Huntington Ingalls Industries, Inc. (HII) Earnings Call Transcript & Summary
November 4, 2021
Earnings Call Speaker Segments
Dwayne Blake
executiveGood morning, everyone, and thank you for being here. We appreciate you taking part in Huntington Ingalls Industries' earnings conference call for the third quarter of 2021. With us today are our President and Chief Executive Officer, Mike Petters; our Executive Vice President and Chief Operating Officer, Chris Kastner; and Tom Steely, our Executive Vice President and Chief Financial Officer. Please keep in mind that anything discussed today that is not a historical fact counts as a forward-looking statement, and it is offered under the safe harbor protections set out in federal securities law, which means actual results may differ. To learn about some of the things that could make actual results differ significantly from what we expect, please take a look at the filings we make with the SEC. Also, when Mike, Chris, and Tom speak today, they will bring up some non-GAAP figures. You can find reconciliations of those figures to the matching GAAP figures in the appendix of the earnings presentation we have put on our website. We intend to go over the presentation slides we posted while we're on the call, to go along with what we have to say. To see the presentation and our earnings release, please go to huntingtoningalls.com and select the Investor Relations link. With that, I'll turn it over to our President and CEO, Mike Petters. Mike.
Mike Petters
executiveThanks, Dwayne. Good morning, everybody, and thank you for being with us on today's call. Earlier this morning, we put out our third quarter 2021 financial results, which marked yet another quarter of steady execution across our shipbuilding programs. I'd like to walk through some highlights from the quarter, beginning on Slide 3 of the presentation. We recorded sales of $2.3 billion, which represents a 1% increase over the third quarter of 2020, while diluted EPS came in at $3.65, which is down from $5.45 in the third quarter of 2020. During the quarter, we secured new contract awards totaling about $600 million. That gave us a backlog of roughly $50 billion when the quarter closed, and about $24 billion of that amount is funded. Now for what's happening in Washington: the federal government kicked off the new fiscal year running on a continuing resolution, which funds government operations through December 3. We continue to push Congress to act quickly, and we remain hopeful that the defense appropriations and authorization processes will be completed in the coming months. As legislation moves through both chambers of Congress, we still see bipartisan support for our programs, as shown in the defense appropriations and authorization bills in the House and the Senate. We're happy to see that all 4 defense oversight committees have shown robust backing for shipbuilding, and that includes adding another Arleigh Burke-class destroyer — something the navy has made a leading priority for fiscal year 2022. There's also wording in the appropriations bill that backs a DDG 51 follow-on multi-year procurement contract in FY23. So, before I wrap up, I want to give you a brief update on COVID-19. We're still cooperating with our customers to meet the mandate that federal contractors get their employees vaccinated against COVID-19 no later than December the 8 2021. Our people, their loved ones, and the communities they live in remain our top priority at HII — we're determined to safeguard their well-being. As a key player in the country's essential infrastructure, we're also focused on keeping things running smoothly for our customers and for the important national security needs of the United States. Roughly 44,000 workers make up our team, and we view them as indispensable allies in this work; we're continuing to assist those who haven't gotten their shots in fulfilling this obligation in the safest, most effective way we can. How the vaccine requirement and the Delta variant impact our staff, along with the availability of materials through our supply chain, will remain under review, and we anticipate providing further updates when we hold our fourth quarter earnings call in February. To wrap up, I want to give you a quick summary of how HII has reshaped its portfolio across the last 20 months. Basically, everything we promised back at our February 2020 Investor Day is now complete. To start, we've placed the Technical Solutions business into growing markets that meet our customers' ever-changing needs. On top of that, we've demonstrated that we have the financial capacity to pursue these critical growth opportunities, and we've done so while preserving our investment-grade credit ratings and continuing to return capital to shareholders. Once the aligned deal was finalized during the quarter, our team has been working hard to integrate it smoothly, which will let us achieve the financial results we expect. We’re also making certain our main shipbuilding efforts are hitting crucial manufacturing targets, which should create robust free cash flow. That will allow us to reduce debt on the balance sheet as we keep providing returns to stockholders through dividends and buybacks. We strongly hold the view that these actions are the right ones to create meaningful, durable, long-term worth for our stockholders, our clients, and our staff. At this point I’ll hand the call to Chris for a few comments about operations. Chris.
