opportunities, and we are targeting specific countries where we believe export potential exists.
Harshit Kapadia
analystCould you also break down that INR 24,000 crore order book for us — how much of it is P72 SVC and how much is the ASW corvette, sir?
P. Hari
executiveYeah, sure. Regarding the P17 Alpha project, the total order value comes to INR 19,293 crores, and we've executed almost INR 3,500 crores of that so far. That leaves us with a balance of INR 15,780 crores on this project. Now for the Survey Vessel Large project, the total order value is INR 2,455 crores, and with INR 583 crores executed to date, we have roughly INR 1,850 crores remaining as the year-to-date balance. Moving on to the Shallow Water Crafts project and the Anti-Submarine Shallow Water Crafts project, the total order value stands at INR 6,311 crores. And with INR 374 crores executed so far, the balance is INR 5,937 crores. I hope that answers your question.
Harshit Kapadia
analystPlease proceed, sir.
P. Hari
executiveNo, I only brought that up in passing — I hope that answers what you were asking.
Harshit Kapadia
analystYes. All right. That was really useful, sir — thanks for walking us through the details. I also wanted to follow up with you regarding the Q4 results: revenue growth has been extremely strong. However, the gross margin came in — it was on the weaker side. So is there any specific reason we can point to for why gross margins ended up considerably lower than what you were perhaps expecting?
P. Hari
executiveRight. And it's not just Q4 — if you look at the whole financial year, as I said earlier, operating profit is up, so overall we've clearly done well. Let me just explain why the margin came down slightly. In '21-'22, interest income fell by INR 18 crore. The main reason was the interest rate coming down from 4.7 percentage to 4.2 percentage. On an average deposit of roughly INR 3,700 crores, that 0.5 percentage works out to INR 18 crores. On top of that, as I said in my opening remarks, we acquired the Goliath crane — it was capitalized in the last financial year, '20-'21, and became operational during the last year. It cost approximately INR 160 crores. So depreciation on it comes to about INR 6.5 crores. Then next, if you're comparing with '20-'21, we were similarly lucky that year to get an IT refund, where the interest component comes to about INR 8 crores. So the net effect — INR 18 crores plus INR 6.5 crores plus INR 8 crores — works out to INR 32.5 crores, which is around 1.8 percentage of revenue from operations.
P. Hari
executiveThere's also this point: as you know, we're carrying out the P17 Alpha projects, and on those the profit margins sit at roughly 7.5 percentage. Meanwhile, the remaining 2 big projects — the ASW Shallow Water Craft and the Survey Vessel Large — were secured through competitive bidding. That means their profit margins come in thinner. During '20-'21, the split of our revenue from operations between the P17 Alpha project and the other ships stood at 56% to 44%. Given how the project execution cycle works, with the other ships having begun gaining traction, the share between P17 Alpha and the other ships has fallen to — or rather shifted to — 52% to 48%. All of these things together produced a slight decline in the margin. Turning to shipbuilding, if you look at the shipbuilding industry overall, a healthy profit margin is anything above the 7.5 to 8 percentage mark. And if you take the past 4 years, our margin — the PAT margin — climbed from 6.04 percentage 4 years ago, reached its peak of 10.87 percentage in the last year, and is now holding steady at 10 percentage, which in my view points to healthy operating conditions.
Operator
operatorMr. Kapadia, could we ask you to kindly get back in the queue? Quite a few participants are waiting for their turn. <<operator_script>> The next question comes from Venkatesh Subramanian of LogicTree Capital Advisors.
Venkatesh Subramanian
analystWell done on the strong results, and congratulations as well on being 1 of just 2 companies rated Excellent among 200 PSUs. So, sir, my question is fairly straightforward: what does the order book stand at right now? And from what you've indicated over the last several con-calls, the understanding was that FY '23 and FY '24 might be peak years in terms of production, particularly where the value of production is concerned. Is that correct? And are we on track to achieve that this year, FY '23, sir? If you could give us some sense of what the execution rate might look like?
