GeoPark Limited (GPRK) Earnings Call Transcript & Summary
November 4, 2026
Earnings Call Speaker Segments
Felipe Bayón
executiveThere are two important developments I'd like to highlight that demonstrate how we're making progress in transforming GeoPark into a more diversified energy company, with multiple platforms for growth over the long term. Earlier this week, we announced the successful completion of our strategic entry into Venezuela through the Barre block, after the 25-year production participation contract with PDVSA became effective. We hit this milestone well ahead of the schedule originally laid out in the contract, and it reflects both how effectively our teams execute and the constructive relationship we've built with PDVSA; with the contract now in force, our focus shifts to taking over Barre's operations safely and with discipline, which we expect to complete before year-end; we've already assessed approximately 300 to 400 wells for potential reactivation, giving us a foundation for the first redevelopment phase. The deal adds a large-scale, long-duration redevelopment opportunity to our portfolio, with meaningful potential to restore production by leveraging existing wells and infrastructure. It also marks a significant step in our strategy of building a more diversified regional platform; we also recently announced the award of the Corralera Noreste block in Argentina, which adds around 26,900 gross acres to our position in Northern Vaca Muerta. This expansion of our unconventional portfolio matters greatly, given its material resource potential and a strategic location adjacent to a development area that keeps growing; we'll pursue this opportunity through a phased appraisal program, applying the same technical discipline and investment criteria that guide how we allocate capital across the entire company. Taken together, these developments demonstrate the progress we've made in growing our portfolio outside Colombia, while maintaining the strong operating foundation that has underpinned GeoPark's growth over the past two decades. Turning now to our third quarter results, we delivered solid operational performance, with production stable in Colombia and growth accelerating in Argentina. Consolidated production averaged 27,973 barrels of oil equivalent per day, up approximately 3% from the previous quarter; in Colombia, output held steady at roughly 25,900 barrels of oil equivalent per day. Our Llanos 34 block continued to benefit from waterflooding and polymer injection projects, while Llanos 123 produced more thanks to ongoing development activity. At CPO-5, we also obtained encouraging exploration results, including the Milano-1X discovery, which has been testing at about 1,000 barrels of oil equivalent per day, underscoring the remaining potential within our Colombian portfolio. Argentina continues to show the progress of our development program. Output rose 51% quarter-over-quarter to roughly 2,100 barrels of oil equivalent per day, after five wells at Pad 1030 in Loma Jarillosa Este were successfully completed and brought on stream. Those wells went through 180 hydraulic fracturing stages, and gross field production surpassed 5,000 barrels of oil equivalent per day once they started up. We're now preparing for the next development phase, concentrating on moving toward a drilling and completion program that is more continuous and efficient, and we look forward to carrying this momentum into 2026. From a financial standpoint, the third quarter was tougher, even with solid operational performance. Brent crude held up reasonably well, averaging $91.4 per barrel, but broader crude differentials in Colombia and Argentina put significant pressure on our results. In Colombia, the Vasconia differential shifted from a $1.43 per barrel discount in the second quarter to $6.67 per barrel. In Argentina, the Medanito differential went from a $1.79 per barrel premium to a $3.50 per barrel discount. Those movements, together with the impact of our existing commodity hedging contracts, pushed our combined realized price down to $56.20 per barrel of oil equivalent, compared with $67.20 per barrel in the prior quarter. Our commodity risk management contracts had a negative impact of $36.4 million on revenue, versus $41.2 million in the second quarter. In response, we've continued actively managing our hedge portfolio to strengthen future price protection and capture more upside when market conditions improve, including optimizing our fourth quarter positions and extending coverage into 2028. At the same time, operating costs climbed to $20.70 per produced barrel of oil equivalent, versus $17.90 in the prior quarter, mainly reflecting higher energy costs, more well intervention activity, and appreciation of the Colombian and Argentine currencies; we recognize how important it is to address these pressures. Our teams are implementing operational efficiencies and cost optimization initiatives, including energy price hedges designed to cushion price volatility. As a result of these factors, quarterly revenue came to $116.2 million, and adjusted EBITDA was $45.8 million, a 39% margin. While financial performance fell short of the prior quarter, our operational results demonstrate the resilience of our portfolio and the progress of our development program; we remain focused on improving margins and cash generation through disciplined execution and active cost management. During the third quarter, we invested $72.2 million, primarily focused on development activities in Vaca Muerta, and continued production and infrastructure investments in Colombia. Operating cash flow was also affected by lower profitability and working capital requirements. As expected during this phase of elevated investment, free cash flow stayed