Good morning, everyone. Welcome to the conference call for Gibson Energy covering the fourth quarter and the full year 2019. Please note that we are recording this call. At this point, I'll hand the meeting to Mark Chyc-Cies, Vice President of Strategy, Planning and Investor Relations. Mr. Chyc-Cies, the floor is yours.

Mark Chyc-Cies

executive
#2

Much appreciated, operator. Morning, everyone, and thanks for being with us on today's conference call, where we'll go through the operational and financial results for the fourth quarter and the full year 2019. Joining us this morning from Gibson Energy are Steve Spaulding, our President and Chief Executive Officer, along with Sean Brown, our Chief Financial Officer. A reminder to listeners that this call touches on non-GAAP measures as well as forward-looking information. The descriptions and qualifications of those measures and that information appear in our continuous disclosure documents, which you can find on SEDAR. At this point, I'll hand things over to Steve.

Steve Spaulding

executive
#3

Thanks, Mark. Good morning, everyone, and thanks for being with us today. We keep posting solid, steady operating and financial results, and that held true in the fourth quarter, which wrapped up yet another exceptional year for Gibson. I'm happy to report that, for a second consecutive year, two measures reached record levels at Gibson: adjusted EBITDA from continuing operations, at $463 million, and distributable cash flow on a combined basis, at $309 million. Growth in our Infrastructure segment drove most of that gain; segment profit there came in at $86 million for the fourth quarter, up $14 million, or 19%, versus the same quarter in 2018. Our Marketing segment also had a strong year, even with the WCS-WTI differential averaging below $13 per barrel in 2019, which is under half its 2018 average. The Marketing organization still earned $195 million, just $9 million below 2018. Beyond these robust financial results, we keep moving our strategy forward. It feels like ages ago now, but in 2019 we finished selling our Canadian Trucking and Environmental Services businesses. Those deals meant we met the divestiture targets we laid out at our January 2018 Investor Day.

Steve Spaulding

executive
#4

We completed the sale of every non-core business according to plan, with total proceeds landing at the midpoint of our target range. Tying that back to strategy, those dispositions—combined with ongoing investment in our core terminal operations—allowed us to transform Gibson into a focused oil infrastructure company. Around the beginning of 2019, we placed our first phase into service at the Top of the Hill at our Hardisty Terminal, which added three tanks equating to 1.1 million barrels of storage. Come November, we brought four more tanks online ahead of schedule, contributing an additional 2 million barrels. All told, across 2019 we added seven tanks, or 3.1 million barrels, amounting to roughly a 35% expansion at our Hardisty Terminal. Maintaining that momentum at Hardisty, we also sanctioned three more tanks during the year, and we expect those to enter service in late 2020. Given the discussions already underway, we have a strong line of sight to contract two to four tanks once again this year. Sanctioning the DRU at Hardisty alongside our joint venture partner, USD, is significant for Gibson and gives us a platform for deploying additional capital backed by long-term contracts. It lets us leverage our position at Hardisty to offer customers additional services beyond tankage and access to the HURC Unit Train Facility.

Steve Spaulding

executive
#5

Anyone new who wants in on the DRU is going to require tankage plus a rail contract that runs long term. We frequently discuss our capacity to put up tankage at Edmonton should TMX go ahead, along with extra tankage at Hardisty if KXL starts operating. Thanks to the DRU, we have confidence that growth can carry on even without those pipeline projects. Our initial 50,000 barrels a day of DRU capacity is fully sanctioned, we've wrapped up all agreements with our customer, we anticipate regulatory approvals shortly, and we expect to break ground within a few months. Regarding the design, the one we select will let us expand to between 250,000 and 300,000 barrels a day of inlet capacity, added in 50,000 barrel increments. Talks are underway with a number of producers, refiners, and integrated customers, and we're hopeful a second customer can be signed before the third quarter ends. Down in the U.S., we brought the Pyote East Pipeline into service during the fourth quarter of 2019. That marks the first infrastructure asset Gibson Energy has constructed in the U.S. Our commercial team has completed agreements with multiple neighboring producers, and as of today we have close to 250,000 acres committed to our system.

