Genus Power Infrastructures Limited (530343) Earnings Call Transcript & Summary
November 10, 2023
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, good day, and welcome to the Genus Power Infrastructures Limited Q2 FY '24 Earnings Conference Call. This conference call may contain forward-looking statements about the company, which are based on beliefs, opinions and expectations of the company as on date of this call. These statements are not a guarantee of future performance and involve risks and uncertainties that are difficult to predict. [Operator Instructions] Please note that this conference is being recorded. Today on the call, we have Mr. Kailash Agarwal, Vice Chairman of Genus Power Infrastructures Limited. Mr. Jitendra Agarwal, Joint Managing Director of Genus Power Infrastructures Limited. I now hand the conference over to Mr. Kailash Agarwal, Vice Chairman of Genus Power Infrastructures Limited. Thank you, and over to you, sir.
Kailash Agarwal
executiveThank you. Good evening, ladies and gentlemen. A very warm welcome to Q2 FY '24 earnings call of Genus Power Infrastructures Limited. Along with me on this call is Mr. Jitendra Agarwal, who is the Managing Director of the company; and SGA, our Investor Relations Adviser. The results and investor presentation are uploaded on the stock exchange and company website also. I hope everybody had a chance to look at it. Let me begin by first wishing everyone a very happy Dhanteras, a very have Diwali and a very happy prosperous new year. Since July 2023, our company has showcased an exemplary track record in terms of order inflow, successfully procuring [SCDs] of 6 notable orders. The aforementioned orders, which carry a significant value of approximately INR 15,160 crores net of taxes, are related to the procurement and installation of about INR 1.17 crores smart prepaid meters. The present aggregate order book of our company stands in excess of INR 19,000 crores net of taxes, thereby reflecting a highly positive outlook for revenue growth in the forthcoming quarters. However, it is important to note that the execution of these orders will commence only after the time frame of approximately 6 to 7 months from the date of order receipts. That significant amount of time is required to complete various essential formalities, like regulatory approvals, contractual negotiations and logistical arrangements. Our team is dedicated to meticulously addressing every aspect of the execution process to ensure a seamless and successful execution process. The execution cycle of the current order book is about 27 months. Thus, it provides healthy visibility for our top line growth for next at least 3 years. Many state electricity boards have initiated the process of inviting proposals for the deployment of smart meters, demonstrating the positive effect of the reform-based result-linked power distribution sector scheme. We expect a robust order flow to continue through the remainder of this fiscal year. Our strategic partnership with GIC marks a crucial milestone in our journey, bringing together the expertise and resources of both entities to drive innovation, sustainability and efficiency. The formidable presence and robust financial position of GIC, combined with our proven track record in delivering cutting-edge meter solutions, create a powerful synergy that will propel us to new heights. The company has also signed a commitment letter with the United States International Development Finance Corporation to obtain a loan of USD 49.5 million to scale up the deployment of electric smart meters across India. Our working capital cycle is expected to improve going forward, as payment terms are better and going forward, most of the business will come through either the platform or AMISP. Coming to the quarterly results, the sales of Q2 FY '24 stood at INR 259 crores, up by 18.4% as against Q2 FY '23, revenue of INR 219 crores. For Q2 FY '24, EBITDA stood at INR 25 crores, up by 46% as compared to INR 17 crores in Q2 FY '23. The company has experienced a notable uptick in employee expenses and other expenses. This can be attributed to the ongoing expansion of our workforce and the implementation of system management. These strategic initiatives are being undertaken in anticipation of effectively executing the significant order book that has been successfully secured. Profit after tax stood at INR 11 crores for Q2 FY '24 as compared to INR 10 crores Q4 FY '23.The company's profitability for the Q2 FY '24 was affected by notable surging finance expenses, which was primarily due to the obligation to furnish [cash-back] bank guarantees in order to secure substantial influx of orders. Based on our analysis, we anticipate a notable resurgence in revenue commencing in Q4 FY '24, coupled by the strength of our order book and consistent stream of new orders. We expect to record total revenue of about INR 1,200 crores in FY '24. The Indian metering industry will see strong order inflows, healthy top line growth, higher operating margins and then improved working capital cycle going forward. We maintain a positive outlook regarding the substantial enhancement of our business operations starting from the fiscal year '25 and beyond. I will now request for question and answers, please.
