GeoPark Limited (GPRK) Earnings Call Transcript & Summary

November 4, 2026

New York Stock Exchange US Energy Oil, Gas and Consumable Fuels earnings 60 min

Earnings Call Speaker Segments

Felipe Bayon

executive
#1

There are two important developments I'd like to highlight that demonstrate our progress in transforming GeoPark into a more diversified energy company, one with multiple platforms for long-term growth. This week, we announced the successful completion of our strategic entry into Venezuela via the Bare Block, following the effectiveness of the 25-year production participation contract with PDVSA. That milestone arrived significantly ahead of the contractual timeline originally set, reflecting both our teams' execution capabilities and the constructive collaboration we've established with PDVSA. With the contract now in effect, we are turning our attention to a safe and disciplined operational takeover of Bare, which we anticipate completing before year-end. Thus far, we've evaluated roughly three hundred to four hundred wells for possible reactivation, which establishes the groundwork for the first stage of redevelopment. This deal brings into our portfolio a sizable, long-life redevelopment prospect that holds considerable upside for bringing production back by making use of the wells and infrastructure already in place. It likewise represents a meaningful move forward in our plan to construct a regional platform that is more diversified; we recently also announced being awarded the Corralera Noreste Block in Argentina, which adds about 26,900 gross acres to what we hold in Northern Vaca Muerta; that is a highly significant enlargement of our unconventional portfolio, offering substantial resource potential and a strategic position next to a development area that keeps expanding. We'll pursue this opportunity via a phased appraisal program, using the same technical rigor and investment standards that shape how we allocate capital throughout the company. Taken together, these developments show the headway we've made in growing our portfolio outside Colombia, while keeping intact the solid operating base that has underpinned GeoPark's expansion for the last 2 decades. Now to our third quarter results: we posted strong operational performance, with steady output in Colombia and faster growth in Argentina. Consolidated production came in at an average of 27,973 barrels of oil equivalent per day, up roughly 3% from the previous quarter. Output in Colombia holds steady at about 25,900 barrels of oil equivalent per day. Water flooding and polymer injection projects kept delivering benefits at our Llanos 34 Block, and ongoing development work drove higher output at Llanos 123. We also saw encouraging exploration results at CPO-5, among them the Milano 1X discovery, now testing at roughly 1,000 barrels of oil equivalent per day, which reinforces the remaining potential in our Colombian portfolio. In Argentina, our development program keeps showing progress. Output rose 51% versus the prior quarter, reaching about 2,100 barrels of oil equivalent per day. After 5 wells at Pad 1030 in Loma Jarillosa Este were completed and brought online, those wells went through 180 hydraulic fracturing stages, and once they started up, gross field production surpassed 5,000 barrels of oil equivalent per day. We're getting ready for the next stage of development, concentrating on shifting to a drilling and completion program that's more continuous and efficient. Financially, the third quarter proved tougher even though our operations did well. Brent crude held up reasonably and averaged $91.4 per barrel, but our results took a big hit from wider crude oil differentials in Colombia and Argentina. In Colombia, the Vasconia differential went from a $1.43 per barrel discount in the second quarter to $6.67 per barrel. In Argentina, the Medanito differential swung from a $1.79 per barrel premium to a $3.50 per barrel discount. Those changes, together with what our current commodity hedges did, pushed the combined realized price to $56.20 per barrel of oil equivalent, compared with $67.20 per barrel the quarter before. Revenue took a $36.4 million hit from our commodity risk management contract, versus $41.2 million in the second quarter. Because of that, we've stayed busy actively managing the hedge portfolio to bolster price protection going forward and keep participation when the market strengthens, which includes fine-tuning our fourth quarter positions and pushing coverage out into 2028. At the same time, our operating costs climbed to $20.70 for each barrel of oil equivalent produced, up from $17.90 in the quarter before. That increase mostly came from higher energy expenses, additional well intervention work, and the strengthening of the Colombian and Argentine currencies. We understand how crucial it is to tackle these pressures. Our teams are pursuing operational efficiencies and cost optimization efforts, such as energy price hedges meant to reduce exposure to price swings. Taking all of this together, quarterly revenue reached $116.2 million, and adjusted EBITDA was $45.8 million, which works out to a 39% margin. Although our financial results fell short of the previous quarter, our operational performance demonstrates both the resilience of our portfolio and the advancement of our development program. We're still concentrating on better margins and stronger cash generation by executing with discipline and managing costs actively. In Q3, we put $72.2 million to work, mainly on development work at Vaca Muerta plus ongoing production and infrastructure spending in Colombia. Lower profitability and working capital needs also weighed on operating cash flow. As we anticipated at this stage of heavy investment, free cash flow stayed negative. That underscores how vital it is to keep a disciplined approach to capital allocation and to protect liquidity while we move our development plans forward. At quarter end, GeoPark's cash stood at $253.4 million, and net leverage was 1.6x last 12 months adjusted EBITDA. After the quarter closed, we finished a liability management deal that included issuing $550 million of senior notes maturing in 2033. That deal stretched out when our debt comes due, took care of refinancing needs in the near term, and locked in long-term funding for a large share of what we plan to invest in Vaca Muerta. It marks a significant move toward matching our capital structure to our growth strategy and gives us more financial flexibility during this investment phase. Going forward, we still anticipate that full-year production and adjusted EBITDA will land inside our guidance ranges, helped by rising output from Argentina and Colombia and by optimizing our fourth quarter hedge positions. Our priorities have not changed. We need to finish taking over the Bare Block safely, speed up work in Vaca Muerta, keep our Colombian assets performing well, and stay disciplined about how we allocate capital. Looking at what we have achieved during the past year, I see a company that has greatly widened its opportunities for growth while still building on the operating strengths of its Colombian business. We acknowledge the difficulties shown in this quarter's financial results, and we stay focused on the steps required to boost profitability, produce sustainable cash flow, and create long-term value for our shareholders. To wrap up, I'd like to recognize our team members for their commitment to safety, to running operations at a high standard, and to carrying out plans with discipline. I also want to express appreciation to our partners and shareholders for their continued backing. Thanks again for joining us today; at this point, we're happy to open the floor to your questions.

