executiveGood morning, everyone. Thanks for being with us today as we present the results for the full year of 2019. It's a real pleasure to report a very strong set of 2019 financial results. Ramón will walk you through the detail in a few minutes, but let me highlight the key points here. We keep placing a lot of emphasis and strength on cost control, and we managed to bring our all-in sustaining cash costs for the year below the 2018 level and also to the lower side of the range we guided to the market. So we're very proud of the work being done on the cost control side. Our EBITDA came in at $343 million, which represents an increase of 28% compared to 2018 — also very strong EBITDA. Our EPS rose by 80% compared to 2018, and that represents $0.09 per share. And finally, on the financial front, we have just declared a final dividend of an additional $12 million that, combined with the $10.2 million we declared for the first half of the year, totals $22.2 million compared to $20 million in 2018 for the full year. So we believe that's very positive news as well.
Ignacio Bustamante
executiveOn top of that, production came in really strong for us. We came in 5% above our guidance, which is another very encouraging sign. And beyond that, we actually set production records at 2 of our operations — both Inmaculada and San Jose. Then, as we'll get into a bit later, perhaps one of the biggest pieces of news we're releasing today is that we've once again made significant discoveries at Inmaculada, with considerably better grades, and that has also substantially expanded our resource base. Also, as you probably remember, we'd been having a hard time securing permits because of government delays in the case of Pallancata, and we finally got hold of those permits. They came through at the start of January. So we now hold every permit required for a full drilling campaign at Pallancata going into 2020, and that campaign, in fact, is already underway. Beyond that, we keep seeing meaningful optionality, as we'll demonstrate with our early-stage projects, exploration and our Rare Earths project. And lastly, we've made a substantial improvement to our debt profile at very attractive interest rates, which Ramón will also walk you through later. Let's turn to the next slide. Safety remains the company's number one priority, and you'll find 2 charts there showing how our safety index — frequency and severity — has been trending essentially since the IPO.
Ignacio Bustamante
executiveYou might remember that when we went public, our frequency ratio stood at roughly 7, and we made a commitment to bring it down to the best levels in the industry — around 5, or somewhere between 4 and 5. We accomplished that rather fast, but then for several years we were essentially stalled in the 2 to 3 range. We came to understand that the sole path to altering that was to build a plan aimed at fundamentally transforming the safety culture among our people. So roughly 1.5 years ago we launched a highly aggressive, intensive plan, and I'm delighted to say it is delivering results. As you can see, in 2019 we achieved our best-ever frequency and severity ratios. That doesn't mean the issue is fully resolved, but it does mean we're headed the right way and that a safety-first culture is truly taking hold across the whole organization. So the results make us very proud, and we think it matters not just to take comfort in having reached this point but also to keep assessing it and figuring out what more we can do.
Ignacio Bustamante
executiveBecause of that, we've just started another evaluation of our safety culture brand, and we're calling it Safety 2.0. It essentially takes the key elements that let us achieve this significant shift in our people's culture and fixes what we might have left out, along with what isn't needed, so we can keep making it better. So it has also arrived with renewed strength as we head into 2020, to keep aiming at being as good as we possibly can in safety. And the environment is the same. We are committed to the highest industry environmental standards. But unlike safety, where we have metrics that are easily measurable and comparable, when it comes to the environment, those metrics are very hard to find. So we decided that if no metrics exist, why not create our own metric? And we created what we call our ECO score, which essentially is a score measuring many things, such as discharge limits, environmental incidents, water consumption, waste generation, recyclable waste, observations from the regulators, et cetera, and pushes that into a score ranging from 0 to 6. We have been raising our bar each year. It began with 4, then 4.25, then 4.5.
Ignacio Bustamante
executiveAnd for this year, the goal is to go above 4.75, which is the line for the rate right here. And this ECO score is now tied into corporate objectives, bonus, and many other things across the whole company. So that has also helped build awareness of environmental care throughout the entire company — or across the entire company. That ECO score also let us earn a recognition last year. We took the Mines and Money Award 2019 for innovation and sustainability. And our aim is that at least this lets us compare our units against one another and see how they change over time. Our aim is that, over time, more companies will adopt this ECO score and be able to compare not only inside our own companies over time but also with the rest of the market. But as you can see there, we had — we hit these levels in the years 2017 and 2018. We saw a slight decrease going into 2019, mostly because of some environmental incidents that were not material, but still counted as incidence. And that has pushed us to take on another undertaking in the company, which is to build on the success we had with our Safety Culture Transformation Plan and apply the same Culture Transformation Plan to our environmental culture.
Ignacio Bustamante
executiveWe're currently rolling out a new Environmental Culture Transformation Plan for 2020. Our aim is to prioritize it to the same degree we've prioritized our safety plan, with the objective of continuing to strive toward hitting the top score of 6 as soon as possible. That covers the main points. At this stage, I'd like to pass things over to Ramón, who will go through the full year results in greater detail.
Ramón Barúa
executiveThanks, Ignacio. I'm really glad to walk you through this very strong set of financials, which, as Ignacio mentioned, rest on the impressive 28% rise in EBITDA for 2019. Revenue came in at $755.7 million. As you can see in the table at the lower right, higher prices drove that. Gold rose 12%. Silver rose 8%. On top of that, our output increased for gold by 4%, while silver fell 12%. Naturally, we aren't including Arcata, our primary silver mine, in 2019 anymore. Costs — we'll get into costs a bit later. Still, they came in better than in — all-in sustaining cost was already better than 2018, supported as well by operational efficiencies and by the fact that Arcata is no longer counted. As you'll recall, in 2018 it was already running very high costs. Higher depreciation during the period partly offset these gains. Consequently, gross profit reached $243 million, a margin of — a very healthy margin of 32%. Administrative expenses were pretty much in line with last year. Selling expenses rose, but that's directly tied to the export taxes we now pay in Argentina from September of 2018 onward.
Ramón Barúa
executiveExploration costs likewise rose. There's another slide where we'll lay out and break down that figure, but essentially it relates to increased exploration activity, mainly at Pallancata and at San Jose. The others line also deserves explanation here, since it climbed substantially — driven, I'd say, mainly by a higher provision for mine closure. Two mines — both old operations — account for this. Ares is the first. At Ares, as you're aware, there's a tailings facility, and we're currently closing it. As part of the required work, dewatering is necessary. Prior to dewatering, that water has to be treated very thoroughly, and we're putting money into a plant that will handle that. Our plan calls for fully dewatering that tailings facility over the next 2 to 3 years, after which we can move ahead and fully close it. The loss cost associated with it is now entirely booked within our mine closure provision. Then there's Sipan. Sipan is a mine that was operating even prior to the IPO.
Ramón Barúa
executiveThis is a really old mine, and we also have to treat the water at that facility. That treatment is taking somewhat longer than we expected, which explains why the provision went up. On top of that, we're putting money into upgrading the plant and the technology we use there, so we can get to a full closure of that facility faster. Given these figures, we posted operating income of $112.3 million, which again works out to a healthy margin of 15%, better than the 10% we delivered in 2018. On taxes, the effective tax rate came in at 46%. However, if you exclude the royalties we pay in Peru that are also recorded on this line, and you also strip out the withholding taxes, the effective tax rate comes to 30%, a figure that is very much in line with the statutory tax rates we have in both Peru and Argentina. Net profit was $60.1 million. The portion attributable to Hochschild shareholders was $47.6 million, which means earnings per share of $0.09. Moving to the next slide. I'll jump straight to the cash flow, since I think this chart does a great job of telling the story of what happened during 2019.