Operator
operator[Operator Instructions] We take our first question from the line of Mohit Kumar from ICICI Securities.
Mohit Kumar
analystSir, my first question is on the -- on your L1 position. Is it possible to tell us how the L1 position also within the pipeline?
Jitendra Agarwal
executiveL1 position is now mostly all the tenders where we were [indiscernible], very few are remaining, which are not yet decided and which we feel should be decided in the next... And regarding the pipeline, primarily there are two large tenders, which are to be quoted in the next couple of months and few other evaluations are going on. So the pipeline is also robust in terms of numbers, almost 25 million meters, either quoted or to be quoted in next couple of months.
Mohit Kumar
analystUnderstood, sir. So my second question is what is the status of platform with GIC? And have you entered into any pricing arrangement -- in the transfer pricing arrangement with the platform?
Jitendra Agarwal
executiveThat was definitely part of our JV with them, and that has already been done.
Mohit Kumar
analystOkay, it's already done. Sir, my last question is on the order book. So when you say the order book, this order book is the total submission of the 90 or 120 months of revenues. Is that right? This is not the order book which is available to Genus, right? Because this is the order, which is available to the platform, not to Genus? Is it possible to segregate the amount which is available the Genus by -- is it possible?
Kailash Agarwal
executiveSo basically, we can say like that, that this is the total order book. You are absolutely right. And out of this, almost 70% will be available to the dealers.
Mohit Kumar
analystUnderstood, sir. So is there any way we can say that out of 18,000, 30%, 12,000 is available to Genus?
Kailash Agarwal
executiveBasically total order book is around 19,500. Of that, 70% will be available to Genus.
Jitendra Agarwal
executiveIt will be more than 70% because 19,500 includes some orders, which are only -- for Genus only around...
Kailash Agarwal
executiveBasically, we are talking about the platform, okay. That's -- out of that one what will be available to us.
Jitendra Agarwal
executive19,500 includes the orders which are only for Genus. These include the export orders also.
Operator
operator[Operator Instructions] The next question is from the line of Milind Karmarkar from Dalal & Broacha.
Milind Karmarkar
analystOne of my questions was the previous -- was answered previously. My second question is, basically, I just wanted to understand, if I look at, say, INR 3,000 per meter. I think roughly out of the total order about INR 3,000, INR 3,500 crores will be for the production of meters. And the balance will be for the installation and maintenance. So out of this maintenance -- would it be the maintenance part, which will go to the joint venture? And the realization of that will be over a period of time? Or how does it work? Could you please explain?
Jitendra Agarwal
executiveSorry, can you repeat the question, please?
Milind Karmarkar
analystOkay. So if I divide the order into three parts. One is the production or supply of meter, second is the installation and third is the maintenance. So production, of course, will entirely come to Genus which probably at INR 3,000 per meter will be -- of the current order book will be about INR 3,000 crores, INR 3,500 crores. And then we have the installation, which probably also will be done by Genus, which will be maybe another INR 4,000 crores, INR 5,000 crores. And then the balance, which will be maintained on -- which will be spread over a period, that will go to the joint venture. Am I correct in assuming this?
Kailash Agarwal
executiveNo, no. Even the maintenance will also come to Genus. But that will be on the annuity basis.
Milind Karmarkar
analystCorrect. So what is the portion which goes to -- or which is funded by the joint venture?
Kailash Agarwal
executiveSo the total will be funded by joint venture only, even the meter installation, but the whole work will be done by Genus, the meter supply, the installation and the maintenance also.
Milind Karmarkar
analystCorrect. But what I'm trying to sort of gather is, that the maintenance turnover out of the current order book will be spread over a period of 7, 8 years. Am I right?
Kailash Agarwal
executiveCorrect.
Milind Karmarkar
analystSo production revenues will come immediately. Installation revenues will come post that. And the maintenance revenues will be spread over a period of 6, 7, or whatever the period is.
Kailash Agarwal
executiveAbsolutely. Absolutely, yes.
Operator
operator[Operator Instructions] The next question is from the line of Nikhil Abhyankar from ICICI Securities.
Nikhil Abhyankar
analystSir, are we having any problems in sourcing of certain key components, like release, for the smart meter production?
Jitendra Agarwal
executiveCurrency, we're not finding any difficulty.
