Operator
operatorGood day, ladies and gentlemen, and welcome to the Q2 and H1 FY '27 earnings conference call of Hindustan Oil Exploration Company Limited. At the outset, allow me to introduce the management team joining us: Mr. Baroruchi Mishra, Managing Director and CEO, along with Mr. <<inaudible>>, CFO. <<operator_script>> Kindly be aware that this call is being recorded. I will now turn the conference over to Mr. Baroruchi Mishra. Thank you, and the floor is yours, sir.
Baroruchi Mishra
executiveThank you. Good evening, everyone, and thanks for being with us on this earnings call for Hindustan Oil and Gas Exploration Company Limited, covering the second quarter and the half year that closed on September 30, 2026. I wish all of you a very happy — and they are very close to the <<inaudible>> — so happy Diwali as well. With the festive calendar and the Diwali holidays in mind, the company chose to line up the results announcement and the earnings call on the same day this quarter, instead of having 2 engagements split apart, half of the 2 events held today as has been the usual practice. We appreciate that — and you have taken the time to join even during this festive season. This really is a departure from the normal schedule. and we truly, truly thank all of you for accommodating this changed timing. And with that, let me begin with A little bit of analysis, or a view, on the global oil and gas scenario. And then we will be dive into how we as a company are performing and indeed contributing to ensure energy security for the country. Both what we have done in the quarter that went by, but also what we would do in the future.
Baroruchi Mishra
executiveAs everyone is aware, the oil market has been pulled in 2 directions. Prices have found support from the Gulf supply disruptions, even while consumption has been bent lower by costlier fuel and softer economic activity. Furthermore, the International Energy Agency projected over the period that worldwide oil demand would decline by 2.6 million barrels in 2026. A lasting rebound in Gulf exports might loosen prices further; additional disruption, though, could drive them up even amid weak demand, and that point matters a great deal. That range also underscores why we, as a company, must maintain capital discipline until this cycle settles, and settling is going to take some time. On the gas side, the Strait of Hormuz disruption has cut Gulf LNG shipments, as all of you know. Part of those losses is being offset by new suppliers out of North America and Africa. Even so, the <<inaudible>> Asian spot LNG averaged roughly $12.5 per BTU between March and October. That has benefited us, although we did not achieve the same price on our gas sales, since this is LNG and so there are costs on the import side. Capacities are arriving, and that is -- but we also have, as everyone is aware, 17% of Qatar LNG's capacity removed by this war.
Baroruchi Mishra
executiveSo, in India, we have price-sensitive bars, and domestic gas that's delivered under the contracts carries a specific value. Our — well, it remains to be seen how many of those term contracts can actually be honored and how much of the situation gets taken over and managed by stocked cargoes. India's crude import bill is up 46%, and that's obvious. And in this first half, it's at $91 billion, while import volumes rose by under 1%. So from that angle, we're fairly steady on the demand side. What isn't very happy news is that domestic and condensate production dropped roughly 3.5%, down to 13.7 <<inaudible>>. Domestic gas production declined about 4.4%, while LNG imports climbed about 4.5%. Now, crude dependence, as all of you know, remains above 88%. So that gap has to be bridged. And we do see, in fact, that our opportunity lies in delivering more domestic and gas reliably. And I'm very happy to say that, except for BAT, all our assets and, of course, <<inaudible>> had low production — all our assets kept running full stream 100% of the days in the last half of the year. And that says a lot about the capabilities and maintenance competencies of the individuals on our team who run these facilities.
Baroruchi Mishra
executiveThere are plenty of obligations on our plate, and we’ll go through those as we move into next year. PY1 is going to contribute somewhat to that, which we aim to do ahead of the monsoon, partly because of the <<inaudible>>. We’ve got a contract in place with SLB for this work, and it will lift output from PY-1. That involves intervention on the wells that already exist, and beyond that we intend to drill 2 new wells — we’ll get into that a little later, though it will happen around the middle of next year. In <<inaudible>> there’s a great deal of work ahead of us where capacity exists to raise production right now. We’ve recorded a solid gain since the last quarter’s discussion. On a gross basis, we had been averaging roughly <<inaudible>> standard cubic meters. At present we’re running at about 0.7 million, yet there’s room to reach as much as 1.2 million standard cubic meters, and we’ll cover that in detail later on in this call. So BAT is where our attention sits — it’s sort of the, I won’t call it the backbone, since it has performed exceptionally well. But B, where we have 2 subsea wells tied to the mobile offshore production unit and a tanker that is starting to be relocated to the SBM, is our flagship asset, because when it operates, it operates extremely well.
Baroruchi Mishra
executiveWe have two wells there, B1 and B2, and there were certain problems we are aware of involving HPLC and the HPCL crude sale last year, and we'll touch on that briefly. There are <<inaudible>> barrels of crude that we had sold to HPCL. For a range of reasons, following HPCL's review after a few days of processing, they believed the quality was new scratch and they had to halt processing. So we found ourselves in a position where arbitration could have happened, or there was an arbitration, but we sought a deferment. We are working hard to reach an amicable supplement, and we will get there soon. Lifting has begun and we have made decent progress here. Now B1 and B2, these are two wells, and B2 has watered out at 93%, 94% water. That is the nature of the beast. There isn't much you can do about it. If what <<inaudible>> happens, it happens; therefore, of course, there is also a reservoir management issue that we have to take into consideration. But if water ingresses in the well, then you have to go for remedials. And that is exactly what we are doing in our two workover programs.
Baroruchi Mishra
executiveB2 — okay, what we'll do is shut off the water zone so we can bring in the intervention. So the rig, the LOA, and so on, have all been awarded, or rather the contract — what's been provided under the LOE has been given the contract, or — and we'll have the Vigan location by the end of November, early December, and the startover on D2 and D1. On D2, we'll back off or shut off the water zone and will open up new zones or create new plays, and there we have quite a thing place, including a very decent gas cap, which can produce a lot of gas. So we'll be working on that. And on D1, we'll do standard perforation cleanup, and we'll also perforate new zones so we're able to produce more from B1 and B2 after D1 and D2. So once we've done the workover — we'll get on to drilling 3 new wells in BA. And the wells — the workovers will get us around 1,000 to 1,500 barrels of crude per day of time per day and gas in the range of 5 million to 7 million <<inaudible>>. So that, we hope to be on stream end of December, early January; we were supposed to have the rig by 15th of November, but for various logistics reasons will now average, but not going as — but for various reasons, we now will help the towards the end of November, early December, not too late for us to catch up on the production.
