Ramelius Resources Limited (RMS) Earnings Call Transcript & Summary

July 29, 2026

Australian Securities Exchange AU Materials Metals and Mining earnings 49 min

Earnings Call Speaker Segments

Operator

operator
#1

At this point, I'd like to turn the conference call over to Mr. Mark Zeptner, our MD and CEO. Please go ahead.

Mark Zeptner

executive
#2

Thank you, Darcy. Morning, everyone. Appreciate you making time to join us on the call today. Alongside our usual quarterly report, we've put out a presentation that we'll be walking through during this session — and note that it also contains details from the exploration update we issued last week. Both of those documents are now up on the ASX platform and should be on our website shortly. With me this morning are members of the executive team — our COO, Tim Hewitt, our CFO, Darren Millman, and our EGM Exploration, Peter Ruzicka. To start, I'll run through the quarter's highlights and those for FY '26, then hand over to the team to cover their particular areas, and I'll finish up with a few remarks about our shareholder returns program. The presentation is fairly high-level, but far more detail is available in the quarterly activities report that came out today as well as in last week's exploration update. As always, there'll be time for questions at the end via both the teleconference and the webinar, whichever way you've joined. If you have the presentation deck in front of you, I'll begin on slide three.

Mark Zeptner

executive
#3

During the quarter, gold output came to 53,500 ounces, with an all-in sustaining cost of 1,973 Aussie. Following a couple of lighter quarters — consistent with our mine sequencing and what we had expected — we are now running at a normalized rate at our Mount Magnet hub, taking into account throughput capacity of roughly 2 million tons per annum at present. The benefit of the Never Never ore feed is starting to show, and we anticipate a larger contribution from that mine over the coming year. Progress across the quarter has been solid on our three key projects: first, ramping up the Dalgaranga mine; second, the Mount Magnet plant upgrade; and third, environmental approvals for the Rebecca-Roe project. On the operational side, project attention has centered on Dalgaranga, where the paste plant construction and ancillary site infrastructure — among them an underground pump station that has been commissioned and is fully operational — are advancing, and Tim will speak to that in more detail shortly. At the Mount Magnet plant, the priority is engineering and execution success, and the owner's team is now largely in place. Refurbishment of the existing circuit, known as Circuit 1, moved forward, with a third-party contractor appointed early in the quarter. Circuit 2 — the front-end engineering design, or FEED — is close to completion, and we expect to award an EPC contract in this September quarter.

Mark Zeptner

executive
#4

Additionally, we obtained EPA authorization during the quarter allowing the Roe mine area of the Rebecca-Roe project to move forward through the established Part V works approval and licensing process. For this project, that approval process represents the final major obstacle, and the Rebecca portion of the project already holds the same approval. On the corporate side, we kept up our share buyback program and have by now completed $141.7 million of our $250 million program, which equals 57%, and I'd note this includes an extra $1 million beyond the figures you'll see in the deck, since the last trade actually settled in early July. You'd be hard pressed to find any peer as active as us when it comes to executing buybacks. Beyond that, during the quarter we paid a fully franked interim dividend of 3 cents per share. Later in the presentation, I'll go into our shareholder returns in greater detail, and a final dividend will obviously be considered by the board once the full financial results are released in late August. Finally, we have signed a sale agreement for the Edna May hub, and we expect to complete it in September. The $300 million in sale proceeds further complement the exceptional cash flow that investment has generated over the past 8 years, and Darren will discuss this value creation in more detail shortly.

Mark Zeptner

executive
#5

On slide four, looking at FY '26: it has been an extremely active year, though that is par for the course in my time at Ramelius, and we'd like to draw attention to what some of the work carried out has delivered. Gold output for the year came in at slightly more than 192,000 ounces, at an all-in sustaining cost of $1,983 per ounce, and we met production guidance for a sixth year running. Shortly after the financial year began, we wrapped up the purchase of Spartan Resources, and after that we finalized the Never Never Underground Mine PFS and also finished the Mount Magnet Integration Study, which came with a maiden ore reserve of 1.6 million ounces. At Rebecca-Roe, a DFS was finished and the board gave FID approval, conditional on environmental permitting for Roe, which is moving forward as I mentioned earlier. We additionally signed a native title mining agreement with the traditional owners in December. Turning to exploration, we put a little more than $100 million into FY '26, and the results coming back from across the portfolio have been excellent, with our focus on replacing lower-grade ore within the 5-year mine plan we published last October. Given these encouraging results to date, we are stepping up exploration further, with a comparable budget already signed off for FY '27.

