Hecla Mining Company (HL) Earnings Call Transcript & Summary

August 9, 2023

New York Stock Exchange US Materials Metals and Mining earnings 42 min

Earnings Call Speaker Segments

Anvita Patil

executive
#1

Morning, Regina, and thanks to everyone for being with us on Hecla's Second Quarter 2023 Financial and Operations Results Conference Call. This is Anvita Patil, Hecla's Vice President of Investor Relations and Treasurer. The news release about our financial results that came out yesterday, as well as the presentation for today, can be found on Hecla's website; joining us on this call are Phil Baker, Hecla's President and CEO; Lauren Roberts, Hecla's Senior Vice President and Chief Operating Officer; and Russell Lawlar, Hecla's Senior Vice President and Chief Financial Officer. Any forward-looking statements the management team makes today fall under the Private Securities Litigation Reform Act and carry risks as shown on Slide 2 and 3 in our earnings release and in our 10-K and 10-Q filings with the SEC. Those risks, along with others, might cause results to differ from what the forward-looking statements project. Non-GAAP measures cited on this call and in related slides are reconciled in the slides or the news release. A reminder that if you'd like to have a call with the management, you can do so by using the link under the section Virtual Investor Event in our earnings release that was issued yesterday; with that, I'll pass the call to Phil.

Phillips Baker

executive
#2

Thank you, Anvita. Morning to all of you. We appreciate you being on this call. Safety, production, cash flow, and the beginning of changes at Casa all made the second quarter a solid one. The restart of the Keno mill, though, might be the quarter's single most important development, since if you put that together with what's taking place at Greens Creek and Lucky Friday, my view is that Hecla has entered yet another stretch of meaningful expansion in silver output and reserves — perhaps moving even more quickly than was the case across the prior 5 years. Slide 4 illustrates what I mean, since it lays out what we accomplished during those 5 years. The figures from that period are quite extraordinary: revenue up 27%, silver reserves up 79%, production up 37%, and $0.75 billion in free cash flow generated by our 3 mines. Whether the Green Street mill can run at 2,600 tonnes per day, or possibly as much as 2,800 tonnes per day, is no longer in doubt. What we now wonder is whether mining can be sustained at that pace or beyond. Meanwhile, Lucky Friday — even without the service hoist in the bunker, which comes online this month and in the fourth quarter, respectively — is already turning out roughly 20% more ore than was the case 18 months ago, and it sits at a 5 million ounce run rate. At the Keno restart, we are experiencing some teething problems. Even so, when you consider the ore grade, the recoveries we are seeing, and the outstanding exploration results with mineralization continually being discovered, this is an exceptional district. So across the past 5 years, we recorded that 37% production increase, and we anticipate 40% over the coming 3 years, with nearly 20% growth in the current year alone; we will likely see reserves grow as well, along with more free cash flow. My expectation is that all of this translates into share performance — positive share performance. Hecla is a silver company with gold exposure, and for many reasons we consider gold exposure permanently valuable to our portfolio; it diversifies us away from the concentrate market. It provides a hedge against silver's greater volatility, particularly in a recession. It gives us the scale to grow, and those are the reasons Casa Berardi matters to our portfolio. As we have said for the last 1.5 years, inflation has hit Casa harder than our other sites, doubling underground mining cost per tonne. Underground grades have fallen as anticipated, and tailings construction costs have risen because more buttressing is needed; so while we pursue permits for the higher-grade pits, we are acting swiftly to mine only the 160 pit. Lawrence will say more about Casa shortly. Now I'd like to turn to Slide 5 and offer a few remarks, specifically about the quarter. I'd say we had an excellent second quarter, and the silver output we achieved in the first six months backs up what I said at the start — namely, that our silver production is now increasing at an even quicker pace. During this quarter, Lucky Friday turned out 1.3 million ounces. In 4 of the past 5 quarters, we exceeded 1.2 million ounces, and if it keeps performing at that level, Lucky Friday is nearly the 30th biggest silver mine globally. To give you some perspective, back in 2021, Lucky Friday's output was roughly 40% below where it stands today. As I noted, we brought the mill at Keno Hill back online, and the upgrades we finished before restarting are delivering solid results. Work on the secondary crushing circuit changes is moving forward on schedule, grades are beating what we had modeled, and we expect to reach full production by yearend. Naturally, Greens Creek's steady 2.4 million ounces of output and $36 million in free cash flow provided the foundation for all this performance. Our all-in injury frequency rate came in at 1.18, the best in company history — an achievement showing how committed we are to shifting behavior and designing out risk; and I'd say the strongest illustration of designing out risk is the UCB mining method, which places miners in safer locations doing safer work. At Lucky Friday, we'll be concentrating on how far down the injury frequency rate can go. Lauren, who retires at the close of the year, will cover each property in more detail. Silver revenues are climbing compared with gold. For the quarter we're at nearly 45%, and I believe by year's end, silver will likely account for over 55% of our revenues. Silver operations generate solid cash flow, and prices could firm up somewhat. The back half of the year ought to be stronger still, and Russell will elaborate on that. We held our consolidated silver production and cost guidance steady, though we revised the production cost guidance for Casa Berardi along with production, reflecting the wildfires' impact and our swift shift to open pit only operations; and with that, I'll hand the call over to Russell.

