Hindustan Aeronautics Limited (HAL) Earnings Call Transcript & Summary
May 17, 2023
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to Hindustan Aeronautics' Q4 FY’23 Earnings Conference Call, brought to you by Elara Securities India Private Limited. <<operator_script>>. Kindly be aware that this call is being recorded. I'll now turn things over to Mr. Harshit Kapadia of Elara Securities India Private Limited. Sir, the floor is yours.
Harshit Kapadia
analystThank you, Kelvin. Good evening, everyone. On behalf of Elara Securities, we welcome all of you to the Q4 FY’22-’23 conference call of Hindustan Aeronautics Limited. I take this opportunity to welcome the management of Hindustan Aeronautics, represented by Shri. C. B. Ananthakrishnan, Director of Finance and CEO with additional charge of Chairman and Managing Director; Shri. Jayadeva, E.P., Director Operation with additional charge of Director HR along with the team members. We will begin the call with a brief overview by the management followed by Q&A session. I will now hand over the call to Ananthakrishnan sir, for his opening remarks, Over to you sir. Thank you. Good afternoon to all of you. And we welcome to fourth quarter financial year results 2023 earnings call. First and foremost, I express my sincere gratitude to all of you for being present today to interact with us and to get all the clarifications on the sort of future prospects of HAL. I have with me Mr. E.P. Jayadeva, Director Operations who is also holding the additional charge of Director HR; Company Secretary, Mr. Bansal and all other senior officials. As you are aware, we have declared our financial results for the FY22-’23 and this call is intended to clarify all the questions you have on the company’s performance.
Harshit Kapadia
analystAs all of you know, the financial year has been quite an eventful one where HAL is concerned. In fact, if you remember, we began the year facing a revenue shortfall of nearly INR6,000 crores between the executable order front-end and the revenue target for the year. In fact, manufacturing orders were steadily getting depleted. So all of us were wondering how we were going to — I mean, how to bridge that INR6,000 crores gap. The year proved even more challenging given the business environment, amid global economic uncertainties, some limited supply-chain disruptions and other difficult reasons. Even so, we demonstrated a degree of resilience and adaptability in navigating these challenges and were able to post a rather strong set of numbers, which we will discuss subsequently. FY 22’23 in general, and the second-half of the year in particular, saw some significant events. As you are aware, the Honorable Prime Minister of India has dedicated our greenfield helicopter project — one of the biggest, I mean in the country — at Tumakuru to the nation. He also, on that occasion, unveiled the Light Utility Helicopter of HAL, designed and developed by HAL. Again, in a major boost to indigenization, our Honorable Prime Minister unveiled the HTT-40 at DefExpo ’22 during October ’22.
Harshit Kapadia
analystHAL also finalized at that time 70 HTT trainer aircraft, worth roughly INR7,000 crores approximately. The HAL-L&T consortium, meanwhile, has secured an INR860 crore contract for end-to-end realization of these five Polar Satellite Launch Vehicles, PSLV, from NewSpace India Limited. I keep bringing this up because it marks one of HAL's major forays into the aerospace industry—particularly the space sector—working alongside the private industry to deliver satellites to ISRO, the Indian Space Research Organization. Now, turning to financial performance, we posted very robust financial results in the last FY '22-'23. On revenue, we achieved a record of almost INR26,900 crores versus INR24,600 crores the year before, which works out to growth of almost 9% plus. In fact, our initial guidance was always maintained at 8%, and we stated that we would hit double-digit growth starting FY '24-'25 onwards. And in fact, I would say with confidence that we are progressing quite well, such that we could achieve a revenue target of nine point—I mean, growth of 9.37% in the last financial year. This year would be no different from that. We will strengthen it further.
Harshit Kapadia
analystAs we said on the previous call, we'll achieve double-digit growth of 10%, starting from ’24’25 onward. On the manufacturing segment, yes — it has stayed subdued because of certain lower platforms available for execution. The shortfall, though, we were able to offset through execution of the repair and overall orders. That trend should carry into the current financial year as well. And beginning next year, manufacturing numbers will begin improving once we start delivering the platforms — basically LCA Mk-1A. Likewise, from ’24-’25 onward, in addition to our LCA Mk-1A, we also expect a meaningful improvement in deliveries of our HTT 40 aircraft, which should begin from September ’24 onward. And in ’25, additional ALH and AL-31FP — that's a Sukhoi engine contract — once we begin executing it. PBT has posted growth of nearly 24%, rising to roughly INR6,500 crores from INR5,231 crores in the prior financial year. One of the reasons, basically, was the higher interest income, which also accrued on account of two things. First is the healthy cash balance, and second is the refund of the long disputed Income Tax, which was sitting with the department and which also got settled last year.
Harshit Kapadia
analystRising interest rates have benefited the company where non-operating income is concerned. We got interest income of nearly INR900 crore plus on surplus balances, versus roughly INR400 crores the year before. On top of that, during the current year we also received interest — as I mentioned annually before, our interest of nearly INR560 crores from the Department, the Income Tax Department, related to refunds that were, I believe, disputed amounts sitting with them. By the way, I'd like to use this chance to let you know that this long-standing dispute with the Income Tax Department has been settled and we've received close to INR2,451 crores of tax refund and INR830 crores as interest from the department, over the last two years, that is FY'22-FY'23 and FY'21-FY'22. This settles the tax dispute with the Department covering all the financial years, from 2008 onwards to 2015 to 2016. Having resolved all the disputes with them, we're quite comfortable now. Consistent with this rise in PBT, the PAT has improved comparatively as well. PAT growth has also been fairly substantial, at around 14%. In fact, you'd have — I've noticed that many people have pointed out a decline in PAT in the fourth quarter of '22-'23 compared with the corresponding period of '21-'22.