Ramón Barúa
executiveTo start, as you can see, our operating assets produced very strong cash flow at 3 of them: Inmaculada brought in $165 million; Pallancata, $41 million; and San Jose, $70 million. Exploration investment came to $44 million. Also, again, bear with me, we have a slide that breaks down how that money was invested. And administrative costs were $52 million, including LTIP payments for 2018 of roughly $8 million, which will not recur this year in this year's cash flow. Interest paid was $5 million. Dividends paid came to $29 million, about $7 million of which, of course, represents the dividends we paid to McEwen Mining, our partner in Argentina. Taxes paid were $14 million, with around $6.8 million paid in Peru, basically royalties, since we still have tax yields for our income tax in Peru, a tax shield that expired in 2019, and we expect to be paying income tax in Peru in 2020. And $7.6 million in Argentina, which relates, of course, to income taxes and the responsibility tax in Argentina. We had $17 million of progressive mine closure and care and maintenance. That number splits roughly 50-50 between the two.
Ramón Barúa
executiveWorking capital was extremely steady: the $57 million investment in BioLantanidos plus a $44 million rise in our net loans. As a result, we ended the year with a very strong $166 million in cash. Turning to the next slide. Here we show how the all-in sustaining cost performed. It landed at $11.9 per ounce, which is very near the bottom of the guidance range — guidance had been $11.8 to $12.3. So the figures are very solid. And quite impressively, it also came in under the all-in sustaining cost we recorded in 2018. Inmaculada helped with grades that beat expectations, roughly 9% higher, along with a number of cost efficiencies. For instance, we brought down the cost of cement, peroxide and cyanide. Pallancata already had a full year of the wider but lower-grade Pablo vein, yet we did see several effects on our cost per tonne. We lowered the transportation cost. Our backfill cost was lower. We also had lower cement costs here. At San Jose, costs held flat. Again, there were increases tied to export taxes and inflation, which ran at 54% in Argentina last year, but those were offset by a 59% devaluation and grades in the operation that were around 10% higher than in 2018.
Ramón Barúa
executiveSo with that, the guidance we’ve already reported for 2020 is $12.1 to $12.5 per ounce of silver equivalent. As you can see on the chart to the right, that does include a significant investment we’re going to be making at Inmaculada. We’re expanding the tailings facility there for $22 million. So if we exclude that one-off impact, guidance would drop to $11.6 to $12, very much in line with what we’ve been achieving over the last couple of years. Moving to the next slide on capital expenditure, the actual CapEx of around $137 million also came in line with the guidance we gave you at the beginning of last year of $130 million to $140 million. For next year, for 2020, guidance is going to be lower at $115 million to $130 million, and that comes despite, as I mentioned, you can see here on the chart that Inmaculada will be going up from $66 million to $80 million to $85 million, primarily, again, as a result of the increase in the tailings facility. But Pallancata will be coming down as we’re doing less mine development. That number is likely to be increased again as soon as we discover new resources at Pallancata.
Ramón Barúa
executiveSan Jose is declining as well. You might remember that in 2019 we had some equipment replacements and backfield plant investments that won't happen again this year. There are also fewer meters of mine development at San Jose. On the table to the right, we're showing you exploration expenditure for the period. Naturally, a significant decrease at Arcata compared with 2018, but an increase at Pallancata and San Jose, whereas Inmaculada stayed fairly flat. On greenfield, we spent $9.4 million on exploring Corina. We'll also have a slide showing you the results we've gotten there, which I'd call very encouraging. We also drilled at our project called Casma in Peru with results that weren't so good, and we explored in Chile and in Nevada as well. The total figure came to $44 million of expenditure, $38 million of which went through the P&L and $6 million was capitalized on the balance sheet. As for guidance for 2020, we have $36 million for more brownfield and $8 million for more greenfield, and we'll also be spending roughly $7 million to deliver the feasibility study for the BioLantanidos project.
Ramón Barúa
executiveNow, the last item is the balance sheet. Our balance sheet is still quite robust. As was noted, cash stands at $166 million, with net debt at $33 million — that works out to a net debt-to-EBITDA ratio of an impressive 0.1x. In December of last year, as you're aware, we finished a refinancing of our debt. We took $150 million from our short-term lines and turned that into a 5-year facility worth $200 million, initially priced at LIBOR plus 1.15%. But I also wanted to share that last week we fixed the floating rate. So the rate we'll now be paying — not a swap rate we'll be paying — comes to 2.534%. And lastly, on the dividend, we're declaring a final dividend of $12 million. That's on top of the $10.2 million for the first half of the year — an increase, as the table below shows, from $14 million in 2016 to $17 million, $20 million and $22 million, really $22.2 million this year. This payout comes to 46% of our pre-exceptional net income and 77% of our post-exceptional net income for the period. With that, I'll hand the presentation back to Ignacio.
Ignacio Bustamante
executiveThanks, Ramón. Now, turning to the next part of the presentation, you'll see the track record we've built over the long term when it comes to growing production and controlling costs. Production in 2019 came in 5% above our forecast. We had forecasted 37 million ounces, and we ended up pushing 38.7 million. So that's a very, very important beat against our guidance. And very importantly, we achieved that while also setting record output at 2 of our mines: Inmaculada and San Jose, as I mentioned. So we're very proud of that as well. And our all-in sustaining costs came in line with expectations across all 3 of our operations. When you look at the chart here, you can see what we've been doing over the past few years. We've grown production from 20 million ounces to almost 39 million ounces. So that's pretty much double the production. At the same time, we've pretty much cut our cost in half. So it's a material increase in production and a material reduction in our all-in sustaining cash costs. And going forward, we want to keep on doing that. How do we plan on achieving that? Through our growth strategy, which is based on 4 pillars: brownfield, greenfield, early-stage projects and strategic alliances, as we've been communicating to the market.
Ignacio Bustamante
executiveBrownfield remains the core of what we're doing, with the focus on aiming for life-of-mine extensions, boosting resource quality, and hopefully taking some of that spare capacity we have on hand and returning it to production — especially at Arcata and at Ares. On the greenfield side, we've also been working hard to streamline our project portfolio. Today our greenfield portfolio looks considerably more interesting and attractive than it did previously — streamlined, but made up of projects with better odds of delivering interesting results. We keep picking up properties we see as attractive for the company, and we're advancing the drill-ready projects we hold, with the aim of drilling somewhere between 4 and 5 projects each year. And we're essentially concentrating on 3 jurisdictions — Peru, Chile, and Nevada — since they offer the right combination of solid political and economic stability plus geological potential. We also have our early-stage projects, and we keep reviewing those. As you know, we have Crespo, we have Azuca, we have Volcan.
