Gibson Energy Inc. (GEI) Earnings Call Transcript & Summary

July 30, 2024

Toronto Stock Exchange CA Energy Oil, Gas and Consumable Fuels earnings 27 min

Earnings Call Speaker Segments

Operator

operator
#1

Hello, and thanks for being with us today. I'd like to welcome everyone to Gibson Energy's 2024 Q2 earnings call. Right now, everyone is in a listen-only mode. Following the speaker's presentation, we'll hold a Q&A session. If you'd like to ask a question during that session, just press star one one on your phone. An automated message will then confirm that your hand is raised. Should you wish to withdraw your question, simply press star one one once more. Please note that this conference is being recorded today. I'll now turn the conference over to Beth Pollock, Vice President of Capital Markets and Risk, our first speaker. Please go ahead.

Beth Pollock

executive
#2

Thanks, Marvin. Good morning, everyone, and I appreciate you being here as we go through Gibson Energy's operational and financial results for Q2 2024. On the line with me this morning are Steve Spaulding, our President and Chief Executive Officer, and Sean Brown, our Senior Vice President and Chief Financial Officer. Several other members of the senior management team are also in the room and can help out during the question-and-answer portion as needed. As a reminder for listeners, this call touches on non-GAAP measures as well as forward-looking and pro forma financial information, which comes in part from historical financial information of South Texas Gateway Terminal, LLC, and is subject to certain assumptions and adjustments and may not reflect actual results. You can find descriptions and qualifications of those measures and that information in our investor presentation, which is available on our website, and in our continuous disclosure documents on SEDAR+. With that, I'll hand things over to Steve.

Steve Spaulding

executive
#3

Thank you, Beth. Before I get started, I'd like to pause and express my appreciation to every Gibson employee, current and former, along with the board and all of our stakeholders, for giving me the chance to lead this organization over the last seven years. I feel proud of everything we've achieved, and I know I'm departing with the company in an excellent position and in capable hands with Curtis. Curtis and I have known each other personally for many years, and I've witnessed directly how he can grow a business and generate shareholder value. I'm eager to see what comes next for Gibson, this time simply as a shareholder, as Curtis keeps executing, enhancing, and expanding our successful infrastructure strategy. This quarter, Sean will cover the financial results, and my remarks will center on the commercial developments surrounding our assets. On July 15th, we announced an extension of a long-term contract at our Gateway Terminal, backed by high-quality investment-grade counterparties. That step is the first in showing the value Gateway delivers to our customers and in matching the high quality of cash flow at our Gateway Terminal with that of the Canadian infrastructure assets. We also announced, in addition, the sanctioning of the Cactus II connection, which we expect to be in service in Q3 2025.

Steve Spaulding

executive
#4

For our customers, this project is going to open up roughly 700,000 barrels per day of additional Permian supply. When the company looks ahead to the second half of 2024, we continue to anticipate deploying about CAD 150 million of growth capital, and most of that will go toward our Canadian infrastructure assets — mainly Edmonton — while the remainder goes to Gateway. Work on the two tanks at our Edmonton Terminal is still moving forward on schedule, and we expect them to be finished in late 2024. Through those tanks, Cenovus will be able to ship on the TMX pipeline, since we are giving them 870,000 barrels of storage capacity. A 15-year take-or-pay agreement stands behind this construction. Now that TMX is running, we are still talking with other customers about how we can effectively support them through this pivotal period going forward. Turning to Gateway, performance keeps coming in ahead of what we expected. Volumes are still close to record highs, in line with what we saw in Q1. On top of that, our contracting talks ended with a valued partner at our facility extending their long-term contract, which satisfied the commercial goals on rate and tenure that we had previously communicated. We continue to expect that we will be able to share more news on the second contract — on a 5 to 7-year term, at or above existing rates — in the relatively near term.

Steve Spaulding

executive
#5

Turning to ESG, we put out our 2023 sustainability report yesterday, and it highlights how far we have come toward our sustainability goals. Other achievements this quarter that make us proud include being named one of Alberta's top 80 employers and, for the third year in a row, one of Canada's Best Diversity Employers. In closing, Gibson has posted another strong quarter. I will now hand the call to Sean, who will take us through the financial results in more detail. Sean?