Mark Zeptner

executive
#6

We put out quite a few strong results in FY '26, though we're sure there's still plenty more ahead. Turning to shareholder returns for the year, we handed back $294 million through buybacks as well as dividends — $255 million of that came in cash, and $39 million was in dividend reinvestments. Slide five lays out where our ore came from across the quarter and the full year. It's pretty clear here — you can see what happened when Never Never ore came in, shown in green in Q4, accounting for roughly 40% of gold production. Right now we're working on updating our mine plan alongside revised mineral resources and ore reserve statements. Those details, together with FY '27 guidance, will come later this quarter. With that, I'll hand things over to Tim.

Tim Hewitt

executive
#7

Thanks, Mark, and good morning, everyone. First off, I want to recognize the tremendous work done by the teams at Magnet, Dalgaranga, and Penny on this quarter's results. Beginning on slide six, I'll review the production figures for the quarter, and every one of them improved versus the prior quarter. Ore mined came to 636,000 tons at a grade of 3.3 grams per ton, which means a 16% rise in tonnage and a 35 35% rise in mined grade. Two factors drove this: first, the growing contribution from the Never Never underground mine; and second, a significant lift in tonnages from Galaxy mine, where 213,000 tons were mined at a grade of 2.22 grams per ton. As we noted in earlier releases, Galaxy is delivering on both volume and mine life and forms an important part of the FY '30 plan. At Cue, open-pit mining carried on during the quarter with material movement similar to the prior quarter. Work at Cue centered on stage two of the Break of Day, Leviticus, Lena, and Big Sky pits. Penny mine turned in another strong performance, with 66,000 tons mined in total at a grade of 8.52 grams per ton, combining Penny West and north stopes within those tonnages.

Tim Hewitt

executive
#8

Although tonnages came in a little lower, the grade — which matters most — rose 35% versus the previous quarter. On the operations side, we plan for the Penny mine to keep producing into the December '26 quarter. At the Mount Magnet processing plant, tons processed rose from the prior quarter, which had been affected by the plant's 6-day mill shutdown. In total, 515,000 tons were milled at a grade of 3.59 grams per ton, which is a 38% increase over the prior quarter. That came about because of the higher tonnages we saw from Never Never underground and Galaxy, along with better grades at Penny. Overall, plant recovery fell slightly, as we had expected, given the larger ore contribution from Never Never. Still, it's pleasing that daily recoveries on Never Never ore have matched, and at times exceeded, the model recovery. We'll complete further analysis of mill throughput over the coming months to confirm an updated recovery percentage to use until the Mount Magnet plant upgrade is finished. Gold production for the quarter came to 53,466 ounces as a result, up 40% on the March quarter, which brings annual gold production to 192,182 ounces. Turning to slide seven, where we look at some site progress at Dalgaranga and the key projects and operational progress for the quarter, I think the main takeaway here is that we've moved quickly into commercial production.

Tim Hewitt

executive
#9

That happened 3 months sooner, driven by mine grades that beat the original model along with a stronger gold price environment, and it speaks to the caliber of geological work completed on the ore body at Never Never. Work on site infrastructure is ongoing, and eight key packages are currently underway. The most important is the paste plant and paste establishment, including the paste boreholes, all of which are now in place. The surface workshop and mine offices are coming along nicely, and the underground pump station has been commissioned and is now operating. Lateral development came to just under 6,000 meters during the period of Ramelius's ownership starting the 1st of August, with 1,800 meters finished in Q4, and that metric has improved quarter-on-quarter. Our attention is on the decline for vertical advance and on the ventilation drives needed to support growing mine volume. The underground mine produced 115,000 tons of ore mined in total at a grade of 5.95 grams per ton, bringing FY '26 to 181,000 tons at 5.3 grams per ton. That came from a mix of stope and development ore, with four stopes mined over the year. Stope recovery and dilution have both been excellent. We keep advancing the Never Never open pit, which has been mined ahead of schedule so as to reduce the impact on adjacent infrastructure.

Tim Hewitt

executive
#10

During the quarter, we mined 69,000 tons of ore at a grade of 2.15 grams per ton. That ore wasn't processed; instead, we gave priority to treating the high-grade underground material, and the pit is set to carry on through the December '26 quarter. From that, 146,000 tons of Never Never ore was processed at a grade of 5.37 grams per ton. At this point I'll hand things over to Darren, who will go through the financials and cash flows for the quarter.

