Good morning, and thanks so much for being with us today for our 2021 full year results. I'd like to extend a special welcome to Tracey Kerr, our newest Board member. So welcome, Tracey. Thank you for joining us today. Tracey brings substantial experience in mining, and in particular we believe she will be a great help on matters related to sustainability. So we're looking forward to continuing to work together. Thank you, Tracey. I'd also like to introduce Eduardo Noriega, our new CFO, and he will be joining us during the presentation as well. Thank you, Eduardo. So we're very enthusiastic to present a very strong set of financial results and also an important delivery on our most important strategic initiatives. So 2021 was a very strong year for the company, as you can see here, coming out of a very complex 2020 when COVID hit us materially. 2021 was a very good year for the company and compared to 2020, we managed to increase our revenues by 30% to $811 million. Our EBITDA was up 41% to $383 million. EPS up 133% to $0.14 per share. Our cash balance is at $387 million and we have a net cash position of $86 million.

Ignacio Bustamante

executive
#2

A final dividend of $0.023 per share has just been declared by us, equivalent to $12 million for the second half of the year, and $22 million in total for the full year. On the operations side, we've also been able to hit every bit of our guidance when it comes to production and when it comes to all-in sustaining cash cost. We produced 31.2 million ounces, and we also achieved all-in sustaining cash costs of $14.4 — all of those within the guidance we provided to the market. And lastly, on the exploration and business development side, it was also a very important year. We were able to add 75 million ounces of silver resources, with most of them coming from Inmaculada and some coming from San Jose as well. Total reserves are up 12%, and the average grade has risen 19% — also a very strong result when it comes to converting silver resources into reserves. As you know, we announced the agreement to acquire Amarillo Gold, and we expect to close that transaction before this first quarter of the year ends. We also exercised our option on the Snip project in British Columbia, and that will allow us to reach as much as 60% of the project and take control of it, and we're also very excited about Snip, and we'll talk about it later on.

Ignacio Bustamante

executive
#3

We finished the demerger and listed Aclara on the Toronto Stock Exchange. As you may remember, we're still a 20% shareholder in that business, and we remain very excited about its prospectivity in Chile. And lastly, we brought in a new CEO for Volcan, Greg McCunn, and we think now is a good moment to begin looking at and thinking about Volcan again, building a business case, and discussing the many different strategic options we have for that project. Turning to the next slide. ESG sustainability sits at the heart of the company and ranks among our most important strategic initiatives, resting on 4 pillars: safety, people, environment, and communities for social. On safety, we succeeded in reaching a long-term industry frequency ratio of 1.26, among the lowest we have recorded in the company's history. We've also kept successfully rolling out our safety culture transformation plan, which we call Safety 2.0, with positive results as well. Most safety indicators reflect past events, and we believe something is missing, since we also need to factor in leading indicators — things that will drive positive change going forward, like training, like inspection, like audit — which the measures we use for safety did not capture.

Ignacio Bustamante

executive
#4

So we've developed — just like we did with environment — our own safety metrics, which we call the SEGU score, and it tracks severity, frequency, plus the usual metrics as well. Beyond that, it captures all those proactive measures we're taking, and we're very pleased with it. We're testing the score this year, with the plan of building it into our own personal objectives going into 2023. We also believe that a major condition or cause of incidents in our operations relates to workers not perceiving risk. So we're putting a lot of effort into a program that will help our people broadly become far more aware of the risks they face at work, and also teach them to say no when they feel the conditions aren't right. That's progressing very well too, and we think it will be another key tool for reaching our goal of 0 accidents. Naturally, we're continuing our weekly safety and leadership training across all our sites. On the people and culture side, as you know, COVID was one of our priorities this year as well, and we're keeping all controls in place.

Ignacio Bustamante

executive
#5

2021 was a really strong year for us, and with the controls we currently have in place, we expect 2022 to carry on in much the same way. On top of that, we run a number of diversity programs. One of them is a project I'm personally very fond of called Siembra, which essentially goes into high schools and shows women why mining matters and how they can take a very active part in it. The reason is that when we try to raise diversity — overall diversity within the company — one of the biggest obstacles is that not many women in Peru, at least, are beginning careers connected to mining. So we set the goal of meaningfully changing that, meaningfully raising the number of women who begin careers tied to mining. That means the effort has to start in high school. So we've teamed up with an organization called Amalta, which has a very strong link to the high school community, and together we're developing a program to promote mining in high school. So hopefully this will deliver a very positive long-term effect not just for our company but for the country as a whole.

Ignacio Bustamante

executive
#6

In addition, Women in Mining in Peru is collaborating quite closely with them. A free of harassment campaign is being run throughout the entire company as well, and it is producing very positive results. We are also working on leadership programs with our team. People from our communities make up 31% of our workforce. That figure keeps rising, and we are very proud of it, and hopefully we will keep on increasing it. And 53% of our workforce belong to unions, which is also a good number, and we have very good representation as well. On the environmental side, we have an ECO Score, our own environmental score, of 5.29 out of 6, which is a very good number as well. Our potable water consumption went down by 17% compared to last year. Our waste generation went down by 15% compared to last year. We take part in the carbon disclosure project, and we are also reporting in line with TCFD. We are developing our carbon net 0 strategy. We are also very specific about that. Hopefully, we can update the market in the upcoming months once the strategy is finished. And just as with safety, we created the safety culture transformation plan that gave us very positive results, we are doing the same with environment.

Ignacio Bustamante

executive
#7

We set up this group whose aim is to shift the mindset around safeguarding the environment, and it's delivering really encouraging results for us. We're quite enthusiastic about it, and we'll keep driving it forward, since for us it's essential to keep fostering that within the company. Then, communities. This year we spent $5.4 million to benefit lower conventions, and $5.4 million on economic or social programs across all our communities. Beyond that, we've put roughly $17 million into services and contracts with all our local communities too. So this has formed a very significant piece of our economic activity. We're addressing the top community needs like connectivity, education, scholarship, and health programs, along with other initiatives to help them become more proactive in their economic activities. Right now the most important project we have underway is one aimed at making sure every one of our communities has all the potable water it requires, both for personal uses and for industrial and, above all, agricultural uses. So that's our flagship program this year, and we think our communities are going to welcome it very warmly.

Ignacio Bustamante

executive
#8

We also see real value in educating them about human rights more broadly. Sometimes they aren't even aware of what rights they hold. So we're currently working to inform them about those rights, so they understand what they can expect, what they ought to expect, and what they should ask for in life overall. Those are the main points, and this will keep being a significant element of our strategy. So at this point we'll turn to the full year financial results, and I'll invite Eduardo Noriega to take us through the key figures, please.

