Hydro One Limited (H) Earnings Call Transcript & Summary

May 5, 2022

Toronto Stock Exchange CA Utilities Electric Utilities earnings 50 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and thank you for joining the first quarter 2022 analyst teleconference for Hydro One Limited. Right now, everyone is in a listen-only mode. Following the speaker's presentation, we'll hold a question and answer session. If you'd like to ask a question during that session, just press star one on your phone. Please be aware that this call is being recorded. I'd now like to hand things over to your host for today's conference, Mr. Omar Javed, Vice President, Investor Relations at Hydro One. Please go ahead.

Omar Javed

executive
#2

Morning, everyone, and thanks for being with us on Hydro One's first quarter earnings call. With us today are our President and CEO, Mark Poweska, and our Chief Financial Officer, Chris Lopez. During this call, we'll review the results for the first quarter and then use most of the time to answer as many of your questions as time allows. There are also a number of slides that show some of the points we'll discuss shortly. Those should be on the webcast now, or if you're on the phone, you can find them on Hydro One's website in the investor relations section under Events and Presentations. Today's discussions will probably include estimates and other forward-looking information. Please review the cautionary language in today's earnings release and our MD&A, which we filed this morning, about the various factors, assumptions and risks that could cause our actual results to differ, as all of them apply to this call. With that, I'll hand the call over to our President and CEO, Mark Poweska.

Mark Poweska

executive
#3

Good morning, and thanks for being with us on our first quarter earnings call. As this morning's release shows, our teams keep working in a highly disciplined way to serve customers and the communities where we operate. I'll spend a moment on a few notable achievements from the quarter, then hand things over to Chris, who will walk through the financial results in more detail. First, I'm extremely pleased with what our teams have delivered. Because of their hard work, we've been able to supply electricity to our customers at the times and locations where it's required. That commitment to strong customer service, together with a record of top-quartile reliability in transmission, has earned recognition. Most recently, we were thrilled to learn that our transmission license has been amended so we can develop four transmission lines serving the rising electricity demand in southwestern Ontario. That comes on top of an earlier transmission designation, in 2020, for the Chatham to Lakeshore line. Together, these five transmission lines will serve the requirements of new and expanding industries, help draw future jobs into the region, and ultimately support economic growth across Ontario. We take pride in the fact that delivering low-carbon electricity to the region will help build a more sustainable future for everyone.

Mark Poweska

executive
#4

Beyond the good developments regarding the transmission lines in Southwest Ontario, the Independent Electricity System Operator — the IESO — has just introduced an engagement plan concerning the scheduling of the Waasigan transmission line. To recap, the Waasigan transmission line, which used to be called the Northwest Bulk Transmission Line, will carry power from Thunder Bay to Atikokan — that's phase I — and afterward from Atikokan to Dryden, which is phase II. Economic growth across the Northwest region, the mining sector included, will be supported by this line. Back in October of 2018, the IESO asked Hydro One to begin development work on the project. During a webinar last week, the IESO stated that phase one of the line would need to come into service as near to the end of 2025 as feasible. This update, which will benefit the communities and businesses of the North, pleases us greatly. Our teams will immediately begin providing feedback to the IESO engagement process and designing plans aimed at achieving the desired in-service date. With First Nations communities, the Waasigan line also lets us take progressive steps toward meaningful reconciliation — something I believe we are obliged to do as members of corporate Canada.

Mark Poweska

executive
#5

I'm really happy to share that Hydro One and First Nations communities reached a landmark agreement yesterday for the Waasigan transmission line. Under this industry-leading deal, First Nations communities have the option to take a 50% equity stake in the Waasigan line. We're dedicated to partnership opportunities and see this as the path forward for major capital projects. Across Ontario, we operate on the traditional territory of more than 100 First Nations. Building long-term relationships with these communities is something we're committed to, and Waasigan shows that in action. Last year, we said publicly that we would offer significant economic participation opportunities to Indigenous communities on major capital projects. We also made a commitment to raise our Indigenous procurement spend to 5% of all materials and services by 2026, and to make sure 20% of our corporate donations and sponsorships go to supporting Indigenous communities. This proactive approach to economic participation reflects our obligation to advance economic reconciliation by offering investment opportunities on large greenfield projects. It gives First Nations communities long-term, meaningful opportunities, which in turn supports our business strategy. Hydro One is committed to every community we serve. For the second year, we announced grants from the Energizing Life Community Fund for Indigenous communities, charitable organizations, and municipalities.

