Earnings Call Speaker Segments

Karl Staubo

executive
#1

Thank you, operator. Hello, everybody, and it's great to have you join us for the presentation of Golar LNG's second-quarter 2026 earnings. My name is Karl Fredrik Staubo, and I serve as Golar's chief executive; joining me is Eduardo Maranhao, our chief financial officer, and together we'll take you through what we achieved this quarter. Prior to starting the presentation, I'd ask you to review the forward-looking statements shown on Slide 2. Turning to Slide 3, we have some thrilling developments to share. During the night, we concluded an agreement for our fourth FLNG vessel — an additional Mark II FLNG whose construction will take place at the CIMC Raffles Shipyard located in China; that is the exact facility where the Mark II FLNG we already have on order is currently being built. Delivery of this fourth FLNG is expected sometime in 2029, and it will represent the soonest-available FLNG capacity to be found anywhere globally. Prospective charterers showed a lot of interest, and that drove this order — plus Golar has said it will bring on more FLNG capacity only after the current fleet is locked into long-term charters. Counting Hilli, Gimi and the second Mark II being built, which is now called FLNG Esperanza, the company's EBITDA backlog comes to $17 billion, and that figure doesn't include commodity upside or a charter for a fourth FLNG unit. This quarter, Hilli wrapped up an 8-year deal with Perenco offshore Cameroon, running at 100% economic uptime throughout the contract. Gimi delivered 15% above the contractual volume, while FLNG Esperanza is still tracking to schedule and staying within budget. Alongside the firm order we placed for our fourth FLNG, we've locked in an option with CIMC Raffles for one more Mark II FLNG — that's the option unit — and we also revealed today a letter of intent signed with Singapore's Seatrium Shipyard covering additional growth units based on either our Mark I or Mark II design. More detail on how far we intend to grow will come later in this presentation. Roughly $1.5 billion is our current liquidity position, which counts the $600 million revolving credit facility we obtained in Q2. If you look at Slide 4, we call attention to our Hilli, Gimi and Esperanza long-term charter agreements, which run through 2045 and represent an EBITDA backlog totaling $17 billion, prior to any commodity upside or inflationary adjustments. Taking on this fourth FLNG project opens the door to what could be a substantial boost in the money we're able to earn, and we're going to walk through the details of that starting on Slide 5. The order we're announcing today pushes Golar-controlled liquefaction capacity up by 41%, which lifts the total capacity across our fleet from 8.6 million tonnes to over 12 million tonnes once everything is fully delivered. If we can land contractual terms similar to the ones we secured for Esperanza last year, then we anticipate the possibility of a 50% gain in earnings capacity. Beyond that, this fourth unit should also help spread out our earnings backlog, in terms of both the counterparties we charter to and where those operations are located geographically. The order we announced today is going to be the first liquefaction capacity available anywhere in the world, coming in at least one to two years before anything else out there. That, in turn, is going to spark more charter interest in this unit. With the extra options in front of us — at CIMC and through the LOI we signed with Seatrium — we've got a repeatable template, plus the capability to capture part of the demand we keep seeing for FLNG deployments. On Slide 6, you'll find an industry overview of FLNG broken out by owner; now that order number four is behind us, we're back in the number one position among owners of FLNG capacity, tied