Baroruchi Mishra
executiveHowever, that's going to cause a 15-day delay in exports. So that covers roughly the 2 wells we'll be doing. Then there are 3 new wells — we've pinpointed the rig location and completed the definitive survey. We're in the process of — in fact, we've already issued the contracts for tubulars, et cetera. Those will begin arriving in December, a bit earlier. We've awarded every integrated service contract, and final negotiations are underway for the remaining awards. And we'd be in good shape to keep drilling once the program wraps up. There is 1 thing I'd like you to be aware of regarding our Bombay High or <<inaudible>> operations.
Mayur Patel
analystWith our development rights, we currently hold nearly 800 square kilometers of area. That came about because last month—or mid-year—we were granted P174, which contains several discoveries plus 2P reserves that BGH reported, or the port reserves, of million barrels of oil equivalent. We'll go into more detail on that during the presentations. So that's an area where I'd like you to recognize that we're sitting on an enormous opportunity in Bombay. We have safety, we have B18, we have B15, and now B174 has been added. In <<inaudible>> basic, we just mentioned E1 one—we'll perform well interventions and also drill new wells. But you should realize those new wells will be drilled early only once we have a firm take-or-pay agreement with the buyers, which is either IOCL or Gail. It's very important to understand this field began with 15 million standard cubic feet of gas per day. I <<inaudible>> well for a while, but then we were hurt by what happened in domestic consumption. So Gail asked us to begin production, since there had been disruptions in the internal consumer to the gas.
Mayur Patel
analystSo what that means is we need to keep those 3 wells shut in, along with an abatement of <<inaudible>>, and that zone has plenty of rocks, fishers, and vertical porosity. If those wells stay on for an extended period, you'd get substantial water ingress into the gas zones <<inaudible>>. We lost that, and we attempted to drive it. We made an effort to revise it for a while, and then we ended up right back at square one. After that we approached PetroVietnam — the only other company working a basement Granat reservoir, <<inaudible>> — and they were producing 80,000 to 100,000 barrels per day. We asked them to bring their core competency in to assess our fees, and they hit that, and the report came back saying we can still produce 15 million to 20 million stops of gas in this field. That's phenomenal, because even at a price of $7 to $10, you're looking at 120,000 to 180,000 barrels, <<inaudible>>, and that is very material, and it will bring the old Gloria P1 field back, and we're very hopeful we'll get there. So that was one — let me take you to Assam, and there have been many questions around Assam and <<inaudible>>.
Mayur Patel
analystSo the field currently has 5 producing wells, and the capacity — the potential there — is to produce 1.2 million standard cubic meters on a gross basis, I mean, from all the wells. Now I realize this is a has very hard pressures, and that speaks to the reservoir's potential. We had Russia, where the pressure at the surface is 3000 PSI. For those of you who understand this terminology, that is 3000 times more than atmospheric pressure. Normally, the pressures in Bombay Hari and other wells, slowly precious, are in the range of 30, 30, 40 bars, or 300, 400 or 500 PSI, the have pressures. There are 3,000 PSI had a pressure. That tells you about beat — the potential of this hydrocarbon system. So we have the capacity to go to 1.2 million standard cubic meters in standard meters from the field. So as soon as the bottleneck on the pipeline, evacuation of this gas, is lifted, we should be able to ramp up within not 1 or 2 days. With that said, we have additional wells which have been approved by DKA, and that will bring our production from 1.2 million standard cubic meters to 2 million standard cubic meters.
Mayur Patel
analystSo that's approximately an 80% increase — a 70% to 80% bump in what we're able to produce. But we'll only grow those wells once the gas execution rate is fully debottlenecked, meaning there's sufficient capacity in the existing pipelines to tack on gas, and also once local demand develops or we secure connectivity to the national gas grid. We've been in discussions with all the stakeholders, and recent progress has been made on that front, as well as on the spurline at the NRL facility, which will link the NPL line to the Norgas rate. So another party won't need to take a shutdown to restart the NPL line. They can buy back the gas from the Notional Gas grid and keep the NPL line deep with nitrogen, so that the new sections — those late replacements for the sections that have <<inaudible>> — can be connected or tugged in. So all the material for the spot line, et cetera, was delivered 3, 4 weeks ago, and that is in process. Our hope is that by the end of this year, or by the middle of December, we will be in good shape to increase capacity for the stakeholders — the NPL Asam Gas Company Limited would be in good shape to raise the capacity of their NPL line, which will increase production from the current 1.2 million standard to meters going through that line at 40 to 2.5 million cubic meters, which is go at 90 bars, because the asset integrity of that line would have been restored.
Mayur Patel
analystSo that basically covers the Girok discussion. Carson, we've had quite a few chances in gas and oil. As you know, on the last call we said we'd doubled oil output at Kharsang, and we have approval for drilling 9 additional wells in the Kharsang area — we were running a bit behind on awarding the contract and so on because of certain issues with the partners. Now everything is soft and has been audited, and the rig has been harder. Hopefully in January, early February, drilling will begin again. And that will again double production at Kharsand. We've found gas risers — 2 wells have gas potential of 8 million to 9 million standard cubic feet as we speak, but we have to keep them shut in, since we can't sell the gas given the lack of infrastructure locally, and also the pipeline linking to the connectivity — to the Assam pipeline isn't there, which is a 24-kilometer pipeline, and we're working on it. We have started — <<inaudible>> 0 In 18 months that line will be laid, but we are very actively trying to look at opportunities to sell the gas <<inaudible>> I am sorry there's a lot of background noise because.
Mayur Patel
analystIs this coming through okay?
Operator
operatorYeah, there are quite a few background lines.