negative; this reinforces how important it is to maintain a disciplined approach to capital allocation and preserve liquidity as we advance our development plans. At quarter end, GeoPark held $253.4 million in cash, with net leverage of 1.6 times the last 12 months adjusted EBITDA. After quarter end, we successfully completed our liability management transaction, including a $550 million senior notes issuance due in 2033. This transaction extended our debt maturity profile, addressed our near-term refinancing requirements, and secured long-term funding for a substantial portion of our planned investment program in Vaca Muerta. It marks an important step in aligning our capital structure with our growth strategy and gives us greater financial flexibility as we move through this investment phase. Looking ahead, we continue to expect full year production and adjusted EBITDA to remain within our guidance ranges, supported by growing production contributions from Argentina and Colombia, and the optimization of our fourth quarter hedge positions. Our priorities remain the same: complete the safe operational handover of the Barre block, accelerate development at Vaca Muerta, sustain strong performance from our Colombian assets, and maintain discipline in capital allocation. Reflecting on the past year's achievements, I see a company that has substantially expanded the growth opportunities ahead of it while continuing to leverage the operating strengths of its Colombian operations; we recognize the difficulties reflected in this quarter's financial results, and our focus remains firmly on what must be done to improve profitability, generate sustainable cash flow, and create long-term value for our shareholders. Finally, I want to recognize our employees for their commitment to safety, operational excellence, and disciplined execution, and to thank our partners and shareholders for their continued support. Thank you again for joining us today; with that, we're ready to take your questions, and we look toward 2026.
Jacob Roberts
analystMorning. Let me start on Venezuela, along with several numbers that surfaced on the September call and came up again today. At a high level, we're looking at 300 to 400 reactivations, as I recall 100 workovers, plus 30 possible new drill horizontals through 2030, and the new drill, I think, kicks off in 2028; since the CPP is now in force and you're stepping in before year-end, could you walk us through how those three buckets ramp year by year to hit that 2030 exit rate?
Felipe Bayón
executiveThanks, Jacob, and good morning again, everyone. Apologies for not finding the unmute button before the call began — good news is I've located it now. I believe my opening sentence may have been missed. Absolutely, Jacob — on Barre, the Barre block, we signed the contract with up to 120 days allowed to make it effective. Making it happen took us only about 65 days, so we're well ahead of schedule, which is great, and at present our teams are working alongside PDVSA to take over the operation before year-end. There's a lot of activity, a lot of preparation, and a lot of work underway when it comes to supply chain, people, and the like. I’d like Martín to walk us through some specifics — particularly reactivations, workovers, and the rest — and share how we’re thinking about them. Martín?
Martín Terrado
executiveAbsolutely, Felipe. Good morning, Jacob. I’ll add a bit of detail on where things stand and echo what Felipe said. Taking over operations safely is our highest priority, and we’re planning for that and feel comfortable doing it before this year ends. Of the three phases we laid out, the first is reactivation, then drilling, then steam injection. During year one, we’ll focus on reactivation, and eventually we’ll begin drilling next year. Looking at the figures, of the 300 to 450 reactivations we’ll carry out by 2030, one-third will happen next year. That means 100 to 150 reactivations we’ll be performing. That’s essentially OPEX. Moving to the next category, workovers, which take somewhat more time and money, of the 100 workovers we mentioned by 2030, roughly a fourth—25%—will be completed in 2027. Then on drilling, by 2030 we said 30 wells, which is about 12 to 15 wells per year, and drilling operations will begin in 2028. From a drilling standpoint, it’s zero for 2027. Now, I’d like to spend a few more minutes on two things. One is readiness, and the other is our relationship with PDVSA, which is very, very good. On readiness, right now more than 50% of the contracts critical to taking over operations have already been awarded, and we’re awarding the rest in the next two to three weeks; we feel confident about that. Which contracts are those? Rigs, chemicals, artificial lift, tubulars, and engineering, because with reactivation it’s not only about reactivating wells—we’re aware that as we go into some pads we’ll need to do some engineering to understand facility integrity; we feel very good about that, and in fact we had a visit with PDVSA where we received a really high ranking, and that’s part of the requirements for effective approval. The other readiness point I want to mention: teams on the ground; we have teams in both Caracas and El Tigre. For the past month and a half, we’ve had offices in both locations, and we already have an understanding and the names of the PDVSA employees who will be joining the Barre block development. Finally, I just want to say once again that we feel the reason we’ve been able to accelerate this timing Felipe mentioned for effectiveness is not only what GeoPark is doing, but our relationship with PDVSA, and we continue working on many fronts, including jointly identifying which wells we’re reactivating with them. We feel very good about what’s coming in Venezuela.