Eduardo Noriega

executive
#9

Thanks, Ignacio, and good morning. 2021 was a very strong year, with revenue reaching $811 million. Production came in higher because of the COVID shutdowns in 2020. Silver prices were also 12% above 2020 levels. Cost of sales rose along with the higher production, and gross profit went from 36% in 2020 to 40% in 2021. Administrative expenses came in at close to $52 million, higher than the prior year because of M&A activity and fees tied to the transactions we completed. Selling expenses were $15.4 million, also up in line with the added volume compared with 2020. Exploration activity bounced back from 2020, at $39.8 million. Others netted $37 million. That figure includes a $22 million increase in our mine closure provisions, mainly at Selene, reflecting the new work done to close our TSS, our tailings dams. We also ran a personnel restructuring program in Argentina that cost us roughly $8 million. Finance net was $28 million, also higher than the previous year, mainly because of 2 factors. The first is the cost of acquiring U.S. dollars in Argentina, which came to $15 million. We also restructured our medium-term facility, raising it from $200 million to $300 million, and that brought an additional cost in our P&L.

Eduardo Noriega

executive
#10

An FX loss of $2.4 million was in line with how the Peruvian sol and the Argentinian peso were devalued. Income tax came in at $81.3 million, which is an increase compared with the prior year, driven mainly by stronger company profit. The effective tax rate stood at 54.7%. Excluding the items listed below within the income tax line, that rate would have been 29.7%. First, royalties and the special mining tax in Peru come to roughly $12 million. We also see the effect of the Peruvian local currency's devaluation on our deferred income tax. The Argentina statutory tax rate went up from 30% to 35%, and that affected our current and deferred tax by nearly $12.5 million. Lastly, nondeductible FX cost in Argentina weighed on our FX effective tax rate. So absent those effects, as I mentioned earlier, the effective rate would have been 29.7%. On that basis, net profit reached $67.5 million, attributable profit was $69.6 million, and EPS came to $0.14. Adjusted EBITDA for the year totaled 383 — nearly $383 million. There were also 3 exceptional items. One was a gain of $37.5 million net of taxes on the demerger of Aclara, our rare earth business.

Eduardo Noriega

executive
#11

At Pallancata, we took an impairment charge of $24.9 million, tied mostly to lower grades at the deposit, and that's why we booked it. And lastly, we also recorded COVID-related costs as extraordinary items. Altogether, those exceptional items left us with a positive result of $7.4 million. Now I'd like to turn to the balance sheet and cash generation. Once again, cash generation was very strong during the period. We began the year with $232 million and ended 2021 at $387 million. Our operations generated strong cash. Here you can see Inmaculada at $247 million, Pallancata at $14 million, and San Jose in Argentina at $80 million. Exploration cost us $46 million, while corporate expenses came to $50 million. As I noted on the prior slide, we added $100 million of debt. We restructured the corporate debt and raised it from $200 million to $300 million, which delivered a $100 million cash increase. In Argentina, we cut short-term loans by $10 million. At the corporate level, interest payments totaled $6 million. Taxes paid amounted to $61 million. That figure includes $18 million relating to the 2020 exercise, with the remainder being taxes for the 2021 period.

Eduardo Noriega

executive
#12

We returned $22 million in dividends to shareholders. We also paid $10 million to our partner in San Jose, McEwen Mining. Prior to carrying out the demerger, we invested $12 million in Aclara, and then at the IPO we put $20 million into the company. In Argentina we had $9 million of unabsorbed costs tied to COVID, and our COVID-related expenses for the year came to $24 million. Mine closure plus repair and maintenance costs totaled $24 million -- sorry, $18 million. Our working capital, net of other effects, was just $1 million, though here we show a positive working capital change of nearly $20 million after netting other items such as the FX cost, the cost of acquiring U.S. dollars in Argentina, and the restructuring plan in Argentina too. So, net $1 million. On that basis, as I mentioned earlier, we closed the year with a solid cash position of $387 million. Turning now to our costs. All-in sustaining cost for the year came in at $14.4 per ounce, in line with the market guidance of between $14.1 and $14.5 per ounce. On production cost, we did better than expected, largely thanks to a higher share of mechanized mining methods at Inmaculada.

Eduardo Noriega

executive
#13

The devaluation in Peru, once you strip out inflation, ended up being positive, and that helped us. Argentina also saw a devaluation. On top of that, legal workers' profit-sharing in Peru went up, which raised our cost, since the previous 2 items came in higher than this last one. Grades and recoveries likewise gave our cost a favorable boost. Inmaculada had better grades, partly offset by weaker grades at Pallancata, and metallurgical recoveries at Inmaculada improved thanks to optimization projects we carried out there. CapEx and exploration came in above what we expected. We approved an incremental budget -- incremental CapEx at Pallancata to reach new areas -- and exploration expenses were also somewhat higher, mainly at Inmaculada and San Jose. Our all-in sustaining cost leaves out the COVID-19 response initiatives as well as the unabsorbed cost incurred in Argentina that I mentioned on the previous slide. On capital and exploration, our CapEx matched market guidance. Market guidance sat between 120 and $130 million. We finished at $126 million, above what we had in 2020, when COVID imposed a lot of limitations on us, and in line with -- as I said, in line with our market guidance; CapEx at Pallancata was slightly higher, as I said, offset by other -- by savings elsewhere.

Eduardo Noriega

executive
#14

Our CapEx excludes the $12 million investment in Aclara. Exploration activity bounced back from 2020, and we managed to carry out our budget — we had guided the market to $45 million and finished at $48.3 million thanks to extra exploration work, primarily at Inmaculada and San Jose, with very good results. On the financial side, we closed the year with a strong cash balance of $387 million and net cash of $86 million. Here you can see the evolution we went through since 2015, when our net debt stood at $351 million, and we finished this year with a net cash position of $86 million. I also mentioned earlier the refinancing of our medium-term facility, that $200 million loan facility. We raised it to $300 million of debt at very competitive rates, LIBOR plus 1.65%. So we are in very good shape to fund the company's growth. As you can see here, this is a 5-year loan with a 2-year grace period. On dividends, as announced, we expect to pay $22 million in 2021 — again a positive trend compared with the past, with previous years. Ignacio?

Ignacio Bustamante

executive
#15

Thanks, Eduardo. Alright, turning to operations and strategy. On the operational side, as I said, 2021 proved to be a really strong year for the company. We hit our production and cost targets. Every mine was running as normal. We're keeping up a regular dialogue with the Peruvian government, which, as you're probably aware, became an issue at the end of the year. The dialogue continues now, and we're making solid progress on that front. The extension of the closure plan at our Inmaculada mine was approved at the end of December for 2 more years, and that's an encouraging signal. Also, the EIA modification for Inmaculada, which lets Inmaculada continue through 2041, remains on schedule for approval in the second half of this year. So we're advancing well in that direction. And our production guidance is set for 2022: we're projecting 360,000 to 375,000 ounces of gold, or 26 to 27 million ounces of silver, for 2022. That assumes the conservative current ratio of 72x gold to silver. Had we applied the ratio used last year, 86x, that output of 26 to 27 million would come in closer to 29 to 30 million ounces.