with ENI when you count units but ahead of them when it comes to liquefaction capacity under our control. Over the coming 6 to 12 months, we anticipate somewhere between 1 and 3 more FLNG orders coming from the owners already listed on this page, which reinforces our view that this market will follow a path similar to what happened with FPSOs — a business that got its start in 1985 and has since expanded past 250 units worldwide. Golar remains the sole proven supplier of FLNG as a service. Moving to Slide 7, we show that same global FLNG unit overview, except this time split out by which shipyard handled construction. The slide makes it obvious that Samsung leads the market when it comes to delivering FLNGs. Wison, based in China, has turned out 3 newbuilds as well and keeps actively marketing newbuild FLNGs, whereas Hanwha Ocean handed over 1 unit back in 2016 and lacks near-term capacity for further units. The 2 yards on the far right — Seatrium and CIMC — have exclusively constructed units for Golar and have only performed conversions. As we read the market at present, we don't anticipate other players actively chasing conversion candidates. So their attention sits on Samsung or Wison. From what both shipyards have told us, our belief is that Samsung can, at the absolute earliest, provide incremental capacity at some point in 2031; we do anticipate Wison being well positioned to capture 2 large FLNG units in the fairly near term, after which they too will be committed for well into the 2030s. So based on our current read of the market, the sole incremental capacity capable of being brought online with fairly near-term delivery, in our view, is Golar conversions at Seatrium and CIMC. Beyond yard capacity, we're seeing considerable strain on critical long lead equipment. Things like turbines, dual fuel engines, steam generators, and cold boxes are up against stiff rivalry from other industries — AI data centers, shipbuilding, and aircraft manufacturing among them. That extra pressure on those lengthy lead items only stretches out delivery timelines for additional orders. Which is exactly why we view today's news — firm order #4 and an option for another unit at CIMC, plus an LOI with Seatrium — as giving Golar a growth path to capture market opportunities before competitors can; we'll maintain our approach of having only a single vessel open at any given time; so after we finalize the contract for #4, we'd probably proceed with #5, though we have no desire to stretch ourselves too thin. Once more, this aligns with both the strategy we've made public and the strategic review we're conducting, under which we're exploring options to speed up FLNG growth — that's what this relates to. Moving to Slide 8, which gives a picture of the LNG sector and the current market conditions as we read them. Between 2026 and 2031, this industry should expand by roughly 40%. During our Q1 call, we noted that the world's 2 biggest exporters, the U.S. alongside Qatar, are simultaneously projected to raise their share of worldwide supply from 40% up to 53%. So even though the market is expanding, supply is becoming concentrated to a very notable degree. Now looking at the graph in the middle: geopolitical developments mean that kind of concentration brings rising uncertainty for offtakers. Qatar, which ranks second globally among LNG exporters, took a direct hit from military action amid Middle East events, and estimates suggest the Ras Laffan liquefaction plant will lose roughly 17 million tonnes from a total capacity of 88 million for a minimum of 3 to 5 years. Given that, we believe the worldwide LNG market needs to diversify where its supply comes from even more; that's the role we expect FLNG to fill, and it's a crucial one. Finally, on the rightmost graph, the global placement of FLNG projects is laid out for you.