Steve Spaulding

executive
#6

We're still in discussions with other producers and midstream companies in that region, and we anticipate expanding our reach further by adding more connections to our current system. Before we secure tankage at Wink, our capital will go toward bolt-on connection projects that are low cost and high return. To round out the infrastructure growth projects, we brought into service in 2019 — and I'd also like to mention the Viking Pipeline, the HURC Unit Train Facility expansion to 3.5 trains a day, and the expansion of our Moose Jaw Facility in Saskatchewan. All together, these projects contribute to the $290 million of infrastructure capital in 2019, including business development activities. This investment produced growth in our fourth quarter Infrastructure segment profit of 2019, which reached $86 million; compared with the fourth quarter of 2017, segment profit is up $30 million, more than 50% since we set out our strategy in January of 2018. And if you look at our growth on a distributable cash flow per share basis, the 2019 figure of $2.13 per share represents nearly a 10% increase over 2018 and nearly a 70% increase from 2017. And importantly, that increase is being underpinned by growth in our long-term stable infrastructure cash flows.

Steve Spaulding

executive
#7

While solid marketing results have certainly been a key factor, the higher cash flow stems from the expansion of our infrastructure, and those strong marketing results have considerably reinforced our balance sheet. We closed out the year at 2.7 leverage, with the ability to put more than $400 million toward growth capital in 2020, and reaching investment grade during the year was a significant accomplishment that opens up access to the hybrid bond and preferred equity markets, which can help us bring in outside capital should the need arise. On top of that, it will lower our interest expenses by $15 million to $20 million annually, a meaningful share of the yearly cash flow goal we have set. Given the success achieved across all of these areas, I am delighted that we could fulfill the final tenet of our strategy, which is to provide a dividend that is both stable and growing. The Board of Directors yesterday gave approval to raise the quarterly dividend by $0.01 per share, bringing it to $0.34 per share each quarter, or $1.36 per share on an annual basis. When deciding on this increase, the board and management were closely aligned on its importance and on keeping it fully funded, considering the scale of our current capital program along with our confidence in continued growth.

Steve Spaulding

executive
#8

Our goal is to grow the dividend over time while staying true to the financial principles that govern us. Both the board and management will keep weighing targeted dividend growth against the need to preserve a strong financial position and a capital program that is fully funded. Turning beyond our financials and operating results, we are genuinely enthusiastic about what we are doing on the ESG and corporate social responsibility front. Over the year, we took a number of significant steps, among them formalizing board oversight of sustainability through our environment, social, governance, health and safety committee, and the board's adoption of a diversity inclusion policy. We are not beginning from a standstill — many of the concepts within ESG have long been part of Gibson. Take safety, for instance: we have consistently worked to better our performance annually and to advance toward the aspirational goal of zero injuries. We have monitored both leading and lagging indicators, and our compensation is already linked to safety and to certain environmental metrics. On the capital project side of our business, thanks to the innovation of our project team, we were able to expand our Moose Jaw Facility so that its production capacity rose by approximately 30% with no increase in GHG emissions, which effectively lowered our facility's GHG emissions intensity by approximately 20% to 25%.

Steve Spaulding

executive
#9

This really shows how we're expanding the business while simultaneously reducing our carbon footprint. Coming back to diversity for a second—to bring more gender diversity into our workforce, particularly at management levels in 2019, we changed our recruiting practices so that applicant interviews aim for equal gender representation. Moves like that are already producing results: 34% of our 2019 new hires were female, compared with 19% in 2018. That let us raise female representation across our workforce to 31% by the end of 2019, up from 26% in 2018, and female representation in management rose to 29% from 25% in 2018. We think a workplace that encourages diversity adds to our business success and fuels innovation across the company. One instance that springs to mind involves community investment. In 2019, we raised our annual community investment spend by 70% over 2018. For 2020, we've lifted our annual community investment budget to a company high of $1 million. We're making these increases because we believe that when our company does well, the communities where we operate ought to share in that success as well. That being said, we understand that ESG is a journey.

