Hecla Mining Company (HL) Earnings Call Transcript & Summary
February 6, 2020
Earnings Call Speaker Segments
Mike Westerlund
executiveThanks, operator. I'm Mike Westerlund, and I serve as Vice President of Investor Relations. Morning to all of you, and we appreciate your participation on Hecla's conference call covering Financial and Operations Results for the Fourth Quarter and Year-end 2019. The news release on our financial results, sent out this morning ahead of the market opening, plus the presentation for today and the reserves and resources press release from Wednesday, are all going to be posted on our website. Regrettably, our website happens to be offline at the moment, and we are trying to resolve that as quickly as we can, and we do apologize for any trouble this causes; joining us on the call today are Phil Baker, our President and CEO; Lindsay Hall, Senior Vice President and Chief Financial Officer; Lauren Roberts, Senior Vice President and Chief Operating Officer; Kurt Allen, Director of Exploration; and Keith Blair, Chief Geologist. Any forward-looking statements the management team makes today fall under the Private Securities Litigation Reform Act and represent forward-looking information under Canadian securities law, as you can see on Slide 2. Those statements encompass projections and goals, which probably carry risks spelled out in our Form 10-K, Form 10-Q and within the forward-looking disclaimer contained in the earnings and exploration releases and at the start of the presentation; such risks might lead to outcomes that diverge from what those forward-looking statements project. Also, on this call, we could reveal non-GAAP financial measurements. Reconciliations of those measurements to the closest GAAP measurements appear in the presentation that accompanies this call, which is going to be posted on our website at www.hecla-mining.com. Last of all, per our SEC filings, we may only disclose mineral deposits that we can reasonably expect to extract or produce economically and legally. Investors should be careful regarding our use of terms like measured, indicated and inferred resources, which do not constitute reserves, and we encourage you to review the disclosures we provide in our SEC filings. Having said that, I'll hand the call over to Phil Baker.
Phillips Baker
executiveAppreciate that, Mike, and hello everybody on this call. I also want to say sorry that our website wasn't accessible; that caught us off guard this morning. I'll be referencing slides as I go. The reason I'm doing that is that a replay will be available, so for those listening back, it will be useful; once more, my apologies; I'll begin with Slide 4, where you can see a list of what we achieved in 2019. The first item I'd like to highlight is reserves. Everything in mining begins with reserves. Although our sector finds it hard just to hold reserves steady, much less expand them, that has not been the case at Hecla. I'll go into more detail on this near the end of the — of our presentation, but for now let me simply note that an 11% gain in silver reserves, together with increases in lead and zinc and merely a minor drop in gold, represents a significant achievement for Hecla. Now, 2019 told the story of a year with 2 distinct halves, and we're quite pleased with the reversal we witnessed during the second half. The crux of that reversal was promptly acknowledging that the plan we had for Nevada wasn't succeeding and that the right move was to halt that plan, take time to reassess, and then begin again once we had removed the risk from the plan. We're only in the early phases of that reassessment, yet our conviction that these mines and exploration targets, which we acquired when gold was priced at $1,200 an ounce, will prove highly valuable going forward, and that conviction hasn't faded. Greens Creek, naturally, was central to the strong reversal last year, and it wasn't something that only materialized last year. 2 years back, we put together a new mine plan at Greens Creek that boosted the grade and cut back on development. And it's worth keeping in mind that how Greens Creek performed has nothing to do with the problems we faced as a company in 2019. We had already locked in that strong performance 2 years before. This fresh plan let us produce $107 million of free cash flow, which is $22 million above what we produced in 2018. So by June we knew we'd produce sufficient free cash flow, and it ended up being $62 million across the second half, which would let us completely pay down the revolver. Certain market participants doubted this, but we held firm, and we turned out to be correct. We likewise acted to reinforce our balance sheet and bring our debt metrics to levels we consider suitable for Hecla. During the fourth quarter we completed a debt equity swap along with a modest ATM financing, which amounted to 6% dilution but let us finish the year holding $62 million in cash and cut our net debt by $136 million over the second half. Our debt-to-EBITDA ratio now sits below 3x, and we think it's headed toward being under 2.5x. The following big milestone: the Lucky Friday strike has been settled after nearly 3 years. The initial batch of workers was brought back just this week. It's a relief for all involved to put this matter to rest, and our attention now is on restoring the Lucky Friday to full output safely before the year is over. Keep in mind that during Q1, our attention will be on capital projects, meaning the mine will mostly be idle through much of that quarter, so serious ramp-up and recall efforts will begin in Q2. Thanks to the updated work rules, we think we can achieve gains in both safety and productivity, while also providing the workforce a chance to move up. In my view, the outlook for the employees, the mine, and