Ignacio Bustamante

executive
#16

For this year, we're aiming for an all-in sustaining cost of $1,330 to $1,374 per ounce of gold, and $18.5 to $19 for silver. Now turning to resources. As I said, resource additions were very strong this year. We added roughly 75 million ounces of resources — that's more than 1 million ounces within 1 year — and as you can see, the bulk of those additions came from Inmaculada and San Jose. With Inmaculada, we're especially excited, since this came with a very significant grade too, which will let us meaningfully raise the grade of both our resources and our reserves. And as this chart shows, on the reserves side we also grew reserves at every one of our operations. Essentially, Inmaculada went from 79 million to 84 million ounces, San Jose from 28 million to 36 million ounces, and Pallancata from 7.1 million to 9.1 million ounces. So it was also a very good year for reserve conversion. The standout point here is how we went from an average reserve grade of 318 grams to almost 400 grams, thanks to converting the new resources we brought in during the year.

Ignacio Bustamante

executive
#17

Thus, a substantial rise in rates for Inmaculada, and we're quite enthusiastic about what we're seeing across every one of our operations—especially Inmaculada—regarding further encouraging results from our brownfield campaign over 2022. Turning to our strategy: this chart is familiar to you, and so is our strategy. We take real pride in the fact that we keep delivering against it. Brownfield remains the top pillar—essentially extending mine life, enhancing the quality of our resources, and also exploring whether we can leverage spare capacity available at certain operations, particularly the Selene plant and Arcata. The strategy's second pillar is now development projects, which have clearly moved into second priority, especially with the Posse project of Amarillo, also in Brazil. Executing on that project will be a critical task this year. We will additionally keep optimizing early-stage projects like Volcan transformation and our projects in Peru, keep drilling further, and keep investing in technologies so those early-stage projects gain value. Strategic alliances for acquisitions will remain a very important priority for the company, even though we have completed 2 important strategic moves with the acquisition of Amarillo and Andina.

Ignacio Bustamante

executive
#18

We remain open and are evaluating every option to take further steps on the strategy, provided it satisfies the rigorous requirements we've established for the company — namely, that anything we acquire must be at an early stage, carry substantial geological potential, be something we control, and deliver meaningful value to shareholders. So we'll keep advancing those initiatives in 2022. And lastly, greenfield. We're simplifying our portfolio, staking new properties, and our aim is to be in a position to drill 4 to 6 projects each year. And this year's focus will be primarily in the United States, and we discuss that on a later slide. Turning to exploration. Once again, 2022 was a tremendous year -- 2021, rather. We have the Angela vein, which is the one that has generated the bulk of production throughout the company's history, and of course it was much lower. And the majority of the results, the 850,000 ounces of gold that we brought in here, come essentially from this zone — from Angela North, from Juliana, from Corridor Angela, et cetera. So that enables us to reach 850,000 ounces, and this area stays open.

Ignacio Bustamante

executive
#19

On top of that, we’ve identified a second structure, Josefa, whose resources we haven’t begun incorporating yet, but interest in it is already quite strong. As a result, we hold high expectations that this zone will keep delivering substantial resource growth as we move into 2022. Beyond that zone, we also have 2 highly appealing areas: Minascucho to the west, plus Lineamiento 3 and Huarmapata to the north. We’re currently securing the final social permit there. With Minascucho, the legal permit is already in hand; the social permit is being finalized. For Lineamiento 3, we’re still awaiting approval. Most likely both the legal and the social permit will come during half of the year. So with luck we’ll be able to drill both targets during 2022. These sit inside areas we’re already permitted for, so we’re proceeding at full speed on these targets. Turning to Pallancata: Pallancata, as you know, is the toughest asset we hold from a resource standpoint. Through the hedges we’ve put in place, we’ve been able to lock in production for 2022 and 2023, and we’re working hard to extend that period of time.

Ignacio Bustamante

executive
#20

At the moment, our attention is on the near term with 2 kinds of targets. The first is these Demian and Laura areas, which sit very near the Paolo vein discovered a few years back. Unfortunately, in this area we are already observing solid intercepts and solid results, yet it lies beyond the permitted zone — permitted for exploration, not for drilling. So obtaining a permit is going to take some time. Should the drilling work succeed, getting the permits that let us operate in that area will take us a while, roughly 3 to 4 years. Beyond that, we are likewise concentrating on additional near-term targets located inside the operating area already, and should we find minerals there, we can move it straight into production. So the emphasis is on these targets named here. Laura and Demian sit here. The Paolo vein is here, and the Paolo structures — that is the Rina vein — are here. The Cinthia-Mirian veins lie in this area here. And the Central Pallancata targets are here, sitting very close to the original Pallancata vein.

Ignacio Bustamante

executive
#21

We still have a lot of targets to pursue, and we're also handling the permitting so we can add more targets for drilling during 2022 and 2023. So although we're limited by how many profitable resources or reserves we hold at Pallancata over the next 2 years, there's still substantial potential that we'll keep testing over the coming 2 years. Then there's San Jose. San Jose also had a very positive year for resources and reserves additions. We were able to identify 13 million ounces at a very good average grade of 881 grams. The majority of those resources came from this area — from the operating area and also from the Saavedra area. For 2022, drilling efforts will again be concentrated on these areas: the mine area and the Saavedra area. In the mine area, and particularly in a vein known as the Olivia vein. Beyond that, we've also locked in a new target that isn't especially near — it's roughly 100 kilometers away from San Jose, okay? But it's a highly prospective area with good grades too, and it's something that could become a potential source for San Jose down the road, or, if it's good and it's large, could even stand as an independent operation.

Ignacio Bustamante

executive
#22

We're currently drilling in that area — it's known as the Ciclon project, as you can see here — and it's a very motivating target as well. There's also lots of drilling potential and targets in San Jose. Turning now to strategic delivery: again, as I said, it was a fantastic year on the strategic delivery front. We're broadening our focus across the Americas, as you can see. Our growth prospects are now spread throughout the Americas — that includes Amarillo in Brazil, which we just incorporated and hope to begin building in the second quarter of the year. There's also the Snip option exercise in Canada, which I'll discuss later. We brought in Tom Elliott, our new Vice President of North America, and he's helping lead those efforts in North America overall, and in the U.S. and Canada specifically. And we keep growing our presence in North America through our greenfield projects, as we keep adding new projects to our portfolio. On our near-term projects, as I mentioned — and there's a slide on this too — we brought in Greg McCunn as the new CEO of the Volcan project, and we're working on a few interesting initiatives that we'll talk about later.

