executiveHello, Jeannie, and good morning. We appreciate everyone taking the time to be with us for Hecla's conference call covering financial and operational results for the fourth quarter of 2023. This is Anvita Patil speaking — I serve as Hecla's Vice President of Investor Relations and Treasurer. You can find our earnings release, which came out yesterday, as well as the presentation for today, over on Hecla's website. Joining us on this call are Phil Baker, who serves as Hecla's President and Chief Executive Officer; Russell Lawlar, Hecla's Senior Vice President and Chief Financial Officer; and Carlos Aguiar, Hecla's Vice President of Operations. The bulk of the presentation will be delivered by Phil and Russell. Carlos, joining us from Keno Hill, will offer a few remarks. Questions can be directed to any of them. Any forward-looking statements the management team provides today fall under the Private Securities Litigation Reform Act and carry risks, which are laid out on slide 2, in our earnings release, and in our 10-K and 10-Q filings with the SEC. Those risks, along with others, might cause actual outcomes to diverge from what the forward-looking statements anticipate. Reconciliation for non-GAAP measures referenced during this call and in the related slides can be found in the slides or the news release. One reminder — should you wish to schedule a call with management, just follow the link located under the Virtual Investor Event section in the earnings release we issued yesterday. At this point, I'll hand things over to Phil.
Philips S. Baker
executiveThank you, Anvita, and good morning to all of you. I appreciate you being on this call. My remarks begin on slide 3. The year 2023 could be described as one where we secured victories despite obstacles. Certain obstacles were anticipated, while others came as a surprise. First, let me highlight what we managed to accomplish. We posted the second-largest reserves ever recorded in company history. Silver reserves are up nearly 40% across the last 10 years. This was made possible not just by substituting 130 million ounces of silver that we mined, but also by adding 65 million ounces via drilling, chiefly at Lucky Friday and Greens Creek, and more recently through buying Keno Hill. Exploration also delivered a strong year, with remarkable findings at Keno and Greens Creek. Silver output reached its second-highest level ever, and we managed that even though Lucky Friday was offline for five months. At both Greens Creek and Lucky Friday, we posted the best all-injury frequency rate ever recorded; we keep being recognized for the inventive culture built over our lengthy 133-year legacy; and we secured a patent for the underhand closed-bench mining technique. Turning to difficulties, three specific events defined this year: the sudden fire at Lucky Friday, our choice to shift Casa to a surface-only approach, and putting safety ahead of output at Keno, which caused the mine to ramp up more slowly than we had anticipated. Lucky Friday has already resumed operations, and we anticipate reaching full production by the close of the first quarter. Our late-August choice to convert Casa into a fully open-pit operation by mid-2024 reflected our understanding that drastic transformation was necessary; we put margin ahead of volume, and carrying out that plan is already producing results. At Keno Hill, exploration drilling has brought to light the promise and the possibilities this mine holds. Although ramping up at Keno Hill has proceeded more slowly than we hoped, we strongly believe that emphasizing safety and the environment and bringing the mine up to Hecla standards is essential for achieving success and delivering the long-term value Keno could offer. Having worked through 2023's difficulties, we move into 2024 with four active mines that will deliver substantial growth across the coming three years. I'll discuss exploration and operations once Russell covers the financial and technical reports, and after Carlos offers a few remarks. Russell.