Baroruchi Mishra
executiveI'll move in a bit closer to the microphone so hopefully you can see or hear me. But if you can't, please give me a call back?
Operator
operatorYes. Sir, please go ahead — we can hear you.
Baroruchi Mishra
executiveAnd so, in Kharsang, we have 2 deep wells that are going to be drilled, and we think they hold zugaspanoil potential, and that work would take place at some point in the third quarter of next year. We're talking with the partners about those 2 wells, and they will genuinely make use of folio the opportunities that exist in Kharsang. In our present Kharsang exploration Block B 19, there is 127,130 Bcf of gas, with plenty of upside, and that's an exploration block that has been awarded to us. There are certain disputes with the government and the local villages — between the government and the local villages — regarding the compensation to be paid for growth for the access and Pecora. That is being sorted out in the middle of next year; hopefully, we'll begin this. We have tabulated in January, February next year. And that by many recent is almost as big as fee that we are producing right now. So Assam is going to be a huge story, not only for HOEC but for and also for operators; it has been — there is — there is so much potential currently limited by the acquisition. The government is aware, P&R GB is aware, and they are working hard, while India and all these stakeholders are working real, real hard to make sure that every molecule which can be produced as peruse.
Baroruchi Mishra
executiveAlright, so let me return to candy for a moment, and after that I'll pass things over to our new CFO, who came on board on the first of October — I'll say a bit about that right after this. Can they in <<inaudible>>, we've got 3 blocks. In, production has been doubled as far as all we need to do on those — and not all. We have to put. We've installed a belt drive, and it lifts output not by much — that's a new technology — so that — so we need to draw our <<inaudible>> material, and we're working with GSPC to put our heads together on producing the limits of the world from Cambay; we're trying to bring parties in for enhanced oil recovery and so forth, and we'll make sure we reach a solid position there. So let me wrap up by saying our operating goal of 11,000 barrels of oil equivalent by the middle of 2027 holds. Come FY 2028, we're eyeing 22,000 barrels, because by then I'll bring in D15, which will bring in, and 30,000 to 32,000 barrels of oil equivalent net HOEC by '29, since P174 would have kicked off or some work would have been drilled, and P1 would have been streaming at that point.
Baroruchi Mishra
executiveSo we remain on our target, and we look forward to your good wishes and support to make that happen. The finance ecosystem in India has helped us. We have raised a decent amount of loan INR 125 crores for the workovers because some of our monies are locked in the SEC of the growth. And also -- we have to still dispose of the 120,000, 130,000 barrels, which we have in the FSO in Bombay High -- in BD field. At the right time, when we get a replacement tanker, we'll take that tanker out completely, and we'll do some dry docking, et cetera, which is also required on that chance. But that is something that is an operational issue, and we are dealing with on a regular basis. So these 2 things, the BAT in place, fresh crude and HPCL, both of them are liquidated. We are looking at around INR 250 million crores of additional funds going into our bank accounts and that will set us up very well for the development expenditures. But also, we are looking at a higher facility with the banks in the tune of INR 600 crores, which is INR 600 crores to INR 700 crores.
Baroruchi Mishra
executiveThat means the overall figure might reach INR 1,000 crores, and that includes the amount we've already secured, since offshore drilling comes with surprises — you can run into delays and so on. So you need to be sitting on solid cash positions so you can handle whatever comes up. And given that spending peaks entirely within the coming 3, 4 months, it matters that your reserves are assured, that your funds are in place so you can — or that you can get at cash to bear the risks and, in fact, actually drill these wells with certainty. So that's basically all I wanted to share with you. And now I'd like to bring in <<inaudible>>, our Chief Financial Officer. He took over on first of October. As you know, Allen Andrade — he and I worked together for a long stretch at British Gas and at Shell. He has asked me to step down. His only reason for stepping down is that he had to commute from Mumbai. At his age, it simply wasn't feasible for him to do a lot of travelling and commuting from Mumbai. So he has chosen to give up the CFO role, but he will — he will serve as our financial adviser.
Baroruchi Mishra
executiveHe hasn't gone anywhere at all. He remains part of who we are and will serve as our excellent financial adviser. He'll keep steering and leading the finance team along with the rest of us, and his help with our fundraising will be enormous. So it works out well for both him and for us, and he'll also mentor our new CFO whenever that's needed. With that said, let me turn things over to David. And I'm glad to answer any questions you may have.
Executive
executiveThank you. I appreciate the introduction. Good evening to all of you, then. I'm the CFO of HOEC — that name came through as <<inaudible>> — and I want to use this chance to express appreciation to our shareholders and to us and our investors for the interest you keep showing in the company. I'm looking forward to engaging with everybody over the quarters ahead. Let me now walk you through how we performed financially in Q2 and H1 FY '27. We saw profitability come back strongly in quarter 2. Comparing quarter 2 with quarter 1, revenue from operations rose 25% quarter-on-quarter, moving from INR 117 crores to INR 147 crores. EBITDA more than doubled, going from INR 21 crores to INR 46 crores, and profit before tax tripled, climbing from INR 12.5 crores to INR 38 crores. The key thing driving that profit is the rise in the guest sales — and the relation of the mutation of that stock, that stock, the prior year. Through that monetation we sold a greater amount of BAT stock, and it contributed close to INR 57.79 crores in revenue. In total, close to INR 80 crores of that HPCL stock will be liquidated during H1 FY '27. So in others, that lower inventory moment valuation, the charge stemming from that.
Executive
executiveOn the inventory side, that figure dropped by roughly INR 20 crores, moving from INR 41 crores down to INR 18 crores. Now, turning to the half-year comparison against the first half of FY '26: half-year revenue declined from INR 405 crores to INR 265 crores. There isn't actually a fall in revenue in absolute terms, because the first half of last year included a resale to the year — that was a one-time sale in the quarter. Beyond that, there was also the one-time adjustment from reinstatement of investment, amounting to nearly INR 32.5 crores, in our BAT investment. EBITDA rose by INR <<inaudible>> crores, going from INR 56 crores to INR 57 crores. Profit increased 46% from an adjusted profit of 34.7, once that one-time adjustment is eliminated from the statement. Moving now to liquidity: we had an operational cash loss of INR 39 crores in this half year ended September, versus a negative figure last year. So the swing was largely driven by — I'd say — the HPCL stock relation of INR 80 crores. We raised funds flow of INR 179 crores, and that includes the credit facility from that financial institution.