Harshit Kapadia
analystWe want to make something clear regarding Q4 ’22: real profit after tax hasn’t declined. It’s only due to certain adjustments tied to an income tax refund — that refund was somewhat higher; what we received in the last fourth quarter was a bit higher at INR1,200 crores versus roughly INR700 crores in the prior fourth quarter. So if you adjust for that, PAT grew at about 10%, even in the fourth quarter. This is purely operating PAT, which grew at about 10%. EBITDA for the year came in at roughly 31% of revenues, compared with the long-term trend of about 25% to 26%. Again, I want to clarify that 31% may not be sustainable. We will settle at about 26%, 27%. This rise in EBITDA for the current financial year is mainly because of certain amortization we had in the current financial year of almost close to INR600 crores related to the HTT contract that we finalized last year. Likewise, on the dividend side, I think we are quite — we have been rewarding all the investors. We paid one final dividend for the last financial year ’21-’22 and two interim dividends, all totaling almost INR50 rupees per share, which is — which works out to almost 500% of the face value of INR10 per share.
Harshit Kapadia
analystRegarding the order book, you won't find it quite as interesting as we've consistently kept it — actually, in the previous earnings call as well, we noted a figure of roughly INR82,000 crores to INR83,000 crores. Even after liquidating orders, the order book still stands at a healthy approximately INR82,000 crores. We have cleared close to INR26,000 crores of orders over the last financial year. That was also achievable thanks to fresh order accretion of nearly INR26,000 crores across the year. The major orders, as I already mentioned, 70 HTT — 70 units of HTT 40 plus six Dornier, I mean, together valued at almost INR9,000 crores, and INR800 crores of PSLV from NewSpace India Limited we have received. All of these contributed to the order book position. And the remaining order flow, as you know, that repair and overhaul there has always been an addition to the order book, and almost INR18,000 crores of <<inaudible>> orders accrue with HAL. Once again, the fresh orders from — we anticipate new orders coming through for 25 units of Advanced Light Helicopter DHRUV, 12 units of LUH, Light Utility Helicopter. And once more, the engines for the AL-31FP and RD-33 engines for mixed series of aircraft.
Harshit Kapadia
analystEvery one of those cost negotiations is now finished, and all of them sit at advanced stages of completion. So we anticipate an annual — that is, an estimated order value of nearly INR48,000 crores being concluded over the next — during the coming financial year, meaning inside a window of six to 10 months. Then, on the maritime UHM, the maritime helicopter, 16 units, AoN has already been granted, and for the coastguard's nine helicopters as well the AoN <<inaudible>> — that is Acceptance of Necessity — which means there is very clear visibility toward these orders for HAL within a two to three year timeframe. Where the utility helicopter, the UHM maritime helicopter, is concerned, we will get a sanction for the first — at first the sanction will cover design and development, and after that it will be followed by the procurement order. In the same way, we have finished the LCS, that is Light Combat Helicopters, 15 units, and we expect a bigger order from this on Light Combat Helicopters. We are at advanced stages of negotiations with the vendor — they are — I mean with the customer. We are identifying the additional systems that are required for the Light Combat Helicopter, and once that gets finalized, the AoN will also get approved, and this too is expected at around INR45,000 crores, including the optional and roll equipment there.
Harshit Kapadia
analystWe expect this to be an anticipated order. Again, there is some visibility here, and it should materialize over the next two to three years. Beyond that, we also expect an additional order for the LUH, the Light Utility Helicopter, of roughly 175 units — all of these are anticipated, and visibility exists for them, though the AoNs and other steps remain. That process will get underway afterward. The same applies to additional HTT-40 aircraft and upgrades coming from the Dornier platform. So once these orders materialize, our order book position strengthens further and places us on a higher growth trajectory — the double-digit growth we have been promising to deliver starting from ’24’25 onwards. We are also making some very significant efforts to grow our international business. With a broad range of indigenous platforms, we are aggressively chasing export leases from the country — from various countries. We have received export leases from Algeria, Argentina, Indonesia, Philippines, Thailand, and the Middle-East, and we have been quite involved in these various discussions, and we are awaiting one breakthrough order, which we are very positive should come through within the next one year timeframe. HAL has also been one of the major beneficiaries of the Government of India’s AatmaNirbharatha and self-reliance initiatives.
Harshit Kapadia
analystSo at this point, a lot of the platforms and systems that HAL is producing are showing up within positive indigenization — which ought to mean exports won't be there — sorry, imports won't be there — and HAL will serve as the production agency as well as the supplying agency for those platforms. That will assist HAL in landing new orders and likewise meet the defense forces' requirements inside the country's framework. Such efforts will benefit HAL and also lift — I mean — the Indian ecosystem of various vendors and suppliers. To wrap up. I won't take much time. I'd say we are committed to excellence and will keep propelling the nation toward AatmaNirbharatha in defense and aerospace manufacturing by way of our indigenous design capabilities, which we have built up over a span of almost seven decades. I think, all in all, HAL's future looks quite bright, and with all these initiatives toward indigenization and self reliance, we are quite sure that HAL's growth trajectory is very sound and strong. I think with that. I will open the floor for questions and clarifications, which you will have. Thank you.
Operator
operatorThank you very much. We will now begin the question-and-answer session. <<operator_script>>. The first question is from the line of Amit Dixit from ICICI Securities. Please go-ahead, sir.
Amit Dixit
analystHello there, good evening everybody, and thank you for giving me this chance. Nice work on a solid set of figures. Two things I'd like to ask about. My first one is really about LCA Mk1A. Some media reports have suggested this program might slip by a few months. So I just wanted to hear your view on the timeline for LCA Mk1A being executed and on when manufacturing can be expected to begin <<inaudible>> to start.