Russell Lawlar
executiveAppreciate that, Phil. Turning to slide 5. If you look at it from multiple angles, 2023 turned out to be an excellent year; revenue came in at $720 million. Silver accounted for 39% of that revenue — a larger share than any other metal — which shows Hecla really is a silver company. Our silver operations keep delivering very robust margins, coming in at 50% of the average realized silver price across the year. Just as we anticipated and told everyone on the prior quarterly call, our net leverage ratio did move higher, going from 2.2 times in the previous quarter to 2.6 times in this one. The main reason was that Lucky Friday wasn't producing during the final five months of the year. Managing that net leverage ratio to under two times is still our objective. Now let me move to slide 6 and talk about how the company is prioritizing its free cash flow and liquidity. I noted on the slide before this one the strong margins at our silver operations; those margins translate into considerable free cash flow; with 12 months of output at Greens Creek plus more than six months at Lucky Friday, those operations delivered $155 million of free cash flow. Using that cash flow along with our balance sheet, we've put some strategic investments into production growth: $64 million spent across both Keno Hill and Casa Berardi. Looking at 2024, we expect robust free cash flow generation from Lucky Friday and Greens Creek, fairly modest investments at Keno and Casa, and we're also anticipating $50 million from the insurance related to the Lucky Friday fire. Continued investment in the long-term production growth of our assets will remain a priority — that covers development and exploration across all our mines — but paying down our revolver debt will also be a priority. Our revolver is fully accessible, and we can tap the accordion if we need to. We believe we'll have sufficient sources of cash flow both to fund our production growth and to pay down the revolver debt. Our view is that revolvers exist to supply liquidity when it's required — which ours has done — but the best state for them is undrawn. As we move into the following few slides, I'll go through a number of the technical report highlights. Slide 7 gives the summary of the Keno Hill technical report. This report validates the value we've been able to capture at Keno Hill. The mine is projected to hold 55 million ounces of silver in reserves, at a reserve grade exceeding 26 ounces per ton, with an anticipated reserve life of 11 years and an undiscounted cash flow of $420 million. After-tax cash flow, discounted at 5%, comes to just over $300 million at $22 silver. This report showcases the value of Keno Hill's reserves, which is only part of the reason we pursued the strategic acquisition. Phil is going to cover this afterward in the presentation, but the value we anticipate Keno Hill will gain via the drill bit, along with our exploration success, validates the substantial exploration upside. Moving to slide 8, Casa Berardi has been in our hands for over 10 years, and during that stretch it has performed well. Still, back when we bought it in 2013, we recognized at the time that the open pits held the potential for meaningful value, and those pits were expected to begin producing later in the asset's life. That value is now becoming visible as we advance through the 160 Pit and progress toward the West Mine Crown Pillar and Principal Pits, where we expect this operation to deliver considerable free cash flow. Until that point, though, the property won't be all investment. According to this report, we expect cash flow from the property to be modestly negative in the current year, become positive in the next one, and be substantial in 2026, which ought to give back a big chunk of what we invested over the last couple of years, before a production pause is taken to allow for a permitting timeline for the higher-grade pits. During 2027, our expectation is to process the stockpile, and after that comes a production gap lasting three years, at which point the higher-grade pits begin producing. Under the revised Technical Report, mine life is anticipated at 14 years, delivering an undiscounted cash flow of close to $600 million and a discounted cash flow of roughly $350 million, which shows the value this mine contributes to the Hecla portfolio. Over to slide 9, and I'll hand the call to Carlos.
Carlos Aguiar
executiveAppreciate that, Russell. Because I'm traveling and not on site with Phil and Russell, I'll keep my remarks brief. To begin with safety: our record overall is solid. Based on the results at mines MSHA inspected, the all-injury frequency rate came in at 0.29 at Greens Creek and 0.66 at Lucky Friday — each the best figure ever recorded at those sites. Casa Berardi fell short of where it ought to be, though it underwent a great deal of change. At Keno, safety performance was not acceptable. Across every operation, we've launched a safety initiative that places greater emphasis on leading indicators, including near-misses, risk assessments, interactions, and inspections; through this, we anticipate every one of our sites will become safer starting this year. All four of our operations have begun the year on a strong note. At Lucky Friday, we commenced as scheduled during the initial week of January. Keno Hill is safer, which means it is starting to ramp up more quickly. Greens Creek has put the weather events behind it, while Casa Berardi maintained the strong results seen over the past few months. Having all four properties in operation will make an enormous difference this year. With that, I'll hand things over to Phil, who begins on slide 10.
