Huntington Ingalls Industries, Inc. (HII) Earnings Call Transcript & Summary

August 6, 2020

New York Stock Exchange US Industrials Aerospace and Defense earnings 59 min

Earnings Call Speaker Segments

Dwayne Blake

executive
#1

Thank you, Wanda. It's a good morning to everyone, and we're glad you could join us for this discussion of Huntington Ingalls Industries' results from the second quarter of 2020. Joining us on this call are Mike Petters, who serves as President and Chief Executive Officer, and Chris Kastner, our Executive Vice President and Chief Financial Officer. Just a reminder that anything we say today which isn't a historical fact falls into the category of forward-looking statements, and such statements are provided under the safe harbor protections established by federal securities law. Outcomes could turn out differently. For an explanation of certain elements that might lead actual results to deviate substantially from what we expect, please see our SEC filings. Additionally, during their prepared comments today, both Mike and Chris will touch on certain non-GAAP measures. You can find reconciliations of those metrics against the corresponding GAAP measures in the appendix of the earnings presentation we've placed on our website. We intend to walk through the presentation slides that were posted as a supplement to what we have to say. Please go to huntingtoningalls.com, then select the Investor Relations link, where you can pull up both the presentation and our earnings release. Having said that, I'll hand things over to our President and CEO, Mike Petters. Mike?

Mike Petters

executive
#2

Thanks, Dwayne. Good morning, everybody, and I appreciate you being with us on the call today. I truly hope all of you remain healthy and safe through these difficult times; so to begin, I'd like to offer my heartfelt thanks and appreciation to the people who work at HII. From the moment the COVID-19 pandemic began back in March, our team has stood on the front lines of this fight. They've juggled battling this extremely contagious virus while simultaneously pouring all of their energy, focus, skill and creativity into hitting key milestones across our programs and helping us steer through one of the toughest periods in my career of more than 30 years; and I can honestly say that what I've seen from this team over the last five months perfectly embodies our motto of hard stuff done right now. Let's now move to Slide 3 of the presentation. I'd like to walk you through the thinking behind how we've approached handling the COVID-19 pandemic within our shipbuilding business. We've brought on roughly 25,000 employees over the past five years, at a time when unemployment sat at historic lows. And we've put more than $0.5 billion into training and certifying those individuals so they could execute the backlog we've managed to win during those same five years, which today stands at $46 billion. So when the pandemic hit, our top priority became safeguarding that investment in our workforce, ensuring they'd be trained, ready and available to deliver on our record backlog once we come out of this hard period. And right from the start, we chose to give our workforce the flexibility they required to cope with disruptions in their personal lives. Just think about how things looked across the country in the middle of March. Schools were shutting down; lots of companies had to lay off parts of their workforce, or in certain cases all of it; and in some regions, people were instructed to isolate. That backdrop generated a great deal of uncertainty and disruption for our workforce. So we rolled out a number of benefit changes, among them liberal leave, making it simpler for our employees to remain home when sick or when facing child or elder care difficulties, so those absences wouldn't be held against them. Simultaneously, we needed to keep pace with CDC guidelines so we could reassure those able to come to work that doing so was safe. That involved modifying shift schedules to support social distancing, temperature screenings, more intensive cleaning of high touch point areas in between shifts, and mandating face coverings for anyone entering our shipyards; so through the second quarter, attendance among our hourly production workforce at both shipyards came in at approximately 65%, with a number of days in April and May near 50%. After our liberal leave policy ended in May, we did observe those metrics get better. During the months of June and July, roughly 77% of our hourly production employees at the two shipyards were showing up for work. Cases have risen at our yards as states have reopened, yet attendance has now reached a level that is both sustainable and manageable, and we keep honing our policies so they fit shifting conditions. As a benchmark: when Hurricane Katrina struck the Gulf Coast back in 2005, a substantial share of Ingalls' seasoned workers was lost; when it came to COVID-19, we moved boldly and aggressively to ensure this pandemic would not produce a comparable result. I feel certain our choices were correct in safeguarding our workforce for what lies ahead. Over the last several years we have also devoted considerable investment toward digitizing how ships are built, speeding up efficiency and the training of our younger employees; that spending built up infrastructure within our shipbuilding support functions, which let us multiply the count of remote workers by 10 within just a few days. COVID-19 has proven a hugely disruptive force on our business, and we have been exploring every possible avenue to recoup our costs from our customers. There are now signs that we might recover COVID-19 labor costs that are directly related, such as quarantining and other paid time-off, under the provisions of the CARES Act or any later legislation. That said, no clear route exists at this moment for recovering delay and disruption impact, even though customers' intentions still look favorable; let's move to Slide 4 of the presentation. In the quarter, we booked a charge of $167 million, largely caused by revised cost and schedule assumptions spanning all of our programs. The bulk of that impact, $111 million, falls on the Block IV boats within the Virginia-class submarine program, stemming from recent cost and schedule performance plus updated assumptions about future program performance and efficiencies, which take in the effects of COVID-19; allow me to add some further detail for context and clarity. Our plan anticipated cost and schedule gains as we progressed down the learning curve on Block IV boats to support a two-boat per year cadence. While carrying out our usual second quarter program status reviews, it grew evident that the VCS program had been especially hit by staffing and efficiency difficulties as we shifted priorities to match our customers' priorities at Newport News; that disruption to the rhythm of work significantly undercut our capacity to reasonably depend on the assumptions in our risk registers concerning both boat learning and cost improvement. Consequently, we are resetting those risk registers to capture the performance trends seen during the quarter, COVID-19's impact included. Keep in mind that the slide lists key milestones for the next two Block IV delivery boats. I couldn't be more proud of our team, whose hard work never stops and who remain absolutely dedicated to safety and quality while the pandemic continues. Facing these difficult circumstances side by side will leave the team with invaluable lessons and experiences that will assist them in learning, developing and delivering the performance needed to hit our goals for safety, quality, cost and schedule going forward. Let me now offer a few quarter highlights, beginning on Slide 5 of the presentation. Revenue came in at $2.0 billion, while diluted EPS for the quarter was a $1.30. Those results contained the $167 million charge I mentioned earlier. Roughly $3 billion in new contract awards were booked during the quarter, among them a $1.5 billion contract to build LPD-31, which left us with backlog of about $46 billion when the quarter closed, and approximately $21 billion of that is funded. Our backlog provides enormous visibility and stability, with more than 85% of expected FY2020 to FY2024 shipbuilding revenue under contract, and to this point it is well supported by the annual congressional authorization and appropriations process. As for what's happening in Washington, we backed COVID relief efforts by the Navy, the Department of Defense and Congress to help ensure liquidity of the supply base, provide contractual relief and promote workforce retention.