Mark Poweska

executive
#6

These grants were awarded to 24 recipients, and they back initiatives that encourage physical, psychological, and emotional safety throughout Ontario. Those receiving the funds deliver vital local services, including service dog training for youth with autism, interactive technology that fosters social engagement for seniors, and environmental educational programming for Black and racialized families. Here at Hydro One, we believe we have a duty to show up and stand behind local organizations that work tirelessly to energize life in their communities. With more than one-third of Canadians knowing a child or person who is suffering from mental health problems because of the pandemic, we partnered with Jack.org to give adults and educators mental health strategies for supporting young people. We take pride in working alongside Jack.org to break down barriers so that young people get the mental health support they need. Beyond removing barriers, we are also actively connecting people. In late March, the Ontario government, Hydro One, and Acronym Solutions started a pilot project that will deliver high-speed internet access to homes and businesses in the municipality of Brighton. Through this pilot project, we will use our existing infrastructure to fast-track the development of a high-speed internet network in this community.

Mark Poweska

executive
#7

Over the last 2 years, it has become very clear just how vital internet access is for economic output and for people's capacity to reach jobs, schooling, healthcare, and other essential services. That is one more example of how we are adopting creative approaches to bring energy to life for the people we serve. Beyond this pilot, a regulation under the Ontario Energy Board, OEB Act, was passed on April 21 to cement the key part that every distribution company plays in backing the government's pledge to connect roughly 700,000 homes and businesses across Ontario. Hydro One is glad for the opportunity to help make improved access and connectivity possible for our customers. Turning to further regulatory developments, taking a customer-focused approach, we submitted an evidence update to the OEB on the Joint Rate Application, JRAP, on March 31. We revised the JRAP cost so it mirrors market conditions and updated the load forecast so it mirrors the IESO's latest annual planning outlook. This filing maintains our capacity to fulfill what we have promised customers without affecting the proposed transmission and distribution rates across the 2023 to 2027 period. We hold firm to honoring our commitments to our customers. We also acknowledge that our customers and all Ontarians are dealing with greater pressures stemming from an unusual mix of economic circumstances.

Mark Poweska

executive
#8

So we're putting forward a distinct deferral mechanism. It makes sure that, through this challenging stretch, customers aren't weighed down by higher costs tied to investments whose benefits extend to today's generation and those to come. Under this proposal, the added revenue needs stemming from the evidence update would go into deferral accounts, with recovery starting in 2028. Consequently, the transmission and distribution rates proposed for the 2023 to 2027 rate period would stay unchanged as a result of the proposed revisions in this evidence update. After the evidence update, the OEB released a procedural order setting out the illustrative hearing schedule. Under that schedule, we'll move into a round of interrogatories, then technical and settlement conferences. Oral hearing commencement is now anticipated for September 2022, and a decision is expected during the first quarter of 2023. Turning to our unregulated segment, we keep making solid progress with our Ivy Charging Network. During the first quarter, Ivy launched 32 level 2 charging stations — now called Park and Charge — working alongside a range of municipalities. Park and Charge gives municipalities and businesses a way to deliver charging to their communities for EV drivers who aren't in a hurry, supported by Ivy's dependable EV network and customer service.

Mark Poweska

executive
#9

Ivy additionally gave its Level 3 network a new name — Ivy Charge & Go — aimed at motorists eager to get back on the road fast. After reaching an agreement with ONroute and its partners, the Canadian Tire Corporation and the Ministry of Transportation, Ivy launched fast chargers across 10 ONroute sites. When complete, the Charge & Go network from Ivy is set to rank among Ontario's biggest and best connected, spanning roughly 60 locations and more than 150 Level 3 chargers. Before handing things to Chris, I want to pause and express gratitude to Jessica McDonald, who will not seek re-election to the board of directors this year. Since 2018, Hydro One has gained much from Jessica's leadership, experience, and forward-looking thinking. On behalf of the Board of Directors, the Governance and Regulatory Committee ran a search to fill the seat left open by Jessica's departure and is putting forward Mark Podlasly for election to the board of directors at the shareholders' annual meeting on June 8, 2022. Following the AGM, you'll hear more about Mark and how deep the skill set is that he'll contribute to the board. With that said, I'll hand things to Chris for a discussion of our financial results this quarter. Over to you, Chris.