Jacob Roberts

analyst
#2

Let me start with Venezuela and some of the numbers that came up on the September call and again this morning. Broadly, we expect roughly 300 to 400 reactivations, I believe 100 workovers, and then 30 possible new drill horizontals by 2030, with the new drill, I think, beginning in 2028. So now that the CPP is in effect and you're taking over before year-end, could you walk us through the cadence year by year across those three buckets to reach that 2030 exit rate?

Felipe Bayon

executive
#3

Thanks, Jacob. Good news, I found the unmute button, since I didn't at the start of the call, so apologies for that. It seems my opening remark may have been overlooked. To be clear, Jacob: about the Bare Block, the contract is signed, and although we were allowed as many as 120 days for it to take effect, we in fact required only about 65 days to complete that step. That puts us considerably ahead of the timetable, which is excellent; and at present we are — with our teams, and coordinating closely with PDVSA — working to assume the operation prior to year-end. So there is substantial activity, substantial preparation, and substantial effort underway on supply chain, personnel, and similar fronts. Now I'd like to turn it over to Martin so he can walk us through the specifics—particularly on reactivations, workovers, and the rest—and share how we're looking at all of that. Martin?

Rodolfo Terrado

executive
#4

Of course, Felipe. Jacob, I’ll add some detail on where things stand and echo what Felipe said. Taking over operations safely is our number one priority, and we’re planning for that and feel comfortable completing it before this year ends. Of the 3 phases we laid out, the first is reactivation, then drilling, and after that steam injection. So during year one we’ll carry out reactivation, and eventually drilling will begin next year. Looking at the figures, of the 300 to 450 reactivations we’ll perform by 2030, one-third would be completed next year. That means 100 to 150 reactivations we will carry out. That is essentially OpEx. Moving to the next category, workovers, you spend somewhat more time there and more money. Of the 100 workovers we mentioned by 2030, roughly one-fourth, so 25%, will be completed in 2027. Then regarding drilling, by 2030, we did say 30 wells. That works out to about 12 to 15 wells each year, and drilling operations will begin in 2028. So from a drilling standpoint, it is 0 for 2027. Now I’d like to spend a few more minutes on 2 things. One is readiness, and the other is our relationship with PDVSA, which is very, very good. On readiness, at present, over 50% of the contracts that are critical for taking over operations have already been awarded, and we are awarding the rest within the next 2 to 3 weeks. So we feel confident about that. And what are those contracts? They are rigs, chemicals, artificial lift, tubulars, and engineering, because with reactivation, it is not only about reactivating wells; we are aware that as we go into some paths, we will need to do some engineering to understand the integrity of facilities. So on that one, we feel very good, and in fact, we had a visit with PDVSA where we received a really high ranking, and that is part of the requirements for getting the effective approval. The other thing I want to discuss is readiness teams on the ground. We have teams in both Caracas and El Tigre for the past 1.5 months; we have offices in both locations, and we already have an understanding and the names of the PDVSA employees who will be joining the Bare Block development; and finally, I just want to say once again that we feel the reason we have been able to accelerate this timing Felipe mentioned for effectiveness is not only what GeoPark is doing, but our relationship with PDVSA. And we continue working on many fronts, including identifying which of the wells we are reactivating jointly with them. We're feeling quite positive about what lies ahead in Venezuela.