Chris Kastner
executiveAppreciate it, Mike, and good morning to all of you. It's a pleasure to share that we've delivered yet another strong quarter from an operational standpoint. Let me now walk through several notable items. Starting with Ingalls, I'd like to give a quick status report on the three contract awards still pending: LHA 9, LPD 32, and 33. Our position remains that acquiring these critically important ships as a bundle represents the most cost-effective approach to procurement, and we're glad the Navy and Congress safeguarded the ship schedules through a long lead material contract on LHA 9, along with ongoing backing for LPD 32 and 33. Turning to where the program stands, LHA 8 Bonneville (ph) is still delivering cost and schedule results that match what we anticipated. Structural erection and the early outfitting stages of construction are moving forward steadily. Over on the DDG program, the team came through acceptance trials successfully for the guided missile destroyer DDG 121, Frank E Peterson Junior, and we anticipate handing that ship over to the Navy before this year ends; beyond that, DDGs 123 and 125 stay on schedule to finish sea trials next year as planned; regarding the LPD program, the christening of LPD 28, Fort Lauderdale took place in August. That vessel is still tracking toward completing sea trials in the fourth quarter, with delivery to the Navy anticipated during the first quarter of next year. At Newport News, our CVN-79, Kennedy stands at roughly 84% complete. Attention is still centered on finishing compartments and reaching key initial propulsion plant milestones. As for the sensitization of a single-phase delivery contract modification, we've come to terms with the Navy regarding cost and schedule impacts, and we anticipate executing that contract modification late this year, or early next year. Moving to the RCOH programs, CVN-73, USS George Washington keeps hitting important propulsion plant milestones and is about 92% complete; meanwhile CVN 78, USS Gerald Ford, came back to Newport News during August to start a planned incremental availability. On the VCS program, SSN 794, Montana is still on track for delivery to the Navy later this year. And for SSN 796 New Jersey, the float up milestone has shifted to early next year so that we secure the ideal build sequence from float off through the delivery plan in 2022; last of all, concerning the submarine fleet support program, SSN 725, Helena remains on schedule for redelivery to the Navy later this year. At technical solutions, the Alion transaction wrapped up in August, and the team rolled out new business groups and executive appointments that line up directly with the strategic focus we've laid out before. We anticipate this highly capable team will carry out a successful integration of Alion and provide unmatched national security solutions to our customers while expanding the business and generating returns consistent with what we expect. Delays in contract awards within our unmanned business for critical new programs continue to be something we're watching; we expect this to get resolved before the year is out, but as a tier, those awards probably won't arrive until early to mid-2022. At this point, I'll hand things over to Tom, who has a few comments about the financials. Tom?
Tom Stiehle
executiveThanks, Chris, and good morning. I'll take a few minutes now to go over the third quarter results and give you an update on how 2021 is shaping up; if you want more granularity on the segments, the earnings release that went out this morning and is up on our website has that, and I'll start with the consolidated figures on Slide four. Revenue for the third quarter came in at 2.3 billion, up roughly 1% from the equivalent quarter a year ago. The increase came from growth at Technical Solutions, driven by the Allied acquisition, and it was mostly offset by lower revenue at Ingalls, largely because of reduced volumes on the NSC, DDG and HLA programs. Segment operating income was a $163 million for the quarter, which is $1 million higher than the third quarter of 2020, and segment operating margin came in at 7%, matching what we saw in the prior-year period. Operating income for the quarter was a $118 million, down by a $104 million versus the third quarter of 2020, and operating margin was 5%, a decline of 455 basis points. Those declines stemmed almost entirely from a less favorable operating FAS CAS adjustment than we had a year ago. The tax rate for the quarter was a negative 4.3%, versus 1.8% in the third quarter of 2020, and the drop was mostly attributable to additional research and development tax credits for tax years 2016 through 2020 that we recorded in the third quarter of 2021. Net earnings for the quarter were 147 million, compared with 222 million in the third quarter of 2020, and diluted earnings per share were $3.65, versus $5.45 a year earlier. Results for the third quarter of 2021 include roughly $15 million of non-recurring pre-tax transaction expenses tied to the acquisition of Alion. Excluding the pension impact, diluted earnings per share for the quarter were $3.58, compared with $3.73 per share in the third quarter of 2020. On Slide 5, cash from operations was 350 million for the quarter, and net capital expenditures were 73 million, or 3.1% of revenues, which left us with free cash flow of 277 million. Compare that with cash from operations of 222 million and 62 million of net capital expenditures, or free cash flow of a 160 million, a year ago. Cash contributions to our pension and other post-retirement benefit plans were 10 million in the quarter, mainly for post-retirement benefits. In the third quarter, we paid dividends of $1.14 per share, or 46 million. Our Board of Directors recently approved raising the quarterly dividend by 3.5%, to $1.18 per share, effective in the fourth quarter of this year. We also bought back