Chris Lopez

executive
#10

Thanks, Mark. Morning, everyone, and I appreciate you being with us today. Turning to how we did financially in Q1, EPS came in at CAD 0.52 versus CAD 0.45 in 2021. What drove the shift in earnings this quarter was mainly the yearly reset of OEB-approved rates for the transmission and distribution segments, plus greater peak demand and energy use caused by favorable weather and the economy reopening — partly offset by increased OM&A from a larger allowance for doubtful accounts and by greater depreciation, amortization, and asset removal costs. Revenue net of purchase power for the first quarter rose 12.6% from a year earlier. That came from recovery of deferred tax asset, or DTA, amounts and from DTA amount sharing ending going forward, after the OEB's DTA implementation decision in April of 2021. As a reminder, the effects of the DTA implementation decision are cash flow positive yet net income neutral, because of a corresponding offset in taxes. Also, transmission and distribution segment revenues mirrored the yearly adjustment of OEB-approved rates for 2022. Chillier weather and the reopening economy pushed peak demand higher in every month of the quarter relative to the same period a year ago.

Chris Lopez

executive
#11

During the quarter, average monthly peak demand rose 3.7%, and energy distributed to Hydro One customers climbed 9.1% as well. Turning to costs, operations, maintenance, and administration expenses came in about 2.1% higher year-over-year. That OM&A increase stemmed mainly from a larger allowance for doubtful accounts, or bad debt expense, driven by aging receivables in the distribution segment. As a reminder, in the first quarter of last year we had accelerated certain work programs such as vegetation management, station maintenance, information technology, and customer program spend. OM&A on those work programs stayed largely consistent with last year's levels. That said, we are starting to feel the effects of the current economic environment, particularly as it relates to materials and services in both segments. Impacts such as essential commodities, including copper, aluminum, and steel, have undergone price increases and supply shortages. Continuous demand and limited supply have led to price increases for freight-based shipping. Rising fuel costs have affected most categories of materials and services purchases, including Hydro One's vehicle fleet fuel costs, which are expected to rise 30%-35% in 2022. Because of these market changes, Hydro One is seeing price escalation for many materials and services that will manifest themselves in the upcoming quarters.

Chris Lopez

executive
#12

Depreciation expense rose 6.3% compared with a year earlier, driven by growth in capital assets, and that aligns with the capital investment program we have laid out. Turning to financing, our financing charges showed no year-over-year movement. That said, financing charges fell by CAD 6 million versus the prior quarter, reflecting the CAD 600 million repayment of long-term debt that came due in January. As a reminder, we borrowed late last year in order to fund that debt maturity. We remain pleased with how stable our balance sheet is and with our robust investment-grade credit ratings. Income tax expense came in at CAD 79 million for the quarter, versus CAD 26 million in the same quarter a year ago. The rise in income tax expense stemmed from the tax expense related to the DTA implementation decision, which, as we discussed earlier, is net income neutral. Beyond the DTA recovery amounts, we also saw higher taxes resulting from higher pre-tax earnings, partly offset by timing differences. The effective tax rate for this quarter was 20.2%, compared with an effective tax rate of 8.8% last year. That is in line with the annual guidance we gave earlier this year of 14%-22% over the next five years.

Chris Lopez

executive
#13

Just to remind everyone, the biggest effects are going to fall within the 2021 to 2023 DTA recovery period. Now turning to investing activities. During the first quarter, we put CAD 229 million of assets into service, marking a 45.9% rise over the prior year. That year-over-year growth was mainly tied to the transmission segment, where a substantial share of the East-West Tie Project went into service. On top of that, we spent more on station refurbishment and replacement work, and we also had a larger volume of assets entering service to meet North American Electric Reliability Corporation, or NERC, standards. Capital investments in the first quarter totaled CAD 449 million, down 14.8% from the first quarter of 2021. That decline was driven mostly by the transmission segment, reflecting the 2021 completion of the Ontario Grid Control Center in Orillia, a smaller volume of station refurbishments and replacements, and fewer wood pole replacements.

Mark Poweska

executive
#14

Capital spending in the distribution segment came in lower as well, and that reflects the Orillia grid control center being finished, which I mentioned earlier. On top of that, we saw fewer wood pole replacements and reduced spending on IT initiatives. Reinforcement projects and more work connecting customers partly offset those decreases. You'll also notice that the projected capital investment profiles for both segments have been revised since the previous call. That revision was made so the numbers reflect the evidence update for the Joint Rate Application, filed in March. The new transmission lines, what's happening around the Waasigan transmission project, and the broadband regulatory initiative are absent from these figures given where they currently stand in development. With that said, whatever amounts these initiatives involve will sit outside JRAP and will add to capital investments going forward. Keep in mind that capital investment figures for future years still require OEB approval. The evidence update we filed has a modest effect on the rate-based growth we project for both segments. Regarding guidance, we remain committed to and affirm our target of 4%-7% earnings per share growth through 2022. And as a reminder, we expect to offer updated guidance covering the period after 2022 once the Joint Rate Application is approved.

Mark Poweska

executive
#15

That's where I'll leave it, and we'd be glad to take your questions.