Philips S. Baker
executiveThanks, Carlos. On this slide, we've described Greens Creek as the foundation stone for Hecla's coming years, since as we grow, it will continue to be that foundation — producing consistent, reliable ounces and cash flow well into the future. The mine posted a strong year, and it would have looked even better had weather not taken out 12 days of output in Q4. Turning to 2024, we expect another stable year there, producing about 8.8 to 9.2 million ounces, which means a little less silver and a little less gold owing to sequencing, as we move through lower grades. We will, though, put out somewhat more zinc. Because zinc grades come in a touch higher, cost per ounce will rise; beyond that, we're lifting capital investment to replace certain mobile and mill equipment, since reducing risk while operating at roughly 2,600 tons per day has grown especially vital. At that higher throughput, everything really must be more reliable, because a disruption leaves virtually no cushion to catch up. And just as we have done at Greens Creek across 30 years, we continue to find ways to lower costs — these investments allow us to reach lower costs — while improving recoveries through some of those same investments. Slide 11 sets out our 2024 exploration plans, both surface and underground, which will test several targets, each holding real potential to add resources. When Greens Creek first opened, its mine plan ran 7 years; now, 37 years later, that plan extends 14 years. Underground exploration last year produced strong results in seven of the eight zones drilled, and four of those zones were drilled in Q4. So we're very excited about this year's program, which pairs underground drilling with surface drilling at the East Ore, the Upper Plate, and Gallagher. We'll also drill across the ground we acquired recently — the Mammoth Claims. We had wanted those claims for at least 20 years. Then there's Cliff Creek, long viewed as highly prospective, but as its name implies, reaching Cliff Creek is nearly impossible. We started mapping there last year, though logistics proved difficult. Even so, we know what needs doing, and we have a contractor we believe can do it. We're not only focused on expanding high-grade mineralization — we're equally focused on making new discoveries, possibly new discoveries at Cliff Creek and the Mammoth Claims. Greens Creek, after all, is a premier silver mine. In fact, it stands as the 11th largest in the world. I want to congratulate the team for excellent, consistent results and for securing a great future for it, because this truly is a world-class asset. Let's move to slide 12. If Greens Creek is the foundation of Hecla's future, then Lucky Friday is the pillar of near-term growth. What sets Lucky Friday apart — its worth, its reliability, the culture there, and the people leading it — is why it ranks as our second cornerstone asset. Together with Greens Creek, these two sites make us the largest silver producer in the United States. The mine restarted in early January. According to Carlos, production should get to about 5 million ounces. Costs per ounce should come in near those of Greens Creek. This year's capital spend will be roughly $15 million under last year's, essentially in line with 2022. Despite having a 19-year mine plan, we're focused on the chance of pushing the mine further east at the current level; so drilling and exploration are happening to the east; naturally there are many uncertainties, but should it pan out, we'd expect higher output and lower costs; and with the mine now stable, we're starting modest upgrades to allow additional throughput, including the 5 new cyclones being added to the mill, scheduled for June installation; let me now move to slide 13. At Keno Hill, two points really stand out. First, the ore body continues to grow, and its quality is equal or better. Let me take a moment on the exploration supporting that claim. I'll come to it soon. Before that, though, I want to cover the second point, which is safety and environmental performance that hasn't met our bar. Fixing that won't be quick. Since we expect a long future there, we stay deeply committed yet patient about improving things. On safety, that means changing mindsets and behaviors and, where we can, designing out hazards. So we've added several senior staff from our corporate technical group and from Lucky Friday, having them cycle through the site. In effect, they're coaching the Keno team. As an illustration of designing out risk, we've funded a cemented tailings backfill plant at Bermingham to enable underhand mining, which is safer than the method we use today; as for Keno's environmental issues, studies are in progress to raise the site to our standards. One result of those studies is a new water filtration plant at Bermingham, which we'll build this year. That should cost around $3-$5 million. Right now, we aren't giving guidance on timing for reaching production or reporting unit costs. We'd rather get safety and environmental matters right without the strain of combined production targets and costs. What I can say is we expect to produce about 3 million ounces of silver. We expect to spend about $15-$17 million each quarter, along with $30 million to $34 million of capital; so at today's prices, 2024 should be a modest investment year for us at Keno. Still, given the exploration upside in the long mine plan, now is the right time to do this properly — much like what happened at Greens Creek almost four decades ago. Now, regarding Greens Creek, we've decided the best way to create more value is to have Greens Creek and Keno implement every synergy they possibly can. There are just 2 hours separating the two. Once you get to Skagway, driving between the sites takes 7 hours, whereas flying takes only 40 minutes. Currently, many of Keno's supplies are routed through Greens Creek on their way to Skagway, then trucked onward to Keno. Our approach is this: Brian Erickson, our VP and GM at Greens Creek, and Kim Campbell, our controller at Greens Creek, will both be promoted to lead the two operations together. In addition to serving as Greens Creek GM for the past 20 years, Brian has been responsible for numerous departments. Mining has been under his watch. Surface ops have been his responsibility. Maintenance has also reported to him. Kim, meanwhile, has been in charge of purchasing, warehousing, accounting, and a number of other areas. So which synergies exactly, and what they'll be worth, we can't yet say — we intend to detail that as time passes. We're looking at somewhere between $30 million and $34 million of capital, along with 2.7 million to 3 million ounces of silver.
