Hecla Mining Company (HL) Earnings Call Transcript & Summary

February 14, 2025

New York Stock Exchange US Materials Metals and Mining earnings 53 min

Earnings Call Speaker Segments

Anvita Patil

executive
#1

Good morning, Kate, and thanks to everyone for being with us on Hecla's Q4 2024 Results Conference Call. I'm Anvita Patil, and I serve as Vice President of Investor Relations and Treasurer. Our earnings release, which came out yesterday, and the presentation we're using today can both be found on our website. Joining us on the call this morning are Rob Krcmarov, our President and Chief Executive Officer; Russell Lawlar, Senior Vice President and Chief Financial Officer; Carlos Aguiar, Senior Vice President and Chief Operating Officer; Kurt Allen, Vice President of Exploration; and Matt Blattman, Vice President of Technical Services. Once our prepared remarks are finished, all of us will be here to take your questions. Any forward-looking statements the management team makes today fall under the Private Securities Litigation Reform Act and carry risks, which are laid out on slide two, in our earnings release, and in the 10-K and 10-Q filings we've made with the SEC. Those risks, along with others, might cause actual results to differ from what the forward-looking statements project. Non-GAAP measures referenced on this call and in the related slides are reconciled either in the slides or in the news release. One reminder: if you'd like to schedule a call with management, you can do that through the link under the section Virtual Investor Event in the earnings release that was issued yesterday. I'll now hand the call over to Rob.

Rob Krcmarov

executive
#2

Thanks, Anvita, and good morning to all of you. When I came aboard at Hecla roughly 3 months back, I kicked off a deep-dive examination of both our operations and our strategy. By this point I've been to every one of our mines except a single one. Truth be told, a winter storm pushed back my trip to Keno Hill, which I'll get to within the coming 2 weeks. Through those visits, plus a great deal of conversation with employees, investors, and stakeholders, I've shaped a sharper picture of what lies ahead for Hecla and which opportunities we can seize. What first attracted me to Hecla, I suppose, was the remarkable legacy here: 134 years as a silver industry leader, with high-quality, long-life mines in premier jurisdictions. And now, after seeing our operations with my own eyes, my confidence in this company's potential has only grown. Those high-quality, long-life mines in premier jurisdictions give us an outstanding foundation, and I must say the quality of our management team has genuinely impressed me. Three key pillars support our operating portfolio. Greens Creek and Lucky Friday, our cornerstone operations, keep turning in strong performance and robust cash flow. Keno Hill remains the biggest area where we see growth ahead. That said, getting it fully up to speed has been tougher than I originally anticipated. Even so, we have a well-defined plan in place to reach steady, profitable output there — it just won't happen overnight and will call for targeted spending over time. When it comes to Casa Berardi, we've realized the operation has not delivered the promise we saw in it when we bought it. It does hold potential going forward, but the money it demands and the amount of management attention it absorbs have prompted me to ask our team to look at every strategic option available for getting the most shareholder value out of that asset. As we move forward, four core strategic pillars will guide us, and each one rests on our dedication to leading on ESG. To start, we're dedicated to operational excellence by constantly getting better—rolling out standardized operating systems at every location, putting money into automation and sophisticated analytics, pushing ongoing gains in managing costs, and creating capabilities for decisions in real time. Next, we're refining what we own to get the most value possible; that started with our strategic review of Casa Berardi, and we're looking at a broad set of exploration assets and investments to free up value. So even though growing Keno Hill organically is still our main priority, we're putting together a strategic, disciplined M&A framework that draws on our core strengths to generate significant value. Also, we're sharpening our attention on fiscal responsibility and giving back to investors. We've put in place a strict system for allocating capital that prioritizes generating free cash flow and measuring returns on investment against defined hurdle rates. Being disciplined in this way ought to reinforce our balance sheet, create financial flexibility, and produce steady returns for shareholders. And fourth, our strategic emphasis on producing silver in the U.S. and Canada keeps generating outstanding value. Thanks to an expanded silver reserve base across North America and operations focused in Tier One jurisdictions, we're well positioned to satisfy rising demand from the green technology and renewable energy industries. With our growing presence across these reliable jurisdictions, paired with a cost framework that leads the industry, Hecla holds distinct benefits when it comes to seizing fresh opportunities. At the same time as we offer investors asset security that has no equal, this unique standing in the market, in my view, truly distinguishes Hecla and justifies a premium valuation, especially given the intricate and fast-moving global landscape we face today. Naturally, what supports these pillars is our steadfast dedication to ESG leadership within mining, and achieving success hinges on responsible environmental care, robust partnerships with communities, and ever-stronger ties with First Nations and, indeed, every stakeholder. So allow me to point out what we accomplished during 2024, laid out on slide four; we turned in robust operational results, hitting our consolidated guidance for both silver output and costs while surpassing our targets for gold production. Through our strategic exploration efforts, we successfully held our silver reserve standing, which ranks as the second largest ever recorded by the company, with especially impressive outcomes at Keno Hill, where reserves grew 17%. We posted record revenues for 2024, fueled by elevated metal prices and dependable input from each of the four mines we operate. Above all, our cornerstone properties, Greens Creek and Lucky Friday, produced $228 million in free cash flow. This strong showing, I believe, let us push forward with strategic investments into developing Keno Hill while carrying out focused upgrades at Casa Berardi. And Russell is going to cover the financial specifics shortly. We have likewise reshaped how we handle returns to shareholders. Following thorough deliberation, we are keeping our base yearly dividend at $0.015 as we back essential priorities, namely putting capital into organic growth, reinforcing our balance sheet, and providing dependable and lasting returns for shareholders. I will pass the call to Russell now so he can give a thorough financial review.