Mike Petters

executive
#3

We keep collaborating with Congress as it weighs the fiscal year 2021 President’s budget request, and we’re quite happy about the robust backing for shipbuilding plus other national security priorities that the defense authorization bills in the House and the Senate each reflect. The House recently passing its appropriations measures is a positive sign, and we’ve pressed the Senate to wrap up the appropriations process at the earliest opportunity. Lastly, we’ll keep working alongside Congress and the administration to back extra authorities and investments that will let our nation’s economic recovery happen via the defense industrial base. Now, I’d like to walk through several business segment highlights from the quarter. At Ingalls, DDG 119 Delbert D. Black was handed over to the Navy, work began on DDG 128 Ted Stevens, the first vessel under the FY 2018 multi-year contract. And DDG 62 Fitzgerald departed the shipyard. On the LPD program, the contract for LPD 31, the second ship and the Flight II class, was granted; plus NSC 9 Stone keeps moving through the test program and should be delivered late this year. Notable events since Q2 closed include the contract award for the DDG FY 2020 option ship, the eighth Flight III ship, and LHA 7 Tripoli sailing away from the shipyard. At Newport News, CVN-79 Kennedy stands at roughly 74% complete, and the team stays focused on compartment completion and finishing our single-phase delivery proposal for submission to the Navy. CVN-73 USS George Washington keeps advancing through its final outfitting and test phase and is about 78% complete, with the ship’s next major milestone being the start of crew movable later this year. In our Technical Solutions business, the team notched two re-compete wins — two key re-compete wins, among them a contract award to supply analytical support services to the U.S. Special Operations Command and an award from the U.S. Postal Service Office of Inspector General to keep providing support services to the office of the Chief information Officer. TS also just shared news of a significant IDIQ contract award, valued at as much as $3 billion across a 10-year span, coming from the Department of Energy, to deliver deactivation, decommissioning and removal services nationwide at excess DOE facilities throughout the country. Taken together, these recent wins reaffirm HII’s longstanding strategic partnerships with several of our key customers. Additionally, TS recently finished a strategic equity investment in Sea Machines Robotics, a Boston based autonomous technology company that specializes in advanced software for unmanned surface vessels; this investment represents our commitment to advanced innovation across the unmanned systems market and our drive to form complimentary partnerships in this important and growing domain. I’d like to close my prepared remarks by highlighting a few key attributes of our business. These qualities indicate an extremely solid base and a promising tomorrow, even as we navigate what is clearly a tough stretch. In my view, the leadership group here is unmatched in this industry, and the care, discipline, and determination they've shown—hitting scheduled milestones again and again while managing COVID-19's disruptions throughout our operations—has only strengthened that belief. Across the last five years, we put substantial money into our people, and when the COVID-19 pandemic hit, we acted correctly to keep our workforce intact, so they'd be trained, prepared, and ready to carry out our record backlog once we come through this hard moment. Our balance sheet is also quite robust. Chris will explain how we've recently taken several sensible steps that reduce what we pay for capital and give us liquidity that is more than sufficient. Beyond that, we expect free cash flow generation to keep speeding up over the coming years as our shipyard capital investments wrap up this year. Lastly, our $46 billion backlog—more than five times what we earned in revenue last year—means an enormous volume of work ahead, and that's a major reason we moved so aggressively to protect the training and qualification investments made in our workforce across the past five years. That workforce now operates in shipyards that have been substantially recapitalized and made more efficient, with improved technological resources available to them, and they are essential to our success as we push through and speed out of this uncertain stretch. I'd like to express my gratitude to them for everything they've accomplished, especially amid the continuing pandemic. As I mentioned before, this is easily the hardest operating climate I've faced in my whole career, yet I'm certain the right team is here to step up. And I have great confidence that we'll come out of this stronger and even more capable over the long run. With that, I'll hand things over to Chris Kastner for a few comments about the financials. Chris?