Philips S. Baker
executiveHowever, when you consider how mature the infrastructure is at Greens Creek, this ought to speed up Keno's transformation into a mine that produces robust cash flow. Let me move on now to exploration at Keno, which you'll find on slide 14. The drilling campaigns we've been running keep delivering pretty extraordinary mineralized intercepts, both from underground definition work and from surface exploration. This morning I'll focus solely on Bermingham, though you should keep in mind that Keno holds a whole set of other targets — some will be drilled in the coming year, and a few of those will receive as much surface drilling as Bermingham, if not more. Take a look at the plan view in the center of the slide, labeled B and B prime at the top corners, and you'll notice the Bermingham deposit contains several zones: Etta, Arctic, Bear, Northeast, and Deep Northeast. The smaller image on the right then illustrates B and B prime passing through those zones. Meanwhile, A and A prime, as you can see, is a cross-section running through the Bear zone. The image on the far left, with A and A prime in its upper corners, shows this. Within the Bear Zone there are three veins: the main vein, the footwall vein, and the Bear vein. What I'd like you to focus on is that 54 ounces over 39.5 feet — the transverse vein sitting between the main and footwall veins. That represents the widest, highest-grade intercept we know of. A quarter ago we had an intercept of comparable grade, though it wasn't quite so wide. Returning to the B, B prime image in the middle, a red star marks high-grade mineralization located over 1,000 feet deeper than what earlier drilling reached. The conventional belief held that Keno's potential was confined to the uppermost 3,400 feet below surface. Evidence now indicates that high-grade mineralization may occur throughout the entire depth of the 1-kilometer favorable Basal Quartzite host rock unit. These two holes, in my view, truly capture what Keno could become. Now, if you turn to Slide 15 — last year we reached the conclusion that mining two distinct underground deposits plus an open pit simply couldn't produce sufficient margin, as I mentioned when we began our remarks. We had far too many workers — 1,100 people all told, counting employees and contractors. The rock just didn't hold enough value to run the mine that way. So we chose to streamline operations by closing the underground. Our team has carried out that change very effectively indeed. During 2024 we'll have roughly half a year of underground operations while we finish mining the stopes already developed; after that, only surface tons will come from the 160 Pit. Then let's go to slide 16, which presents our production costs and capital guidance. Looking at our 2024 guidance for silver output, we're expecting roughly a 15%-20% rise this year, and 30% by 2026. On the silver cost side, guidance is a touch above what we saw in 2023. Cash costs sit at $3-$3.75, while AISC lands between $13-$14.50. That leaves us with a healthy margin at today's prices and even at lower ones, which demonstrates we truly are the industry's low-cost leader. For gold, cost guidance comes in lower. Capital guidance is also reduced, since we've finished major projects like the service hoist and the ore bunker at the Lucky Friday and are now seeing their benefits. Before opening things up for questions, I'd like to close with how silver's role keeps expanding in solar and the energy transition. On slide 17, you'll find key figures illustrating this. 2023 marked the 22nd consecutive year that renewable capacity hit a new record. So it has simply kept rising annually. And of that renewable capacity added in 2023, 75% was solar. Within the United States alone, solar capacity has grown at an average of 44% per year since 2009. Now, roughly 500,000 ounces of silver are needed per gigawatt of installed solar; so during 2023, silver demand for solar rose by approximately 50 million ounces, reaching 190 million ounces. That represents a 12% growth rate over the past 10 years. To give that 50 million ounces some context, it equals five new Greens Creeks or 10 new Lucky Fridays. So it's unlikely our production could ever rise at the same rate that solar's silver demand is climbing. That means we'll have to depend on above-ground silver; and to obtain it, I believe higher prices will be necessary to satisfy that demand. With that, Jeannie, I'd like to open the call to questions. So, Jeannie, I'd like to open the call to questions.