Executive
executiveAnd how big that ends up being will hinge on the BAT CapEx for the BAT workover and so on. So we've got the closing at INR 458 crores, and — a significant portion of that Asian instrument will go toward CapEx across all the fields, including BAT and the large one. So that's arriving in Q2 FY '27. Consolidated revenue came in at INR 151.78 crores, with EBITDA at INR 37.51 crores, which works out to an EBITDA margin of 24.71%. Profit after tax for the quarter was INR 19.3 crores. For H1 FY '27, revenue reached INR 275.78 crores. EBITDA was INR 63.1 crores, and profit after tax came to INR 25.10 crore. So what drove our performance in this first half was mainly lower volume along with the stock relation. As we move into the next phase of the development program, a key focus for us is converting the earnings, in case. So that's going to be our priority. So during H1, operating — as you said, we're <<inaudible>>. So will the cash conversion be mainly generated through rotation of that prior-year inventory? We expect this will strengthen the momentum of the relation of the previous year's wealth, the current stock of — our focus stays on stronger cash conversion from our existing production asset, and that will fund our development of the portfolio internal.
Executive
executiveRegarding that, we've advanced on turning the inventory into revenue. And to date we have brought in INR 80 crores, INR 80 crores, with roughly that amount to <<inaudible>>. So on the balance sheet front, we will end September with cash and cash equivalents on a consolidated basis of INR 166 crores and gross debt of INR 211.11 crores, which gives net debt of INR 44.90 crores. Our net debt to EBITDA stands at 0.71x. Our strategy is going to be to balance cash generated internally against deployment of external funding. So while making sure capital deployment stays in line with project milestones, and the production addition we expect. So with that, we can open the floor for questions. That's what I have from my side.
Baroruchi Mishra
executiveThank you. Before we open the floor for questions, let me just drop in a quick note there: with the award of the B1 174 DSF field, for the first time, HOEC has closed its 2P reserves to more than 100 million barrels of equivalent, and that is a good place to be in. So that is something that I want to share with you, because I've not followed the flow of the slides, but I just wanted to bring it up to you that now we have sat on a 2P reserve of more than 100 million barrels. It is 104 million approximately. And that is a good place to be in. That puts a lot of challenge on us and expectations from the shareholder community to fast monetize this reserve, because out of the 104 million barrel super equivalent, we have not produced more than 5 or 6. So there is an opportunity for us to run as if there is no tumor. So we will have to do that, and we look forward to all your health and support. So let me start here with a huge thank you to all of you, because it's a festival season, Gunters today, and you have still chosen to dial in.
Baroruchi Mishra
executiveMuch appreciated. I'll end my remarks at this point.
Operator
operator<<operator_script>> Our initial question is from Anubhav Goel at Cosma Ventures.
Anubhav Goel
analystThank you for those really thorough remarks — we do appreciate them. To begin, I'd like to open with a pretty wide-ranging question, because it's genuinely difficult to predict where the EBITDA and PAT figures will land if we successfully ramp up to 10,000 barrels. So if you could share a few thoughts on the EBITDA and PAT margins across our 3 assets — <<inaudible>> and BAT — I'd say at a crude price, since so many factors come into play, such as pricing differences, production costs, the government's share, the oil-and-gas mix, onshore versus offshore — just broad thoughts across the 4 assets.
Baroruchi Mishra
executiveAs you yourself put it quite well, this is subject to a great deal of variability, and not least from gas and oil prices themselves. First, for BAT: our operating costs there are the highest, since on a consolidated basis we have offshore OSVs — offshore support vessels — plus maintenance, tanker maintenance, and all of that. But we also saw high gas prices on the gas exchange in BAT. And crude has not immediately supported the cash flows. So our margins typically sit in the 30% to 40% range. Each $10 rise in oil prices adds roughly INR 30 crores to INR 40 crores to revenue flows. So let's talk there, because otherwise profit calculation and profit petroleum calculation involve multiple steps and follow different tranches. And so for this quarter, we had INR 10 crore of additional profit petroleum and things like that. So I'll hold back my comment on what the return would be — on a company basis, we are in the $30 to $40 range of margins in NBAD.
Baroruchi Mishra
executiveWhen it comes to quarter-on-quarter, we can provide exact figures, but predicting that is extremely hard. What we can forecast, however, is the volumes. After that, it's up to you to work out what our profits and operating cost might be, and we can say that our operating cost at the company level falls somewhere between 20 and 25, or 20 and 30, depending on diesel prices and other commodity prices. So we remain on track for the volumes we said we would produce. As of today, we believe we will reach them, even though we have a 15-day delay in the workover. But we will get there. So with those volumes, I suggest you run your first-chip first-pass calculations and come back to us, and then we will go into the details, because there are at least 10, 15 variables that determine what the final realization from these volumes would be.
Anubhav Goel
analystNo, sir, that was useful. So at the company level, it's $30, $40 — understood. And sir, just on BAT, you mentioned the targets we have for workover. Those targets come after the 2 new wells drilling stage, correct — at 5,000, 6,000, 8,000. I just wanted your thoughts, sir, on the monsoon risk here, because that risk is always present during the monsoons — we face a disruption, and that has really hurt us in the past. And if we do drill successfully and counter that risk, like — are you better at this now, with learnings from the past few years? How should we think about this.
Baroruchi Mishra
executiveThat's a really good point. So, our volumes are based on 3 new wells plus workover of 2 wells. And we will drill. The drilling itself will be finished because we have to demobilize the rig by May 15. If not, they lose to insurance, and they would have to stay continuously, and we'd incur standby charges all through the monsoon. So whatever the completion status of the wells, we'll have to demobilize. So that's — and we do hope we should be producing from these wells by then. Having said that, monsoon disruptions are real. But what we're trying to do is we've created a very small capacity on the Moku itself to have at least 3, 2 to 3 days of production, but with increased production, it will be less. So that if there's a short disruption in the ABL and the change, et cetera, we don't stop production. I mean, you should note that this year, even when our BAT is down during this monsoon period, they're not — 1 day, we shut down total production. We continue to produce from throughout the on soon.