Jacob Roberts

analyst
#5

That was incredibly detailed and genuinely helpful; moving on to my second question, I want to turn to Argentina, and I hope you'll forgive my pronunciation, but in the Corralera Noreste we just don't have much well data at all. So I'm wondering if you could walk through the technical rationale for that asset, and specifically which data your team was examining, what you're seeing when it comes to rock quality, that kind of detail, and then ultimately what you need from the asset for it to stack up against the current Vaca Muerta blocks.

Felipe Bayon

executive
#6

Sure thing, Jacob. And before I pass it over to Rodrigo, let me offer a bit of background that I believe is important. First, the Corralera award has now been made official, which is excellent news. Closing is underway, so sorting out the contracts and all remaining details will likely require a few weeks; and as you probably know—we have already announced this to the market—we have 4 years initially to carry out substantial work aimed at derisking the area. I know Rodrigo will cover some of this in more detail, but to put it briefly: if you look at the neighborhood, it's obviously different from where the other two blocks we're currently operating are located, but other companies are probably producing around 80,000 barrels in the area; this is roughly 27,000 gross acres, so for GeoPark, adding the existing two blocks plus this one would bring us to 39,000 acres, which is great. And we've identified — remember in Loma Jarillosa and Puesto Silva we have two landing zones. In this one, we see two to four landing zones. The positive development is that the land is available, and we are able to begin the work. We have a four-year window in which to initiate this risk-reduction effort, which means we can stage things appropriately with respect to capital efficiency, logistics, and all the rest. So, Rodrigo, it would be great if you could give us a bit more detail.

Rodrigo Dalle Fiore

executive
#7

Sure. To start, we see this asset as adding to what we already hold in Argentina, since we have 12,000 acres and, as Felipe said, 3 years of development on the current asset. Before the work we must do to assess subsurface potential, this new asset can give us another 27 acreage that lets us keep developing the area, with the drilling rigs and also with new wells. The asset sits in the oil window, which matters a great deal to us. It is in the north of the basin, in what we call the new hub, close to infrastructure, which is good. Chevron, Pluspetrol, Tecpetrol, and YPF in the north are in fact developing unconventional resources in the area, which is why we think we are in the right neighborhood. On the information you asked about, the previous operator drilled a well. From that well, we know the reservoir is there. What we will test over these 4 years is the potential and the productivity of the well. One uncertainty we face is the water cut we will produce. The well type we are after here is similar to El Trapial. In the south, Chevron is producing from El Trapial, with very good results there. So what we expect is to try to achieve that well type. We are talking about more than 1 million barrels per well in that case. The landing zones we will test over these 4 years are the T7 and the Veracian. Those landing zones have been tested by the neighborhood, but not by the previous operators. That is why we will introduce something new into the equation here. You asked about competitiveness. The plan we have today is preliminary, given the information surrounding it. We are talking about more than 120 wells for the development; we are thinking about a conventional well at the moment, so 3,000 lateral length, because the polygon of the block allows us to think about that. More than 120 million of potential reserves in the future; and the well cost is between $14 million and $15 million, as you can see with many of the other operators in the area; so it is preliminary. We have to test the potential of the reservoir, but that is the bet we have in Vaca Muerta today.

Alejandro Demichelis

analyst
#8

I have a couple of questions, if that's alright. To start with, Felipe, you mentioned that the team is focused on the cost structure now and that everyone is examining it. Could you give us some sense of how you expect costs to develop, in Argentina as well as in Colombia, and also with the new acreage that's coming up in Venezuela? My second question builds on what you discussed about Venezuela. Now that the deal has closed, there remain certain milestones that may or may not end up triggering, let's say, an additional number of shares for your controller; so could you walk us through what those milestones are and how you expect them to play out?