Russell Lawlar

executive
#3

Thanks, Phil. I'll begin with Slide 7. For a long time, Hecla has been recognized as a top player in the silver mining space, being the biggest silver producer in the United States. When we examine this slide, the reason becomes clear: across the last 6 months, our silver mines delivered a 56% margin, and so far this year we've generated over $105 million in free cash flow. We're eager to see what Keno Hill contributes to this picture. During the past 3.5 years, the Greens Creek and Lucky Friday mines produced in excess of $560 million in free cash flow. That has given us the ability to put money into exploration to expand our output of silver reserves, and also to buy and invest in Keno Hill, which we expect will boost our production profile while strengthening our balance sheet and debt metrics. That brings us to Slide 8, where I'll go over our first quarter revenue profile and balance sheet. Silver made up 40% of revenues in the first half of the year, which keeps demonstrating the strength and consistency of our silver mines. Roughly 34% of revenue came from gold, with 26% from base metals. We finished the quarter with $107 million of cash on the balance sheet and $219 million of liquidity. We also monetized our zinc hedges for about $7.6 million, since the zinc price fell to its lowest level in the second quarter since April 2020. The strength of our balance sheet and financial flexibility, with a net leverage ratio below 2x, remains among our most important objectives. At quarter's end, we were a bit above our target; the main reasons are the June suspension of mining operations at our Casa Berardi mine because of Canadian wildfires, along with ongoing investment in Keno Hill. As we enter the third quarter, this will go back to being under 2x thanks to production from both of these lines during the quarter. I'll now hand the call over to Lauren.