Steve Spaulding

executive
#10

Over the past year, we completed a great deal of foundational work, and what we're doing in this area keeps developing. In numerous respects, we think our starting position is solid. That said, gaps definitely exist, and there are even some places where we'd like to do better. Disclosure is one such area we're aiming to strengthen, and we'll close that gap shortly, since we plan to release our first sustainability report in May. To sum up, we're happy with how strongly we executed and delivered during 2019. For a second consecutive year, Gibson stock posted the best total-return performance among peers. And we feel we're positioned well to keep delivering. We've approved a $300 million capital program for 2020, giving us visibility toward extending our growth through 2021. We stay confident in our capacity to put $200 million to $300 million each year, or more, of capital into contracted infrastructure projects with high returns. We have visibility toward approving extra tankage during 2020 and feel confident that we'll approve further phases at the DRU. Our financial standing is quite robust. We're fully funded, with marketing now performing and supplying added cushion.

Steve Spaulding

executive
#11

Both leverage and payouts are still running under where we want them to be, and we've managed to get our dividend growth going again. As I mention on every one of these calls, the objective couldn't be clearer. We have to stay focused on carrying out our strategy and keep delivering on the commitments we've made. At this point I'll hand things to Sean, who will take you through the financial results in greater detail. Sean?

Sean Brown

executive
#12

Thanks, Steve. As Steve noted, 2019 was a really strong year that set new highs for both adjusted EBITDA from continuing operations and distributable cash flow for the year. Both for full-year 2019 and for the fourth quarter, a very strong and predictable contribution from the infrastructure segment drove the results. Marketing in the fourth quarter came in roughly as we expected, though performance remains very strong compared with the long-term annual run rate of $80 million to $120 million. Looking first at our key metrics on a fourth-quarter basis: adjusted EBITDA from continuing operations was $126 million, which is $16 million, or 14%, higher than the $110 million earned in the third quarter of 2019, after adjusting the third quarter for a $12 million credit tied to the amendment to the company’s retirement benefit plan. Breaking that down by segment: infrastructure rose by $4 million, reflecting a partial contribution in the fourth quarter for the four tank placed into service at the Top of the Hill in November, along with a limited contribution from the Pyote East pipeline, which entered service but was still ramping up during the quarter. Marketing reported segment profit of $46 million and adjusted EBITDA of $52 million, which was modestly ahead of our expectations.

Sean Brown

executive
#13

If we look at adjusted EBITDA, that figure came to $14 million, which represents a 37% gain versus the third quarter, with stronger performance in both the crude oil side and the refined products side during the fourth quarter compared with the third. Turning to segment profit, marketing came in $3 million lower in the third quarter, driven by a swing from a net unrealized gain of $12 million in the third quarter to an unrealized loss of $6 million in the fourth quarter — an $18 million change across those two quarters. Moving down to distributable cash flow, it rose $4 million in the fourth quarter compared with the third quarter of this year, while replacement capital ran higher in the fourth quarter, mainly because of certain required projects at Moose Jaw, along with several other smaller projects we had to complete before year-end, and lease payments under IFRS 16 edged up slightly as additional rail cars joined our fleet. Those factors were partly offset by reduced cash taxes and interest. Compared with the fourth quarter of 2018, adjusted EBITDA from continuing operations was $8 million lower this quarter. Keep in mind that marketing had benefited at the end of last year from the very wide WCS to WTI differential, which produced a $16 million decline in adjusted EBITDA from the marketing segment.