Felipe Bayon

executive
#9

Thank you, Alejandro. Let me take the second question first, if that's alright, and then I'll turn to Jaime and Martin for help with the first one. So, on the Bare Block — what's our perspective? Alejandro, as I said before, we still have to kick off operations, which is a great thing. We're aiming to get that done before the year is out. And honestly, that's where all our attention and focus is going. As Martin was describing, how do we conduct operations in a manner that's both safe and efficient? And once again, we're going to begin — even though we've already carried out assessments of the area and the wells, and we've collected the data. Getting into the field and bringing wells back online to restore output is a different matter. That will take a while, and as Martin made clear, the priority will be on reactivating those wells. On the positive side, we have a very ample well stock. Of the 1,100 wells, we've examined 300 to 400, and next year the figure will be around 120 or so. From that standpoint, Alejandro, I think we're in good shape. Regarding those milestones—whether they end up being triggered or not—Jaime can probably add more detail, but we did announce the share issuance tied to Bare, to the Bare Block, and we also announced a possible additional batch of shares that milestones could set off, chiefly connected to certain tax events that might occur in Venezuela; so, Jaime, would you like to say a bit about that?

Jaime Caballero

executive
#10

Right, of course. Absolutely. The milestones Felipe mentioned are tied mainly to Venezuela's tax rules, especially the corporate income tax that applies to the various kinds of fields there. The specific situation is this: there's an ongoing discussion between the Venezuela executive and the Congress about the most suitable conditions for reactivating the industry going forward. In that context, a possibility exists that the corporate income tax applicable to a field like Bare could be revised downward. So at present, our business case assumes we will be paying a 50% corporate income tax over time, and there's a chance this might be reviewed downward over the coming weeks. What we agreed with Grupo Gilinski as part of this transaction is that, should these revisions happen by the 1st of December of this year, we would get that adjustment. Importantly, the revision must be absolutely clear in scope. It must be very clear that it applies to Bare in its entirety, and if that condition is met, then we would apply this clause, which implies an additional share grant to Grupo Gilinski.

Felipe Bayon

executive
#11

Thank you, Jaime. Now, if we could move on to the first question, which comes from Alejandro and concerns costs.

Jaime Caballero

executive
#12

Okay, and Alejandro, my apologies — I didn’t even say hello earlier. On costs, let me begin by noting that naturally this company still takes a very stringent stance when it comes to operating expenses, and we’re quite aware that across this quarter and the one before it, our unit costs have risen considerably, correct? The way I’d frame it is this: if you look back at the guidance we gave earlier for this year, when we sat in the $13 to $15 per barrel range, and today we’re at $20, how should we characterize that $5, $6 gap? What’s really going on is that two-thirds of that variance ties back to Colombia macro factors that sit largely beyond our control. Those are energy costs, accounting for roughly $1.5 per barrel, plus the FX effect from a stronger peso, which accounts for roughly $1.5 per barrel. The remaining piece, the other one-third, comes from more activity. Our activity levels have picked up, especially at Llanos 34, and Martin will walk through that shortly. I’d like to concentrate on what’s happening with energy and FX, and on our response. In essence, on energy, because of gas shortages in Colombia — which mean sizable imports — we’re seeing a substantial rise in the cost of electricity drawn from the grid. There are multiple sources involved, and I won’t dive into great detail here, but in essence that growth in gas-related imports shows up in grid spot prices. At GeoPark, historically we carried considerable exposure to spot pricing, since over the long term it has proven more cost-effective than fixed prices. That held true in the past, right? As we move through this transition in Colombia’s energy grid, things are shifting, and we’re heading toward a situation where spot pricing is turning highly volatile; it’s expected to rise substantially over the coming few years, and we’re making that shift from spot pricing toward fixed pricing. That leaves us with a better outlook ahead. There are 3 specific items we see taking effect in 4Q. First, we’re beginning to see some fixed pricing arrive in 4Q. Essentially we’ll go from a situation where roughly 60% of our pricing is fixed, sourced from PEL, the grid serving Llanos, to one where only around 45% will be purchased from spot. The second item taking effect is PEL grid rates. The CREG, the commission under the new government that oversees energy matters in Colombia, has already issued an intervention amounting to roughly a 30% discount on the energy rates we receive from the grid. That is taking effect this quarter as well. And the final point I’d like to flag is certain energy hedges we have contracted. So those energy hedges essentially lock in a fixed price at roughly one-third of what we paid during 3Q. That means a meaningful reduction compared with the spot pricing we paid in 3Q. And it all begins to take effect in 4Q, which gives us an improved outlook. Now, looking further out, what we aim to accomplish across 2027 is to get to a point where roughly 75% of our demand is tied to fixed pricing, and that effort is still underway, and we'll keep you posted on it. On FX, that's public, and it's quite easy for you to see what's happening between the Colombian peso and the dollar. Basically, what we're doing is making sure we have protection on the downside. If we hit an extreme scenario where exchange rates fall below COP 3,000 per dollar, we're protected from that. We have hedges in place that shield us from that, so in effect, the downside exposure is already capped. The other thing we're doing is reviewing our whole cost base to identify where opportunities exist to improve efficiency and offset that exposure we have. That said, if the FX rate remains at present levels, around COP 3,200 to COP 3,300 per dollar, we'll keep having that increase, in effect, in dollar-based exposure. So with that, I'll pass it to Martin to discuss the activity drivers a bit more.