Baroruchi Mishra
executiveSo we're getting there. A time will come. Next year, we're carrying out a full assessment of our subsea infrastructure. We're altering some of the flowing. We're examining the SBM design itself — not that anything is wrong there, but is there a better design to make sure the subsea hoses, et cetera, aren't affected by the met ocean conditions that prevailed during the monsoon in the Western offshore in India. But we're working towards — this year was a good story on monsoon, I mean, continuing our ability to produce through the monsoon because we were continuously producing, albeit at a lower rate because of D2 well completely watering out on 93% warn that not happened. You would have seen to disruption in monsoon this year itself. But we had a problem — so we had an SBM problem, and we created space in the Map storage in the Moroso while the SPM houses have been repaired 2, 3 days, they took or 4 days, we were continuing to produce from 1 of the roles. So at least that assurance we have. And we have a line of line of sight on how to improve monsoon, availability of our facilities.
Baroruchi Mishra
executiveI’ll pause right there.
Anubhav Goel
analystUnderstood. And sir, the PPT said the drilling rig contract has been awarded for the workover on the 2 new wells. So is it that it's been awarded for the workover, and then we'll see the outcome and then take a call to drill the new wells? Or, because you mentioned earlier, it's a single campaign — so I just want to check whether you have procured everything to do both? Or is <<inaudible>>
Baroruchi Mishra
executiveWe've got all the materials needed for the workover and for drilling the new wells. And really — look at this, how wrong can things go? I mean, stuff can happen, and stuff has happened. Take OGC's reserves: they had to accept a 70% downgrade, and 98 Bar as well. Reliance actually took hole downgrades in day. So these things do occur. But as of now, we're sitting on roughly 35 million barrels of oil equivalent in BAT — 26 million tonnes of oil, and 12 million, 11 million to 12 million of, I mean, the balance gas equivalent, oil equivalent of gas. So $35 million in total, of which we've used 3 million, or no more than 2.5 million. So how far can we go — that's the question we have to answer. Even with half the month, I'm still doing well. So we have to go for these wells, and we have clear structures where we can see unlocks plus other side data, and we do hope they'll turn out to be a good thing. What matters for you to know about how we're managing this risk is this: I'm not putting a platform — a marshaling platform — on top of the cells.
Baroruchi Mishra
executiveWe're doing this with what you could call a newer approach — it isn't a brand-new technology, but it's one that isn't used very often: mud suspension wells. The well gets drilled and tested without bringing a superstructure onto it. We drill through a template that's currently being designed, and then we'll drill 3 wells. Should we run into issues with the well trajectories, or in the worst case, we might not drill a third well — but that's 0.01, 99.99, we will drill all 3 wells. What I'm getting at is there's still a chance to save some money on building a new platform, putting it on top of the wallet platform over the wells, and tying it back to these 3 wells — if these wells don't turn out the way they're supposed to. That could change things; obviously, it's very low, but that's how we're managing the risk.
Operator
operatorMy apologies for cutting in. Mr. Goel, we'd ask that you rejoin the queue for any follow-up questions. <<operator_script>> Our next question is from Nirbhay Mahawar of N Square Capital.
Nirbhay Mahawar
analystSir, would you mind giving us those volume rates again for H1 FY '27 and 28, both on a gross and a net basis?
Baroruchi Mishra
executiveAll right. No. So, as I've mentioned, you guys are all financed with it. Let me give it a month and then you can say whether it is or has to be, because I'm looking at a monsoon on the West Coast. So by June of next year, we're aiming to have roughly 10,000 barrels of oil equivalent net to production. Now that could be 8.5 or it could be 11, but we're looking at 10,000 barrels of oil equivalent by June of next year. Why do I say June of next year? Because drilling, et cetera, stops by May. We have the final wells testing data and everything. We've put the offshore facility to start and rate the pipeline, additional pipeline and et cetera. After that, we can't do anything — if it slips, it's postponed. But we have a fair handle on our ability, on the scheme of things, to get to that production. The — but time, Assam will also produce from — at least from 0.8 to 1.7 that they're producing now to 1.2, which is 0.5 more. So that adds another volume. We'll have drilled 6 or 7 wells by then, which adds to volumes.
Baroruchi Mishra
executiveAnd then Kambey and PY1 — the interventions will be finished. And at that point, we’ll be in a pole position to drill the new wells by June, July of next year. So 100,000 barrels is our base case for next year, June. And then by December, when we have done — or by SP1 December of next year or January of next year, we will get to PY-1 production completely 15 million, which is roughly in barrel terms, will be roughly 1,500 barrels to 2,000 barrels of oil equivalent. So that takes us to 12 million to 14 million. And then we will P15, which we are hoping to develop in the quarter 1 — quarter 4 of '27, '28 and that will be on stream by June of 2028 and that will give us additional 3,000 barrels, 3,000 to 3,500. And then P174 will be online. So our target is by end of 2028 or the financial close in 2028, '29. We are looking at 22,000 then we do B124 and get 32,000 barrels.
Nirbhay Mahawar
analystLet me just make sure I understand this—when you say 10,000 barrels by next—by June '27, are you talking gross or net?
Baroruchi Mishra
executiveThat's net BOE net OEC — I believe I mentioned that.
Nirbhay Mahawar
analystSo on that net figure — are you saying that what you're turning out at present, 2,000, is going to reach 10,000 within the next 1 year?
Baroruchi Mishra
executiveRight. And that’s something that really confuses a lot of folks, because in manufacturing and other industries, you don’t hear about output rising 5x within 8 to 10 months. Here, we’re drilling wells, and the results are there to be produced. So that’s a very — that’s something that occurs in oil and the asset.
Nirbhay Mahawar
analystSo according to your projections, this 2 will turn into 10 crore over the coming 1 year, and then next year it becomes 30,000?