Felipe Bayón
executiveThanks, Martín.
Jacob Roberts
analystThank you — that was excellent detail and very useful; so for my second question, I'd like to turn to Argentina, and I apologize for how I pronounce this, but in the Corralera Noreste, we simply don't have much well data available, so I'm wondering whether you could discuss the technical case for the asset, and in particular which data your team was examining, what you're seeing regarding rock quality, all those sorts of details, and then ultimately what you expect from the asset to make it competitive with the current Vaca Muerta blocks.
Felipe Bayón
executiveAbsolutely, Jacob. Before I hand things to Rodrigo, I'll give you some context, which I believe is relevant. First, the award for Corralera is now official, so that's great; we are in the process of closing, and it will probably take some weeks to get everything sorted regarding the contracts and everything else. As you're probably aware, and as we've announced to the market, we initially have four years to do a lot of work to derisk the area. I know Rodrigo will go into some detail, but briefly, if you consider the neighborhood, obviously this differs from where our other two blocks that we currently operate are located, but other companies in the area are probably producing around 80,000 barrels; this is roughly 27,000 acres gross, so for GeoPark, adding the existing two blocks plus this one, that would take us to 39,000 acres, which is great; we've identified — remember in Loma Jarillosa and Puesto Silva, we have two landing zones; in this one, we see two to four landing zones. Good news, we have the acreage, we have the possibility of starting the work. We have four years to begin this derisking; in that sense, we can phase things accordingly regarding capital efficiency and logistics and everything else. Rodrigo, if you could provide us a bit more detail, that'd be great.
Rodrigo Dalle Fiore
executiveNaturally. In Argentina, we see this asset as something that adds to our existing position, because, as Felipe mentioned, we hold 12,000 acres and have three years of development at the current asset. Before doing any work to evaluate subsurface potential, this new asset gives us another 27 of acreage, which allows us to continue developing the area with the drill rigs and with new wells too. The asset is located in the oil window, and that is very important to us. It sits in the northern portion of the basin, in what we call the new hub, near infrastructure, which is an advantage. In the north, Chevron, Pluspetrol, Tecpetrol, and YPF are actually developing unconventional acreage in that area, and that is why we believe we are in the right neighborhood. Based on the information we have, which you asked about, the previous operator drilled a well. From that well, we know the reservoir is there. What we will be testing over these four years is the well's potential and productivity. One uncertainty we face is the water cut we will produce. The well type we are targeting here is similar to El Trapial; in the south, Chevron produces from El Trapial with very good results, and we expect to try to achieve that well type. In that case, we are talking about more than 1 million barrels per well. The landing zones we will test over these four years are the T7 and the Berriasian; those landing zones have been tested by the neighborhood, although the previous operator did not test them, and that is why we will bring something new into the equation here. As for competitiveness, which you asked about, the plan we have today is preliminary, consistent with the information around it. We are talking about more than 120 wells for the development. Right now we are considering a conventional well with a 3,000 lateral length, because the block's polygon allows us to consider that, more than 120 million of potential reserve in the future, and the well cost runs between $14 million and $15 million, as you can see with many of the other operators in the area. It is preliminary, and we have to test the reservoir's potential, but that is the bet we have in Vaca Muerta today.