approximately 83,000 shares in the quarter, at an aggregate cost of approximately $17 million. Turning to Slide 6, Ingalls revenues for the quarter were $628 million, a decrease of $47 million, or 7%, from the same period last year, driven primarily by lower revenues on the NSC, DDG, and LHA programs. In the quarter, Ingalls posted operating income of $62 million with a 9.9% margin, versus $62 million of operating income and a 9.2% margin during 2020's third quarter. The better operating margin came from an incentive tied to the DDG program plus greater risk retirement on the LPD program, partly offset by reduced risk retirement on the NSC program. Moving to Slide 7, Newport News quarterly revenues were roughly $1.4 billion, down $4 million, or under 1%, from the prior-year period, as reduced revenues from Nucleus support services were partly offset by greater revenues in submarines and aircraft carriers. Naval Nucleus support services revenues fell mainly because of smaller volumes in submarine fleet support services and facility maintenance services, partly offset by larger volumes in carrier fleet support services. Submarine revenues rose on greater volumes in block 5 boats of the Virginia class submarine program plus submarine support services and the Columbia class submarine program, partly offset by smaller volumes on block 4 boats of the Virginia class submarine program. Aircraft carrier revenues grew mostly because of greater volumes on the RCOH of USS, CVN 74, and construction of Doris Mellow CVN 81 and enterprise CVN 80, partly offset by smaller volumes on RCOH of USS George Washington, CVN-73, and construction of John F. Kennedy, CVN-79. Newport News delivered operating income of $88 million and a 6.5% margin for the quarter, against operating income of $79 million and a 5.8% margin in 2020's third quarter. That gain stemmed mainly from greater risk retirement on the RCOH of the USS George Washington, CVN-73, and block 4 boats of the VCS program, partly offset by reduced risk retirement on the Naval Nuclear support services. Now, Technical Solutions, on slide 8 of the presentation: quarterly revenues of $394 million, up 23% from the prior-year period, chiefly because of revenue tied to the mid-August Alion acquisition, partly offset by the divestiture of our oil and gas business and the contribution of the San Diego shipyard to a joint venture in this year's first quarter. The Alion acquisition closed on August 19, and third-quarter results included about $163 million of revenue attributable to Alion. Technical Solutions' operating income was $13 million with a 3.3% operating margin for the quarter, against operating income of $21 million and a 6.6% operating margin in 2020's third quarter. Those declines came mainly from including roughly $8 million of Alion-related purchase intangible amortization, plus weaker performance in Defense and federal solutions, the divestiture of our oil and gas business, and the contribution of the San Diego shipyards to the joint venture I mentioned earlier. Results for 2021's third quarter included approximately $4 million of operating income attributable to Alion. During the third quarter, Technical Solution's EBITDA came in at roughly $30.3 million, which works out to an EBITDA margin of 7.7%. If you'll turn to slide 9 in the presentation, we refreshed our guidance for 2021 and 2022 covering pension and post-retirement benefits. Looking at 2022, FAS is expected to swing to a benefit instead of an expense, largely driven by stronger asset returns. As a result, the FAS CAS adjustment is higher than what we previously projected, and it's now anticipated to reach a total of 52 million in 2022. Keep in mind that figures tied to pensions depend on year-end performance and measurement criteria. We'll give you a multiyear pension estimate update during our fourth quarter earnings call in February. And last, on Slide 10, we've included a view of what's ahead for the rest of the year across both shipbuilding and technical solutions, with Alion included. On the shipbuilding side, our 2021 revenue expectation is now roughly $8.2 billion, which sits at the low end but still inside our original guidance range. Shipbuilding's third quarter revenue took a modest hit from material timing, and that could carry into the near term. On top of that, we're still working through a tough labor market and the possible effects of the COVID-19 vaccine mandate. With all of that in mind, we believe it's wise to stay cautious about near-term expectations; we still anticipate ship building operating margin landing in the 7.5 to 8% range for the full year. For the fourth quarter, we expect shipbuilding operating margin to be about in line with what we saw in the third quarter, since we managed to recognize several key retirement events during that period, among them the completion of sea trials for DDG 121. When it comes to Technical Solutions, as I mentioned, the Alion acquisition closed in mid-August, and our revised 2021 expectations now factor in Alion starting from the acquisition date, including incremental purchase intangible amortization, which affects our segment operating margin expectation. Switching to free cash flow, our current expectation is. 2021 free cash flow will land somewhere between three $300 million and $350 million, because the repayment of the accelerated progress payments, originally anticipated in 2021, has been pushed out to 2022. Also, on Slide 10, we've laid out an updated outlook covering several other discrete items to help with your modeling. As for our longer-term targets, our view remains that the 3% CAGR for shipbuilding revenue is the right one. Beyond that, we're still comfortable with our free cash flow target of $3.2 billion from 2020 through 2024. We intend to share a more detailed picture of 2022 on our fourth quarter call in February. At this point, I'll hand the call back to Dwayne for Q&A.