P. Hari
executiveLike I said when I spoke with investors previously, yes, the years ahead — FY '23, FY '24, FY '25 — those will be the peak years when it comes to executing the order book we currently have. I noted that the P17 Alpha project — I believe I also gave the percentage progress figures. The first ship has reached roughly 37%. The second ship is sitting at about 22% to 23%. And the third ship is coming along quickly. So in a typical shipbuilding cycle — I'm using P17 purely as an illustration, and the same holds for any project. These are ordinary shipbuilding cycles. The largest revenue from operations of the VOP builds up when the ship goes from — roughly — again, this depends on how big the ship is and how complex the vessel is. On average, the highest VOPs are produced as the ship goes from about 35% to 60%. That's the stage where equipment content is lower and integration begins. So, as I said before and I'll say again now, our strongest performance in executing orders and converting that into VOP will come in the years ahead — namely '23, '24, '25.
Operator
operatorThe next question comes from Viraj Mithani, who's calling in from Jupiter Financial.
Viraj Mithani
analystNice work on those results. There are really 2 things I want to ask about. The first concerns material costs — looking at the quarter-over-quarter comparison, they've actually risen from, let's say, 36% of sales last quarter to 57% of sales this quarter. Then the second one relates to exports, which you brought up. Could you shed more light on that — for instance, what efforts are underway, and what exactly do we plan to export, and so on? That's all from me, sir.
P. Hari
executiveLet me begin with your first question, which concerned material cost. You correctly noted that material cost rose from 36% in the last quarter to 57% in the prior quarter, Q4. That clearly shows the projects are moving in the right direction. As projects advance, and particularly once they reach a stage where equipment and systems are lowered and indicated onto the ship, material cost rises automatically. As the projects mature further, this percentage — material cost — would certainly go up. Onboard any shipbuilding project, material input is tied directly to the physical progress of ship construction. And as I said, equipment lowering generally takes place — again, depending on ship size — at perhaps around 30% when the ship reaches roughly 30% progress, and peaks by the time it hits 60%. Regarding export orders and our efforts to raise export content, we have identified certain countries with export potential, targeted those nations, and already appointed marketing representatives there. This is a long-term process.
P. Hari
executiveIt's not as though appointing an agent will produce immediate results. Patience is required on our part. And in our situation, the outcome is already evident, since we achieved a breakthrough in Bangladesh, where we won an order through competitive bidding. So looking ahead, with not only GRSEs but also the government's confidence placed in exports, we anticipate that export orders will grow in the years to come.
Viraj Mithani
analystAnd sir, what would the — this commodity inflation in what we consume as materials be like? Say, for instance, steel prices — some days it's normal, right, not the equipment? And if you could give some color on it, sir, what percentage of the material consumed would that commodity inflation represent?
P. Hari
executiveSure, sure. So with a ship, let's consider steel — what we refer to as yard material, meaning the installation and the minor fittings. Those account for a rather small share of a ship's total cost. For steel specifically, it represents only about 4% to 5% of a ship's overall cost. And all the yard material, steel included, comes to roughly 10% to 12% of a ship's overall cost. The biggest value lies in equipment — the propulsion machinery, the communication systems, the weapon sensors — those carry the largest cost. To address your question, steel plus yard material take up approximately 10% to 12% of a ship's overall cost.
Operator
operatorOur following question comes from Abhishek Poddar, who is on the line from HDFC Mutual Fund.
Abhishek Poddar
analystAbout the order pipeline you brought up, sir — you mean the next-gen vessels — and earlier you also discussed ASW Corvettes. With those pipelines in view, sir, once the current orders hit peak execution after 2 or 3 years, do you see your order book declining from INR 24,700 crores? Or will these pipelines be sufficient for you to keep a healthy order book even beyond 2 or 3 years, sir?