Karl Staubo

executive
#2

Six of the exporters operating today owe their existence to FLNG technology — without it, they wouldn't be exporting at all. In every location where Golar has operations, ours is the sole export facility. That holds for Mauritania and Senegal, it will hold for Argentina, and it held for Cameroon prior to our departure from that country. A substantial amount of proven gas reserves is still stranded, which opens up additional possibilities for diversifying LNG supply through FLNG-led projects. Moving to Q2 and the latest highlights and developments. As we noted during the quarter, Gimi's delivered output came in 15% above the contractual day rate, with a 41st cargo delivered. Hilli wrapped up its 8-year contract in Cameroon, posting 100% economic uptime from contract startup and 156 cargoes delivered across those 8 years. The unit is currently en route to Singapore for modifications prior to its 20-year contract in Argentina. SESA formally gave the name Mark II to the unit under construction — the FLNG Esperanza. We obtained a $600 million revolving credit facility. We placed the fourth FLNG order, and via the EPC for #4 along with the LOI with Seatrium, we established a pathway for growing the fleet beyond 7 units. Moving to Slide 11, which centers on Hilli. On July 26, Golar delivered the last cargo under our contract with Perenco Offshore Cameroon. We take enormous pride in seeing the unit achieve 100% economic uptime from start-up. We're also glad to see redeployment advancing as planned. We departed the country and are in transit on schedule. After the modification work is finished, we will sail to Argentina, where a contract will begin in the second half of next year, generating $285 million of annual EBITDA before any further commodity upside. On Slide 12, we want to express our gratitude and thankfulness to our partners, SNH and Perenco, for solid cooperation across 8 years in Cameroon. Beyond LNG export, the project has generated meaningful value for the local economy and people. Golar's operations employed over 100 Cameroonians, amounting to more than 40% local content on board the unit. Along with significant scholarship and training courses, we have spent $80 million in local procurement and generated more than $1.5 billion in cash earnings to Cameroonian state interests. We have also voluntarily invested in critical infrastructure in country, such as water holes, streetlights, school renovations, new sports centers, et cetera; we're motivated to work together again on potential gas monetization in Cameroon and hope to return in the near future. Moving to Slide 13 and the Gimi. Gimi keeps producing above contractual levels. During the quarter, our output was 15% above the contracted capacity. That's despite the fact that we are entering summer months and liquefaction plants are sensitive to both ambient and water temperature. So we're extremely pleased with this performance. We do expect continued impact from high temperatures during Q3 before performance improves as we enter the winter months. Over the year, we do expect the unit to produce meaningfully above the contractual capacity. Now moving on to FLNG 3, the Esperanza project is still on schedule and within budget. Conversion work is 74% done, and we've passed 15 million manhours without any lost time incidents. The vessel should still sail away by the end of 2027 and begin operating in Argentina during the second half of '28. To date, we've put roughly $1.3 billion of cash equity into the conversion, against a total budget of $2.2 billion. On Slide 15, you'll see we're also making headway on the infrastructure needed in Argentina. SESA, our contract counterpart — Golar holds a 10% stake in it — is now advancing key infrastructure, such as the pipeline connections needed for start-up, a warehouse for operations support, and the provision of both feeder vessels and crew vessels, and we're marketing the LNG offtake as well. Of the total 6 million tonnes, the first 2 million tonnes has been sold to securing energy for Europe. We've now had multiple offtakers submit bids for the remaining 4 million tonnes, and we anticipate wrapping up more offtake before year-end. Moving to Slide 16. We've now confirmed our final investment decision on our fourth FLNG unit. This unit will be comparable to the Esperanza, which is currently being built. The total CapEx budget has risen because of inflationary pressure — especially on long-lead equipment worldwide. Our CapEx budget now sits at roughly $2.45 billion, versus about $2.2 billion for the Esperanza. Despite this roughly 10% cost increase, we regard it as highly competitive, both against an FLNG newbuild and certainly relative to the cost inflation seen across other offshore and shipping assets worldwide over the last 2 years, which have risen considerably more than 10%. We anticipate meaningful synergies from a repeat design and from having 2 units under construction at the same shipyard at the same time. A donor vessel for the conversion has been secured, and we're now in advanced talks regarding long-term employment for the unit. We don't plan to add further units until we have clear visibility on the long-term charter for the unit just ordered. Once we do, though — turning to Slide 17 — we have a very clear path for growing beyond unit #4. First, the order we placed overnight carries an option for a third Mark II FLNG at CIMC Raffles in Yantai, China. As mentioned earlier, we've also signed an LOI with Seatrium. Seatrium built both the Hilli and Gimi, and it's also the shipyard that will carry out the Hilli modification work this year and next year; that LOI reserves slots for either a Mark I or a Mark II design FLNG. Beyond shipyard capacity, we've locked in options for additional long lead equipment. We've identified more donor vessels and are working to secure them, and we're certainly pushing forward charter discussions for long-term employment with multiple counterparts. Today's signing means Golar is putting in place the foundation for faster FLNG expansion over the coming years. At this point I'll pass things over to Eduardo, who will walk us through the group results.