Ignacio Bustamante

executive
#23

Our attention is going to remain on the former mines and the near-term projects within the Southern Peru cluster — for instance, efforts to bring Ares and Arcata back into operation, along with work involving Azuca, Crespo, and Guaculo, all of which could eventually become potential operations. The emphasis there will be on the geological side and the technological side, yet these will remain a significant part of what we concentrate on in 2022. Then, lastly, on greenfield, we have quite an interesting set of drilling targets that we intend to drill during this year. 4 of those come through EMX Royalties, our partner, which has enabled us to bring in projects in Nevada and Idaho. And there is one more that we are currently negotiating in Idaho as well. The budget for this year is comparable to what we had in 2021, at roughly $11 million. Turning to Amarillo. We are extremely excited about the Amarillo acquisition, extremely excited. In fact, around a month ago, we were over there and we toured the project, and we held a number of different discussions with authorities at the government level in Brasilia, the capital, as well as in Goias, the state in which the project sits, and also with the Mara Rosa authorities, the district in which the project is situated.

Ignacio Bustamante

executive
#24

Every one of them is quite positive about the project and very supportive too. So the impressions we got in Brazil were really excellent. As you know, we expect to close this by the end of Q1 of this year. Voting is already under way among Amarillo shareholders, and up to now we are seeing backing for the transaction from roughly 99% of shareholders, which is good. And as we said, Hochschild's shareholders will be casting their votes at the end of March. So hopefully, before the quarter ends, we will be completing this very good acquisition. There is an implied net acquisition cost of $106 million, which is very reasonable and very affordable when you have seen our balance sheet that Eduardo Noriega just presented. It aligns very well with our strategy and with our experience. So we believe it is going to be a fantastic fit for Hochschild in terms of operation and commercialization. It is a long-life mine asset located in a mining-friendly jurisdiction. I will talk about that a little bit more on the next slide. It has very attractive cost dynamics, and part of the construction is already underway. And it has very compelling near-mine and regional exploration opportunities.

Ignacio Bustamante

executive
#25

We view this as an initial stake in Brazil, with room to expand on the project side, and we also think Brazil will keep presenting us with meaningful opportunities for growth. So going forward, we believe Brazil is going to turn into a very important area of focus for the company. And the 2022 budget, on top of the $106 million acquisition cost, includes plans to spend $120 million on project development. As you may recall, the project's total CapEx comes to roughly $200 million, and we intend to spend $120 million during 2022. Let me get into a bit more detail. So this is the map of Brazil. Goias state sits at the center of the country. We have Brasilia, the capital, here, and Posse, the project, which is located very close to Brasilia in the state of Goias. Goias state also has other mines and projects that matter a great deal. Chapada, Lundin Mining; Pilar from Pilar Gold; Serra Grande from AngloGold. And this is a state that is very friendly and very welcoming toward mining investments, so that makes it very attractive to us. Mining, in general, matters a great deal to Brazil, and it is also an activity that is very well promoted.

Ignacio Bustamante

executive
#26

Regardless of what ideological direction the government has taken—whether toward the right or the left—mining has kept on being a significant economic activity for the country. Therefore, we think that whatever the new administration's leanings or opinions happen to be regarding economic management, mining is going to remain an activity that the country supports and promotes very well. At present, the project sits at the feasibility stage. Work on some infrastructure is in progress, including the main camp, the electrical substation located in Porangatu city, the power line, and the office renovations that we got to see during our visit there; the economics are very robust. So what we are discussing here is a very low initial CapEx—as I said, $106 million for the acquisition and roughly $200 million for the construction. A very good life of mine all-in sustaining cash cost of somewhere between $750 to $850 from all-in sustaining cash cost, very good cash cost. The long life of mine is estimated at about 10 years. Average production is estimated at about 80,000 ounces per year, but the first 4 years are going to be bringing an average of 100,000 ounces per year. So it's going to be a good addition to our production profile.

Ignacio Bustamante

executive
#27

I really think there’s a lot of room for optimization and exploration there. One satellite target is known as Pastinho. There’s also potential to deepen the deposit, which we still need to explore. And as I said, there’s the chance to use it as a stepping stone for expanding further into Brazil. The key milestones are these. The transaction was announced on November 19. The Hochschild shareholder vote is expected on March 22, and we expect to close at the end of March. Then we expect an updated technical report by Q1 2022. So far, everything is basically consistent with what we anticipated. In fact, we’ve already placed some orders for major equipment that align very closely with our own budget, so we’re seeing no surprises on that front. Construction should begin in H1 of this year, in the coming months, and we expect to finish and start production by H1 of 2024. Turning to the next slide, we have Volcan. As you may remember, Volcan is our project located in northern Chile, near the Copiapo area. It’s an area with many operations and projects. Here you can see La Coipa Kinros, and you have Lobo Marte, Cerro Casale, Maricunga, La Pepa, et cetera.

Ignacio Bustamante

executive
#28

This is a really promising region in Chile, and there's lots of gold there. We're discussing a belt that contains over 100 million ounces of gold. So it's a really big area, and there's plenty of gold in it. We acquired the asset in 2012, so roughly 10 years ago. From day one — and we've been very open about this — we purchased it as a very long-term asset for us. Developing it right away was never our intention. But ever since we acquired it, we felt that, with mine deposits becoming depleted and grades declining, this was an asset that over the long term could create or represent significant value for the company. But 10 years later, we think this is a good moment to begin considering this project more seriously and to examine the various alternative strategic options available to us. The asset is a very compelling one. Initially, the company we acquired it from had completed a PFS. Their estimate was 4.3 million ounces of gold production over 15 years. The resources that company estimated came to around 9 million ounces of gold, so it's a huge deposit — a huge accumulation of gold there.

Ignacio Bustamante

executive
#29

So, as things stand right now, we've brought on Greg McCunn — as I said earlier — to serve as the new CEO of Volcan, and we're working through what the strongest possible business case scenario looks like. That means a great deal of mine planning effort along with extensive metallurgical studies and work, all aimed at figuring out the optimal size and the optimal processing approach for the project. As soon as we've landed on the most compelling business case scenario, we'll be deciding what the next strategic steps for the project will be — whether we develop it ourselves or examine a potential divestiture or spinoff. So all the strategic alternatives are on the table, and hopefully as the year passes by and we finish this business case study that's currently underway, we'll be making a decision. And then lastly, we've restructured the project into a Canadian subsidiary named Tiernan Gold. So from here on, when we refer to Volcan, we'll be referring to Tiernan Gold. Snip is also something very interesting. We're quite excited about this project in British Columbia. It sits in the northern part of British Columbia, as you can see here, in an area known as the Golden Triangle, where there are many other projects and operations.