Rodolfo Terrado

executive
#13

Absolutely. I'll add to what Jaime said. And Alejandro, thank you again for being on the call. So when we look at Colombia, as Jaime mentioned, $1.5 for energy, $1.5 for the exchange rate — those are dollars per barrel — and the rest is probably operations. And in Colombia, if we consider Llanos 34, that's where the bulk of the OpEx increase occurred. I'll touch a bit on Llanos 123, but at Llanos 34, during the first half of the year, our failure rate fell outside the ranges we had historically seen. That means more pulling jobs than we anticipated; that has since changed; we aren't seeing that in the second half of the year; and the other piece of that bump in pulling jobs is that, proactively, we've carried out what we call deepening, which essentially means placing the well, the pump, at a shallower depth or using a larger pump and producing more fluid, so that we can hold back the declines. And we still had some of those candidates early in the year. So that's the pulling side of why OpEx came in higher. So what are we doing in Colombia to hold back part of this added OpEx? I'd say it comes down mainly to 2 big buckets. The first big bucket is water management. That's why workovers matter so much at Llanos 34. Some of those workovers involve water shutoffs, or they add incremental production, or both; and we keep doing workovers. In fact, we're doing about 8 more workovers than expected, agreed with our partner, and they're delivering good value. Looking at Llanos 123, water management means simplifying and cutting back water trucking. And so, we've done that over the past 9 months. We have 2 pads, and we've cut the water trucking between pads by engineering some of the facilities so that we can treat the water and inject it at the same location; so that's another thing we've done; and then the other component, for Colombia, is what else can we do on energy efficiency? And one thing we're doing is, as Jaime was saying, not only hedges, but can we switch the feed of our machines somewhat from diesel to other sources? So that's giving us some savings. Year-to-date, we've achieved savings of roughly $7 million that are being offset by the effect of exchange rate and energy. And I don't want to leave out Argentina. And yes, Argentina is contributing around 5,000 barrels of the total production we achieved. And for the quarter, it was, as we mentioned, around 28,000 barrels of oil per day; so — but Argentina, when we took over operations a little over a year ago, the OpEx was high 20s, low 30s. So, between $29 and $32 per barrel. I can't recall the exact figure, but that was the sequence; and at this point we're under $10 a barrel; and that comes from all the effort, and you folks have tracked our work on the facilities and the investments. The team's performance makes me very proud, with no incidents, and these days we aren't trucking crude. The crude is delivered through a pipeline. We aren't trucking water either. That water is sent down a disposal well, and we're piping the gas as well; so all of that, together with the upscaling we carried out at the Loma Jarillosa battery, helps us hold OpEx on the trajectory we have in mind, and that is our plan.

Operator

operator
#14

We've got a handful of questions coming in from the webcast now. Daniel Guardiola at BTG asks: considering Felipe's background running big oil and gas assets throughout Latin America, which one do you see as the tougher execution job right now — ramping a fairly new unconventional development in Vaca Muerta, or bringing back a mature asset in Venezuela that has been underinvested? And how does that view shape where you put management focus and capital?