Felipe Bayón
executiveThanks, Rodrigo, and thanks to you as well, Jacob.
Jacob Roberts
analystAll right. Well, I do appreciate that, fellas — appreciate you making the time.
Alejandro Demichelis
analystGood morning, everybody. Thanks so much for taking my questions. I have a couple, if that's all right. The first one: Felipe, you mentioned the emphasis on the cost structure at the moment, with the entire team examining it. Could you perhaps give us some sense of how you expect costs to develop, in Argentina as well as in Colombia, and also with the additional acreage that's coming in Venezuela? My second question builds on what you talked about concerning Venezuela. The transaction's complete now, and certain milestones remain that could potentially grant additional shares to your controller. Would you walk us through those milestones and your expectations for how they'll play out?
Felipe Bayón
executiveAppreciate it, Alejandro. If it's alright, I'll probably take the second question first, then turn to Jaime and Martín for help on the first. On the Barre block and our thinking there, as I said before, Alejandro, operations still have to get underway, which is a great thing. We're aiming to have that wrapped up ahead of year-end, and that's where all our attention and focus sits. As Martín explained, how do we operate in a manner that is both safe and efficient? Once more, we are going to begin — despite having completed assessments of the area and the wells and having collected data — because it is one matter to go in, reach the field, and start bringing wells into operation and restoring production. That process will require some time from us, and as Martín was clearly explaining, the emphasis will be placed on reactivating the wells. The favorable part is that our well inventory is quite abundant. Out of the 1,100 wells, we have examined 3 to 400, and next year the figure will be 120 or something within that range. Looking at it that way, Alejandro, I'd say we're in good shape. As for which milestones might or might not get triggered, Jaime can probably give you more detail — we did announce the share issuance tied to Barre, to the Barre block, and we announced a possible additional batch of shares that milestones could set off, chiefly connected to certain tax events that might arise in Venezuela. Jaime, would you like to say a bit about that?
Jaime Caballero
executiveRight, of course. Those milestones Felipe mentioned are tied essentially to Venezuela's tax framework — specifically the corporate income tax that applies to the various categories of fields over there. The particular situation is this: there's an ongoing conversation between Venezuela's executive branch and the Congress about which conditions would best suit reactivating the industry moving forward. Against that backdrop, it's possible the corporate income tax applying to a field like Barre could be revised downward. As things stand, our business case assumes we'll be paying a 50% corporate income tax over time, and there's a chance this gets reviewed lower within the coming weeks. What we've agreed with Grupo Gilinski as part of this transaction is that should those revisions happen by the 1st of December of this year, we'd get that adjustment. Crucially, the revision has to be completely unambiguous in scope — it must be very clear that it covers Barre in its entirety — and if that condition is satisfied, we would then apply this clause, which entails an additional share grant to the Grupo Gilinski.
Felipe Bayón
executiveThanks, Jaime. If we can go to the first question from Alejandro on costs.
Jaime Caballero
executiveSure. Alejandro, my apologies — I also failed to say hello earlier. Regarding costs, let me begin by noting that the company, naturally, keeps a very disciplined stance on operating expenses, and we're acutely aware that across this quarter and the prior one, our unit costs have risen considerably, correct? The way I'd frame it is this: if you recall our initial guidance for this year, when we sat in the $13 to $15 per barrel bracket, and today we're at $20, how should we characterize that $5, $6 gap? What's really driving it is that two-thirds of that swing ties back to Colombian macro conditions that mostly lie beyond our control. Those are energy costs — roughly $1.5 per barrel — plus the FX effect from a stronger peso, which accounts for another $1.5 per barrel. The remaining piece, that other one-third, reflects higher activity; we're running more activity, especially at Llanos 34, and Martín will walk through that shortly. I'd like to zero in on what's happening with energy and FX and the steps we're taking in response. Essentially on energy, given the gas shortages in Colombia — which mean sizable imports — we're seeing a substantial rise in costs tied to electricity drawn from the grid. There are multiple drivers, and I won't dive into great detail here, but in essence that growth in imports linked to gas shows up in grid spot prices. Historically, GeoPark has carried considerable exposure to spot pricing, since over the long run it has proven more cost-effective than fixed prices. That held true previously, right? As this transition unfolds in Colombia's energy grid, things are shifting, and we're arriving at a point where spot pricing grows highly volatile, with significant expected growth over the coming few