Ignacio Bustamante

executive
#30

Canada is a highly promising region for this. This is a past-producing property, having yielded roughly 1.1 million ounces at an average grade of 27.5 grams. It covers approximately 4,500 hectares within Tahltan Territory. The project—it formerly belonged to a company named Skeena Resources, and at present it is held by us under an option. Back in 2020, the company reported a maiden resource of around 650,000 ounces of gold, with an average grade ranging between 13 and 14 grams. We are currently in the midst of updating those resources, and we anticipate announcing the final results shortly; however, our expectations are high that this maiden resource will grow materially through a new update, which will follow once 32,000 meters of drilling have been completed and additional resource evaluation has been carried out. So once again, we are quite excited about it, and the objective for this year involves working on 2 separate fronts. The first front consists of moving the project toward prefeasibility. Thus, on one hand, we will conduct further drilling and engineering work in order to prove out the resources and also to establish whether a business case exists via a prefeasibility study, and we intend to complete that ahead of year-end in Q4.

Ignacio Bustamante

executive
#31

The second track will focus on figuring out what this deposit could ultimately amount to. So alongside the prefeasibility and drilling activity, we're also running potential resource drilling to test whether the resource can be grown. We've already pinpointed some zones with strong prospectivity that will be drilled over the course of the year. So by the time 2022 is over, the aim is to establish whether the resources we hold today support a profitable project, and also to get a really clear picture of the project's prospectivity and whether the resource might expand in size over time. So we're very enthusiastic about Snip, and we think it will be among our most critical and important objectives for the year as we try to deliver on this project. Wrapping up, we believe the company, as you probably know, is significantly undervalued in general terms and also relative to our peers. Here are some metrics that demonstrate this. For instance, on price to earnings, we currently stand at 9x while our peer group average sits at 23x. On EBIT to EBITDA, we're currently at 1.9x versus an average of 7.1x for our peers.

Ignacio Bustamante

executive
#32

At present, our free cash flow yield stands at 18%, whereas the average for our peer group is 4%. And lastly, on a price to NPV basis, we sit at 0.6x versus 0.7x for our peer group. So we think that by pretty much every measure, the company is substantially undervalued and provides considerable room for additional stock appreciation over the near term, especially considering everything we've talked about today. So to sum up, Hochschild has genuinely been transformed over the last year, and we're very enthusiastic about that. As I've laid out and as Eduardo laid out, we're demonstrating very strong profitability and a very robust balance sheet position. The brownfield program keeps on delivering. 2021 was a highly successful year — we managed to produce more than 1 million ounces at very good grades — and we anticipate continuing to grow our resources materially in 2022 and beyond. We have abundant growth options across the Americas, with Amarillo, with Snip, with Volcan and with our own early-stage projects in Peru. The dividend is a key part of our strategy, so we're carrying on with our long-term dividend growth. As I said, we recently showed a highly compelling valuation from every single angle, and we believe there's very significant upside potential to be captured in the near term with the Hochschild stock.

Ignacio Bustamante

executive
#33

That brings the presentation to a close. Now I'll turn it over for whatever questions you might have.

Kevin Kerdoudi

analyst
#34

Kevin Kerdoudi from Bank of America here. Regarding that event in Peru back in November — does it push you in some way to speed up your projects beyond Peru?

Ignacio Bustamante

executive
#35

Not really, because as you know, acquisitions of this kind take quite a while to come together. So we've been focused on diversifying the company over the last 3 or 4 years — well before the political situation now in Peru. Luckily, this year was very successful for us, and the opportunities we were most interested in came through, which is the case of Amarillo and SNIP. We've examined many other alternatives over the past 3 or 4 years, and probably even more. So it was, I'd say, not necessarily — and of course, I can also say that in Peru's case, we, as I mentioned, keep working very closely with the government. We believe that what happened, the event that took place in November, was mostly a misunderstanding on the government's side that was corrected quickly. And after that, they have raised the milestones that the company has been able to achieve in corporation and in coordination with the government and with all interested parties. So we remain fully committed and fully motivated to invest in the country as well, and we will keep doing so through our current operations and also through brownfield work and greenfield work.

Ignacio Bustamante

executive
#36

But geographic diversification extends past that point. We think we want to keep expanding the business, and we think that having more regions where we operate that are friendly to mining, that offer solid — that amount to solid jurisdictions and hold good geological potential is essential if we are to maximize our growth chances. So at present we remain very fond of Peru, we are fond of Chile, we are fond of Brazil, we are fond of Canada, we are fond of the U.S., and those are the places where most of our efforts are concentrated right now as we keep diversifying the business.

Kevin Kerdoudi

analyst
#37

How do you see Argentina right now?

Ignacio Bustamante

executive
#38

Yeah. Argentina is another interesting country, okay? We've got the San Jose operation there, and it has proven to be a very important operation for the company. We've earned a very good return on our investment in that operation, and it remains a very strategic country for us. So with Argentina, I'd say the point is that we face some other challenges, because mining isn't necessarily as important an activity for the country as it is in other countries like Peru or Chile. There are plenty of other competing economic activities in the country. So it presents some challenges depending on where you are — for instance, in finding the right amount of skilled people to do certain work, particularly underground mining, or in having a very diversified base of potential suppliers, for instance, or service providers in general, that you might have in other countries with a much longer mining history. Costs are higher. We're facing inflation challenges now. Inflation is going up materially. The exchange rate is controlled by the government, so when you compare the official rate with the market rate, there's a huge gap. So that means it's being artificially controlled, and that's creating a false reality in the sense that it doesn't represent the real value of the dollar.

Ignacio Bustamante

executive
#39

Operating in Argentina has generally been quite costly. I'd say we still like the country, but for us to keep developing deposits there, we think the bar in terms of deposit size and richness has to be extremely high—very, very high—to ensure the investment is justified given all the costs and challenges I just described. Now, San Jose is a fantastic deposit. Its grade is by far the highest across all our operations, and it's a deposit that can absorb and withstand those challenging cost situations. If we found a similar deposit, we would certainly take a very close look at doing it in Argentina, of course. But the minimum threshold for us to invest in Argentina is different because of all those external challenges I just mentioned.

Patrick Jones

analyst
#40

Patrick Jones from JPMorgan here. Could you go over the EIA and mine closure plan matters at Inmaculada? Specifically, what are the main flashpoints and the essential hurdles that must be cleared for that EIA to be approved within the first half? And then secondly, could you take us through the same closure plan concerns that might exist at Pallancata? Would you walk us through those issues?