Russell Lawlar

executive
#3

Thanks, Rob. I'll begin on slide six. Through our 2024 strategy, we hit three main goals: making the balance sheet stronger, cutting leverage, and increasing production. Those objectives were met even with operational difficulties, and Carlos will go into that later. As we look to 2025, we're making bold moves to boost our financial flexibility. One major strategic call was doing away with the dividend tied to silver. That decision wasn't simple, but we think putting money back into our organic growth prospects will generate far greater shareholder value than paying out dividends. The cash that's freed up will also speed up our deleveraging efforts. How strong our core assets are shows in the $228 million of free cash flow that Greens Creek and Lucky Friday produced this year. That result extends their outstanding record, since they've generated more than $800 million of free cash flow in 2020; this powerful cash generation and the related EBITDA let us greatly enhance our net leverage ratio, moving it from 2.7 to 1.6 times, even as we invested $215 million of capital throughout our portfolio. Now on slide seven, like Rob said, we brought in record revenues above $900 million this year, and 44% of that came from silver, 34% from gold, with the rest from base metals. We also got a modest amount of revenue from copper this year — the first time in decades that Hecla has earned revenue from copper; on top of that, our realized silver price rose almost 23%, while our cost per ounce held steady and rose only 11%, which helped our margin per silver ounce grow from 50% in 2023 to 54% in 2024. This extra silver margin plus higher revenue drove record-adjusted EBITDA, which kept lifting our net leverage ratio. As this slide points out, we've made major strides in strengthening our balance sheet and deleveraging the company; even so, we're not happy with how far we've come. In time, we anticipate paying off the revolver entirely while also building up cash on our balance sheet, aiming to get our net leverage ratio below three times. And further out, we plan to keep lowering our debt on a gross basis so we can unlock more cash flow to put into organic growth inside our operating portfolio; given our solid asset base and rising silver demand, I'm sure 2025 will be another successful year for our strategy of strengthening the balance sheet, investing in our assets, and producing free cash flow. I'll hand the call over to Kurt now.