Omar Javed

executive
#16

Thanks, Mark and Chris. We’d like the operator to explain how she would prefer to arrange the Q&A polling process. If we can’t get to your questions today, my team and I are always available to answer follow-up questions. We ask that you keep your questions to one question and one follow-up. Should you have any further questions, we request that you rejoin the queue. Please go ahead.

Operator

operator
#17

Thanks. Just a quick reminder that to ask a question, you'll need to press star one on your telephone. If you want to withdraw your question, press the pound key. Please stand by while we put together the Q&A roster. Our first question is from Maurice Choy at RBC Capital Markets. Your line is open.

Maurice Choy

analyst
#18

Thank you, and good morning. My first question concerns the JRAP. I was hoping to gain a bit more clarity regarding your cost updates. To be specific, could you talk about the breakdown between what stems from inflation slash pricing updates and what portion simply reflects projects moving between different regulatory periods?

Mark Poweska

executive
#19

Morning, Maurice. Mark here. As you're aware, we put together an investment plan grounded in the engagement we had with our customers when we assembled that plan. More than 50,000 customers took part in that engagement. Our belief in the investment plan remains, and we still believe it reflects what our customers asked of us. The evidentiary update we filed is meant to reflect higher costs for delivering that program, but the program itself has remained intact for the JRAP period.

Maurice Choy

analyst
#20

Got it. To pick up on something you mentioned during your prepared remarks regarding the use of deferrals rather than raising what customers pay: generally, is this an idea you've put forward as part of the consultation, or is it something where the regulator has already given you some early indication of how they see that approach?

Mark Poweska

executive
#21

Sure. Under OEB's practice rules, whenever a material change hits our filing, we have to refresh the evidence. With the economy as it is and inflation driving costs higher, refreshing that evidence became mandatory for us. That is exactly what we did. The commitments made to our customers are ones we believe in, and we wanted to stand by them — the rates we pledged when we filed our evidence. So we put forward a regulatory mechanism designed to let us honor that pledge without loading those cost pressures onto customers right now, at a moment when they are dealing with pressures elsewhere in their lives. Those costs will be recovered by us in later periods.

Maurice Choy

analyst
#22

Thank you. If I may wrap up with some reflections on the election, now that the campaign is in full swing. What are your thoughts on the tone coming from the leaders when it comes to energy policy, and also on affordability and customer bills?

Mark Poweska

executive
#23

So yes, as you mentioned, the election formally got going yesterday. The writ has been issued. We're aware that this election is happening. We do anticipate hearing a range of viewpoints from the parties and from various individuals on that. At Hydro One, what we're concentrating on is continuing to carry out our strategy to serve our customers, to support economic growth through initiatives such as the new transmission lines I discussed in my opening remarks, and to keep taking costs out of our business. As you know, we've succeeded at that for many years, consistently delivering no less than CAD 50 million in cost improvements annually. We'll stay focused on doing that.

Maurice Choy

analyst
#24

Yes, and thanks so much.

Operator

operator
#25

Thanks. We’ll take our next question from Rob Hope at Scotiabank. Your line is open.

Robert Hope

analyst
#26

Good morning, everyone. I’d like to circle back to how the incremental JRAP cost is being treated through deferral. When you looked across all the various opportunities available to you, could you perhaps walk us through some of the puts and takes on why deferral mechanisms seemed like the best route to take? I realize it would be net income neutral, but it would create a headwind for cash flow relative to what you otherwise could have received. Given the strong balance sheet and the credit metrics you have at present, does that give you the willingness to forgo some cash flow in the near term?

Mark Poweska

executive
#27

Yes, Rob, I believe you captured that correctly. As I mentioned earlier, when we filed this, we gave our customers a commitment, and that commitment came from the feedback those customers provided. We feel a deep obligation, you know, to honor those commitments to our customers. Our balance sheet is strong, and we can support that during the JRAP period. As an organization, we thought it was the right thing to do to support our customers through these times over the JRAP period and look to collect those costs later.

Robert Hope

analyst
#28

Thanks for that. Perhaps I could zoom out a bit and speak more conceptually and over a longer horizon. For a number of years, Ontario gave us essentially no meaningful demand growth. Looking ahead, though, we're witnessing a fairly solid level of transmission construction, whether that's to supply southwestern Ontario and the load sitting there — greenhouses, battery manufacturing, or the mining activity up north. When you examine the IESO load forecast and weigh some of the pluses and minuses, would you say you lean toward upside on load growth in Ontario, and by extension, on additional transmission growth?