Darren Millman

executive
#11

Thanks, Tim, and good morning, everyone. I'll be referring now to slide eight. During the June quarter, we sold 52,000 ounces of gold, and the average price realized was $6,230 per ounce. The greater gold sales came from increased production at our operations as well as the realized gold price, which rose 8% compared with the March quarter, since the June quarter hedge book commitments were pre-delivered in March. All-in sustaining costs came to $1,973 per ounce for the quarter, a solid improvement, helped by the higher mill grade. Despite the recent movement in the gold price, this really is a great moment to be a gold miner, as the company recorded its highest margins ever at 68%. Those margins generated underlying free cash flow of $138.3 million, with closing cash and gold balances just under $650 million. For FY '26, reported all-in sustaining cost is $1,933 per ounce, and that deserves more discussion on slide nine, where we reconcile the original guidance against the actual all-in sustaining figure for the year. The biggest factor by far behind our elevated all-in sustaining cost for the year was the Never Never underground mine moving from development into commercial production sooner than expected, which meant mining costs previously assumed to be growth development and therefore excluded from all-in sustaining are now treated as sustaining operational cost.

Darren Millman

executive
#12

That reflects both the improved grades that were modeled early on during Never Never's development and the stronger gold price setting. Two key points are worth making here. For FY '26, the total mining costs at Never Never underground match our guidance. Only the classification has been altered. Our 5-year plan, prepared last October, had assumed a transition to commercial production at the mine on 1 July 2026, and we do not anticipate that this reclassification will affect our all-in sustaining cost in FY '27 and beyond. Also on all-in sustaining cost, our cost base — as with peers — has felt the effect of elevated diesel prices through the second half of the year. That lifted our all-in sustaining cost by $24 an ounce, and we managed part of that impact through our proactive diesel hedging program, which saved Ramelius roughly $5 per ounce. Our initial guidance for the year assumed a gold price of $4,750 per ounce Aussie, while the actual average spot price for the year came in at $6,129 per ounce. That raised our cost base by $6 million, or $33 an ounce.

Darren Millman

executive
#13

Now turning to slide 10, looking at how cash flowed through the business during the quarter: our operational cash flow came in at $191.2 million, which is up on the previous quarter, helped along by better production and the gold price. That operational cash flow covered growth capital spending of $42.1 million for the quarter, mostly tied to the Dalgaranga infrastructure plus development of the stage two cutback and the Break of Day and Big Sky pit, both of which are at Cue. Exploration and resource definition investment came to $33.9 million for the quarter, concentrated on Dalgaranga, Mount Magnet, and Cue. Peter will be walking through the exciting results from that investment shortly. Underlying free cash flow for the quarter stood at $138.3 million. That gave us the capacity to return cash to shareholders, made up of the FY '26 fully franked interim dividend payment plus share buybacks, together totaling $84.6 million, or 60% of our underlying free cash flow for the quarter. As a result, our closing cash position rose $45 million over the quarter, reaching $649.6 million. And while we'll be giving a full report on our Q4 '26 results in August alongside our annual reporting, I'd like to use this opportunity to give you an overview of the cash flow for the year.

Darren Millman

executive
#14

Operations delivered 190,000 ounces of gold, which generated $764.2 million in cash flow and $624.6 once the hedge book is taken into account. Across the year, $163 million went into developing Dalgaranga and Mount Magnet, along with more than $100 million for exploration, with the emphasis on displacing low-grade ore inside our 5-year plan. Cash returned to shareholders totaled $255 million, equal to 60% 65% of underlying free cash flow, through a fully franked dividend and share buybacks. On top of that, $39 million came back through our dividend reinvestment program. We paid $74 million to Spartan shareholders for the Dalgaranga acquisition, net of the $199 million in cash acquired from Spartan. I would also note that in July we have now paid the outstanding stamp duty on the Spartan acquisition, amounting to $131 million. Income taxes paid came to $180 million, including $130 million for FY '25 earnings and a $50 million prepayment for FY '26 earnings. Closing out the FY '27 hedge book, 90% of FY '27 production is available to sell at spot, while the remaining 10% relates to 22,500 ounces of zero-cost collars carrying a ceiling price of $5,906 per ounce.