Dwayne Blake
executiveAppreciate that, Tom. Just a quick note for everybody joining us: kindly keep it to 1 question up front plus a single follow-up, which lets us work through as many folks in the queue as we can. Operator, over to you to run the Q&A.
Myles Walton
analystThanks. Good morning.
Mike Petters
executiveGood morning, Myles.
Myles Walton
analystI was hoping we could begin by discussing the shipbuilding revenue outlook, and perhaps focus less on the revenue outlook itself and more on what you're observing regarding the labor force and the shift toward the lower end of this range. Is that a reflection of anticipating things you haven't yet seen concerning the covered mandate and the effect it might have on attendance and workforce, or is it based more on what you observed during the third quarter? If you follow what I'm getting at.
Tom Stiehle
executiveHey, good morning, Myles, this is Tom. I'll take that one first; so, from an outlook standpoint, we did move to the bottom end of the range. If you recall, our initial guidance for the year was a range of 2 to 8. Now, based on how the quarter has played out so far and what's still in front of us, let me shift to what we expect for shipbuilding revenue — the $8.2 billion figure. A couple of things worth noting right now: we're running a little short on material, especially over at Ingalls. On the Newport News side, net revenues came in flat. There's obviously some hindsight involved when it comes to PTC, but on the shipbuilding front, material ran behind by roughly $40 million across the quarter, and looking toward Q4, that situation could persist. At this point, we aren't seeing any major labor pressures that would hit our top line. We're watching closely what's happening with the executive order and the mandate, since that situation keeps shifting, and we're also monitoring our supply chain to track how materials are moving. Right now it's really just a matter of timing as we look at the outlook, and like I said, it remains within the range we shared with you back at the start of the year.
Myles Walton
analystAll right. What share of your employees have gotten the shot so far, and if things shift around, do your contracts account for that, since this is a fresh mandate imposed on you?
Mike Petters
executiveSure. Myles, Mike here. At this moment, I'd put it at about 75%. Over the past 30 days, we've witnessed a huge surge in people receiving the vaccine. I believe what's breaking right now is that the executive orders appear to be pushed to January, and the discussion is about getting your shot by January, rather than finishing the whole quarantine process; so we'll need to figure out how that unfolds. We're collaborating very closely with our customers regarding how to put the executive order into practice. What I mean is, the executive order — from a policy perspective, we have been squarely in line with what came from the white house; yet, as you suggested, the executive order carries no contractual force. So we're working with our customers across all of our contracts to determine the best way to carry out that executive order, and we're doing this everywhere. Thus, we keep pressing forward. Our goal is to vaccinate as many of our employees as we can, since we're dedicated to a safe workplace and we believe that's the finest approach.
Myles Walton
analystOK. Thanks a lot.
Doug Harned
analystHello there. I appreciate it.
Mike Petters
executiveGood morning.
Tom Stiehle
executive.
Doug Harned
analystAt this moment, you're making the shift on Virginia-class from Block-4 over to Block-5. Could you say something about what Block-5 looks like regarding how much content you have for it, and how would you characterize whatever risks exist in that shift compared with the one you went through in moving to Block 4?
Mike Petters
executiveAll right, I'll begin, and then Chris can take over. When Block 4 began, negotiating that agreement required a fair amount of time, and because of that, some material was procured late — material that sort of contributed to a rough beginning for that program, along with the production ramp-up; so we had many things in motion, many parts in motion at the start of Block 4. Yet none of those partners are in motion as Block 5 is being built. And so, for us the shift amounts to going essentially without interruption from Block 4 to Block 5 — quite enthusiastic about that, and quite hopeful regarding where it will lead.