Sean Brown

executive
#14

Like Steve mentioned before, the key point here is the expansion in our Infrastructure segment—up $14 million, or 20%—which mostly made up for the decline in marketing, though the cash flows are of considerably better quality. Now shifting to a year-over-year comparison, 2019 came in even stronger than a 2018 that was already very strong. Adjusted EBITDA from continuing operations reached $463 million, after adjusting for both the future remediation provision booked in the second quarter and the credit tied to the amendment of the company's retirement benefit plans in the third quarter, which is a $6 million rise versus 2018. Much like what we discussed for the fourth quarter, growth in infrastructure offset a decline in marketing. If you adjust for the future remediation provision, Infrastructure segment profit for 2019 rose by roughly $31 million, or 11%, compared with 2018. Marketing segment profit fell $8 million; even with that much narrower gap, the marketing group managed to uncover other opportunities as the year went on, following a very strong opening in the first quarter of 2019 that came from volatility experienced after the prior Alberta government announcement of production curtailment in December 2018. Looking at distributable cash flow, the 2019 number was $309 million, which is $27 million above what was recorded in 2018.

Sean Brown

executive
#15

Building on the items I covered regarding EBITDA, the $33 million reduction in cash flows from divested businesses was more than compensated for by a $45 million drop in current taxes during 2019, largely attributable to a set of one-time tax credits we were in a position to claim. Distributable cash flow for 2019 additionally gained from somewhat reduced interest and maintenance capital, which together made up a $6 million Delta. As Steve noted, a major milestone on the finance side in 2019 was obtaining our investment grade credit rating, something that has already lowered our cost of capital and widened our access to capital. In line with moving our capital structure toward an investment grade model, we just finished extending our credit facility out to 2025 and raising upside capacity to $750 million. Although we had only $50 million drawn against that facility at year end, the added capacity ensures we hold ample liquidity and flexibility to fund our capital program without needing to lean unduly on the debt capital markets at moments that might not be optimal. Regarding our financial position as of the close of 2019, debt to adjusted EBITDA stood at 2.7 times, comfortably beneath our 3 to 3.5 times target.

Sean Brown

executive
#16

At year end, the payout ratio stands at 62%, and that's also comfortably under the 70% to 80% target range we've set. On both of those measures, our inclination is still to remain toward the bottom of those ranges, particularly in light of the greater number of capital opportunities we're seeing. Still, it's worth remembering that this forms part of our financial governing principle: we evaluate those metrics with an eye toward a far more sustainable long-term contribution for marketing. To be specific, we aim to hold leverage on an infrastructure only basis at or below four times, and we've set a target of a dividend payout ratio under 100% on an infrastructure only basis. Beyond that, staying fully funded matters enormously to us. Having said that, we'd very much like to see marketing outperformance persist, since it replenishes our balance sheet and assists us in funding infrastructure growth capital. Turning to the first quarter of 2020, we anticipate adjusted EBITDA for marketing in the range of $30 million to $40 million, with a bias toward the higher end of that range, which sits above our long-term run rate of $20 million to $30 million per quarter. So although we do expect both leverage and payout to stay under our target levels in the near-term thanks to marketing outperformance, we'll keep staying true to our capital allocation philosophy, under which our dividend is underpinned by infrastructure earnings, and marketing outperformance is first invested into high quality growth capital projects and second returned to shareholders via buybacks, to the extent that we lack visibility into being able to reinvest those earnings back into long-term infrastructure.

Sean Brown

executive
#17

To sum up, our financial footing is quite solid. Results for 2019 came in very strong, with infrastructure still expanding and marketing still beating expectations. We keep ticking every box, and under our guiding financial rule, we stayed fully funded for all sanction capital, with payout and leverage comfortably under target, and after reaching investment grade in 2019, we will look to cut interest costs further in 2020. We achieved a great deal of progress in 2019, and we believe that sets us up to succeed in 2020 and beyond. With that, I will hand the call to the operator so we can begin taking questions.