Sean Brown

executive
#6

Thank you, Steve. Before I get into the financial results for this quarter, I'd like to pause and express appreciation, on behalf of the whole organization, for everything you've contributed to Gibson. I take pride in what we've achieved together and as a company, particularly as we built out and executed our infrastructure strategy. ... I'm also genuinely enthusiastic about Gibson's future. It was a pleasure to meet Curtis recently, and I look forward to collaborating as we keep executing our infrastructure strategy, strengthen and expand the business, and above all else, generate value for shareholders. Now, moving to our results, we posted another robust quarter to close out the first half of 2024, with Adjusted EBITDA of CAD 159 million and Distributable Cash Flow of CAD 101 million. Within our infrastructure segment, Adjusted EBITDA came in at CAD 153 million for the Q2 of 2024, surpassing the prior record we set in Q4 of last year, and CAD 43 million above the Q2 of 2023, once normalized for the CAD 17 million environmental remediation provision from last year. That infrastructure growth came mainly from adding our Gateway Terminal, which turned in another strong quarter. Q2 2024 infrastructure segment results also lined up with Q1 2024, which speaks to the strength and stability of the cash flows from our high-quality infrastructure.

Sean Brown

executive
#7

Now moving to marketing, Adjusted EBITDA came in at roughly CAD 20 million, matching what we had guided to previously. That said, it is down CAD 15 million compared with Q2 2023 and down CAD 14 million versus Q1 of this year. What drove these results was mainly a smaller number of storage-related opportunities, along with tighter, heavy differentials that weighed on Moose Jaw feedstock pricing. Going forward, based on where things stand right now, we anticipate the conditions facing our marketing business will look much like what we saw in Q2. So for Q3, we would expect Adjusted EBITDA to land at or a bit under CAD 20 million. That said, we are hopeful that extra opportunities will come up during the quarter, and to the extent they do, we will be ready to capitalize on them. Alongside this guidance, we also want to reaffirm our long-term annual guidance of CAD 80 million to CAD 120 million for 2024. To wrap up the review of results for the quarter, let me quickly cover a few items that affected Distributable Cash Flow. Distributable Cash Flow for Q2 2024 came to about CAD 100 million, which is CAD 19 million higher than Q2 of 2023, and most of that difference stems from greater infrastructure EBITDA thanks to the gateway acquisition, which was only partly offset by increased finance costs.

Sean Brown

executive
#8

We stayed true as well to the principles that govern our finances, with leverage at 3.5 times, inside the 3 to 3.5 times target range once you adjust for a full year of Gateway. At 63%, our payout ratio sat comfortably under the 70%-80% target range, which shows how sustainable our dividend is. On an infrastructure-only basis, the payout ratio comes to roughly 71%, comfortably below our 100% target, and leverage of 3.8 times also sits under our 4 times target when accounting for a full year of Gateway-adjusted EBITDA contribution. Low leverage, plenty of liquidity, and a staggered debt maturity profile keep giving us substantial financial flexibility. To sum up, Gibson posted solid results in Q2 of the year. Record infrastructure results surpassing the previous high water mark set in Q4 of 2023, which shows the strength and stability of our business. Marketing-adjusted EBITDA of approximately CAD 20 million matched our earlier guidance and supports full year contributions within our CAD 80 million-CAD 120 million run rate. After the quarter ended, we announced a long-term contract extension at Gateway with a high-quality investment-grade counterparty, which further boosts the quality of our infrastructure cash flows, along with the sanctioning of the Cactus II pipeline connection, which will widen the supply available to our customers at the facility.

Sean Brown

executive
#9

I'll hand things over to the operator now so we can begin taking your questions.

Operator

operator
#10

Thanks. We’re going to move into a Q&A session now. Just a reminder: if you’d like to ask something, press star one one on your phone and then wait until your name is called. If you want to take your question back, press star one one once more. Please hold on while we put together the Q&A roster. The first question is from Benjamin Pham at BMO. Your line is open now.