Lauren Roberts

executive
#4

Thank you, Russell. To begin, it brings me real satisfaction that the work we've done on succession and developing our people means we could promote from within to cover the VP ops position and fill the gap it left behind. Carlos and Chris are dependable, and I'm confident they'll excel. As for myself, I'm not riding off into the sunset quite yet. There's still plenty to get done over the coming 5 months. With that said, let's move to Slide 10. Greens Creek, our cornerstone asset, delivered yet another strong quarter, producing 2.4 million ounces of silver along with $36 million in free cash flow, bringing the total to over $73 million in free cash flow across the first half of 2023. Gold output stayed robust at 16,000 ounces, helped by grades that came in above plan and better results from the gravity circuit. Cash cost came to $1.33 per ounce for the quarter, while AISC per ounce landed at $5.34. Both figures came in a bit above the prior quarter, largely because the zinc by-product credit shrank on a weaker zinc price. Capital spending reached $8.8 million during the quarter, totaling $15 million so far this year. Our anticipated capital spend at Greens Creek now sits between $49 million and $52 million for the year, a modest reduction from what we guided previously. We're raising our gold guidance for Greens Creek and reducing our AISC guidance, thanks to a lower planned sustaining capital spend this year. Turning to Slide 11. Lucky Friday turned out 1.3 million ounces of silver in the second quarter at an AISC of $14.24 per ounce. This marked the fifth quarter in a row that silver production topped 1 million ounces, the strongest quarterly output in 23 years, plus a new safety milestone with an all-injury frequency rate of 0.52 as of the end of June — a truly impressive result. Capital spending at the mine came to $16.3 million, with our focus on 2 key projects: the Service Hoist, finished earlier this month, and the Coarse Ore Bunker, which we expect to wrap up by the fourth quarter. The Service Hoist should remove the bottleneck on our production hoisting capacity, and the Coarse Ore Bunker will decouple the mine from the mill by giving us the ability to stockpile ore across multiple days. Both efforts are essential to hitting our production target of 425,000 ore tons per year, a rate we anticipate reaching by year-end. Free cash flow generation during the first half came in at $34 million, which speaks to the mine's strong performance this year; we're reaffirming production guidance, though we are raising cash cost guidance for 2023 to $4 to $4.70 per silver ounce, along with all-in sustaining cost of $11.50 to $13 per ounce. The revised cost outlook stems from a $2.5 million rise in labor expenses tied to wage hikes under the new collective bargaining agreement, reduced zinc by-product credits stemming from diminished zinc output and pricing, and greater sustaining capital driven by the scheduling of mobile equipment deliveries plus additional development work needed to hit our throughput goal. Our capital guidance is being raised to reflect increased sustaining and growth capital spending, largely connected to our 2 major debottlenecking projects. Turning to Slide 12. At Keno Hill, we continue to expect full production during the fourth quarter. We brought the mill back online in the second quarter, feeding it lower grade stockpiled ore for startup. Output from the mill during the quarter totaled 184,000 ounces, achieved while running a temporary portable crusher. Completing the secondary crusher upgrades stands as the next mill milestone, and we expect that during the third quarter. For the full year, we anticipate capital spending at the mine between $47 million and $49 million, a bit above our original guidance because of added development and mill improvements. Our progress at Keno Hill gives me encouragement. Although our sample size remains limited, the resource model has been performing nicely through the second quarter. Reconciliation between mill and model indicates somewhat fewer tons at superior grades for equivalent silver on lead content, along with additional zinc. The mill enhancements completed before restart, such as elevating the degree of process control, are delivering the results we anticipated. Silver recovery then surpassed our 94% target, and concentrate quality looks excellent; we eagerly await commissioning of the upgraded secondary crushing circuit in the third quarter and anticipate it will boost that circuit's reliability and efficiency. Within the mine, we are navigating the standard ramp up learning curve. We have figured out how to handle the ground in the primary development headings and are currently working through that process in the ore headings. The Bear Zone demands more shock than we had projected, and that factor is now built into the mining cycle. Our main underground infrastructure project ought to wrap up in the third quarter, and we anticipate a robust close to the year; we reaffirm our production and cost guidance at over 2.5 million ounces with an all-in-sustaining cost ranging from 12.25 to 14.75 per ounce. I feel enthusiastic about what lies ahead for Keno and believe the mine is capable of producing as much as 4 million ounces in 2024. On Slide 13, the photograph on the left offers a great illustration of the very high grades we are finding in the Bear vein. It is somewhat hard to make out in the — in the presentation, there is plenty to pick up from it, and that represents 160-ounce space, which is quite remarkable. The right-hand portion displays our advancement on the secondary crusher circuit, where we are swapping out the majority of components apart from the crusher itself. Now looking at Slide 14, Casa Berardi turned out roughly 19,000 ounces of gold during the quarter, with an all-in sustaining cost of $2,286 per ounce. Output came in below expectations because of wildfires and Abitibi, and those caused access roads to be shut for most of June. As Phil mentioned when he spoke, Casa Berardi has seen head grades fall and cost pressure mount across the past several years. Our technical report notes that in the future, Casa becomes an open pit only operation. After evaluating things carefully, we chose to implement some changes at this point so we are better positioned for that future. During the quarter, we carried out a stope-by-stope margin analysis covering the remaining underground resources. We reached the conclusion that the East mine did not offer attractive economics, so we closed it. When it came to the West mine, that analysis indicated attractive economics through roughly mid-2024; these changes place additional production pressure on the 160 open pit, and we decided to start the process of in-sourcing the mining there. We approved buying $16 million of surface mobile equipment, and about $12 million of that has already arrived, with our team busy putting it together and training operators. As our crews ramp up and the rest of the equipment arrives, we expect to assume responsibility for all open pit mining before the end of 2024. A large portion of the waste rock that the stripping generates is going toward building tailings cell 7 during this year and through calendar year 2026. We are revising our production cost guidance to account for these changes. In the past, our plans assumed that the 160-pit together with underground production would serve as a bridge until we obtain the permits needed to mine the higher-grade open pits. Given the changes I just outlined, a production gap cannot be avoided, and we estimate it at approximately 2 years, falling between 2028 and 2030. After 160 is completely mined, we expect to repurpose it as our long-term tailings storage facility for the higher-grade pits. Until that point, we will construct multiple raises on our existing 7 tailings facility. Working alongside our engineer of record and independent review panel, we have concluded that raising the facility's height will mean we must build a substantial buttress for it. That capital is already reflected in our ongoing plans. My way of thinking about Casa involves 3 phases. Across the next 4 years, we'll make modest investments that are returned within the period to produce the remaining permitted reserves and resources. After that comes a period of investment while we finish permitting the higher-grade pits, put money into the infrastructure and equipment required to complete the transition to a fully surface operation and to expose the first ore. When the first ore arrives, which is expected in 2030, positive free cash flow generation comes soon after and then grows over the years that follow. Prior to handing things over to Phil, I'd like to highlight Casa's extended reserve life, along with considerable exploration upside across a sizable land package situated on the Casa Berardi break. The choices we're making now are the correct ones to return Casa to a trajectory of generating free cash flow and a more promising tomorrow. With that said, I'll turn the call over to Phil.