Chris Kastner
executiveYeah, that sounds correct. And if you consider VCS along with block 4 returning to a rhythm in which we launch 1 vote annually and hand over 1 vote annually, then moving that team straight into block 5 is very logical. So we hold strong expectations for block 5's results, given what block 4 is teaching us once you reach a cadence of 2 each year.
Doug Harned
analystOn top of that, when it comes to submarines, you mentioned during this call that services revenue had dipped somewhat. Could you say something about the stage each of those 3 Los Angeles class vessels is at right now, and what your outlook is for services and revenues at Newport News as we move through the coming couple of years?
Chris Kastner
executiveAbsolutely. This is Chris, Doug — Helena is going to be delivered by us this year. Columbus is currently working its way through the cycle under their contract, and Boise is essentially at the start of its prompts period. We're heading toward a situation — and in our discussions with the customer, I believe it makes a lot of sense — where you'd have something like a steady stream of both work and revenue. Looking ahead, it probably won't reach the level it has been at, and we need to build that plan together with our customer. That's where things stand with the 3 currently at Newport News. And like I mentioned, we're engaging with a customer so that we can make sure there's a consistent cadence of repair work going forward.
Doug Harned
analystOkay. Very good. Thank you.
Chris Kastner
executiveSure.
Seth Seifman
analystThank you so much. And a good morning to all of you.
Mike Petters
executiveMorning to you.
Seth Seifman
analystI'd like to kick things off. Earlier, I believe you said something about aiming to wrap up the single pay delivery agreement with the Navy for the carrier around the end of this year or during the first quarter. Could you once more let us know whether any effect on margin or cash is something we ought to factor in after it's completed?
Chris Kastner
executiveThat's right, Chris here. We're going to definitize it, whether that happens this year or at the start of the following year. We don't expect any meaningful hit to margin or cash. Clearly, it lifts the top-line for that shift, yet it also pushes the risk retirement events out roughly a couple of years, since the test program gets extended. So at this point, there's nothing material when it comes to sales margin or cash impact.
Seth Seifman
analystAll right. Then it sounds like this is largely a matter of timing, but I did want to ask about the higher cash flow guidance for this year. Should we view that as lifting your roughly 5-year outlook, or does it mostly relate to when those progress payments return to the government?
Tom Stiehle
executiveGood morning; this is Tom. Yes, that's right. The progress payments account for the bulk of the shift we currently have. Clearly, another quarter with rich retirement, and we have actual — through Q3 and we have a line of sight for the end of the year, but mostly the change there was because the progress payments did not get pushed into the 2022-time frame. Also keep in mind that at year-end, we have to return half of the payroll bike attacks that we did not pay in 2020. So that is included in the numbers. So, it is timing and within the 32, it still holds.
Seth Seifman
analystAll right, thank you so much.
Ron Epstein
analystYes. Hello, everyone.
Tom Stiehle
executiveHello.
Ron Epstein
analystI was hoping you might provide a bit more detail, perhaps building on what Miles asked, regarding the situation in your supply chain, where you're encountering certain material shortages — and is that simply caused by transportation delays, or what's actually happening?
Tom Stiehle
executiveAbsolutely. This is Tom, and I'll handle that question. We've discussed this during the past few calls, and we're monitoring it closely and on a routine basis, checking in with the supply chain teams in Cabot, at each yard, and some at Speed to confirm precisely where things stand at present. As we've mentioned previously, given how our long-term agreements work, with long-term material purchases placed before construction begins on those agreements — and clearly, with the backlog from this spin-off contracting, you can see the work that will be carried out in the yards. A large portion of those needs has already been ordered, and we're handling them vigorously regarding upcoming material flows and whether they arrive by the end-of-year required dates. Most of the material is arriving on schedule and satisfying the contractual requirements we have within the yard. I'd say that lately, over the past 3 to 6 months, when we have spot orders, we're noticing somewhat of volatility in pricing, and the validity periods are contracting somewhat on items we purchase on the spot market. However, when it comes to executing the contracts we already hold, we aren't seeing a major effect right now. Naturally, we're monitoring how the EO mandate affects the supply chain. And the products we make here rely on second and third tier suppliers who depend on raw materials. So copper cabling, items like that. Yet once more, as things stand today, the supply chain we require — because of the way we've contracted work ahead of time — is allowing us to keep to schedule right now.