Ben Tam

executive
#11

Hello, thank you, and good morning. Perhaps to begin, on the Gateway recontracting: could you say something about when the second renegotiation might happen? And could you also confirm — I know you said the weighted average rose by roughly half a year — could you confirm how things stand at present on an overall basis? Is it 3.5 now?

Steve Spaulding

executive
#12

Let me begin with recontracting. Our outlook is still very bullish about signing another party to a renewed deal. Timing, of course, tends to sit partly with the customer and partly with us, so we won't be giving precise dates at this point. Even so, we continue to feel quite confident that in the near term we will get this agreement done — an extension, and an extension with additions, possibly adding more volume later on at the same rates.

Sean Brown

executive
#13

… Yeah, Ben, regarding the weighted average contract life at that facility — if you remember, when we bought it, which closed almost exactly 1 year ago, we had an average term of roughly 3.5 years. After 1 year has passed, we'd naturally be at around 2.5 years, and along with the release — you know, that contract extension we announced — it added about half a year. So, you know, as things stand today, we're at about 3 years.

Ben Tam

executive
#14

All right, understood. Now that Cactus II has been sanctioned and with the CapEx involved, does that shift at all how you see the share repurchase opportunity as we get toward the end of the year?

Sean Brown

executive
#15

Not at all, no. I mean, if you remember, our guidance for growth capital this year stood at CAD 150 million. At that point, we mentioned that roughly CAD 125 million of it would be in Canada and sanctioned, while the remaining 25 was expected to happen south of the border, mainly at Gateway — and that other 25 was really Cactus. So in terms of how we message capital allocation, this has been part of the plan and the budget all year long.

Ben Tam

executive
#16

All right, I understand.

Sean Brown

executive
#17

Thanks very much — and my very best wishes go out to you as well.

Steve Spaulding

executive
#18

I appreciate that.

Operator

operator
#19

Thanks. Give me a second to get to the next question. Robert Kwan from RBC Capital Markets is up next. Your line is open now.

Robert Kwan

analyst
#20

Thanks, and I'd like to return to Gateway for a moment. Regarding that contract that was extended not long ago, did anything stand out as distinctive about the arrangement — something that essentially became the template for every extension you'll sign going forward?

Steve Spaulding

executive
#21

There isn't really anything I'd call unique about it. It was sort of — you know, if you go back to the very start, I mean, pulling these contracts forward and extending them two years ahead, at the same point before those contracts expire, is genuinely uncommon in the commercial world. Typically, it happens within a year. So actually getting that contract done, you know, probably a year and a half sooner than we expect and then sooner than is typical, really just demonstrates the strength of the terminal, you know? And doing it on really the exact same terms, merely adding term, I mean the existing term length. Every one of our contracts carries slightly different fees.

Robert Kwan

analyst
#22

All right.

Steve Spaulding

executive
#23

Robert, every one of our contracts carries somewhat different fees. They aren't a cookie cutter arrangement. No two of them are the exact same contract. Each is kind of tailored to our customers.

Robert Kwan

analyst
#24

Understood. You mentioned earlier some of the incentives for simply persuading people to extend contracts ahead of schedule. Could you also—are there other factors that might generate a bit of pressure, or the sticks, so to speak, that help push deals across the finish line? For instance, is it necessary to complete the Cactus II connection so that there's at least the—for want of a better phrase—threat of extra supply attempting to enter the terminal? And then, once an existing contract expires, do you have the capability to add a contract with another customer? And does that generate pressure on someone to simply extend the term?

Steve Spaulding

executive
#25

Regarding Cactus, absolutely — from a strategic standpoint, linking up with the terminal matters a great deal, particularly for the customers we serve. As things stand, we have, I believe, 6 or 7 customers at that terminal right now. We keep seeking out more customers there, purely to boost liquidity and create the kind of competitive tension you were referring to, Robert. Still, having Cactus supply that additional volume to those customers is essential as we move ahead.

Robert Kwan

analyst
#26

Okay, let me just wrap up with a quick question here. Would you have any interest in adding more rail capacity exposure at Hardisty?

Steve Spaulding

executive
#27

Please continue.