Phillips Baker

executive
#5

Appreciate that, Lauren. If you go with me to Slide 15, we are reaffirming our guidance for silver output and consolidated AISC, reflecting the adjustments at Casa, and we're updating the 3-year outlook for gold production and costs for this year. On capital, guidance is moving up to a range of $225 million to $235 million, driven largely by the higher spending at Lucky Friday and at Casa Berardi, for the reasons Lauren laid out. Now let me move to Slide 16, and before wrapping up my comments, I want to stress how essential silver is to the renewable energy shift. Photovoltaic silver demand came in at roughly 140 million ounces during 2022, which represents around 12% of all silver demand; during 2023, technologies referred to as TOPCon and HJT should represent 80% of all newly built photovoltaic manufacturing facilities. Those 2 technologies consume 30% and 120% more silver, respectively, compared with the PERC technology that is widely used at present. So silver demand from solar is going to keep expanding as the clean energy transition speeds up. And I would not be shocked to see a 30%, perhaps even 40%, rise in silver demand for solar occur this year or next, which would push solar above 15% of all silver demand. And should the economy slow down, I'm confident that the pledge already made to renewable energy will keep silver and solar growth going. And so it appears unavoidable that solar will overwhelm the other silver demand categories, with the possible exception of investment demand. With that, Regina, I'd like to open the call to questions.

Lucas Pamatat

analyst
#6

I wanted to ask about Casa Berardi — can you give us a bit more detail on what you're expecting to spend during those 3 years while the mine is shut down, and also across the coming 18 months? My understanding is that you'd said earlier it would take $100 million to $120 million to make the switch to open pit mining. Is that figure still good? And if it is, what portion of it sits inside the CapEx guidance?

Phillips Baker

executive
#7

Yes. Briefly, that figure remains good, and it excluded stripping; once stripping costs are included, you're looking at something on the order of $200 million, $250 million. That falls in '28, '29, possibly a small piece in '30. So it isn't a capital outlay we face right away. We're putting in some fairly modest amounts — Casa's free cash flow won't cover every capital cost we incur this year and next, though the total is fairly modest. As I recall, it runs about $30 million, $40 million per year; after that, free cash flow turns positive; and the capital we put in during '23 and '24 gets returned across the '25, '26, '27 timeframe, yes, those 3 years.

Lucas Pamatat

analyst
#8

And one final thing from my side. Previously, you mentioned being reluctant to close the mine purely because of the labor demand in that region, as I recall. What do you intend to do with those workers? Or, I suppose, how do you intend to keep them on?

Russell Lawlar

executive
#9

Sure, keeping employees is definitely something we're aiming for, and it's something we want — we are the biggest private employer in that area, but the truth is the mine must be economic. So we examined very closely which stopes were mineable, decided there was a need to shut down the East mine. And when mining the West mine stopes that are economic, we'll have that workforce through that period of time. And then we'll move to open pit, an only open pit mine. And so certainly some of those people will transition into those roles. Lauren, what would you like to add to that?

Lauren Roberts

executive
#10

Thus, we've already started shifting a portion of the underground staff over to positions in the open pit. Accordingly, a considerable number of individuals who lost their jobs at the East mine are being moved onto the new fleet—the equipment we acquired to run that new fleet.