Eduardo Maranhao

executive
#3

Thanks, Karl, and good morning to all of you. Let's turn to Slide 19. Golar delivered another robust quarter in Q2, with our FLNG fleet continuing to run well operationally and a significant lift in EBITDA. Operating revenue for the quarter totaled $130 million, and FLNG Gimi kept operating above its contractual levels, producing earnings roughly 15% higher than the contracted base rate in Q2. We also wrapped up the last legacy O&M contract tied to the FSRU Italis LNG, which completes our shift into a pure-play FLNG infrastructure company. EBITDA rose about 20% versus Q1, reaching $127 million, up from $106 million, mainly on the back of stronger commodity-linked earnings from Hilli. Hilli brought in $37 million of commodity-linked earnings this quarter, versus $10 million in Q1, once again showing the considerable commodity upside built into our contracted earnings base. Net income came to $56 million for the quarter, taking year-to-date net income to $158 million. And in line with our capital allocation framework, we've declared yet another quarterly dividend of $0.25 per share for Q2. Now let's go to Slide 20. Our balance sheet keeps giving us considerable flexibility to finance the next stage of FLNG growth. At the close of the quarter, total cash was around $900 million, while net interest-bearing debt was roughly $1.8 billion. During July, we took another step to bolster our liquidity by closing on a fresh $600 million revolving credit facility, and as of now we haven't drawn on it at all. Once you factor in that RCF, our total available liquidity comes to roughly $1.5 billion. Meanwhile, we've already covered approximately $1.3 billion of the FLNG Esperanza conversion through equity funding, which means there's still a meaningful amount of untapped financing potential across our asset portfolio. The right side of the slide illustrates that if we optimize how Hilli is financed and arrange long-term funding for Esperanza, we could free up close to $2.3 billion in extra liquidity. Discussions regarding both of these transactions continue to move forward. When you combine our existing liquidity, the cash we generate from operations, and whatever proceeds might come from asset-level financing, we ought to have considerable room to finance FLNG #4, all while preserving the balance sheet flexibility needed for additional growth, as Karl walked through. When it comes to financing FLNG #4 at the asset level, the schedule will end up matching the vessel's long-term charter plus our broader FLNG expansion prospects. Turning now to Slide 21, I want to spend a moment here talking about the slice of our earnings tied to commodities, which has become more and more significant as LNG prices strengthen. Hilli is a useful example of the value this kind of arrangement delivers. Over the course of its eight-year deal in Cameroon, Hilli generated over $650 million in commodity-linked earnings, before counting any of the hedging proceeds we locked in during that stretch. Our Argentina contracts likewise give us meaningful participation in the upside. Under the Hilli and Esperanza charters, Golar gets a commodity-linked fee equal to 25% of FOB prices above $8 per million BTU, while our 10% stake in SESA adds further commodity exposure. As we've noted before, each $1 per million BTU above $8 can deliver up to roughly $100 million in incremental annual earnings for Golar. What's really important is that LNG offtake indices and forward pricing have gotten a lot stronger since the start of this year. Looking at where pricing sits today and where the forward curve is pointing, our estimate is that this shift might add as much as $500 million each year to the worth of our commodity exposure across the initial 3 years that SESA is in operation. Liquidity in the forward market does thin out the further along the curve you go, and that's only natural, but the crucial takeaway is that this upside comes on top of the contracted earnings base we have for the long term. Moving now to Slide 22; this slide lays out the 2 core pieces of our model, a contracted earnings base with a high degree of visibility and meaningful upside tied to commodities. Looking ahead, when Gimi, Hilli, and Esperanza are each operating at their maximum output, our projected yearly EBITDA run rate should come in around $800 million come 2028 — and that figure doesn't factor in any gains from commodities or adjustments for inflation. If FLNG #4 gets signed under conditions largely in line with what Esperanza has, then yearly EBITDA might climb by about 50%, topping $1.2 billion by 2030. What's key is that this still represents base contracted earnings. Beyond that, having exposure through Hilli, Esperanza, and SESA gives us substantial involvement in LNG pricing. As the graph shows, with prices at $8 per million BTU, we'd anticipate yearly EBITDA exceeding $1.2 billion. When the price is $10, that figure rises to $1.4 billion. Should it reach $15 — the forward price currently quoted for next year — Golar would see roughly $1.9 billion in EBITDA. To show the upside that's built in, applying the LNG pricing observed during 2022 would point to potential yearly EBITDA nearing $4 billion. What matters most here: our contracted earnings base is highly visible and can top $1.2 billion per year once FLNG #4 is included, with meaningful extra upside should LNG markets stay robust. Moving now to Slide 23. A major draw of FLNG is that it gives buyers LNG supply spread across different geographies, while reserve owners get very attractive economics. The graphic on the left lays out the economics for a Mark II FLNG at 3.5 MTPA, using today's forward LNG prices. When we factor in feedstock gas from upstream, plus what it costs to liquefy, ship and regasify, we figure the all-in cost of delivered LNG comes in below $8 per million BTU. Compare that with a one-year forward LNG price of roughly $15 per million BTU, and there's a very substantial margin left over for the charter. Running at about 90% utilization, a 3.5 MTPA FLNG would produce roughly 50 cargoes a year; under those assumptions, that works out to about $1.3 billion in annual operating margin for the charter, or close to $25 million per cargo. What matters here is that these favorable economics line up with what FLNG brings strategically: getting to market faster, tapping gas resources spread across different regions, and cutting back reliance on just a handful of big onshore LNG supply sites. When you pair appealing economics with that kind of supply diversification, it makes a pretty convincing case for anyone considering an FLNG charter. To wrap up, Q2 was yet another solid quarter for us. Operationally, we keep performing. Contracted revenue provides substantial visibility well into the future, our commodity exposure leaves ample upside potential, and a strong balance sheet positions us to fund the next phase of FLNG growth. Since the economics look appealing enough to drive interest in more units, we feel our position is very strong when it comes to what lies ahead; and with that, I'll turn things back over to you, Karl.