Ignacio Bustamante

executive
#41

Okay, so one of the misunderstandings—or confusions—that came up in November, when the Prime Minister made that message that we export a percentage of the market, was that people misread what a mine closure plan actually means, right? And broadly speaking, this is an industry that's heavily regulated and very technical. Generally, the general population doesn't really grasp what that means. So when you look at a mine closure plan, people tend to think the mine is shutting down, or that it's being forced to shut on some specific day of the year, when in fact the closure plan is estimated over a certain estimated period. That isn't how it works. A mine closure plan is a dynamic document—it's a live document, one that changes as time goes on and essentially responds to your current mining plans. So, to give you an example: when Inmaculada started, we had 7 years life of mine, so we present our life of mine plan, and we also present a mine closure plan for when we close Inmaculada in 7 years. But if starting in year 3 we find more resources—say an additional 10 years—then you modify your mine closure plan, and now it closes in year 17.

Ignacio Bustamante

executive
#42

You see, there are 10 additional years, so that's a lifespan matching the life-of-mine plan you already have, and that's exactly where the confusion arose. And in fact, that closure plan for the mine is now tied to the most recent mine plan approval we hold for Inmaculada, so it concludes at the end of 2023, all right? So that's the situation as it stands today. Now, well before this took place, we had submitted the new environmental impact assessment for Inmaculada covering the following 20 years through 2041, including all the new resources we've brought into the company. So that's the plan currently going through the approval process. As part of it, there's a long, drawn-out procedure. Typically it takes roughly 3 years from the moment we begin until we wrap up. It began quite a while ago and passes through numerous distinct phases, okay? And you must satisfy a certain number of requirements. Among the final requirements prior to a project being approved is going through a public consultation, a public hearing, which is nonbinding. That forms part of the process involving all the communities, local authorities, regional authorities, and so on.

Ignacio Bustamante

executive
#43

And that public hearing took place on February 12th, so a week or 10 days back, and it's been completed. So at this point we're in the final phase of the approval process, which is essentially coordinated by Senasa — the technical environmental authority responsible for issuing the permit — and right now it's a matter of responding to whatever questions or observations they may have, and we expect to wrap that up over the coming months. So our target is to have that new environmental approval for Inmaculada in place in the second half of this year, and that ought to let Inmaculada keep producing through 2041. With luck, 2041 will then be extended thanks to the new additions we expect to keep finding, so it's a live situation. And once that new environmental stage is approved, we'll then submit a new mine closure plan that reflects the new life of mine plan we're going to get approved. So that's how the process works. I don't know if that's clear, Patrick.

Patrick Jones

analyst
#44

Actually, could you just explain whether there's any opportunity with the mines close to where those somewhat more distant projects are, such that you could make use of infrastructure located near Volcan or Snip? Is there shared infrastructure that you might be able to talk over with partners, or pursue in an effort to save costs on development?

Ignacio Bustamante

executive
#45

Yeah. The brief response is affirmative — those do exist. Take Volcan, for example: we hold every one of those projects across the Maricunga area, and there may be a chance for us to carry out joint work there. Water is the clearest example. Our own water rights are something you're aware we possess. A significant piece of what we gained through acquiring Volcan was those water rights — yet water permits still have to supplement them. So a portion of the effort underway right now involves assessing how likely we are to secure the water permits needed to support our water rights. A different route, though, is sourcing water from the sea, desalinating it, and providing it to numerous projects throughout Maricunga. Among those projects I just listed — I'm not sure it's the majority, though many of them — a great number hold no water rights at all. That leaves desalination as perhaps the sole choice available to them. In fact, a handful of company projects are attempting precisely this — seeking a pipeline that would carry seawater in, desalinate it, and serve the region. And once more, we are holding talks with them.

Ignacio Bustamante

executive
#46

We're looking at the 2 options. The first is to obtain the permits through our water rights. The second involves working alongside those other companies and sharing a collective infrastructure that benefits everyone. That's one illustration. With Snip, other operations nearby might gain from possibly being integrated. Naturally, we'll evaluate that, though ultimately we'll treat it purely as upside. So when we consider partnering with others to use infrastructure, we want to be certain we have a positive case on a standalone basis. That means building our own plan, having our own deposit, and doing everything ourselves; if that yields a positive case, we can proceed with the project. Should we meanwhile find ways to boost shareholder value by sharing that infrastructure, great. But negotiating potential infrastructure before we know our project's true value, in our view, could mean leaving money on the table and failing to maximize value. So we must first grasp what it's worth to us, and then decide whether partnering with other local infrastructure providers can lift that.

Ignacio Bustamante

executive
#47

Is there anything else from the public? If there isn't, we can check whether any callers have questions.

Operator

operator
#48

<<operator_script>> Our first question comes from Ian Rossouw at Barclays.

Ian Rossouw

analyst
#49

To follow up on what Patrick asked, I don't think you addressed the Pallancata side of it. Clearly there's somewhat more uncertainty regarding the mine plan. So does that create a risk, given that you lack updated mine plans extending the life past the existing closure plan? Does that raise the risk around your capacity to operate there? That's the first question. Then returning to what you said about the currency gap in Argentina: from the cash flow statement it appears you're basically losing 40% to 45% of whatever cash you attempt to distribute to the mine's shareholders. Would it make sense instead to keep that cash within the business, or should we read that as your view on the country's outlook — that you don't expect improvement anytime soon — so you're essentially repatriating the cash to the parent? And one more question on your reserve grades, which rose by 19%. How — you've clearly discussed this at Inmaculada, that with additional mine development you could raise the reserve at the mining grades over the coming few years.

Ian Rossouw

analyst
#50

But how much potential do some of your other operations have in that area? I think that's where I'll leave it.

Ignacio Bustamante

executive
#51

Thanks, Ian. So, regarding the first item on Pallancata, as I showed on the slide for Pallancata, we already hold a permitted area that remains valid for another 2 or 3 years, right? And we're able to extend it at any point. That extension happens really fast since it falls under the same environmental impact assessment plan. The difficulty arises when you need to move into other areas that sit outside your environmental impact statement. So as long as we're inside the environmental investment, you can scale it up fairly quickly. You were referring to months, not years. So we have the 5 targets we just referenced inside the currently permitted area. If we find that, it will be a very simple and easy process, and we see no risk there. The ones outside our operating area are the ones I mentioned first, which are the <<inaudible>> targets that are the ones on the way, very close to the public structure. Those fall outside the permitted area. So permitting those will take more time. Those can take 3 to 4 years. They have to go through the long permit.