Operator

operator
#18

Thanks. <<operator_script>> For our opening question, we have Jeremy Tonet at JP Morgan on the line, and it's open.

Jeremy Tonet

analyst
#19

Good morning. I'd like to begin with the DRU project. Regarding those incremental contracts you mentioned, it sounds as though additional signings aren't expected until 3Q. I'm curious how advanced those discussions actually are, since it appears they're still a bit of a distance off. And I suppose, any detail you could give on the potential size here. Do you anticipate filling the remainder of the facility? Might it be more?? Might it be less? I guess, just any further insight into how you see that shaping up right now.

Steve Spaulding

executive
#20

Jeremy, Steve here. We're in talks with a number of parties, though I'd say two of them have moved further along. Both of those two have taken the opportunity to their boards. And when you consider a DRU, the contracting side is genuinely very complex, since it takes almost 16 distinct agreements — think rail, rail unload railroad, storage, DRU, railcars, and many rail companies. Commercially, it's a fairly complicated transaction. That's the reason we've pushed it to the third quarter, but two of the parties we're negotiating with right now had board discussions in the last week or two.

Jeremy Tonet

analyst
#21

That's quite useful, thank you. And perhaps we could shift over to rail for a moment. There have been plenty of disruptions, considering all that is going on in that network. I'm just curious whether you might take us through how you expect that to affect Gibson at any of the various levels you see there.

Steve Spaulding

executive
#22

Okay, so the one that's likely closest at hand is probably Moose Jaw, largely since every product there either was Moose Jaw or moved by rail. That area sits in southern Saskatchewan, more or less. As a result, they cross into the states fairly fast. That said, we're observing rail congestion tied to the slower speeds in Saskatchewan. When you factor that in, you need additional railcars. So your costs rise, and your operating expense rises too. Regarding the DRU, one point about the DRU is that the C5 plus and the condensate get pulled out of that dilbit. That leaves you with a product that doesn't — that won't leak out or ignite. So in our view it's a far safer product to transport. It's in fact categorized as non haz, which wouldn't be subject to a fee limit.

Jeremy Tonet

analyst
#23

That's useful. And I suppose, perhaps regarding the upside, in terms of any spreads in that region that might benefit Gibson given how things stand with the rail.

Steve Spaulding

executive
#24

I’m not sure that made much difference to the spread right now. In January, we did send out a few unit trains with a partner, and we moved some manifest out of Edmonton that same month, and those spreads have narrowed at this point. And I don’t think — my understanding is that we store the majority of those cars.

Jeremy Tonet

analyst
#25

Understood. Now, on the dividend, quickly — I'm just curious whether you could give us a bit more detail on what kind of dividend growth, in your view, would be appropriate for Gibson, the kind Gibson intends to present to the market here. And the cadence, perhaps, of how you expect those raises to come through, that would be helpful.

Sean Brown

executive
#26

Thanks, Jeremy. Sean here. As everyone is aware, the dividend is a decision made by the Board. That said, we did talk about it at the Board level yesterday. What I think we would say about future dividend growth is that we clearly recognize both the value and the significance of growing the dividend each year. We gave it a great deal of consideration when raising it this quarter. And we did so through the lens of being able to raise it annually going forward from here. That is going to be supported by continued growth in our restructure earnings. When we think about dividend growth, though, we will be very measured in how we approach it. And we will review it on an annual basis. But the way we view it is very much on a total return to shareholders basis. And as we look ahead and consider the capital opportunity projects we have, that will be a key consideration for us going forward. So I think the message would be that we will be very measured in how we think about dividend growth. But do expect that it will be something we review annually. And by reinstating it now, we would expect that you can see annual increases.