the community is very promising. Last, the final achievement I want to bring up is our safety results, where our all-in frequency rate dropped 20% to 1.61, the best figure ever recorded by our company. Lucky Friday was also honored with the Sentinels of Safety award from the National Mining Association — the first time in our 129-year history we've earned it. Now, moving to the next slide, I'll discuss the 2020 estimates, but first let me note a few of our wider objectives for this year. To start, we plan to refinance the senior notes. With interest rates and metal prices where they are, we're optimistic this can be arranged on favorable terms; during this quarter, our study on the San Sebastian sulfides ought to be finished; and lastly, throughout the year, Casa Berardi's output is set to begin coming from the higher-grade East Mine, and we anticipate mill enhancements. So, now on Slide 5. Turning to our 2020 estimates, we project silver production of 11.1 million to 12.1 million ounces, a bit under 2019, mainly because of reduced output from the San Sebastian oxides, which have been mined out. Compared with 2019, Lucky Friday should yield 1 million ounces more in 2020, leaving us nearly unchanged in terms of silver production. This year, gold output is forecast to fall to 212,000 to 225,000 ounces, largely as a result of halting production in Nevada. That said, it brings the gold all-in sustaining cost down by roughly $300, since the less-profitable Nevada production is no longer occurring. After by-product credits, silver all-in sustaining costs are expected to rise by $1 or $2, because of the lower prices we're using for our base metals output and weaker smelter terms, plus reduced production. Capital expenditures should come in around $10 million below 2019, once again from reduced Nevada spending. Remaining estimates are roughly in line with 2019. With that, I'll hand the call to Lindsay.
Lindsay Hall
executiveThanks, Phil, and good morning to all of you. If you'll turn with me to Slide 7. We're happy with how our assets did in the fourth quarter, and together with a robust third quarter, that has brought our balance sheet back to the level it had at the beginning of 2019. During Q4, we moved 4 million ounces of silver along with 85,000 ounces of gold, representing increases of 79% and 22%, respectively, compared with this year's third quarter. Along with stronger metals prices, that let us book a record $225 million of revenue for the fourth quarter, and once cash expenses were netted out, it produced $57 million of cash provided by operating activities — the best figure for the year — and after subtracting $24 million in quarterly capital expenditures, it left us with $33 million of free cash flow before financing transactions. On Slide 7, the year's financial results are laid out, and they can be described as a story of 2 halves: the first 6 months spent investing in Nevada, and the final 6 months halting Nevada and relying on cash flow produced by our other assets to rebuild our financial position. As you can see, across the last 6 months we brought in $62 million of free cash flow, or $75 million once you take out what we refer to as discretionary expenditures. That proves our assets are resilient and capable of delivering financial results; it also reflects a degree of discipline within the company, showing we can take the necessary steps to strengthen our financial position whenever needed. Although cash flows are our focus, I should note that our GAAP loss this year was significantly affected by $65 million of additional depreciation versus the prior year, with $56 million of that tied to the Nevada operations. Since we bought Nevada only recently and then stopped investing further, that depreciation expense skews our earnings, because we lacked the anticipated gold production revenues needed to offset those depreciation expenses. With Nevada's production now expected to stop around mid-year 2020, depreciation's negative impact on EPS in 2020 will be far smaller. Moving to Slide 8. Slide 8 shows silver margins remain solid. Over the last 2 quarters, gold margins are considerably better than they were — they had been nearly — earlier in 2019, when gold margins were basically wiped out, largely because of the investment in our Nevada operations. That showed up in our EBITDA and our cash flow generation results. Moving to Slide 9. Phil brought up the $136 million decrease in net debt from the second quarter, and I'd like to give some context around that. The robust cash flow generation allowed us to fully repay the revolver by year-end and put some cash onto the balance sheet. On top of that came $49 million from drawing on the ATM, the at-the-market facility we have, during the fourth quarter, which left us holding $62 million of cash on the balance sheet at year-end — $34 million more than at year-end 2018. On top of that, we converted $31 million in debt owed to Ressources Qu?bec into equity. Taking everything into account, we brought our net debt-to-EBITDA down to under 3x, compared with roughly 6x during the second quarter; those moves were made so we'd be in a position to refinance our outstanding senior notes. Moody's just gave us an upgrade, and alongside our bankers we're working to unlock $100 million out of the $250 million available on the revolver, which would help cover the existing bonds if we decide we want to refinance an amount smaller than the $500 million of existing bonds still outstanding. Having that extra flexibility is a nice option to weigh as we settle on how we'll approach the market. We finished the year in a stronger financial position than we had at the start of 2019, which shows our financial discipline at work and puts us in good shape for 2020. With that, I'll hand things over to Lauren.