P. Hari
executiveRegarding the orders we already hold, we anticipate those will be completed by FY '27, given how the ship is progressing at present along with equipment availability and the project execution plan. Additionally — as I noted earlier — we have one further order in the pipeline, which we expect to finalize within the current year for 4 next-generation Ocean Going Patrol Vessels, and that order is valued at roughly INR 3,200 crores. Another thing we anticipate is the Navy issuing an RFP for next-generation Corvettes. And as you probably know, we at GRSE have constructed 9 Corvettes — both surface types, meaning Missile Corvettes and Anti-Submarine Corvettes — for the Indian Navy. So given our experience, expertise and technical know-how in Corvette construction, we will bid accordingly and are very confident of achieving results in the right direction. To respond to your question, at present the existing order book, not counting the next-generation OPVs, will carry us through to FY '27. And taking into account the build period for the next-generation OPVs, we will hold orders at least until 2029. And as I said earlier, should the next-generation Corvette come our way, it is a major project — INR 13,000 crores, INR 14,000 crores — and that project will extend as far as 2032.
Abhishek Poddar
analystGot it. And sir, regarding margins, one question. As we go forward with stronger execution, would operating leverage help us report improved margins? Or would the higher equipment cost and all of that kind of consume those gains we can achieve from greater operating leverage?
P. Hari
executiveEarlier, another investor posed a comparable question, and in explaining it to them, I noted that with shipbuilding — I mean the shipbuilding industry specifically, not ship repair — healthy profit margins sit somewhere between 7.5 and 8 percentage. And based on what our own results show, this year we've reached 10 percentage. Last year, we had — I described how the gap versus last year, that marginal decline, stems from the specific rating. Now, should all the bids come in on a competitive basis, we're quite confident we can keep up similar margins going forward. The second point is that we're also moving into ship repair, where margins run high. As high as 15% to 20% on some of the ship repair contracts. So we believe we'll manage to strike a balance and hold margins at a similar level.
Abhishek Poddar
analystSir, got it. Just one more question on that, sir: when you mention a PAT margin of 10% achieved this year, a big chunk of other income—interest income—sits inside that figure. So are you referring to 10% with other income included? Or should interest income be left out when that 10% is being calculated?
P. Hari
executiveNaturally, that figure takes other income into account. Other income is included in it.
Abhishek Poddar
analystAnd sir, you’d include that because it’s an advance from the orders, and that factors into your profitability outlook?
P. Hari
executiveThat isn’t an advance. When it comes to shipbuilding, no such thing as an advance exists. Payments are made across 15 stages, and this was merely a single stage payment released during the preparatory phase—the pre-production phase. So it isn’t an advance. It’s a milestone—a project milestone. That is a payment milestone. Yes—to answer your question, yes, it is inclusive of our other—this is included in our other income, which in turn manifests into the profit margins.
Operator
operatorMohit Kumar from DAM Capital has our next question on the line.
Mohit Kumar
analystNice work on those results. First off, how do you expect revenue and margins to shape up for FY '23? And by FY '24-'25, with the leap you're anticipating, could you reach that INR 5,000 crore level of top line? Also, will margins look much the same across '23, '24, and '25?
P. Hari
executiveAs I told someone on an earlier question, in '23 and '24 — that's fiscal year, so FY '24 and FY '25 — we will definitely see revenue from operations grow. Right now, all I can say is that our trajectory is upward. Beyond that, we're confident we can hold on to the margins we delivered this year.
Mohit Kumar
analystSir, regarding the PAT margin, are you referring to the 10% figure? Is that correct, sir?
P. Hari
executiveYou're right about that.
Mohit Kumar
analystYes. And sir, within that, naturally a portion involves nominations along with certain projects already finished. With that blend, do you still anticipate a 10% margin, and you don't see it weakening over the medium term?
P. Hari
executiveCould you ask that again, please?
Mohit Kumar
analystSince a portion of the order book is priced through competitive bidding and another portion is priced on a cost-plus basis, we still think it should be possible to maintain a 10% margin. Is that a fair assessment?
P. Hari
executiveCorrect — that's exactly the point I made. It's a hybrid equation: competitive bid orders procured, meaning obtained through competitive bidding, orders, or nomination — that's the P17 Alpha project — plus what's in the pipeline, including our moves into export or ship repair, all combined, and we expect to keep margins similar going forward.