Jeremy Tonet

analyst
#27

That’s genuinely useful. And if I could, just one final question. We’ve discussed in the past how the Permian is, broadly speaking, extremely competitive. I was wondering whether you could remind us about your approach there in the Permian. I mean, I notice you’ve had a fairly significant increase in acreage dedication in that region. Reaching that figure is pretty impressive. But I’d just like to hear whatever you can tell us about any guardrails you have in place to ensure you achieve the rates of return you’re targeting there.

Steve Spaulding

executive
#28

Jeremy, our gathering system sits pretty much right at the edge of the central platform over in the Delaware Basin. I wouldn’t characterize it as a highly competitive spot for us, particularly given the backbone infrastructure we constructed through very first project. We brought on two more producers, and that pushed the acreage up to 250. We’re still evaluating likely another two to three. In terms of how we approach that area, it isn’t a conventional gathering play — it leans more toward a central delivery point model, where the producers do the gathering into us and we simply construct a single potential delivery point. That means we aren’t constantly spending capital just to hold our position. Volumes, I’d say, started off somewhat slower than we had anticipated. That was likely tied to operational problems at our — at our anchor tenant, essentially. Our large driller in that region keeps delineating the area, and they remain very positive. Should the drilling plans they’ve shown us move ahead, we’ll be extremely pleased.

Jeremy Tonet

analyst
#29

That's useful. I'll leave it at that. Thanks.

Steve Spaulding

executive
#30

Thanks, Jeremy.

Sean Brown

executive
#31

Thanks, Jeremy.

Operator

operator
#32

Thanks. We move to Patrick Kenny at National Bank, whose line is now open for questions.

Patrick Kenny

analyst
#33

Morning, everyone. I just want to ask a follow-up about the U.S. strategy. I'm wondering whether the recent decline in oil prices and, I suppose, the rise in some macro headwinds have affected how quickly your conversations are moving regarding new tankage down in the Wink area?

Steve Spaulding

executive
#34

Thank you, Patrick. I'd say that when we ran the economics, we based them on lease commitment drilling, and that lease commitment drilling has kept progressing. There was one producer that was essentially doing some extra drilling with a different rig, drilling in a shallow zone in that area. They did shut that down. As for conversations with other producers, I think things are moving at roughly the same pace as last year. We haven't really seen a significant falloff there. We believe we'll still reach that $5 million run rate in the fourth quarter. It'll be a gradual ramp up. We think it will likely strengthen later in the third quarter. And then, by the fourth quarter, we will see that $5 million run rate that we've discussed.

Patrick Kenny

analyst
#35

All right, thanks. Turning now to marketing — it seems like contributions remain above normalized levels. But do you have any thoughts on the Enbridge mainline offering being out there and how it opens priority access for some of the smaller producers via these requirement contracts? Over the longer term, once that's in place, if some of those smaller producers do sign up, do you foresee any kind of effect on volumes or margins for the marketing group?

Steve Spaulding

executive
#36

That isn't the case for the bulk of what we earn — only a tiny share of our earnings truly sits in that area. The majority of what we earn is really around Moose Jaw, and then at Hardisty and Edmonton, rather than on the long-haul route down to the states. So my view is that this won't affect us. One thing with Enbridge: it's simply about making sure we keep having ratable supply into Moose Jaw, which matters to us.

Patrick Kenny

analyst
#37

All right, that’s excellent. Appreciate it, Steve. I’ll stop there.

Operator

operator
#38

Thanks. We’ll take the next question from Robert Catellier at CIBC Capital Markets. Your line is open.

Robert Catellier

analyst
#39

Hey, congrats on the dividend bump and that big milestone. I wanted to begin with the rail situation and explore it a bit more. You shared some initial remarks about what it means operationally, but how do the DRU contracts react when rail service is disrupted?

Steve Spaulding

executive
#40

Those aren't carried over to rail stoppages, Robert. They're simply straight take-or-pay arrangements. So if a rail stoppage happens, that has no effect on our take-or-pay. It might — aside from a possible force majeure that could extend the contract's term.