Nick Giles
analystThanks, operator. Morning, everybody. Nick Giles here, posing this question for Lucas. We truly value the Keno update. Seems like you've already achieved some solid headway. Is any evaluation still underway, or has it come down to nothing but putting things into practice?
Philips S. Baker
executiveRight, it's purely about carrying it out; our focus is simply on ensuring folks are in the right places at the right moments. One observation, certainly, is that we have numerous young, fairly green individuals who arrive from every part of Canada; that's precisely why this mentoring matters so much in our view; and it has produced genuine results. The gains we've witnessed across the past several months have been extraordinary. That said, we're determined to stay careful about not driving the organization ahead more quickly than it can truly proceed without risk.
Nick Giles
analystThat covers it. I appreciate it. It's good to learn about the synergies involving Greens Creek too. I understand you aren't.
Philips S. Baker
executiveYes, the potential those synergies hold has me quite enthusiastic. What I'd point to is certain administrative functions that fall under Kim's purview. Brian clearly arrives with a wealth of experience, and the approaches to mining share similarities. The equipment differs somewhat, since Greens Creek uses bigger machinery; however, something we're actually considering is performing rebuilds. Those get done by us in Juneau for Greens Creek. It's possible we'll handle them in Juneau for Keno as well.
Nick Giles
analystUnderstood, understood — that's really good to hear. I get that you aren't in a position to offer guidance along the lines you described. Still, is it fair to say this is more of a second-half event before anything shows up, or could you share any color on timing, even just rough estimates?
Philips S. Baker
executiveWell, I won't put a date on it; we'll move as quickly as we believe we can while staying safe and getting that organization stabilized. As we said when we made the change, luckily we had no incidents that led to injury, no major significant injury. The potential for one existed, though, and taking a risk simply isn't something we're going to do.
Nick Giles
analystUnderstood, understood. And I do value the detail you've given on this. I'll step back into the line now, but keep it up and all the best.
Philips S. Baker
executiveThanks.
Joseph Reagor
analystHi Phil, and hello to the rest of the team. I appreciate you fielding my questions. Regarding Keno Hill, when you compare the guidance you've issued for this year with what was provided at the start of last year, what would you say is the single largest obstacle explaining why the increase we'd expected for this mine this year hasn't been as substantial? Is it a shortage of workers? Is underground development still lagging? Could it be mine sequencing? What's your thinking on that? And beyond that, what do you believe are the most critical actions required going forward to bring it to the level you're aiming for?
Philips S. Baker
executiveYeah. Well, look, I'd say some caution plays a role here, Joe — we need to be certain, as I mentioned, that we aren't driving the organization ahead too quickly. What caught us off guard, I think, was how well the organization could handle problems in a systematic fashion as they came up. We're now putting those systems in place so that we can do exactly that. Yes, it's going to require some time, but I have a great deal of confidence that during the next year, we'll reach that point. First off, we've selected the most seasoned, veteran personnel within our company, and they're dedicating their time. That's why Carlos is on site as part of this reorganization, with Brian overseeing what happens at both operations, Greens Creek and Keno — that gives us that leadership. And since that leadership will be nearby, I believe we're set on a solid course toward seeing these improvements. On the technical side, no, it isn't. There are difficulties, yes, but from a technical standpoint, every one of them can be handled. Carlos, would you care to add anything?