Lucas Pipes

analyst
#11

My first question also concerns Casa, and sort of working through the transition there; the previous question brought it up a bit regarding shifting labor. Could you outline what the net effect would be across the years ahead and how you'd handle it? And then, is there something like idle mine costs for the underground works after exiting underground operations? I'm just attempting to grasp whether there's anything we should model over a longer horizon tied to the underground workings. Thanks so much for that.

Phillips Baker

executive
#12

So Lucas, before you — could you say your second question again? I'm not certain I got it.

Lucas Pipes

analyst
#13

So basically, once you give up on Casa's underground portion, do you simply shut it down and leave those workings behind? Or are there still expenses and upkeep costs tied to the underground operations, even though you're no longer producing there?

Phillips Baker

executive
#14

The underground does not get sterilized, and down the road we'll need to figure out what amount of maintenance we perform on it. So keep watching, and we'll see how that turns out; but for sure, whatever we do will try to preserve the capability to re-enter that underground mine — under different pricing scenarios, a different cost setting, that underground might be brought back along with exploration. We're still advancing the exploration drift for additional drilling to the west of the area where we presently work in the West mine. So keep watching for that, and it's going to take place across the next year; regarding the workers, given that we're such a big employer, the problem won't be a shortage of employees because we're actually cutting that headcount. But that's going to happen across the next year. And I believe in the end, we finish up with about half the — good, you're prepared Lauren, please continue.

Lauren Roberts

executive
#15

Yeah, so when it comes to the people we employ directly, we kicked off the year with roughly 650 of them, and at this point that figure has fallen to around 522, just to give you a sense of the scale. And as the year has gone along, there really haven't been many additional shifts, to be honest, just the usual attrition. The upcoming shift will be tied to shutting down the West mine.

Lucas Pipes

analyst
#16

To follow up, my second question stays focused on staffing. Phil, previously you brought up limitations related to workers, particularly where specialized skills are concerned. Could you update us on Greens Creek, Lucky Friday, and Keno — what's the situation with hiring right now? That's all from me at this point.

Phillips Baker

executive
#17

Absolutely, Lucas. Perhaps we speak broadly first, and after that, Lauren, feel free to chime in if any particular point comes to mind. Broadly speaking, bringing in the personnel our operations require has gone quite well for us. At Lucky Friday, as an illustration, attrition has dropped to numbers resembling what we experienced long ago — a rate of 10% or lower. Honestly, our most significant problem involves the technical staff — engineers and geologists — which presents a greater difficulty right now. Trouble finding mechanics and highly trained miners never really goes away, yet that side has gone reasonably well; the openings we currently have tend to sit in technical functions. Lauren?

Lauren Roberts

executive
#18

Yeah. On the whole, I'd put it this way: filling those positions has gotten easier across the last 12 months compared with, let's say, the 2 before that. I'm not claiming competition has vanished, but we're essentially fully staffed in every location, and we can bring people on board — plus, for the skilled trades, we add contractors whenever the need arises. Even so, up to now this hasn't made a significant difference to the business.

Phillips Baker

executive
#19

We need schools to fill up more engineers and geologists, right?

Lauren Roberts

executive
#20

Correct, you've put your finger on it — the shortage of skilled people is most acute when it comes to technical roles. There may be a fair number of older, experienced folks over at Hecla. Even so, we're managing fine in that regard.

Lucas Pipes

analyst
#21

I value that context. As I’ve said previously, I’m aware which degree I’ll suggest to my kids. So once more, thank you, and good fortune.

Joseph Reagor

analyst
#22

Continuing somewhat from the labor topic, given that the East mine is shutting down, will anything shift regarding the workforce at Casa during Q3? And regarding that East mine as well, are there any charges that will be recorded because of the closure?

Phillips Baker

executive
#23

Both of those questions get a no. We expect no further labor-related actions, and there is no impairment charge.

Joseph Reagor

analyst
#24

All right. Then next, when you look at that tactical report on Casa from February 2022, how much will the mining rates differ once you move to fully open pit in 2024 versus what that document contained?

Phillips Baker

executive
#25

Basically, only 2 modifications exist relative to that document. First, the underground production appearing in it won't happen after 2024, and I believe that had initially been intended to run until roughly 2030, and second, more capital will be shown. Apart from that, it remains the plan we have had all along. Lauren, anything you'd like to add? Russell, anything?