C.B. Ananthakrishnan
executiveOkay, so looking at the contracted delivery schedule, deliveries are set to begin starting February ’24. During this current financial year, we’re meant to hand over three aircraft — one fighter and two trainers — 3 aircraft within this fiscal year. And we’re on track. We’re on track. Actually, it also involves — the Mk1A also involves certification of a number of systems that have been added onto the LCA Mk1A, and together with the ADA — that’s the Aeronautical Development Agency — we’re working to complete these certification processes in good time so the deliveries will also take place. Right now, even though we’re operating on a very tight schedule, with all these many systems needing certification, we have already begun building the aircraft, and the aircraft structure should become available by June or — before — within the next three to four months. And after that, these systems too, as and when certification happens, will get fitted into it, and we’ll be in a position to have ground tests and things like that taking place within the next eight to 10 months timeframe.
C.B. Ananthakrishnan
executiveWe’re therefore focused on hitting the delivery timelines. Even if some delays do arise, they likely won’t be very significant. It may be — we’re confident that we can address those delays and make sure these aircraft are delivered in line with the contracted delivery schedule.
Amit Dixit
analystSir, just as a quick follow-up on that, what does the schedule look like? How many do you expect to deliver in FY’25, FY’26, and FY’27?
C.B. Ananthakrishnan
executiveUnder the contracted delivery schedule, it's 16 units starting from ’24-’25 onward. Three will be there during the current financial year, and 16 need to be delivered each year — 16 units is the peak delivery load. In fact, as you may be aware, we have recently — well, actually begun setting up a third line in the Nasik division to see how these deliveries can be expedited. While we can produce 16 units from our Bangalore facilities, we wanted to raise that figure so deliveries could happen at a quicker pace, and we would be able to finish the entire delivery within a year ahead of what the delivery schedule has contracted. So, as I said, even if there could be some — I mean, even if we fall short by one or two aircraft in the current financial year, we can make those up with our additional capacities in subsequent years. Wonderful, sir. The second question is basically about order book accretion. You had mentioned that on the manufacturing side, there is a possibility of INR48,000 crores of order book accretion this year. Could you enumerate a similar number for ROH and development as well.
C.B. Ananthakrishnan
executiveSure, on ROH, our expectation is that the year-on-year accretion to the order book will average out at roughly INR18,000 crores — somewhere between INR17,000 and INR18,000 crores. So that figure is only going to keep rising. And at present, we're holding an average order book of, I mean, for ROH it should be — on an annual basis, INR18,000 crores ought to be the attrition.
Amit Dixit
analystAnd then there’s development.
C.B. Ananthakrishnan
executiveOn development orders, sir — that is, again, it hinges on specific sanctions that are going to come through. And we aren't sitting idle waiting for those development orders either. We're funding it internally out of our own resources, and whenever it does come through, we'll be in a position to take it on. But we're confident that development — you know, the IMRH program — will come through when your LCH Phase-II systems are in place; this will add to the development orders. And in a similar way, a certain portion of the pure AMCA portion will come through as well. UHM will be there. UHM sanctions will be there. So all of these, plus the development orders, will rise substantially. But as things stand, we can't commit to a number on development orders, because discussions with them have only just begun right now.
Amit Dixit
analystBut just to follow up on this ROH, what does the execution period look like for INR17,000 crores to INR18,000 crores?
C.B. Ananthakrishnan
executiveOn a year-over-year basis, that reflects our accretion — what I mean is our execution — and the timeframe involved is within 1 year, a 12-month period.
Amit Dixit
analystThanks so much, sir. I’ve got a few more questions, and I’ll rejoin the queue. Thank you, and best wishes.
Operator
operatorThanks. <<operator_script>>. We now have a question from Charanjit Singh at DSP Mutual Fund, who is on the line. Sir, please go ahead.
Charanjit Singh
analystHi there. To start, congratulations on the strong results. My first question concerns that engine framework contract we’ve discussed for quite a while now — where does it stand at present, and do you expect it to be wrapped up within the next six months? Because after that, as you know, the election and the code of conduct come into play — could those affect some of the order inflow finalizations we’re anticipating? That’s my first question.
C.B. Ananthakrishnan
executiveWhich engine framework are you referring to?
Charanjit Singh
analystSir, AL-31, AL-31.
C.B. Ananthakrishnan
executiveRegarding AL-31, the 240 engines — we're already in advanced negotiations on that number. The CMCs are done as well. In other words, contract talks with the customer have wrapped up. At this point the paperwork is being prepared for CCS approval, and we're confident we can secure these orders during the current financial year. Things are quite far along. We expect to close it out in a timeframe of the next six months to eight months.
Charanjit Singh
analystAnd sir, what would the total value of this order come to?
C.B. Ananthakrishnan
executiveThe overall worth of this order ought to come to roughly INR26,000 crores.
Charanjit Singh
analystAll right, sir. Sir, my other question concerns the export side. You mentioned that some opportunity is emerging there. So could you give us more detail on what kind of platform we're looking at in the export market? And earlier we also took part in, you know, one of those international export orders. So what's giving us the confidence, and what could the quantum of this order be when we look at the export potential?
Jayadeva E.P.
executiveWe’re engaged with nations such as the Philippines, Argentina, Egypt, Sri Lanka, the Maldives, Botswana, Thailand, and Nigeria regarding fixed-wing platforms or LCA, and also with our rotary-wing helicopters including ALH, LEH, and LCH. Those are the key countries we’re focused on. Proposals have been submitted to every one of these nations — I mean for the helicopters as well as the fixed-wing types. And we’re pursuing follow-up through both our defense channels and our services. At present, one or two leases are at an advanced stage — for instance, the Philippines and Argentina. As for the rest, we’re seeking to encourage them further to evaluate these proposals, and we continue to press our case with them.