Darren Millman

executive
#15

Before I pass things to Peter for the exploration update and results, I'd like to address the Edna May sale, which is on slide 12. We first picked up Edna May back in 2018, and over the course of its life we strengthened the project through our hub-and-spoke additions of Tampia and Symes. Through to the close of 2025, Ramelius turned out slightly more than 600,000 ounces from those operations, which produced $430 million of pretax cash flow. The total proceeds from the sale, which we anticipate receiving in September once the transaction completes, come to $300 million — $210 million of that in cash and $90 million in FireFly shares, which lets Ramelius keep exposure to the future development upside at the Edna May hub. For Ramelius, Edna May has proven to be an outstanding investment, delivering $590 million in total pretax value against $140 million invested. With that said, I'll hand things over to Peter for an update on our exploration activities.

Peter Ruzicka

executive
#16

Thanks, Darren, and good morning, everyone. I'll start off on slide 13. A lot of you have probably seen this slide before. Just a reminder that our approach to exploration is different from that of our peers, since we aren't trying to extend the back end of mine lives. What we're focused on is displacing low-grade ore material from our 5-year outlook, with the main focus at Mount Magnet. The real impact of successful exploration will show up in FY '29, as we look to displace the 1.9 million tons at 0.8 of low-grade ore, and in FY '30, displacing the 1.8 million tons at 0.6 grams per ton. On today's call, I'll be talking about some exploration success at Cue, Galaxy, Eridanus, and Gilbey's Underground. You'll see that most of those are in fact listed as opportunities on the right-hand side of that slide. Moving on to slide 14: This is a long section of the Lena and Break of Day mineralized system within the broader Cue complex. For information purposes, the Break of Day underground mine has only 50,000 ounces in the current 4-year mine plan and no contribution from Lena. Our initial FY '26 exploration plan was to focus on Break of Day underground potential.

Peter Ruzicka

executive
#17

After those strong assay results were reported — including 6.2 meters at 60.3, 7.5 meters at 35.8, and 4.6 meters at 15.2 grams per ton gold, all of which appear in the figure — operational constraints meant the drill rigs could not be placed at the best spots for Break of Day. So we used that opportunity to carry out some work at Lena. The assay results from Lena have come back very positive, including 19.7 meters at 5.73 grams per ton and 9 meters at 12.9 grams per ton within the same drill hole, which points to two lode positions. Those results sit 50 to 100 meters beneath the current resource model and underscore the depth potential of the 400-meter-long system. Scoping studies point toward a meaningful expansion of our underground plans at Lena, as the conceptual design in the image illustrates. Moving to slide 15: noted there are the existing underground resources at Cue prior to the drilling updates — at Break of Day, 250,000 tons at 8.9 grams per ton for 72,000 ounces, and at Lena, 910,000 tons at 3.6 grams per ton gold for 110,000 ounces. In FY '27, we intend to drill out both Lena and Break of Day aggressively.

Peter Ruzicka

executive
#18

We're going to keep up surface drilling to convert the Lena underground inferred mineral resources, push the scoping study forward, and also explore the down-dip extensions of Break of Day mineralization. Those dashed lines on the figure show where drilling is planned. Just to highlight that connection once more back to slide 13, what we're aiming for is to displace low-grade material over the long term, grading from 0.6 to 0.8 grams per ton gold. Slide 16 gives a long section of the Galaxy mining area. Saturn and Mars are both operational and scheduled to wrap up at the end of FY '28 within the current 5-year production profile. Roughly 6 months ago, we set an exploration target of 6 to 7 million tons at a grade range of 2.1 to 2.6 grams per ton for 400 to 600,000 ounces. We're quietly confident there's more upside in this system. You might wonder why. If you look at the image, it shows the exploration target area. The Galaxy mineralized system remains open at depth, with the same BIF host and structural continuation. Drill density is the only thing limiting it. Compare that with the Hill 50 system on the right, which was developed to 1.5 kilometers depth and is still open. That demonstrates the excellent depth continuity of these BIF-hosted systems.

Peter Ruzicka

executive
#19

Drilling results from the reporting period — infill and lateral extension holes — include 20.2 meters at 40.7 grams per ton, 10.5 meters at 3.16 grams per ton, and 8 meters at 4.42 grams per ton. We are establishing two dedicated, purpose-built drill platforms for depth extension work, and to speed things up we're going from two to three underground drill rigs. Moving to slide 17, Franks Tower: this is a long section of the Eridanus corridor. Eridanus and Franks Tower both sit along the same granodiorite intrusive dike. At Franks Tower, exploration is centered on repeating the high-grade success achieved at Eridanus, with the aim of a second conceptual high-grade open pit. It's early days, but we have some positive results that prove up the concept. Assay results include 14.8 meters at 54.6 grams per ton and 3.6 meters at 113 grams per ton. The long section shows how shallow the drilling is along the granodiorite away from Eridanus, and the scope for high-grade at Franks Tower. On to slide 18, Gilbey's Underground: in April, we gave the market a Dalgaranga exploration update, setting an exploration target of 2.1 to 4.7 million tons at a grade range of 1.5 to 2.0 grams per ton for 100 to 300,000 ounces of gold.