Carlos Aguiar

executive
#4

Thanks, Russell. If you go to slide nine, you'll see why Greens Creek is the bedrock of what lies ahead for us. It's what provides steady, dependable production and cash flow. During Q4, silver output from the mine reached 1.9 million ounces, and across the entire year it came to 8.5 million ounces. Output in Q4 was constrained by equipment issues and limited ability to reach high-grade zones, but because equipment improved and backfill rates got better during Q4, we anticipate silver grades climbing in early 2025. Our operational footprint covers 45 areas that are organized into six zones. We produce five metals that are saleable, and silver output remains unchanged from one year to the next at 8 to 9 million ounces. As for 2025, our forecast is 8.1 million to 8.8 million ounces, reflecting the planned sequencing at the main mine plus lower precious metal grades and a greater share of zinc. On costs, we foresee an increase in cost per ounce. The pressure stems from higher labor expenses — a challenge at every one of our sites, and across the wider industry as well — and from more expensive power, since the hydro utility serving the mine is undergoing maintenance work, and because snowpack and precipitation have been reduced, we're using diesel to move tons. We're also lifting capital guidance as engineering and construction get underway for the next dry stack tailings expansion, which will extend capacity through 2040. Thanks to our exploration program, the mine's 12-year reserve life has been maintained. During 2024, the mine brought in $147 million in free cash flow, contributing to an impressive $2 billion in free cash flow since production began in 1986. With over 30 years of successful operation and considerable reserves remaining, Greens Creek has a strong future for continued growth. Now on slide 10, Lucky Friday delivered a record-breaking operational year in 2024 — the most tons mined and milled, the most zinc produced in its 80-year history, and the highest silver and lead production since 2000. One point deserves emphasis: we achieved our strongest safety record ever, with an injury frequency rate of 1.4 over a full year of production. Silver output from the mine came to 4.9 million ounces during 2024, and Q4 was especially strong — 1.3 million ounces, backed by 1,180 tons per day, which resulted from a favorable mining sequence and improved grades. For the full year, all-in sustaining cost was $16.50 per ounce, beating our guidance, due to higher labor expenses and heavier dependence on contractors. Even so, we anticipate contractor-related costs dropping in 2025 as additional positions are filled. We generated $82 million in free cash flow during 2024, which includes $50 million connected to insurance receipts. Turning to 2025, we expect the mine to produce between 4.7 million and 5.1 million ounces of silver, and our all-in sustaining costs ought to fall in a range similar to 2024's. When it comes to capital, we're allocating additional funds at the plant to improve the surface cooling infrastructure. This matters a lot — it helps us keep throughput consistent as mining goes deeper within a 17-year reserve life, and it also aligns with the site's zero-discharge goal. The record-setting results achieved following the 2023 secondary escapeway fire show plainly how capable this management group is and how well they handle difficult situations. As our second cornerstone asset, this mine is well positioned for another solid 2025 — robust free cash flow, dependable output, and continuous enhancements. Pair that approach with disciplined capital spending and favorable geology, and the business is built for lasting success. Moving to slide 11, Keno Hill achieved the 2024 production target it had set, delivering 2.8 million ounces of silver even while dealing with operational and social hurdles. During Q4, the mill averaged 250 short tons per day processed, though a 25-day mill shutdown tied to dry stack tailings facility permitting, along with 10 days of power curtailments from Yukon Energy Corporation, reduced that output. Those power limits are anticipated to persist through Q1 and ought to be resolved by mid-2025, when hydroelectric turbine repairs are slated for completion. We've established a clear two-phase plan designed to reach sustaining profitable production at Keno Hill. Phase I focuses on reaching and maintaining 440 short tons per day of throughput by advancing essential infrastructure work, including the cemented tailings backfill plant, water treatment facilities, dry stack tails, and mine development. Despite permitting delays, these investments are highly important for future production growth. Phase II aims at boosting throughput to approximately 600 short tons per day, which is vital for profitability at this remote location given the mine's heavy fixed costs. That phase requires further infrastructure spending and additional permits. Beyond the technical side, we also rely on strengthening relationships with First Nations and the Yukon Government, serving as a reliable long-term partner. It's encouraging that the Yukon Premier is concentrating on making permitting more efficient and supporting established mining partners, and our ties with the Yukon Government are building positive momentum. The Premier has shown strong support through moves to steer resources toward power infrastructure needs, work on a charter involving major mines departments, and collaborative approaches to resolving operational challenges. Although obstacles remain, including permitting for the Phase II expansion, positive momentum keeps building; for 2025, Keno Hill expects silver production of 2.7 million to 3.1 million ounces, with quarterly production costs between $15 million and $17 million. Turning to 2026, we anticipate output will climb as we progress toward our Phase I target of 440 tons per day. Reserves went up 17% during 2024, hitting 65 million ounces — a major achievement that really underscores the potential this district has. Kurt is going to take you through the exploration resources shortly. Sure, there are near-term challenges, but by building infrastructure carefully, maintaining solid relationships with stakeholders, and growing our resource base, we are creating a strong foundation for Keno Hill's long-term success. Turning to slide 12, you'll notice Casa Berardi produced 87,000 ounces in 2024, at an all-in sustaining cost of $1,990 per ounce. The mine's transition is expected to finish by mid-2025, after which it will run purely as a surface operation. Everything there will center on the 160 Pit, and with the strip ratio declining, that should bring improved economics and stronger free cash flow. As for what lies ahead at Casa Berardi — the current operating plan extends through 2027. After that comes a 5-year development phase, focused mainly on permitting, infrastructure, dewatering, and pre-stripping tied to 2 new open pits: the Principal Pit and the West Mine Crown Pillar. Those undeveloped pits carry substantial free cash flow potential, though because of the lengthy gap without production, the company decided to look at strategic alternatives for the asset, which was announced this past November. That review is still ongoing, and an update will come sometime later this year. With that, I'll hand things over to Kurt so he can discuss our exploration results, including the $15 million to $17 million range, along with 2.7 million to 3.1 million ounces and 4.7 million to 5.1 million ounces.