Ignacio Bustamante
executiveWe are examining Crespo more closely at this point, since Crespo is a project that remained profitable even when gold prices were lower—the issue was really one of scale. At current ratios, that scale could reach roughly 3.5 million to 4 million ounces annually, which isn't too bad. We are handling this across 2 separate areas. The first involves efforts to optimize the engineering work, while the second consists of exploring certain other zones around Crespo to determine whether we can identify additional material that would let the project either generate more output or extend the mine's life. So Crespo has us excited, and we will keep bringing you updates on whatever progress we manage to achieve there. We have Azuca, and I will spend a little time discussing Azuca. We also have Volcan in that location, which I will address a little later on. And clearly we are moving our BioLantanidos deposit forward, and Ramón will cover that a little later in the presentation. Lastly, we have the strategic alliances—essentially acquisitions aimed at joint ventures—and we keep reviewing opportunities in that space provided we are confident we can enter at an early stage, hold control, secure meaningful geological upside, and earn a solid return on our investment.
Ignacio Bustamante
executiveOn the resources side, you can see the news I flagged this morning. Essentially, 46 million ounces were added at an average grade of 475 grams per tonne. So there you can see a meaningful resource increase during 2019. I'll share a bit about where those resources come from and what we plan for 2020 regarding new exploration areas at Inmaculada. We're very pleased and proud of these results and expect to keep delivering even more during 2020. At San Jose, roughly 10 million ounces of resources were added, which wasn't enough to offset production, but we have done considerable work on potential that I'll gladly explain in the slides ahead. And finally, Pallancata — as you know, owing to the permitting delay, we were unable to drill there for pretty much the whole year. So only a few resources were added. But the permits are now in hand, and drilling is already underway. I'll tell you right now, in the upcoming slides, our view on that. So let me begin with this slide, and let me just move closer.
Ignacio Bustamante
executiveSo essentially, we have 65 kilometers here across the area that includes Inmaculada, Pallancata, and our Selene plant, along with all the key targets we hold — Corina up in the north, which I'll touch on a bit later; Pablo Sur, where we began drilling roughly the last 10 days; Cochaloma, where we're planning to kick off drilling fairly soon; Palca, which we already started last year and which is currently paused on account of the rainy season; and obviously the targets surrounding Inmaculada. So what we're trying to do here is hunt for veins that could carry material importance — veins that could be what we call a close to $1 billion vein, like what we had at Inmaculada, what we had at Pallancata, what we had at Selene. That's our objective. We're attempting to find similar things at Corina, at Pablo Sur, at Cochaloma, and at Palca — to look for material things. And as I mentioned, we're moving at full speed on that plan through the year, with all the permits that we're required to have in place. Moving on to Inmaculada and giving you the detail: at Inmaculada, as you may recall in 2019 — '18, we brought in something like 120 million ounces of resources at current silver-gold ratios, and the majority of them were coming from this area.
Ignacio Bustamante
executiveSo this is the Angela vein, and the material we brought came from this zone—say, the eastern side of the Angela vein. Those were giving us an average grade of roughly 320 grams per tonne, more or less. So we could have kept going with that and carried on with their expansions, but we said what we want now is to focus on areas with the potential to give us higher grades. So we began looking at many different areas, did a lot of potential in-field drilling—or potential drilling—and we came up with an area that was showing very interesting potential for a grade increase, which is this area right here. That comprises Pilar, Dora, Salvador, Santa Beatriz, Noelia, et cetera. And this is the area where we put all of the focus this year, and that's the area where we've been able to find 46 million ounces with 475 grams. And we're already starting to do the infill drilling to convert those into reserves as soon as possible as well. So we're very excited with these results. And also, this is an area that continues still totally open. We can see that the mineralization improved significantly on the other side of the Falla Lita, the structures are on this side as well, but the best mineralization is on this side.
Ignacio Bustamante
executiveThose structures remain open toward the east, and our aim is to keep tracing them as we speak. This sits extremely near existing infrastructure. It lies extremely near the spot where the Angela vein is found, and that permits very low incorporation costs along with very low-cost operations. And through 2020, our objective is to explore this zone continuously and to explore this zone right here as well, which takes in the Lady structure, and that is likewise delivering very positive results. So at this moment, we are pursuing these structures. And this, along with bringing out inferred resources very fast, very fast during the first half of the year, which is something we cannot presently accomplish given the permits we hold at Inmaculada. And you can also see here, this is where the resources sit and where our targeting is focused, but this is a zoom out, so to speak. And here you can see 3 areas that are likewise highly encouraging: Minascucho, Huarmapata and Shakira. Those 3 areas lie beyond our currently permitted areas yet are displaying a great deal of geological potential. So we are in the process of securing the permits, and we expect to have them, I would say, sometime between May and August of this year.
Ignacio Bustamante
executiveOur aim, then, is that throughout 2020, beyond drilling around the mine—which ought to deliver very favorable news too—these zones appear increasingly promising and will keep building out the footprint of our deposits. We're quite encouraged by that, and these will serve as 2020 drill targets. As a quick reminder, this zone here is this zone here, and this whole property is held by us at 100% at Inmaculada. So plenty of potential remains untapped there. The results achieved to date have me quite excited, and I'm looking forward to a successful 2020 as well. Turning to Pallancata. At Pallancata, you may remember we were awaiting several permits—essentially for 3 targets at Palca, Cochaloma and Pablo Sur. For Palca, we secured those in 2019. But for Pablo Sur and Cochaloma, we only secured them within the first 15 days of January. So what we're doing, with the permit just secured for Pablo Sur, is attempting to test, first, the westward continuation of the Pablo vein; second, the westward continuation of the Pallancata vein; and third, a system already in resources but still fairly minor—the Huararani area—though in our view we have potential to grow it and potential to connect it with the Pallancata vein as well.
Ignacio Bustamante
executiveSo those are the 3 main targets we're testing. We should be testing these 3, I'd say, over the coming 2 to 3 months, and wrap up the entire drilling campaign. By May, I'd say, drilling ought to be done and results in hand. So we're excited about that, and it could be the nearest-term source of extra production and resources given how close it sits to where we're working now. So we'll keep the market updated on those results. At the same time, we're drilling 5 long holes — long drill holes — in this area as well, roughly 1.5 to 2 kilometers in length, aiming to intercept any other structures we might find inside our existing operating area. And this is on the actual area of operations. South of that, we have Cochaloma here. And at Cochaloma, there are 2 structures, or 3, that we want to test, which are Cochaloma, Esperanza and Pumahuire. And at Palca, where we began drilling last year, we did encounter structures that were already economic, particularly Prometida, Escondida — sorry, Santa Beatriz, Escondida and Prometida. And our goal for 2020 is to keep advancing Escondida and Prometida and bring in one more vein, the Alexandra vein, and carry on with the drilling program.
Ignacio Bustamante
executiveThose are the ones that have looked most encouraging up to now, and we'll keep working through 2020 on converting them into inferred resources. We're also quite encouraged by Palca and Cochaloma, and hopefully we can make solid headway there too and keep you updated. Beyond that, Corina is another possible source of mineral for the Selene plant. Corina, as well, has us very excited given the results we've gotten. Here you can see the structure, or the potential structure. We carried out our first drilling campaign. The rainy season forced us to halt it, but we got some very interesting intercepts, for example 3.5 meters grading 9 grams of gold and 32 grams of silver. We got 43 meters at 4 grams of gold; 25, including 16 meters, at 6 grams of gold; 3.7 meters at almost 8 grams of gold. So there are plenty of encouraging results there that we think are bringing Corina very close to a discovery. So we're waiting for the final -- for the rainy season to end. And hopefully in April and May of this year we can resume drilling in this area and define our resource.