Karl Staubo

executive
#4

Thanks, Eduardo. Moving to Slide 25 for the recap. Golar ranks as the top FLNG company worldwide, with a fleet of 12.1 million tonnes per annum under its control. Our operations so far have achieved 100% economic uptime, and we've delivered 197 LNG cargoes. Before commodity upside and inflationary adjustments, our backlog is $17 billion, and there's additional upside from a possible charter for our fourth FLNG unit, which was announced today. If we can secure that unit on terms similar to our last fixture last year, we could increase annual earnings by 50%, or to more than $1.2 billion by 2030, before commodity upside and inflationary adjustments. FLNG, in our view, is becoming a more and more important source of global energy security and supply diversification; our strategic position supports growth. And given today's announcements, with both CIMC and Seatrium, we're well placed to seize the market opportunity well ahead of any additional competition from other suppliers. Our capital allocation remains disciplined and centered on shareholder returns, and we still have room under our share buyback program. We're continuing our quarterly dividend, with considerable capacity for further growth as the fleet delivers into their long-term contracts. With that, I'll turn the call over to the operator for questions.

John Mackay

analyst
#5

Nice work on the announcement of vessel number four. There were a few items you've mentioned that I'd like to follow up on. Could you perhaps take us through how that ship gets commercialized and how a customer gets signed? Also, you mentioned possibly outlining the economics for the most recent vessel, but perhaps give us a general discussion of target return profiles here.

Karl Staubo

executive
#6

John, looking at how we sequenced our earlier speculative orders along with what we've announced so far this year, our attention has been on developing the charter possibilities so that the design gets refined. We had been weighing Mark I against Mark II. Given what we can now see, though, a Mark II order strikes us as offering the strongest value proposition, and that's the reason we placed it; our expectation is that we'll then refine the charter possibilities further and land a long-term charter for the unit, keeping a duration of roughly 20 years, give or take. And our guidance stays in the range of 5 to 6x CapEx to EBITDA.

John Mackay

analyst
#7

To make sure I understand, what's the way we ought to frame the schedule that's left, plus the milestones we should keep an eye on, for getting that customer signed?

Karl Staubo

executive
#8

Honestly, no standard procedure exists for getting an FLNG locked in, since Golar is the sole company that has ever provided these as a service, and every single one has turned out pretty distinct. That said, the usual opening move is putting pen to paper on a term sheet or a framework agreement, which lays out the main commercial terms. It can be binding in some cases and non-binding in others, yet achieving that definitely counts as a milestone. After that point, we take that term sheet or framework agreement and build it out into a complete contract. Following that, step three normally involves getting every CP cleared afterward, and those tend to be regulatory in nature, covering both the export license and the environmental license that's needed. In some nations that don't yet export LNG, you additionally require clarity around how they tax you. So there you have it — 3, let's say, main steps: putting pen to paper on a term sheet, putting pen to paper on definitive contracts, and finally, clearing the CPs.