Kurt Allen

executive
#5

Thanks, Carlos. On slide 13, you'll see that starting in 2018, we've generated 99 million silver ounces, and our silver reserves have grown by 49 million ounces, reaching 240 million — which ranks as the second largest silver reserve in the 134 years this company has operated. Because we pull more ounces out of the ground annually, focused drilling lets us replenish that silver reserve base. Over the past year, Keno Hill grew its reserves by 17%, Greens Creek came close to offsetting what mining depleted, and Casa Berardi more than made up for production while adding a modest gain. Turning to slide 14, exploration work at Keno Hill keeps showing major upside through drilling programs both underground and at surface. At the Bermingham Deep Target, we hit the widest silver bearing zone ever recorded beneath the Northeast Ore Zone. The evidence points to closeness to a newly identified ore shoot, where an interpretive vein intersection seems to govern the structure. These results have me genuinely enthusiastic. Over at the Inca Vein, we outlined more than 800 feet of mineralized strike length. Among our notable drill hole intercepts, we recorded 26.1 ounces per ton of silver, 20.9% zinc, and significant indium credits, and this was found over a striking width of 14.3 feet; these findings give us further confidence in our exploration model and continue to demonstrate the outstanding mineral potential of this district. On Slide 15, you'll see strong support for our latest discovery at depth in the Bermingham system. The slide contains two important views: one is a cross-section of the Bear Vein system, and the other is a longitudinal section of the Footwall Vein. Both sections are contoured using silver grade times thickness values, which underscores just how strong the mineralization is. At the Bermingham Footwall Vein, a major new mineralized shoot has come to light. It reaches downward along the plunge from the high-grade sections located in the vein's upper portion, sits parallel to the Arctic Fault, and goes far beyond what had been anticipated for this region. Significant silver grades and widths showed up in intercepts we received this quarter, in places that had earlier been described as holding lower-grade stringer mineralization, with one reaching as much as 53.8 ounces per ton of silver across 15.3 feet. Our most recent drill hole, positioned 140 feet deeper and along the plunge, cut a broad 55-foot zone of stringer mineralization holding two robust veins that carry galena, sphalerite, and tetrahedrite in varying quantities. We're still waiting on assay results for the most recent intercept, but what we can see in the mineralization points to the high-grade shoot continuing to extend deeper. That structure hasn't been closed off yet, so there's room to grow the resource and real upside there. Findings like these keep sharpening how we understand the district geologically and strengthen our belief in just how much mineral potential it holds. Every fresh intercept both builds out the resource base and gives us a better read on the structural picture of this remarkably well-endowed district. With that, I'll hand things back over to Rob.

Rob Krcmarov

executive
#6

Thanks, Kurt. Now, turning to slide 16 and what we're expecting for 2025, our silver output should stay roughly in line with what we saw in 2024 — somewhere between 15.5 and 17 million ounces — while gold production looks set to fall off as Casa Berardi shifts entirely to open-pit operations. On a consolidated basis, we expect cost per ounce to rise somewhat, pushed up by greater labor expenses at both Lucky Friday and Greens Creek, along with power generation costs across a couple of months. And lastly, the money we're putting into capital projects sets us up to keep production steady at our core assets even as we push our growth efforts forward. Capital spending ought to come in a bit higher than 2024, mostly to support our production profile at Greens Creek and Lucky Friday, while over at Keno Hill and Casa Berardi, the investments we're making should deliver added production and cash flow down the road. So with that, Kate, let's go ahead and take questions from the call.

Nick Giles

analyst
#7

Thanks, Operator, and good morning to all of you. Everyone, congratulations on the solid headway made here in Q4. My initial question concerned Casa. Clearly, we are anticipating reduced strip ratios and somewhat better free cash flow during the second half, but I wanted to ask whether you might lay out the strategic review process, and does a specific timeline exist? Might you consider a full sale rather than selling a stake? What factors are under consideration? Many thanks.

Rob Krcmarov

executive
#8

Thanks for that question, Nick. Every option is being examined, and that encompasses a possible divestment of any kind or structure; we are also focused on genuinely enhancing our operating plans. As you know, at present we expect roughly a 5-year gap between when production wraps up at the F-160 Pit and when output begins at the Principal Pit. That represents a lengthy lead time, and we truly don't know how gold prices will appear 5 years from now, yet at today's gold prices, the Principal Pit in fact generates some extremely robust cash flows. Thus it is genuinely a trade-off pitting bringing value forwards via a possible divestment against waiting it out, refining our operating plans, and considering capturing cash flows somewhat further down the line. I anticipate we will hold a clearer, more cohesive perspective in Q2.

Nick Giles

analyst
#9

Rob, thanks for all those details. My follow-up was simply that the net leverage ratio has come down quite sharply thanks to some better earnings. And I believe you mentioned a fresh target, but I didn't quite hear it clearly. So if metal prices stay strong and you can reduce the revolver, how should we view the odds of more capital returns against perhaps accumulating extra dry powder for some of those organic growth opportunities you brought up?