Chris Kastner

executive
#4

Thanks, Mike, and good morning to everyone. I'll take a few minutes now to walk through the results we posted for the second quarter, and I'll also share a few thoughts regarding the revised outlook we've issued for 2020. Starting on Slide 6 with the consolidated figures: revenue for the quarter came in at $2 billion, which is a decline of 7.4% versus the comparable period a year ago. Operating income fell by $118 million, landing at $57 million relative to the second quarter of 2019. Operating margin dropped 519 basis points, coming in at 2.8%. What drove those declines was mostly unfavorable adjustments adding up to $167 million, tied to revised cost and schedule assumptions on programs across the company that Mike already walked you through. Net earnings for the quarter were $53 million, against $128 million in the second quarter of 2019. That lower net earnings figure was mostly attributable to reduced operating income, partly offset by a more favorable FAS non-service pension benefit. Looking at it by segment: at Ingalls, quarterly revenue was $622 million, which matched the prior-year period. Ingalls posted operating income of $55 million and margin of 8.8% for the quarter, both below the second quarter of 2019, largely because of unfavorable adjustments — among them disruption from COVID-19 pushing things later, plus reduced risk retirement on the NSC program — partly offset by greater risk retirement on the DDG program tied to delivery of DDG 119, along with recognition of incentives connected to capital investments for the DDG program. At Newport News, revenue for the quarter was $1.1 billion, down 12.3% from the same period a year earlier. Newport News recorded an operating loss of $69 million in the quarter, compared with operating income of $71 million in the prior-year period. The drops in both revenue and operating income stemmed from unfavorable cost and schedule performance, together with revised assumptions about future program performance, mostly involving Block IV boats of the Virginia-class submarine program. At Technical Solutions, quarterly revenue was essentially flat versus the second quarter of 2019, while operating margin rose 344 basis points to 2.8%. Moving to Slide 7: strengthening the balance sheet through this uncertain stretch has been a priority for us. As I mentioned last quarter, we issued $1 billion in new senior notes and also added a 364 day revolving credit facility with $500 million of capacity. We closed the quarter with $631 million of cash and $2.4 billion in total liquidity. As I said last quarter, our plan was to delever in November by calling $600 million of senior notes due in 2025; during the second quarter, cash from operations was $201 million, and net capital expenditures were $75 million, or 3.7% of revenues, versus cash used in operations of $44 million and $91 million of net capital expenditures in the second quarter of 2019; we still expect to generate more than $500 million of free cash flow this year. In Q2, we distributed dividends amounting to $1.03 per share, totaling $42 million. We also put $56 million toward pension and post-retirement benefit plans during that quarter, with $45 million of that figure being discretionary contributions into qualified plans. Now on Slide 8, you'll see a refreshed look at the key program milestones coming up. Those milestones back the revised financial outlook for 2020 that we've laid out on Slide 9. Looking at 2020, our expectation now is shipbuilding revenue ranging from $7.6 billion to $7.9 billion, with shipbuilding operating margin landing between 5.5% and 6.5%. Beyond changes to our cost and schedule performance assumptions, we've adjusted shipbuilding assumptions to account for a single-phase delivery approach on CVN-79. This new approach means the program schedule gets updated, and risk retirement milestones shift into later periods, in line with that revised schedule. Turning to Technical Solutions, our 2020 revenue expectation falls between $1.2 billion and $1.25 billion. Operating margin should be somewhere in the 2% to 2.4% range, while EBITDA margin comes in between 5.7% and 6%. Those Technical Solutions assumptions factor in San Diego Shipyard results through August, 2020, plus UniversalPegasus results through December, 2020. As a reference point, we've included in our outlook table a look at full-year Technical Solutions expectations that leaves out San Diego Shipyard and UniversalPegasus. When it comes to both revenue and operating margin, we anticipate fourth quarter results to be slightly better than what we see in the third quarter, because of how milestones fall across the rest of the year. Last, I'd like to give a broad-brush picture of how we view 2021 right now. Having a $46 billion backlog puts us in a good spot, offering a really solid base for the business. On shipbuilding, revenue should land somewhere between $7.8 billion and $8.1 billion, with operating margin in the 7% to 8% range. And for Technical Solutions, revenue comes in at roughly $1 billion, with EBITDA margin between 7% and 9%. Our planning process will wrap up across the back half of this year, and we'll share more specifics on the 2021 outlook when we hold our fourth quarter earnings call. At this point, I'll hand things back to Dwayne for Q&A.

Dwayne Blake

executive
#5

Appreciate that, Chris. Just a quick note for everybody listening in: keep it to 1 question up front and 1 follow-up, which lets us work through as many folks in line as we can. Wanda, over to you to run the Q&A.

Carter Copeland

analyst
#6

Hey, good morning, guys.

Mike Petters

executive
#7

Good morning.

Carter Copeland

analyst
#8

I'll combine my first question and my follow-up into two quick ones. First, could you share anything about cost reimbursement you might receive, which could affect some of this going forward, depending on how things turn out with the DOD? Second, regarding the Block IV negative cumes, was any portion of that unrelated to the disruption you've been experiencing at the yards? Was there anything idiosyncratic in there worth pointing out? Any detail you could give on that would be great. Thanks.