John Mackay

analyst
#9

Then my second question is for you, Karl. You brought up the possibility of 7 vessels. I get that there are several variables at play, and as you noted, the schedule can shift. Still, perhaps under a, say, best-case outlook, how should we think about the rate of deployments and the ability to reach that 7-vessel fleet?

Karl Staubo

executive
#10

Starting with the yard capacity angle: unit #4 was ordered by us today. There's an option for one more unit we hold. We won't tie ourselves to that being CIMC or Seatrium in that particular order. To keep it simple, though, unit #5 would come with a fixed option at CIMC, and units #6 and 7 at Seatrium — although the exact sequence might differ. It's possible the fifth goes to Seatrium and the sixth to CIMC, if that makes sense; what we've already secured as of today is the signed contract at CIMC and the LOI with Seatrium. On sequencing, our policy remains the same and has been stated plainly: we will never have more than one open FLNG going at any given time. Because of that, ordering unit #5 isn't something we're looking at until we have solid visibility on a long-term contract for the fourth unit. After that gets locked in, we'll move ahead with the fifth, and we'll keep repeating that approach as we expand. When long-term contracts are secured, we'll then put asset level financing onto the FLNG that is by then derisked and cycle that capital into the next unit.

Alex Bidwell

analyst
#11

Regarding the letter of intent with Seatrium that covers a Mark I or a Mark II, plus the option you hold for a third Mark II at CIMC — could you walk us through your thinking on choosing a shipyard for the next unit? Are there any distinctions between picking one versus the other?

Karl Staubo

executive
#12

We've clearly constructed 2 units at Seatrium previously, and both were Mark I vessels. Right now we're in the middle of building a Mark II at CIMC. Since that unit has reached 74% completion, we're at ease placing an order for the second one there; so for the upcoming unit and the yard decision, we're plainly at ease with either shipyard. It will therefore hinge on price, payment terms and delivery. Where applicable, a charter might favor one yard over another; but broadly speaking, it relates to price, payment terms and delivery. Those are the decisive factors; and if it's a Mark I, the odds strongly favor Seatrium regardless.

Alex Bidwell

analyst
#13

Then, as a fast second question, could you walk us through what I believe is the budget gap separating FLNG Esperanza from that second Mark II conversion? My understanding is $2.2 billion against $2.45 billion.

Karl Staubo

executive
#14

Right. As we mentioned, that works out to roughly a 10% rise. The primary cause is extremely large cost inflation affecting long lead equipment, with steel prices and currency movements also playing a part. Yet considering that certain long leads generally see 40% to 60% cost inflation, the fact that the whole unit is, let's say, merely 10% higher is clearly still substantial, though we view it as proof of the enormous effort we've put in throughout this year, in terms of both long lead items and talks with the shipyards. I'd also want to point out that the figure we quote is the all-in price, which means it covers the EPC with the shipyard, crew training, bunkering and transport from the yard site to the contract sites, plus the mooring system we expect to use; in other words, it's the delivered cost to site.

Sherif Elmaghrabi

analyst
#15

To start off, in the simplest terms, what was behind the choice to place an order for a Mark II? Does that signal how talks with charters have been moving forward? Since three months back, you folks mentioned quite a wide spread when it came to reviewing capacity.

Karl Staubo

executive
#16

The audio cut out somewhat toward the end of your question, yet I believe we caught it; so the main driver behind selecting that unit is that it's where we're seeing the most robust charter interest for putting the unit to work in the relatively near term. That's also the area where we're seeing the best CapEx per tonne and OpEx per MMBtu. I'd say considering both the economics for the client and the charter interest along with the gas reserves involved right now, it's the unit with the most active demand among our fleet, so we felt at ease proceeding with that, also helped by the shipyard's strong track record in building the Esperanza, which currently stands at 74% complete.