Peter Ruzicka

executive
#20

From a conceptual standpoint, our aim is to bring this exploration target into production as early as FY '29. The assay results keep looking promising for hitting that goal. We're still at an early stage, and we don't want to interfere with Never Never's underground development. We're eager to share the resource and reserve update for Gilbey's Underground, and our exploration teams regard the FY '26 drilling programs as a success, with further exploration upside still to come. With that, I'll turn things back to Mark.

Mark Zeptner

executive
#21

Thanks, Peter. On the final slide, slide 19, you can see shareholder returns for FY '26 and a sense of how things might look down the road. We truly are delivering on our vision of superior returns for stakeholders, through the interim dividend of 3 cents per share, fully franked, plus share buybacks worth more than $140 million. Worth noting we're in a blackout period now — it's been in place from the beginning of July through August, until our FY '26 results come out. During this window we'll take a closer look at the mix of dividends and buybacks we prefer, taking into account internal valuations and similar factors, as well as the recent shifts in capital gains tax laws and what effects they might have. As the top of the slide states, our aim is to keep returns in FY '26 and '27 at the levels we set in FY '25 while our expansion projects are underway, and then lift returns in FY '28 and beyond as those projects wrap up and cash flows rise. That wraps up this morning's presentation. If we can, we'll now open the line for questions, Darcy.

Operator

operator
#22

Thank you. To ask a question over the phone, press the star key and then the number one on your keypad. Should you wish to withdraw that request, press star two. To submit a question through the webcast, enter it in the "Ask a question" box and hit submit. Our first phone question today is from Jonathan Sharp at JP Morgan. Please go ahead.

Jonathan Sharp

analyst
#23

Good morning, Mark and team. I appreciate you taking my question. On the cost side, all-in sustaining costs per unit appear pretty strong, largely thanks to those additional ounces. You provided helpful specifics a moment ago regarding cost increases from diesel—on an absolute basis, costs have risen. It sounds like you shared some figures there for diesel. Are there any other cost worries? We're noticing costs climbing across the sector among your peers. Are you experiencing cost inflation related to labor or anything else? Some detail on that would be excellent.

Darren Millman

executive
#24

Thanks, Jonathan. This is Darren speaking. As you've noticed, several of our competitors have come out with reports. What you've observed, I believe, is that the range is largely from 8% to 12%, which looks like inflation. We're probably seeing salary labor rates in the 5% to 7% range. Then there's some piping that comes in considerably above that level. Yes, those cost inflation increases are indeed hitting us. I suppose the positive thing, or the advantage on our side, is first, we're expanding capacity at Mount Magnet. We're achieving better grades as we bring in additional Never Never ore. Naturally, as Peter mentioned, there are plenty of possible offsets as we work to find higher-grade material. That same pressure our peers are experiencing does affect us. We'll be releasing that update around the close of the September quarter, together with our 4-year mine plan and our capital cost profile, and at that point you'll have the complete picture going forward.

Jonathan Sharp

analyst
#25

Great. Without offering anything like formal guidance, could you sketch out FY '27 for us—perhaps with a bit of detail on the operating assumptions and how they progress? How should we think about it building sequentially as Never Never ramps up in terms of volumes? Is it weighted toward the second half? And then on costs as well: should we expect to see costs flatline now on an absolute basis, or should we still expect some inflationary pressure?

Mark Zeptner

executive
#26

Jonathan, this is Mark. Sadly, you’ll need to hold off on receiving every one of those specifics. Giving you the entire cake instead of merely one piece is what we’d prefer. We’ve previously made clear that Penny will continue through later in this calendar year. At Never Never, the ramp-up is going to keep going. Until someone tells you differently, I’d treat the PFS ramp-up schedule as your baseline. As for plenty of the remaining items, we’re working through them and pulling them together. Clearly, certain of these cost factors — Iran wars that switch on and off, fuel prices rising and falling — make it somewhat difficult to settle on a number while we ourselves are still assembling everything. On that, you’ll simply have to show a bit of patience, and I apologize.