Mohit Kumar
analystAnd finally, regarding ship repair, sir, how do you expect revenues from ship repair to trend over the medium term? Also, what's the aspiration there, and what kind of margin could this line of business achieve?
P. Hari
executiveShip repair is a vertical we began concentrating on starting in the prior financial year. And just to give you some background — to lend momentum to ship repairs, we took over the 3 drydocks under a long-term arrangement, meaning a strategic lease, from the Kolkata Port Trust. And we've begun in a modest fashion, with a very, very clear plan for the years ahead. The results are there for all to see, along with all the orders we've obtained for refit from the Indian Coast Guard on a competitive bid basis. And naturally, a few commercial vessels as well. So answering your question about the revenue we expect from the ship repair business, at this point I can only say that we hold aspirational targets. But my expectation for the years ahead — that is FY '23, '24, '25, and onward — is first for us to stabilize and after that, growth of roughly 10% to 15% annually. As for the margins, the profit margins where ship repair is concerned, ship repair is a profitable segment in which profit margins run to the tune of 15% to 20%. And in certain cases, they fall in the range of 20% to 25%. So it's a profitable business.
P. Hari
executiveAnd that's exactly why we've moved into this aggressively.
Mohit Kumar
analystWishing you the very best, sir.
Operator
operatorOur following question comes from Ankit Babel, who is calling in from Subhkam Ventures.
Ankit Babel
analystYes. Ankit Babel here, sir. Sir, a big chunk of your profits comes from other income. Now, as you alluded to the fact that from here on, the execution cycle will pick up drastically. So do you feel that a lot of your cash balance would be used to take care of your working capital and other execution-related requirements and hence, there could be a sharp drop in your other income in the coming years?
P. Hari
executiveWe're seeing projects pick up on the sales side. So naturally, some portion of our cash balance is going to go toward execution — procuring materials, paying our sub-contractors, and so forth. But the good news is that a few of these projects are also nearing completion. They're being delivered. On top of that, as I mentioned, we expect the contract for the next-generation Ocean Going Patrol Vessels to be signed within the current year. So whatever boat goes out will also come in. Therefore, I don't anticipate any significant dip in our cash balance. And with the higher VOP, our operating profit should rise accordingly as well. So it comes down to a balance among all these factors. And that will offset the dip — which I don't think will be a major one, since with the next projects coming in during the current year, it will balance.
Ankit Babel
analystAnd, sir, regarding any broad revenue range you're eyeing for FY '23 — I mean, something like INR 4,000 crores or INR 5,000 crores — what broad range are you considering, given your execution cycles?
P. Hari
executiveWhen we look at the execution cycle, we're expecting an increase of roughly 20% compared with the current year — 20%, 25% increase. That's the target we have in mind. And again, that target is aspirational. That's what we're aiming for.
Ankit Babel
analystSo starting from a base of INR 1,750 crores to INR 1,760 crores, you're looking for 25% growth. In other words, you expect just INR 2,200 crores in revenue during this year?
P. Hari
executiveLook, when it comes to those numbers right now, I’m not in a position to say anything about them.
Ankit Babel
analystSir, I just want a range here, sir, since the expectation was around INR 5,000 crores — I mean, that's what the other investors and analysts were expecting. And you're saying roughly INR 2,500 crores. So the gap is drastic. That's why I need to understand this.
P. Hari
executiveThere's one thing you have to understand: shipbuilding is a process where I can't bring down the equipment or systems until the vessel gets to a particular level of maturity. So when we look at finishing the projects now underway by 2027 — we're at a stage where, yes, physical progress goes up every day, and equipment will follow. So FY — when I began this discussion, since I'd said that FY '23, '24, '25 are the years in which the projects will get to a stage where the P17 Alpha project, our biggest revenue earner, hits a physical progress percentage running from 35% this year to 60%, 65% over the next 2 years — the ASW Shallow Water Craft project, with a similar range or, since those are much smaller ships, similar or better percentages. And with the Survey Vessel project wrapping up over the next 2 years, taken all together, we can grow — we can see a steady increase in our income in the coming — a sheer rise in our revenue from operations in the years ahead.