Mark Poweska

executive
#29

Right. And in the latest annual planning outlook from the IESO, we did observe that they're projecting load growth — which, as you mentioned, had been fairly flat across Ontario for a good stretch before it began edging up somewhat. That most recent annual planning outlook, with a horizon of 10 years and beyond, indicates some rise in load. We're genuinely witnessing that on the ground, and that's the reason we in southwest Ontario have previously discussed agriculture and the load growth needed to serve the agricultural demand. At this point we're seeing manufacturing — the announced EV and EV battery manufacturing projects. Additional segments of the economy are beginning to electrify. That's why we approached the IESO alongside our partners and made the case that they require this electricity, that they're committing to invest in Ontario, and that we must provide the power. That formed part of the driving force behind these new lines. And then, looking at the Northwest, we're seeing considerably more activity in mining, and many of those minerals in fact go toward supporting EV manufacturing or EV battery manufacturing. Earlier this month, the IESO in fact requested that we explore getting Waasigan in as near to the end of 2025 as possible.

Mark Poweska

executive
#30

That is speeding up, and it comes from investments and requirements in the Northwest, you know. We are observing that folks are realizing Ontario is somewhere to establish business, given the low carbon electricity available here. That is beginning to occur, with genuine commitments and announcements from companies. We are glad to see that.

Robert Hope

analyst
#31

Much appreciated. I’ll rejoin the queue now.

Operator

operator
#32

Dariusz Lozny from Bank of America has our next question. Your line's open. Darius-

Dariusz Lozny

analyst
#33

Hello, everyone.

Operator

operator
#34

The floor is yours. Kindly verify that your mute is switched off.

Dariusz Lozny

analyst
#35

Hello there, and good morning — I appreciate you making the time. I’d like to pick up along a similar line of inquiry, focusing in particular on those 4 transmission projects that were announced and that could potentially be incremental to JRAP. I was hoping to ask when you expect to have sufficient confidence in those projects moving forward for them to be incorporated into your formal investment plan. I also wanted to verify the financing side of that: it sounds as though external equity would not be required. If you could just confirm that, please.

Chris Lopez

executive
#36

Hi Dariusz, Chris here. Thanks for asking that. Typically our approach is, once something has been awarded — as just happened — we'll go ahead and work out those development costs and include them. The actual construction costs get added at the point we file what's known as a Section 92. That's when we feel comfortable about, you know, how the project's cost would progress under the regulatory framework. It's been allocated to Hydro One. At this stage we need to carry out the development work, and after that we need to include the construction cost. You're, you're still quite a distance away. There will be a few of those lines — five altogether. One runs from Chatham to Lakeshore. We'd anticipate, you know, a Section 92 on that one reasonably soon. We'll be in a position to include that one. My guess is you'd see them entering our forecast gradually over the coming 12 to 18 months. Development costs will begin showing up within the next six months, in my view. Dariusz, regarding your question about equity, I enjoy the challenge of additional growth. This particular announcement won't need new equity. With more announcements coming — Mark's mentioned the further growth in the Northwest and so forth — there may come a point when we examine it, but we'll communicate that very clearly to all stakeholders, if and when that moment arrives.

Chris Lopez

executive
#37

That is not something this particular announcement is going to bring about.

Dariusz Lozny

analyst
#38

All right, thanks. That's quite useful. The next question is probably more long-term and a bit more conceptual in nature. It looks like you're putting greater emphasis on certain unregulated initiatives, such as Ivy charging and the telecom component. So as we think about the guidance update you'll be providing, which comes after the JRAP process wraps up, might you consider setting some formal growth targets for that segment — perhaps for charging or for some of the other unregulated businesses in which you're engaged?

Chris Lopez

executive
#39

Dariusz, this is Chris once more. Yeah, that's a fair question. We would. I'd like to point out that Ivy is more. We've mentioned this several times—the real point is backing our customers. They're the ones who requested it. At present it isn't a high-growth business. I wouldn't want to read too much into that, but the real point is backing EVs and that entire sector here in Ontario. We discussed manufacturing, we discussed the batteries. You need a solid market here in Ontario to back that too. That's the reason for it. It might grow into a growth business, but at present it's more of a developing business. The other areas you're referring to around LDC, potentially that's still regulated, but EMS definitely will put some guidelines around that when we come out with guidance, and the next level of guidance we give will come after the Joint Rate Application decision.

Dariusz Lozny

analyst
#40

All right, thanks a lot. I'll stop there.

Operator

operator
#41

Thanks. The next person to ask something is Linda Ezergailis of TD Securities. Your line is open.