Russell Lawlar

executive
#10

Yeah, yeah. Good morning, Nick. This is Russell. Yeah, regarding that new target, what we've previously stated is that we essentially have a ceiling of two times the net leverage ratio. We went over that ceiling. We've gotten ourselves back into compliance, and actually we're now under that threshold, and we've made a lot of headway with that deleveraging; staying below a target of less than one time has always been our goal, so I'm not sure there's anything particularly new in that. I'd say we're just approaching our target. On the cash generation side, obviously getting off the revolver and accumulating some cash on the balance sheet is going to be one of our strategic priorities. At the same time, we have to continue investing in our business, both the capital — you can see that in the guidance we released yesterday — and the exploration, since that represents the future of our company. We have to weigh several priorities at once: reducing what we owe on the revolver, growing our cash reserves, and putting money into the business. My view is that we can grow that cash position even while funding those investments. You also saw us do away with the dividend tied to silver, since we believe the cash we bring in can be put to work more profitably inside the company than it would have been through that payout.

Nick Giles

analyst
#11

Russell, I really appreciate that thorough explanation. If I may, just one more question. When is the hydro power utility's maintenance scheduled? In what way did that alter your cost guidance?

Russell Lawlar

executive
#12

Broadly speaking, as far as when, it will happen at some point in the middle portion of this year. Yet we're also observing right now — in fact, we're already running on our generated power at Greens Creek sooner in this year, and even at present — so altogether, on an as-produced basis, it has raised our costs by roughly $5 million, just so you have some idea of the magnitude.

Nick Giles

analyst
#13

Understood, understood. Well, Russell, Rob, and everyone on the team, keep it up and all the best.

Russell Lawlar

executive
#14

Thanks.

Joseph Reagor

analyst
#15

Hey, everyone. I appreciate you fielding the questions. And it's really refreshing to hear phrases such as return on capital investment rather than growth. So with that in mind, regarding Casa, is there a result you'd lean toward? You're discussing the various options, but does one stand out as preferable? Would a straight-up sale be more appealing since it helps support the balance sheet, or is it a case where selling it would somewhat harm future production, so you'd rather hold on to it?

Rob Krcmarov

executive
#16

If someone came to us with a compelling offer for a straight-up sale, we would put those proceeds to work to keep delivering. That matters to us. The projected future cash flows, like I mentioned, could be more than 5 or 7 years away, and though that looks appealing at this moment, we'd be taking a risk on where the gold price would be at that point.

Joseph Reagor

analyst
#17

Yeah, that's reasonable. And regarding that gap of five years, I believe it was closer to a gap of three years previously. Has permitting alone extended it out to two?

Rob Krcmarov

executive
#18

That's right. Yes. Yes, a bit of detail.

Carlos Aguiar

executive
#19

Yes, it comes down to permitting. Getting permits has proven harder than what we had initially expected, and we intend to get things moving on schedule again, though permitting remains the primary factor behind this.

Joseph Reagor

analyst
#20

Alright, that's reasonable. Moving to Keno — given the power issues we faced early in the year, and Rob, I realize you've only just arrived, though it's something you plan to address — do you have any sense of what has to shift for that asset to turn cash flow positive? Have you already spotted any major items?

Rob Krcmarov

executive
#21

Yes. The key is that we keep putting money into infrastructure. At present, our permit allows a maximum of 440 tons per day, yet that isn't the final target; we have to reach 600 tons per day, mostly due to the heavy fixed costs Carlos mentioned. The site is far from everything. Expenses have come in above what we expected. Reaching 600 tons per day is what we're ultimately aiming for. To make that happen, more infrastructure spending is required. That covers the mill, water treatment plant, tailings, power, camp space, everything of that nature; all of it depends on securing new permits. Permits have been something of a bottleneck. We can see a route to hitting 600 tons per day.

Joseph Reagor

analyst
#22

All right, and have you folks sort of weighed internally the option of maybe pausing operations for a while until those permits come through, as opposed to keeping things running?

Rob Krcmarov

executive
#23

Yeah. What I'd say is, our investments get reviewed on an ongoing basis. So should it make sense to shift into care and maintenance mode and resume at a later point, that's something we'd definitely look at; however, at this moment, the conversations we've had with the Yukon Government have left us feeling encouraged. And once more, should permitting delays look like they'll persist, we'll take another look at where we stand.

Joseph Reagor

analyst
#24

Alright, thanks. I'll hand things over.

Rob Krcmarov

executive
#25

But I do want to mention, yes, it's been heartening to see some of the conversations we've had and the renewed contacts we've made with the Yukon Government — not only the premier, but the mining minister, Yukon Power as well; every one of them gets that we can't keep waiting forever on permits.

Joseph Reagor

analyst
#26

Okay. Thank you.

Rob Krcmarov

executive
#27

Thanks, Joseph.