Sherif Elmaghrabi

analyst
#17

For those 2 or 3 options you're holding, could you let us know — and sorry if I overlooked this earlier — when those extra options run out, and it would also help to hear the lead time on those units, meaning when they'd actually reach the water.

Karl Staubo

executive
#18

We'd rather not get into specifics about the exact expiration timing, since from a commercial standpoint that's somewhat sensitive, and our view is that we can create more value by keeping that to ourselves at this point. As for delivery, you're looking at roughly 38 to 40 months, depending on the shipyard and the timing.

Chris Robertson

analyst
#19

When we consider where the upcoming chances lie, Argentina stood out because it had 2 FLNG units within a single nation. Now that you've reached FID on the fourth one, might a fifth vessel be placed in that same location, working almost like a 2-for-1 arrangement? Or do the commercial prospects you're reviewing span a wider set of geographies?

Karl Staubo

executive
#20

It's both. Certain locations allow for either approach, while some parties are interested in only a single unit. To illustrate, Argentina accepted 2; however, if you examine the venture involving YPF, ENI and XOG, they are likewise discussing the addition of 2 units in that country, each at 6 million tonnes. That adds up to another 12. Clearly, there's substantial room to greatly expand Argentina. Then you have nations such as Mozambique, which are presently taking 2 units from ENI. Several other nations fit that same pattern, where multiple units can be accommodated. So the response is yes, we can certainly consider several deployments within particular regions. From our standpoint, though, the usual approach is to begin with one and then expand from there. Still, thanks to the option package we currently hold, we're able to engage with both sides.

Chris Robertson

analyst
#21

And as a quick follow-up, with FID now announced for unit four and an obvious route toward further units, how does that fit within the strategic review that remains underway? When should we anticipate that process wrapping up? Any news on that front?

Karl Staubo

executive
#22

In the announcement about the strategic review, we explained that its rationale had two parts. First, the Board and management see a gap in value between how the public market prices things and what other parties might pay for the current business. Second, and at least as significant, was speeding up FLNG growth given the market development we're observing. Today's announcements, I believe, make very clear what we intend to accomplish when it comes to accelerating the FLNG market. Regarding the strategic review, you're correct that it continues; and per what the strategic review press release said, we won't offer any remarks about the review itself — not its outcome, not its timing — until there's material information to share or the Board chooses to call it off. So we anticipate coming back to the market on that in due course; but meanwhile, we aren't providing any specific commentary on it.

Chris Robertson

analyst
#23

Understood. Could I pose a single additional question? Simply to restate the outlook, the present outlook concerning Hilli and its move to the yard — does it remain the identical schedule, the identical budget, the CapEx budget for the refurbishment and redeployment?

Karl Staubo

executive
#24

I'm not certain I grasped that. So the refurbishment budget comes to roughly $350 million, counting from the day we leave Cameroon through the day we reach Argentina and right through to commissioning in Argentina.

Jostein Aschjem

analyst
#25

So I was just wondering about the schedule for the CapEx of the new FLNG unit. Do you aim to take delivery of the unit by 2029? And then how should we think about kind of the sequence and timing of the CapEx related to that unit?

Karl Staubo

executive
#26

Sorry, the CapEx on #4?

Jostein Aschjem

analyst
#27

Yes.

Karl Staubo

executive
#28

So with unit #4, the capital expenditure picture comes out considerably better than what we saw with the Esperanza. That improvement was something we worked into the discussions around the yard contract. And honestly, it does a lot to counterbalance that 10% rise in costs, since our capital outlays are notably smaller — especially across the first 2 years of the build, which happens to line up with the very same stretch of time before the Esperanza reaches full operation. So we managed to bring the CapEx curve down well below where the Esperanza's sits, though the payment structure still works on a pay-as-you-go basis rather than the sort of fixed installment arrangement you'd see with a shipyard for traditional commercial vessels.