Nikhil Abhyankar
analystWe are not having any -- and sir, also other players are also winning smart meter orders. So we were expected to order from us as well. So have you already started receiving inquiries? And have you already started booking orders from them?
Jitendra Agarwal
executiveReceiving inquiries from all the AMISP players. We are also booking orders through the...
Nikhil Abhyankar
analystSorry, I did not get that.
Jitendra Agarwal
executiveSo we are already getting inquiries from all the AMISP providers. People who have won the order, and we are working closely with them. Few orders have been closed, and few will get closed over a period of time.
Nikhil Abhyankar
analystOkay. Few are already closed. So are they also included in this 19,000 order book?
Jitendra Agarwal
executiveSomehow. Yes, they are included in this.
Nikhil Abhyankar
analystOkay. And sir, again back to the products. And sir, of the smart meter, what do we expect to produce in-house? And what all things do we outsource?
Jitendra Agarwal
executiveSo all the key components are outsourced like any typical manufacturing, we don't manufacture semiconductors. Most of the things we do in-house all HMC lining, assembly of the product, molding tools, are all done in-house.
Nikhil Abhyankar
analystOkay. Okay. And sir, just a final question. We have already got an order of INR 19,000 crores. And during the SPV was formed, you mentioned that the target would be somewhere around INR 30,000 crores of orders. So are we capable of taking in orders beyond that? And -- so just want to understand about that.
Jitendra Agarwal
executiveSo we are well above our target what we decided in the SPV. So we are very well within the target and within the...
Kailash Agarwal
executiveAbsolutely, we are open to take more orders. It depends how it works and how the things moves out. We had a target of INR 30,000 crores in 3 years' time. So already, we have reached that 2/3 level within 6 months or 7 months' time. So once it happens, we will see in the future how it works and how it goes.
Nikhil Abhyankar
analystAnd sir, just a follow-up on that. If we get orders beyond 30,000, will our equity requirement investment in the SPV will also go up?
Kailash Agarwal
executiveIt may. It may go up. It may go up.
Nikhil Abhyankar
analystIt may go up. Okay.
Kailash Agarwal
executiveThen the accruals also if they won't go up in a very big number.
Operator
operator[Operator Instructions] The next question is from the line of Mr. Manan Poladia from MKP Securities.
Manan Poladia
analystFirst of all, sir, congratulations on posting a good set of numbers. Sir, what I wanted to understand was, first, on the margin side, historically, from what I can see, in the recent past, we may not have done it, but say, March 21, et cetera, we used to do about 15%, 17% type operating margin as well. And in the recent past, we've only done about 10%, 11%. Is there some specific sort of margin pressure with respect to component prices or something? Or the other that is restraining us from doing higher margins? Or do we see that coming into force with operating leverage going forward?
Kailash Agarwal
executiveSo here, you will see that if you even compare from June quarter to September quarter, you will see that margins are almost same, but the expenses -- other expenses, the finance expenses, the employment expenses, everything has increased. And it has increased by almost 4% to 5% from June to September quarter. So that -- once the revenue will grow, these all expenses have grown because of the preparation that is happening to execute all the orders. So basically, employment, you will see there is a gap of almost 2% there. Other expenses, you will see there is a gap of almost 1.5%, 0.5% to 1% is a gap in finance costs also. So that will be all covered once the revenue will grow. And this additional thing will directly come to the margin. So you can calculate that the margin immediately will reach to 15%, 16% level once -- even these costs are taken care.
Manan Poladia
analystSo my second question is on the order book. Sir, like the previous participant also pointed out, you spoke about how the order book is divided into production and retail and installation, right? So if you could give us a sense of how the INR 97 crores is broken up in these three segments? And what would be the implementation time line for each of the segments?
Jitendra Agarwal
executiveCan you repeat your question...
Manan Poladia
analystSo what I'm trying to ask is, sir, out of this INR 19,000 crores order book, what portion of it would be manufacturing? What portion of it would be installation? And what portion of it would be maintenance? And what would be the time line that these order books would play out over in terms of manufacturing, installation and maintenance?
Kailash Agarwal
executiveWhole INR 19,000 crores does not come -- again, there is AMISP orders. So in this INR 19,000 crores, you can break them in four portions. One is the manufacturing and installation. It will be 50%. Then around 25% to 30% will be your maintenance [indiscernible] year. And the remaining 20% is the value of -- is the cost of financing, which will go to the platform. So this is how you will see the revenue of this INR 19,000 crores.