years, so we're making the move from spot price toward fixed price. That gives us a stronger outlook ahead. There are three specific items we see taking effect in 4Q. First, some fixed pricing is beginning to come through in 4Q; we'll essentially shift from a position where roughly 60% of our pricing is fixed, sourced from PEL — the grid serving Llanos — to one where only about 45% will be purchased from spot. Second, PEL grid rates will take effect. The CREG — the commission under the new government that oversees Colombian energy matters — has already issued an intervention amounting to roughly a 30% discount on the energy rates we receive from the grid. That is also kicking in this quarter. The final item I want to flag is certain energy hedges that we have contracted. So those energy hedges essentially lock in a fixed price for us at roughly one-third of the rates we paid during 3Q. That represents a meaningful saving compared with the spot pricing we paid in 3Q. All of it begins to take effect in 4Q, which gives us an improved outlook; now, looking further out, what we aim to accomplish across 2027 is to get to a point where roughly 75% of our demand is tied to fixed pricing, and that remains a work in progress, and we'll keep you updated on it. On FX, this is public information and you can quite easily observe what is happening between the Colombian peso and the dollar. What we're essentially doing is making sure we have downside protection. In an extreme scenario where exchange rates drop below 3,000 pesos per dollar, we are protected against that, we have hedges in place that shield us. If you like, the downside exposure is already capped. Another thing we're doing is reviewing our whole cost base to identify where opportunities exist to improve efficiency and mitigate that exposure we carry. That said, insofar as the FX rate remains at present levels of around 3,200 pesos, 3,300 pesos per dollar, we will keep having that increase, if you will, in dollar-based exposure. With that, I'll pass it to Martín to discuss the activity drivers a bit more.
Martín Terrado
executiveTo add to what Jaime said—and Alejandro, thanks once more for being with us on this call. When we consider Colombia, as Jaime noted, it's $1.5 for energy, $1.5 for the exchange rate, and those figures are dollars per barrel, with the rest coming mostly from operations. In Colombia, looking at Llanos 34—which is where the bulk of the OPEX increase occurred—I'll say a few words about Llanos 123, but at Llanos 34 during the first half of the year our failure rate fell outside the ranges we were accustomed to. What that meant was more pulling jobs than we had anticipated. That situation has since changed; in the second half of the year we aren't seeing it. Another driver behind that bump in pulling jobs is that, on a proactive basis, we carried out what we refer to as deepening—essentially installing the pump at a greater depth or using a larger pump to produce more fluid, which lets us hold back the declines—and we still had some of those candidates early in the year. That is the context when you consider the pulling reason behind the higher OPEX. So what are we doing in Colombia to curb part of that added OPEX? I'd say there are mainly two large buckets. The first large bucket is water management, which is exactly why workovers matter so much at Llanos 34. A number of those workovers involve water shutoffs, or they deliver incremental production, or both, and we keep doing workovers. In fact, we're performing roughly eight additional workovers beyond what was expected, as agreed with our partner, and they are delivering solid value. Turning to Llanos 123, water management there means simplifying things and cutting back on water trucking, and that's what we've done over the past nine months; we have two pads, and we've lowered the water trucking between pads by engineering some of the facilities so the water can be treated and injected at the same location—that's another step we've taken. Then there's the other component for Colombia: what more can we do around energy efficiency? One of the efforts, as Jaime mentioned, isn't only about hedges—it's whether we can partially switch the feed of our machines away from diesel toward other sources. That is producing some savings for us. Year to date, we achieved savings of roughly $7 million, which are being offset by the impact of the exchange rate and energy. I don't want to leave out Argentina, and yes, Argentina is contributing about 5,000 barrels of our total production, and for the quarter it was, as we said, roughly 28,000 barrels per day. In Argentina, when we took over operations a little more than a year ago, OPEX was in the high 20s, low 30s—between $29 and $32 per barrel, I don't recall the exact figure, but that was the ballpark—and today we're below $10 per barrel. That comes from all the effort, and you folks have tracked our facilities and investments with us—really proud of the team's work, with no incidents, and at this point we aren't hauling crude by truck, the crude flows through a pipeline, we aren't trucking water either, the water goes down a disposal well, and we're piping the gas as well. Every one of those items, together with the upscaling we carried out at the Loma Jarillosa battery, is helping us hold OPEX on the trajectory we have in mind, and that's our plan.