Lauren Roberts

executive
#26

When it comes to what shifts right away as a result of the underground being shortened, we're pulling forward that 160 bps, and that's the reason we went ahead and bought the equipment. To put it in perspective, the pull-forward isn't enormous. This year we're at roughly 12 million tonnes moved, and next year it goes to slightly below 20 million tonnes, so it's not a dramatic difference. After that, across the next couple of years, the pace tapers off, and by then we'll have everything in-sourced.

Joseph Reagor

analyst
#27

Then regarding Keno, it's clearly wonderful to see that it launched ahead of schedule. My understanding is that you had initially planned for the third quarter. Given that you began sooner, how sure are you about the guidance for the entire year — could there possibly be some upside? Also, is everything progressing without issues as this quarter gets underway so that you can meet it?

Phillips Baker

executive
#28

At this stage, we feel good about the guidance, though this is a startup, so it will depend on what we observe regarding our capacity to feed the tons into the mill, along with what the grade will be and the recoveries; we are definitely gaining knowledge as we proceed. That said, nothing exists that would lead us to conclude we should alter anything right now. Lauren?

Lauren Roberts

executive
#29

No, nothing to add Phil. That's correct.

Mike Parkin

analyst
#30

I apologize for harping on this, yet I have a few inquiries regarding Casa too. You've roughly outlined the unemployment level at which you began the year and the level where you stand today. Could you provide some indication, for instance around 2025, of the number of workers you anticipate having? Does it remain at approximately just above 500, or might it be even less?

Phillips Baker

executive
#31

We'd land roughly in that vicinity, since keep in mind we are bringing the mining in-house; consequently tasks currently handled by contractors are going to be performed by Hecla personnel.

Mike Parkin

analyst
#32

All right. Then regarding the reserves and resources you have, will any of those ounces currently classified as underground potentially be moved into open pit?

Phillips Baker

executive
#33

Open pit isn't where we're headed, though some reserves will be shifted over to resources out of the underground. That said, the amount is fairly minor. As I remember it, we're talking 10% or 15% of the whole. It's minor.

Lauren Roberts

executive
#34

1.7 million tons. It's not a big number.

Mike Parkin

analyst
#35

All right, and as far as what you intend to extract from that future open pit, does that match what shows up in the inferred resources at present?

Phillips Baker

executive
#36

Correct, that sits within the reserve. Right, it's part of the reserve, and it's, you know, roughly 3 gram material to — so the 160 pit as it stands today runs 1.7 grams, 1.8 grams, around there. And then once we move into the Principal and the West Mine Crown Pillar pits, the grade is considerably better and the strip ratio, especially at the Principal pit, is pretty favorable.

Mike Parkin

analyst
#37

Honestly, that was one of the things I was going to ask about. In the past, your strip ratio has been fairly high. Could you just give us a rough idea of what the average would be over the life of mine?

Phillips Baker

executive
#38

Honestly, I can't recall that, but Principal, Principal sits at roughly 7:1, and the West Mine Crown Pillar is several times that. I can't recall the exact figure, 22:1, and that appears in the technical report. The timing of those pits hasn't shifted at all from what the technical report describes. The real major shift in the technical report is the underground being made shorter and the 160 pit being moved up, plus additional, additional capital for Cell 7, the buttressing at Cell 7.

Mike Parkin

analyst
#39

Alright. As for the choice to proceed with this, do you apply some kind of minimum IRR cutoff to support it? And at what silver price level would that occur?

Phillips Baker

executive
#40

Well, you know, this is a gold asset, so… Yes. So the actual call regarding the sizable capital expenditure likely won't take place until 2027, 2028; the reason being that during the period before that it produces positive cash flow, so you simply have those 2 years, during which you need to put out capital; and so although we anticipate that this will move forward, naturally, if conditions differ at that point a different choice could be taken; but — and the basis we anticipate moving forward is that this is very high grade open pit material; it's highly economic. Based on the technical report, it's producing, I'd like to say billion plus or minus free cash flow after including the capital. So it's a highly economic group of pits. The final call gets made in '27, '28.

Heiko Ihle

analyst
#41

I apologize if this has already come up. I joined a bit late. I was tied up on a different call. So my honest apologies if that turns out to be the case here.

Phillips Baker

executive
#42

No problem at all, Heiko.