Operator
operatorThe next question comes from Akshay Kothari with Envision Capital, who is on the line.
Akshay Kothari
analystSir, I was just hoping to find out what the defense budget allocation for the Navy would be. And going forward, how do we see it increasing? And at present, our order book stands at roughly INR 25,000 crores. So 4 to 5 years from now, where might we see this order book — just a ballpark figure?
P. Hari
executiveLook, at this point I can't give you the precise defense budget allocation for the Indian Navy. What I can say with clarity is the RFPs that the Navy will be issuing over the coming year. One of the big projects headed for RFP — and we expect that RFP to be published this year — is for the next-generation Corvettes. That project carries an order value of roughly INR 13,000 crores to INR 14,000 crores. Another project the Navy will likely bring out this year or next could be for the follow-on Water Jet FACs. Here too, the order value would be around INR 2,500 crores <<inaudible>>. On top of that, the Indian Coast Guard — that order is in the pipeline for all of us, namely the 15 SPV project. Again, the order value comes to roughly INR 1,800 crores to INR 2,000 crores. Those are the major orders we expect in the near future, and beyond those there's a large order for building 4 landing platform dock, LPDs, for which the RFI came out last year. So this year, toward the end, or next year, we expect the RFP to be issued.
P. Hari
executiveThat order value might come to roughly INR 25,000 crores. So, in short, those are the orders we expect from India's defense sector — meaning between the Navy and the Coast Guard. On our order book: in reply to an earlier question, I said the present order book stands at about INR 24,000-plus crores. Add the order already in the pipeline for this year — the 4 next-generation OPVs at around INR 3,200 crores — so taken all together, INR 27,000-plus crores will comfortably carry us through 2029, that is FY '29. And we are quite confident of securing at least a couple of these orders I mentioned, which will likely come through RFPs this year and next year.
Akshay Kothari
analystAlright, that's great. And one more thing — what I've been picking up is that there are some frigate orders we're co-developing with Russia. So look, why exactly are we developing it together with Russia? We're self-sufficient. Or is it that our capacities are fully utilized? So what's the underlying reason for that?
P. Hari
executiveYes. An order is currently being jointly developed alongside Russia for a frigate — project 11356. The background here is that India originally brought in a handful of vessels belonging to this class from Russia. The purpose behind the joint development effort is straightforward: it's about creating the ability to construct these ships inside India. That's the intent driving the co-development of this project. As you're probably aware, 2 of these ships are under construction in India at Goa Shipyard. And a couple of vessels are simultaneously being built overseas. But to answer your question directly — the intent, if this is purely meant to secure the capability for full-fledged development, meaning the desire and the construction of the ship gets developed within India, that had abated.
Akshay Kothari
analystAll right, that's excellent. And one final question about bookings. Would you be able to walk us through that exceptional item that appears there?
P. Hari
executiveI'll ask our Director of Finance, Shri Dash, to respond to that question.
Ramesh Dash
executiveYou can already see these exceptional items spelled out in our note. During the pandemic, in the last year, FY '21 and FY '22 — in FY '21, 81 days, and in FY '22, 31 days — there was no operation. But we still had to pay wages to operators, and also our -- <<inaudible>> was also operating, along with some depreciation, all of which were in the classes. So these are expenses we incurred that produced no VOP or revenues, and this was written off. That is why we have categorized them as exceptional items.
Operator
operatorHarshit Kapadia with Elara Capital has a follow-up, and that's our next question.
Harshit Kapadia
analystApologies for dwelling on this pipeline matter, sir—you said the RFP for the next-generation Corvette is going to be issued this year. That means order finalization will take place next year. I just wanted to confirm: will it be divided among you and other shipyard companies, or will the entire thing go to a single company? That's my first question. And second, regarding the order pipeline you mentioned for water jet FPVs and even LPDs, where do you see GRSE's capability putting it in terms of winning these other 3 orders? That would be helpful.