Baroruchi Mishra
executiveYes, that is correct, that is what you're seeing. As I mentioned, our 2P reserves stand at 100 million barrels of oil equivalent. And in the oil industry, generally, when you hold 100 million barrels of reserves, it's quite feasible to have activity lasting 6 to 7 years at 40,000 to 50,000 barrels of <<inaudible>>.
Operator
operatorManpreet Arora from Northern Lights Wealth is up next with a question.
Manpreet Arora
analystPrior to my first question, I just want a clarification regarding the figures you provided for oil and gas realizations at certain fields. <<inaudible>>, could you let me know what the average realization was for gas sales, or was it just to check?
Executive
executiveThat figure I can provide. What was the quarter again? My recollection is roughly 7.8%, or 7.8% — it's in the slides. Let me pull it up. No problem.
Manpreet Arora
analystSo shall I move on to the first question?
Baroruchi Mishra
executiveThat comes to somewhere in the neighborhood of $7 to $8.
Manpreet Arora
analystAlright, so first off, I want to ask about the volume ramp-up we saw at Dirok this quarter — 22.1 million curves per day. Our understanding was that with APM pricing, the way it works is customers go for the lower price cuts and then only pick the premium cars, which is why we were sitting in the 14%, 15% range over the past few quarters. So has that changed materially now? And should we expect this run rate, or was there something special that happened this quarter?
Baroruchi Mishra
executiveRegarding Assam, we aren’t — so this is — we used a hydrocarbon date that reflects the PPAC price, and that project is what we must follow. So it was only meant to help you understand — in August, we stood at 7.78, so from there, month over month, it has moved between 7.5% and 7.78%; as of today, we are — so each month, and this is tied to the Indian basket team. So today, realization in derailment — yes.
Manpreet Arora
analystLet me just make my question clearer, because I don't think I communicated it well. What I was getting at is that in the earlier years we were doing more than 20 million starts per day, but then we dropped to 15%, in a range of 15%, 14%. And the explanation we were given was that premium gas was being taken as a second option, since customers in Assam are taking a lower price cap from the other producers. And so as a result, the volumes had gone down. Now this quarter, I see it has moved from 15% to 22%. So I just wanted to understand, has demand gone up -- and can we assume that 22 million will be the run rate going forward, or did something special happen this quarter?
Baroruchi Mishra
executiveThe reason comes down to this: our gas is rich gas, and IOCL Oil India, the entities that purchase and market it, also produce decent quantities of natural gas. That said, you're absolutely right. We're a Sagas company, AGC is our sole customer, and price sensitivity there is enormous. They consume roughly 3% of the gas. So price sensitivity does exist in that relationship. Take at <<inaudible>> since NPL receives an APM from Sagas companies as well as this pipeline being the national gas grid. NRL is going to turn into a reseller — and we'll attempt — they'll likely levy a marketing margin, and that has to be factored in, or else they'll eat into our gas. And should they be unable to absorb our gas owing to our pricing, we'll then have the chance to sell at the gas state into the national gas grid. So my expectation is that yes, there will be an impact, but only in the range of 10% to 20%. Not beyond that, since <<inaudible>> will keep purchasing our gas, and at this price, and they've been doing so for some time now, and we've raised our production on that foundation, accordingly.
Manpreet Arora
analystRegarding the NPL pipeline, you mentioned earlier that some hot stopping was needed last time? There were certain <<inaudible>>
Operator
operatorApologies for cutting in. Sir, your audio keeps dropping out on us.
Manpreet Arora
analystCan you hear me?
Baroruchi Mishra
executiveYes, we can hear you. Please continue.
Manpreet Arora
analystRight, so I’ll ask that again. Regarding the DNPL pipeline, on the prior call you said an upgrade might be required and that they were working it out — and I just wanted an update from your end.
Baroruchi Mishra
executiveRight, right. No, I will. So here's the situation: that took place, we spoke with every stakeholder, and AGCL gave it very active consideration. They received all the pieces, they assessed every bid — but the price they were quoted for the hot tap was quite high, and reaching those locations was somewhat difficult since the sound floods had left that access very soft. So rather than hot tapping, NRL stepped in — they entered the picture — and said: look, previously I had made the personalization of NPL conditional on the shutdown, because the NPL would only be depressurized once I take that step. That has now changed. The reason is that we are installing a bypass line — NRL is installing a bypass line, which I showed last time as well — that links the DNPL line to the national gas grid. And there will be a tap-off on top of that where another party will buy the gas back from the national gas grid and keep producing, while it will depressurize — it will take no gas on the DMPL line, depressurize it fully, flush it with nitrogen, and then permit a standard conventional tie-in by cutting the waste section and creating laterals or welding sections with walls, et cetera.
Baroruchi Mishra
executiveTo link up the new section—which has been laid alongside the sections that had reduced thickness and asset integrity issues—so the dry—the hot tap was given very active consideration. It went to their Board; costs had come in high, and folks like KD Williamson and others, we're giving them 4 to 5 months schedule for hot—so tap access was an issue. So NRL stepped in, and they said, we'll give you a shutdown, we'll give depreciate the line without us having to take a shutdown. So that's happening now. The sport line material was all delivered in NRL premises early last month, and they should have completed or they will complete the by pipeline soon. and bypass line soon. And with that, they will start buying back the gas from the national gas grid and the precise the NPL for the rest of the world. That makes sense to you.
Operator
operatorApologies for the interruption. Please return to the Q4 follow-up questions, since a number of other participants are waiting for that. The next question comes from Purushottam at Cogito Advisors.
Analyst
analystOn the previous conference call, the timeline for us getting connected to the grid and gas was given as roughly December of this year. Where do things stand on that at the moment? I realize this isn't really in your direct control. But what information do you have — what did the revised timeline look like, based on whatever details you can share. Okay.