Ignacio Bustamante
executiveAnd it sits really near the Selene plant, so that could be a pretty interesting potential mineral source too for Pallancata, feeding the Selene plant. Then there's San Jose. For San Jose, these are the targets we have lined up for the year: Aguas Vivas, the areas around our current operations; Rosalia; Telken; and the area sitting between our current operations and Newmont's Cerro Negro. Let me start with our operations. At the operations, we keep adding resources. As I showed you, we added roughly 10 million ounces of very high-grade material in 2019, and we think this area can keep giving us more high-grade resources. We're basically chasing Micaela to the west and the Huevos Verdes area down in the south, and we're drilling as we speak as well. So that's a target for the first half of the year, and that target is the one here. On top of that, we've already started Titan geophysical work. Titan geophysical work — we've talked about that before, but it's basically a system that lets us do geophysical work at much deeper depth.
Ignacio Bustamante
executiveAnd that approach has already shown it works at Inmaculada. So we're taking that Titan model and applying it at Pallancata, at Selene, at San Jose, across every one of our operations and our targets, with the aim of generating further exploration targets. So right now we're carrying out the Titan drilling between our properties and Newmont's Cerro Negro properties, with the purpose of producing new targets that we can also test during 2020. And as you may remember, getting permits in Argentina is a much simpler and far leaner process than it is in Peru. So once we've identified the targets, being able to drill them should happen fairly, fairly fast. Telken North is another target we have. So what is Telken North? Telken North is an area that essentially works on the assumption that the veins from Newmont's Cerro Negro project continue projecting into the property of ours that's called Telken North. We only got the permit 2 days ago to drill this area, and we're currently preparing the roads and everything else needed to kick off this drilling campaign. And we already have indications that there could be -- that those successions are reaching into our own property. So Telken is something else we're very excited about, and that's something that, hopefully, within the next month or so, really should get started as well.
Ignacio Bustamante
executiveSo looking at those structures at Cerro Negro, our belief is that they're trending in this direction. And Rosalia is a target where the hypothesis involves testing whether this structure potentially continues further north. So Rosalia will be one more target that we'll be testing as we move through 2020. And lastly, there's Aguas Vivas. Aguas Vivas is an interesting target. We already have economic intercepts at that location, but it's a target that appears to be more of a lead and zinc deposit. Lead and zinc content is significantly greater than that of precious metals. So unless we can demonstrate that something big or bigger exists there, continuing to place a lot of focus on Aguas Vivas really doesn't make too much sense. But we do have certain ideas that we're going to test, aimed at potentially finding larger bodies beneath the areas where we currently operate, to see whether or not they are there. So that's what we'll be testing — testing for the possibility of larger occurrences at Aguas Vivas. So those are the plans for the current operations. This chart is one we find interesting, because these are our properties in Peru.
Ignacio Bustamante
executiveHere's the region I just showed you, and it takes in Inmaculada, Pallancata, Selene and Corina over on the western side. Then down in the southwest we've got Arcata, Ares, Crespo, Azuca and Condor. Beyond the work we'll carry out at our operations and at Corina, we're also going to be drilling during 2020 and 2021. The permits are already being reapplied for. A portion of those could arrive in 2020, and a portion could arrive in 2021. That covers quite a few targets at Selene that we're listing here — Pacapausa, Makarena, Gaby Marina, Huachuhuillca, Sayrosa and Condorillo. A few of them, Huachuhuillca for example, will get drilled in 2020, and a few in 2021, but this remains a highly prospective area sitting very near the Selene plant. On top of that, you might remember our early-stage Azuca project. Azuca is a project holding a substantial number of ounces already — more than 100 million ounces of silver — yet it still doesn't reach the economics we'd want before it can be economical or deliver the financial returns we're expecting. So there's a project beside Azuca, Huacullo, with the potential to hold higher grades.
Ignacio Bustamante
executiveWe’re expecting the permit to drill Huacullo at some point around the middle of this year, and the aim is to drill Huacullo. I think we can locate better mineral there that might materially alter the project’s economics and make the Azuca-Huacullo combination an attractive project. So we’re also waiting for that to happen during the year. Crespo, we discussed that. Crespo looks interesting and has potential to grow from essentially 3 areas. We’ve only touched the shallow portion of the Crespo deposit. We think that going deeper could also allow it to grow. Also, over time, this deposit has been eroded, and the erosion has been deposited in what are called colluvial deposits. So we’ve tested some of those colluvial deposits and they are showing the same grade as the ones we see at Crespo. So that could be an additional source of further resources. And also, there’s another target nearby, Cusco, that we have not finished exploring, and it will also be a target for exploration in the coming months. So there’s also a lot of potential at Crespo as well. Arcata, Ares, we have many targets.
Ignacio Bustamante
executiveWith Ares, drilling is underway right now. As for Arcata, we're awaiting the permits, though we keep seeing substantial potential there and are treating it as a temporary suspension. Then there's Condor, which is also waiting on permits and sits fairly near Arcata and Ares. That one could become either feed or a new — possibly a new — operation. It's already producing, and small miners are active there. The mineral is present, but a geological — a full-scale geological study has never been carried out there. So no one has any real sense of how large this could be. All we know is that plenty of mineral exists at very good grades and it keeps coming and coming. So we now hold control of the project and are in the permitting process to drill and determine whether it can work as a stand-alone operation. And obviously, the targets we just mentioned at Pallancata and Inmaculada. So there's still plenty of optionality even beyond our current operations. Briefly, we touched on this a little. Our aim is to drill 4, 5 projects each year; 3 countries, Peru, Chile, and Nevada. Peru. In Peru, permits are taking longer.
Ignacio Bustamante
executiveWe'd like to add to that with additional projects in Chile and Nevada. In Peru, we're drilling Corina. At Corina, we think the cash indications could point to an economic discovery. That's got us quite excited — so much so that it's no longer with the greenfield team. It has now been shifted over to the brownfield team. And an aggressive drill plan is set for this year to see whether we can convert it into our resource. Condor, which we just covered, is in permitting, and we have 2 further greenfield projects, Cueva Blanca/Alto Ruri, though we are currently in talks with communities so we can get access to the land and begin geological work there. In the Americas, we have Snip in Canada, which I'll cover on the next slide. We also intend to drill 2 additional projects. One is Cooke Mountain with Adamera, located in Washington, and the other is Horsethief with Allianza Minerals in Nevada. So those are the locations where drilling will take place this year. With luck, we can identify 1 or 2 further ones to add to our pipeline as well. Lastly, there's Volcan. Volcan is a project holding roughly 10 million ounces of gold and has the potential to become a huge project, but there remain 2 items we still need to address.
Ignacio Bustamante
executiveThe first item is metallurgy. We think there’s room to improve the metallurgy, and we’re already collaborating with a couple of engineering firms to determine whether the metallurgical recoveries can be optimized there. The second item is the water situation. As you know, we hold the water rights, but obtaining water permits from the government is becoming more difficult. So we’re looking into a wide range of alternatives. One involves a company named ENAPAC, which is attempting to bring together the companies active in that part of Chile, Maricunga, and determine whether they can assemble a project to deliver desalinated water and supply it across the whole Maricunga area. On that front, there have been positive — a couple of positive developments. One is that Kinross has just announced it will restart operations at La Coipa in that area. Also, Goldfield has announced it will move forward with the Salares Norte project, which is situated very near this project as well. So there is activity, which is broadly good for the area. And clearly, it raises the odds of Volcan becoming involved in a project, or getting closer to an actual project, over the short to medium term.