P. Hari
executiveTurning to the next-generation Corvettes, I had said at one point that among all the Indian shipyards, we have the most experience when it comes to building these particular products, having delivered 9 vessels that remain in active service with the Indian Navy — that is, the Missile Corvette and the Anti-Submarine Warfare Corvettes. Now, regarding your question on whether this will be split or whether a single shipyard would secure it, I'm unable to comment at this stage, since we ourselves are not clear on that. Still, just to give our investors confidence, we are very confident that our bid would be appropriate and would bring a positive result for our company. As for the Water Jet FACs, once again, similar to the Corvettes, between the Navy and the Coast Guard, we have delivered more than 30 platforms — similar platforms. And during 2013 to 2016 — 2013 to 2015 — we delivered 4, which is the latest set of Water Jet FACs handed over to the Indian Navy. And as you know, we are currently building what are termed Fast Patrol Vessels, but in effect, they have Water Jet propulsion.
P. Hari
executiveWe’ve built these jets for a long time, so our confidence is high when it comes to this Water Jet FAC order. Regarding the LPD, the RFI was released last year, and we anticipate the RFP may be issued at the end of this year or in the following year. That is everything I’m able to say right now about the LPD.
Harshit Kapadia
analystGot it, sir. I just wanted to verify the figures you mentioned a moment ago to one investor. So you expect revenue growth of roughly 20%, 25% in FY '23. Is that what you mean? Are you saying that on a conservative basis, or would that be the minimum you'd deliver, sir?
P. Hari
executiveRight, I can't give you an exact revenue figure for what we'll generate in the years ahead. But it's enough to say that given how the projects are progressing, we're quite confident about delivering a solid result next year on both revenue and profitability. And earlier, one of the investors asked how performance will look during '23, '24, '25 — will it peak or not? Yes, according to the project build schedule, we will be peaking during this year. And we're on a steady upward path for the foreseeable future — that's the next 3 years for sure.
Operator
operatorThe next question comes from Abhishek Mody, who is calling in from Emkay Global.
Abhishek Mody
analystCan everyone hear me?
P. Hari
executiveYes, I can hear you clearly.
Abhishek Mody
analystYes. Only 2 questions. First, regarding the order book you mentioned — is that INR 24,072 crores or INR 24,700 crores? I couldn't catch <<inaudible>> one of the gentlemen said...
Operator
operatorMr. Mody, sorry to cut in, but there's some interference on the line. Could you just remove your earphones and talk?
Abhishek Mody
analystCan everyone hear me at this point?
Operator
operatorYes.
Abhishek Mody
analystYeah. On the order book — is it INR 24,700 crores or INR 24,072 crores? Something got missed there. I believe I caught a bit — I had written down a different figure.
P. Hari
executiveAlright, let me address that question first. The figure is INR 24,072 crores — not INR 24,700 crores — INR 24,072 crores as of 31st March this year.
Abhishek Mody
analystYes. On the second question, I think, about commodity inflation, you mentioned steel and yard materials at 4% to 5%. And the biggest cost comes from communications and weapon system. So do communications and weapon systems not benefit from improved commodities like steel and those? Because you -- Garden Reach might -- will it be impacted to some extent, or is it because those are the kind of components where inflation has yet to have an impact?
P. Hari
executiveAll right, I'll address that question. What we refer to in the column for shipbuilding is that we separate equipment and systems from yard material. What we call yard material is generally the ship construction material, which is steel, and the cost of steel comes to around 4% to 5%. The second part is yard material such as fasteners, insulation, and the consumables used for steel fabrication and building. So all of this put together comes to just about 10% to 12% of the overall project cost. Now, what you termed as commodity, let us say the main propulsion system or the communication weapons — now our contracts are fixed price contracts with the customers. And in turn, we have fixed price contracts with our OEMs and vendors. And all these orders have been placed in such a manner at the appropriate time of the project execution cycle. And therefore, the question of inflation and escalation does not arise. And further, as far as steel is concerned, the information that we have — we procure steel from indigenous sources, and we have running MoU contracts with Steel Authority of India, a major steel manufacturer, PSUs in our nation. And there again, we do not see such price variations because the MoU is already in existence.