Felipe Bayón
executiveThanks, Martín. Appreciate it, Jaime.
Alejandro Demichelis
analystMany thanks to you both. We've got a handful of questions coming in from the webcast now.
Felipe Bayón
executiveAppreciate the question, and Daniel, thank you for always keeping tabs on us and for your interest in the company. My view is that these are two distinct things, and each brings us, I'd say, different challenges along with different opportunities. If you take a step back for a moment and consider GeoPark, and I believe with the portfolio we have today, now that Barre is effective and the CPP contract is effective, we effectively have a Latin American platform featuring conventional oil in Colombia, heavy crude too, unconventionals in Argentina, and extra-heavy oil in Venezuela. Three distinct crude types, three distinct operations. The positive side, during the past year particularly in Vaca Muerta, and with the team we've been able to put together, including many people who bring lots of years of unconventional experience, we're progressing nicely when it comes to activity and intensity. As we've explained previously, Vaca Muerta will be a very CAPEX-intensive development across the coming few years; it comes down to execution on drilling and factory-mode drilling, which kicks off in December. On the positive side, we've already drilled 5 wells, and those were completed earlier this year in March and April. All of that information, all of that experience, everything we encountered in the subsurface has been folded into the plans going forward. Another positive thing we probably haven't discussed much, we just completed a very high-quality 3D seismic survey across the area, and it will supply plenty of data going forward. Very specific regarding the challenges that this involves or that it carries with it for Vaca Muerta. We remain on track with the investment and with the production ramp-up, so that's positive. As Martín was pointing out during the past year, a solid reduction in lifting costs, which always matters; regarding Barre, and stepping back again, a field that holds, or a block holding, close to 16 billion barrels of oil in place, where we've at minimum identified that across the next 25 years we can produce roughly 600 million barrels, offers plenty of opportunities, and it centers on reactivations. The challenges there would involve getting the pulling rigs and the small rigs, the 350-horsepower and 550-horsepower units, into the field on schedule, kicking off the reactivations, and securing the right people. As Martín was pointing out, we've already awarded roughly 50% of the services needed; we're quite comfortable, and many of those companies are ones we've worked with previously or that bring extensive experience in La Faja, which is great. One more thing, Daniel, stepping back, I think, and you correctly note, different challenges, different natures of the developments, we have very, very strong teams for both Vaca Muerta and Barre, and I'm very confident about that. At the same time, we'll continue looking after Colombia—we haven't lost sight of what got us to this point and what makes this move possible. On a personal level, I'm extremely excited and quite optimistic. There will be developments ahead, and probably some surprises too, but I believe the opportunity set here is of very high quality. Once again, it places us within reach of being a regional platform for investors and for those who wish to stay with GeoPark over the long term. Thank you for the question.
Felipe Bayón
executiveThanks, Daniel — I’ll connect my answer to the first question you raised. It’s clear that Argentina and Venezuela will be supplying extra volumes as we move ahead, and output from Vaca Muerta will rise as we drill and complete some of the facilities. As it happens, during the past couple of weeks we’ve already completed the first tie-ins to the regional oil and gas pipelines, and evacuation is in a much stronger position now that trucking has been reduced. Volumes will come, and once we take over operations at the Barre block in Venezuela, we’ll begin to see production grow. As we’ve said previously in gross terms, that’s probably about 15,000 to 20,000 barrels for Barre. Stepping back, our hedged volumes for next year come to roughly 22,000 barrels on average across the year. Incremental volumes will arrive that will, to some degree, be able to capture higher prices if those prices persist. I think it’s worth stepping back for a moment. A year ago, when we decided to enter the two blocks in Vaca Muerta, we stated very specifically that we needed the hedging to make sure we could fund the CAPEX and pay down our debts. We knew this quarter — 3Q especially — would be difficult, and that we’d be in a somewhat tight spot. I think this is delivering the strategy going forward, and once again, I think we’re in a good place in that respect, able to deliver investments going forward. Thanks for the question.