Ron Epstein
analystOkay, understood. All right, I appreciate that. Now turning to the Technical Services segment — if we widen the lens a bit and consider where things stand when we look ahead 2, 3, 4 years, what kind of margin do you expect there? I'd assume it will be significantly improved compared to the current level. And I'm just wondering, if you could offer — I realize you aren't providing forward guidance, and most companies avoid that. So I'm not requesting it, but perhaps you could give us a rough structure for how to think about margins in that segment over the longer term.
Tom Stiehle
executiveYes. Given the way we assembled that division through acquisitions, purchase intangibles, and similar items. As you may have observed, we have been guiding and pushing toward an EBITDA relationship relative to performance and our outlook. You saw from our announcement around the July period and then with July, closing in August, what we said about how that would create an uplift there. Roughly speaking, we stood at 4% to 5%; from an EBITDA standpoint we targeted being within the 8% to 10% range by 2024. The original guidance we provided during the July period regarding Alion backed that up. As things stand now following the August close and that close to the quarter with Alion incorporated into our financials. They are sitting at the low end of the range at present, which is encouraging since that represents over 50% of that portfolio. I believe moving forward, as those purchase intangibles are amortized over the next 3, 4, 5 years ahead, clearly that will bring improvement. I would say PI is already factored in, though even for this quarter TSD is 2.6% with $8 million of purchase intangibles, and when you compare that to the 5.3% last quarter, the EBITDA currently sits at 7%. So that covers the near-term picture and how I expect it to develop in later years.
Ron Epstein
analystAll right, excellent. Thanks.
George Shapiro
analystYeah, you said the Shipbuilding margin for Q4 would look like Q3 since certain things shifted into Q3. Could you simply enumerate those items that went into Q3? Also, I believed you noted a few could have slipped into Q1 — that is, the following year. Regarding incentives, what should we anticipate in Q2 — I mean Q4 — compared with our earlier assumption?
Tom Stiehle
executiveHi, George. This is Tom. Good morning. Sure. I'll handle that. There are just a few pieces in motion. Our guidance for Q2 heading into Q3 was that it would be licensed and somewhat larger than that. We've moved a pair of incentives at Newport News related to the RCOH fund from 73 to the left, and also — was it before? — Ingalls taking DDG 121 to trials was a risk retirement evaluation on a bad — so only a few elements shifting there from Q3 into Q4. Even so, we remain on track within that 7.5% to 8% range we provided for shipbuilding at year-end. I never said anything was moving into the next year. During my remarks, we do have LPD 28 either moving or remaining on contracting at the start of 2022.
George Shapiro
analystAlright. Now for a different question, and this is likely directed at Mike. I saw that over at Newport News — the union has a contract covering 50% of employees through November at this point — so could you share your perspective on where things stand? I think it's getting more attention because of what happened with contracts later in the year.
Chris Kastner
executiveSure. George Oliver. George, let me take this one first. It's Chris here. We're currently engaged with the Newport News union, negotiating that agreement, and our relationship with them is quite positive. I'm confident we'll reach a fair deal on the contract. Mike spent time leading Newport News, so he likely has — actually for quite a while — probably has more insight on this. But we're in talks with them daily, aiming to reach a settlement.
George Shapiro
analystAll right, thank you.
Mike Petters
executiveWe take a lot of pride in the fact that the relationships we have with our labor partners are very constructive, and my expectation is that this situation will turn out no differently.
George Shapiro
analystOkay. Thanks very much.
Mike Petters
executiveGeorge.
Richard Safran
analystThanks. Good morning, everybody.
Mike Petters
executiveGood morning.
Richard Safran
analystSo, regarding the Navy's new destroyer crews or class, the vessel isn't expected to show up until quite late in this decade. If I'm mistaken, please set me straight, but my understanding is that amounts to something of a slip to the right on the schedule. Could you talk through what a competition timeline might look like, and picking up on what you said at the top, I'm curious how you see the Navy's strategy with this new ship now affecting the plan to purchase the new flight of DDG 51, given that the new ship won't be here. That's roughly a decade away at this point. To me, that really strengthens the case for a new flight of DDG, though that's just my take — I wanted to hear your thoughts.