Linda Ezergailis

analyst
#42

Thanks. I was hoping you might expand a bit on how the board and management weigh added growth against the rising marginal cost of capital. More specifically, as you consider possibly buying LDCs or taking on additional growth projects, is there a chance that some of those transmission opportunities just awarded to you might end up crowding out certain LDC deals or pushing back some LDC consolidation?

Chris Lopez

executive
#43

Hi, Linda. Chris, that's a good question. I believe what you're getting at is how quickly we complete these deals. Right now we have a decent amount of balance sheet capacity, so that isn't a problem for us at the moment. And even if that problem did arise — suppose we had several transmission lines and several LDC opportunities showing up simultaneously — the economics on those are quite comparable. It turns out that, you know, in the end they effectively come in to us at 1 times rate base. On the LDC we pay a premium. We have an opportunity to earn back part of that premium over the first 5 to 10 years of ownership. For us the economics are the same. You know, that's a hard choice to make. We'd pursue all of them, and we'd seek the appropriate financing approach. I don't believe it would be incremental. What you're referring to is the next cost of that dollar of financing. As I mentioned, both are effectively regulated businesses. I don't foresee a higher cost arising from that. It grows into a bigger business, but not a — the next dollar doesn't cost us more to acquire.

Linda Ezergailis

analyst
#44

Alright, thanks. So maybe just shifting topics for a moment—as you keep moving forward with sustainability work, could you help us get a clearer picture of which programs fall under JRAP, which ones sit outside it, how that split might change as time goes on, and what drives that call?

Mark Poweska

executive
#45

When we put out our upcoming sustainability report, we will refresh our materiality assessment. The ESG efforts we have concentrated on thus far in that report are diversity, equity, and inclusion. Commitments are in place on that front, and they carry no added costs. It is built into our base business. There are also pledges to cut greenhouse gas emissions, including things such as making our fleet greener. Once again, no added cost. That forms part of our JRAP, and when vehicles reach end of life and get replaced, we will swap them for lower carbon vehicles. We will keep supporting communities, and that sits within, you know, our space business budget and is included in JRAP. I do not see our ESG metrics creating, you know, extra pressure on our costs overall. We will refresh our materiality assessment, and you will likely see that in August, when we issue our next sustainability report.

Linda Ezergailis

analyst
#46

Excellent. Thanks. I’ll rejoin the queue.

Operator

operator
#47

Thanks. We’ll take our next question from Ben Pham at BMO. Your line is open.

Ben Pham

analyst
#48

Hello, and thank you. I’m curious whether you can link any CapEx to the priority projects that were announced recently?

Chris Lopez

executive
#49

Ben, I believe you're referring to the transmission lines that came up recently, and Dariusz raised a comparable point. For those projects, you should anticipate that we'll incur some development costs across the coming couple of quarters. After that, at the point when we file a Section 92 — that's the regulatory application we submit in order to build — we would include the complete construction cost at that time. My expectation is that we'll do so for one of those lines in the near term, while the remaining four are relatively new, so that will follow over the next, you know, 12 to 18 months.

Mark Poweska

executive
#50

Regarding Waasigan, this has been underway for a number of years now, so an application seeking Section 92 leave to construct will be submitted before too long. The cost associated with that project will become visible to you as well.

Chris Lopez

executive
#51

Sure.

Ben Pham

analyst
#52

All right.

Chris Lopez

executive
#53

You've got two distinct announcements in that group. The first covers the southwest, five lines in total. The other one has been in the works for some time, and four of those lines are pretty recent. Then there's the Waasigan item — the IESO has stated they'd like it in service by 2025. We don't have the directive on it as of yet, but we're aware it's on the way now. Once it arrives, we'd include the construction cost.

Ben Pham

analyst
#54

Right, thanks for that. Those projects you mentioned — part of it is to support the greenhouse, and others are for the battery manufacturing facility. So my question is: is it really difficult to predict EV penetration rates and electrification? For instance, do you expect to construct transmission in a manner that amounts to overbuilding in order to enable electrification? That, of course, means you must keep consumer costs in mind — or will it be more of a piecemeal approach, where a battery facility or battery plant shows up, you build for it, and then you wait for the next one?

Mark Poweska

executive
#55

We collaborate with the IESO to examine the load forecast and identify where that expected growth might occur. For the projects we're currently building, as I mentioned earlier, we actually have very strong visibility into the load that will genuinely materialize for those. Take, for instance, the first line we announced back in 2019 for the Southwest — it's already oversubscribed. I wouldn't characterize this as a build-it-and-they-will-come strategy. We truly have load and customers waiting to be connected. We'll keep doing that. In the end, the IESO decides whether these proceed, but we partner with our customers to make sure their commitment to connect to the grid is in place, and then we make the case to the IESO regarding the need.