Charanjit Singh
analystAnd sir, what kind of size could these first orders end up being for us?
Jayadeva E.P.
executiveThe first orders, if we begin with the ALH platform we're aiming to enter, could come to roughly INR150 million as a starting figure.
Charanjit Singh
analystUnderstood, sir. Sir, finally, sir, regarding spares, we previously faced some problems obtaining spare parts from Russia. So at present, how are things — on the supply-chain front, are there any issues we should be concerned about, or have you sorted that out, and what level of indigenization are we now looking at on the spares side?
C.B. Ananthakrishnan
executiveSure — so yes, there has been a degree of concern arising from these geopolitical conflicts, particularly on the Russian side. Even so, up to this point we've managed to handle those kinds of disruptions, where any have occurred. What I mean is that delays did happen, but matters are returning to normal, and supplies have begun reaching us. My own view is that a major problem is unlikely. We'll manage it — though, as you probably are aware, I'd also like to point out here that so far, across the past two years, despite all the COVID disruptions and the geopolitical conflicts that followed, HAL has always been in a position to keep operations running with no disruptions, and fleet serviceability has likewise remained unaffected. We have strong confidence that, with our channels opened up with the Russians, we'll be able to secure the supply chain continuously, without any disruptions. There were certain payment issues, and those have been sorted out as well. At this point, we are in a position where payments are also going through. So we will be able to — our intention is to maintain the fleet without difficulty — we will be able to maintain these fleets.
Charanjit Singh
analystYes sir. Sir, I have nothing further from my end. Thank you for taking my questions.
Operator
operatorThanks. We’ll take the next question from Aditya at Securities Investment Management Company. Your line is open.
Aditya
analystHello, sir, and thank you for the chance to ask. My first question concerns the grounding of the PLSV. From what I gather, we're going to swap out the aluminium control products and use steel rods instead. With that change, are the problems now fixed, or do some design matters or other issues still remain, and when might we see the armed forces begin flying the ALH? Second, if you could also help me get a handle on how those issues have affected the company's order book — in particular the 25 ALH order that you're expecting, and also the 140 MCH order we're expecting within the next one to two years, since the MCH and ALH share a similar design and engines — will these orders, or any of the orders, be delayed, given where our position stands?
Jayadeva E.P.
executiveAs you know, we had three incidents occur back-to-back over the past two, two-and-a-half months. That has, in fact, set us back somewhat, but we want to point this out. None of these accidents stem from the same kind of problem. Each one involves a different issue and cannot be attributed to just one cause. That is simply how it is — they may not trace back to a shared problem. So, as of now, there is no design flaw in any of these three helicopters that can be blamed on the design. Of these, preliminary investigations have already been wrapped up on two to some extent. The third is still being investigated. We would not — I would not want to comment on that one. Aside from that, design adequacy has been reaffirmed once more, and we believe there is no need to redesign the entire helicopter in the places where these problems have shown up. Still, as a precautionary step to prevent further — to reinforce. The control rod was earlier made of aluminum, so to speak, but at this point we have chosen to switch to steel, so that the steel is more tolerant of damage and, should some kind of misalignment or maintenance issue arise, it can accommodate that better.
Jayadeva E.P.
executiveSo that's the reason we're moving to steel rods at this point. It really isn't about design adequacy as such. The helicopters, in their current configuration, are safe. So that's why — that's how things stand right now. Other fleet owners continue to fly these helicopters. So as of now, everybody is <<inaudible>> helicopter. And if you look at the ALH's helicopter accident rate, it has flown 3.9 lakh hours, all combined. And we have incidents of roughly 7.3 or 7.4 per million hours — sorry, lakh hours. So compared with other international players, these are regarded as a very good indication of the helicopter's safety. And during the last — we've also — we have a very good record in that the number of accidents is very, very low compared to the average — the normal worldwide safety average. So we believe the ALH is in good hands and that the design has been robust. And this has no impact on future orders, whether it be UHM or any other further requirements. Our defense services, I mean, they are quite confident in this machine.
C.B. Ananthakrishnan
executiveNo, I’d just like to add something to what our Director of Operations said. Regarding this ALH, since accidents occurred back to back, there have been some concerns, but apart from that, it is — I mean, as the preliminary investigations have revealed, where the helicopter’s design is concerned, this is not really a major concern. Whatever smaller issues are coming up that need reinforcement — we are — HAL is very confident that we will be able to get through that. And one more thing we would like to mention is that the fleet is on — it is not that all these fleets have been grounded; I understand that one of the services is still flying. The other services — I mean, the air force is flying. The other — the army one has grounded it. And once we get the preliminary checks, the army will also fly, but this fleet is not going to be — because it has been in operation for almost 20-plus years now. And just a bit of statistics on this: up to 2018, almost 18 years, we had flown close to two lakh hours, with almost 19 accidents, which translates into some 9.1, 9.2 per lakh hours.
C.B. Ananthakrishnan
executiveAnd once 2018 came around, we've really capitalized on the mission, since the figures have gone up. It has also flown another two lakh hours over the past four, five years, and the accident rate there sits at roughly 11, and because of those accidents — which have actually brought it down — I mean, I'm not saying this to justify the accident. I'm only saying it to give you confidence that this aircraft is very robust, proven, and tested, and as for the design capabilities and all of that, it's continuous improvement that we'll have to make. It isn't something that's happening only because of accidents, and that we're trying to improve the design capabilities. But we are — it's continuous improvement that we'll keep doing, but we can — we're very confident in telling you that this mission is very proven and there's nothing to be concerned about except that unfortunate incident that has happened in the last three to four formats.