Carlos Aguiar
executiveSo really, it comes down to mentoring and training, plus doing our best to bring in the right people, keep them, develop them, move them up, and put the team together the right way.
Joseph Reagor
analystAll right. Then moving on to Casa — when you look at the long-range plan, do you happen to know, right off the top of your head, what the after-tax IRR is on that expansion?
Philips S. Baker
executiveYes. Once we finish the technical report, it will go in with our 10-K. The thing is, we didn't run an IRR, simply because with Casa we're sort of in the middle of the project right now. What makes Casa fascinating is that this year we'll be spending a small amount of capital. Over the coming few years, we ought to get some solid cash flows, after which there's a break, and then more spending. So an IRR wasn't something we figured out; however, we did figure out the discounted cash flows for it. Joe, we're getting a laugh out of this, since a director of ours posed that very same question.
Joseph Reagor
analystOkay, so what's behind my question is just a general guideline. If this weren't a functioning asset, then a CapEx above the after-tax NPV would imply an IRR sitting at 25% or below. I'm simply curious whether there's any chance whatsoever that you folks conclude some other deployment of capital beats that one.
Philips S. Baker
executiveI suppose the initial point I'd make is that what ultimately gets invested there is essentially only the stripping out of the pits, which is set to occur in 2028 and 2029; therefore it's fairly, and most of the machinery will already be on hand. As a result, very little equipment must be acquired compared with simply the expense of relocating the rock; we've got somewhere to put that waste rock; so I believe we certainly, we're able to run the numbers to determine what that would be once we've got really strong cash flow from now until that pause point when we're carrying out that stripping.
Russell Lawlar
executiveAnd then there's another point — you'll find this in the technical report — but those pits, the Principal Pit and the West Mine Crown Pillar Pit, pay back extremely fast, almost by 2030. So that stretch of spending across 2028 and 2029, plus a bit of 2030, gets recovered swiftly in 2031, 2032, and so on. So yes, that ties into what Phil just mentioned about how, even now, we're putting money into the surface fleet and so forth, positioning ourselves for this mine over the long term.
Joseph Reagor
analystAll right. And if I could, one last item. A few weeks back, I came across an article. Phil, I think your remark was that you folks view South America as a chance to perhaps grow the business and the production profile. Is that a long-term idea, or might there be room to pursue M&A within the coming 1 or 2 years?
Philips S. Baker
executiveJoe, the potential is always there to do it; and what we've stated consistently is that for silver assets, we're ready to go beyond the United States and Canada. For gold or any other metal, we won't do that, but for silver, we will consider it. That said, getting those transactions done is hard. So we won't, and we don't need to, force it; we're lucky because we have near-term growth; by 2026, we should reach close to 20 million ounces; in our portfolio, we actually have to count the operating properties. Within our portfolio, we hold 20 properties, half being silver assets, half being gold assets. And we want to move those forward. A number of them are kind of in the permitting stage. On some, we need to explore more. But within our portfolio, we do have the capacity to do things. That said, our long-term aim is to truly be the premier silver company, which means more production, and also to become, and this is a very long-term goal, also to become an S&P 500 company. And with more production and higher prices, which, as I said, are why we believe prices will go higher, we think that's something achievable over the long term.
Joseph Reagor
analystAlright, I appreciate the additional detail. I'll hand it back over.
Philips S. Baker
executiveOf course.
Don DeMarco
analystThanks, operator, and good morning, Phil. For my first question, perhaps piggybacking on what the previous speaker asked regarding M&A: when it comes to going after silver assets, we've noticed that a number of your competitors have found it difficult to bring in silver assets or have branched out into gold. I believe I picked up from you that silver remains your number one priority. You definitely wouldn't pursue gold beyond North America. That said, would you ever look at gold assets, or is any M&A you'd do, assuming it cleared all your hurdles, still squarely centered on silver?