Felipe Bayón
executiveThanks, Daniel, and that's a great question. I want to recognize that collaborating with Grupo Gilinski on the Venezuela opportunity was essential in getting us to where we stand today. Very, very swiftly and in a highly efficient manner, getting that opportunity before GeoPark and then being able to finalize the deal alongside Grupo Gilinski. One thing I would note, Daniel, is that any opportunity — and all opportunities — that comes forward for the company will be handled through GeoPark. Everything will be carried out with GeoPark as the vehicle in Venezuela, or should other opportunities arise down the road. I want to emphasize one point. I believe that during the last 12 months, we have succeeded in assembling a highly competitive portfolio, and at present I think our attention is largely on execution and delivery of what we have managed to build as a very, very competitive, high-quality portfolio. Thanks, Daniel.
Jaime Caballero
executiveHi Vicente, thanks for those questions—I'll take the first one. Essentially, the schedule for the tender process is set by the contract, the PSA we reached with Grupo Gilinski, and it essentially allows for a 90-day window after closing in which to carry out the tender; that began last Monday, and it will run for the following 88 days, so to speak. The offer is proportional for all shareholders, excluding Grupo Gilinski; it is open to every shareholder of the company outside of Grupo Gilinski, and if there is an oversubscription, tenders will be allocated on a pro rata basis. Over to Martín.
Martín Terrado
executiveVicente, I appreciate the question. Regarding the short-term operational milestones, let me expand a bit on what I mentioned earlier, but the main focus is on taking over operations safely. The primary emphasis is on bringing equipment onto the block so we can bring wells back online, and that equipment means the rigs. We're aiming to begin with one to two rigs, and after that we'll keep ramping up. Equipment also includes wellheads, tubulars, and similar items. Another element during the first 100 days — sorry, 100 days — is making sure that, just as we did in Argentina, the teams are building bonds, and that we maintain a solid relationship with PDVSA and a path forward. As for how we'll measure that, I'd say our key performance indicators for the initial 100 days will be operations with zero incidents, safety once more, and then production levels. Where do we stand on production compared with what we had when operations began? After that we'll shift toward efficiencies, but I'd say that during the first 100 days, the focus will be on reactivation and safe operations.
Felipe Bayón
executiveThank you, Martín.
Jaime Caballero
executiveHello Joaquín, and thanks for raising that question. First off, I want to say we're quite pleased to have secured investor backing for our expansion initiatives lately through this bond issue. That 2033 maturity gives us plenty of runway to carry out the growth plans centered on the portfolio transition Felipe outlined. Seen from that perspective, securing such investor support is highly strategic, and we're genuinely grateful for it. Turning to the figures: if you take the net proceeds from the recent issuance, after refinancing the 2027s — which is already done, so that's handled — along with the 2030s, everything that was tendered, our net proceeds come to roughly $170 million. That $170 million has to be combined with the cash we already hold, which, as you'd have noticed in the 3Q results, stood at approximately $250 million. Beyond that, we hold several committed lines that remain undrawn, and those include Vitol — though there's more than just that; we have a couple of additional lines, among them a club line involving a group of international and Colombian banks totaling $150 million, plus several revolving facilities in Argentina accessible to the Vaca Muerta operations, and those Argentine lines combined come to roughly $150 million. My point here is that, in essence, adding it all together gives us available financing on the order of $600 to $700 million, which leaves plenty of headroom for what we're aiming to accomplish at Vaca Muerta. To frame that properly, naturally, as we watch market conditions across the coming year and track how Vaca Muerta develops, we'll be assessing what the most efficient deployment of those lines looks like, and I'd describe the Vitol line and the contingent line under the club deal as contingent facilities — they serve as safety nets. They don't form part of our core plan, yet they are there if needed. I believe our choices regarding how we fund Vaca Muerta will hinge heavily on how market conditions unfold over the next 12 months or so, but 2027 is fully funded in aggregate, covering all requirements not just for Vaca Muerta but also for Barre and Corralera. Thanks.