Operator
operator[Operator Instructions] We'll take the next question from the line of Srijan Sinha from Future Generali.
Srijan Sinha
analystYes. So first of all, let me wish you a very happy Diwali. And I wish you a very prosperous year for you ahead. Sir, I had a couple of questions. One, if you could help me with your current capacity. Is it INR 1 crores meter, if I remember correctly?
Jitendra Agarwal
executiveYes. We have always maintained that in the current situation, we can manufacture around 10 million meters annually.
Srijan Sinha
analystOkay. So sir, in that case, I mean, we have already booked orders for, let's, say about INR 1.75 crores meter, executable over the next 30-odd months, right, 2.5 years. Then -- on requirement basis, our current order book itself is closer to INR 70 lakhs, INR 75 lakhs meters a year, right? So in that case, are we open to taking orders from AMISPs as well because then we are crunch for capacity. And how quickly can we increase our capacity to manufacture these meters?
Jitendra Agarwal
executiveSo we are definitely open, and we are taking orders from the other AMISP. So we don't want to be looked in the market areas not supporting as a meter manufacturer, but we are playing our role as a meter manufacturer absolutely properly. And we have been saying this in the past also. For us to ramp up the capacity from 10 million to 15 million, and from 15 million to 20 million to 6 months. So as and when we have seen the requirement, we are going to increase our capacity. We are definitely capable of supplying to the market and catering the market whenever they require.
Srijan Sinha
analystIs there any specific CapEx requirement to increase your capacity?
Jitendra Agarwal
executiveNot major, but definitely some CapEx will be required. It is already -- we are continuously building our capability. And some CapEx will be required, but it won't be immediate.
Srijan Sinha
analystOkay. Okay. And sir, my second question is with respect to this quarter's revenue. What would be the ballpark contribution from the AMISP? I mean with specific behind AMISP that we have been executing?
Jitendra Agarwal
executiveMost of the revenue coming from the AMISP project and from the other old orders which we are executing. In terms of percentage, it's very difficult for me to right now, specifically comment [Foreign Language] this much of percentage comes from the AMISP.
Srijan Sinha
analystOkay. I mean the reason why I wanted to understand this was a, what is the legacy order book that is left, which is a drag on our margins? And b, what gives us the confidence that we'll be able to achieve INR 1,200 crores top line this year? Because -- I mean bulk of the order inflow has happened post July end. Even assuming 6 to 9 months of pre-execution phase, I mean, the bulk of the revenue should start accruing from next fiscal year itself. So then -- because we have only done about INR 500-odd crores in H1 of FY '24, about INR 700 crores is required in H2. That's a INR 350 crore quarterly run rate, which at the moment seems quite far-fetched because of the lack of contribution from these new projects, right? Then what is giving you that confidence that INR 1,200 crores is an achievable number?
Jitendra Agarwal
executiveSo the 2 reasons...
Kailash Agarwal
executiveHere you have to understand that we have orders before 6 months also like Bihar, Chhattisgarh and all.
Jitendra Agarwal
executiveNo, Bihar and Assam.
Kailash Agarwal
executiveI'm sorry, Assam it is.
Srijan Sinha
analystYes, that's what I wanted to understand. What has been the Bihar's contribution?
Jitendra Agarwal
executiveThere's been a lot of contribution. There will be a lot of contribution coming from Bihar and Assam projects in next 2 quarters. So that is why we are 100% confident that we will achieve this INR 1,200 crores mark.
Srijan Sinha
analystOkay. Sir, I mean what is the legacy order book still pending with? What would be the size of it?
Jitendra Agarwal
executiveAround INR 400 crores, INR 500 crores and lot of -- even conventional meter orders are also coming, if not, but they are completely stopped. We are also getting some -- and we are doing some export business also. So all these are getting added to the list.
Srijan Sinha
analystOkay. And sir, secondly, my question is on margin. How soon do you think we can revert back to that 15%, 16% kind of margin trajectory? Is it second half this year itself? Or does that spill over into next fiscal year?