Mike Petters

executive
#9

Absolutely. As you keep seeing in the news, there was approval for certain COVID-related relief that Congress gave the Pentagon the authority for, yet the money was never allocated. So people are now arguing about how to secure that funding. That ties to items you could describe as entirely tied to the virus — new cleaning stations, quarantines, or similar measures. Underneath all that, however, sits any subsequent schedule slippage or interruption. Our customers have said they'd like to see that covered, and they want to figure out a way to do so. At this moment, we don't really know how it will ultimately shake out. There's legislative activity underway. There's also engagement with the customer. Still, for the report we're giving today, our underlying premise is this: although we believe there's a chance it could occur, and we're chasing every possibility, we are not yet including it in the figures. So that certainly has an impact on us. Second, Carter, you know how we operate. When something goes wrong, our instinct is to own it — to say we mishandled it. Either we lacked the proper qualified individual, or we lacked the proper instruction. Getting quality, the qualified person, and the sequence right, along with the instruction — we begin with a very clear-eyed stance and say, that's on us. We failed to achieve that. That inefficiency was our problem, and we experienced some of it during this quarter. Yet you don't need to dig far beneath those matters. We get those each quarter, but you don't need to dig far beneath them to find either a direct COVID effect, an indirect COVID effect, or simply that COVID has left us without the degrees of freedom required to bounce back from that inefficiency. So the difficulty is this: we can pinpoint costs in our business that are entirely COVID related, but once you get to everything else and say we have inefficiencies in program performance, trying to sort out how much stems from not having the right person at the right moment versus how much stems from virus impact — separating all of that becomes truly difficult. That's the reason we reported it the way we did.

Carter Copeland

analyst
#10

Okay. That makes immense amount of sense. Thanks, Mike.

Mike Petters

executive
#11

You bet.

Doug Harned

analyst
#12

Good morning. Thank you.

Mike Petters

executive
#13

Good morning.

Doug Harned

analyst
#14

Still on Virginia class — you guys put $95 million down to something other than COVID, and like you were saying, maybe COVID had some part in it. We hadn’t really been seeing this type of problem at General Dynamics. I’m just trying to figure out how what you’re seeing there relates to the whole Virginia class Block IV effort, or whether these are Newport News-specific matters instead of something hitting the wider lot work?

Mike Petters

executive
#15

Doug, I’ll say this — that’s a tough one. My take is it’s probably tied more to what makes Newport News shipbuilding distinctive. There’s a broad mix of products at Newport News and a broad mix of conditions among those vessels. Early in this effort, when we worked alongside the Navy to prioritize ships that can deploy first and then unit deliveries, that begins shifting priorities around a bit within the business; so when you think about deployable assets, you’re thinking about submarine repair work we do. You’re thinking about the RCOH we do. Right now we’re helping the Ford at sea with weapons elevator work. We’re helping — frankly, we’re helping naval shipyard work across the country in some — with certain critical skills. What occurs is you begin — when attendance isn’t full, you begin shifting personnel from one spot to another, and you begin attempting to ensure the right skills land in the right spot. So I believe that’s particular to Newport News. I believe handling commission ships and deployable assets is a distinctive challenge for them under these circumstances. That said, I’d tell you the attention to near-term milestones throughout the business has been fairly solid; it’s the tail, and the chance to catch up in the tail, that’s the hard part. So I don’t know, Chris, whether you’d like to add anything there.

Chris Kastner

executive
#16

No, that covers it.

Doug Harned

analyst
#17

Just one more thing. Looking ahead, we used to view Block IV as the path down the learning curve; once it matures, that's a solid avenue for margin expansion. Previously you were expecting something closer to 9% to 10% for next year and then dialed that back somewhat. As we take a longer view — I mean, you're entering what I believe is the tougher portion of CVN-79, that final fourth. So how are you thinking about where margins go at Newport News next year and afterward, versus your earlier expectations?

Chris Kastner

executive
#18

Okay, I'll begin. Thanks, Doug. Across the whole business, we felt it mattered to provide some 2021 figures to everyone. Our plans for later years are still being finalized. I'll lay out a thorough review of 2021 and our view on how shipbuilding margins will develop, and from the 2021 numbers we shared with you, I expect only improvement as we head into upcoming periods.

Mike Petters

executive
#19

Let me also say this. On the whole, I believe the path Newport News is on right now, versus where it stood 4 months back, is going to be somewhat — reaching that point will take somewhat more time. And I see 2 pieces to this. First, how will Block IV ultimately unfold? Second, the single phase delivery on 79 has not yet been negotiated by us; and, as Chris said during his remarks, that will push milestones we had been eyeing for this year and the start of next year, it will push those milestones further out. So the path will be somewhat flatter, but my broad sense of what will take place at Newport News is that they will knock it out of the park. They will simply need somewhat more time to reach that point, given the sort of work mix they currently have.

Doug Harned

analyst
#20

All right. Thanks. Appreciate it.

Myles Walton

analyst
#21

Thank you. Mike, a period such as this one really stands apart, since Huntington faced greater exposure to something irregular and outside the market's normal behavior. So I'm curious — when compared with other companies in the sector; and I'm curious, when you're speaking with your client and you bring up a situation such as this, or something like Katrina, or choose whichever outside factors you're more exposed to than not, why isn't that brought into the debate over what profitability ought to be, given the apparently unique risk you bear in a business with such a lengthy cycle?