Kevin O'Halloran

analyst
#28

Hi, Rob, and hello to the rest of the team. I appreciate you fielding my questions. Perhaps I'll begin where the previous one left off, at Keno — quite similar territory — but regarding the permits, what timing do you currently anticipate for obtaining them? And after those permits are in hand, how long would it take to construct the infrastructure components, such as the water treatment and backfill facilities?

Rob Krcmarov

executive
#29

I'll begin with the permitting side, and then hand things over to Carlos regarding infrastructure. So let me rewind slightly here, Kevin. Progress has been achieved on permitting, yet difficulties persist. In January we sat down with the premier and his team, and the Yukon government has recognized that permitting must stay on schedule and that responsible firms such as Hecla are needed. He grasps that our company has operated for 134 years, and he also grasps that at Greens Creek we possess an outstanding environmental track record and that we hold the social license required to be serious producers in the Yukon. That commitment has therefore been shown via a number of key initiatives. He is consequently committing that a charter will be developed together with the major mines department. Resources will be allocated to tackle those power infrastructure requirements; and indeed, he directed his department toward a more collaborative approach in seeking operational solutions and genuinely attempting to generate efficiencies within the permitting process for established operators. Now, clearly, matters were paused last year owing to the heap leach failure at the Eagle Gold Mine, which of course we do not own. And so although this positive momentum and the partnership with the Yukon government encourage us, we will keep engaging with the First Nations; and thus permitting remains a substantial risk on the path to that 600 tons per day I mentioned, which is the critical threshold for reaching profitable production. But given the premier's demonstrated support, his encouraging words, and the actions he is about to take, we believe we ought to make steady progress toward our goals during this year.

Carlos Aguiar

executive
#30

When it comes to projects, our focus is on carrying them out over the coming 2 years, and those efforts will enhance and maintain Phase I — that's the 440 tons per day. Once that's done, naturally, we'll take another look, and moving up to the 600 tons per day level will likely require an additional 2 years.

Kevin O'Halloran

analyst
#31

All right. Thank you. I appreciate that detail, and maybe just regarding the expenses at Keno, could you help us understand what share of them is fixed? Looking at the costs you reported this quarter, approximately what portion would you classify as fixed rather than variable?

Russell Lawlar

executive
#32

Yeah. Providing an exact percentage would be difficult. However, they're mostly fixed, since when you consider the site itself — given that it's a remote operation — there's a charter, there's a camp, there are people rotating in and out, that kind of thing; so because of all that, you'll find fixed costs are higher. And as Rob had mentioned, the way for us to overcome those will be higher throughput.

Kevin O'Halloran

analyst
#33

All right, that's clear. Then my last question concerns the Lucky Friday CapEx — roughly what portion goes toward the cooling project? Does that account for the entire growth CapEx? And perhaps following on from that, what share is mine development, just so I can gauge what a normalized capital spend might look like in future years?

Carlos Aguiar

executive
#34

Mine development at the Lucky Friday comes to approximately $20 million, while the surface cooling system runs about $13 million over the next year. After we finish this project in the years ahead, capital for the Lucky Friday will come down.

Kevin O'Halloran

analyst
#35

Okay, that sounds fine. Appreciate you answering my questions. I'll hand it over to the following caller.

Rob Krcmarov

executive
#36

Thank you, Kevin.

Heiko Ihle

analyst
#37

Hi, Rob, and hello to everyone else. I appreciate you fielding these. Over at Lucky Friday, it appears operations are firing on every cylinder right now. That said, setting aside the figures momentarily, could you give us some flavor regarding what adjustments you anticipate occurring at the site during this quarter and afterward that might drive even better efficiency and output? Perhaps you could even put a figure on how significantly each of those separate elements will move your production? After all, we've basically reached the midpoint of Q1 as we speak.

Russell Lawlar

executive
#38

Heiko, the audio isn't coming through clearly on our side, so allow me to try rephrasing what you asked. Let me know whether I capture it correctly. Yes, regarding Lucky Friday, your assessment is accurate. The mine enjoyed an excellent 2024, particularly given how we recovered following that fire. Right. As was noted earlier during this call, the management team — and I want to emphasize this — is exceptionally well qualified. Consequently, we anticipate Lucky Friday will keep delivering strong results going forward, providing a steady foundation and reliability well into the future. I suppose I'm somewhat — I had difficulty catching the specifics of your inquiry concerning our expectations for Lucky Friday over the shorter term?

Heiko Ihle

analyst
#39

Could you put some numbers on the efficiency gains and output shifts we ought to anticipate during Q1 and perhaps further out, if possible? Put differently, what work is being carried out, and what work has been carried out over the past 6 weeks from the start of the year that might not have shown up in the Q4 figures?