Aditya
analystThanks for walking us through that. I have one follow-up question. I’d like to understand the cost involved in fixing the replacement of those control rods, or any other problems that have been flagged, since this replacement has to be done across the entire fleet of 300 ALH. So roughly what would it cost to remedy this, and will we receive compensation from the <<inaudible>>?
C.B. Ananthakrishnan
executiveLook, on this point — the first thing is we need to pin down exactly what all has to be replaced and so on. Based on what the preliminary investigations show us, nothing very major is expected apart from those control rods once again. Converting from aluminium rods to steel ones is not going to be a large undertaking. As for cost right now, we don't expect much. It should land somewhere around INR150 crores to INR200 crores. On top of that, we also carry warranty coverage on many of these aircraft. So profitability won't really take a hit from this cost, and as I said, it won't be a big issue — the figure could be in the range of no more than INR200 crores.
Aditya
analystYes, sir, I had one more question about ROH revenue. This year, our ROH revenue came to INR18,800 crores. If we break that down broadly, what would the top three or four major platforms — things like Su 30, ALH and engines — contribute to that ROH revenue? And second, what growth should we expect from ROH over the next two to three years? And what will drive it — which platforms will keep contributing to that growth?
C.B. Ananthakrishnan
executiveWhen it comes to ROH revenue for ’22-’23, let me walk through some of the key platforms that drove it. First, Sukhoi-30 repair and overhaul: 20 units were repaired and overhauled, whereas previously the figure sat at roughly 18, then 15 to 18, and now we've hit 20 at peak load. We're also confident of pushing that up by another two to three units starting in the current financial year. Second, on the engines — AL-31FP engine repair and overhaul — some 76 units have already been completed this year. We're aiming to get to somewhere around 95 to 100 during the current financial year, with a ceiling of about 105. Then there are rotables, of course — the various rotables keep climbing too. They brought in roughly INR1000 crores during the last financial year. As for the ALH, close to 30 ALHs were repaired and overhauled over the last financial year. All of this has fed the topline revenue growth — I mean repair and overhaul — on top of higher spares supply, which added almost close to INR5,000 crores as well. So this kind of pattern should carry into the current financial year too, with a slight uptick in repair and overhaul activity, but beginning next year, repair and overhaul growth should land at about 5% to 6%, while overhaul within B2B — manufacturing too — will pick up, so we'll be able to sustain that overhaul growth.
Operator
operatorMr. Aditya, we'd ask that you rejoin the question queue for any follow-ups. We'll move on to the next question now. That comes from Harshit Patel of Equirus Securities on the line. Please go ahead.
Harshit Patel
analystThanks a lot for taking the question, sir. My first one concerned HTT 40. You said deliveries are set to begin in September 2024. So, sir, what would that delivery schedule look like? How many units are we planning for FY ’25, and then what would the schedule be from FY ’26 onward?
C.B. Ananthakrishnan
executiveApologies — I said September ’24 earlier, but that's incorrect; it's actually September ’25, since we finalized the contract last year. That's 30 plus 24 months, and if so — I mean, it will kick off starting September ’25, with deliveries averaging nearly 20 aircraft. Again, on that point, peak delivery will hit 20. We'll begin with 12, then 16, and after that 20. But once more, we're working to speed up the delivery timeline so it lands around 20 beginning in the second year, which would let us wrap up the content sooner, because we anticipate another 36 units coming in, and there's also some export potential there.
Harshit Patel
analystGot it, sir. Sir, my second question concerns the engine orders. You said we'll be getting the orders for AL-31 SP and RD-33 in financial year ’24. So, sir, at this point, what would the execution schedule be — will this also follow a T plus 24, T plus 36 kind of timeline, or would we begin production right away?
C.B. Ananthakrishnan
executiveWe intend to begin — what I mean is, production has not yet started right away. As a matter of fact, we already are, and we are also wrapping up contract talks with the Russian suppliers, so that we won't be waiting for this order to be finalized before getting back to work with the vendor. We have already begun. So we're confident that we'll be able to, I mean, start delivering from '24, '25 onward. Both of these ranges, RD33. And actually, with RD33, we are also planning, in the present financial year, that the moment the contract is concluded, we will start delivering the numbers.
Operator
operatorMr. Harshit, please rejoin the question queue for any follow-ups. We now go to Umesh Raut from PhillipCapital, who is next in line. Go ahead.
Umesh Raut
analystThanks a lot for the chance to ask. Sir, my first question is about one of our big prospects, the LCA Mk2. According to some media reports, we're now up against the difficulty of signing the TOT contract for the supply of GE's F414 engine. So I'd like to know exactly where things stand on developing LCA Mk2, and whether this TOT delay would affect the development timelines for LCA Mk2.
Jayadeva E.P.
executiveFor the LCA Mk2, the design work on all components is nearly finished — almost done. And we intend to start <<inaudible>> production at AHL before long. On engine production as well, we've given our — in fact, we already serve as the production agency for GE 414. Our division in Bangalore has been designated as a production agency. We recently offered our willingness to be involved in this too — and we reiterated that willingness to ADA. ADA is in discussions with GE and the U.S. government to make sure TOT is provided to the fullest extent. Following that, we expect the contract to be finalized once ADA receives <<inaudible>> sanction in full form. Sanction in full form.
Umesh Raut
analystBut sir, do you foresee any significant obstacle when it comes to signing the TOT with GE?
Jayadeva E.P.
executiveNo, we aren't seeing any issue with the TOT with the GE. We'll be manifesting the engine at scale.