P. Hari
executiveRegarding inflation’s effect—sure, it’s present—but it doesn’t hit total project cost all that heavily, since roughly 60% to 65% of that cost is tied to equipment. Those are orders that have already been placed, and every one of them is under a fixed-price contract.
Abhishek Mody
analystSo what you're saying is that because both the supply side and your input are covered by a Memorandum of Understanding and the contract is locked in, then — given that it's fixed, the current high prices are the least likely outcome — the effect on your company is going to be smaller, right? Have I got that right?
P. Hari
executiveWould you mind asking that again?
Abhishek Mody
analystRight. So that means, for instance with Steel Authority of India, you already have an agreement on steel pricing, and those contracts are fixed-term. And given that these are fixed-term contracts, the current high commodity prices won't have much of an effect on your company?
P. Hari
executiveWhen it comes to steel, the answer is no. For equipment and systems, also no. However, regarding yard material — which represents a tiny fraction of the total project — yes, there is some effect, though that effect amounted to a deviation in overall project cost of roughly 0.1 to 0.2 percentage.
Abhishek Mody
analystYes. All right, I believe that covers what I asked.
Operator
operatorOur next question comes from Venkatesh at LogicTree.
Venkatesh Subramanian
analystYes. Sir, to quickly recap the order flows you mentioned. If I understand correctly, the present order book carries us through FY '27. Over that period, we might perhaps secure a Corvette order valued at INR 15,000 crores, plus another INR 2,000 crores in terms of — I didn't catch that one, sir. Then roughly INR 20,000 crores of orders work in progress that we are bidding for. And besides that, there is a big ticket order of a landing pad, which could exceed INR 20,000 crores. So there is a possibility of bidding for approximately more than INR 20,000 crores. Is that right, sir?
P. Hari
executiveI'll take that question. As you correctly noted, our current order book stands at roughly INR 24,000 crores through the end of FY '27, once you factor in the project execution cycle. I also mentioned earlier that we've been declared L2 for the next-generation Ocean Going Patrol Vessel. We expect that contract to be concluded. Under the tender conditions, 4 ships will come to GRSE. We anticipate signing the contract during this financial year. That's approximately INR 3,200 crores. The remainder — the next-generation Corvettes, the Water Jet FACs, and the LPDs — will all go out for competitive bidding. Okay? We'll bid aggressively. If we win it, that's good for all of us.
Venkatesh Subramanian
analystRight, okay. The overall worth of the orders that will be put up for open bidding might exceed INR 20,000 crores, INR 25,000 crores. Is that correct?
P. Hari
executiveYep, definitely. The orders that exist now — plus the whole mix of orders we expect to land over, say, the coming 3 to 4 years, if you look at it realistically — should come to roughly INR 20,000 crores to INR 30,000 crores.
Venkatesh Subramanian
analystFrom INR 20,000 crores up to INR 30,000 crores? All right, that's great. And for my final question, sir, one of the participants had raised the matter of revenue guidance. I'm probably not going to press you for a figure, sir. But during our earlier con-calls, the former MD gave us a broad picture of how this industry behaves when it comes to the peak cycle. It looks like a bell-shaped curve. So the takeaway was that FY '23, FY '24 and '25 would be the peak years in that sense. So perhaps this INR 20,000 crores might average out, or it could move up and down. So what we're thinking is that the figure you mentioned — this order ought to be above INR 4,000 crores, though I don't want you to confirm that number. But is our thinking correct that the coming 3 years will be the peak years for the current order?
P. Hari
executiveRight. You said you didn’t want me to confirm it, and you’re absolutely spot on. That said, the coming 3 years should work out well for every one of us, both on revenue from operations and on profitability.
Operator
operatorThe next person to ask something is Arjun Goel, who is an individual investor.
Speaker
unknownI'd like to pick up on a point another participant raised about other income. You said yields are dropping this year, from 4.7% down to roughly 4%. But when I look at FY '18, '19 and '20, I believe yields were around 10%, 11-odd percent. So my first question is: why the steep decline? And could you give some color on the process that's followed — okay, we get a stage payment from the government, so what happens to that money? What kinds of securities do we put it into? What process do we use to decide on an appropriate yield? And how will this shift going forward? That's broadly my line of questioning.