Felipe Bayon

executive
#15

Appreciate that, Daniel, and thanks as always for sticking with us and for your interest in the company. I'd say those 2 are not the same, and in fact they hand us probably distinct challenges and distinct opportunities. Take a step back for a moment and look at GeoPark, and I think with the portfolio we have today, now that we've made Bare effective and the CPP contract effective, we really are a platform across Latin America that holds conventional oil in Colombia, including heavy crude, unconventionals in Argentina, and extra-heavy oil in Venezuela. So that's 3 kinds of crude and 3 kinds of operations. The encouraging part over the last year, especially in Vaca Muerta, and with the team we've been able to put together, with plenty of people who bring many years of unconventional experience, is that we're moving along well when it comes to activity and intensity; and as we've said before, Vaca Muerta will be a very CapEx-intensive development across the next few years. So it comes down to execution on drilling, and on factory mode drilling, which kicks off in December. And the encouraging part is we've already drilled 5 wells, done earlier this year, in March and April; so all of that information, all of that experience, everything we found in the subsurface has been folded into the plans going forward; and another positive we probably haven't discussed much is that we just completed a very high-quality 3D seismic survey across the area, which will supply a lot of data going forward. So it's quite specific when it comes to the challenges that brings, or that come with it, on Vaca Muerta, and we're on track with the investment and with the production ramp-up. So that's good; and as Martin pointed out, a solid reduction in lifting costs over the last year, which always matters. And on Bare, stepping back again, a field, or a block, holding close to 16 billion barrels of oil in place, where we've at least identified that across the next 25 years we can produce some 600 million barrels, has no shortage of opportunities, and it's all about reactivation. So the challenges there would revolve around getting the pulling rigs and the small rigs — I mean the 350 horsepower and 550 horsepower units — into the field on time, kicking off the reactivations, and getting the right people. And as Martin pointed out, we've already awarded around 50% of the services required; and we're very comfortable. Many of those firms are ones we have worked with previously, or they possess substantial experience in La Faja, which is excellent; and the other point, Daniel, let me pull back a bit, I believe, and you correctly highlight various challenges, various kinds of the developments, we have extremely, extremely strong teams covering both Vaca Muerta and Bare. So I feel very confident about that. And alongside that, we will continue looking after Colombia; so we are not losing sight of what has gotten us to this point and what is allowing us to make this move. So on a personal level, I am very excited. I am very hopeful. I mean, there will be matters further ahead. There will likely be surprises, but I believe the opportunity set is one that is of very high quality and once more, places us within the range of a regional platform for investors and for people who wish to stay with GeoPark over the long-term.

Operator

operator
#16

Daniel's second question is this: "With the big losses booked this year and your large hedging commitments running through 2028, how do you weigh protecting the downside against the cost of limiting upside, especially as output ramps up in Argentina and Venezuela?"

Felipe Bayon

executive
#17

Thank you, Daniel, and I'll connect that to the first question you raised. Obviously, Argentina and Venezuela are adding volumes as we move forward. So production in Vaca Muerta will keep rising as we drill and complete some of the facilities. Incidentally, over the past couple of weeks, we've already completed the first tie-ins to regional oil pipelines and gas pipelines. So on evacuation, we're in a much stronger position at present, with less trucking. So volumes will come; and again, once we take over operations in Venezuela at the Bare Block, we'll begin to see output grow. And as I've said previously in terms of gross figures, probably about 15,000 to 20,000 barrels for Bare; and if you step back, consider that our hedged volumes for next year average roughly 22,000 barrels across the year. So incremental volumes will be arriving that will be, to some degree, able to benefit from higher prices should those persist; and I think it's worth stepping back for a moment. A year ago, when we decided to enter 2 blocks in Vaca Muerta, we said very explicitly, "We need the hedging to make sure we can fund the CapEx and pay our debts." And we knew this quarter, 3Q especially, would be difficult and that we'd be in a rather tight spot. But I think the strategy is delivering going forward; and again, I think we're well positioned in that regard, able to deliver investments as we move ahead.

Operator

operator
#18

Then Daniel had one last question: "Since Grupo Gilinski was involved in originating the Bare transaction, should we anticipate that more investment opportunities in Venezuela will come about via the controlling shareholder? And if that happens, how would GeoPark go about funding those acquisitions, and what protections would be put in place so that future transactions don't cause additional dilution for minority shareholders or set up possible conflicts of interest?"