C.B. Ananthakrishnan
executiveActually, let me just build on what was said — as things stand today, our approach involving every one of our suppliers, the engine makers included, is pretty straightforward. Should they wish to conduct any business in India at all, they will need to establish both the TOT and a manufacturing facility inside the country. That being the case, we are engaging with all our OEMs on this front, and we feel confident it will come about. And that's because they too have come to realize that if they are going to do business with India and with HAL, they will need to have those facilities set up within the country. So we will be in a position to negotiate toward our requirement of getting a complete TOT done inside India.
Umesh Raut
analystThank you very much, sir. Regarding my second question, it concerns the bookkeeping. We recorded roughly INR770 crores of HTT 40 development revenue during this quarter, yet I understand no cost was booked around or prior to EBITDA, while we recorded only about INR600 crores of amortization. Is that assumption accurate?
C.B. Ananthakrishnan
executiveYes, you’re right about that, since everything ties back to design and development—particularly the intangible assets that were on our books, that unamortized portion. As soon as we received the sanction, we recognized it as part of our revenue and also released it as part of our amortization, taking it off the balance sheet from the intangible assets. So you are correct. Is that clear?
Operator
operatorMr. Umesh, we’d ask that you rejoin the question queue for any follow-ups. We’ll move on to the next question. That next question comes from Hardik Jain at ISJ Private Securities. Please go ahead.
Hardik Jain
analystYes, I appreciate the chance to speak. Everything I wanted to ask has been addressed, so thanks.
Operator
operatorThanks. We’ll take the next question now. Our next question comes from Jonas Bhutta at Birla Mutual Funds. Please go ahead.
Jonas Bhutta
analystGood evening, sir, and congratulations on a strong set of numbers. So, first, just a bookkeeping question. Could you tell us how many aircraft and helicopters were produced in FY — in the current year, FY23?
C.B. Ananthakrishnan
executiveSo for FY23, we turned out — we built 7 ALH units, along with 2 LCA units. Then there were 6 AL-31FP units. For Light Combat, that figure was 8 units. Dornier accounted for 2 units. And LCH was at peak numbers. Those represent the platforms we produced during the previous financial year.
Jonas Bhutta
analystAnd as far as deliveries go — what would that figure be from this, sir?
C.B. Ananthakrishnan
executiveEverything has shipped. All of it, in line with what we laid out for Q4 two, three years — what we refer to as the documentation for delivery — it's all been delivered.
Operator
operatorAnd regarding FY24, you mentioned that two Mk1s would be built when it comes to Tejas, but my understanding is that there are trainers of the earlier Mk1 version. Trainers are still fewer. So how many Tejas deliveries in total would that be this year?
C.B. Ananthakrishnan
executiveAs far as LCA trainers go, we expect at least 6 plus 2 — that's 8 — to be delivered during the current financial year.
Jonas Bhutta
analystUnderstood, understood. And for my last question, sir, regarding the fact that we appreciate the third line in Nasik has also been launched for LCA — sir, could you tell us the man-hour rates, the man-hour requirements, from the first plane through the 83rd plane, what sort of reductions you've assumed, roughly.
C.B. Ananthakrishnan
executiveNo, it will be — the Nashik division's productivity levels should certainly match those of the Bangalore-based divisions, meaning the LCA division and the Aircraft Division. So all of those things were factored into our contract when we finalized it, in order to take the average hours. And the average hours now considered for contract purposes will keep applying at the Nashik division too, since productivity stays more or less the same and the labor cost, we will try to — it will be maintained.
Jayadeva E.P.
executiveAnd we got the bulk of the learning from that. IOC and FOC, all 40 to 32 aircraft fighters you've turned out. So you achieved most of those learnings. And in Mk1a, it's only new systems — there are four new systems. So that's not a — there isn't much scope for learning at this point. Of course, we'll have to do. At Nashik, there'll be a little bit of learning. But in Bangalore, all the people are convergent with all the production activities.
Operator
operatorMr. Jonas, we'd ask that you rejoin the queue if you have follow-up questions. Our next question comes from Mahesh Bendre of LIC Mutual Fund, on the line. Please go ahead.
Mahesh Bendre
analystHello, sir, and thanks very much for the chance to ask. Sir, with the order book as it stands, the many orders in the pipeline, and the delivery you mentioned, what sort of growth could one look for from our company across the coming two to three years? Looking at last year, we grew by just 9%. And looking back from FY ’19 onward, we’ve barely grown at a 4%, 5% CAGR. So if I look ahead three years, what kind of growth should one expect from the company?
C.B. Ananthakrishnan
executiveLook, from 2019 onward — I mean, across the past four years, the past five years, the average CAGR has come in at roughly 7.7%. So where growth is concerned — it hasn't been sitting at 4%. I'm not sure how that 4% figure was calculated. Over the last four to five years, we've been expanding at a rate of nearly 7%. Beyond that, we have been — this isn't something we failed to signal even in the last — I mean last year, we kept saying that for FY '23 and FY '24, growth would land in single digits at 8% — 7% to 8%. In fact, last year, at 9%, we raised our guidance and delivered an additional percentage point, reaching 9%. And in the current financial year as well, we have been maintaining that we will grow — it will be single-digit growth only, and it will be around 9%, which is what we have achieved, but we are inching towards the double-digit growth that we have promised will be there starting FY '25 onwards. And we expect that — from FY '25, it will be double-digit growth.
C.B. Ananthakrishnan
executiveFollowing that, we anticipate growth will level off, rising by roughly 12% to 13%, and then settle at approximately 14% to 15%.