Lauren Roberts
executiveThank you, Lindsay, and a warm good morning, everyone. Safety comes first in everything we do, as we've said before. I'm happy to walk you through Slide 11, which shows our all injury frequency rate dropping steadily across the last 5 years. In fact, at just 1.61, the 2019 figure stands as the best ever recorded in our company's history. My congratulations go out to the operating teams at every mine for putting safety first. Now, turning to the mines, let's begin with Greens Creek on Slide 12, which keeps delivering strong results. A new mine plan was introduced last year, and it captures the continuous improvement culture that defines Greens Creek. Throughout the year, the plan delivered benefits we could see, such as increased output and robust cash flow, along with record throughput at the mill. For 2020, output is projected to be a bit lower, since mill throughput should return to levels typical of earlier years and grades will decline under the mine plan. Higher cost of sales and unit cost per ounce are anticipated because of expected power generation stemming from dry conditions, more maintenance work, greater treatment charges, and smaller by-product credits. I commend the exploration team for substantially boosting reserves and resources at Greens Creek, which should lengthen the mine life and enhance free cash flow generation from our top asset. Looking ahead to 2020, we're expecting it to be another solid year when measured against historical norms, with silver production in the range of roughly 8.9 million to 9.3 million ounces, alongside 46,000 to 48,000 ounces of gold. Now let's move on to Casa Berardi. As you can see on Slide 13, this is yet another very important mine for the company. During our last quarterly discussion, we mentioned that we were shifting our focus toward boosting the mill's reliability by strengthening how we handle operations and maintenance. We're looking to take those same efforts into additional areas so that we can achieve further gains in throughput, recovery and costs. We anticipate lower costs in 2020, driven by less waste movement at the open pits and a reduction in tailings construction. We anticipate output will be greater, mostly because of expected gains in mill throughput and recovery stemming from our improvement efforts, partly counterbalanced by planned reductions in grades. Now let's look at Slide 14. Over the last few quarters, we've discussed the robust intersections observed in the 148 and 160 Zones at the East Mine. Traditionally, the East Mine has carried a richer grade compared to the West Mine, and that pattern shows up in the 148 Zone, where grades run roughly 50% above the typical underground grade. Our plan is to begin processing ore from the already developed 148 Zone during the first quarter, and to reach newly developed ore before the year is out. Let's proceed to San Sebastian on Slide 15. Our analysis of the Hugh Zone sulfide ore is nearly finished, and we anticipate making a development call during the first quarter, which might make it possible to start producing before the year is over. Test mining performed well — from the test stopes, we got 90% of the tonnage we had expected, plus 114% of the projected NSR. After running the sulfide ore through a mill set up with 2 concentrate streams, zinc and bulk, the recovery rates came in right where we had estimated, and the concentrates proved saleable. This quarter, we're doing work to look into a different option: producing 3 concentrates — zinc, lead and copper — rather than 2, which would improve the economics should it turn out to be feasible. For San Sebastian, 2020 is a year of transition, since the remaining oxide material is running out and we're moving toward a production decision on the Hugh Zone. Should that Hugh Zone project proceed, we'd expect only limited output and cash flow from it during 2020, given the development work needed to get it ready for mining. Come 2021, it ought to be a dependable cash flow contributor to the portfolio for roughly another 6 years. Now to the Lucky Friday, on Slide 16. Like Phil said, the workforce is coming back. We began by bringing back electricians, mechanics and hoist operators, and we expect the majority of workers to get their callback notices before the first quarter ends. Through the first quarter, contractors are at work on 2 capital projects — the #2 Shaft hoist and the 5370 loading pocket upgrades. Together, these 2 projects should come to roughly $5 million in capital, and finishing them ahead of the return of most of the workers is