Kailash Agarwal
executiveSo here, basically, as I told to the earlier answer also that you can see the numbers. That the numbers itself reflects that the margin is going to increase. Because whatever the expenses that has been increased, that is increased for the execution of this order book only. To get the order, we have given a higher finance cost because of vendor increase and all. A lot of employees have been recruited. So their salaries also will increase. So you will see that there is a clear set reflection from the June number to the September number, that if the revenue increases, like we are talking about INR 700 crores revenue instead of INR 500 crores in next half. So that's purely made the margins to -- go to a level of 13%, 13.5%. And then another jump in the revenue will go up to a level of 15%, 16%. So once the revenue will be growing, the margins will automatically be growing.
Srijan Sinha
analystOkay. Fair enough, sir.
Kailash Agarwal
executiveSo you just compare the June numbers quarter and the September number quarter. You will see that the margin has increased, but the expenses have also increased. The revenue has not gone to a level where they can justify the expenses. Once the revenue will go to that level, with a justification to the expenses, the margin will automatically increase.
Srijan Sinha
analystFair enough, sir. I mean looking slightly further ahead, for FY '25, what is the kind of top line number that we can potentially look at? Because all these orders should ideally start contributing in FY '25, right? And FY '25 should be a really big year for us.
Kailash Agarwal
executiveSrijan basically, when we are sitting on an order book of INR 19,000 crores, and we say that almost 70% will come to Genus, including maintenance and all. And even if we remove maintenance business out of it, which is the annuity business, almost 60% we have to execute in the next 3 years. So there will be a big -- substantial big numbers coming in FY '25, '26, '27. So right now the projects are under consideration, and we are just evaluating that how much time we will take to start these projects and lot. So you give us 1 new quarter so that we can give you the proper numbers or exact numbers for '25 and '26. But there should be a multifold increase that we can say. There will be a multifold increase that we can say.
Srijan Sinha
analystOkay. And sir, my final question is, given your current capabilities, given your current capacity, what is the kind of peak order book that you are looking at?
Kailash Agarwal
executiveEarlier also discussed that we made a target of INR 30,000 crores. And already, we are sitting on INR 20,000 crores. So let us first reach to that level, and then we shall revise our numbers and all, and see how that we can revise that.
Operator
operator[Operator Instructions] The next question is from the line of Soniya Varnekar from Dalal & Broacha PMS.
Soniya Varnekar
analystSir, previously, you mentioned that if we look at the total order book breakup, manufacturing and installation should be around 50% and maintenance should be around 30%, and the rest 20% goes through the financing. So when you said that execution of -- execution cycle of the current order book is around 27 months. So does that mean that this manufacturing and installation, which is 50%, is likely to come in your revenues in the next 27 months? And the remaining next 30% of the maintenance that comes in 9, 10 years, and the remaining 20% goes on the books the AMISP that SPV, which we have made recently? Is my understanding correct?
Jitendra Agarwal
executiveYes, your understanding is correct.
Soniya Varnekar
analystOkay. Okay. And sir, my second question...
Jitendra Agarwal
executiveA little bit here and there. But, yes, mostly it is correct. And maintenance is about 9, 10 years. Total project is 93. So this is how we would like to see it.
Soniya Varnekar
analystOkay, sir. Okay. And sir, my second question is on the orders, which we are receiving or we might receive from the other AMISPs. Like, for example, Tata Power also got some orders. So when they give their orders to players like us, so do they give the whole package for manufacturing, installation and maintenance and everything? Or they keep -- they just give the manufacturing portion, and the installation and maintenance part is done by them? How is the structure generally?
Jitendra Agarwal
executiveDifferent clients have different requirements. Lot of them want us to do end-to-end, but we at Genus, we are going to be only a technology provider. This can be meter. This can be software. This can be communication. But yes, we are not going to take their installation services. We have enough in our own company. So for them -- for the other AMISP players, we will be a sole technology provider.
Soniya Varnekar
analystSo sir, when you say a technology provider, so from the overall piece, what percentage roughly of that pie would come under that like 20%, 30% roughly?
Jitendra Agarwal
executiveThat will be around 25%, 40%. So it will be meter. We can also provide the software with communication, without communication. It depends on the requirement of the client, with mostly meters.
Operator
operatorThe next question is from the line of Mr. Rahul Kothari from Grit Equities.