Jonathan Sharp

analyst
#27

No, that's fine. That's some good detail there and appreciate that it's difficult. Thanks. I'll pass it on.

Operator

operator
#28

Thanks. We’ll take the next question from Michael Scantlebury at Euroz Hartleys. Please go ahead.

Michael Scantlebury

analyst
#29

Hi Mark, and hello to the rest of the team. I wanted to ask how much detail you can share regarding the recoveries at Dalgaranga. You clearly have indications in the 82% to 84% range. Are you seeing anything unusual there, or is it simply a conservative approach in the study work on that front? Then, as a quick follow-up, the grades are coming in a bit above what you guided previously — 5 grams versus the 3.7 grams you're guiding now. Is that higher-grade reconciliation, or is it just stopes coming online somewhat earlier than anticipated? Thanks, guys.

Tim Hewitt

executive
#30

Hi, Michael. This is Tim Hewitt speaking. I'll address the question about recovery. Our modeled recovery stands at 81%. In the most recent quarter, what we observed was a monthly range of roughly 82% to 84%. Since we have 7 million tons of this material to process through the mill, we really need to operate a bit longer so we can narrow that figure down, because we have a couple of nuggety ore sources that also pass through that mill along with Penny and some of the Cue oxide as well. That's certainly a positive. It isn't below the test work, which is a good thing. We do need a few more tons processed through the mill before we can lock that number in. Obviously, that comes before the Magnet mill upgrade, which clearly compensates for that finer grind.

Mark Zeptner

executive
#31

How are grades?

Tim Hewitt

executive
#32

In terms of grades, as we moved nearer to the ore body, we naturally carried out additional grade control drilling. That has revealed, once again, grades that are probably as good as, if not better than, our original expectations. The grade is determined by the sequencing of the stoping. When it comes to the actual reconciliation of the grade, it matches what we expected. There are no surprises on that front; it simply reflects where we are within the ore body.

Michael Scantlebury

analyst
#33

Great, that’s completely clear. I just have one quick follow-up—I know Mark mentioned it right at the end, specifically regarding the payout ratios. With the cash coming in from Edna May, are there any plans to raise the buyback in the near term?

Mark Zeptner

executive
#34

That assumes Edna May wraps up in September, obviously. And we've also flagged in the stats that the net figure will come closer to $150 once we've paid the tax man again on that sale. We'll think about what to do with it. Clearly, we have strong confidence that our 4- or 5-year plan is fully funded. The split between buybacks and dividends deserves a bigger conversation. We'll have that over the coming couple of months as we pull our plans together. No, nothing definitive is in our minds right now regarding the cash from Edna May, but we'll work through it over the next little while.

Michael Scantlebury

analyst
#35

Great, appreciate that, everyone. I'll make sure to share it.

Mark Zeptner

executive
#36

I appreciate that.

Operator

operator
#37

Thanks. Our following question is from Richard Knights at Barrenjoey. You have the floor. Oh,

Richard Knights

analyst
#38

Hey, gentlemen. Just to follow up on that earlier question about grades at Dalgaranga. You said it reflects where you are within the ore body rather than being a reconciliation problem. Not really a problem since reconciliation is coming in better. If we look ahead over the next 6 to 12 months or so, is it fair to say you therefore believe you can reach higher-grade sections of the ore body sooner, or should we expect the grade to ease back and reconcile more closely with what the previous mine plan had? Hey,

Tim Hewitt

executive
#39

Richard, I don’t think grade is what we’re after — we’ll stay with the mine plan. We’re at the top of the Never Never ore body, and our room to adjust that is quite limited. We’ll hold to the mine plan as it stands. Like I said, the overall grade will mirror the stope grades. No, we aren’t making any attempt to high-grade the mine. We simply have to get through the next 12 months. That’s part of preparing the mine for the higher tonnage. Getting that infrastructure in place is very important.

Mark Zeptner

executive
#40

Perhaps I can add a point that's useful, Richard. That 3.7 grams per ton in the first FY '26 really reflects just the first quarter. The assumption may have been that we'd mostly be mining development ore. We began stoping somewhat sooner, and the first stope, for instance, sits right in the middle of the ore body. I think the 3.7 is likely a bit of a red herring; it's the 5-plus grams from that point onward, and we appear to be reaching that somewhat earlier. There could be a little upside, but I wouldn't build in too much, again, until we have more data and can be confident, because we know this will be a long-term mine, and we don't want expectations sitting above where we'll actually end up. Thanks for the question, anyway.