Felipe Bayon

executive
#19

Thank you, Daniel, that's a really good question. First off, I want to recognize that partnering with Grupo Gilinski on the Venezuela opportunity was essential in getting us to where we stand today. It brought the opportunity before GeoPark extremely fast and in a highly efficient manner, and then we were able to close the deal with Grupo Gilinski. One thing I would mention, Daniel, is that every opportunity, any opportunity that comes forward for the company, will be handled through GeoPark. So in Venezuela, everything will be done with GeoPark as the vehicle, or if there are other opportunities down the road. But let me stress one point. I believe that across the last 12 months, we have put together a very competitive portfolio; and at this moment, our attention is mainly on execution, on delivering what we have built as a very, very competitive, high-quality portfolio.

Operator

operator
#20

Let's go back to our audio questions. The next one comes from Joaquin Robet at Balanz Capital. Joaquin, can you hear us? I think Joaquin also submitted a question in writing. Joaquin, are you with us? We'll go to the next text question instead. This one is from Vicente Falanga at Bradesco. What does the company expect when it comes to the timing of the share tender process? Is the offer proportional for all shareholders? That's Vicente's first question. Then he adds a follow-up: "In the release, GeoPark said it could already assume operations before year-end. What will be the key short-term operational milestones for the first 100 days?"

Jaime Caballero

executive
#21

Vicente, thank you for those questions. I'll handle the first one. Essentially, the timing of the tender process is set by the contract, the PSA (sic) SPA that we agreed with Grupo Gilinski, and it basically sets out a 90-day period after closing for carrying out the tender. That started last Monday, and it will run through the remaining 88 days, so to speak. And the offer is proportional for all shareholders, excluding Grupo Gilinski. So it is available to every shareholder of the company other than Grupo Gilinski. And if there is an oversubscription, tenders will be awarded on a pro rata basis. I'll hand it to Martin.

Rodolfo Terrado

executive
#22

Yes, Vicente, thank you for asking. Regarding what the short-term operational milestones are, I'll expand a bit on what I mentioned earlier, though I'd note it centers mostly on taking over operations safely. It's mostly about bringing equipment onto the block so that we're able to reactivate wells. And when I say bringing in equipment, I mean the rigs. To begin with, we're aiming at 1 to 2 rigs, and after that we'll keep ramping up; equipment also covers wellheads, tubulars, and so on; and another piece during the first 100 years — 100 days, sorry — is making sure that, just as we did in Argentina, the teams are bonding and that we keep a good relationship with PDVSA as we move forward. So how will we measure that? What I'd say is that our key performance indicators over the first 100 days will be incident-free operations, so safety once again, and then they'll center on production levels. I mean, where do we stand on production compared with what we had when operations began? After that we'll shift into efficiencies; but in the first 100 days, I'd say it will be about reactivation and safe operations.

Operator

operator
#23

Our next question is from Joaquin Robet at Balanz Capital. They're asking: following the recent bond issuance, what amount of extra funding will you require through 2027, taking in Vaca Muerta, Corralera, and Bare? Should a funding gap remain past the Vitol facility, how would you intend to cover it, and what portion of that financing has already been committed?

Jaime Caballero

executive
#24

Joaquin, thank you for that question. First off, I'd say we're quite pleased to have gained investor backing for our growth plans lately through this bond issuance. The 2033 tenor gives us plenty of room to carry out those growth plans, which center on the portfolio transition Felipe described. From that standpoint, securing that investor support is highly strategic, and we're genuinely grateful for it. Now, turning to the figures: looking at net proceeds from the recent issuance, after we refinance the 2027s, which is already done, so that's handled, along with the 2030s, everything tendered, our net proceeds total roughly $170 million. That $170 million has to be added to our current cash position, which, as you'd have seen in the Q3 results, stood at around $250 million. Beyond that, we hold several available committed lines that remain undrawn, Vitol among them, but there's more than that. We have a couple of additional lines, including a club line with a group of international and Colombian banks totaling $150 million, plus several revolving facilities in Argentina accessible to the Vaca Muerta operation, and together those Argentine lines come to approximately $150 million. So my point here is that, adding it all together, we're looking at available financing on the order of $600 million to $700 million, which gives us ample leeway for what we're aiming to do at Vaca Muerta. To frame that in context, naturally, as we watch market conditions across the coming year and how Vaca Muerta develops, we'll be assessing what the most efficient use of those lines is. I'd describe the Vitol line and the contingent line under the club deal as contingent lines. They serve as safety nets. They aren't part of our core plan, yet they're there if needed. So I believe our choices on funding Vaca Muerta will hinge heavily on how market conditions unfold over roughly the next 12 months. But 2027 is funded in aggregate, covering all the requirements, not just those of Vaca Muerta but also of Bare and Corralera.