the more efficient route. Production ramp-up is scheduled to kick off in Q2 and run through the fourth quarter, at which point we expect to hit full production. On the cash flow side, this year is one of building. Things will look better than last year, but we don't expect the mine to turn cash flow positive while restarting. Once at full production, mining deeper will get us into higher grades, and we anticipate average grades climbing roughly 0.5 ounce per year across about 5 years. On to the RVM machine. It's back at the test mine in Sweden. Acceptance testing will keep going until we're confident it's robust and reliable enough to head underground at the Lucky Friday. Looking at what we have planned right now, the RVM should arrive at Lucky Friday toward the end of the year — assuming, that is, that it wraps up the testing stage in a way we're satisfied with. Let's move to Slide 11; in Nevada, or actually — 17, my mistake. Over in Nevada, we continue to extract the developed oxide ore at Fire Creek, and that work should be finished near the end of the second quarter. We've got a scoping study underway that will help us determine what conditions any potential restart would require. On top of that, we'd need a method for processing refractory ore, which would involve agreements with third parties for processing, and our expectation is that a restart would entail going through a permitting cycle. All of this takes time, but getting it right matters. Back to Phil.
Phillips Baker
executiveAppreciate that, Lauren. Prior to opening things up for Q&A, I want to circle back to the topic we began with, which is reserves. If you turn to Slide 18 — all too frequently, reserves get treated as a given, yet they represent the very lifeblood of any mining business and are extremely difficult to obtain. What made this particular year stand out is that a mere $15 million in exploration outlays allowed us to substitute for our production and grow our silver holdings by 22 million ounces, and that demonstrates the capability inherent in this collection of properties. Back in 2013, our silver reserves stood at nearly 150 million ounces. We extracted 50% of that amount, after which exploration contributed another 150 million ounces, all while those reserves were being calculated using what I believe is the most conservative price assumption anywhere in the sector. On the gold side, we have now mined everything we brought in during 2013 and have grown our position to 3 times the level we held back then. Though I don't anticipate pulling this off annually, I — I do believe we can achieve it once every few years, which gives us the ability to withstand whatever challenges arise and the endurance needed to deliver long-term value to our shareholders. With that said, operator, please open up the line so we can take questions.
Jacob Sekelsky
analystBeginning with San Sebastian, you brought up the study being undertaken at the Hugh Zone. Should we be looking for results on that soon? Or does this lean more toward an internal scoping study for your...
Phillips Baker
executiveWell, it's internal, but something will come out during the first quarter — it has been a 3-step process, in a way. The first step was whether we can long hole. The second was whether the mill can deliver products that are marketable. And the third is whether we can add a third circuit to the mill so those products become more economic. So we're at that third stage, and we should be wrapping it up over the coming 1 month, 1.5 months. Along with that will come the study and the final determination. Lauren, anything to add?
Lauren Roberts
executiveThat's exactly right, Phil — you've got it spot on. That test will get underway within the coming weeks.
Jacob Sekelsky
analystUnderstood. So by the close of the first quarter, we ought to have something, simply to get a sense of how 2021 and beyond might shape up?
Phillips Baker
executiveCorrect, that's accurate. Keep in mind that what we expect is a — shifting over to the sulfides isn't going to demand substantial capital spending. Our thinking is that San Sebastian would mostly — the oxide output would mostly cover the capital needed. It may not cover the whole amount, but it would definitely cover the biggest portion. So we're not expecting any major capital outlay.
Jacob Sekelsky
analystUnderstood; that helps. So, quickly regarding Lucky Friday: could you separate out what the restart will cost, and perhaps mention some milestones across the coming quarters we ought to watch for prior to bringing that project back up to full-scale output?