Felipe Bayón
executiveThanks, Jaime.
Jaime Caballero
executiveHi Andrés — hello! Regarding Vasconia, the first point I’d make is that what is going on there caught us by surprise as well. It’s totally unheard of and totally unanticipated, correct? That’s where we have to begin, right? This is an extremely unusual market circumstance the likes of which we have not encountered previously; it impacts not only GeoPark but every Colombian operator relying on the Vasconia reference, and it isn’t confined to Vasconia — it is affecting essentially all heavy oil crudes headed to refineries in the Gulf of Mexico. This is, so to speak, a sector-wide problem, which in fact carries knock-on consequences for Medanito, though at present it mainly concerns Colombian crude going to the Gulf of Mexico, and that is how Vasconia connects to it. What is basically taking place involves several factors, but I’d boil it down to three things. First, the sustained elevated prices witnessed throughout this year create an incentive for heavy oil that would otherwise be unprofitable to be produced. Essentially new supply is arriving from Canada and from Mexico into the Gulf of Mexico, which in turn is eroding, so to speak, or stripping away the competitiveness of Colombian crude. That’s one factor. The second factor is that freight costs have risen substantially across the Caribbean, and in fact this is a global phenomenon tied to the Hormuz disruption, to what is happening in the Gulf basically. Since the conflict has now persisted for over six months, all of it shows up in freight costs, and those freight costs are hitting the Vasconia differential and the transport costs tied to that crude; that’s the second key component, I’d say. Now, as to whether this is structural or temporary, our view is that it is not structural. It is tied to present oil market conditions and disruptions, and to the degree those geopolitical situations unwind, things will return to normal, because the fundamentals remain in place. The crude has not lost its quality, the crude has not lost its appeal to Gulf of Mexico refineries, so that ought to normalize. The question is how long that will take, and we don’t know. We don’t know how long it will take. What are we doing about it? We are doing two or three things. The first is that we are in fact optimizing our hedging positions, and there have been several questions regarding hedging. We have kept room within our hedging policy for specific, so to speak, surgical interventions in our hedging positions, and we are doing that in the fourth quarter. Essentially, what we have done is take part of the volume we have hedged for 4Q, and we have released the ceilings attached to it through a rollover mechanism. So essentially, we're carrying our current positions forward under improved pricing terms, since the futures curve has gotten better, and we're leaving ourselves additional headroom to lock in stronger pricing during 4Q. That ought to a substantial degree to counterbalance the situation with Vasconia, assuming it remains at sensible levels. We'll monitor how that develops across the coming 45 days. That's one intervention. The other intervention we're pursuing involves re-examining our commercial strategy together with other operators who rely on the Vasconia reference. We aren't the only ones. If you look at essentially every Colombian operator, they use the Vasconia reference either directly or indirectly, and we're holding discussions with them about how to steer through this situation — specifically whether there's a possibility of blending crudes together, aggregating supply so that we obtain better conditions, and similar measures. More technical items, like cooperating with Platts to make sure the Vasconia marker is priced adequately, or whether opportunities exist around that. Those are the kinds of things we're undertaking at present, which ought to assist us in mitigating to some extent the situation in the wider market. Thanks.
Felipe Bayón
executiveThank you, Jaime, and thanks, Andrés, for the question.
Felipe Bayón
executiveThank you, and I appreciate everyone joining us today and for your interest in GeoPark. We feel a great deal of enthusiasm about where we stand right now regarding the strategy we set out nearly 12 months ago, when we chose to safeguard our existing assets and return to a growth path. Growth inevitably brings certain challenges, and we have needed to raise our activity level and our CAPEX, and we touched on a number of those matters in our release and on today's call. With respect to Vaca Muerta, we remain on track; intensity will build as we drill additional wells and operate in factory drilling mode, and we are genuinely delighted about securing operational control at the Barre block prior to year-end. Once more, thank you for attending today, thank you for the questions, and we hope to see you on our next results conference call.
Operator
operatorThis concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete GeoPark Limited transcript — plus 131,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to GeoPark Limited earnings transcripts and 131,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in GeoPark Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.