Baroruchi Mishra
executiveI mentioned this only 5 minutes back: once that per-line work wraps up — which should happen at some point in November — they'll need another 15, 20, though as things stand right now December still holds. That's exactly what I said. And you're correct, we aren't in, yet we're staying quite active in following up with our stakeholders, assisting and doing whatever we can to help with what they require from us, and they've contacted us about numerous matters. AGCL and ourselves enjoy very good terms — very good terms — for talks regarding technical opportunities or ways to cut cost and time. Still, yes, a December-end finish stays our best case: middle of December, or early November, or December. By 30, though, it should be complete, sir. That is excellent news, quite encouraging. It matters for the country, since all of us must now talk with our company hat on and wear the India hat, and with $24, $25 gas price, every molecule that can be produced ought to be produced.
Sunil Jain
analystOf course. SP1 I appreciate it — our following question is from Manan Patel, who is an individual investor.
Vaibhav Badjatya
analystAnd thanks for that thorough explanation. Sir, one question. Our CapEx on BAT has gone up from $45 million to $65 million versus the prior quarter. Could you explain the reason for that? SP1 Well, what you're stating is that wealth was consistently 45, and workover was consistently 15%. So 60% was the figure in our case last year, or in the last quarter as well. -- where 45% still remains. Okay. So my understanding was that the total is 45%. -- and just one confirmation. So once the NRL and BNPL connection takes place, our realization ought to be nearer to the IGX realizations? Or how should we view that? So I won't count the chicken before they come home. But we would be permitted to sell on the national gas grid, and that will certainly be above my current realization term, so this month it is $12 per MMBtu. We hope to average somewhere in the range of $9 to $11. That's the hope. Great, sir.
Operator
operatorThe following question is from — sorry, our next follow-up comes from Anubhav Gol at Cosma Ventures.
Anubhav Goel
analystSir, could you expand a bit more on how likely it is that T1 drilling will take place next year? Because even in the previous quarter, you said that until the contract is in place, you wouldn't proceed — and so far, that contract still hasn't been finalized. So what are the — is this actually going to happen?
Baroruchi Mishra
executiveThat's an excellent question, sir. The Board asks me this as well, and everyone does. So here's the situation. Without a firm gas sales contract or pay contract in place, if I spend 20 million, 25 million drilling these wells — and then I have to shut them down, we'd be back to what happened in the year — or 15 years ago when those wells came on stream. So that is a precondition for us — but it's not that once it's signed and we've all agreed, we'll then begin drilling, because from a technical standpoint we're already planning, and we'll be ready at the drop of a hat. We won't award contracts until we have a clear line of sight on an agreement, or even a tax of agreement, for the offtake with IOCL or Gail. Right now there is a very clear line of sight: IOCL has a station 24 kilometers from our PY-1 plant, and there they are running that facility, or that pipeline, which goes to the national grid at 63 bar. From the PIN line, we are — that line is a Gail line running from P1 to that C terminal; this 24-kilometer line exists now, but it's a Gail line, and it operates at 10 bars — and so there is a need to put some pressure on the IOCL premises to be able to boost my pressure from 10 bar to 63 bar, so that it can go into the national gas grid and into the distribution networks of.
Baroruchi Mishra
executiveSo what we've proposed to IOCL is this: since the compressors have a 2-year lead time, let's bring in rented compressors — and we've already secured ports for rented compressors. As soon as we hold further talks with them and reach an agreement, we'll move on this very aggressively. With those rented compressors, we can raise the pressure of the PY-1 gas, and from there it can flow into their national gas grid. Gail is showing interest as well. Right now they're capped at a volume of 3 million to 4 million scraps, or 2 million to 3 million stops, from PY 1, but they've indicated that new buyers might also come in, so we'll be watching the situation closely. As for whether I'll sign a take-or-pay agreement next year, I'd put it at a P50 chance, because rented compressors carry a cost, and in many instances sole sourcing has to go through their board. So what we'll be prepared for is this: the moment the gas sales contract is signed, we're ready to go. So we're in the game. But ahead of that, we're carrying out the well intervention to lift our production to 3 or 4 million square per day, so that we can keep selling to GAIL.
Anubhav Goel
analystNo, no—that was clear. So just to confirm, basically the compressor sourcing is the bottleneck. What if this issue were sold today itself—could we absorb it this year? Do they have to bring in more and more here, because then it goes into their gas grid and they have multiple chances to sell. They're also in—they supply to a lot of—so IOCL, if you look into it, they're getting very heavily into gas plays.
Baroruchi Mishra
executiveThey're already running their pipeline at 63 bar from their station, and the line of ours that runs to that station is about 24 kilometers at 10 bars — but every molecule we produce, they'll take it. We have that confirmation from them.
Anubhav Goel
analystUnderstood, sir. And sir, regarding Kharsang, over the coming 9 days we had driven. I believe we previously shared targets of 1,800 barrels of oil per day, but evacuating the gas portion is difficult — so as far as oil goes now, what target ought we to hold once you have finished with the next 9 bars?
Baroruchi Mishra
executiveFor many years, yes, in that sale range. So right now we're doing — on a gross basis, 12, we'll be looking at 1,400 barrels, 1,200 to 1,400 barrels from Kharsang on a gas and oil equivalent basis; if all the gas is included, we've gone past our target. But since we've hit gas and there's no way to sell it, oil will be doubled from 680, 700 barrels per day to 1,400, 1,200 to 1,400 barrels per day. That's the ambition, sir. What I mean is, that's what the technical study is telling us.
Operator
operator<<operator_script>> Our following question is from <<inaudible>> Varnekar, who is an Individual Investor.
Shareholder
unknownIs this coming through? About B 174, the new field that was awarded to us — the area is quite big — would we be looking to replicate the BAT model there, meaning acquiring new offshore facilities and setting things up? And what would the timeline be for B15 and B 174 to come online — what do you think is a suitable timeline, 3 to 4 years or longer? And one more thing. On the palate 2 areas — did we receive the production sharing contract from the government? I think you were going to get it — that's right.