Mike Petters

executive
#22

That's a genuinely strong question, in my view. And it's definitely something we discuss with the client. I'd say we likely hold that discussion with them every week, maybe even every day. The flip side of it, Myles, and I'll simply describe for you how that discussion unfolds, is that on the other hand, you've got — there's a $45 billion backlog. And this business has revenue we can foresee stretching into the coming decade. So there's reduced risk surrounding what's already contracted and the additional work they're doing. Consequently, all of this belongs to the contract talks. And I doubt we truly had a pandemic listed in our risk registers back when we started our most recent round of contract talks. It will definitely shape how we approach negotiations from here on, though it's only one piece of that discussion.

Myles Walton

analyst
#23

And Chris, should those big settlements materialize, what portion of the costs you flagged in the press release would come back? Are we talking about the $61 million in discrete items, or is it more than that? Can you see anything about what the sales figure would be?

Chris Kastner

executive
#24

Yeah. Well, there's no question that the $61 million is specifically called out as delay and disruption that we estimated against our programs. So estimating what it would do to the rest of the negative adjustments is really hard. There's no question it's in there, but at this point it's just really hard to estimate.

Myles Walton

analyst
#25

All right. Two is where I'll stop. Thanks.

Jon Raviv

analyst
#26

Thanks. Since we've got the 2021 figures in hand, I suppose 2022 becomes the topic. Appreciate the detail. Mike, though, during your opening comments you said you anticipate free cash flow will keep rising from here. Chris, you restated at minimum $500 million for this year. Could you discuss the longer-range objective? I believe you'd earlier spoken about the $3 billion through 2024, plus how you draw focus and how a pension factors into that picture?

Chris Kastner

executive
#27

Right. Jon, it's Chris here. My sense is that cash involves plenty of shifting pieces at the moment. For 2020 we can see clearly enough to feel good about slightly more than $500 million. Given the CARES Act along with shipbuilding timelines slipping somewhat, and the single phase delivery, my view is it's too soon to address 2021 and afterward on a free cash basis. A full review of that will come your way at the close of the year in February.

Jon Raviv

analyst
#28

All right. So could you break down a few of those variables we ought to be looking at — perhaps with a bit more detail on the components, since that figure is a goal. My understanding is that you've mentioned this before, so which are the major fluctuating elements that might be changing position here? The reason is that it's a multi-year cumulative objective, and in theory it absorbs plenty of the potential annual ups and downs that UPIs generally experience.

Chris Kastner

executive
#29

Certainly. The CARES Act is clearly a matter of timing, capital tied to timing, and pension appears quite steady. Working capital is going to fluctuate across the years, though I don't expect a significant effect there. And then clearly, reduced profitability in both this year and the next will have some influence on us; but those are genuinely the components in motion right now. So in order to provide you with solid timing along with a cumulative figure, I'll simply hold off until the year concludes.

Jon Raviv

analyst
#30

Alright, I'll stick with 2. Appreciate it.

Chris Kastner

executive
#31

Of course.

Robert Spingarn

analyst
#32

Hi, good morning.

Mike Petters

executive
#33

Good morning.

Robert Spingarn

analyst
#34

This might be one for Mike or Chris, but what kind of framework guides how you decide on capital allocation? Consider the funds directed toward the yards—that $1.8 billion—and the recent returns from the business, outside of COVID; they simply aren't what you'd hope for or steady relative to competitors, especially when I stack that against your cost of capital. So I'm just wondering about the overarching framework you used, the choices made, regarding both internal investments and, really, M&A too.

Mike Petters

executive
#35

Okay, I'll kick things off, Rob, then Chris may jump in and set me straight. Let me bring you back and remind you that right from the start, the capital investment we undertook was a generational one. That's how we framed it from day one. We truly began along that road and stated this won't generate new sales, and it won't necessarily boost performance of any program currently underway. It will represent a generational reset of how this business operates over the next 25 to perhaps even 50 years. What occurred is that while we were making that investment, it built confidence with our customer so that they could—when they recognized needs for additional ships, they essentially returned and said we must go purchase more ships; thus, over the last three years, the order book has filled up. As of today, we're at the tail end of that capital investment, and our backlog is at a historic peak. I wish I could claim I was clever enough to foresee that putting money into that capital would generate such a backlog. I wasn't that clever, yet it certainly turned out well. At this point we've recapitalized facilities, and we have—what we've put into workforce positions us to go carry out the backlog. Regarding the returns we're observing so far, I'd say the verdict is still pending. Honestly, the—we've needed to rebuild the workforce during the past five years. We're at the early stage of several major—given the backlog, we're at the early stage of several major large programs. Right now we have three carriers contracted for construction. It's been 30 years since that scenario existed at Newport News. Ingalls keeps competing effectively in the destroyer program, and the Navy keeps advancing with amphibious programs, and then the Coast Guard program appears—goes quite well. And what we've invested in the shipyard of the future in Pascagoula has proven highly effective at driving efficiency into the programs. So I guess my take is that we still don’t know yet how those returns will play out, but I’m genuinely pumped about the direction we’re headed. Around COVID specifically, at the very beginning, it took roughly 10 days from when our crisis team was assembled until we saw our first case. When we kicked things off, we definitely didn’t have a fully developed set of protocols; we just began experimenting and giving things a shot. A few things succeeded, a few things failed, we pulled back from certain efforts, and we gave new approaches a try. But let me paint a picture of where things stand right now. At present, we’ve recorded as many cases across our business within the last 2.5 weeks as we saw during the entire period prior to that; even so, we’re running things in a highly sustainable manner, with a mature set of protocols that now lets us forecast the business going forward. On top of that, our workforce has gone through this specific event together as a shared experience, and that will serve as a unifying force—or a catalyst—for them for the rest of their careers. And I believe they’re now stepping into it, and we’ve already witnessed their creativity in leveraging the capital investment, leveraging the technology investment, and speeding up the opportunity to do better on that front; so it’s been a tough three months, but wow, we’ve picked up a tremendous amount, and we’ve sped up a great deal of opportunity here to transform the business. And that has me very excited. I’m truly interested and truly, truly excited to have the chance to lead the pursuit of those returns on capital that you’re referring to. And I hope Chris…