Robert Catellier

analyst
#41

All right, then. So I suppose there are simply a couple of policy matters here, which to some degree you might describe as frontier policy issues. But what implications do you believe they hold for industry growth in general, considering what that frontier application could signify? And second, as a counterbalance to that, clearly there has been a court ruling regarding carbon taxes. So, taking those two items together and considering what they might mean for growth, how do you view the effects on growth in the business, and particularly where oil sands customers are concerned?

Steve Spaulding

executive
#42

It was disappointing to see them retreat yesterday. Honestly, I believe even the tech companies themselves want offtake that's genuinely sustainable, correct? I mean, in what way can you advance any opportunity before you've got sustainable uptake? Be it TMX, KXL, Line 3, or actually DRUs. So my view is that producers need to be given sustainable offtake so their projects can be viable. Clearly, the carbon tax was a good development.

Robert Catellier

analyst
#43

And then last, could you tell us the EBITDA tied to those injection stations that may be classified as held for sale?

Steve Spaulding

executive
#44

U.S. injection? Yeah. No, I mean, Robert, it's de minimis. I mean, that's a business we've been scaling back over time, and we keep scaling it back. So I mean, at this point the contribution is going to be negligible.

Robert Catellier

analyst
#45

All right, thank you, everyone.

Steve Spaulding

executive
#46

Thanks, Robert.

Operator

operator
#47

Thank you. <<operator_script>> Matthew McKellar from RBC Capital Markets has our next question. Your line is open.

Matthew McKellar

analyst
#48

Hello, and thank you. I’d like to add to what Jeremy asked about the dividend and ask you to remind us of your thinking on capital allocation, especially in light of where you ended the year with the dividend increase. So, if you had extra capital or funding capacity compared with the current plan—whether from stronger results or lower spending than expected—would you aim to reduce leverage further, return more through dividends, repurchase shares, or pursue something else?

Sean Brown

executive
#49

Thanks for that, Matt. I mean, nothing has really changed there. We'd come out in January of 2018, instead of our overarching capital allocation philosophy, we reaffirm that in our April Investor Day last year. So even with the dividend increase and where we currently sit on a leverage and payout ratio basis, that doesn't change at a very high level. As I said, we do favor measure annual dividend increases consistent with growth in our infrastructure cash flows as we move forward. And if we have marketing outperformance, so if you go beyond that, to the extent that we have excess cash flow and as we look at our capital opportunities in front of us, it's clear that, that excess cash flow is in excess of that capital opportunities, and that excess cash flow comes from marketing outperformance, and we would buy to share buyback. But from a capital allocation philosophy, first and foremost, it is — if we have an opportunity to invest in our infrastructure growth projects at a 5x to 7x multiple, underpinned by contracts that we see throughout our portfolio, I think 10 years with investment grade counterparties, we will continue to do so. We will favor measured annual dividend increases as we move forward.

Sean Brown

executive
#50

Should we generate cash flow above that amount, our likely approach would be returning capital to shareholders via share buybacks.

Matthew McKellar

analyst
#51

Perfect, thank you Sean. I have nothing further to add.

Sean Brown

executive
#52

That’s great. I appreciate it.

Operator

operator
#53

Thanks. At this point I see no more questions. Mark, I'll hand it back to you for any closing comments.

Mark Chyc-Cies

executive
#54

Thanks, Catherine. And thanks for being with us on the conference call for the fourth quarter and year-end of 2019. Once more, I want to mention that we've posted some additional materials on our website, gibsonenergy.com. Should you have any other questions, please don't hesitate to contact us at <<email_hidden>>. Thanks for being with us. Have a great day. Bye-bye.

Operator

operator
#55

That wraps up the conference call for today, ladies and gentlemen. We appreciate everyone taking part. You're free to disconnect at this point. Have a wonderful day, everybody.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Gibson Energy Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Gibson Energy Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Gibson Energy Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.