Operator

operator
#25

Andres Pautasso from Argentaria has our last question. The Vasconia differential level over the quarter and the transport cost both caught me off guard. Which main drivers affected those during the quarter? What do you expect for the rest of the year and the first half of 2027, and what mitigation measures are you taking to counter the impact on realized prices?

Jaime Caballero

executive
#26

Regarding Vasconia, the first thing I would say is that we too were surprised by what's happening there; this is entirely unprecedented; it's entirely unexpected, right? And that's where we need to begin, right? It's a highly atypical market situation the likes of which we have never seen. It doesn't affect only GeoPark. Every Colombian operator using the Vasconia reference is affected. And it isn't only Vasconia that's affected. Essentially, it's affecting basically all heavy oil crudes heading to the Gulf of Mexico refineries. So this is, if you will, an industry issue, which in fact has knock-on effects on Medanito, but right now it's primarily about Colombian crude going to the Gulf of Mexico, and that's the connection with Vasconia. So basically, what's happening? Multiple factors are at play, but I would sum it up around 3 things. Basically, with the sustained high prices we have seen over this year, there's an incentive for heavy oil that otherwise wouldn't be profitable to be produced; so basically, we're getting new supply from Canada, from Mexico, into the Gulf of Mexico, which in turn is depreciating, if you will, or stripping competitiveness from Colombian crude. That's one of the factors. The second factor is that freight costs have risen significantly high across the Caribbean, and in fact, it's a worldwide phenomenon tied to that Hormuz disruption, what's going on in the Gulf. Basically, since the conflict has now lasted more than 6 months, it's all reflected in freight costs, and those freight costs are affecting the Vasconia differential and the transport costs associated with that crude. That's the second important component, I'd say. Now, when you ask whether this is structural or temporary, our view is this is not structural. This is linked to the current oil market conditions and disruptions. And to the extent that those geopolitical situations unwind, this is going to go back; this is going to go back to normal because the fundamentals are still there. The crude hasn't lost its quality. The crude hasn't lost its appeal for the Gulf of Mexico refineries, so that should normalize. The question is, how long is it going to take? And we don't know; we don't know how long is it going to take. So what are we doing about it? We're doing 2 or 3 things. The first thing is, we're actually optimizing our hedging positions, and there's been a number of questions around hedging. We have kept room in our hedging policy for what you might call targeted, surgical adjustments to our hedge positions, and that is what we are carrying out during the fourth quarter. Essentially, here is what we have done: we took a portion of the volume hedged for 4Q and removed the ceilings tied to it by means of a rollover mechanism. In essence, we are moving the current positions forward into later periods under better pricing conditions, since the futures curve has improved, and we are creating additional room for ourselves to capture stronger pricing in 4Q; to a significant degree, that ought to offset the effects of what is happening with Vasconia, as long as it remains at sensible levels. And we will monitor how that develops across the coming 45 days. That is one adjustment. The second adjustment we are making involves rethinking our commercial strategy together with other operators who use the Vasconia reference. We are not on our own. Essentially, every Colombian operator uses the Vasconia reference, whether directly or indirectly, and we are holding discussions with them about how to steer through this situation, considering whether there is a possibility of blending crudes together, aggregating supply so that we obtain better conditions, and similar matters. And more technical items, for example working with Platts to make sure the Vasconia marker is priced adequately, or whether opportunities exist there. So those are the kinds of things we are doing at present, which ought to help us mitigate to some extent what is happening in the wider market.

Felipe Bayon

executive
#27

Thank you, and I appreciate everyone joining us today and for the interest you’ve shown in GeoPark. We feel a great deal of enthusiasm about where we stand right now with respect to the strategy we set out nearly 12 months ago, when we made the decision to safeguard what we already have while returning to growth. Growth inevitably brings certain difficulties, and we have needed to raise our activity level and our CapEx, and some of those matters were covered in our release and on today’s call; with regard to Vaca Muerta, we remain on track. Intensity will build as we drill additional wells and operate in factory drilling mode, and we are genuinely delighted about taking control of operations at Bare Block prior to year-end. Once more, thank you for joining us today. Thank you for the questions, and we hope to see you on the next results conference call.

Operator

operator
#28

This concludes today's call. Thank you for attending. You may now disconnect.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete GeoPark Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to GeoPark Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in GeoPark Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.