Ignacio Bustamante
executiveLet me keep this quick. Snip represents a highly intriguing investment we made. We bought shares in that company. That capital, however, was strictly designated for exploration activity solely on the Snip property. The company's name is Skeena Resources, and it holds 2 projects, Eskay Creek and Snip. The project we feel aligns best with what we need and what we're good at is Snip. Those funds went toward exploration during 2019, and the results were quite interesting. The thinking behind it was that Snip historically yielded roughly 1 million ounces at extremely high gold grades — approximately 1 ounce of gold per tonne. And the goal was to find out whether parallel structures existed alongside that original body. So drilling took place, and they hit, I'd say, at least a couple of drill holes that are very interesting. One of them is 5 meters at 16 grams of gold, which is very good. And the other is 1.5 meters but carries 1 kilo of gold. So -- and that one includes 50 centimeters with nearly 3.4 kilos of gold. So there's plenty of gold in there. And these results have us very excited. Another drilling campaign is coming in '20 -- in 2020, once the cold season ends.
Ignacio Bustamante
executiveWe're eager about that campaign too. What matters most here is that we hold an option to buy as much as 60% should the project please us and we decide to take control of it. So we're very, very enthusiastic and eager for the next campaign. That said, I'd note this project looks quite promising as well. With that, I'll pass the next 3 slides to Ramón so he can speak briefly about BioLantanidos innovation and valuation, and then I'll return for the conclusions.
Ramón Barúa
executiveThank you. Thanks, Ignacio. Now, BioLantanidos — if you happen to believe in the electric revolution, then BioLantanidos should definitely be of interest to you. Honestly, the market has been — I think the market genuinely does believe in the electric revolution. All of us have watched Tesla's stock climb rather impressively over recent weeks. And the bulk of the market has been asking, "Alright, so which minerals will this revolution need?" And attention has gone toward the ones tied to batteries. There's plenty of discussion about cobalt, lithium, and nickel, yet not much about rare earths, which matter critically when it comes to motor efficiency. So essentially, the performance achievable from the same battery by using rare earths — particularly the ones that function as permanent magnets — is truly essential for this revolution to happen. With that in mind, we've already spent 4 years studying the market, and we found this deposit in Chile. Now, this morning I was asked about other rare earth deposits located in Africa. I was asked about Molycorp in the U.S. and how our deposit stacked up against those. And my answer was, "Well, it has nothing to do with those." Truly, the global leader in rare earths is China.
Ramón Barúa
executiveAnd in China, six companies hold sway over the market. Five of those dominate heavy rare earths. Those five companies possess ionic clay deposits. And the deposit in Chile is the sole ionic clay deposit beyond China that works economically. That is the reason this project is so distinctive and so crucial for the future and for the electric revolution. This project is especially rich in the heavy rare earths. Keep in mind that 4 of them function as permanent magnets. We have neodymium and praseodymium, the lighter rare earths. They matter for the magnets. But for that magnet to perform under extreme temperature conditions, such as in an electric vehicle, you will need to add dysprosium and/or terbium. And that is particularly what this deposit provides. Operations should be extremely straightforward. The mining is really closer to quarrying. No explosives are required. The mineralization sits within the first 30 meters. And the process is also very simple. It has 3 stages. The first is the desorption stage, in which the clay gets washed with an ammonium sulfate, which is not a hazardous chemical.
Ramón Barúa
executiveIt's actually a fertilizer. After that come 2 stages in which the impurities precipitate. Then there's the final stage, where carbonates of the rare earths precipitate. So this calls for very low CapEx. The way this deposit works is that the main cost is tied to hauling the clay to the plant. So as you go deeper into the deposit — and keep in mind, we hold around 87,000 hectares of Chile's finest clay deposits — you'll likely need to build another module. That's fantastic, because it lets us grow in stages. And we would have had to commit a huge amount of capital upfront just to get going or to begin producing rare earths. There's plenty of geological potential. We're testing some of it. Testing that potential costs substantially less than the other exploration work we're carrying out at our existing operations, since this uses sonic drilling. Again, it's just 30 meters deep. And here, running them is very easy. We've appointed a separate management team to chase this opportunity. We've brought on a local CEO. We've brought on a project manager.
Ramón Barúa
executiveWe already have a full geological team based in Chile. So the plan, naturally, is that we at Hochschild Mining don’t get pulled off course by one project or another, or give it as little attention as we can, while the project itself still gets very strong management focus. As you’re aware — as you know, we remain a gold and silver company. That is absolutely our main focus, but we think a project like this one, where the entry cost was fairly low relative to our market capitalization and which offers such explosive and exponential growth if the electrical revolution happens, is a very appealing investment for the future. We are in the middle of finishing metallurgical optimization. That work is going very, very well. And we are finding ways to improve on the work done previously. The permitting process is also progressing. And we’re carrying out some equipment testing that will, of course, be an important input for completing the feasibility study that we have offered for the first quarter of 2021. On the next slide, I just wanted to give you a couple of examples. I mean, there is a very strong push that we as management are giving the company when it comes to innovation.
Ramón Barúa
executiveAnd here are just a couple of examples. The first one, which we've already discussed, is ore sorting. We think there's a lot of value we can add—particularly at Inmaculada, in the new veins we're discovering, namely Millet and Divina and the new ones Ignacio has mentioned—by applying ore sorting. We've done testing in Germany with, again, 2 German companies, Steinert and TOMRA, and the results were very, very positive. We've done pilot testing in Brazil with Steinert. Results are going to be coming in March. But preliminarily, they do support the findings we obtained in Germany and further complement them. We've hired Ausenco to help us figure out how this new technology would fit into the existing flow chart that we have at the Inmaculada facility, so it's going very well. We've also been working in-house to improve the sensors and the algorithm that separates the ore from the waste. What I can tell you is that, in general, with very simple technology, we're able to separate very easily between the quartz-based mineralization and the andesite that is the holding rock. The ore restriction that we were facing was the size, the particle size.
Ramón Barúa
executiveThere's a certain size that works ideally for the sorters. And in our operations we weren't exactly achieving that, since we use a lot of explosives to bring down the cost of grinding and milling later in the process. But we've been collaborating with various suppliers. And we've found that we're able to control the particle size at the mine so it matches the sorters precisely. So that's something we're quite enthusiastic about. And naturally, you can picture how much buzz this is generating within the company around innovation. And at this point it's pushing the rest of the team to consider innovation too. Mine digitalization is another example. Previously, all the data from within the mine was gathered by hand. Right now we're in the middle of digitizing it. We brought in a company. It's actually a Chilean start-up. And we ran a 3-month trial on certain equipment. And we discovered that productivity could rise quite substantially, by 34% to 42%. So given that conclusion, we've chosen to fully adapt this technology to our equipment. And we do expect reductions in fleet size and costs, of course, at Inmaculada.
Ramón Barúa
executiveAnd lastly, there’s a slide about valuation. The figures come from FactSet, dated February 14. As you’ll see, on each valuation measure we examined — comparing ourselves with peers in both the U.K. and North America — we looked clearly undervalued. So with that, I’ll hand back to Ignacio for the conclusions.