Sean Brown

executive
#28

Sure, that’s a pretty specific question, but honestly, when you get right down to it, we’re really pleased with the rail-

Steve Spaulding

executive
#29

Correct.

Sean Brown

executive
#30

Still, when all is said and done, our rail exposure is something we feel genuinely good about. We're quite at ease with it. In our view, that facility is an outstanding one. It's a required component of the DRU value chain, and as we've said, we keep viewing that as hugely favorable for the business. So in a status quo setting, we're perfectly content. That said, we do recognize the optionality a rail facility offers. Anything along those lines, then, would need to make complete economic sense and deliver genuine value to our shareholders. In other words, our current position suits us well. We're comfortable carrying that position forward, and we'd have to weigh alternatives as they come up.

Robert Kwan

analyst
#31

All right, that sounds excellent. Thanks so much. Steve, wishing you all the best as you retire.

Steve Spaulding

executive
#32

Thanks, Robert.

Operator

operator
#33

Thanks. Give us a second while we bring up the following question. That question is from Robert Catellier at CIBC Capital Markets. Your line is open now.

Robert Catellier

analyst
#34

Morning, everyone. I'd like to spend a moment on the marketing side of things. Has your view on marketing over the long term shifted in any meaningful way? I realize you've just restated those figures for 2024, but I'm curious whether putting TMX into service affects that longer-range picture at all?

Steve Spaulding

executive
#35

Well, no, Robert — look, that CAD 80 million to CAD 120 million range has always been our pattern. And honestly, I'd say that remains a solid figure as we move ahead. Nothing has come along that really creates major turmoil in the market during the last Q2, or even into Q3 as we look forward. So in periods without market disruption, when traders have plenty of opportunities, we're able to stay within that CAD 80 million to CAD 120 million mark across a quarter — but when opportunities do arise, we can jump to CAD 30 million or CAD 35 million or CAD 40 million in a single quarter, and we expect to see those opportunities going forward. Robert?

Robert Catellier

analyst
#36

All right. Could you take just a moment on this — it really is a fairly small deviation from your earlier CAD 20 million guidance, and definitely inside what you'd expect as ordinary forecast error for a business like this. Even so, you came in slightly below that CAD 20 million guidance for the quarter, and you're holding somewhat more NGL and crude inventory at quarter end. Could you walk us through what's happening with those two factors?

Steve Spaulding

executive
#37

Yes, I would. You know, looking at the market, right around 20 — we said 20 or higher — and we landed at $19.7, so that's 20. What I'd say is we had anticipated that most of the inventory would have been sold off during the quarter. But what happened was Q3 actually got weaker on price, and as prices softened, that gave us a chance to do some tank rolls into Q3. Not at very big margins, but it did provide us some opportunity for tank rolls into the quarter, and even though our inventory was down quarter-over-quarter, we did come in above on inventory. Robert?

Robert Catellier

analyst
#38

So that seems to be a matter of timing. Regarding the waste-to-energy feed study, is there anything new you can share with us? How is it going — what have you found out, and what do you expect when it comes to completing the feed? And is FID still anticipated in early 2025?

Sean Brown

executive
#39

Yeah, Rob — Sean here. Robert, honestly there’s no real update on where things stand with that. We’re still advancing the feed. As I believe we’ve mentioned previously, it’s backstopped by long-term contracts. We do like the cash flow stability that gives us. But from a timing or update standpoint, honestly it’s still a fairly early stage. As things stand today, we’ll move the feed forward, move through the year, and make sure it becomes 100% commercially secured. Right now we’re at about 80%. And then certainly we hope to have a fuller update on next quarter’s call. But as things stand today, we really are continuing to work on it. Not much new versus what we said before.

Robert Catellier

analyst
#40

Alright, that's my final question. Given the strong financial position—after Gateway and with some of the recontracting now being finalized—is any consideration being given to a higher payout ratio rather than share repurchases or pursuing projects that could be seen as somewhat of a step out?