Ignacio Bustamante

executive
#52

So that's exactly why we're concentrating on both areas and building out the target over the coming 3 to 4 years. And by the way, within that same category — Palca, Cochaloma and Corina — those are targets whose permitting will require 3 to 4 years from us. But given that we've only got 2 years in front of us, we want to be certain that, among the targets sitting in the permitted area, we identify enough to carry us through the 3 or 4 years we need for the other projects. So keeping attention on the 2 separate plans matters a great deal. I'm not sure whether that addresses your question, Ian.

Ian Rossouw

analyst
#53

Right, got it. All right, I wasn’t aware of that. I had assumed it was only the drilling permit you brought up, but then — so it’s — the EIA is included in that too.

Ignacio Bustamante

executive
#54

Exactly right — exactly. Yet inside the area we're allowed to work in right now, we really shouldn't have any trouble carrying on, because the more we discover, the more we're able to keep drilling without doing any exploration and hit the mine without any volume. On the second question, about Argentina, part of what I mentioned earlier is this: if we locate something in Argentina that's attractive and clears the threshold we've set for that country, then we will definitely keep putting money in there. No — <<inaudible>>, for example, the project I just brought up that sits 100 kilometers outside of San Jose, that's a project that is attractive, and it's going to need capital to develop a potential mine there and to build an operation if it doesn't suit the San Jose plant. So we keep working on alternatives for using the cash and keeping it in Argentina. That way we don't have to take on any extra cost to move it out of the country. But without those opportunities, that cash doesn't really have a use yet, and then we have something we can spend that money on. So we've got no choice but to move it out of the country at a cost like the one you just mentioned.

Ignacio Bustamante

executive
#55

Turning to the third point about grades, we genuinely think there’s still plenty of high-quality grade material to be found at Inmaculada. So our expectations are quite strong that in the years ahead, in those areas, we’ll keep delivering grades similar to or even better than the average resource rate we currently have. Naturally, the surest bet—or the lowest-risk option—is the whole area across the North of Angela, North Josefa, plus the extensions of Angela Northeast and Juliana, since those hybrids have already been observed. That said, both Minascucho and the Lineamiento trace, the San Francisco area, show signs of holding high grade. So we’re very enthusiastic and encouraged that we’ll keep encountering high grades, which will keep letting us raise the grade of our minerals. With Pallancata, it’s more of an open question, because as you’re aware, over the past couple of years our drilling plans haven’t succeeded. We still have targets, but those targets need further development to determine whether we can grow the resources and lift the rate. And for San Jose, I’d say that up to now we haven’t seen any signs that we can locate areas with higher grades.

Ignacio Bustamante

executive
#56

The grades we have are already extremely high—by a wide margin the best grade across our operations. And it takes real talent to locate resources of that quality. Honestly, if we lowered the threshold at San Jose and went after a mineral with, say, 500 grams, 600 grams, we might be able to identify considerably more resources. But the mandate our geological team works under is to seek the highest grade achievable, which currently sits at around 800, 900, 1 kilo of silver, and at times beyond 1 silo of silver. So for the last few years they have concentrated on high-grade material, and that is essentially what we are pursuing. In Argentina, then, I would say we would be pleased if we could keep extending the life of mine at similar grades. That in itself is already difficult enough where Argentina is concerned.

Ian Rossouw

analyst
#57

Alright, perhaps just one more follow-up. On COVID, those exceptional costs plus the fixed costs you leave out of your all-in sustaining costs — I mean, that came to roughly $32 million in 2021. Could you give us some guidance on whether you'll keep doing that in 2022? And how much should we anticipate for each of those this year?

Ignacio Bustamante

executive
#58

All right. 2021 is the final year when we can treat those costs as exceptional, right? As we move into 2022, they won't be viewed as exceptional or as part of the company's regular cost base. So that's one key piece of news. The second key piece of news is that, with COVID having started and the situation becoming more endemic and less critical, we believe the expense of dealing with COVID should keep going down. We have a budget for this year of roughly $13 million for the full year that won't be exceptional. And that covers moving to random testing and beginning to scale back the measures we currently have in place. If the criticality of COVID keeps declining, we expect some savings against those $13 million. So that's our goal. But the way we've budgeted for the year is that this year will cost us $13 million. But rest assured, we're going to work diligently to see how we can bring that number down without, of course, exposing any vendor or our workers to any kind of health issues.

Ian Rossouw

analyst
#59

And that's something you're leaving out of your AISC guidance?

Ignacio Bustamante

executive
#60

Yes, that is left out of the all-in sustaining costs guidance. It is excluded.

Ian Rossouw

analyst
#61

And then on the other side — the fixed costs tied to, I suppose, the capacity cuts — are there extra expenses there too that won't be counted in guidance but that you anticipate taking on during this year?

Ignacio Bustamante

executive
#62

Look, those costs mostly come from personnel expenses. We had employees who weren’t able to work and couldn’t go in because of operations. As a result, the production we had in 2021 did not absorb those fixed costs. And for next year—for this year, 2022, we’re assuming that would be 0. Any other question from the phone?

Operator

operator
#63

Yes, our next question comes from Daniel Major at UBS.

Daniel Major

analyst
#64

A couple of questions. The first is about Snip and the cash outlay you've guided to, I believe, $9 million for this year. Could you remind us what the total remaining commitment would come to for exercising the 60% earn-in?

Ignacio Bustamante

executive
#65

Okay. The requirement was that within 4 years — up to 4 years — we need to spend an amount equal to double what they've already put in, I believe. For us, that figure comes to CAD 52.5 million. Based on that number, it means we'll have to invest roughly CAD 105 million over as many as 4 years, all right? And by doing so, we lock in our 50% stake in the project. In this year, and in every single year, our minimum spend is CAD 7.5 million. The amount we currently have set aside for this year is around USD 9 million. So we'll comfortably exceed the obligations for this year. And should the projects keep looking attractive, and we succeed in delivering a positive PFS by year-end, then we'll stay committed to putting money into the projects and to keep building toward our 60%.

Daniel Major

analyst
#66

Sure. To put that another way, once the $9 million has been spent this year within your budget, what amount remains to be spent over the following 2 to 3 years in order to secure the earn-in?

Ignacio Bustamante

executive
#67

Let's see. So CAD 105 million comes to about USD 85. We're going to spend $90 here. That leaves us with $76 to spend over the remaining 3 years.

Daniel Major

analyst
#68

Right, yes. So the base case assumes 76 across 2023 through 2025, provided you move forward with the project. Okay, that's clear. Yes, next question. When we look at your slide chain, your valuation with that 18% free cash flow yield — obviously, that's somewhat backward looking. And looking ahead, there's a $285 million cash outlay this year if you total the CapEx commitment to the Posse project and Snip, plus potentially rising expenditure on things like Snip and other possible options, which would, I suppose, on that basis, leave you in a substantially negative free cash flow position over the next few years. Is there some maximum level of total cash outlay you have in mind? Or do you believe the business can sustain that?