Chris Kastner

executive
#36

Right. And I would say as well, Rob, we rely on every suitable metric when evaluating capital or choices about deploying capital, though I should also mention a few of the investments we've completed during the early portion of this year in the unmanned area at Hydroid and Sea Machines; for the Navy's future and for HII's future, these matter a great deal. So we are quite — we feel good about those investments, and those represent the sort of investments we're seeking going forward.

Robert Spingarn

analyst
#37

All right. You two are each making valid arguments. And Mike, I get it — that's a reasonable observation that the backlog has grown. But — once more, setting COVID aside and not counting it, over a longer horizon, do the returns stay the same as they have been with a bigger backlog? Is this still a shipbuilding business at 9% to 10%?

Mike Petters

executive
#38

Correct. Why wouldn't it be? I mean, I think it truly — it might be, yes, 9% to 10%. What matters is, at what point will you arrive there? And that will be shaped by a few of the contracting matters we're handling related to 79 and the work surrounding the CARES Act and that kind of item, yet it will also be shaped by, in what way do we get through the pandemic and speed up out the opposite side of it? Whatever that opposite side turns out to be. But yes, it is unquestionably a 9% to 10% business.

Robert Spingarn

analyst
#39

All right, thanks.

Ron Epstein

analyst
#40

Morning, everyone.

Mike Petters

executive
#41

Morning.

Ron Epstein

analyst
#42

So Mike, based on how these questions are coming across, I figure you can pick up on it. You went over that 9% to 10% figure again, yet we ended up tripping over the Virginia class here. You've got that massive backlog. After a stumble like this, how is anyone outside supposed to trust that you'll actually deliver on that backlog, right? I mean — I figure you can — it's probably quite obvious, the kinds of questions coming our way. I mean, what makes investors confident you'll deliver on that backlog?

Mike Petters

executive
#43

Ron, this is one of those situations where we have to show you. The way we see it, we understand what has to get done; we've assembled the team that will get it done; we've put the necessary investments in place to get it done; from there it's simply the cadence of doing it again and again. This isn't new territory for me. I hadn't — the pandemic was something I hadn't lived through, but as I believe I said in my prepared comments, think about the tail end of Katrina, when at the start of Katrina, we lacked the kind of unified workforce that exists across the company now. In fact, I used to point out that in early 2008, during Katrina, Ingalls had the youngest workforce in the industry, and within 3 years, they delivered 10 ships. Three years on from that, they still had the youngest workforce at Ingalls, yet they had become the industry's most seasoned workforce, and that has benefited them enormously through the past 10 years. That's the place — my belief is that's the place Newport News occupied prior to the pandemic. And what the pandemic has shown me is that this young workforce is speeding up how the business transforms. There's nothing more I can offer beyond this — we've laid out milestones. Those milestones will be met by us, and performance will be tracked by you; that's about the best I've got.

Ron Epstein

analyst
#44

Looking ahead across the coming 1 or 2 or 3 quarters, from an outside perspective, what indicator ought we to watch for? What is the upcoming development that would let people conclude, alright, they truly are following through? What signals should be on our radar?

Chris Kastner

executive
#45

Sure, Ron, that's a solid inquiry. Speaking as Chris here. To be precise regarding the VCS initiative, the narrative will emerge through 794 and 796. Thus, the float off involving 794 during this year's latter half, followed by pressure hole completion early in the following year; those represent the upcoming key milestones for those vessels; and we will supply updates with each quarterly report until those are finished, so you can track our advancement on them.

Ron Epstein

analyst
#46

Okay. All right. Thank you.

Mike Petters

executive
#47

Sure.

George Shapiro

analyst
#48

Good morning.

Mike Petters

executive
#49

Good morning.

George Shapiro

analyst
#50

I'd like to dig a little deeper into the margins you're implying. If Newport News charges were excluded, or if you added them back, you'd get a core margin around 3.5%. Historically, that figure has generally exceeded roughly 6%. So should we treat this 3.5% as the typical margin going forward, given that it reflects adjustments tied to Virginia class and also the Kennedy?

Mike Petters

executive
#51

No, no. We don't disclose margins by division for ships, but across shipbuilding we landed between 7% and 8% in Q3 and Q4, and for the rest of the year that's in line with the shipbuilding guidance we provided.