Baroruchi Mishra
executiveIt's imminent — it's with the MoPNG, there are a few bank guarantee issues and other matters that we're sorting out, but it is imminent, sir. And that is — thank you for bringing it up, as it's a very prolific block, because right next to it, folks have discovered wells or producing wells at 300, 400 barrels per day. So we're looking forward to that block, sir. So it should be — my hope is that by January, we will have all of that in place; all the PSC extensions, et cetera, were already in place for the R2. Now coming back to your first question, which was about the B 174, it has a lot of discoveries at least at different locations. So we have to come up with a very innovative development concept where, if we are close to ONGC's facilities, we'll try to tie in there and pay them a tolling charge, or we might look at a minimum facilities platform. There are 8 locations, material discoveries for us. So we will have to plan that very well. But yes, there would be new facilities that we will build there. And under the Samut month the government has come up with this support for facilities, and there could be sharing of facilities also there, and we are talking to — we will talk to the local — the other winners or awardees of the blocks, and we'll come up with a situation where we do not duplicate efforts and duplicate resources and waste money.
Baroruchi Mishra
executiveLooking at it from a top-line standpoint, here's the situation. Drilling at VAT will be completed by June of next year — I mean, we'll try to have it on stream by June next year — and at BAT, come October 2027, we'll begin drilling, with the hope of being on stream by June 2028. Then come October 2028, we'll start drilling 174. With 174, full development will take us 2 years, since those accumulations are spread out and there appear to be multiple of them. As a result, we may need more than 1 facility. The 2P key reserves stand at 21 million — that's the DGH figure. Historically, we've seen — and we just saw in Era — that what was booked as 1P, or pending, had actually already been produced. So we've moved into a 2-key situation, which is now turning into 1P for <<inaudible>>. In the same way, we'll fully assess this field. Our hope is that 21 million will rise considerably higher. And because of that, we'll need additional structures that bring in resources together with other operators. Does that answer your question?
Operator
operatorNext up, we have Arora from Northern Lights.
Manpreet Arora
analystSir, regarding what you said about the FSO going for dry or — though that usually means sometime between January and March next year, and that is likely when we will sell the oil that is there. And in light of what happened with HPCL, what steps have we not taken to make sure this kind of discrepancy does not occur, because even in that case we had a COSA and the oil was taken, yet we had to go into arbitration. So have we taken some additional steps — so that when the oil is taken, there is some guarantee that nothing like this happens again.
Baroruchi Mishra
executiveRight. So to make a long story short, we're sampling on a routine basis, and no aberrations have turned up. The reason I mentioned January, February is that it could happen sooner, but with the tanker situation we aren't able to get small barges or vessels to lift the smaller cargoes. We've shared our site samples with IOCL, and they haven't found any issues in them. Still, we're awaiting finalization, and for the samples we've handed over, we've included all the content of provides, et cetera, so they can take a first-pass look and nothing comes back at them afterward. We've done the same thing at HPCL as well. That said, we'll be very rigorous about testing. We'll use third-party testing. I intend to be on the barge myself, on the tank, to make sure everything is handled properly. Not that I'll add a lot of value, but I simply want to be certain things are done right. With that said, we test our wells regularly, both D1 and D2, and they have 0 — when I say 0, I mean 0, nil, to write content in these wells.
Baroruchi Mishra
executiveSo we do have to. But I hear what you're saying, and we're being extra careful to make sure that kind of repeat doesn't occur. And on that repeat — I'm not suggesting there's any causation there, and I'm not admitting any liability by saying this. What I'm saying is that we don't run into problems with any party, with any of our buyers. We want to give them confidence that with Avenue, everything is right.
Manpreet Arora
analystRight, that’s good to hear. And sir, regarding the USD 65 million we need — the amount required for CapEx — are you also considering raising some equity to support that, or will it come through cash flow instead? So, again, sir? We have a significant CapEx program ahead, and I was asking whether you intend to raise equity as well to fund it, or whether it will mainly be our cash flows and debt only?
Baroruchi Mishra
executiveSo it’s not off our table, at least in terms of whether we—and this will require a lot of discussion—but if we have a strategic partner who wants to partner with us on PY1 at the right price and percentages, I think—and I might be speaking out of turn because all of this has to go through the Board. But on PY-1, we can definitely take partners and infuse equity at such a in dilute equities and whatever is needed to be able to raise on—but that said, we have got good response from the market from the banks. And we are hoping to have cash, both from our books but also from the lenders to be able to go through CapEx plans. But if there are some firm proposals—very happy to look at.
Executive
executiveYes, one thing I want to add here. So whatever CapEx we have, the plan exists. I would like to cover that CapEx through a mix of internal expo as well as external funding. So if at all — as already mentioned, and we did mention that anything that, okay, at project level, if any investor is interested — then the funding and all the structure will sit at project level. So it may not be that equity SP-9. Actually see it. SP1. Yes. So as I said for PY <<inaudible>>.
Baroruchi Mishra
executiveRight. So a lot goes into this — things like 1 field, the project level, and so on. And as we speak, we're actively examining collaboration at the project level — not through equity dilution or anything like that — rather, we're reviewing different constructs, commercial ones, that let us reduce the CapEx burden while still drilling the wells. So in that sense, we're doing — <<inaudible>>.
Operator
operatorThanks. That’s going to be our final question for today, ladies and gentlemen. I’ll now turn the conference back to management for closing remarks. Over to you, sir.
Baroruchi Mishra
executiveThank you. All I can really say is that every question shareholders bring forward helps me sharpen my own thinking and the thinking of our company, and each call with you leaves us sharper. So thank you very much. And we truly look forward to returning with good news. Challenges will always be there -- but we keep our chin up and give our best. So thank you for all the support, and I wish you a very happy Diwali, and you can now return to <<inaudible>>. Thank you. Bye-bye. Okay. So that's everything from my side. Should any questions arise, they can always work back to us, and we'll be happy to take them. Okay.
Operator
operatorThat brings this conference to a close on behalf of Hindustan Oil Exploration Company Limited. Thanks to all of you. We appreciate your joining us today, and you can disconnect your lines at this point. Thank you. Thank you, everyone. Enjoy your evening. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hindustan Oil Exploration Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →For developers and AI pipelines
Programmatic access to Hindustan Oil Exploration Company Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hindustan Oil Exploration Company Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.