Philips S. Baker
executiveSilver is unquestionably where our main focus lies. That said, we would look at gold and perhaps even additional metals located in the jurisdictions, in the areas where we run operations. We're in Alaska, for instance. We're in Yukon. We're in Idaho. We're in the Abitibi, Quebec. And geologically speaking, I'd describe what lies just over the border as identical. So, in those areas, would we look at commodities besides silver? Yes, that's the answer. Is that our top priority? No, but you certainly saw the ATAC deal we completed in the Yukon. In our view, that was a strategic acquisition that truly positions Hecla for very long-term potential involving things that might prove very, very meaningful; so yes, we're willing to look at those things.
Don DeMarco
analystAll right. Yeah, that logic holds up when you consider possible synergies across jurisdictions. All right. Turning to the production forecast, silver output is on the rise across the coming 3 years; a few years out, we see 20 million ounces at the top end of the range. Costs weren't included. We understand that. But over this period, how should we approach costs in our thinking? Should we assume they rise, stay level, or is there some guidance for modeling purposes regarding what trends to consider?
Philips S. Baker
executiveBroadly speaking, I'd say inflationary pressure will be present, which means costs will go up because of it. Let me address this initially regarding the overall amount of costs instead of per-unit figures. There will be modest upticks, yet at Greens Creek and the Lucky Friday, nothing of that sort. I don't expect any meaningful cost escalation. As for Keno, it's in a transitional—it will be going through a transitional phase. My view is that Keno will—the goal we'll likely hold over the long term, based on the exploration results we've obtained, is for that property to raise its throughput. Actually, within the technical report, we include an assumption that we reach, I believe, 550 tons or 600 short tons per day around 3 or 4 years from now. Consequently, additional dollars will need to be directed toward that site; yet once you examine it per unit, for Greens Creek and the Lucky Friday, it truly comes down to the byproducts and what those byproducts are priced at. If we remain at roughly the same price levels as today, I wouldn't expect much movement. Regarding Keno, I believe in time we can push costs down quite significantly, though it will require more tons; and I think securing some of those synergies alongside Greens Creek could end up benefiting both properties. Anything to add, Russell?
Russell Lawlar
executiveI'm on the same page as you there. When we look ahead, nothing stands out that we could identify as something that would dramatically alter how our costs are shaped — particularly when it comes to Greens Creek and the Lucky Friday. I'm approaching this from the standpoint of production costs as they are actually incurred, meaning what we shell out on a monthly or annual basis. At Keno Hill, a meaningful portion of the cost structure is made up of fixed costs. So as we manage to grow that operation and achieve greater throughput, we'll incur more variable costs, yet on a per-unit basis, those ought to decline; and then there are the byproduct credits Phil brought up, plus we also have treatment charges sitting in there. At present, my sense is that the treatment charge outlook ought to be fairly steady, though we'll find out — such things are capable of swinging around and, in fact, can affect how our costs are shaped too.
Philips S. Baker
executiveYeah, pretty dramatic to move them in Treatment Charges over time.
Don DeMarco
analystAlright. And for my last question, Phil, you brought up Keno Hill and how it's increasing output toward roughly 550 short tons annually. So how should we frame this? For 2024, you're looking at 2.7 to 3 million ounces of silver, and ought we connect that to the throughput figure? Actually, I'd assume that's 550 tons each day. So how do we think about daily tons in 2024?
Philips S. Baker
executiveThat's definitely something we're continuing to figure out, since we do have zones with higher grades. Broadly though, it lands somewhere from 3 to 400 tons per day; but once more, we won't force it. If we end up at the bottom of the ounces range, then we'll be at the bottom of the daily tons. If we land at the top of that range, then it simply means more tons that we've managed to process, so somewhere from 3 to 400 tons.
Don DeMarco
analystAll right. I really appreciate the responses; that covers everything I had, and I hope the remainder of the quarter goes well for you.
Philips S. Baker
executiveThanks.