Sean Brown

executive
#41

No, no, I wouldn’t say that. What I mean is, we feel good about where we are. Our payout ratio range—our target range—is 70%-80%. As you know, we’ve actually run closer to that 60% for a while now. When we think about producing excess cash flow, supporting growth capital, and not necessarily stepping out growth capital—I think we’ve been very disciplined in how we’ve deployed growth capital, certainly throughout our history. So what I mean is, our focus remains on deploying growth capital into long-term contracted assets, backstopped by investment-grade counterparties. Really, nothing has changed there, and we’ll keep doing that. At that sort of 60-ish% to 70-ish% payout ratio, I think that creates the right balance as we look at our cash flow waterfall, and as we also balance the fact that we very much—and I think the board does as well—believe in steady annual dividend growth. So there’s no real plan or intent at this time to flex the payout ratio up. We think it’s appropriate for our business and as we look at our overall cash flow waterfall and capital allocation priorities.

Robert Catellier

analyst
#42

All right, many thanks — and Steve, make the most of your retirement.

Steve Spaulding

executive
#43

Thanks, Robert. That's my aim.

Operator

operator
#44

Thanks. Just a moment while we get to the next question. The next one is from Robert Hope at Scotiabank. Your line is open now.

Robert Hope

analyst
#45

Morning, everyone. Steve, during the Q4 call you said South Texas EBITDA could rise 15% with no capital needed. Given what you're seeing in the contracting environment, along with some of the other initiatives at the terminal, could you update us on where we stand there?

Steve Spaulding

executive
#46

Yeah. So a lot of that expansion comes from putting in more windows. I think we've. At the moment, you know, with those extra windows being added, we anticipate including a portion of that in the upcoming contract that is presently being negotiated. We've also taken on certain month-to-month arrangements simply to generate some added revenue flowing into the terminal, and to attract new customers there as well. Perhaps a pair of the new customers we are pursuing at present had been purchasing FOB loaded from our asset during the last several years, and now they actually want to be part of the terminal. So we're beginning to collaborate with them on developing possibilities for long-term contracts going forward.

Robert Hope

analyst
#47

Okay, that helps. Next, could you give us a status report on the deepening project — where things stand on the engineering side, what the capital costs might look like, and when that work could take place?

Steve Spaulding

executive
#48

Right, that is a genuinely exciting project. We are actively doing the engineering work on it at this moment. We are getting near to a clear picture of what it will cost. And we think it will have, in effect, 2 revenue streams. The first one is essentially certain contracts that would add incremental MVC to them. But as Beth — I spoke with Beth yesterday, and she offered a really clever comparison about making the terminal deeper. What happens is that today we can put a bit more than 1.2 million barrels, million barrels, on a ship, and once the terminal is deepened, we will be able to load more than 1.4 million barrels onto a VLCC. The way Beth put it, which I thought was terrific, was: when you pull into a gas station, do you stop at three-quarters of a tank, or do you fill it? So what we have observed — we did a modest deepening before, one extra foot, and what we have observed is that they use that foot on every load. So those extra fifty thousand barrels get used each time they fill up and load.

Steve Spaulding

executive
#49

So our view is that the terminal, when it comes to loading VLCCs, is going to rise from 1.2 to 1.4, and VLCCs account for more than 65% of what we load. So that is one of the ways in which we genuinely expect income to grow going forward.

Robert Hope

analyst
#50

Okay. Thanks, and best of luck. Thanks, sir. Thanks.

Steve Spaulding

executive
#51

Thanks, Robert.

Operator

operator
#52

Thank you. That brings the Q&A portion to an end. At this point, I'd like to hand things back over to Beth Pollock for some closing remarks.

Beth Pollock

executive
#53

Thanks. Thanks, Marvin, and I appreciate all of you being with us on this call for the second quarter of 2024. Once more, I want to point out that supplementary materials can be found on our site, gibsonenergy.com. Should you have additional questions, feel free to contact investor.relations@gibsonenergy.com. Thanks, and enjoy the rest of your day.

Steve Spaulding

executive
#54

Appreciate it.

Operator

operator
#55

We appreciate everyone joining this call today. That brings the program to an end. You’re free to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Gibson Energy Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Gibson Energy Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Gibson Energy Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.