Heiko Ihle

analyst
#43

Honestly, that's a first for me during one of your calls. Could you give us some detail regarding labor expenses, components, and similar items for the new mine you're running up in the Yukon? What I mean is, I figure you've got a fairly solid data set by this point comparing what really occurred against what you'd projected for output costs. Is there anything else you think would be worth sharing with the analyst community about getting operations underway that perhaps caught you off guard — labor availability, parts bottlenecks, things like that?

Phillips Baker

executive
#44

Okay, Heiko, I suppose the initial point I'd make is that luck has been on our side, since we haven't seen major turnover among what was a core group of individuals there, and they were keen to be on site, it's a genuinely neat location, and they understand the grades involved. So — we've had good fortune in that the rate of turnover hasn't been particularly elevated, and we've managed to bring technical staff to the property. Of course, the challenge is the rotational work schedule. That means you essentially need double the headcount required for an operation without such rotation; and it's definitely located in the Yukon. Still, when it comes to compensation, I'd say we're competitive. I can't recall the exact figure right now. Lauren, do you have anything to add?

Lauren Roberts

executive
#45

Not in that sense, no. What I'd say is that finding workers for either the mining side or the technical roles hasn't really been an issue for us.

Phillips Baker

executive
#46

On top of that, several other operations have shut their doors, and that has actually provided us with an extra group of quite a few people — so, the Minto operation.

Heiko Ihle

analyst
#47

Shifting to a different topic — from what I could hear, Casa was where all the other questions were aimed. Could you take us through what you have planned for exploration at the Bear Zone compared with the Townsite Zone through the rest of the year? Specifically, things like how many meters, how many holes, and how much money will be spent?

Phillips Baker

executive
#48

Sorry, could you repeat that — which zones were you asking about?

Heiko Ihle

analyst
#49

What about Bear Zone compared with the Townsite Zone?

Phillips Baker

executive
#50

All right. Well, you know, the number of targets we have is so large that it creates a real challenge. And what's happening is — the drillers have now shifted away from those 2 zones over to the Chance Vein, which sits — it's a bit farther out. Even so, the results coming in are excellent. One thing we're hoping to work out is the question of how we could drill during the winter and whether winter drilling makes sense for us. So I'd say keep watching for news on that. When it comes to exploration, our total spend for well is $3.7 million. That means our budget there isn't enormous, but it's going to grow ahead of when we begin winter drilling, and on top of that we'll begin gaining underground access; there are platforms we're still waiting to reach, though we'll reach them quite soon. So during the fourth quarter you'll see some drilling from underground, and more drilling will follow because of those underground platforms.

Heiko Ihle

analyst
#51

I had no intention of bringing this up until you mentioned it. Roughly how much more expensive is it to drill during winter compared to summer?

Phillips Baker

executive
#52

Other than saying it costs more, I can't give you a figure. The main challenge they face is simply dealing with the water, since temperatures drop so low. Keep in mind, sometimes it hits minus 40, 50 degrees there. That said, we saw that situation at Casa, and we've been — in fact we handle all of the surface — not every bit, but nearly all —

Lauren Roberts

executive
#53

Mainly during the winter months.

Phillips Baker

executive
#54

That's right — winter, given how swampy that region is. So we've got the know-how and the background to pull it off. It's simply that we haven't done so in that location; and when I say we — Alexco wasn't doing that work there, but — my guess is you'll probably see us beginning to take on some of that.

Phillips Baker

executive
#55

All right, thank you so much, Regina. I’m grateful for what you asked. I’d like you to reflect on the 5 years we’ve just been through and what has been achieved in that time. My sense is we are positioned to witness a similar kind of trajectory, with expansion — really striking expansion — in the silver we produce; and the reality that this output of silver comes from the U.S. as well as Canada carries greater significance now than it did 5 years back. Also, we truly have a team whose abilities are strong. They take pleasure in being part of Hecla and in belonging to an enterprise with the legacy and the know-how that ours possesses, which lets us carry out things such as the UCB mining approach at the Lucky Friday. So keep watching; we are of course open to questions. There’s a block of time arranged for analysts, shareholders, and anybody else who wants to speak with Lauren, Russell or me. So kindly put in a request to join one of those calls; and until then, enjoy the remainder of your day. Many thanks.

Operator

operator
#56

This brings us to the end of today's conference call. We appreciate everyone for participating. You are free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hecla Mining Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hecla Mining Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.