Ignacio Bustamante
executiveThanks, Ramón. To wrap things up quickly, what we've shown today is a really solid, strong record when it comes to production and keeping costs under control. Inmaculada keeps coming through on the increases to our life of mine, and that has us quite excited. The exploration program across the whole Hochschild portfolio is also generating a lot of excitement now that we hold every permit at Pallancata too. So that ought to give us news flow over the coming months as well. There's attractive optionality in greenfield, early-stage projects and in the M&A strategy too, and as we discussed, the innovation program Ramón just walked through — which is meant to deliver upside on both operations and projects — keeps us very motivated as well. On top of that, we're generating significant free cash flow with the prices we're seeing right now. You can see the gap between the first half and the second half, with production at roughly similar levels, and the effect those higher prices are having on free cash flow and on the balance sheet overall. A strong balance sheet lets us execute the strategy at full speed and gives us the chance to generate further shareholder returns. So that covers pretty much the whole presentation. Now, any questions you might have for Ramón or for me, we're happy to take them.
Daniel Major
analystDan Major from UBS. I have two lines of questioning, really. First, on exploration, which you touched on briefly. Could you reiterate that you have absolutely all permits needed across your key 3 assets to carry out every drilling program required for 2020?
Ignacio Bustamante
executiveLet's take them one at a time. For Inmaculada, we have the permits — remember, I said we needed to — that during the first half of the year we'll be working on this area and on this area here, so the veins here and the veins here. To do that, we have every permit required. The other part is a small extension beyond the current operations area, which is Minascucho, Huarmapata and Shakira. For those, we're in the process of obtaining the permits and should be finished. For some of them, we're targeting May, July and August. So we expect to have all 3 of these permits during the year, okay? But for the others that should give us the continuation of the further extensions on Lady and hopefully other structures, for those, we have 100% of what we need. These are for the extensions that will need permits for 2020. That's one at Inmaculada. At Pallancata, we have all the permits. For Corina, we have certain permits to keep drilling once the rainy season is over. And we expect it isn't just an ITS, which is something simple — a simple process, to get within 3 months, the process to complete all the rest.
Ignacio Bustamante
executiveThat looks good too. And with San Jose, the sole permit we still needed was the Telken North one, which we already hold. So for 2020, we have every permit in hand.
Daniel Major
analystOkay, that's very clear. My next question concerns the reserve and resource statement. I believe your resource grade was pretty stable, maybe a touch higher. At Inmaculada specifically, the reserve grade declined somewhat. Could you give us a brief explanation of what caused that lower reserve grade?
Ignacio Bustamante
executiveYes, and that appears in the schedule right here. What you can see is that — as you recall, back in 2018 we succeeded in bringing in a substantial quantity of resources across the Divina and Millet areas. That area has already been through infill drilling. So we've now shifted it out of the inferred resources category and into reserved drilling. And keep in mind those carried a grade of roughly 320. There's also been some grade upgrade, which is a positive. But once you convert all of that, and there was a sizable amount — 22 million ounces — turned into reserves, that's the factor pushing the grade lower, those new ones. And with the 320, those are what we've converted. This year, though, we're also putting hard work into converting the higher-grade ones. That infill is underway right now as we speak, with the aim that by June those new higher-grade resources will likewise become reserves, lifting the average grade of the resource additions.
Daniel Major
analystGot it — and one last thing on exploration. Because of the permitting holdups you ran into this year, do you still expect to hit that goal you described — I don't recall the exact figure — of 10 years of resources across all of your assets by 2022?
Ignacio Bustamante
executiveI'd say with Inmaculada, we're basically at that point already given where we stand. And keep in mind, Inmaculada accounts for roughly 75%, 80% of the free cash flow we generate. So I'd put it this way: in 75% to 80% of our plan, we're essentially there now. And clearly, with Pallancata, things have slipped owing to the permitting circumstances. Our goal of getting to a 10-year life of mine hasn't changed. What we need now is to drill those Pablo Sur, Palca, Cochaloma areas and then await the results. That part isn't within our control. The work has all been completed on our side. We think they hold a lot of promise. But we have to do the work before we can say anything. That said, we already hold every permit required to test whether that's a possibility. And as for San Jose, we remain very enthusiastic about the upside and the targets we just referenced. So we're eager as well to see this plan carried out and to hold off until we can provide a further forecast. So what we expect is that by the end, ideally we'd want to hold another Capital Markets Day, where we discuss exploration, the results, and bring you up to date on our newest views regarding that.
James Bell
analystJames Bell here from RBC Capital Markets. To build on what Dan asked regarding Inmaculada: you're projecting 250,000 ounces of gold equivalent output for 2020 — how should we view the years beyond that, considering the reserve grade is lower but you've clearly outlined an additional 0.5 million ounces at a grade well above it? Should we take 250,000 as the correct figure for the coming few years, or might we see some short-term decreases while those higher-grade resources are firmed up and brought into the mine plan?
Ignacio Bustamante
executiveIt's probably still early to say. I think we can foresee the next at least couple of years with production being very similar, 2 to 3 years. As we have talked, the grades coming from the Divina, Millet areas were lower. But in certain areas, we have had upgrades on grade, particularly in Millet. Not necessarily in Divina, but in Millet, we have seen an uplift once we have done the infill of about 15%, which is a good number. The new -- the areas that we are bringing have significantly higher grades, much closer to production. We have this ore sorting technology that could also allow us to improve the grade. Those areas are located very close to current operations, so the CapEx should be also very, very low to compensate for the all-in sustaining cash cost. And also remember that we have the possibility of increasing very, very cheaply and efficiently the plant capacity by 10%, investing around $15 million. And even more increase also very efficiently if we wanted to work ahead of that. So our goal is to try to continue coming up with the resources that would allow us to maintain a production as evenly as possible going forward.
Ignacio Bustamante
executiveStill, those alternatives are in our hands — we’re managing them, lifting the grades we have now, developing new resources, ore sorting, the cost — that ought to help, along with the <<inaudible>>.
James Bell
analystAlright, so back to exploration for a moment — you mentioned the goal of going after those veins you're calling $1 billion. And you've got early-stage drilling underway at some exciting targets, with results apparently coming around the middle of the year. From that initial drilling, do you think you can generate that same level of excitement? Or at what point do you start saying, "Actually, this is something real"? Will it take a few holes? Will it be toward the end of the year when you're saying, "Actually, this is one of the key veins"? How should we think about that timeline for results and the potential materiality to the business?
Ignacio Bustamante
executiveSo with Corina, I'd say hopefully we'll have an answer by the end of this year as to whether it could be a $1 billion vein — by the end of 2020. For Pablo Sur, definitely this year. And for Palca and Cochaloma, if something is very obvious, we may find it this year. If it isn't that obvious, it could take us beyond this year — and these ones are more complex, since they're new and farther apart. Keep in mind, Palca has 14 kilometers of superficial anomalies, so — and we only just completed a first drilling campaign that had to be stopped because of the rainy season. So there's still plenty of pending work to do here. So for these ones, we should know in 2020 or 2021 at the latest. And for these ones here, let me see where they start. I believe they're here. Yes, among the ones we have for Selene, Pacapausa, Makarena, Gaby Marina, Huachuhuillca, Sayrosa, Condorillo, I think Huachuhuillca so far is the only one that looks likely to be drilled this year. So that's another one we should test this year for a potential $1 billion occurrence.