Chris Lopez

executive
#56

Ben, let me just tack something onto that. You may be thinking of cases such as Waasigan, which have gone in fits and starts. We've been at that one for the past few years, and that's exactly why we can now get it into service very quickly. Same story in the Southwest. Mark just pointed to that first line we've been working on for a number of years. Even though they announced five, one is, you know, pretty much ready to construct. What we're really talking about is this: we've got. Across the whole industry, there's growing certainty around, you know, environmental targets, EVs, policies coming from the federal government and the provincial government. That certainty is what's letting these big infrastructure investments move ahead. We hear that a lot, but the environment is right today. The economic environment, the environmental targets are all being supported federally and provincially. That's what's letting these things move forward rather quickly. They've been on the boards for a number of years, but it's that certainty more recently that's helped that progress.

Ben Pham

analyst
#57

Alright, that’s great — thank you. Perhaps I can ask about something else. You said your balance sheet is in solid condition, but it also sounds as though, with the larger CapEx deferral accounts out there, there could be somewhat more strain on that balance sheet in other years. You might have to consider equity. I believe that is what I heard. When you first examine Holdco debt, maybe before you look at that, what are your views regarding DRIP programs?

Chris Lopez

executive
#58

Yeah. Ben, let me just make my earlier point a bit clearer. Like I said, given what was announced today — the Waasigan line up in the North, the five lines in the South — no equity is required across that Joint Rate Application period. That runs until 2027. Should more lines show up during that window, we'd then assess what that would mean. I wouldn't reject any growth. We'd guarantee power reaches all of our customers where and when they need it. We would absolutely do that. That's the role we play as a supplier. With 99% of transmission in Ontario, we wouldn't walk away from that. At that stage, I'd consider, you know, how do you fund the next dollar? You've put forward one suggestion, and I agree with it — we would look at holdco debt, definitely at that point. We would, you know, simply make sure the business remains on the right footing, 60% debt, 40% equity at the regulated level, and then we'd examine, you know, the Holdco to see what makes sense when it comes to bringing in that additional funding.

Ben Pham

analyst
#59

All right, that's excellent. I appreciate it.

Operator

operator
#60

Thanks. Just a quick reminder that if you'd like to ask a question right now, you can press star followed by one. We now go to Mark Jarvi at CIBC Capital Markets. Your line is open.

Mark Jarvi

analyst
#61

Thanks. Morning, everyone. Just regarding the transmission lines — you know, obviously you saw, or you're seeing, some timelines on Waasigan that have moved up. Could that same thing happen with the Southwest lines? And is it right to think about roughly three to five years until in service once the Section 92 filing is done?

Mark Poweska

executive
#62

Yeah, Mark — Mark here. Well, I obviously can't make any commitments on that front. Whether we move ahead with those is really the IESO's call and their timing. It hinges on how long and how big the line is, and on the construction duration. The upfront development work, plus the environmental assessments, permitting, and all of that, does take two to three years on a major transmission line. That's exactly the work we're doing right now on several of the projects we announced in the Southwest. That really positions us, once we're notified of when the in-service date needs to be, to hit those timelines. You know, I'd say your timeline of 2 to 3 years to construct on average is accurate. The upfront work on these — as you know, with long and linear infrastructure — involves a lot of consultation, environmental permitting, and checks and balances that also take upfront work or time, and that's what we're already working on for a bunch of these.

Mark Jarvi

analyst
#63

Understood. Would you all expect to hold full ownership, or would First Nation partners be involved? What do you envision for your eventual ownership stake in these transmission lines?

Mark Poweska

executive
#64

You might have caught it yesterday — we announced an equity partnership with First Nations in the Northwest on the Waasigan line, where we hold 50% equity. On that line, we're equal partners. We really see that as the model ahead for linear infrastructure in Ontario, through partnerships of that kind. And on new greenfield large transmission lines, we do see them being done via partnerships. I'd also remind you that the OEB has laid out a distinct regulatory process for those kinds of projects, where we're undertaking them through partnerships with First Nations. That isn't part of our JRAP application. Those will move through separate regulatory processes.

Mark Jarvi

analyst
#65

Alright, turning back to the deferral in the refiled Joint Rate Application — has any feedback come in from stakeholders yet? My understanding is that a precedent exists for this. Is the thinking there that the OEB is at ease with such a construct? Perhaps you could give us some early thoughts on whatever feedback you've received.

Mark Poweska

executive
#66

That's one of the tools that exists. Other jurisdictions do employ it. As far as I know at Hydro One, we haven't made use of it here. You know, we have put it forward. In the end, whether they wish to let us use an account of that kind is going to be up to the OEB to determine. Again, you know, we think doing this is right for our customers, but the OEB will make the final call.