George Shapiro

analyst
#52

Alright. Then, looking at it from another angle, if I were to suppose that the rest of that $56 million in unfavorable adjustments—which I believe sits at Ingalls—then Ingalls' margin would have come in unusually high, around 16%, it appears, sort of outside the typical range, or perhaps not every charge lands there. Alternatively, could you clarify why the takeaway is that you'd wind up with a margin that high?

Mike Petters

executive
#53

George, let me walk you through a fuller picture of the cumulative adjustments, alright? Unfavorable totaling $167 million, favorable totaling $56 million, netting to $111 million. Within that, the net negative $126 million belongs to Newport News. Ingalls accounts for positive $13 million, while TS contributes positive $2 million, okay?

George Shapiro

analyst
#54

All right.

Mike Petters

executive
#55

George, Dwayne is able to take you through that once the call is over, too.

George Shapiro

analyst
#56

All right. Then perhaps a broader question. That revenue outlook you gave for the ships next year, following the reduction for this year — does it merely capture the planned slippage spread across multiple years? Otherwise, what would keep revenues from being at least a bit stronger in the coming year than the figure you're pointing to?

Chris Kastner

executive
#57

We're just taking those ship schedules and extending them forward twelve months; giving you folks something to anchor on for your modeling was the goal. When we get to the close of the year, we'll come back with an update on that.

George Shapiro

analyst
#58

Okay. Thanks very much.

Chris Kastner

executive
#59

Sure, George.

Mike Petters

executive
#60

Absolutely.

Seth Seifman

analyst
#61

Excellent. Thank you so much. And hello in the morning.

Mike Petters

executive
#62

Morning to you.

Seth Seifman

analyst
#63

To build just a bit more on the profitability picture as we head into the coming year, the guidance, as I read it, suggests something in the mid-to-high 7% range in shipbuilding for what's left of 2020. You mentioned 7% to 8% for the following year. As we break down the individual pieces, what is it that stands in the way of any margin expansion in the coming year? And what is it about the carrier milestone that's being pushed out, which might let you capture some of that margin expansion?

Mike Petters

executive
#64

Yes. So the intent was to give you all an anchor for the coming year. That way she can run her modeling, as I was just saying to George. We are working through that single-phase delivery on 79, and once we have the final negotiated settlement and the schedules that come out of it, our plans will be adjusted accordingly; so as things stand, the best outlook we can offer is the one I gave in my script and the one I gave in the outlook. Should that shift, I will certainly make sure all of you know.

Seth Seifman

analyst
#65

All right, thank you. And just to follow up on that, can you remind us how much time is left that you anticipate spending on the Block IV boats — the ones this $111 million negative adjustment relates to — over what span should we expect those profits to be affected?

Mike Petters

executive
#66

The 800 delivery is a minimum of 3 to 4 years away. We'll get back to you on that, Seth.

Seth Seifman

analyst
#67

Okay. Great. Thank you very much.

Mike Petters

executive
#68

Sure.

Gautam Khanna

analyst
#69

Hey, thanks. Good morning.

Mike Petters

executive
#70

Good morning.

Gautam Khanna

analyst
#71

I have two things to ask. The first one picks up on something raised earlier, regarding the VCS Block IV — if my memory serves, during Q4 a couple of years back, we saw a negative cumulative catch-up. I simply want to confirm — can we break down the present cumulative catch to determine whether — what I'm getting at is, what degree of realism was implied by the accrual rate as of Q1 compared with Q2? Had a great deal of productivity been assumed, such that reaching it was always going to require stretching? I'm attempting to work out what portion of this stems from leftover problems going back to that Q4 a couple of years ago, as opposed to merely COVID-related disruptions that essentially knocked you off course.

Chris Kastner

executive
#72

That is a tough one to respond to, Gautam — a hard question, and not an easy one to address. What I can say is that each quarter we apply a highly disciplined approach when evaluating our EACs. As Mike mentioned during his script, once we worked through the VCS EAC, it simply grew clear that our risk registers and our expectations for that program required resetting. So relative to how you framed it, this is somewhat of a difficult answer. Nevertheless, the adjustment taken this quarter results from an EAC process that is extremely disciplined, one we must apply quarterly, much like what gets used across all our shipbuilding programs.

Mike Petters

executive
#73

This is something we carry out on a quarterly basis. Also, when we wrapped up the first quarter, that review showed no sign of any problem.

Gautam Khanna

analyst
#74

Right. So Mike, I believe during the prior quarter you commented that perhaps some of this could be recovered afterward in the year. Is the sole factor workforce absenteeism and such — I'm merely attempting to separate out which variables might account for the shift between one quarter and the next. Clearly, COVID is persisting for a longer stretch. And — though I think it's — yes.

Mike Petters

executive
#75

I think it's — that particular remark doesn't stick in my memory. What I'd say is our knowledge today far exceeds what we had at the close of April, the start of May, during that call. I do believe we stated our intention to pursue near-term milestones, in light of the attendance situation. Near-term milestones would get our attention while long-term ones would suffer. And we assumed our suppliers would take the same approach. So at present we're sort of grinding through that; yet let me return to — as things stand right now, we possess a fairly dependable, lasting grasp of the work before us and the protocols we've implemented. Consequently, we can begin forecasting how the business will proceed. I won't claim that every milestone from Q2 will be recovered before the year ends. That, I believe, won't occur. And certain of those items could require considerably more time to recover. So we'll simply have to wait and see.