Mike Petters
executiveThis is Mike. Broadly speaking, I'd say you're not too far off. The general principles, I think, are that nailing down the development, the path, and the schedule for a brand-new program like this, this early on, is genuinely difficult. They're working through how the design gets funded, how the project gets funded, when they'll actually have it, and where the requirement will land. That's a fairly dynamic situation, so pinning it down with precision is somewhat of a challenge. Our overall view is that you really don't want to halt a line's production before you're set to shift to a mature design product going forward. So as that product matures, there will be interaction. With the construction work underway — so, DDGs today, the flight 3 ships will — my — we will certainly push for and hold the belief that the wisest, most prudent path forward is to keep building flight threes until that designer matures. We're ready to enter production on it; and if that turns out to be 20 something else, then it's 20 something else, and we'll be ready. As for the competition for that, it'll — that will simply fall into place as the program matures, and we'll gain more visibility into what the competition — when it might happen, what shape it would take, and so forth. I do think it would be an error, though, for any kind of curtailment to occur in the destroyer program. In anticipation of some maturation path; we sort of traveled down that road in a couple of programs over the course of my career, we've done it with submarines; we did it, in fact, with DDGs and we attempted a transition over to the 1,000s and then transitioned back. So, we had a gap and then a short program. Our industry is full of people who've watched gaps in production turn into enormous problems for restarting production. So, let's keep the production line moving. And when the production line, when the design churns off to transition, we will transition it.
Richard Safran
analystAll right, I appreciate that. And, stepping back for a moment, I was hoping you might spend a little time on the efficiency programs — previously we had items such as digital transformation — but I was thinking you could address the work being done to bring costs down, and as part of that answer, perhaps you could get into how big a role that plays in improving margins. Is there any target out there, ultimately, for reaching margins of 9%?
Chris Kastner
executiveChris here — I'm not going to get into what that adds to the margin rate. As for when we anticipate reaching 9%, we'll have far more to say about it during the year-end call. That said, the capital investments we've made in technology investments we've made at both Ingalls and Newport News are progressing quite well. Put most simply, at Ingalls, having all that work under cover truly boosts efficiency — if you've ever spent time in Mississippi in August — and the digital shipbuilding products are maturing further and providing support on the manufacturing side as well as for CVN 80 and the Columbia class. So the technology investments and the capital investments we've made give us a lot of encouragement, and our hope is to keep driving costs out of our products.
Richard Safran
analystAll right, thanks.
Pete Skibitski
analystMorning, everyone.
Dwayne Blake
executivePlease continue.
Pete Skibitski
analystTo build on what Seth asked regarding the Kennedy. Chris, I believe you mentioned that securing the contract defeminization could push the risk registers slightly to the right. I just want to confirm my understanding is correct. My assumption has been that the Kennedy retirement opportunities, those chances for retirement, would occur in 2022 and 2023. Does that still hold, or have they moved right to 24 or 25? I just want to establish a baseline.
Chris Kastner
executiveNo, no. 23 and 24 make a lot of sense. At the moment, we're truly at volume with the 79, working through compartments and work packages, and beginning localized testing. But it's the 23, 24-time frame.
Pete Skibitski
analystThanks for that, and Mike, here's one I'd like to direct your way. I typically enjoy asking whether there's any remaining optimism regarding NFC 12 — from what I can tell, every committee has submitted its report, and I couldn't tell if any of them held back on wording or money related to it.
Mike Petters
executiveYeah, I believe your interpretation is correct. That product line is excellent, and we feel great about our accomplishments there. However, at this moment, when it comes to competing for resources, it simply isn't performing well. So I suppose that's all we can say about it.
Pete Skibitski
analystYeah. Those never quite hit the mark, and I realize, that's unfortunate. All right, appreciate it, everyone.
David Strauss
analystThank you. Morning. I'd like to inquire regarding Alion. I believe whenever the deal was announced, you mentioned $1.6 billion in annualized revenue. Depending on what you do during the quarter and how you apply it across the year, it appears either it's tracking significantly under that, or you anticipate substantial growth in '22. Could you address that?
Tom Stiehle
executiveCertainly. Yeah. Morning. So, regarding the court, I believe in my comments, you'll notice a $163 million Q3 from the line perspective. You sort of extend that for one more quarter as Q4, that's the run rate. Slightly above $300 million there. So together it's roughly $450 million. Annualized, that's around $1.4 and change. Then you arrive at the 1/6 growth rate of somewhat more than 11.5%, 12%, so that's the arithmetic as it stands now; we continue to uphold the guidance that we; and revenue and the 135 adjusted EBITDA.
Chris Kastner
executiveDavid, Chris here. I'd say as well that bringing together the front end of that operation has worked out quite nicely when it comes to business development and capture. There's a $60 billion total pipeline we are moving through, and we're ranking a set of major competitions ahead over the next period, along with a book-to-bill of 1.8 for the quarter. So every signal points in a favorable direction for that business.