Rahul Kothari
analystJust to further understand on the selling trailing of meters to other AMISP. I just wanted to understand, on a broader note, how is the company's approach towards it? Whether it's more of considering that there are limited large players in India to manufacturing smart meters. So it's more of an inbound inquiries that we are entertaining or being large houses participating in AMISP. For the long term, we are also marketing smart meters to them to secure product -- to secure tie-ups with them. And secondly, also, please help me understand the competitive landscape when it's about selling only products to other AMISP?
Jitendra Agarwal
executiveWe have to understand one simple thing, Genus has always been an electronic energy meter, and we continue to do the field. So we are approaching all the AMISP project owners and doing our marketing to sell meters to them. So with that full commitment. It's not that we have become an AMISP and now we are not serious about selling our meters or technology to our customers. So that business, what we have been doing in the past and which is going to continue in the future also. So now it's a kind of competition also and collaboration also. During tender, sometimes we compete with -- but when it comes to once the tender is decided, once orders have been placed, we work with them as they are our customers, and we work very closely with them. When it comes to competitive landscape, it is like every business has a good competition, and meter business has equal competition. But it used to have earlier also some 3, 4 good companies in the country as a major player of this smart meter.
Rahul Kothari
analystYes, sir. Just to understand, more on that. Considering the flow of orders across the AMISP, do we foresee that over the period, next 1 or 2 years, there would be a demand and supply gap or more on the -- towards meter manufacturers like almost capacity utilization for us, full capacity, either for our own...
Jitendra Agarwal
executiveI feel it will be full capacity utilization. Demand and supply side, I don't want to comment right now; maybe after 12 months, there will be some picture in front of us, but currently, I don't see any...
Rahul Kothari
analystOkay. And sir, just last one. So what is the current order book that we are having as of now? Considering 27x -- 27 months' time line, it is safe to assume that for this FY '23, '24, '25, '26, almost all this order has to be installed -- product has to be supplied and installed in the market, right?
Jitendra Agarwal
executiveYes. From the date of agreement, we have to complete these in 27 months. Mostly collected by the end of '26, we will also complete this project.
Operator
operator[Operator Instructions] The next question is from the line of Mr. Narayan Singh from [indiscernible] Securities.
Narayan Singh
analystI just have one -- two questions actually. In the smart meter OEM, so how many OEMs do we have in India? Because -- I am tracking another company, HPL. So they also say that they have a market share of 22 -- 30% or 25%. And from Genus also, I read that they're 27% of market share. So where is this other approximately 50% of supply coming from? Do we have some other manufacturers in India? Or are they imported? So -- if you can cover these details.
Jitendra Agarwal
executiveSo there are no imported meters in the country. They are all Indian manufacturers. And there are companies like Schneider, Secure Meters, HPL, Avon meters, they are a few good manufacturers who are in the market.
Narayan Singh
analystOkay. I have next question, actually, it's more of your organization long-term vision. So I mean do you see that now you are in front of this massive order book, which probably brings a lot of cash flows in the next 2, 3 years. So -- what is your vision for the company? So what do you want to do with this cash, sir? I mean it's too early probably to speak about these things, but just I want to understand, are we just about this only one way? Or you plan to use cash to maybe build organization for bigger things in future? Would be really helpful to know from your view, sir?
Jitendra Agarwal
executiveDefinitely, I want to build an organization for the very long term. But beyond that, I don't want to make any statements right now.
Operator
operatorThe next question is from the line of Milind Karmarkar from Dalal & Broacha.
Milind Karmarkar
analystYes. So a couple of things. One was around the debt or the money that you plan to raise, I think, $40 million or $50 million. One, will it be -- what will be the end use for that?
Kailash Agarwal
executiveIt will be for the Bihar project we will be doing in the company. That will not be transferred to the platform.
Milind Karmarkar
analystOkay. Okay. The second question would be something similar to what the previous participant asked, which was, I know that next 4, 5 years, the company has got its hand full. Beyond that, I just wanted to understand what kind of opportunities do you see in this field of metering, sir?
Jitendra Agarwal
executiveSince decades, electricity has become most important thing for the human kind. So with the way the use of electricity is increasing, the future of metering companies or the companies involved in this kind of work is very, very bright. There will be a lot of opportunities beyond metering also, which will get opened up for people like us in the times to come.