Mark Jarvi

analyst
#67

All right, thank you, Mark.

Operator

operator
#68

Thanks. We now take our final question from Andrew Kuske at Credit Suisse. Your line is open.

Andrew Kuske

analyst
#69

Thanks. Good morning. I suppose this is a question, and it probably begins with Chris before perhaps moving over to Mark as well. The subject is really just OM&A. I'm aware that commentary in the MD&A mentioned something along the lines of reduced spending on lines maintenance. Is that mainly a matter of timing, or is it something structural, given the performance gains you've observed throughout the portfolio over the past few years?

Chris Lopez

executive
#70

Hi, Andrew. As far as this quarter goes, I'd say productivity is there, though I don't believe it would be significant when it comes to a lower quarter-over-quarter figure. That analysis is really comparing this quarter against the same quarter a year ago. We also said that the overall work program hasn't shifted dramatically when it comes to the volume of work being done. I wouldn't describe that as an ongoing part. We've certainly gotten more productive, but we also have an aging system that we need to prepare. I wouldn't put it that way.

Andrew Kuske

analyst
#71

Appreciate that. So perhaps you could walk us through your thinking on inflation pressures once more — how you've approached them philosophically over time, and then how you plan to handle them looking ahead.

Chris Lopez

executive
#72

That's a fair question, Andrew. Historically, with our productivity initiative, the goal has been to offset CAD 50 million annually. It just so happened that fifty million worked out to roughly 2%. That's approximately the long-term inflation rate we've observed since the 1990s. That approach was functioning quite well. In the new environment we find ourselves in today, or over the last two years, inflation has come in above that level. We're still carrying out our productivity program, and we continue to target CAD 50 million per year, so roughly 2%-2.5% of our spend. Since inflation is above that, we aren't able to fully offset it at this point in time. That was the primary reason we brought forward the evidentiary update to our Joint Rate Application. It will also add a bit of extra pressure this year. We're now in the third year of COVID. You've seen the disruption in Europe. We've seen, you know, commodities rise. We've seen freight go up. We've had really solid strategies around locking in cost over a longer period of time, and that has worked well. The longer this continues and you renegotiate contracts, that begins to flow through our cost structure as somewhat protected in JRAP because we go through and do that work with them.

Chris Lopez

executive
#73

We’ll have to handle that this year and counterbalance it as effectively as we can. Our first quarter has been solid, and we’ve made that clear. I said again that earnings guidance is going to land at the top end of our range. That should tell you something: yes, we are facing some cost pressure during the current year, but Q1 has produced some strong results that let us reach the top end of that range.

Andrew Kuske

analyst
#74

Thanks for that background. So perhaps just one last question, which connects to the wider, larger strategy and that CAD 50 million in essentially productivity savings meant to offset inflation. As you deploy some of that capital and swap old infrastructure for completely new, does that productivity saving in effect broaden and strengthen itself?

Mark Poweska

executive
#75

Yeah, Andrew, this is Mark. Honestly, bringing in new equipment does impact our OM&A somewhat, though not to the extent you'd expect. Just because equipment is new doesn't automatically mean maintenance goes down or maintenance costs go down. You don't get a one-to-one trade-off there. What we do observe is that as capital spending rises, we're placing far more assets in the ground that will require upkeep over a longer stretch. That partly cancels out some of the sort of savings you might capture by swapping old assets for new ones, if that's what you're getting at.

Chris Lopez

executive
#76

I'd like to build on that point, Andrew: our program has grown larger. As you know, across the coming 5 years, we're getting the system ready for what lies ahead. The bigger the investment plan, the bigger the chance to realize productivity savings, since you're genuinely putting more capital to work. That's where we get it from. On the offsets, as Mark mentioned, it isn't a one-to-one relationship, but the larger the program and the more transmission lines we're building, the more purchasing power we have. In the end, we actually deliver a better result overall for every consumer.

Andrew Kuske

analyst
#77

All right, that’s excellent. Thanks.

Operator

operator
#78

Thank you. That brings our question-and-answer portion to a close for today. I'd now like to hand the call back to Omar Javed for any closing comments.

Omar Javed

executive
#79

We appreciate you being with us today. Should any additional questions come up, don't hesitate to get in touch. Thanks for being owners and for spending your time with us. Thank you.

Operator

operator
#80

Ladies and gentlemen, thank you for joining today's conference. That brings today's program to a close, and you're all free to disconnect. Have a great day, everyone.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Hydro One Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Hydro One Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Hydro One Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.