Ignacio Bustamante
executiveAs for the remaining ones, we're working as hard as possible to have those become 2020 targets. That said, we can't confirm that at this point. And if they don't land there, then without question they'll be 2021 targets, which we ought to be able to test too.
James Bell
analystAll right, so we should be watching for plenty of results with Q2 production on this <<inaudible>>.
Ignacio Bustamante
executiveWhen it comes to Q2 production, we're right where we should be given the resources we've got at this point — absolutely.
James Bell
analystAlright, just one more quick question if I can. At this point, it doesn't seem like BioLantanidos is getting much value reflected in its share price. A feasibility study is still quite a way off, in 2021. Do you think it would be worthwhile to do more to educate the market about the project and the upside you see from that feasibility study, beyond the single slide and the information you've shared today?
Ignacio Bustamante
executiveYes. Would you like to handle that, or...
Ramón Barúa
executiveOkay, so here's where things stand. This deposit was acquired from a private equity company based in Chile. And what we're discovering as we optimize the metallurgy is that there's considerable upside coming our way. So we feel — well, I feel — that when we hand you a figure, we need to stand fully behind it. Fortunately, those figures keep shifting in a direction that benefits us. So at the moment we're putting the equipment through its paces. On the equipment testing side, I noted that the prior work done by those folks was, in our view, suboptimal. That means those figures need adjusting too. So we genuinely require that extra time in order to give you figures that are very, very solid. We're aware, and we fully understand, that the danger of withholding those figures until later is that the market gets somewhat puzzled about the investment and lacks a complete grasp of it. So you're weighing one against the other. I could toss out some figures for you, but if I'm not standing 100% behind them, then — what I mean is I'd be revising them within a very short window, and I don't believe that would be fair.
Ramón Barúa
executiveWe get the risk involved here. We want to use this chance to go through this really unusual process thoroughly, because — again, apart from China, as I said, there isn't much experience or only quite limited experience with this kind of thing. It isn't hard. But that work has to be finished before we can give you a very solid picture of what the numbers look like.
Richard Hatch
analystRichard Hatch from Berenberg here. I'll start with the dividend. I appreciate that you've raised it and that you keep raising it. Still, this company produces a great deal of free cash flow, your leverage sits at an extremely low level, and you're yielding 2%. Yet compared with some other London peers, roughly 5% is kind of the top, the upper end of the dividend yield. So why not raise the dividend more meaningfully? You can afford to do it. If you can extend the life of the mines, you generate strong free cash flow. So what's the thought process behind that?
Ramón Barúa
executiveNo, absolutely not. All of that has been under review. Once more, we feel 2018/'19 was a really outstanding year where cash flow generation is concerned. 2020 appears to be shaping up the same way. Yet, as Dan mentioned, plenty of work remains before we can keep the Inmaculada grade steady over time. That's why we have an ambitious exploration program in place. And we — what I mean is — should those results come in positive, we must also be prepared to back it further if that becomes necessary. Next, we still carry debt amounting to $200 million. We managed to extend it. And even though prices are favorable at present, we have to ensure we keep a substantial cash balance so that net debt stays reasonable and we retain the flexibility to carry out our growth plan — we'd like to add an ore mine for you. Also keep in mind that our flexibility on the equity side is limited, with Eduardo holding 51%, which is a good thing. It also gives shareholders some reassurance in knowing the equity is tight. So from that standpoint, cash matters a great deal to us and is very precious to us.
Ramón Barúa
executiveAnd we don't want to hand you an increase this year that we can't sustain in the years ahead. So the message we want to send is that we're raising the dividend, particularly in years when we're profitable like this one. We would like to — we don't have a policy, because we want to keep the flexibility so that if prices fall, we can make an adjustment without hurting our credibility. So we do treat that dividend as a serious matter. We don't think we're going to be a very — a company with a super high dividend yield. But we're going to be there for you and paying a dividend down the road in scenarios like this.
Richard Hatch
analystThanks, Ramón. And since I have you, on the digitization — digitalization of the mines, you mentioned some opportunities for cutting costs or boosting efficiency. Is it too soon to give a rough figure for where you think Inmaculada's all-in sustaining costs could land if that efficiency does improve?
Ramón Barúa
executiveSee, when it comes to digitalization, the effect is going to be fairly limited, honestly. What we've discovered is that, for instance, with the tests we conduct, the cost savings will be — the initial savings will land somewhere in the range of $1.5 million to $3 million. So the fleet reduction will likely cut 1 jumbo and 1 scoop. So yeah, that's sort of an innovation that keeps improving continuously. Ore sorting, in my view, is far more radical. Should we succeed with ore sorting, which we're fine-tuning again, that could have — a massive impact of, I don't know, somewhere between, depending on how many resources you run through the ore sorter, it could carry an impact of, I don't know, $50 million to $100 million. But once more, I can't give you those figures at this point since I lack robust numbers to back them up. Still, that project's impact is far, far greater than mine digitalization. Conversely, mine digitalization is happening this year. The other one is going to require more work to...
Richard Hatch
analystSo at Pallancata, clearly output got reduced this year as a result of the drilling. Should we be expecting it to sort of rebound to the 2018 levels, or the 2019 levels, in 2021?
Ignacio Bustamante
executiveThis will hinge greatly on what we discover and the location of that discovery. Should we uncover something significant that sits near our existing operations, then the odds improve. But if the find differs from what we anticipate, or lies at a greater distance from where we currently operate, fitting it into 2021 becomes harder. So it comes down to both what and where. I'd expect we'll have a clearer picture on that by the second half of the year.
Richard Hatch
analystAnd finally, just regarding Skeena — I know you mentioned Snip in the presentation. But according to the nature of the accounts, it says you sold some shares after year-end. So what's the situation there?
Ignacio Bustamante
executiveRight. The rationale behind our investment in that company was to secure the option, correct? And that option is ours. Yes. The other piece was more of what I'd call a financial move. We're already earning money from the investment. So we decided to capitalize on it and sell our shares. But we retain the option on just 60% of it. That was the part that truly mattered to us — having that optionality, not really the actual equity stake, since it amounted to roughly 5% of the company. It wasn't material.
Thomas Streater
analystYes, this is Thomas Streater calling from Streater Investment Research. In the RNS this morning, you said you want to strengthen or expand how much ESG reporting you do. So I was just wondering — are there any initiatives or frameworks that you plan to join or adopt?
Ignacio Bustamante
executiveYeah. I mean, the team is looking at a lot of different options at the moment. But we'd still prefer not to lock ourselves into any single one, since the evaluation is still underway. Still, the short answer is yeah — we think that's really important. We're 100% behind it, and hopefully we can bring you updates down the road about which ones we pick for the first stages. More broadly, though, we've made a great deal of progress on our ESG reporting over the years. And the plan is to keep heading that way.
Tim Huff
analystThis is Tim Huff from Peel Hunt. I have just a couple of questions. I noticed that, keeping with the exploration theme, there's a bit more emphasis today on Corina and Selene than on the Arequipa-Cusco cluster you discussed quite a lot last year. Is that simply down to how prospective Corina is, in your view, for what you believe you can deliver this year, and perhaps Selena as we head into '21, and that's why the focus has shifted? I know Arequipa-Cusco still comes up, but far less than it did last year.