Milind Karmarkar
analystOne last question from my side was about these meters. So I'm told that especially in Maharashtra what is happening is that the smart meters are being installed, and the money is being recovered from the consumer by increasing his or her electricity bill. So there's a charge which comes in addition to the normal charge. How is it happening across India? Are each state is different? That is how much does the consumer have to pay? And how much is contributed by the government and the state electricity board? How does it work?
Jitendra Agarwal
executiveNothing is to be paid by the consumer. Even in Maharashtra, I'm pretty sure there's nothing to be paid by the consumer. You have some confusion in there. Looking further, get your data corrected. But as per my understanding, no electricity board or no utility...
Milind Karmarkar
analystSorry, sir, your voice is inaudible. Could you please repeat?
Kailash Agarwal
executiveBasically, there must be some confusion to you. There is nothing like that even in Maharashtra also. Nothing is being charged by the consumer in any of the states, what we know of.
Milind Karmarkar
analystOkay. Because I was reading the newspaper report which said that or maybe they have got it wrong?
Kailash Agarwal
executiveSo there might be some confusion in understanding or something like that.
Operator
operatorWe'll take the next question from the line of Nikhil Abhyankar from ICICI Securities.
Nikhil Abhyankar
analystJust one question. Sir, prices for -- that you get for the AMISP are fixed at the -- once we win the order. So who takes the pricing risk for the smart meters? Do we take it? Or does the platform take it?
Kailash Agarwal
executiveWe will take that.
Nikhil Abhyankar
analystWe will take it. So okay. So in case we are not able to supply or any case there are delays, so whatever the cost escalations, we wouldn't get any price hikes for it right?
Kailash Agarwal
executiveNo, no. But it will be through the utility only, there will be any mistake of utility, then it will be passed to us.
Nikhil Abhyankar
analystI'm sorry, sir, can you repeat that.
Kailash Agarwal
executiveIf anything, platform will get you from utility because of their delays. It will be passed to us.
Operator
operatorThe next question is from the line of Mr. Rahul Kothari from Grit Equities.
Rahul Kothari
analystSir, now that a good amount of tenders are in the market, so do you see there is any change in the pricing in the AMISP level? Or on the smart meter level since it's more of large volume orders are being discussed? Compared to 6 months before that was explained?
Jitendra Agarwal
executiveNothing much. It is almost in the same range.
Rahul Kothari
analystOkay, okay. And sir, secondly, now that it's almost a quarter end we are into -- we have secured the orders, how is the ground execution front with regards to the team bandwidth and execution there -- with the -- on the ground front, are we facing like how -- at the organization level, how are we gearing it up -- gearing for it?
Jitendra Agarwal
executiveWe knew this 12 months back, what we are entering into, which was not something absolutely alien to us because in the past also we have done some key projects in large numbers. So we have been building our capability significantly to make sure that all these projects are executed well within time. And I'm very confident that, yes, we will be able to execute this project well within time.
Rahul Kothari
analystSir, one more thing, with regards to the technology front. One is meter and another is the communication technology. So is it our own built technology? Or we have some kind of joint venture with some technology service providers?
Jitendra Agarwal
executiveNo, we don't have any kind of joint venture. Most of the technologies are in-house. And then they are -- Telecom is, of course, Reliance and GE, Reliance Jio and Airtel are the 2 largest telecom players in the country. And there are some very good software vendors in the country. We work with TCS also very closely. So we have our vendor there and then a lot of things we do in-house.
Operator
operatorLadies and gentlemen, that was the last question for the day. I would now like to hand the conference over to Kailash sir, for closing comments.
Kailash Agarwal
executiveThank you, everyone, for joining this call. As we continue to strengthen our position in the smart metering industry, we are grateful for the hard work and dedication of our team members who have made this achievement possible. We remain committed to our core values of innovation, sustainability and customer satisfaction. And we are excited about the opportunities and challenges that lie ahead. In case of any further queries, please contact SGA, our relationship adviser. I wish you all a very, very happy Deepawali and happy prosperous New Year. Thank you.
Jitendra Agarwal
executiveWishing everyone a very happy Diwali. Thank you everyone. Thank you.
Operator
operatorThank you, sir. On behalf of Genus Power Infrastructures Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.
For developers and AI pipelines
Programmatic access to Genus Power Infrastructures Limited earnings transcripts and 32,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.