Phillips Baker
executiveSure — the initial milestone is obviously finishing those 2 projects along with bringing the workforce back. By the time we report first quarter earnings, those 2 projects and that recall will largely be done, so we ought to provide you with excellent visibility. After that, we'd expect the restart to resemble what you witnessed in 2013 following our clean down of the silver shaft. Roughly speaking, that means 150,000 to 175,000 tons of production across the year. Lauren, anything you'd like to add?
Lauren Roberts
executiveOur expectation is that we'll reach our full production pace during the period from November to December. And naturally, we're going to do everything possible to speed that up, but I believe it's a fairly sensible ramp-up curve, given what we've experienced previously.
Phillips Baker
executiveI mean, one thing that's working in our favor now versus back then is that in that earlier period, we went in and basically rebolted the entire mine. This time, that isn't necessary, because rather than having the mine sit idle for a year, we've kept it running with our salaried staff. And they've done an excellent job maintaining the mine in solid shape, which couldn't be done back in 2012, since we weren't inside the mine at all.
Matthew Fields
analystI appreciate that you took what I see as sensible measures with the debt-to-equity swap and the equity raise, using them to clear the revolver, and still got free cash flow to neutral for the year — so well done on that. Now that you're in a stronger spot to pursue a refi, what sort of transaction structure should we expect? Is it simply a direct refi of the entire 500 bonds, or some kind of split? How does the deal shape up? And what's the likely timing?
Phillips Baker
executiveWell, the — I suppose the only thing I can say regarding timing is that we'll move on it once it makes sense. Those bonds don't come due until May of 2021, yet waiting until the very end isn't something we want. And letting them go current is definitely not something we want, so we'd aim to act ahead of that point. On structure, that call gets made when we actually enter the market, and market conditions will dictate it. We obviously can do a smaller amount. Keep in mind, the outstanding figure is $507 million; doing less than that is possible since we hold cash on the balance sheet, and we have — we anticipate having a setup with the revolving banks letting us tap some of that revolving capacity. So if market conditions make doing the full $500 million unwise, those options are available to us. Lindsay, anything you'd like to add?
Lindsay Hall
executiveNo. I believe you've got it right, Phil. Every possibility remains on the table for us. And the high-yield market, as you're aware, Matt, has recovered; it's considerably more robust right now than it was perhaps around the middle of 2019, so we feel positive regarding what we can do to refinance those bonds.
Adam Graf
analystNice work on everything you've accomplished. Just a couple of quick things; regarding what you said about Lucky Friday and the grades, could you shed a bit more light there, since the typical reserve grade of 14.4 ounces per ton silver implies that an annual increase of 0.5 ounce sustained over several years isn't achievable? So if you could expand a little on what we should expect for Lucky grades? And then regarding the Casa mill and the open pit against the underground profile, perhaps you could elaborate on where the constraints sit and how the open pit versus underground will take shape in 2020?
Phillips Baker
executiveAll right. Beginning with the Lucky Friday, what I believe occurs there is that as we get deeper, fewer holes are in place. Consequently, we ultimately observe the reserve dropping off since the strike of that better grade narrows. And that — and we're speaking roughly 10 years ahead, correct? This isn't a thing that occurs right away. Yet across the following 15, 20 years, we have 5 years during which we ramp up with better grade, remain there for a stretch of 4, 5 years, and afterward it begins to fall away in the later years. But that's — I believe there's a sensible expectation that through infill drilling, that may not hold true and we could in fact see better grade, and we could see better grade for the resource we intend to mine past that point. So I believe you can feel fairly at ease concerning the coming roughly 10 years that we'll see those — the grades sitting above the reserve grade. Anything you'd like to add? Is that a fair way to put it? I'm — okay, great. And then regarding the mill, I'm going to hand that over to Lauren right away.
Lauren Roberts
executiveYour question concerned the shift from underground — mostly underground output — over to open pit output, and my view is that the greater grades are what come out of underground. Because that material carries a higher grade, we'll always send the largest volume of underground tonnage we can to the mill. After that, we add open pit output on top to cover whatever remains of the mill's capacity. In 2020, that output is supplied by the East Mine Crown Pillar pit, and we're carrying out a modest amount of stripping on the extension of that pit. As time passes, though, we begin adding further pits on top. At this very moment we're examining which sequence of pit mining would be best, so that cash flow is maximized in the near years, and that work isn't finished yet. Yet when our underground exploration succeeds and we keep extending underground mine life, the pits face less pressure, which lets us do a solid job of optimizing our planning.