Ignacio Bustamante

executive
#69

From our standpoint, we're quite confident in the strength of our balance sheet and in the capital we'll need to put toward Amarillo and Snip, and we don't expect to need any form of extra financing for those. In fact, we think there may even be a bit more headroom for other strategic moves. Naturally, that hinges on how much cash flow we generate and on market conditions — if a solid opportunity comes along, we're still ready to pursue it. But simply to keep moving forward with Amarillo and with Snip, our own balance sheet leaves us quite confident. As you're aware, we hold a strong financing facility — an interim one — carrying very attractive interest rates and with repayment timing that works very well for us. That leaves us in a genuinely comfortable spot to deliver both of those 2 projects successfully, and ideally more beyond them.

Daniel Major

analyst
#70

So you're okay with spending $250 million to $300 million in cash over the next few years and taking on debt to cover it?

Ignacio Bustamante

executive
#71

Sure. But not by much — the debt is already in place. So no extra borrowing is required for that.

Daniel Major

analyst
#72

All right, so, I mean, looking at your cash position at year-end — what did cash stand at when the year closed, around $84 million, was that it...

Ignacio Bustamante

executive
#73

We’re going to start with the 300...

Daniel Major

analyst
#74

$386 million — sorry, yes, that's right. Okay. But then you're putting another $106 million into buying Amarillo, plus roughly $250 million to $300 million across the next 2 years. Do you figure you have enough, without taking on any additional debt, just from the cash balance over the coming few years?

Ignacio Bustamante

executive
#75

Considering the funds we currently hold and the cash flow we expect to generate over the coming 2 years, that will be more than sufficient.

Daniel Major

analyst
#76

Alright, that's clear. Then I just have a question about Pallancata. Obviously, you've given the 2022 guidance for production and all-in sustaining costs, and you have enough visibility on sustaining production through 2023. The all-in sustaining cost of $20-something per ounce this year is clearly covered by the hedges. But what should we be thinking for 2023 and 2024? It sounds like you're going to keep mining, and based on the updated statement you've got sufficient reserves. Should we be thinking about a similar cash breakeven cost? And should this asset be viewed as you extending the life while expecting costs to stay very high and cash flow to be limited, on the basis that you can keep the asset going until you bring the other permitted areas into the mine plan, which will bring the cost down and improve the economics?

Ignacio Bustamante

executive
#77

Yes. We're aware of that, and that's exactly why we put these hedges in place. If you recall, we hedged at $27 for 2021 and 2022 and at $25 for 2023, covering pretty much all of Pallancata's silver production. So with that in mind, we know Pallancata will be generating cash flow for the -- well, it generated cash flow last year, and it's going to generate cash flow for 2022 and 2023. Clearly, we have hedges because we sit relatively close to the breakeven price at Pallancata. So the goal, in addition to making money, was to make sure we have enough time or that we need enough time <<inaudible>> to deliver on more resources. These resources are expensive because we've had to access new areas, we've had to do mine development to access those new areas. So these smaller resources are having to bear pretty much the entire development cost to access there. So our goal is to find additional resources that are larger so they can absorb much better the development costs to access those new areas. And as I mentioned, to get enough at least to get by the next -- the following 2 years of 2024 and 2025 so we make enough time for the new areas to get permitted.

Ignacio Bustamante

executive
#78

Naturally, if we come across a deposit that's bigger and has better grades and all of that, we're certainly going to take a look at it. That said, the main objective for us at this moment is extending the mine's life by another 2 years, which buys time for Laura-Demian and, naturally, for the other highly encouraging targets we hold in Palca, Corina, et cetera. That's the work we've completed.

Daniel Major

analyst
#79

Right, could you remind me again — for 2023, how many ounces have you hedged from Pallancata?

Ignacio Bustamante

executive
#80

We saw 3.3 million ounces of silver.

Daniel Major

analyst
#81

Yeah, so that comes out to 3.3 at 25%.

Ignacio Bustamante

executive
#82

Yes. You've got that right.

Operator

operator
#83

Our next question comes from Steve Archer, a private investor.

Speaker

unknown
#84

On the Inmaculada ore sorting project, I had expected — based on earlier comments — that it would be operating by this point, but there seems to be little mention of it — has anything already been said about where that stands?

Ignacio Bustamante

executive
#85

When it comes to ore sorting technology in general, we remain quite enthusiastic about it, okay? That said, we think it's important to run a fairly large-scale test before committing to the full technology. So ultimately, the project we currently have in place will need $10 million in CapEx to get into operation, and that's a big number. It's a big number, and we want to be sure that this project, even though it will function more as a pilot test, is profitable. Judging from the latest work we've completed, we still haven't reached the profitability level we'd want for an investment of that size. So right now, and over the next, I'd say, 4 to 6 months, we're working on boosting that project's profitability, and we're focused on 2 areas. The first is pursuing improvements to the algorithm used in ore sorting for separation and screening, and we have some very interesting leads we're tracking that we think could end up materially enhancing the already good resource we're getting from screening.

Ignacio Bustamante

executive
#86

And the second thing is, this is a project whose original concept involved a great deal of material handling. Handling materials on that scale costs a lot of money. So our view is that by automating a portion of that handling, we could gain efficiencies as well and make the project more profitable. So at this point we're going to concentrate on that — on bettering the economics — and once the case is a profitable one, then it has to move at full speed. But my sense is that it will likely take us the next 4 to 6 months to reach that level.

Speaker

unknown
#87

Okay. Earlier on, you mentioned that permitting was a blocker for moving forward. Does that still hold true, and what kind of timeline would the permitting process take?

Ignacio Bustamante

executive
#88

We're still working through the permitting, and we do expect to have that permit ready before we finish the additional testing we're doing. So our belief is that the permitting should be ready within the next 4 to 6 months. It's still ongoing, but from our perspective, permitting is not going to be the bottleneck.

Operator

operator
#89

At this point I'll turn things back over to the speakers in case they have any additional remarks or closing comments.

Ignacio Bustamante

executive
#90

All right. Thank you so much, and thanks a lot for being with us — whether you're here in the room, on the phone, or over the Internet. We truly appreciate it. And if any further questions come up, please feel free to reach out. You can always get in touch with Charlie Gordon, who's seated at the back, and I'm around as well, so I'd be glad to take any other questions you might have on a more personal basis once we've hung up. So thank you very much. Have a good day.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hochschild Mining plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Hochschild Mining plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hochschild Mining plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.