Ignacio Bustamante
executiveNo. Basically, the reason comes down to the permitting situation. In some cases, permits take 1, 2, 3, 4 years. And with Corina, getting the permit took us 4 years, and we already have it. So we're moving forward on that. In the other cases, it's the permitting process we have to follow. But I'd say if we had the permits, we'd be going at full speed on all of them. It's just the timing of the permits that's creating this timing.
Tim Huff
analystSo that kind of leads me back to how you're allocating capital. Rich already covered the dividend and said growth is much less of a focus. Obviously, you've just completed 1 acquisition. And there's a lot of cash generation coming in over the next year, which moves you toward net cash. Are you still pursuing growth as much as you did last year? Or is your focus this year much more on the exploration side?
Ignacio Bustamante
executiveNo. What I'd say is that we keep examining things — with the same intensity and degree of interest when it comes to acquisitions or joint ventures. And beyond that, I'd add that we're taking a closer look at our early-stage projects too, Crespo being one example. So on the cash question, having the money matters to us. Also, should we pursue an acquisition, put money into a project, enter a joint venture or, say, move forward with Crespo, for instance, that depends on our results. But those are the kinds of things we'll be set for. Still, it's clear that buying, building out or growing our project portfolio remains a leading priority for the company — alongside the exploration work.
Tim Huff
analystAlright. And I suppose the final one, I suppose, regarding external growth is — I mean, when you consider BioLantanidos at roughly $50 million, are you folks fairly at ease with that $50 million to $100 million range, where you're looking at your cash flow coming in over the year ahead, where you want to remain from a balance sheet standpoint? Or are you in fact considering things larger than that?
Ignacio Bustamante
executiveWhen you talk about possible acquisitions in gold and silver, are you asking in a general sense?
Tim Huff
analystOr really anything at all from the outside. Since you also brought up pressures coming from outside.
Ignacio Bustamante
executiveYes. I mean, as Ramón said, there's a constraint placed on us by the majority shareholder. That said, broadly speaking, we do believe — and we're under the impression — that given the right conditions, if a deal comes along that's highly value-accretive, we can also try to persuade our main shareholder that dilution could actually be a positive thing too. So we aren't shutting the door on things we can only do in cash. We're also opening up the possibility of doing things in shares, should that be the situation, and if we're able to make a case that could convince our main shareholder. So I'd say, no, we're not limited to $100 million, $150 million ; what limits us is whether something could be profitable — even at a higher ticket mark, I'd say, if it makes sense for the company.
Kennedy Nyangoni
analystKennedy Nyangoni here, from Barclays. I'd like to ask about the cash flow bridge you mentioned earlier, the one that shows $52 million in admin costs. How much of that, as a percentage, is nonrecurring? And should we anticipate those costs returning at some point down the road?
Ramón Barúa
executiveAbsolutely. Thanks, Kennedy. So, if you look at our P&L and specifically our admin expenses, those are pretty steady. For 2020, we aren't planning for anything different. The only thing that made a difference in cash flow was when the LTIP — which is management compensation tied to share performance — kicked in. Again, we had that benefit at the end of 2018. So that was a payment made during 2019. In 2019, we didn't earn it. The share price didn't do as well. So in 2020, that figure should come back to levels near $45 million, $46 million.
Kennedy Nyangoni
analystWe ought to anticipate one more <<inaudible>>.
Ramón Barúa
executiveWe go through a 3-year LTIP review annually. Based on how the share performs, the specifics are visible in the annual report. So when the share price does really well relative to our peers, then the payout kicks in. That way, through that program, we ought to be aligned with shareholders.
Daniel Major
analystDan here from UBS, with a couple of quick follow-ups. I just want to be really clear on the dividend and the balance sheet. If you don't execute on a transaction, you'd be comfortable moving, or you plan to move, to a net cash position this year — meaning you won't raise the dividend to a level that, assuming current prices hold, is that the base case we should be modeling?
Ramón Barúa
executiveYeah, absolutely. If we don't — if we fail to execute on M&A or on growth, then sure, depending on prices, we could move toward a net cash position. The dividend is really something the Board decides, not us. And every 6 months, when our results come out, we sit down with the Board and have that conversation.
Daniel Major
analystThat's very clear. As for my second question about Inmaculada, you've obviously delivered better grades from the extra resource you added. Could you give us any sense, or some further color, regarding the mining cost and the vein width? My understanding is that at Millet and Angela the width is wide while the grade is lower — so if you're moving toward higher grade, does that mean the veins are narrower and the mining cost goes up?
Ignacio Bustamante
executiveMining expenses will hinge on what the final mix turns out to be. Still, these are narrower veins—some run about 1.5 meters. So they aren't as narrow as the ones at Arcata, where we had to go with full conventional mining. In this case, then, it will depend more on the infill resource we identify in order to determine the optimal mining approach. That said, I'd note you shouldn't expect costs as high as those faced by operators at Arcata, though they won't be like the fully mechanized 4, 5, 6 meters seen at Angela. Still, I'd say the total all-in sustaining cash cost for those ounces ought to be fairly competitive, because first, the development cost will be low, and that's an important component of all-in sustaining cash cost since they're right there. Second, the grade is higher. And the—even if they can't be highly mechanized, at 1.5 meters they can still allow you to do many interesting things to achieve a very efficient production rate.
Daniel Major
analystGot it, that's clear. So yes — better grades, but the all-in sustaining cost and economics come out similar.
Ignacio Bustamante
executiveYes, that is exactly our target.
Patrick Jones
analystPatrick Jones from JPMorgan. On the rehab and closure expenses at Sipan and Ares — you mentioned that with the other net cost, it came to roughly $26 million last year. Should we expect that to come back down to around the 10 million tonne level by, say, 2022 or 2023? Just a rough idea of how that profile looks. And then on Pallancata, if everything goes exactly right and you get the resource you're seeing in Q1 and Q2, what would you consider a blue-sky scenario for how much extra you'd spend in the second half of the year?
Ignacio Bustamante
executiveLet's move to the one on the…
Ramón Barúa
executiveYeah. Regarding Sipan, what I can say is that at present we're spending roughly $2 million annually. And with the facility we intend to put in place, the aim is to reduce that expense, hopefully bringing it down to nearly $1 million per year, until we reach a final closure. So that would be a meaningful improvement. We've completed the studies. We think that could work. So we'll be putting that into effect this year.
Ignacio Bustamante
executiveAnd <<inaudible>> — historically, when we were building out Pablo, for example, we were still spending on CapEx somewhere in the range of $20-something million, $25 million, $30 million annually. So if we identify areas that look interesting and that we need to access and develop, that could serve as a decent indicator. But then again, it will depend heavily on where we find it and what exactly we find. So it's difficult to say at this point. That said, I'd imagine that within 6 months, we'll have a far clearer answer on that front. Are there any further questions? Anything coming in from the web services?
Operator
operator<<operator_script>> At this moment, we have no questions coming in from the phone lines.
Ignacio Bustamante
executiveAll right. Thanks so much. If any more questions come up, please don’t hesitate to reach out to Charlie directly — we’re around too, so we’d be glad to chat. And thanks again so much for your time.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Hochschild Mining plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Hochschild Mining plc earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hochschild Mining plc or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.