Richard Knights

analyst
#41

Excellent. Appreciate it, gentlemen.

Operator

operator
#42

Thank you. As a reminder, if you would like to pose a question, press star one on your phone and then wait until your name is called. Our next question is from Adam Baker at Macquarie. Please proceed.

Adam Baker

analyst
#43

Hey Mark and team. I was just wondering whether you might be able to give us a bit of a status update on Rebecca-Roe. I suppose what does it mean at this point that the Environmental Protection Authority is authorized for the Roe area? Are we now fully permitted there?

Mark Zeptner

executive
#44

I'll handle that question. It isn't completely approved yet, but it offers a more defined route in which we follow the identical process for the main environmental approval that we used with Rebecca — and that one has already come through — instead of undergoing a Part IV process, which, as you've witnessed with a few other peers of ours, has the potential to be rather drawn out. Our timeline is far more certain, and we believe that will give us extra flexibility in the mining sequence. This is positive news. The final approval is not yet in hand, but the path ahead is shorter than it would have been otherwise. That's the point we've been trying to make all along. Did that address your question, Adam?

Adam Baker

analyst
#45

It does. Yeah. Yeah. I suppose I'd just point out that there's an existing mill close by whose ore supply is running down — a different company, to be clear — and I was just wondering whether that might lead to a different way of approaching the FID. For instance, might tolling be an option you'd consider, or would you possibly be willing to take a look at a data room if this peer, say, decides to carve off some of its non-core assets?

Mark Zeptner

executive
#46

Based on what I've seen — and I've sat on both sides of this — tolling isn't ideal, and you don't choose it when there's any way around it. Ideally you'd want everything to be purchase, though that's a separate conversation entirely. Tolling isn't much fun for anyone involved. We're pressing ahead with our projects team. We've now established a projects team to construct Mount Magnet and then move directly into constructing Rebecca-Roe. Some Rebecca-Roe personnel are already in the office here, working on that project and on early works. We've moved on, so to speak, and we'll be building Rebecca-Roe right after we build Mount Magnet. Does that answer your question?

Adam Baker

analyst
#47

That's completely clear. Thank you, Mark.

Operator

operator
#48

Thanks. The next question is from Hugo Nicolaci at Goldman Sachs. Go ahead, please.

Hugo Nicolaci

analyst
#49

Hey, everyone. Thanks for today’s update. Look, first off, on FY ’27, I appreciate that you’ll provide guidance later this quarter, but you reiterated the 5-year outlook figures today. Should we take that ’27 production figure, then, as in line or tilted to the upside next year with respect to some of the exploration piece, and is it perhaps just the costs that are being worked through?

Mark Zeptner

executive
#50

Starting with in-line is likely the best approach, maybe with a bit less upside. Look, I don't want to hand you figures while we're still assembling everything. What we actually have to fold in is this exploration upside and these mine extensions into a fairly complex mine schedule so we can clearly optimize not just ounces but costs, cash flows, and so on. That's work we're doing right now. As I told Jonathan from JPs at the beginning, we'll simply need a little patience until those numbers come through.

Hugo Nicolaci

analyst
#51

Excellent. It's helpful to have that cleared up. The risk isn't on the downside — that's great. So maybe this one's for you, Darren. You flagged the classification effect on '26 all-in costs stemming from Never Never arriving early. That seems to suggest roughly $27 million in the second half that you consequently expensed for Dalgaranga, which in turn suggests around $165 a ton in the second half. Is that the correct way to look at it? As we move forward from here, should we expect that per-ton dollar figure to keep declining as you increase volumes there?

Darren Millman

executive
#52

That's right.

Mark Zeptner

executive
#53

To put it briefly, that's correct.

Darren Millman

executive
#54

Yeah, as you’d expect, the big push over the last 6 months has really been on getting the infrastructure ramped up and ready, so that’s where Tim and the team have been putting their attention. We’ve been seeing some pretty encouraging increases in volume. In the June quarter, we’ve seen that, and we expect it to carry on so we can reach these numbers. Obviously, the goal—or the big prize—is the million ton per annum coming out of Never Never. You should see those decline quarter-on-quarter. On the exciting side, yeah, I think we’ve also got that extension on Penny for December. As usual, we’ll always put priority on the high-grade material. We might be in a great position where we’ve built up a stockpile of some of that ore. So.