David Strauss
analystAll right, thanks for that. For my follow-up, Tom, I'd like to dig into the longer-term free cash flow picture. Clearly, you're holding to the 3.2. I believe you'd mentioned before that across '22, '23, and '24, free cash flow during that stretch would be pretty — pretty even year to year. Does that still hold, or will it build up over that span? Thanks.
Tom Stiehle
executiveYeah. So like you mentioned, Q2 remains solid. 757 is now behind us. I've provided the outlook for this year, so it comes to roughly 1 to 1, and that carries into what we saw over the prior three years. So a strict pick map would land around $700 million. As I noted, next year we do have the fica payments to repay, which is $66 million. There are progress payments that must be returned, that's $100 — roughly $160, so you can run some numbers on that, but a ramp does exist. So with those 2 payments plus a modest ramp, I mean, you can simply model those 3 years out, yet we remain comfortable and it's suitable to guide to $3.2 billion across these 5 years.
David Strauss
analystOkay, that's great. Thanks a lot.
Noah Poponak
analystHello, everybody.
Mike Petters
executiveHello.
Noah Poponak
analystTom, once you take into account the things that aren't part of normal operations, such as supply chain, along with their material and labor costs, and then add in what growth is likely to look like in the shakeout, ought we to be considering next year? Is that shipbuilding growth rate going to be weighted pretty heavily toward the back half rather than the first half? And then, to follow up on what was said about Alion, are you noticing — we've observed those headwinds in hardware and beyond hardware. Are you encountering similar difficulties outside of Alion, or is it less pronounced there?
Tom Stiehle
executiveSure. Starting with shipbuilding, I mentioned this briefly before, but I left out the backlog component of the guidance. What sets us apart is that we don't depend on securing new contracts or additional funding — the work already in our pipeline is visible to us. So when I assess shipbuilding's outlook, that 3% CAGR still looks solid. Even though things appear to be tracking at the same level as they were during this year's first three quarters relative to last year, I'd point out that last year was an extraordinary one — 6% growth from '18 to '19, followed by another 6% from '19 to '20. Looking at the fourth quarter of last year, growth reached 19% compared with the prior quarter. So there is some material impact, as I pointed out — once Chris shifted into the closing part of Q4 of 2020, that made that year appear large, which in turn makes 2021 appear flat. So at this moment I'm not worried, since we have the backlog, we have the work, and we have the labor force right now. We are monitoring materials, as I mentioned, and we're also watching whether the EO mandate has any effect on our workforce, but I don't — from a revenue standpoint, I'm not concerned about how 2021 was shaking out. And going forward, I would think that ship building is pretty linear in 2022. On your question about lying, I honestly don't see it that way — their contracts differ and lean more toward services. Having them join us is something we're enthusiastic about. Andy has brought his leadership group into action, and as Chris noted before, between the initial reviews we did ahead of the acquisition and now that the deal has closed, we've had a solid six weeks of run rate in the financials, plus a look under the hood. What lies ahead for them leaves us at ease. Between the opportunities they're pursuing and how they're carrying out the current contracts, we're assessing revenue synergies — how Alion makes us stronger, and the same for DFS and MDIF in the other direction. So going forward, I have confidence in that. At this point, I still don't expect the EL requirement to have much of an effect on what we're projecting for revenue on the Alion side. We've pointed this out before. It's something to keep an eye on as the funding takes shape and the unmanned portfolio keeps developing and expanding down the road.
Noah Poponak
analystAlright. Thanks.
Mike Petters
executiveAnd thanks to all of you for being here on today's call. I appreciate it. Before I wrap up, I wanted to let you know that Dwayne Blake has told me he wants to retire.
Dwayne Blake
executiveTurn that down, Mike.
Mike Petters
executiveYes. I've rejected it multiple times already; however, Dwayne and his family have been members of our family here for 37 years. His personal backing for everyone of us at Huntington, it — across his whole career, but particularly in his most recent role here was simply remarkable. So, if you ring in today to pester Dwayne regarding the filing or the call, just keep in mind, he's now a short timer and therefore he could hold some sway on that call. Having said that, we wish Dwayne and his family well, and we wish them the very best as they proceed into the next chapter of their lives; and with that, we value your interest in HII and we welcome your ongoing engagement and your feedback. Thank you so much.
Operator
operatorThat wraps up our call. We appreciate everyone joining us for today's presentation. You're welcome to leave the line at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Huntington Ingalls Industries, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Huntington Ingalls Industries, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Huntington Ingalls Industries, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.