Ramesh Dash
executiveMr. Goel, I just want to make clear that whatever funds sit in our account are not there for investment purposes. That money is purely temporary working capital, since in shipbuilding or any defense contract we don't factor financing cost into our pricing. Our payment structure is such that whatever working capital we need will be available to us. So this is nothing other than working capital. The deposits you've already seen — that has sold, and now peak time is approaching, and when peak time arrives, naturally there will be an outflow of this money and it will come down. It is natural. At first it will rise, then step by step it will decline, and as a sequence of order book comes in, it will again be replaced. But at the same time, on profitability, I'm saying that whenever our VOP rises — you see, in FY '22, 92% was our other income and 8% was our operating income. Now those have gone up. This year our operating income — operating profit has moved from INR 40 crores last year to INR 104 crores.
Ramesh Dash
executiveSo slowly — operating income is going to rise, and that will offset the drop in our other income, the interest income. So it's a cycle.
Speaker
unknownNo. So sir, my question is essentially this: earlier, when yields were around 10% — they were 10%, right, roughly in '18, '19, '20? The yield you were earning on other income, right. So at present it has dropped from 10% to roughly 4%, right, in '21 and '22. So what I'm asking is, what has shifted in the execution cycle — in the cycle you're referring to, such that yields have gone from 10% down to 4%? That's what I want to know.
Ramesh Dash
executiveRight. Actually, I'm bringing that up because that other income isn't our goal. Our goal relates solely to the income that comes from operating income, since this is a manufacturing organization. Operating income is what we're mainly after. This is temporary money that's available with us, and at times when the interest rate is higher, we're getting more. And now the interest rate has gone down, and as expected — according to the present trade, I expect that next year the interest rate will go up. So this income isn't our — it isn't the core business. Operating profit is the core business.
Speaker
unknownIs it fair to assume roughly a 4% yield on the cash balance, or whatever the benchmark rate happens to be?
Ramesh Dash
executiveRight. It's 4.2% at this point. So what — my expectation is that, given interest rates are climbing now.
Speaker
unknownOkay, so when inflation rises and the RBI hikes rates, then naturally our interest rate is going to increase as well. But generally put, what you're receiving is the savings account rate, correct? That's...
Operator
operatorMr. Goel, once this question has been answered, we ask that you please go back into the queue.
Speaker
unknownCorrect.
Operator
operatorWell, ladies and gentlemen, because of the time limits, that brings us to the final question. I'll now give things back to Shri Commodore PR Hari for some closing remarks. The floor is yours, sir.
P. Hari
executiveThank you, Inba. To wrap up, fiscal year '22 proved a successful one for us on both the physical and financial fronts, as we posted the highest-ever turnover and operating profits since the company began. We dealt effectively with the difficulties created by the COVID pandemic, particularly through the first half of the year — and above all in the first quarter, when we lost some production time — yet we came through unharmed and hit every planned milestone on our shipbuilding projects. With a robust order book of more than INR 24,000 crores and a very clear strategy for executing projects, the company is on an accelerated growth trajectory, and we are highly confident of meeting the expectations of our customers and investors. Beyond domestic warship building, our focus will be on exports, ship repair, and product diversification, with emphasis on green energy platforms and digitalization across the full spectrum of operations. Thank you again, Inba, and thank you, Gaurav from Concept Investor Relations, for organizing the conference call. I would also like to express my sincere gratitude to all my analysts and investor friends who have taken time from their busy schedules to listen to us today. Thank you. Stay healthy.
P. Hari
executiveTake care of yourselves. Jai Hind.
Operator
operatorMuch appreciated. Everyone, that brings this call to a close on behalf of Garden Reach Shipbuilders & Engineers Limited. We're grateful you could take part, and at this point you're free to hang up.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Garden Reach Shipbuilders & Engineers Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Garden Reach Shipbuilders & Engineers Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Garden Reach Shipbuilders & Engineers Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.