Hugo Nicolaci

analyst
#55

Thanks, that’s useful. One final item: for FY ’26, sustaining capital is a fairly small outlay. Is there any catch-up work—plant works or anything similar—that we should keep in mind looking ahead?

Darren Millman

executive
#56

Yes. Certain outlays, particularly those tied to the Mount Magnet mill, are going to shift out of FY '26 and into FY '27. And then there's another consideration: in light of the recent excellent news on Roe, do we pull forward some of the spending or some of the capital tied to the Rebecca-Roe project? That's the sequencing work we're in the middle of. The other item worth calling out, as Peter flagged, is that Galaxy is looking very encouraging when it comes to mine life extensions — we need to work out what that means for the spend required over the coming 24 months or so to extend past the currently planned operational finish in FY '28. That's roughly why it's taking a bit more time, Hugo, on a few of these items. They're all positive, but it's simply taking a bit more time. You'll see a higher level of capital than what we originally planned in the October 5-year plan.

Mark Zeptner

executive
#57

I should mention too that we anticipate receiving the output from our competitive FEED process at the close of this week. Clearly, that matters a great deal for the Mount Magnet upgrade, both on cost and on schedule. It's quite difficult to produce a dependable mine plan while you're mostly leaning on PFS figures from late last year. That's a major piece of it, along with the other elements. With luck, that clarifies why we're allowing as much time as necessary to gather all the pieces required for a dependable mine plan. No,

Hugo Nicolaci

analyst
#58

Absolutely. That makes sense, everyone. Anything worthwhile takes time. Thanks for the update.

Darren Millman

executive
#59

Appreciate that, Hugo. Thanks a lot.

Operator

operator
#60

Thanks. Right now, we don't have any more questions coming in by phone. So I'll turn things back to handle any questions submitted through the webcast.

Mark Zeptner

executive
#61

Alright. We have a webcast question from Monty Graham: "Could you please shed some light on the Never Never ore recoveries of 82% to 84% through the mill? Does this plan increase with upgrades at the Mount Magnet Checkers Mill?" Tim?

Tim Hewitt

executive
#62

Sure.

Mark Zeptner

executive
#63

Yes, that’s correct.

Tim Hewitt

executive
#64

Yeah, I believe we covered this, but yes, regarding Mount Magnet, that is certainly one component of the engineering work aimed at boosting recovery through that process.

Mark Zeptner

executive
#65

Just so we're clear, that 82% to 84%, versus the 81% we had anticipated, rested on the premise that it runs through the Mount Magnet mill in its current configuration — a setup that's been in place for quite a while — and that grind is far coarser than what we'll eventually get for the Dalgaranga ore body, or specifically the Never Never ore body. When we get to that finer grind, we're really looking at closer to 93%, just to be fully clear on that point. So that's a lower recovery over the short term. There's a question from Chris — I can't pronounce your surname, apologies: "With a focus on core operations ramping up for production and improving grades, would $1,500 all-in sustaining cost be an achievable target?" I'll let the finance team field that one, though my view is it would be world-beating. I'm not certain whether that's in Aussie dollars, but sadly I believe the days of $1,500 are behind us. Getting to $2,000 and staying under $2,000 — we didn't make as much noise about that as maybe we should have, but few companies are managing it. $1,500 strikes me as unachievable.

Darren Millman

executive
#66

Mark, there’s nothing further I’d add on that.

Mark Zeptner

executive
#67

Yeah. What else do we have? "Are we considering adding electric trucks at any of your mines?" I guess our operations rely on contractors, both underground and open pit, plus surface haulage. We do depend somewhat on those folks. We'd gladly examine electric alternatives or back them in adopting electric. My guess is that'll begin with surface haulage. I did come across an article from a haulage contractor where they're evaluating those. We know for certain that underground, you can potentially achieve greater production and need less ventilation because of having less diesel equipment. That's a plus, but we aren't at the sharp end of developing that; it's something we rely on via our contractors and OEMs. Anything to add, Tim?

Tim Hewitt

executive
#68

You've got it exactly right there, Mark. We’re certainly watching market developments, but yes, we are absolutely continuing those discussions with our key mining contractors.

Mark Zeptner

executive
#69

We're at almost 50 minutes now. There are no further questions. There are a few comments, but nothing else coming in online. That's where we'll end the call. Thanks to all of you for joining us this morning. Have a great day. Thank you.

Operator

operator
#70

That brings today's conference to a close. We appreciate everyone joining us. You're welcome to disconnect at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ramelius Resources Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ramelius Resources Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ramelius Resources Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.