Gautam Khanna

analyst
#76

Yeah, I appreciate that. That's a tough one to pin down exactly. Chris, on a separate note, regarding the long term — you provided a five-year guide on free cash flow, and I believe it put the back half of that period approaching $700 million. Given what's happened today, is there any revision to that view?

Chris Kastner

executive
#77

Yes. Like I mentioned before, we have to get through our planning process before we update that. But the key elements that formed that guidance — the backlogs — haven't changed. Profitability will take longer to reach 9%, as Mike said. Capital remains the same. Pension remains the same at this point, and we'll give updates if necessary; but yes, at this point there's no reason to change it, and I'll give a comprehensive update at the end of the year.

Gautam Khanna

analyst
#78

Thanks, everyone.

Matt Akers

analyst
#79

Hi there, good morning, everybody. Actually, this is Matt Akers, filling in for David.

Mike Petters

executive
#80

Morning to you.

Matt Akers

analyst
#81

Could you share your thoughts on the free cash flow outlook? You kept that guidance unchanged for the year, despite the fact that CapEx sounds perhaps somewhat greater and the shipbuilding picture appears a bit worse. Would you explain what the favorable offsets might have been?

Chris Kastner

executive
#82

Sure. The CARES Act definitely assists us through the deferral of payroll tax. That is a benefit. Our Navy customer has — has accomplished a tremendous job making sure payment reaches us throughout this whole process. As a result, we have received payment on schedule, and we have been hitting our milestones, correct? We deliver 119, delivered 62 million, been achieving the majority of our milestones. So fairly at ease regarding where we stand from a cash flow perspective this year.

Matt Akers

analyst
#83

All right, thank you. All right, so I suppose returning to the Virginia class — how are Block IV and Block V split in terms of what you're currently doing? Does that negative cumulative figure include any Block V work at all, or does it relate purely to Block IV? And in what way do you assess the risk associated with Block V?

Mike Petters

executive
#84

Every bit of it is Block IV. As for Block V, our comfort level at present is quite high; that program has only just begun for us, and when beginning a block we tend to be quite conservative.

Matt Akers

analyst
#85

Got it. Thanks guys.

Mike Petters

executive
#86

Sure.

Joseph DeNardi

analyst
#87

Morning, everyone. I said I'd steer clear of a margin question, yet here I am starting with one anyway. Mike or Chris, can you see a path back to 9% to 10% for ships? And in the best scenario, is 2022 achievable, or does that slip later? Also, if we move to single phase on CVN, does that speed up the return or push it out?

Chris Kastner

executive
#88

To know the ultimate effect, we first have to work through the CVN-79 negotiation. I know I sound like a broken record, but so many pieces are in motion at the moment. We're sure we'll get there, but until our planning process wraps up, we can't offer a better guide right now.

Joseph DeNardi

analyst
#89

All right. Then, Mike, during the Investor Day, all of you discussed capital deployment and expanding your services division, with what I believe was an emphasis on nuclear services assets. Does that remain your thinking? Has COVID caused any postponement of capital deployment through M&A? And what does the pipeline of opportunities look like? Thank you.

Mike Petters

executive
#90

Yeah, so — we finished the Hydroid acquisition once all of this had already begun. And we recently invested in Sea Machines for certain autonomy within the unmanned space; we feel quite good about our position in unmanned and where we need to head, and we have a perspective on how to move forward there. So the market is truly the problem when it comes to how valuations are being set these days; but that's sort of — it's simply the conditions we find ourselves in; regarding DOE, the energy side, it's no different. I noted that we are — we keep growing our role as a prime to the Department of Energy; we keep growing our role at all of the DOE sites. And so we're — we can see clearly there what our customers want and the capabilities they require, and we have ideas about how to deliver that in the remaining portion, the government services portion. I believe the reason we must move in that direction is that valuations there are genuinely difficult to determine. I believe we must move in that direction by, a, showing that we can perform in that business; and then, b, grasping the niches in that business where particular capabilities will matter greatly for our customers and moving along that course. So that's how we're approaching it. We aren't altering that. We might be polishing it somewhat, because of the present conditions we face, but we stay dedicated to it. One thing that we have — we are sort of experiencing the ideal situation right now is that we are in a position where we are extremely concentrated on manufacturing. The portion of our business that isn't manufacturing, the services portion, actually performed quite well and is holding up fine amid this pandemic; so the difficulties we've faced in manufacturing haven't really been mirrored to any degree on the services side, and that simply confirms our belief that we must keep working to diversify the business.

Joseph DeNardi

analyst
#91

Thanks.

Mike Petters

executive
#92

I'd like to express my appreciation to all of you for being with us on this call. My hope is that both you and your loved ones keep remaining safe and well. And as we always do, we're grateful for the time you've given, and we can't wait to talk with you once more very shortly. Thanks.

Operator

operator
#93

That wraps up the call for today, everyone. We appreciate you taking part. You're free to leave the line now. Have a great rest of your day, all of you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Huntington Ingalls Industries, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Huntington Ingalls Industries, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Huntington Ingalls Industries, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.