Jostein Aschjem

analyst
#29

If I could just ask one more thing regarding those optional units you've locked in, or the options you're holding — would you begin placing orders for the long lead items on them? And to what extent would you be prepared to commit, say, on long lead items for those units over the coming 2 years?

Karl Staubo

executive
#30

The way this operates is that at the moment we put in the firm orders for unit #4, alongside that firm order, we went on to negotiate packages covering a possible unit #5 — for most of them at zero incremental cost, and for a few of them at an extremely, extremely small incremental cost, amounting across all of them to under $1 million. Clearly, there's a time limit attached to that. Often, that time limit is something you can extend. However, should you actually extend that time limit, you'll probably end up with a later delivery slot, since there's quite substantial pressure on these long lead items; even so, we're happy to have secured the options we did secure at incremental cost that was very limited or nothing relative to the order itself.

Sunil Sibal

analyst
#31

I believe you mentioned possible counterparties for vessel number four. What I'd like to know is, when you consider the fourth counterparty, how do geographical factors and credit considerations factor in? Regarding the credit quality of that fourth counterparty in particular, is there anything specific we ought to be watching for?

Karl Staubo

executive
#32

That's a fair question, and the answer isn't entirely straightforward. Whenever these calls happen, the investment banks and investors send us the exact same set of questions. Since anyone can join this call, though, prospective charters, shipyards, equipment suppliers and plenty of others may be listening in, so we choose our words with care. Right now we're in advanced charter negotiations across a number of geographies. Certain of those are with NOCs, certain ones with independents, and certain ones with IOCs. Depending on the counterparty's credit quality, they will probably require somewhat different contract structures, and that in turn carries at least a different perceived risk, even though I think we've done very well historically at structuring around risks of that kind. Ultimately, an FLNG gets paid by the client purchasing the offtake gas. And what's favorable about LNG is that you won't find bad credit buyers. The offtakers there tend to be countries, very large industrial groups, or the biggest traders in the world; so depending on where you operate, contractual protections matter most, yet we do acknowledge that financeability goes up when we charter to, say, IOCs. That said, as we've laid out before, they're less inclined to share commodity upside and similar benefits. So ultimately, from our standpoint, this is a trade-off. What we focus on is economic returns and, naturally, equity returns. Leverage then factors into that; yet ultimately, we think that holding the market position with the industry's lowest CapEx per tonne, the strongest operational performance and the soonest delivery in a world where geopolitical pressure for supply certainty keeps rising leaves us uniquely placed to drive value to Golar and its stakeholders.

Sunil Sibal

analyst
#33

Then just to clarify one point. From what I recall about your earlier guidance for the 3 vessel scenario, I believe you eventually see leverage somewhere around 3 to 3.5x once all 3 units are operational. Given that you're now considering the fourth one, ought we to assume the ultimate target leverage sits in that same band? Or do you figure you might be able to push somewhat harder within that range, now that you're diversifying the fleet and so on?

Karl Staubo

executive
#34

What we've demonstrated to — you're correct that on a net debt-to-EBITDA ratio, that's where we stand right now. As Eduardo described, there's considerable room to unlock a few billion dollars of liquidity were we to relever the Hilli and put asset level financing in place on the Esperanza. We showed previously, through the Gimi financing in November, December last year, that depending on contract counterpart and contract structure, we've completed asset level financing at 5.5x. Overextending the balance sheet isn't something we want, since we need capacity to keep adding appealing growth projects; but as we secure more EBITDA backlog, we anticipate the ratio won't shift in any meaningful way.

Karl Staubo

executive
#35

We appreciate everyone joining the call today; the announcement and progress we shared have us quite enthusiastic, and we're eager to talk with you once more about how the company will keep advancing as we expand further in the FLNG sector. Wishing each of you a wonderful day, and we hope to be in touch before long. Thanks so much.

Operator

operator
#36

That wraps up the call for today. Thanks for joining us. Everyone is free to hang up at this point. Enjoy the rest of your day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Golar LNG Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Golar LNG Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Golar LNG Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.