Phillips Baker
executiveCould you perhaps speak a bit about just the mill on its own for 2020, what sort of thing you have in mind there?
Lauren Roberts
executiveSure. So in 2019, the mill's performance was, I'd say, fairly disappointing in 2 respects. Throughput was one. We came in a bit under what we'd aimed for on throughput. Recovery is the other, and it's been below where it should be. Naturally, both matter a great deal to us, so a dedicated team has been assembled to focus on these areas. On throughput, the biggest problem I see is plant reliability; work has started on raising that reliability, and availability at the plant went up by more than 5 percentage points during the fourth quarter. That's a — that's a sizable move within 1 quarter. And we'll keep pushing that effort through 2020 into 2021 so the plant reaches what I'd call first-tier availability; and that, naturally, lifts throughput. On recovery, we ran into some mechanical difficulties that hurt recovery in the grinding circuit. This tied back to cyclone and screen maintenance in the gravity circuit, plus the leach train, where several drive units needed replacing; mechanical availability also matters for recovery, since optimizing recovery is hard whenever the mill isn't in steady state. So raising mechanical reliability at the plant is a key factor in getting better recoveries. We also see room to lift gravity gold recovery at the plant. Nelson is actually there this month, auditing the system, and we'll aim to put their recommendations in place, because pulling gold out of the circuit as early as possible helps from a recovery standpoint. Last, I'd mention that particular stopes in particular areas of the mine produce more sulfide and/or more arsenic and/or more carbon than other stopes do. So we're trying to give the mill a better forward view of the feed headed its way, which lets us blend better; and a range of metallurgical test work is underway right now, examining what we can do to boost plant performance while we're processing those materials. And actually, Coram is, I believe, on-site this week — if not this week, then next week — assisting us with some real-time equipment to examine how we tune the circuit in response to those sorts of changes. Coram is a consortium of Abitibi operators who cooperate and collaborate on mill performance. So a lot of pressure is being applied, and I expect considerable improvement in 2020.
Phillips Baker
executiveAnd when I say that, let me be clear: Casa Berardi produced $20 million in free cash flow. Every single year we've owned it, this mine has generated free cash flow for us, apart from one, and I believe that one was negative $16 million. So this is a mine we believe has room to improve; it isn't a problematic mine, but it is one with plenty of opportunity. Plenty of opportunity thanks to the reserves and resources it holds. Plenty of opportunity because with infrastructure constructed 30 years ago, there's a chance to enhance those practices and how it's operated. And so...
Lauren Roberts
executiveThere's nothing but upside.
Phillips Baker
executiveYes.
Lauren Roberts
executiveIt's not broke, it just can be more.
Phillips Baker
executiveYeah.
Adam Graf
analystYeah. The — set me straight if I've got this incorrect. As I remember it, that mill was meant to handle around 4,500 tons daily. So what do you folks figure you can push it to during 2020? Like, what are your shorter-term targets on that?
Phillips Baker
executiveWe're at roughly 4,000 tons per day, and 3,900 is roughly the level we believe we can reach.
Lauren Roberts
executiveCorrect, those are long tons. So, looking ahead, what we anticipate the plant will yield over the long term comes to roughly 1.4 million each year. And we're going to make a significant push — we'll narrow that difference considerably during 2020.
Adam Graf
analystAnd what's your outlook on how throughput will divide between open pit and underground down the road? I realize you're shifting toward open pit — more toward open pit, I mean — but what volume do you figure you can pull from underground in 2020?
Phillips Baker
executiveSo it's been about a 50-50 split, and that's how it will stay. So we — keep in mind, we've had the open pit running for 2 years at this point?
Lauren Roberts
executiveRight.
Phillips Baker
executiveSo it's been a fifty-fifty kind of situation for us. What we've discovered recently is that when a mill runs with a great deal of spare capacity, its operating practices end up not being up to the standard required once that mill is going at maximum output. So that's one piece of what this discussion is about.
Lauren Roberts
executiveAbsolutely. We're chasing bottlenecks now, and that's a good place to be.
Trevor Turnbull
analystYes. I was just curious whether you might provide us with some of the CapEx breakdown across the various assets; we saw the full-year guidance and just wondered where most of that is headed, which — among, let's say, Greens, Lucky and Casa?