Operator
operatorThanks. Mr. Mahesh, we'd ask you to get back in the queue for any follow-ups. <<operator_script>> Our next question comes from Viraj at Jupiter Financial. Your line is open.
Viraj
analystGood afternoon, sir, and congratulations on those strong numbers. I have a single question. Since FY ’24, you’ve been guiding to roughly 13%, 14% growth — is it fair to assume that even the margin, the net margin, would land in a double-digit range?
C.B. Ananthakrishnan
executiveFor FY ’25, we’ve consistently said it would be double-digit growth, though we haven’t given a specific figure — it’ll land somewhere near 10%, or 10% to 11%. After FY ’25, we’ll lift those double-digit margins up to 12%. Following that, we expect them to settle at 15%. On profitability — the growth — because, again, as you know, this is a profit policy, and we’ve been guided by a profit policy, and all the improved profit — the profitable margins we’re seeing come from better efficiencies we’re working to operate at, with more of — meaning boosting productivity and also through outsourcing and bringing in more private industry. So what that means is profitability at this point — our operating profit in today’s situation sits at roughly 17% to 18%. And we are — this is — I mean, that percentage is quite a healthy one for an industry like ours, and we’ll be more or less around it. Perhaps — we might improve it slightly year-on-year. But definitely, there won’t be — I mean, any substantial increase as far as operating profit growth is concerned.
C.B. Ananthakrishnan
executiveIt's going to be in the neighborhood of 18%, 19%.
Operator
operatorOur next question comes from Vivek N. at Shanti. You have the floor.
Vivek N.
analystYes, thanks. My question is once more about how HAL is growing. We've been steady and expanding little by little. But considering the volume of orders coming from the government, spanning so many different areas, and the near-monopolistic supply position we hold — do you expect that over the next two, three years there will be a sharp jump in the top line, at least for retail, and that it will then level off? Because we're only at 3 billion on the top line, and if you look at the top five manufacturers in the U.S., since those are the biggest firms, they bring in 350 billion annually. And with HAL being the leading provider of these solutions in the country, do you think there will be a drastic improvement in the top line and, as a result, in revenue as well?
C.B. Ananthakrishnan
executiveTaking into account every element that works in HAL's favor along with the order book pipeline we foresee, that is what underpins our projection of double-digit growth starting in ’25, and after that we expect that double-digit growth to improve further, settling at roughly 15%. That said, all of this — this growth rests on the very factors we have just been citing, such as an exceptionally strong order book position with very clear visibility, plus HAL's standing as a major player in the industry, with so many design and development projects on the annual. So all of that means we will definitely hold a good order book position, though the execution timeline also matters. And given the execution timeline we envisage, growth of around 14% to 15% ought to be good enough for HAL at this point of time.
Operator
operatorShirom Kapur from Prabhudas Lilladher has the next question. Your line is open.
Shirom Kapur
analystHello, and thank you for the chance to ask a question. I'd like to get some clarity on that INR48,000 crore pipeline of orders you referenced for FY ’24. You noted that the AL31 engines account for roughly INR26,000 crores, across the 240 units. As for the other orders sitting in that pipeline — things like 80 RD33 engines, plus 25 ALH, 12 ULH, 12 Su 30s, and 9 cost helicopters — could you break down what the potential value would be for each of those individually?
C.B. Ananthakrishnan
executiveSo essentially, INR48,000 crores—that's the main figure, I mean, the project included there, the major contracts, as we've said, is 240 units for the AL-31FP, which comes to roughly INR26,000 crores. The RD33, again, some 18 units, expected at about INR4,500 crores, and 25 Advanced Light Helicopter DHRUV should be around INR3,500 crores. And in the same way, the Light Utility Helicopters, 12 of them, should fall in the range of almost INR2,500 crores. And of course, the additional Su 30 is what we're envisaging—another 12 units. If that also materializes, it would give us an extra order of almost INR12,000 crores. So all of this would add up to INR48,000 crores, which we expect to realize in the current financial year.
Operator
operatorThank you. Our next question comes from Abhineet at Emkay Global. Yes. Regarding the prospects you mentioned for the coming two to three years, I believe one was LCH, at INR45,000 crores. The others were LUH, the marine helicopter, and so on — could you quantify what those might amount to in revenue terms?
C.B. Ananthakrishnan
executiveLook, we've got nearly everything through AoN — that's Acceptance of Necessity — approved. Yes, I mean, apart from the projects I just mentioned, where the contract is expected and which we'll wrap up during this financial year, I'm setting those aside. Beyond those, for the AoN-approved projects where negotiations haven't started yet — or rather, where the RFC hasn't been issued — it's the ALH coastguard, 9 numbers, for which AoN has been granted. The RFC will now be floated, and we'll be presenting — submitting our quote. Likewise, the UHM, a supply contract for 60 numbers, which will come about after the sanction for development arrives and once we begin, I mean, developing the aircraft, and then the supply contract should follow. That one is another INR20,000 crores. And similarly, the PBL contract for the UHM we'll be supplying is another INR13,000 crores. So the visibility, where the AoN — that is Acceptance of Necessity — has been approved, where there's certainty of orders for HAL, stands at around INR36,000 crores. This process will kick off at some point in the current financial year and will be concluded over the next two to three years' timeline.
C.B. Ananthakrishnan
executiveAnd in the same way, for the areas where the AoN hasn’t yet been approved — meaning we do have visibility, we’re confident the order will come, but approval of the AoN is still pending — that includes the Light Combat Helicopter Prachand <<inaudible>>, where we’re indicating 145 units. Likewise, for the Light Utility Helicopter, we estimate another 175 units. Then there’s the HTT 40 trainer, for which we’ve already received 70, and we’re likely to get 36 additional. Of course, the Dornier Navy and the Dornier upgrades — navy and the IAF upgrade — that is again an upgrade program, and for that alone almost 60 units are expected. So broadly, this would mean that the AoNs not yet approved, but where visibility exists, account for another INR65,000 crores. So INR36,000 crores is for those already AoN approved, and INR65,000 crores is what, in our view, we will get approved, which should happen over the next two to five years.