Matt Blattman

executive
#40

Hello, Heiko. Matt Blattman here. That one will be tough. As you're aware, the deeper we go and the further we move from our main access point, the tougher it becomes to locate efficiencies and bring costs down. That isn't to claim they won't exist, but my sense is you won't witness quantum-level shifts. What we'll get is continuous improvement — gradual and consistent. We should confirm that each change delivers gains; and keep in mind as well, Lucky Friday achieved record production during the past year. Attempting to top your own record annually becomes tougher and tougher.

Heiko Ihle

analyst
#41

All right, that's reasonable. Your press release mentions that Casa's expenses for the back half of the year will be somewhat reduced. Still, could you give us some additional detail on what to anticipate each quarter? What I'm getting at is, where ought the analyst community plug in for Q1 — I suppose by tomorrow we'll effectively be midway through that quarter — and perhaps Q2 as well, relative to the rest of the year, in figures we can actually quantify?

Russell Lawlar

executive
#42

Yes. Heiko, I'll kick things off, and Carlos is welcome to chime in and add anything needed. Obviously, Casa Berardi today runs as both an underground mine and a surface mine, correct? So around mid-year, our expectation is that the underground portion wraps up, since at that stage we anticipate the surface mine being capable of feeding the mill. Once that occurs, the underground's costs go away. Then on the surface side, regarding the stripping ratio, we also expect that figure to decline; therefore, we ought to incur fewer surface-related expenses. One thing to note is that we don't provide quarterly guidance, and that's a deliberate choice, because as we progress through 2025, much like during 2024, circumstances shift, and we'll handle them as they arise. Consequently, on the quantification front, we couldn't really furnish any quarterly figures, only that we'd anticipate costs declining during the latter half of the year as the underground drops off and surface costs shrink too, with the strip ratio and waste haulage falling away; and honestly, those efforts will center on ore haulage and ore mining. Anything you'd like to tack on there?

Carlos Aguiar

executive
#43

Correct. Two requirements have to be satisfied during the back half of the year — the period that matters most. The first is that the open pit will be able to keep pace with the mill running at its highest throughput.

Heiko Ihle

analyst
#44

Let me try asking that in a slightly different way, then. If a company moves to an operation that is open pit only, how many quarters do you figure it takes before the cost savings show up completely in the reported figures?

Russell Lawlar

executive
#45

What I'd say is that when we watch the underground come off, if that happens partway through the year, some expenses will carry on while we figure out how to proceed with the underground; and that means continuing to keep it open for exploration, and so on. We'll keep making those calls. So my sense is you'd likely see a Q4 that ought to be stronger than a third, looking at it that way, since a few carry-on costs will probably be tied to the transition during Q3.

Heiko Ihle

analyst
#46

Right, you picked up on exactly what I was driving at there. Thanks a lot.

Rob Krcmarov

executive
#47

Thanks.

John Tumazos

analyst
#48

Hey, Rob. Good to see you on board.

Rob Krcmarov

executive
#49

Thanks.

John Tumazos

analyst
#50

You know how Montana enacted a special purpose law aimed at the company you succeeded, in an effort to hold back Montanore and Rock Creek from moving forward. Have you managed to sit down with anyone from Montana's government? And how do things look when it comes to speeding up those two projects? I've looked up to them for all my grown-up years.

Rob Krcmarov

executive
#51

That's a fair question, and I get why you hold them in high regard. What grabbed me right away was the incredible mineral endowment — 300 million pounds of silver and 3 billion pounds of copper at 0.7%. The scale of the opportunity definitely caught my eye. As far as updates go, right now we're essentially working through a permitting strategy. The Forest Service's draft EIA for the Libby Exploration Project is in its final week of public comment. Roughly 1,500 comments have come in. Honestly, looking ahead, the Forest Service will have 30 days to respond to those comments. Then there'll be a decision on issuing the final EIA. Should it be approved, a FONSI gets issued, and that would be followed by a 45-day objection period plus a 30-day period for objection responses. Depending on what sort of objections the U.S. Forest Service receives, the project's updated plan of operations could get approved in Q3 2025. I haven't sat down with them myself, but clearly our team has been meeting with the regulators often. We're in that comment period right now, John.

John Tumazos

analyst
#52

When it comes to Casa Berardi, there's a lot of exploration happening, as you're aware, along that east-west trend, possibly running from Cochrane and the Detour Mine in Ontario right through to Fenelon, Wallbridge, other companies, Maple Gold Mines, Estrades, various projects. Do you figure that within our lifetimes a major east-west highway could exist from Cochrane across the trend, or a north-south highway, to make access better, which would bring down operating costs at Casa Berardi? Might it be worthwhile to perhaps put the mine on idle and hold out for improved conditions, once the neighbors catch up and the area turns into a more flourishing mining district?