John Tumazos
analystThanks. Did that $21 million inventory writedown come entirely from declining zinc prices along with zinc concentrates that were in transit?
Philips S. Baker
executiveJohn, the quick response there, as I see it, is that it comes down to Lucky Friday.
John Tumazos
analystSo John, when you look at the cash flow statement, that's what you're doing, right? The add-back that isn't cash. Right. On the cash flow?
Philips S. Baker
executiveYeah, there are a few elements there. To start, that ties back to Casa Berardi, and I'd call it the biggest piece of it, where the cost for each ounce, particularly once you factor in the charges that aren't cash, the depreciation included in inventory, a net realizable value write-down occurred there. And the reason it got sped up is that when we halted development of certain new resources or new reserves at the West Mine Underground, we accelerated depreciation since we expect mining there to be finished by mid-2024. So what we're seeing is that at Casa Berardi the non-cash charges have risen. And I believe if you dig into the 10-K, that level of detail will show up, showing those non-cash charges have increased. So that's what drives it most. Then there are also some movements at Greens Creek, where concentrate gets shipped, and you must true up estimates regarding what inventory sits in the concentrate barn. So those will move through there too, but Casa is mainly the reason. What I'd add is that you brought up the change in the zinc price, and what we've observed is that the zinc price has declined. A couple of points, though. When you look at the realized zinc price, it's actually fairly strong, because hedges we had in place meant we didn't have to accept that lower price, right? So for the quarter it's above $1.30. But beyond that, even with zinc at $1 or $1.10, both Greens Creek and Lucky Friday enjoy solid positive margins. So really, at neither of those mines are there NRV write-downs.
John Tumazos
analystIf I could ask one more thing. That $76 million tied to idle facilities — does most of it go away once Lucky Friday comes back in January, and then around the middle of the year when Keno Hill begins bringing in revenue?
Philips S. Baker
executiveThe brief response would be affirmative. Yes, you've got that right. During 2023, Lucky Friday was the main cause. Beyond that, a portion of it also came from Keno Hill, correct — operations there have been building up, and at Keno Hill our cost of goods sold basically equals our revenue, with remaining expenses flowing through that line. So if Keno Hill ends up producing more, that piece ought to get smaller too; plus a small amount, yeah, a small amount from Casa and certain Nevada operations is included in that figure.
Russell Lawlar
executiveRight, if you recall Casa, a fire broke out up in Quebec, and because of that, operations there had to be halted.
John Tumazos
analystThank you very much.
Philips S. Baker
executiveThanks, John.
Nick Giles
analystThanks, operator. Nick Giles here once more, speaking for Lucas. Could you give us some sense of how insurance payments might be spaced out over the year? I realize the initial proceeds arrived in February. After that, how should we view the schedule for reducing the revolver balance? Does lowering that balance depend on getting those payments?
Philips S. Baker
executiveNick, since this is an insurance company, I won't speculate about the exact moment they will pay us. That said, they have performed quite well, and just a couple of days ago they made a payment. What they've indicated, though, is that they expect it to happen at some point across the year—so merely sometime within that period. Regarding bringing down the revolver, it will depend on that as well as cash generated by our operations. So ideally, as our cash position grows, we'll reduce it.
Nick Giles
analystUnderstood, understood. All right, that's reasonable. Thanks for the detail. Good luck.
Philips S. Baker
executiveThank you. Thank you, Nick.
Philips S. Baker
executiveAll right, so thank you all for joining us on this call. Just a quick note — if you'd like to sit down with us one-on-one, there's still time to set that up within the next 1 or 2 hours. Should that timing not suit you, don't hesitate to get in touch with Anvita, and we'll gladly find another slot for you. We truly appreciate the interest, and I firmly believe we're now in a spot with silver unlike any we've occupied previously, and we intend to keep spreading that message so people grasp what's taking place in the silver market amid solar's expansion. So many thanks, and I'll be speaking with you again before long.
Operator
operatorThis concludes today's call. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hecla Mining Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hecla Mining Company or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.