Operator
operatorThanks. Our following question comes from Bhavin Vithlani of SBI Mutual Funds, who is on the line. Please proceed.
Bhavin Vithlani
analystGood evening, and congratulations to you, sir, on those strong numbers.
C.B. Ananthakrishnan
executiveThanks.
Bhavin Vithlani
analystI have just one question about the ROH. If you could provide the revenue split between the Su 30 and the engines, that would be very helpful?
C.B. Ananthakrishnan
executiveYou're referring to the most recent fiscal year, which is FY ’23.
Bhavin Vithlani
analystYeah, that would be really helpful — both FY ’23 and FY ’22.
C.B. Ananthakrishnan
executiveSo in ROH for FY ’22 — and then FY ’23 in ROH, as I mentioned earlier, we’re looking at roughly 20 Sukhoi aircraft and 76 engines, the AL-31FP, which is the Sukhoi engine. On top of that there are the rotables plus repair and overhaul, and ALH — about 30 ALH units. So broadly, that’s the platform for repair and overhaul in FY ’23. The figure for FY ’22 was somewhere around — I mean, for engine overhaul it came to roughly 80 units, and Sukhoi overhaul was about 20.
Operator
operatorThanks. Our following question comes from Amit Bhinde at Morgan Stanley. You have the floor.
Amit Bhinde
analystHi there. My first question concerns the margin outlook once your manufacturing deliveries begin in FY’25. That’s number one. Second, we had been targeting provisioning at roughly 7%, yet in quarter four it also came in elevated. So how should we view that going forward? And third, is there any additional tax refund amount still pending in dispute from 2016 through today?
C.B. Ananthakrishnan
executiveOn the tax amount side, things are more or less wrapped up. What I mean is that every dispute has been resolved. Nothing remains outstanding at this point. We got the final refund as well as the sanction — I mean the refund sanction — during the last quarter of the current financial — of the last financial year, so January to March ’23. As a result, we have nothing still pending with the department. So no further dispute settlement will arise where the IT department is concerned, where income tax is concerned. — then on the.
Bhavin Vithlani
analystOn provisions.
C.B. Ananthakrishnan
executiveOn provisions, yes, 7% is the level we aim to hold, though we're also striving to stay as conservative as we can. The provisions we set up during this financial year are all for — I mean, some of the loan items we received from the Indian airports: we made a provision for those because once we begin supplying this, it will need to be replaced with our — I mean, we'll have to return it to them. So a provision has been made for that. And then for replacement and other charges, we've also set aside some provision. So all of this, when the actual expenditure is incurred — this could represent the maximum provision we've established, to ensure that there are — that there is no — that it's done on a conservative footing, and that profitability won't take any further hit. But as we could see, when this expenditure is actually incurred, we expect there may be some savings against these provisions too, and that could return as income. So we anticipate the provisions will be — I mean, cut substantially in the current financial year, given the net effect of the withdrawal of provisions, which is expected to take place during the current financial year.
Operator
operatorOur next question comes from Harshit Patel at Equirus Securities. Your line is open.
Harshit Patel
analystHello, sir, and thanks again for the chance to ask. I just wanted some sense of how much the MIG-21s are going to add to our ROH revenues overall. Because I believe, given that we'll be phasing them out over the coming few years, that portion of the revenue would drop out of ROH sales — would that be the right way to look at it?
C.B. Ananthakrishnan
executiveNo. What I mean is that, where HAL is concerned, there is no MIG-21 overhaul whatsoever. It isn't going to form part of our revenue stream. So there will be no impact on the MIG-21, apart from the R25 engines, which we have been handling — and that work ended in the last financial year. It made no difference in FY ’22 or ’23 either, since that was never a significant contributor to revenue. So as far as HAL is concerned, the MIG-21 carries no major impact — it is barely INR100 crores of work that we do, and it doesn't really affect us; that figure covers the engines alone. And on the aircraft side, there is no repair and overhaul at all.
Harshit Patel
analystAnd this is probably going to be turned off in ’25.
Operator
operatorBecause of time limits, that was the final question. At this point I’d like to pass the conference back to Harshit Kapadia for closing remarks. Please go ahead, sir.
Harshit Kapadia
analystThank you, Klevin. We'd like to express our appreciation to Shri C. B. Ananthakrishnan sir, Director, Finance, CFO, who also holds additional charge of CMD, and to Shri Jayadeva, E.P., Director, Operations, who likewise carries additional charge of Director HR, for the chance to host this call. Our thanks go out as well to every investor and analyst who joined us on this call. Sir, if there are any closing remarks you'd like to share with the investors and analysts.
C.B. Ananthakrishnan
executiveYes. Thank you. We truly appreciate this chance, and it has also allowed us to clear up a lot of the questions that were sitting in the minds of the various investors. And we feel confident that given the kind of growth we have been demonstrating and the kind of performance HAL has consistently delivered — I mean, delivered over the last four to five years — and with greater visibility of orders in the pipeline, we are certain that all the investors' expectations will be satisfied. And I'm sure — I'm very confident, and I can assure you that we will be in a position to deliver the goods to the investors, and at the end of the day the investors will always feel happy about having been associated with HAL. Thank you.
Operator
operatorThanks, operator. I appreciate it.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hindustan Aeronautics Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Hindustan Aeronautics Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hindustan Aeronautics Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.