Phillips Baker
executiveYes. We — let's — that isn't handy for me. Does...
Lauren Roberts
executiveYes, I have it.
Phillips Baker
executiveAll right. Lauren’s got it.
Lauren Roberts
executiveJust a moment on that — I didn't fold it in. All right, more or less — checking now, most of that spending, which shouldn't surprise you, heads toward the 2 big producers. I'd put it at somewhere around $46 million, $47 million for Casa, roughly $38 million for Greens Creek, and about $22-ish million for Lucky Friday, and that accounts for nearly all of it.
Lindsay Hall
executiveTrevor, within those figures, there's certain tailings facility activity being carried out by them at Casa, plus you have the Remote Vein Miner over at Lucky Friday, with some work underway.
Lauren Roberts
executiveYes, but those are entirety of capital.
Trevor Turnbull
analystAnd regarding Lucky, yeah, I was sort of wondering. Is it spread pretty evenly? Or is it somewhat weighted toward the front as you get set to ramp that back up? So should we expect more of that to land early in the year?
Phillips Baker
executiveNo. At Lucky Friday, for those 2 projects, the first quarter comes to roughly $6 million, $7 million; and after that it builds up fairly steadily, because you need the people and you need the places where they can work in order to spend the money on the underground capital; so once that first $6 million, $7 million for the first quarter is done, then you can take what's left and distribute it fairly evenly, I believe.
Trevor Turnbull
analystAll right. I honestly can't recall exactly how this has been handled. During the period you've had it operating — mostly with management rather than the entire workforce — but should we view everything you're doing this year as essentially full commercial production? Or will it be accounted for in some other way while you're ramping up, in terms of how it flows through the income statement, or simply offset against the capital and so on?
Phillips Baker
executiveYes. The — we're not truly — if you check our earnings release, there's a footnote under the cost outlook. For Lucky Friday, the anticipated cost of sales at full production, along with cash cost and all-in, are derived from Q4 production and costs alone.
Trevor Turnbull
analystAll right, my apologies. That figure relates to the 2020 guidance, right?
Phillips Baker
executiveThat's right.
Trevor Turnbull
analystAlright, that makes sense. Great. And then, last item, let's pivot back to Nevada briefly. Did I overlook it? Any idea on the schedule for your study regarding Fire Creek? And related to that, you mentioned permitting is another item you have to chase. Could you just refresh us on roughly what — what you're aiming to permit now for the new study?
Phillips Baker
executiveAbsolutely. Broadly put, the studies on their own will require 1 to 2 years, and it really hinges on what we discover while conducting them as to the final duration, though it falls within that range. We'll kick off with the scoping study, and following that scoping study, a feasibility study gets done to ensure we handle this properly. We won't hurry back into a situation where money gets spent without a clear capacity to earn a return on that investment. Permitting is mostly focused on groundwater, correct? So that will — hinges on whether it's an EA or an EIS, and that hinges on what we conclude from the study. So it might be a year if it's an EA, or it might be 2 years if it's an EIS. And then, naturally, you must factor in whatever the broader environment in the U.S. looks like regarding how long such things could take, since that genuinely matters.
Trevor Turnbull
analystAlso, is it possible to start that permitting process moving once the scoping study is in hand? Or must everything be finalized through the feasibility stage before you can truly push that forward at a fast pace?
Phillips Baker
executiveWhat comes out of the scoping stage will determine that. Still, based on what I expect and what I've seen, my sense is that the feasibility needs to be there before we're set to proceed. It might not be fully complete, yet it will need to be quite near completion. Would you agree, Lauren?
Lauren Roberts
executiveYeah, that’s my view.
Phillips Baker
executiveAll right, then, thank you so much for joining us on this call. Once more, we’re sorry that the website is unavailable. With any luck, it’ll be restored shortly and everyone will be able to view the slides. If anything comes up that you’d like to ask, give a call to Mike Westerlund or to me. Many thanks. Enjoy the rest of your day.
Operator
operatorThat wraps up the call for today, everyone. We appreciate you joining us, and enjoy the rest of your day. Everyone is free to leave the line now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hecla Mining Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hecla Mining Company or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.