Rob Krcmarov

executive
#53

That's a fascinating idea. Should we end up keeping Casa Berardi, that result would definitely be something we'd be glad to see. Still, John, I honestly can't say. Whether infrastructure money would go in, which party would put it up, and when it might happen — those things I just don't know. Even so, I do appreciate the direction your mind is taking.

John Tumazos

analyst
#54

Let me just add one more question, and I don't mean this as a criticism of how things were planned a year or two back, but the camp and the fixed costs up in the Yukon were common knowledge prior to the Alexco buyout and before Wheaton Precious Metals bought the stream. Have the camp costs and the mining costs come in at double what was anticipated? And clearly, the silver price is stronger, around $10 an ounce. So it's puzzling to me that 600 tons a day is required and that 400 tons a day won't get the job done.

Russell Lawlar

executive
#55

John, once more, I'll step in here, and Carlos is welcome to add his thoughts too. Yet when we examined this project, we understood it would carry a significant fixed cost. I believe Rob also noted that bringing it up to speed proved tougher than we had anticipated. Regarding the money we've put into infrastructure, and honestly, the money still going in, certain tasks have come up that we hadn't figured on having to handle. So from the standpoint of expenses, that's among the areas where we might have been more precise.

John Tumazos

analyst
#56

So the $10 an ounce good surprise on the silver prices, and.

Russell Lawlar

executive
#57

Remember, at this moment we remain within that period of ramping up, correct? So as of now we are continuing to construct what we need in terms of infrastructure, installing all of those kinds of elements. Of course, the rise we're seeing in silver prices does provide some help. Even so, at present we haven't yet reached that level of 400 tons per day. There are things we must put into position before we can arrive at that point.

John Tumazos

analyst
#58

I appreciate it.

Mike Parkin

analyst
#59

Hello everyone, and thank you for fielding my inquiries. You mentioned Rock Creek briefly, specifically regarding its enormous mineral endowment. Rob, before you consider any possible divestiture there, do you feel you'd like to gain a bit more exposure to what the American exploration portfolio might hold? It appears you're sitting on a collection of projects, and the market conditions for selling could be outstanding. What are your early impressions now that you've been in this position for a few months?

Rob Krcmarov

executive
#60

Yes, I appreciate that, Mike. We are absolutely not going to discard the good along with the bad in this situation, and I fully plan on dedicating some time in Nevada during spring and summer, when the rocks are exposed and conditions like that are present, so certain opportunities have me feeling enthusiastic. Regarding our exploration budget for this year, it will be limited, and allow me to elaborate on that a bit, because essentially we have deliberately kept our exploration expenditures beneath what I believe are the industry averages for businesses our size, and this is genuinely an intentional approach rather than a restriction. Across our portfolio, we possess a fairly strong pipeline of high-quality targets. A lot of those sites are located in Nevada, which you correctly note, though our spending on exploration is being handled in a pretty deliberate way, and ultimately it's a question of where capital makes the most strategic sense. As you know, the mines we operate already have very long remaining lifespans, which means we can be flexible about when to run our exploration work; so under the financial conditions we're facing right now, I'd say we'd put that money toward other essential investments first, such as Keno Hill. That said, it doesn't make our exploration prospects any less promising. The main thing to understand is that the amounts we're spending on exploration and drilling are a result of disciplined capital allocation, not because we lack opportunities. As I mentioned, we have plenty of high-potential targets, and we'll evaluate them methodically as our capital priorities shift. It really comes down to making the best use of our resources in the current environment. Once we begin producing more free cash flow, I believe there will be a strong case for putting more money into exploration and moving our best projects forward through stage gates and key decision points. So yes, I'm genuinely enthusiastic about some of the projects in our portfolio. We've also flagged some additional ones that likely won't stay in the mix. The real objective, though, as you're aware, is to keep improving what we hold—rather than letting a bunch of inactive initiatives just sit on the shelf.

Mike Parkin

analyst
#61

Great. And then only recently, we saw B.C. roll out an expedited approvals pathway. Is there any signal you're picking up that Quebec could introduce something along those lines via its government, which might serve as a tailwind for Casa regarding the schedule for the future open pit plan?

Rob Krcmarov

executive
#62

That question, Mike, I can't answer. Right now we're working on bringing aboard a VP Sustainability. That individual brings a great deal of experience with permitting. So before long, we should be able to give you a stronger response.

Mike Parkin

analyst
#63

That's all I had. Thanks a lot, everyone.

Rob Krcmarov

executive
#64

Appreciate it, Mike.

Rob Krcmarov

executive
#65

We appreciate all of you being here for this call, and we're eager to share what's happening with our story as it develops in the coming quarter. Thank you, and enjoy the rest of your day.

Operator

operator
#66

Ladies and gentlemen, that concludes today's call. Thank you, and have a great day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hecla Mining Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Hecla Mining Company earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hecla Mining Company or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.